KR101178597B1 - Floating drum for transporting submarine cable and submarine cable landing method using the same - Google Patents

Floating drum for transporting submarine cable and submarine cable landing method using the same Download PDF

Info

Publication number
KR101178597B1
KR101178597B1 KR1020110069345A KR20110069345A KR101178597B1 KR 101178597 B1 KR101178597 B1 KR 101178597B1 KR 1020110069345 A KR1020110069345 A KR 1020110069345A KR 20110069345 A KR20110069345 A KR 20110069345A KR 101178597 B1 KR101178597 B1 KR 101178597B1
Authority
KR
South Korea
Prior art keywords
cable
line
drum
frame
towing
Prior art date
Application number
KR1020110069345A
Other languages
Korean (ko)
Inventor
안승환
Original Assignee
(주)한국해양기술
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)한국해양기술 filed Critical (주)한국해양기술
Priority to KR1020110069345A priority Critical patent/KR101178597B1/en
Application granted granted Critical
Publication of KR101178597B1 publication Critical patent/KR101178597B1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G9/00Installations of electric cables or lines in or on the ground or water
    • H02G9/12Installations of electric cables or lines in or on the ground or water supported on or from floats, e.g. in water
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/12Laying or reclaiming pipes on or under water
    • F16L1/20Accessories therefor, e.g. floats, weights
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01BCABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
    • H01B7/00Insulated conductors or cables characterised by their form
    • H01B7/12Floating cables
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/06Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
    • H02G1/10Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle in or under water

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

PURPOSE: A floating drum for transporting a submarine cable and a submarine cable landing method using the same are provided to minimize the friction between the drum and the cable by using a roller installed around the circumference of a frame. CONSTITUTION: A frame(110) is composed of a pair of horizontal members and a vertical member connecting the horizontal members. The horizontal member is the shape of a ring. A roller(120) is formed between the horizontal members using a rotary shaft. The roller is the shape of a cylinder. A float(130) is installed on the upper part of the frame.

Description

케이블 운반용 부유식 드럼 및 이를 이용한 케이블 양륙공법{FLOATING DRUM FOR TRANSPORTING SUBMARINE CABLE AND SUBMARINE CABLE LANDING METHOD USING THE SAME}Floating drum for cable transport and cable discharging method using same {FLOATING DRUM FOR TRANSPORTING SUBMARINE CABLE AND SUBMARINE CABLE LANDING METHOD USING THE SAME}

본 발명은 케이블 운반용 부유식 드럼 및 이를 이용한 케이블 양육공법에 관한 것으로, 더욱 자세하게는 폭이 좁은 지역에서도 케이블을 쉽게 양륙할 수 있고, 케이블의 양륙시간을 단축하여 해류, 조류 및 바람 등에 의한 케이블의 유동을 최소화할 수 있으며, 케이블과의 마찰을 최소화하여 케이블이 손상되는 것을 방지할 수 있는 케이블 운반용 부유식 드럼 및 이를 이용한 케이블 양륙공법에 관한 것이다.The present invention relates to a floating drum for transporting cables and a cable rearing method using the same. More particularly, the cable can be easily landed in a narrow area, and the cable landing time is shortened to reduce the cable landing time. The present invention relates to a floating drum for transporting cables and a cable discharging method using the same, which can minimize the flow and minimize the friction with the cable to prevent the cable from being damaged.

해저케이블(submarine cable)은 대륙과 대륙, 육지와 섬 등과 같이 바다를 사이에 두고 격리된 두 지점 사이의 통신을 위해 해저에 부설되는 케이블이다. 이러한 해저케이블은 해저에 포설되기 때문에 해류, 조류, 파도 및 해저면과의 마찰 등에 의해 손상될 수 있으며, 특히 어업활동이 활발한 지역에서는 선박의 닻이나 어구 등에 의해 손상될 수 있다. 따라서 외상으로부터의 보호와 장력에 견딜 수 있도록 외피에 특수 처리를 한 외장케이블을 해저케이블로 사용한다.Submarine cables are cables laid on the sea floor for communication between two isolated points across the ocean, such as continents and continents, land and islands. Since these submarine cables are installed on the sea floor, they may be damaged by currents, tidal currents, waves, and friction with sea floors, and may be damaged by anchors or fishing vessels of vessels, especially in areas where fishing activities are active. Therefore, the outer cable with special treatment on the outer shell is used as the submarine cable to withstand the protection and tension from the trauma.

해저케이블의 포설작업을 살펴보면, 바다를 사이에 두고 격리된 육지와 섬에 포설 시작점과 포설 완료점을 선정하고, 선정된 두 지점을 연결하는 포설라인을 따라 케이블이 적재된 포설선을 이동시키며 케이블을 포설한다. 그 후, 케이블의 단부를 육상으로 이동시켜 육상케이블과 접속하여 완료한다. 이때, 케이블의 단부를 육상으로 이동시켜 육상케이블과 접속하는 작업을 양륙작업이라 한다.Looking at the installation of the submarine cable, the starting point and completion point for laying on isolated lands and islands across the sea are selected, and the cable-loading laying line is moved along the laying line connecting the two selected points. Install it. Thereafter, the end of the cable is moved to the land, connected with the land cable, and completed. At this time, the operation of moving the end of the cable to the land and connecting with the land cable is referred to as the unloading operation.

상술한 양륙작업은 크게 포설 시작점의 양륙작업과 포설 완료점의 양륙작업으로 구분된다. 포설 시작점의 양륙작업은 포설선의 드럼에 감긴 케이블의 일단을 해안에서 유도된 견인선 또는 로프에 연결한 후, 포설선의 드럼에 감긴 케이블이 풀리도록 견인선 또는 로프를 포설 시작점으로 당겨 육상케이블과 접속한다. 이러한 포설 시작점의 양륙작업은 견인선 또는 로프를 이용하여 케이블을 양륙하므로 양륙시 해류, 조류, 파도에 의해 케이블이 휘지 않도록 고려하여 견인하면 된다.The above-mentioned discharging work is largely divided into the discharging work of the installation start point and the discharging work of the installation completion point. The landing operation of the installation start point is to connect one end of the cable wound on the drum of the installation ship to the tow line or rope guided from the coast, and then pull the tow or rope to the installation start point so that the cable wound on the drum of the installation ship can be connected to the land cable. do. The discharging work at the starting point of the installation takes out the cable by using a towing ship or a rope, so the cable may be towed by taking into consideration that the cable is not bent by currents, tides, and waves during discharging.

반면, 포설 완료점의 양륙작업은 상술한 방법으로 케이블의 양륙이 불가능하다. 이는 포설 완료점으로 견인되어야 할 해저케이블의 타단이 드럼의 가장 안쪽에 위치되기 때문이다. 즉, 드럼의 가장 안쪽에 감긴 케이블의 타단을 풀기 위해서는 포설선이 포설 완료점에 접근해야 하는데, 일반적으로 케이블을 운반하는 포설선은 톤수가 큰 대형 선박이므로 수심이 낮은 해안에 접근할 수 없기 때문이다. 따라서 포설 완료점의 양륙작업은 해류 및 조류의 영향을 최소화할 수 있는 지점에 포설선을 정박시킨 상태에서 여러 척의 작업선을 이용하여 케이블을 푼 후 그 끝(케이블의 타단)을 포설 완료점으로 견인하여 육상케이블과 접속한다. 이때, 작업선에 의해 풀려진 케이블은 케이블의 타단을 양륙하는 과정에서 엉키거나 꼬이지 않도록 일정한 직경을 갖는 원형으로 배치하는데, 이러한 양륙공법을 오메가(Ω) 공법이라 한다.On the other hand, the discharging operation of the installation completion point is impossible to dismount the cable by the above-described method. This is because the other end of the submarine cable to be towed to the completion point of installation is located on the innermost side of the drum. In other words, in order to release the other end of the cable wound on the innermost side of the drum, the laying ship needs to approach the completion point of the installation. In general, the laying ship carrying the cable is a large tonnage ship and thus cannot access the low-depth coast. to be. Therefore, the unloading operation of the installation completion point is to unload the cable using several working ships while anchoring the installation ship at the point where the influence of current and current can be minimized. Tow and connect with land cable. At this time, the cable released by the working line is arranged in a circular shape having a certain diameter so as not to be tangled or twisted during the discharging of the other end of the cable, this landing method is called an omega (Ω) method.

그런데 폭이 좁은 포구의 안쪽에 위치된 포설 완료점이 위치된 경우 오메가 공법의 적용이 용이하지 못하다. 오메가 공법을 적용하기 위해서는 상술한 바와 같이 케이블을 풀어 원형으로 배치해야 하는데, 포구의 폭이 좁을 경우 케이블을 원형으로 배치하는 과정에서 간섭이 발생할 수 있고, 작업선 동선 공간이 협소하여 작업이 원활하기 못하기 때문이다.However, when the installation completion point located inside the narrow muzzle is not easy to apply the Omega method. In order to apply the OMEGA method, as described above, the cable should be unrolled and arranged in a circular shape. If the width of the muzzle is narrow, interference may occur in the process of arranging the cable in a circular shape. Because you can't.

대한민국특허공개공보 제1984-0008724호(1984.12.17)Republic of Korea Patent Publication No. 1984-0008724 (1984.12.17)

본 발명은 전술한 종래 기술의 문제점을 해결하기 위한 것으로서 폭이 좁은 지역에서도 케이블을 쉽게 양륙할 수 있고, 케이블의 양륙시간을 단축하여 해류, 조류 및 바람 등에 의한 케이블의 유동을 최소화할 수 있으며, 케이블과의 마찰을 최소화하여 케이블이 손상되는 것을 방지할 수 있는 케이블 운반용 부유식 드럼 및 이를 이용한 케이블 양륙공법을 제공하는데 그 목적이 있다.The present invention is to solve the above-mentioned problems of the prior art can easily land cable in a narrow area, it is possible to minimize the flow of the cable by the current, current and wind by shortening the cable unloading time, An object of the present invention is to provide a floating drum for transporting cables and a cable discharging method using the same, which can minimize the friction with the cable and prevent the cable from being damaged.

상기 목적을 달성하기 위한 본 발명에 의한 케이블 운반용 부유식 드럼은, 상하로 이격된 고리형상의 수평부재와 상기 수평부재를 연결하는 수직부재로 이루어진 프레임과, 한 쌍의 상기 수평부재 사이에 회전 가능하게 결합되고 상기 프레임의 둘레를 따라 설치된 롤러와, 상기 프레임의 상부에 설치된 부구를 포함한다. 또한, 상기 프레임의 하부에 설치되고 일단이 상기 프레임의 외부로 돌출된 견인부재를 포함하여 구성될 수 있으며, 상기 프레임의 하부에 설치되고 일단이 상기 프레임의 외부로 돌출되며 상기 견인부재와 수평방향으로 직각을 이루는 한 쌍의 평형유지부재를 더 포함하여 구성될 수 있다.Floating drum for carrying a cable according to the present invention for achieving the above object is a frame consisting of a vertical member for connecting the horizontal member and the horizontal member of the annular spaced up and down, and rotatable between a pair of the horizontal member And a roller installed along the circumference of the frame and a buckle provided on the upper portion of the frame. In addition, it may be configured to include a towing member installed in the lower portion of the frame and one end protruding to the outside of the frame, is installed in the lower portion of the frame and one end protrudes out of the frame and horizontal to the towing member It may be configured to further comprise a pair of equilibrium holding members forming a right angle to.

한편, 본 발명에 의한 케이블 양륙공법은, 포설 완료점 인근 해상과 상기 포설 완료점에서 이격된 해상에 제1바지선과 제2바지선을 정박하는 단계와, 상기 제1바지선에서 연장된 제1견인선의 단부에 제1드럼을 연결하는 단계와, 케이블을 적재한 포설선이 위치된 해상까지 상기 제1드럼을 이동시키는 단계와, 상기 포설선에 적재된 상기 케이블을 풀어 상기 제1드럼의 둘레에 감는 단계와, 상기 제1견인선을 당겨 상기 제1드럼을 상기 포설 완료점 측으로 이동시키는 단계와, 상기 제2바지선에서 연장된 제2견인선을 이용하여 상기 케이블의 선형을 유지하는 단계와, 제2드럼이 설치된 보조 작업선을 상기 포설선 주변으로 이동시키는 단계와, 상기 포설선에 적재된 상기 케이블의 단부를 주 작업선에 연결하는 단계와, 상기 주 작업선에 연결된 상기 케이블을 상기 제2드럼에 감는 단계와, 상기 케이블이 지그재그로 배치되도록 상기 주 작업선을 상기 포설 완료점 측으로 이동시키는 단계와, 상기 주 작업선에 연결된 상기 케이블의 단부를 상기 포설 완료점에서 연장된 제3견인선에 연결하는 단계와, 상기 포설 완료점에서 제3견인선을 당김과 동시에 상기 보조 작업선이 상기 포설 완료점 측으로 이동하며 지그재그로 배치된 상기 케이블을 선형으로 만드는 단계와, 선형으로 배치된 상기 케이블을 해저에 가라앉히는 단계를 포함한다.On the other hand, the cable discharging method according to the present invention, anchoring the first barge and the second barge on the sea near the installation completion point and the spaced apart from the installation completion point, and the first towing line extending from the first barge Connecting the first drum to an end, moving the first drum to the sea where the laying vessel carrying the cable is located, unwinding the cable loaded on the laying vessel and winding it around the first drum And pulling the first towing line to move the first drum toward the installation completion point, and maintaining the linearity of the cable using a second towing line extending from the second bar line. Moving the auxiliary work line provided with two drums around the laying line, connecting an end of the cable loaded on the laying line to a main working line, and connecting the cable to the main working line Winding the second drum, moving the main work line toward the installation completion point such that the cable is arranged in a zigzag; and extending an end of the cable connected to the main work line from the installation completion point. Connecting the three towing lines, pulling the third towing line at the installation completion point, and simultaneously making the cable arranged in zigzag while the auxiliary work line moves to the installation completion point side, and linearly arranging And sinking the cable into the seabed.

상술한 바와 같이 구성된 본 발명에 따르면, 케이블 운반용 부유식 드럼을 사용할 경우 포설선에 풀린 케이블을 지그재그로 배치할 수 있으므로 폭이 좁은 지역에서도 케이블을 쉽게 양륙할 수 있다. 또한, 케이블의 양륙시 소요되는 작업시간을 단축할 수 있어 해류, 조류 및 바람 등에 의한 케이블의 유동을 최소화할 수 있다. 특히, 프레임의 둘레에 회전 가능하게 설치된 롤러를 통해 케이블과의 마찰을 최소화하여 케이블이 손상되는 것을 방지할 수 있다.According to the present invention configured as described above, in the case of using a floating drum for transporting cables, the cable loosened in the laying ship can be arranged in a zigzag, so that the cable can be easily landed even in a narrow area. In addition, it is possible to shorten the working time required during the dismounting of the cable can minimize the flow of the cable due to currents, tides and wind. In particular, it is possible to minimize the friction with the cable through the roller rotatably installed around the frame to prevent the cable from being damaged.

도 1은 본 발명의 일 실시예에 따른 케이블 운반용 부유식 드럼의 사시도.
도 2와 도 3은 본 발명의 일 실시예에 따른 케이블 운반용 부유식 드럼의 분해사시도.
도 4 내지 도 11은 본 발명의 일 실시예에 따른 케이블 운반용 부유식 드럼을 이용한 케이블 양륙과정을 도시하는 도면.
1 is a perspective view of a floating drum for cable transport according to an embodiment of the present invention.
2 and 3 is an exploded perspective view of a floating drum for cable transport according to an embodiment of the present invention.
4 to 11 is a view showing a cable discharging process using a floating drum for cable transport according to an embodiment of the present invention.

첨부된 도면을 참조하여 본 발명에 따른 실시예를 상세히 설명한다. 이하, 본 발명에 따른 실시예를 설명함에 있어, 그리고 각 도면의 구성요소들에 참조부호를 부가함에 있어, 동일한 구성요소들에 대해서는 비록 다른 도면상에 표시되더라도 가능한 한 동일한 부호를 부가하였다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Referring to the accompanying drawings, embodiments of the present invention will be described in detail. In the following description of embodiments according to the present invention, and in adding reference numerals to the components of each drawing, the same reference numerals are added to the same components as much as possible even though they are shown in different drawings.

도 1은 본 발명의 일 실시예에 따른 케이블 운반용 부유식 드럼의 사시도이고, 도 2와 도 3은 본 발명의 일 실시예에 따른 케이블 운반용 부유식 드럼의 분해사시도이다.1 is a perspective view of a floating drum for cable transport according to an embodiment of the present invention, Figures 2 and 3 is an exploded perspective view of the floating drum for cable transport according to an embodiment of the present invention.

도 1 내지 도 3에 도시된 바와 같이, 본 실시예에 따른 케이블 운반용 부유식 드럼(100, 이하 드럼이라 함)은, 프레임(110)과, 프레임(110)의 둘레에 설치된 롤러(120)와, 프레임(110)의 상부에 설치된 부구(130)를 포함하여 구성된다.As shown in Figures 1 to 3, the floating drum (100, hereinafter referred to as a drum) for cable transport according to the present embodiment, the frame 110, and the roller 120 provided around the frame 110 and It is configured to include a buckle 130 installed on the upper portion of the frame (110).

프레임(110)은, 상하로 이격된 한 쌍의 수평부재(112)와, 한 쌍의 수평부재(112) 사이에 위치된 한 쌍의 보강부재(114)와, 수평부재(112) 및 보강부재(114)를 연결하는 수직부재(116)로 구성된다.The frame 110 includes a pair of horizontal members 112 spaced up and down, a pair of reinforcing members 114 positioned between the pair of horizontal members 112, a horizontal member 112, and a reinforcing member. It consists of a vertical member 116 connecting 114.

수평부재(112)와 보강부재(114)는 소정의 길이를 가진 사각봉(단면이 사각인 봉)의 양 끝을 맞붙인 원형의 고리형상이다. 보강부재(114)는 한 쌍의 수평부재(112) 사이에 롤러(120)가 설치될 수 있도록 수평부재(112)의 직경보다 작은 직경의 고리형상으로 형성된다. 수직부재(116)는 한 쌍의 수평부재(112)와 한 쌍의 보강부재(114)를 수직방향으로 연결하여 일체화할 수 있도록 ‘ㄷ’자로 굽은 형상으로 형성되며, 수평부재(112)와 보강부재(114)의 둘레를 따라 방사상으로 배치된다. 이때, 본 실시예에서는 보강부재(114)를 한 쌍으로 예시하고, 수직부재(116)를 8개로 예시하고 있으나, 이에 한정되는 것은 아니며 필요에 따라 그 수를 증감할 수 있다.The horizontal member 112 and the reinforcing member 114 is a circular annular shape that adheres both ends of a square bar (bars having a rectangular cross section) having a predetermined length. The reinforcing member 114 is formed in a ring shape having a diameter smaller than the diameter of the horizontal member 112 so that the roller 120 can be installed between the pair of horizontal members 112. The vertical member 116 is formed in a curved shape of the letter 'c' so that the pair of horizontal members 112 and the pair of reinforcing members 114 can be connected in a vertical direction to be integrated with each other. Disposed radially along the perimeter of the member 114. In this embodiment, the reinforcing member 114 is illustrated as a pair and the vertical member 116 is illustrated as eight, but the present invention is not limited thereto, and the number may be increased or decreased as necessary.

상술한 바와 같이 구성된 프레임(110)은 케이블(도 6의 200)을 양륙하는 과정에서 케이블(200)이 엉키거나 꼬이지 않도록 최소곡률반경을 유지해야 하는데, 이를 위한 프레임(110)의 반경은 3m이상인 것이 바람직하다. 또한, 부이(도 6의 210)가 설치된 케이블(200)이 프레임(110)에 감긴 상태에서 파도 등과 같은 외부 영향에 의한 이탈을 방지하기 위해서는 그 높이가 1.5m 이상인 것이 바람직하다.Frame 110 configured as described above should maintain the minimum radius of curvature so that the cable 200 is not tangled or twisted during the landing of the cable (200 of FIG. 6), the radius of the frame 110 for this is more than 3m It is preferable. In addition, the height of the cable 200 in which the buoy (210 of FIG. 6) is installed on the frame 110 is preferably 1.5 m or more in order to prevent separation due to external influences such as waves.

한편, 프레임(110)의 하부에는 드럼(100)의 견인에 사용되는 견인부재(140)와, 드럼(100) 견인시 드럼(100)의 유동을 방지하기 위한 평형유지부재(150)가 설치된다. On the other hand, the lower portion of the frame 110 is provided with a traction member 140 used for the towing of the drum 100, and the equilibrium holding member 150 for preventing the flow of the drum 100 when the drum 100 is towed .

견인부재(140)는 프레임(110)의 직경보다 긴 길이를 가진 사각봉이다. 견인부재(140)는 드럼(100)을 물에 띄운 상태에서 드럼(100)이 좌우로 기울어지는 것을 방지하기 위하여 프레임(110)의 중심을 지나도록 설치된다. 또한, 견인부재(140)의 일단은 드럼(100)을 견인하는 과정에서 드럼(100)이 전후로 기울어지는 것을 방지하기 위하여 프레임(110)의 외부로 돌출되고 크랭크 형상으로 벤딩(bending)된다. 또한, 견인부재(140)의 타단은 드럼(100)을 견인하는 견인력이 드럼(100) 전체에 전달될 수 있도록 프레임(110)과 부구(130)를 감싸도록 벤딩된다. 이때, 견인부재(140)의 선단에는 윈치 등과의 연결을 위한 견인수단(142)이 마련되는데, 본 실시예에 예시된 견인수단(142)은 견인부재(140)를 관통하는 견인홀(142)이다.Traction member 140 is a square rod having a length longer than the diameter of the frame (110). The traction member 140 is installed to pass through the center of the frame 110 to prevent the drum 100 from tilting left and right in the state in which the drum 100 floats in water. In addition, one end of the towing member 140 protrudes to the outside of the frame 110 and is bent in a crank shape in order to prevent the drum 100 from tilting back and forth in the process of pulling the drum 100. In addition, the other end of the traction member 140 is bent to surround the frame 110 and the mouth 130 so that the traction force for pulling the drum 100 can be transmitted to the entire drum 100. At this time, the front end of the towing member 140 is provided with a towing means 142 for connecting to the winch, etc., the towing means 142 illustrated in the present embodiment is a tow hole 142 penetrating the towing member 140 to be.

평형유지부재(150)는 크랭크 형상으로 벤딩된 사각봉이며, 그 일단이 프레임(110)의 외부로 돌출된다. 평형유지부재(150)는 서로 대향하는 방향에 설치된 한 쌍으로 구성되고, 한 쌍의 평형유지부재(150)를 연결하는 연장선이 프레임(110)의 중심을 지나도록 설치된다. 이때, 한 쌍의 평형유지부재(150)는 견인부재(140)와 수평방향으로 직각을 이루도록 배치되는 것이 바람직한데, 이는 드럼(100)을 견인하는 과정에서 파도와의 마찰 등과 같은 외부 영향에 의해 드럼(100)이 롤링(rolling)하는 것을 최소화하기 위함이다.The balance maintaining member 150 is a rectangular bar bent in a crank shape, one end of which protrudes out of the frame 110. Equilibrium holding member 150 is composed of a pair installed in a direction opposite to each other, an extension line connecting the pair of balancing members 150 is installed so as to pass through the center of the frame (110). At this time, the pair of balancing members 150 is preferably arranged to be perpendicular to the traction member 140 in the horizontal direction, which is due to external influences such as friction with waves in the process of towing the drum 100 This is to minimize the rolling of the drum 100.

롤러(120)는 드럼(100)의 둘레에 감긴 케이블(200)과의 마찰을 최소화하기 위한 수단이다. 롤러(120)는 한 쌍의 수평부재(112) 사이의 이격거리보다 짧은 길이를 가진 원기둥 형상으로 형성되고, 그 상단과 하단에 회전축(122)이 돌출된다. 이 회전축(122)은 롤러(120)를 프레임(110)에 설치할 때 수평부재(112)의 장착홈(118)에 삽입되는 부분이다. 즉, 롤러(120)는 회전축(122)을 통해 프레임(110)에 회전 가능하게 설치된다. 이때, 롤러(120)는 프레임(110)의 둘레를 따라 방사상으로 배치되되, 견인부재(140)의 타단이 감긴 프레임(110)의 일측에는 필요에 따라 생략할 수 있다.The roller 120 is a means for minimizing friction with the cable 200 wound around the drum 100. The roller 120 is formed in a cylindrical shape having a length shorter than the separation distance between the pair of horizontal members 112, the rotary shaft 122 protrudes on the top and bottom. The rotation shaft 122 is a portion inserted into the mounting groove 118 of the horizontal member 112 when the roller 120 is installed on the frame 110. That is, the roller 120 is rotatably installed in the frame 110 through the rotation shaft 122. At this time, the roller 120 is disposed radially along the circumference of the frame 110, one side of the frame 110, the other end of the traction member 140 is wound may be omitted as necessary.

부구(130)는 프레임(110)의 상부에 설치되어 드럼(100)에 부력을 인가하는 수단이다. 그 형상을 살펴보면, 소정 높이를 가진 원판 형상으로 형성되고, 부력이 발생될 수 있도록 중공으로 형성된다. 이러한 부구(130)는 부이(210)에 의해 띄워진 케이블(200)이 프레임(110)의 중단에 감길 수 있는 드럼(100)의 흘수(드럼을 물에 띄웠을 때 물에 잠겨 있는 부분의 깊이)를 충족시킬 수 있는 부력을 발생할 수 있어야 한다. 예를 들어, 본 실시예와 같이 프레임(110)의 직경과 높이가 각각 5m와 1.5m이고 부이(210)에 의해 띄워진 케이블(200)이 드럼(100)의 저면에서 0.37~0.55m 상부에 위치되도록 요구되는 경우, 드럼(100)의 흘수는 약 1.62m이어야 하며 이를 충족하기 위한 부구(130)의 크기는 반경과 높이가 각각 3m와 0.5m이어야 한다. 물론, 상술한 부구(130)의 크기는 일례에 불과하며 프레임(110)과 부구(130)의 재질 및 작업 위치에 따라 달라질 수 있다.Buoy 130 is installed on the upper portion of the frame 110 is a means for applying a buoyancy force to the drum (100). Looking at the shape, it is formed in a disk shape having a predetermined height, it is formed in a hollow so that buoyancy can be generated. The buoy 130 is a draft of the drum 100 that can be wound by the cable 200 floated by the buoy 210 to the interruption of the frame 110 (depth of the part submerged in water when the drum floated in water) Must be able to generate buoyancy to For example, as shown in the present embodiment, the diameter and height of the frame 110 are 5 m and 1.5 m, respectively, and the cable 200 floated by the buoy 210 is 0.37 to 0.55 m above the bottom of the drum 100. If required to be located, the draft of the drum 100 should be about 1.62m and the size of the mouthpiece 130 to meet this should be 3m and 0.5m in radius and height, respectively. Of course, the size of the above-described floats 130 is only an example and may vary depending on the material and the work position of the frame 110 and the floats 130.

도 4 내지 도 11은 본 발명의 일 실시예에 따른 케이블 운반용 부유식 드럼을 이용한 케이블 양륙과정을 도시하는 도면이다. 도 4 내지 도 11을 참조하여 상술한 드럼(100)을 이용한 케이블 양륙과정을 살펴보면 다음과 같다.4 to 11 is a view showing a cable discharging process using a floating drum for cable transport according to an embodiment of the present invention. Looking at the cable discharging process using the drum 100 described above with reference to Figures 4 to 11 as follows.

우선, 바다(A)를 사이에 두고 격리된 지역에 포설 시작점(미도시)과 포설 완료점(B)을 선정하고, 포설 시작점(미도시)과 포설 완료점(B)을 연결하는 포설라인(C)을 결정한다. 그 후, 포설 완료점(B) 인근 해상과 포설 완료점(B)에서 이격된 해상의 포설라인(C) 상에 제1바지선(310)과 제2바지선(320)을 이동시켜 정박한다(도 4 참조).First, a laying start point (not shown) and a laying completion point (B) are selected in an isolated area with the sea (A) in between, and a laying line connecting the laying start point (not shown) and the laying completion point (B) ( Determine C). Thereafter, the first barge line 310 and the second barge line 320 are moved and anchored on the sea installation line C spaced from the sea near the completion point of installation B and the completion point of installation B (FIG. 4).

제1 및 제2바지선(310,320)의 정박이 완료되면, 도 5에 도시된 것처럼 포설 완료점(B) 인근 해상에 정박된 제1바지선(310)에서 연장된 제1견인선(312)의 단부에 제1드럼(100a)을 연결하고, 주 작업선(330)을 이용하여 케이블(200)을 적재한 포설선(340)이 위치된 해상까지 제1드럼(100a)을 이동시킨다.When the anchoring of the first and second barges 310 and 320 is completed, the end of the first towing line 312 extending from the first barline 310 anchored in the sea near the completion point B of installation, as shown in FIG. The first drum 100a is connected to the first drum 100a, and the first drum 100a is moved to the sea where the laying line 340 on which the cable 200 is loaded is located using the main working line 330.

포설선(340)의 근처까지 이동된 제1드럼(100a)을 중심으로 포설선(340)을 선회시키고, 포설선(340)이 선회하는 과정에서 적재된 케이블(200)을 풀어 케이블(200)이 제1드럼(100a)의 둘레에 감기도록 한다. 그 후, 제1드럼(100a)을 주 작업선(도 5의 330)에서 분리하고, 제1바지선(310)에 설치된 윈치(미도시)를 작동시켜 제1견인선(312)을 당김으로써 케이블(200)이 감긴 제1드럼(100a)을 포설 완료점(B) 측으로 이동시킨다(도 6 참조). 이때, 도 7에 도시된 것처럼 제1견인선(312)을 당겨 제1드럼(100a)을 포설 완료점(B) 측으로 이동하는 과정에서 케이블(200)이 선형을 유지할 수 있도록 제2바지선(320)에서 연장된 제2견인선(322)을 케이블(200)에 연결한다.The laying vessel 340 is pivoted around the first drum 100a moved to the vicinity of the laying vessel 340, and the cable 200 is released by releasing the loaded cable 200 during the turning of the laying vessel 340. It is wound around the first drum 100a. Thereafter, the first drum 100a is disconnected from the main work line (330 of FIG. 5), and the winch (not shown) installed in the first pants line 310 is operated to pull the first towing line 312. The first drum 100a wound around 200 is moved to the installation completion point B side (see FIG. 6). In this case, as shown in FIG. 7, the second bar line 320 may be maintained so that the cable 200 may maintain a linear shape in the process of moving the first drum 100a toward the installation completion point B by pulling the first towing line 312. Connect the second towing line 322 extending from) to the cable 200.

상술한 작업이 완료되면 제2드럼(100b)이 설치된 보조 작업선(350)을 포설선(340) 주변으로 이동시키고, 포설선(340)에 적재된 케이블(200)의 단부를 주 작업선(330)에 연결한 후, 제2드럼(100b)을 중심으로 주 작업선(330)을 선회시켜 케이블(200)을 제2드럼(100b)에 감는다. 그리고 케이블(200)이 지그재그로 배치되도록 주 작업선(330)을 포설 완료점(B) 측으로 이동시킨다(도 7 및 도 8 참조).When the above-described operation is completed, the auxiliary working line 350 provided with the second drum 100b is moved around the laying line 340, and the end of the cable 200 loaded on the laying line 340 is moved to the main working line ( After connecting to 330, the main work line 330 is pivoted around the second drum 100b to wind the cable 200 on the second drum 100b. Then, the main work line 330 is moved to the installation completion point B side so that the cable 200 is arranged in a zigzag (see FIGS. 7 and 8).

주 작업선(도 8의 330)이 포설 완료점(B)에서 연장된 제3견인선(362)의 단부까지 이동하면, 도 9와 도 10에 도시된 것처럼 주 작업선(330)에 연결된 케이블(200)의 단부를 제3견인선(362)의 단부에 연결한다. 그 다음, 포설 완료점(B)에서 제3견인선(362)을 당김과 동시에 보조 작업선(350)이 포설 완료점(B) 측으로 이동하며 지그재그로 배치된 케이블(200)을 선형으로 만든다. 이때, 케이블(200)이 분리된 주 작업선(330)은 도 10에 도시된 것처럼 이동하여 케이블(200)이 포설라인(도 4의 C) 상에 위치되도록 한다.When the main work line 330 of FIG. 8 moves to the end of the third tow line 362 extending from the installation completion point B, the cable connected to the main work line 330 as shown in FIGS. 9 and 10. The end of the 200 is connected to the end of the third towing line 362. Then, at the same time, the third towing line 362 is pulled from the installation completion point B, and the auxiliary work line 350 moves toward the installation completion point B, thereby making the cable 200 arranged in a zigzag form linear. At this time, the main work line 330 from which the cable 200 is separated moves as shown in FIG. 10 so that the cable 200 is positioned on the laying line (C of FIG. 4).

케이블(200)이 포설라인(도 4의 C) 상에 위치되면 케이블(200)을 해저에 가라앉혀 케이블(200)의 양륙작업을 완료한다. 이때, 케이블(200)에는 등간격으로 부이(210)가 설치된다. 따라서 포설라인(도 4의 C) 상에 케이블(200)을 위치시킨 후 케이블(200)에 설치된 부이(210)를 제거할 경우 케이블(200)이 해저에 가라앉게 된다.When the cable 200 is located on the laying line (C of FIG. 4), the cable 200 sinks to the sea floor to complete the discharging operation of the cable 200. At this time, the buoy 210 is installed in the cable 200 at equal intervals. Therefore, when the cable 200 is placed on the laying line (C of FIG. 4) and the buoy 210 installed in the cable 200 is removed, the cable 200 sinks to the seabed.

이상 본 발명을 바람직한 실시예를 통하여 설명하였는데, 상술한 실시예는 본 발명의 기술적 사상을 예시적으로 설명한 것에 불과하며, 본 발명의 기술적 사상을 벗어나지 않는 범위 내에서 다양한 변화가 가능함은 이 분야에서 통상의 지식을 가진 자라면 이해할 수 있을 것이다. 따라서 본 발명의 보호범위는 특정 실시예가 아니라 특허청구범위에 기재된 사항에 의해 해석되어야 하며, 그와 동등한 범위 내에 있는 모든 기술적 사상도 본 발명의 권리범위에 포함되는 것으로 해석되어야 할 것이다.While the present invention has been particularly shown and described with reference to preferred embodiments thereof, it is to be understood that the invention is not limited to the disclosed embodiments, but, on the contrary, is intended to cover various modifications and equivalent arrangements included within the spirit and scope of the appended claims. Those skilled in the art will understand. Therefore, the scope of protection of the present invention should be construed not only in the specific embodiments but also in the scope of claims, and all technical ideas within the scope of the same shall be construed as being included in the scope of the present invention.

100: 케이블 운반용 부유식 드럼 110: 프레임
112: 수평부재 114: 보강부재
116: 수직부재 118: 장착홈
120: 롤러 122: 회전축
130: 부구 140: 견인부재
142: 견인홀 150: 평형유지부재
100: floating drum for cable transport 110: frame
112: horizontal member 114: reinforcing member
116: vertical member 118: mounting groove
120: roller 122: rotation axis
130: fitting 140: towing member
142: tow hole 150: balance member

Claims (10)

상하로 이격된 고리형상의 수평부재와, 상기 수평부재를 연결하는 수직부재로 이루어진 프레임;
한 쌍의 상기 수평부재 사이에 회전 가능하게 결합되고, 상기 프레임의 둘레를 따라 설치된 롤러; 및
상기 프레임의 상부에 설치된 부구를 포함하는 케이블 운반용 부유식 드럼.
A frame consisting of an annular horizontal member spaced up and down, and a vertical member connecting the horizontal member;
A roller rotatably coupled between the pair of horizontal members and installed along a circumference of the frame; And
Floating drum for carrying a cable comprising a buckle installed on the upper portion of the frame.
청구항 1에 있어서,
상기 프레임의 하부에 설치되고, 일단이 상기 프레임의 외부로 돌출된 견인부재를 더 포함하는 케이블 운반용 부유식 드럼.
The method according to claim 1,
The floating drum for carrying a cable is installed in the lower portion of the frame, one end of which further comprises a towing member protruding out of the frame.
청구항 2에 있어서,
상기 프레임의 하부에 설치되고, 일단이 상기 프레임의 외부로 돌출되며, 상기 견인부재와 수평방향으로 직각을 이루는 한 쌍의 평형유지부재를 더 포함하는 케이블 운반용 부유식 드럼.
The method according to claim 2,
And a pair of equilibrium holding members installed at a lower portion of the frame and having one end protruding to the outside of the frame and perpendicular to the towing member in a horizontal direction.
청구항 3에 있어서,
상기 수평부재보다 작은 고리형상으로 형성되고, 한 쌍의 상기 수평부재 사이에 위치된 보강부재를 더 포함하는 케이블 운반용 부유식 드럼.
The method according to claim 3,
And a reinforcing member formed in an annular shape smaller than the horizontal member and positioned between the pair of horizontal members.
청구항 4에 있어서,
상기 수직부재는 상기 수평부재와 상기 보강부재를 연결할 수 있도록 굽은 형상인 것을 특징으로 하는 케이블 운반용 부유식 드럼.
The method of claim 4,
The vertical member is a floating drum for cable transport, characterized in that the curved shape so as to connect the horizontal member and the reinforcing member.
청구항 3 내지 청구항 5 중 어느 하나에 있어서,
상기 견인부재의 타단은 상기 프레임과 상기 부구를 감싸도록 굽은 형상인 것을 특징으로 하는 케이블 운반용 부유식 드럼.
The method according to any one of claims 3 to 5,
And the other end of the towing member is curved to surround the frame and the mouth.
청구항 6에 있어서,
상기 견인부재의 일단에 견인수단이 마련된 것을 특징으로 하는 케이블 운반용 부유식 드럼.
The method of claim 6,
A floating drum for carrying a cable, characterized in that a towing means is provided at one end of the towing member.
포설 완료점 인근 해상과 상기 포설 완료점에서 이격된 해상에 제1바지선과 제2바지선을 정박하는 단계;
상기 제1바지선에서 연장된 제1견인선의 단부에 청구항 1에 따른 제1드럼을 연결하는 단계;
케이블을 적재한 포설선이 위치된 해상까지 상기 제1드럼을 이동시키는 단계;
상기 포설선에 적재된 상기 케이블을 풀어 상기 제1드럼의 둘레에 감는 단계;
상기 제1견인선을 당겨 상기 제1드럼을 상기 포설 완료점 측으로 이동시키는 단계;
상기 제2바지선에서 연장된 제2견인선을 이용하여 상기 케이블의 선형을 유지하는 단계;
청구항 1에 따른 제2드럼이 설치된 보조 작업선을 상기 포설선 주변으로 이동시키는 단계;
상기 포설선에 적재된 상기 케이블의 단부를 주 작업선에 연결하는 단계;
상기 주 작업선에 연결된 상기 케이블을 상기 제2드럼에 감는 단계;
상기 케이블이 지그재그로 배치되도록 상기 주 작업선을 상기 포설 완료점 측으로 이동시키는 단계;
상기 주 작업선에 연결된 상기 케이블의 단부를 상기 포설 완료점에서 연장된 제3견인선에 연결하는 단계;
상기 포설 완료점에서 제3견인선을 당김과 동시에 상기 보조 작업선이 상기 포설 완료점 측으로 이동하며 지그재그로 배치된 상기 케이블을 선형으로 만드는 단계; 및
선형으로 배치된 상기 케이블을 해저에 가라앉히는 단계를 포함하는 케이블 양륙공법.
Anchoring the first barge and the second barge to the sea near the completion point of installation and the sea spaced apart from the installation completion point;
Connecting the first drum according to claim 1 to an end of the first towing line extending from the first bar line;
Moving the first drum to the sea where the laying ship carrying the cable is located;
Unwinding the cable loaded on the laying vessel and winding it around the first drum;
Pulling the first towing line to move the first drum toward the installation completion point;
Maintaining the linearity of the cable using a second towing line extending from the second bar line;
Moving the auxiliary work line provided with the second drum according to claim 1 around the installation line;
Connecting an end of the cable loaded on the laying line to a main working line;
Winding the cable connected to the main working line to the second drum;
Moving the main work line to the installation completion point such that the cable is arranged in a zigzag;
Connecting an end of the cable connected to the main working line to a third tow line extending from the installation completion point;
Pulling the third tow line at the installation completion point and linearly making the cable arranged in a zigzag movement with the auxiliary work line moving toward the installation completion point; And
The cable discharging method comprising the step of sinking the cable arranged in a linear seabed.
청구항 8에 있어서,
상기 케이블을 따라 등간격으로 부이가 설치된 것을 특징으로 하는 케이블 양륙공법.
The method according to claim 8,
Cable discharging method characterized in that buoys are installed at equal intervals along the cable.
청구항 9에 있어서,
상기 케이블에 설치된 부이를 제거함으로써 상기 케이블을 해저에 가라앉히는 것을 특징으로 하는 케이블 양륙공법.
The method according to claim 9,
Cable dismounting method characterized in that the cable is submerged on the seabed by removing the buoy installed in the cable.
KR1020110069345A 2011-07-13 2011-07-13 Floating drum for transporting submarine cable and submarine cable landing method using the same KR101178597B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110069345A KR101178597B1 (en) 2011-07-13 2011-07-13 Floating drum for transporting submarine cable and submarine cable landing method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110069345A KR101178597B1 (en) 2011-07-13 2011-07-13 Floating drum for transporting submarine cable and submarine cable landing method using the same

Publications (1)

Publication Number Publication Date
KR101178597B1 true KR101178597B1 (en) 2012-08-30

Family

ID=46888117

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110069345A KR101178597B1 (en) 2011-07-13 2011-07-13 Floating drum for transporting submarine cable and submarine cable landing method using the same

Country Status (1)

Country Link
KR (1) KR101178597B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20170137658A (en) 2017-09-29 2017-12-13 (주)판토스 Apparatus for transporting submarine cable of ship and method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS53143091U (en) 1977-04-19 1978-11-11
JP2006166524A (en) 2004-12-03 2006-06-22 Furukawa Electric Co Ltd:The Floater

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS53143091U (en) 1977-04-19 1978-11-11
JP2006166524A (en) 2004-12-03 2006-06-22 Furukawa Electric Co Ltd:The Floater

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20170137658A (en) 2017-09-29 2017-12-13 (주)판토스 Apparatus for transporting submarine cable of ship and method thereof

Similar Documents

Publication Publication Date Title
JP6923547B2 (en) Semi-submersible aquaculture system
CN101035708B (en) Offshore vessel mooring and riser inboarding system
JP4500210B2 (en) Float diffuser
JP5565803B2 (en) Installation method of tension mooring floating structure and ship for installation of tension mooring floating structure
US6503022B1 (en) Bouyant moon pool plug
KR101078391B1 (en) Balance barge using two spud
US8181589B2 (en) Gravity anchor
KR101178597B1 (en) Floating drum for transporting submarine cable and submarine cable landing method using the same
US4386874A (en) Method for installation of a mooring cable
JP5255078B2 (en) Collection method of middle-floating floating reef
RU2571681C2 (en) Filling hose
EP0089344B1 (en) Float arrangement
JP6884311B2 (en) How to lay
KR101435396B1 (en) Vessel
JP5684220B2 (en) How to install a buoy
JPH0656076A (en) Submarine cable laying construction method and laying work ship thereof
KR102034347B1 (en) Tidal Current Power Generator Construction System Using Guide Wire
KR100516140B1 (en) Towing system
KR101498247B1 (en) Anchor chain for a ship
KR20130003914A (en) Method for mounting azimuth thruster for ship on land
KR102629003B1 (en) Fender of floating structure
CN218142007U (en) Multi-array auxiliary retraction system suitable for geophysical prospecting ship
GB1569734A (en) Floating terminals for loading and/or unloading tankers
CN210634711U (en) Mooring buoy
KR102020108B1 (en) Tidal Current Power Generator Construction System With Easy Submarine Cable Installation

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150619

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20160622

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170823

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20180821

Year of fee payment: 7