KR101165347B1 - Open water channel and construction method - Google Patents

Open water channel and construction method Download PDF

Info

Publication number
KR101165347B1
KR101165347B1 KR1020120052761A KR20120052761A KR101165347B1 KR 101165347 B1 KR101165347 B1 KR 101165347B1 KR 1020120052761 A KR1020120052761 A KR 1020120052761A KR 20120052761 A KR20120052761 A KR 20120052761A KR 101165347 B1 KR101165347 B1 KR 101165347B1
Authority
KR
South Korea
Prior art keywords
mortar
pipe
channel
open
connection portion
Prior art date
Application number
KR1020120052761A
Other languages
Korean (ko)
Inventor
송영기
Original Assignee
유한회사 삼흥산업
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 유한회사 삼흥산업 filed Critical 유한회사 삼흥산업
Priority to KR1020120052761A priority Critical patent/KR101165347B1/en
Application granted granted Critical
Publication of KR101165347B1 publication Critical patent/KR101165347B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B13/00Irrigation ditches, i.e. gravity flow, open channel water distribution systems

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Sewage (AREA)

Abstract

PURPOSE: An open water channel which does not require a protrusion at a connection part and a construction method thereof are provided to reduce construction time and costs because an additional excavation process is not required. CONSTITUTION: An open water channel which does not require a protrusion at a connection part comprises a main body part(10), a first connection part(20), and a second connection part(30). A water channel(11) having an opened top is formed inside the main body part in a longitudinal direction. The first connection part is extended from one end of the main body part and has first mortar insertion grooves(21) and an exhaust groove(22). The exhaust groove crosses the mortar insertion grooves and exhausts mortar and air to the outside. The second connection part is extended from the other end of the main body part and has second mortar insertion grooves(31) corresponding to the first mortar insertion grooves.

Description

연결부위에 턱이 없는 개거수로관과 개거수로관 시공방법{Open Water Channel And Construction Method}Open water channel and construction method with no jaw at the connection part {Open Water Channel And Construction Method}

본 발명은 개거수로관과 시공방법에 관한 것으로서, 좀 더 상세하게는, 개거수로관을 제작할 시 설계부터 시공까지 복잡한 공정 없이 이루어지고, 개거수로관 간의 연결작업이 매우 용이하면서도 종래기술보다 작업완료시간이 빠르고, 장비 또는 인력 소요가 효율적인 연결부위에 턱이 없는 개거수로관과 개거수로관 시공방법에 관한 것이다.The present invention relates to an open water pipe and a construction method, and more specifically, it is made without a complicated process from the design to the construction when manufacturing the open water pipe, connection between the open water pipe is very easy, but the work completion time is faster than the prior art The present invention relates to a method of constructing a canopy and a canopy pipe without a jaw at a connection site where equipment, manpower, or personnel are efficient.

일반적으로 농지에 물을 효과적으로 대주기 위해 설치되어 농업용수 공급라인을 형성하는 수로는 개간한 후에 이 개간된 농업용지 등에 농업용 용수를 공급하기 위해 형성된다.In general, the channel which is installed to effectively supply water to farmland to form an agricultural water supply line is formed to supply agricultural water to such cleared agricultural land after clearing.

이러한 수로는 통상적으로 U자 형상의 단면을 이루도록 상부가 개방된 콘크리트 재질의 개거수로관을 설치하여 형성하게 된다.Such a waterway is typically formed by installing an open water canal pipe of a concrete material having an open top to form a U-shaped cross section.

상기 개거수로관의 양끝에는 안착턱과 삽입부가 각각 형성되어 있고, 이들을 서로 연결 조립시공함으로써 농업용수 공급라인이 형성되는 것이다.Mounting jaws and inserts are formed at both ends of the gas channel, respectively, and the agricultural water supply line is formed by connecting and assembling them.

상기와 같은 종래의 개거수로관으로는 등록특허 제10-0922874호가 있다.Conventional open water channel as described above there is a Patent No. 10-0922874.

상기 등록특허 제10-0922874호의 개거수로관을 간략하게 설명하면, 본체(20)의 선단에는 외향으로 확장되는 확관부(25)와 안착턱(27)이 일체로 형성되고, 후단에는 확관부(25)와 안착턱(27)의 사이로 삽입되는 삽입부(23)가 일체로 형성된 것으로서, 비교적 단순한 구조를 이루고 있어 개거수로관을 상호 연결함에 있어 쉽고 간편하게 이음할 수 있는 이점이 있다.Briefly describing the open water channel of the Patent No. 10-0922874, the expansion portion 25 and the seating jaw 27 extending outward is integrally formed at the front end of the main body 20, the expansion pipe 25 at the rear end And the insertion portion 23 is inserted between the seating jaw (27) is formed integrally, has a relatively simple structure has the advantage that can be easily and simply connected in the interconnection channel pipe.

하지만, 상기 종래의 개거수로관은, 외향으로 돌출된 확관부(25)와 안착턱(27)으로 인하여 지면에 설치하고자 할 때에 반드시 확관부(25)와 안착턱(27)의 돌출부분만큼 별도로 지면을 굴착해 주어야 하는 불편함이 있고, 이로 인해 장비 또는 인력을 효율적으로 관리할 수 없게 되며, 근본적으로 시공기간 및 비용이 늘어나게 되는 문제가 있다.However, when the conventional clearing canal pipe is to be installed on the ground due to the expansion pipe 25 and the seating jaw 27 protruding outward, the ground must be separately separated by the protrusions of the expansion pipe 25 and the seating jaw 27. There is a discomfort to excavate, this is because the equipment or manpower can not be efficiently managed, there is a problem that the construction period and cost increases.

만약, 확관부(25)와 안착턱(27)의 돌출부분만큼 별도로 지면을 굴삭하지 않은 상태에서 개거수로관을 연속해서 설치하게 되면 지면과 개거수로관 간에 틈이 발생하게 되고, 특히 지면에서 침하가 일어날 경우 개거수로관은 면 접촉이 아닌 확관부(25)를 통한 선 접촉을 하고 있기 때문에 힘이 확관부(25)와 안착턱(27)의 돌출된 부분을 향해 순식간에 힘이 집중되면서 쉽게 연결된 상태가 해제될 뿐만 아니라, 지면에 개거수로관을 매설하게 되면 개거수로관 전체, 그중에서도 상호 연결된 부분에 전방향으로 가해지는 토압 및 개거수로관의 자중으로 인하여 쉽게 연결된 상태가 해제되는 심각한 문제가 있었다.If the expansion channel 25 and the mounting jaw 27 have not been excavated separately from the ground, if the channel is continuously installed, the gap is generated between the ground and the channel, and in particular, the settlement may occur on the ground. In this case, because the open water pipe is in line contact through the expansion part 25 rather than the surface contact, the force is quickly connected to the protruding part of the expansion part 25 and the seating jaw 27, and the state is easily connected. In addition to being released, there is a serious problem that when the landfill canal pipe is buried in the ground, the connected state is easily released due to the earth pressure and the weight of the open waterway pipe which are applied to all the interconnected waterway pipes.

본 발명은 상기와 같은 문제를 해소하기 위하여 안출된 것으로서, 다수의 개거수로관이 동일선상에 놓이면서 지면에 밀착되도록 하여 침하의 염려를 일시에 해소한 연결부위에 턱이 없는 개거수로관 및 개거수로관 시공방법을 제공하려는데 그 목적이 있다.
The present invention has been made in order to solve the above problems, a number of open channel can be placed on the same line while being in close contact with the ground to eliminate the concern of settlement at one time without a jaw channel and the channel can be constructed The purpose is to provide.

상기 목적을 달성하기 위한 본 발명의 개거수로관은, The open water channel of the present invention for achieving the above object,

내부에 길이방향을 따라 수로가 형성되며 상부가 개방된 본체부와;A main body part formed along a longitudinal direction therein and having an open upper portion;

내면에 외부로부터 주입된 몰탈이 내측에 수용될 수 있도록 내면을 따라 일정한 폭과 깊이로 형성된 몰탈삽입홈과, 몰탈삽입홈에 교차되게 형성되어 몰탈과 공기가 외부로 배출될 수 있도록 하는 배기홈을 갖추고서, 본체부의 일단으로부터 길이방향으로 연장되되, 외폭은 본체부의 외폭과 동일하고, 내폭은 본체부의 내폭에 비해 상대적으로 더 넓게 형성된 제1연결부와;Mortar insertion grooves are formed to have a predetermined width and depth along the inner surface so that the mortar injected from the outside on the inner surface and the exhaust grooves formed to cross the mortar insertion grooves to allow the mortar and air to be discharged to the outside. A first connection part extending in a longitudinal direction from one end of the main body part, the outer width being the same as the outer width of the main body part, and the inner width being relatively wider than the inner width of the main body part;

외면에 제1연결부의 몰탈삽입홈에 대응되는 몰탈삽입홈을 갖추고서, 본체부의 타단으로부터 길이방향으로 연장되되, 외폭은 제1연결부의 내폭과 동일하고, 내폭은 본체부의 내폭과 동일한 제2연결부로 구성된 것을 특징으로 한다.
A mortar insertion groove corresponding to the mortar insertion groove of the first connection part is provided on the outer surface thereof, and extends in the longitudinal direction from the other end of the main body part, the outer width of which is the same as the inner width of the first connection part, and the inner width of the second connection part that is the same as the inner width of the body part. Characterized in that consisting of.

상기 목적을 달성하기 위한 본 발명의 개거수로관 시공방법은,Opening canal pipe construction method of the present invention for achieving the above object,

길이방향을 따라 지반을 일정 폭과 깊이로 굴삭하여 개거수로관이 설치될 공간을 형성하는 터파기단계:Digging step of excavating the ground along the longitudinal direction to a certain width and depth to form a space for the gas channel pipe installation:

일정 폭과 깊이로 굴삭된 공간의 울퉁불퉁한 지면을 평평해지도록 다지는 평탄화단계:Flattening step to flatten the uneven surface of the excavated space to a certain width and depth:

길이방향을 따라 굴삭된 공간으로 개거수로관을 순차적으로 삽입시켜 주는 개거수로관 삽입단계:Inserting the channel into the channel in order to sequentially insert the channel into the excavated space along the longitudinal direction:

선 삽입된 개거수로관의 제1연결부로 후 삽입되는 개거수로관의 제2연결부를 결합하여 연결시켜 주는 개거수로관 조립단계:Assembling the open water channel pipe connecting the second connection portion of the open water channel pipe which is inserted into the first connection of the water channel pipe inserted after the line:

상호 조립된 개거수로관의 몰탈삽입홈으로 몰탈을 주입하여 몰탈삽입홈 및 배기홈이 몰탈에 의해 채워지도록 하면서 배기홈을 통해 공기가 배출될 때에 함께 배출되는 몰탈에 의해 제1연결부와 제2연결부 간의 이격된 틈을 메우도록 하는 몰탈주입단계를 포함하는 것을 특징으로 한다.
Mortar is injected into the mortar insertion groove of the inter-conduit channel to allow the mortar insertion groove and the exhaust groove to be filled by the mortar while the air is discharged together through the mortar to be discharged together between the first connection part and the second connection part. It characterized in that it comprises a mortar injection step to fill the gap.

본 발명의 바람직한 실시 예에 따르면, 종래의 개거수로관과는 달리 측방으로 돌출되는 돌출부가 형성되어 있지 않아 별도의 굴착공정을 요하지 않기 때문에 공사기간의 단축 및 이에 따른 시공비용을 절감할 수 있다.According to a preferred embodiment of the present invention, unlike the conventional clearing canal pipe does not have a protrusion protruding sideways is not required because it does not require a separate excavation process can shorten the construction period and thereby reduce the construction cost.

또한, 본 발명의 바람직한 실시 예에 따르면, 외관이 민자형태를 이루고 있어 다수의 개거수로관을 상호 연결할 경우 다수의 개거수로관이 동일선상에 놓이면서 지면에 밀착되므로, 개거수로관 전반에 거쳐 균일하게 자중이 작용하기 때문에 침하염려가 전혀 없어 사후 하자가 발생하지 않는 이점이 있다.In addition, according to a preferred embodiment of the present invention, the exterior is in the form of a private, so when connecting a plurality of open channel pipes are mutually close to the ground while the plurality of open channel pipes are placed on the same line, the weight is applied uniformly throughout the open channel pipe Because there is no fear of sinking there is an advantage that no post-defect occurs.

또한, 본 발명의 바람직한 실시 예에 따르면, 개거수로관의 제1연결부와 제2연결부는 동일한 공정을 통해 제조되었다 하더라도 두 제품을 상호 연결해 보면 표면의 거칠기 및 제조상의 변형으로 인해 미세한 유격(틈)이 발생할 수밖에 없고, 이 유격(틈)을 통해 수로를 지나는 물이 세어 나가게 되면서 누수로 인한 침하를 유발하게 되는데, 이와 같은 유격(틈)을 배기홈을 통해 배출되는 몰탈이 메우면서 주변으로 배출하기 때문에 유격(틈)으로 인한 누수 발생 및 이로 인한 침하발생을 최소화할 수 있다.
In addition, according to a preferred embodiment of the present invention, even if the first connection portion and the second connection portion of the gas channel can be manufactured through the same process, when the two products are interconnected, fine clearances (gaps) are formed due to surface roughness and deformation in manufacturing. As the water passing through the channel is counted through the gap, it causes settlement. The gap is filled with the mortar discharged through the exhaust groove and discharged to the surrounding area. It is possible to minimize the occurrence of leakage due to play (gap) and the settlement caused by this.

도 1은 본 발명에 따른 연결부위에 턱이 없는 개거수로관의 사시도.
도 2는 본 발명에 따른 연결부위에 턱이 없는 개거수로관의 저면사시도.
도 3a 및 도 3b는 본 발명에 따른 연결부위에 턱이 없는 개거수로관의 결합과정을 도시한 도면.
도 4는 본 발명에 따른 개거수로관의 시공단계를 도시한 블록도.
도 5 내지 도 9c는 본 발명에 따른 개거수로관 시공방법에서 각 단계를 설명하기 위해 도시한 도면.
도 10a 내지 도 10c는 본 발명에 따른 개거수로관 시공방법에서 다른 복토단계를 설명하기 위한 도면.
1 is a perspective view of a dog-free gas channel in the connecting portion according to the present invention.
Figure 2 is a bottom perspective view of the culvert tube without a jaw in the connection portion according to the present invention.
Figure 3a and Figure 3b is a view showing the coupling process of the open channel canal without jaws in the connection portion according to the present invention.
Figure 4 is a block diagram showing the construction stage of the open waterway pipe according to the present invention.
5 to 9c is a view showing for explaining each step in the construction method of open water pipes according to the present invention.
10a to 10c is a view for explaining another cover step in the construction method of open water pipes according to the present invention.

이하, 첨부된 도면에 의거하여 상세하게 설명한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

그리고, 본 발명을 설명함에 있어서, 관련된 공지 기능 혹은 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명을 생략한다.
In describing the present invention, when it is determined that a detailed description of a related known function or configuration may unnecessarily obscure the subject matter of the present invention, the detailed description thereof will be omitted.

도 1 및 도 2를 참조하면, 본 발명에 따른 개거수로관(1)은, 콘크리트로 제조되는 본체부(10)와 제1연결부(20) 및 제2연결부(30)로 구성되어 일정한 폭과 깊이로 굴삭(掘削)된 지면을 따라 연속해서 설치된다.Referring to Figures 1 and 2, the clearing canal pipe 1 according to the present invention is composed of a main body portion 10, the first connection portion 20 and the second connection portion 30 is made of concrete, a constant width and depth It is installed continuously along the ground excavated by the furnace.

여기서, 본 발명의 경우에는 종래의 개거수로관과는 달리 측방으로 돌출되는 돌출부가 형성되어 있지 않으며, 이로 인해 다수의 개거수로관을 연결할 경우 다수의 개거수로관이 동일선상에 놓이면서 지면에 밀착된다는 점에 주목할 필요가 있다.
Here, in the case of the present invention, unlike the conventional channel channel is not formed protruding to the side, it is to be noted that when connecting a plurality of channel can be connected to the ground while the plurality of channel can be placed on the same line. There is a need.

상기 본체부(10)는‘∪’자 형상의 단면을 가지며, 내부에 길이방향을 따라 수로(11)가 형성되고 상부는 개방된 형태를 이루고 있다.
The main body portion 10 has a '∪' shaped cross section, the channel 11 is formed in the longitudinal direction therein, and the upper portion forms an open shape.

상기 제1연결부(20)는 본체부(10)의 일단에서 외향으로 단차져 길이방향을 따라 연장되며, 내측으로 제2연결부(30)가 삽탈가능하게 결합된다.The first connecting portion 20 extends in the longitudinal direction by stepping outwardly from one end of the main body portion 10, and the second connecting portion 30 is detachably coupled inwardly.

특히, 상기 제1연결부(20)의 내면에는, 외부로부터 주입된 몰탈(M)이 내측에 수용될 수 있도록 내면을 따라 일정한 폭과 깊이로 형성된 몰탈삽입홈(21)과; 몰탈삽입홈(21)에 교차되게 형성되어 몰탈(M)과 공기(A)가 외부로 배출될 수 있도록 하는 배기홈(22)이 형성된다.In particular, the inner surface of the first connecting portion 20, mortar insertion groove 21 formed in a predetermined width and depth along the inner surface so that the mortar (M) injected from the outside can be accommodated inside; Exhaust groove 22 is formed to cross the mortar insertion groove 21 to allow the mortar (M) and the air (A) to be discharged to the outside.

그리고, 본 실시 예의 경우, 본체부(10)의 일단으로부터 길이방향으로 연장되되, 외폭(外幅)은 본체부(10)의 외폭(外幅)과 동일하고, 내폭(內幅)은 본체부(10)의 내폭(內幅)에 비해 상대적으로 더 넓게 형성되어 있다.
And, in the present embodiment, it extends in the longitudinal direction from one end of the body portion 10, the outer width is the same as the outer width of the body portion 10, the inner width is the body portion It is formed relatively wider than the inner width of (10).

상기 제2연결부(30)는 본체부(10)의 일단에서 내향으로 단차져 길이방향을 따라 연장되며 제1연결부(20)에 삽탈가능하게 결합한다.The second connecting portion 30 is stepped inward from one end of the main body portion 10 and extends in the longitudinal direction and is detachably coupled to the first connecting portion 20.

특히, 상기 제2연결부(30)의 외면에는, 제1연결부(20)의 몰탈삽입홈(21)에 대응되는 몰탈삽입홈(31)이 형성된다.In particular, the mortar insertion groove 31 corresponding to the mortar insertion groove 21 of the first connector 20 is formed on the outer surface of the second connector 30.

그리고, 본 실시 예의 경우, 본체부(10)의 타단으로부터 길이방향으로 연장되되, 외폭(外幅)은 제1연결부(20)의 내폭(內幅)과 동일하고, 내폭(內幅)은 본체부(10)의 내폭(內幅)과 동일하게 형성되어 있다.
And, in the present embodiment, it extends in the longitudinal direction from the other end of the main body portion 10, the outer width is the same as the inner width of the first connecting portion 20, the inner width is the main body It is formed similarly to the inner width of the part 10.

한편, 상기 제2연결부(30)에는, 제1연결부(20)의 배기홈(22)에 대응되는 배기홈(32)이 더 보강 구비된다.
On the other hand, the second connecting portion 30, the exhaust groove 32 corresponding to the exhaust groove 22 of the first connection portion 20 is further provided with reinforcement.

또한, 상기 제1연결부(20)와 제2연결부(30)에는, 다수의 몰탈삽입홈(21,31)과 배기홈(22,32)이 보강 구비된다.
In addition, a plurality of mortar insertion grooves 21 and 31 and exhaust grooves 22 and 32 are reinforced in the first connection portion 20 and the second connection portion 30.

참고로, 본 발명에서 사용되는 시멘트 몰탈의 원료는 시멘트, 골재, 분말 팽창제, 시멘트 접착제 및 물로 이루어진다.For reference, the raw material of cement mortar used in the present invention is composed of cement, aggregate, powder expanding agent, cement adhesive, and water.

상기 시멘트는 일반적으로 사용되는 통상의 시멘트로서, 1 ~ 100㎚로 미세하게 분쇄된다. The cement is generally used cement, which is finely pulverized to 1 to 100 nm.

상기 골재는 모래 또는 자갈로 이루어진 통상의 것으로, 1 ~ 100㎚로 미세하게 분쇄된다.The aggregate is usually made of sand or gravel, and finely pulverized to 1 to 100 nm.

상기 분말 팽창제는 시멘트 몰탈에 첨가되어 수축을 저감하거나 팽창성을 부여하기 위한 것으로서, 1 ~ 100㎚로 분쇄된다.The powder expanding agent is added to cement mortar to reduce shrinkage or impart expandability, and is ground to 1 to 100 nm.

이러한 분말 팽창제로는 알루미늄 파우더와 같은 팽창제가 있으며, 그 외에도 일반적으로 널리 사용되고 있어, 이에 대한 자세한 설명은 생략하기로 한다.Such powder expanding agents include expanding agents such as aluminum powder, and are generally widely used, and thus detailed description thereof will be omitted.

상기 시멘트 접착제는 시멘트 몰탈의 접착력을 향상시키기 위한 것으로, 에멀젼 형태를 가진다. 그리고 시멘트 접착제는 시멘트 몰탈의 굴곡강도, 인장강도, 내충격강도, 내수성, 내마모성, 보수성을 향상시킨다. The cement adhesive is to improve the adhesion of cement mortar, and has an emulsion form. And cement adhesives improve the flexural strength, tensile strength, impact resistance, water resistance, wear resistance and water retention of cement mortar.

이러한, 시멘트 접착제로는 아세테이트비닐계와 변성고분자 수지의 공중합물을 원료로 제조되는 시멘트 접착제가 있으며, 그 외에도 일반적으로 널리 사용되고 있어, 이에 대한 자세한 설명은 생략하기로 한다.Such a cement adhesive is a cement adhesive prepared from a copolymer of an acetate vinyl-based polymer and a modified polymer resin. In addition, the cement adhesive is generally widely used, and a detailed description thereof will be omitted.

상기 물은 통상의 물이다.
The water is ordinary water.

도 3a 및 도 3b를 참조하면, 본 실시 예의 경우, 기설치된 개거수로관(1)의 제1연결부(20)로 후에 설치될 개거수로관(1')의 제2연결부(30)를 삽입시켜 상호 연결시켜 준다.3A and 3B, in the present embodiment, the first connection portion 20 of the pre-installed clearing canal pipe 1 is inserted into and interconnected by inserting the second connecting portion 30 of the open-water canal pipe 1 'to be installed later. Let it be.

그 다음, 제1연결부(20)와 제2연결부(30)의 몰탈삽입홈(21,31)으로 몰탈(M)을 주입시켜 주게 되면, 몰탈(M)은 몰탈삽입홈(21,31)을 따라 자연스럽게 유동하게 되고, 유동하는 과정에 배기홈(22)으로 유입되면서 내부 공기와 함께 외부로 배출되게 된다.Then, when the mortar (M) is injected into the mortar insertion groove (21, 31) of the first connector 20 and the second connector 30, mortar (M) is a mortar insertion groove (21, 31) As it flows naturally, it flows into the exhaust groove 22 in the flowing section and is discharged to the outside together with the internal air.

특히, 상기 개거수로관(1,1')의 제1연결부(20)와 제2연결부(30)는 동일한 공정을 통해 제조되었다 하더라도 두 제품을 상호 연결해 보면 표면의 거칠기 및 제조상의 변형으로 인해 미세한 유격(틈)이 발생할 수밖에 없고, 이 유격(틈)을 통해 수로(11)를 지나는 물이 세어 나가게 되면서 누수로 인한 침하를 유발하게 되는데, 이와 같은 유격(틈)을 배기홈(22)을 통해 배출되는 몰탈(M)이 메우면서 주변으로 배출하기 때문에 유격(틈)으로 인한 누수 발생을 최소화할 수 있다.In particular, even if the first connection portion 20 and the second connection portion 30 of the open water pipe (1, 1 ') is manufactured through the same process, when the two products are connected to each other, the fine play due to the roughness of the surface and the deformation in manufacturing (Gap) is inevitably generated, and the water passing through the water channel 11 through the gap (gap) is counted, causing the settlement due to leakage, such a gap (gap) is discharged through the exhaust groove (22) Since the mortar (M) is filled and discharged to the surroundings, it is possible to minimize the occurrence of leakage due to play (gap).

또한, 본 실시 예에 따르면, 종래의 개거수로관과는 달리 측방으로 돌출되는 돌출부가 형성되어 있지 않으며, 이로 인해 다수의 개거수로관을 상호 연결할 경우 다수의 개거수로관이 동일선상에 놓이면서 지면에 밀착되므로 침하염려가 전혀 없어 사후 하자가 발생하지 않는 이점이 있다.
In addition, according to the present embodiment, unlike the conventional water channel, there is no protruding portion that protrudes laterally, and thus, when the plurality of water channel pipes are interconnected, the plurality of water channel pipes are placed on the same line and are in close contact with the ground. There is no concern at all, there is an advantage that does not occur post-defect.

도 4는 본 발명에 따른 개거수로관의 시공단계를 도시한 블록도이고, 도 6 내지 도 9b는 본 발명에 따른 개거수로관 시공방법의 각 단계를 설명하기 위해 도시한 도면이며, 도 10a 내지 도 10c는 본 발명에 따른 개거수로관 시공방법에서 다른 복토단계를 설명하기 위한 도면이다.
Figure 4 is a block diagram showing the construction step of the open waterway pipe according to the present invention, Figures 6 to 9b is a view showing for explaining each step of the open waterway pipe construction method according to the present invention, Figures 10a to 10c Is a view for explaining another cover step in the construction method of the open waterway pipe according to the present invention.

1)터파기단계(S1)1) Digging step (S1)

상기 터파기단계(S1)는 개거수로관(1,1')이 설치될 공간을 형성하는 단계이다.The step of digging (S1) is a step of forming a space in which the clearing canal pipe (1, 1 ') is installed.

본 실시 예의 경우, 도 5에 도시된 바와 같이, 굴삭기(100)를 매개로 길이방향을 따라 지반(E)을 일정 폭과 깊이로 굴삭하여 개거수로관(1)이 설치될 공간을 형성하였다.
In the present embodiment, as shown in Figure 5, the ground (E) along the longitudinal direction via the excavator 100 was excavated to a predetermined width and depth to form a space in which the water channel pipe (1) is installed.

2)평탄화단계(S2)2) leveling step (S2)

상기 평탄화단계(S2)는 울퉁불퉁한 지반(E)을 평평하게 다지는 단계이다.The flattening step S2 is a step of flattening the uneven ground E.

본 실시 예의 경우, 도 6(a) 및 도 6(b)에 도시된 바와 같이, 일정 폭과 깊이로 굴삭된 공간으로 머캐덤롤러(200)를 투입시켜 준다. In the present embodiment, as shown in Figure 6 (a) and 6 (b), the mercader roller 200 is injected into the space excavated to a predetermined width and depth.

그 다음, 투입된 머캐덤롤러(200)를 운행하면서 롤러를 이용하여 울퉁불퉁한 지반(E)을 평평하게 다져주게 되는데, 이는 이후에 설치될 개거수로관(1,1')이 지면에 안착되었을 때 지면과 최대한 밀착되도록 하여 보다 안정된 구조를 실현하기 위함이다.
Then, the uneven ground (E) is flattened by using the roller while driving the injected macadam roller (200), which is to be installed on the ground when the gas channel (1,1 ') to be installed later is placed on the ground. This is to achieve a more stable structure by making it as close as possible.

3)개거수로관 삽입단계(S3)3) Insert the open water channel pipe (S3)

상기 개거수로관 삽입단계(S3)는 길이방향을 따라 굴삭된 공간으로 개거수로관(1,1')을 순차적으로 삽입시켜 주는 단계이다.The open channel channel inserting step (S3) is a step of sequentially inserting the open channel channel 1, 1 ′ into the excavated space along the longitudinal direction.

본 실시 예의 경우, 도 7에 도시된 바와 같이, 크레인(300)을 매개로 개거수로관(1)을 들어올려 평평하게 다져진 지반(E)에 개거수로관(1)을 안착시켜 주었다.
In the case of this embodiment, as shown in Figure 7, the crane channel 300 via the channel (1) to raise the flat channel (1) was placed on the ground (E) flat ground.

4)개거수로관 조립단계(S5)4) Opening channel pipe assembly step (S5)

상기 개거수로관 조립단계(S5)는 선 삽입된 개거수로관(1)의 제1연결부(20)로 후 삽입되는 개거수로관(1')의 제2연결부(30)를 삽입하여 조립시켜주는 단계이다.The open water channel pipe assembly step (S5) is a step of inserting and assembling the second connection portion 30 of the open water channel pipe (1 ') that is inserted into the first connection portion 20 of the line inserted water channel pipe (1).

본 실시 예의 경우, 도 8에 도시된 바와 같이, 새로운 개거수로관(1')을 크레인(300)을 매개로 들어올려서 기 설치된 개거수로관(1)의 제1연결부(20)로 후 설치되는 개거수로관(1')의 제2연결부(30)를 삽입해 준다.In the case of this embodiment, as shown in Figure 8, the new water channel pipe (1 ') by lifting the crane 300 as a medium through the first connection portion 20 of the gas channel pipe (1) pre-installed by the open water channel pipe Insert the second connecting portion 30 of (1 ').

이때, 상기 제1연결부(20)와 제2연결부(30)는 최대한 유격(틈)이 발생하지 않도록 상호 연결시켜 줌이 바람직하다.
In this case, it is preferable that the first connecting portion 20 and the second connecting portion 30 are connected to each other so that a gap does not occur as much as possible.

한편, 상기 개거수로관 삽입단계(S3)와 개거수로관 조립단계(S5) 사이에는 상호 연결되는 개거수로관(1)의 제1연결부(20) 내면 또는 개거수로관(1')의 제2연결부(30) 외면에 몰탈(M)을 얇게 발라주는 몰탈도포단계(S4)가 더 보강될 수 있으며, 이를 도 9b와 같이 도시하였다.On the other hand, between the open channel pipe insertion step (S3) and the open channel pipe assembly step (S5) of the first connecting portion 20 of the open channel pipe (1) that is interconnected or the second connecting portion 30 of the open channel pipe (1 '). Mortar coating step (S4) to apply a thin mortar (M) on the outer surface can be further reinforced, as shown in Figure 9b.

그리고, 상기 개거수로관(1)의 제1연결부(20)와 개거수로관(1')의 제2연결부(30) 사이에 도포된 몰탈(M)을 매개로 상호 견실하게 고정될 수 있도록 몰탈(M)이 경화될 때까지 소정시간 동안 방치하는 것이 바람직하다.
Then, the mortar (M) so as to be firmly fixed to each other through the mortar (M) applied between the first connecting portion 20 of the open water pipe pipe 1 and the second connecting portion 30 of the open water pipe pipe (1 '). It is preferable to leave for a predetermined time until the) hardens.

5)몰탈주입단계(S7)5) Mortar injection step (S7)

상기 몰탈주입단계(S7)는 상호 결합된 개거수로관(1,1')의 몰탈삽입홈(21,31)으로 몰탈(M)을 주입하는 단계이다.The mortar injection step (S7) is a step of injecting mortar (M) into the mortar insertion grooves (21, 31) of the open water pipe (1, 1 ') coupled to each other.

본 실시 예의 경우, 도 9b에 도시된 바와 같이, 상호 결합된 개거수로관(1,1')의 몰탈삽입홈(21,31)으로 몰탈(M)을 주입하여 몰탈삽입홈(21,31) 및 배기홈(22)이 몰탈(M)에 의해 채워지도록 하면서 배기홈(22)을 통해 공기가 배출될 때에 함께 배출되는 몰탈(M)에 의해 제1연결부(20)와 제2연결부(30) 간의 이격된 틈을 메우도록 한다.In the present embodiment, as shown in Figure 9b, by inserting the mortar (M) into the mortar insertion grooves (21, 31) of the open water pipe (1, 1 ') coupled to each other mortar insertion grooves (21, 31) and While the exhaust groove 22 is filled by the mortar (M) while the air is discharged through the exhaust groove 22 is discharged together with the mortar (M) between the first connecting portion 20 and the second connecting portion (30) Make sure to fill in the gaps.

본 실시 예에 따르면, 상기 개거수로관(1,1')의 제1연결부(20)와 제2연결부(30)는 동일한 공정을 통해 제조되었다 하더라도 두 제품을 상호 연결해 보면 표면의 거칠기 및 제조상의 변형으로 인해 미세한 유격(틈)이 발생할 수밖에 없고, 이 유격(틈)을 통해 수로(11)를 지나는 물이 세어 나가게 되면서 누수로 인한 침하를 유발하게 되는데, 이와 같은 유격(틈)을 배기홈(22)을 통해 배출되는 몰탈(M)이 메우면서 주변으로 배출하기 때문에 유격(틈)으로 인한 누수 발생을 최소화할 수 있으며, 이를 도 9c와 같이 도시하였다.
According to this embodiment, even if the first connection portion 20 and the second connection portion 30 of the open water pipe (1, 1 ') is manufactured through the same process, the surface roughness and manufacturing deformation when the two products are interconnected Due to the fine play (gap) is inevitably generated, the water passing through the waterway (11) through the play (gap) is caused to cause settlement due to leaks, such a play (gap) exhaust groove (22) Since the mortar (M) discharged through) is discharged to the surrounding while filling, it is possible to minimize the leakage caused by the gap (gap), as shown in Figure 9c.

한편, 상기 상호 결합된 개거수로관(1,1')의 몰탈삽입홈(21,31)으로 몰탈(M)을 주입하기 전에 개거수로관(1,1')이 안착된 공간의 벽면과 개거수로관(1,1')의 외부 벽면 사이로 토사를 부어 틈을 메우는 제1복토단계(S6)를 더 포함할 수 있으며, 이를 도 9a와 같이 도시하였다.On the other hand, before injecting the mortar (M) into the mortar insertion grooves (21, 31) of the mutually coupled open water channel pipe (1, 1 '), the wall surface and open channel pipe ( 1, 1 ') may further include a first cover step (S6) to fill the gap between the outer wall between the outer wall surface, as shown in Figure 9a.

본 실시 예에 따르면, 상기 제1복토단계(S6) 이후에 몰탈주입단계(S7)를 실시하게 되면, 배기홈(22)을 통해 배출되는 몰탈(M)이 토사에 의해서도 미처 메우지 못한 공간을 메우게 되므로 개거수로관(1,1')의 주변을 확실하게 실링할 수 있게 된다.According to the present embodiment, when the mortar injection step S7 is performed after the first covering step S6, the mortar M discharged through the exhaust groove 22 may not be filled by the soil. Since it fills up, the periphery of the open water pipe (1, 1 ') can be sealed reliably.

그리고, 상기 몰탈주입단계(S7) 이후에는 주입된 몰탈(M)이 경화될 때까지 소정시간 동안 방치하는 것이 바람직하며, 이를 좀더 상세하게 설명하면, 상기와 같이 개거수로관(1,1')의 몰탈삽입홈(21,31)으로 주입된 몰탈(M)은 일정시간이 경과하게 되면 경화되는데, 경화된 몰탈(M)로 인해 고정돌기가 형성되어 연결된 개거수로관(1,1')에 길이방향을 따라 횡력이 작용하더라도 고정돌기가 개거수로관(1,1') 간에 상호 이격되지 않도록 맞물어 줄 뿐만 아니라, 개거수로관(1,1') 간의 강한 결속력이 통해 견고한 연결상태를 유지할 수 있는 이점이 있다.
Then, after the mortar injection step (S7) it is preferable to leave for a predetermined time until the injected mortar (M) is cured, and in more detail, as described above, The mortar (M) injected into the mortar insertion groove (21, 31) is cured when a certain time passes, the fixed projection is formed by the hardened mortar (M) in the longitudinal direction to the open water channel (1, 1 ') connected In addition, the fixed protrusions do not separate from each other even when the lateral force is applied to each other so as not to be spaced apart from each other, and the strong binding force between the open waterway pipes (1,1 ') maintains a strong connection. have.

한편, 필요에 따라 도 10a 내지 도 10c에 도시된 바와 같이, 상기 몰탈주입단계(S7) 이후에는, 개거수로관(1,1')이 안착된 공간의 벽면과 개거수로관(1,1')의 외부 벽면 사이로 토사를 부어 틈을 메우는 제2복토단계(S8)를 실시할 수 있다.On the other hand, if necessary, as shown in Figure 10a to 10c, after the mortar injection step (S7), the wall surface of the space in which the open channel pipe (1,1 ') and the open channel pipe (1,1') A second covering step (S8) may be performed to fill the gaps by pouring the soil between the outer walls.

참고로, 상기 제1복토단계(S6)와 제2복토단계(S8)는 몰탈주입단계(S7)를 기준으로 전에 하느냐, 후에 실시하느냐에 따라 구분된다.
For reference, the first cover step (S6) and the second cover step (S8) is classified according to whether to perform before or after the mortar injection step (S7) as a reference.

본 발명은 기재된 구체적인 실시 예에 대해서만 상세히 설명되었지만 본 발명의 기술사상범위 내에서 다양하게 변형 및 수정할 수 있음은 당업자에 있어서 당연한 것이며, 이러한 변형 및 수정이 첨부된 특허청구범위에 속함은 당연한 것이다.
It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the present invention as defined by the appended claims.

1.1': 개거수로관 10: 본체부 11: 수로
20: 제1연결부 21: 몰탈삽입홈 22: 배기홈
30: 제2연결부 31: 몰탈삽입홈 32: 배기홈
100: 굴삭기 200: 머캐덤롤러 300: 크레인
E: 지반 M: 몰탈
1.1 ': open water channel 10: main body 11: water channel
20: first connection portion 21: mortar insertion groove 22: exhaust groove
30: second connection portion 31: mortar insertion groove 32: exhaust groove
100: excavator 200: macadam roller 300: crane
E: Ground M: Mortar

Claims (7)

내부에 길이방향을 따라 수로(11)가 형성되며 상부가 개방된 본체부(10)와;
내면에 외부로부터 주입된 몰탈(M)이 내측에 수용될 수 있도록 내면을 따라 일정한 폭과 깊이로 형성된 몰탈삽입홈(21)과, 몰탈삽입홈(21)에 교차되게 형성되어 몰탈(M)과 공기(A)가 외부로 배출될 수 있도록 하는 배기홈(22)을 갖추고서, 본체부(10)의 일단으로부터 길이방향으로 연장되되, 외폭은 본체부(10)의 외폭과 동일하고, 내폭은 본체부(10)의 내폭에 비해 상대적으로 더 넓게 형성된 제1연결부(20)와;
외면에 제1연결부(20)의 몰탈삽입홈(21)에 대응되는 몰탈삽입홈(31)을 갖추고서, 본체부(10)의 타단으로부터 길이방향으로 연장되되, 외폭은 제1연결부(20)의 내폭과 동일하고, 내폭은 본체부(10)의 내폭과 동일한 제2연결부(30)로 구성된 것을 특징으로 하는 연결부위에 턱이 없는 개거수로관.
A main body portion 10 formed therein along the longitudinal direction and having an open upper portion;
Mortar insertion groove 21 and a mortar insertion groove 21 formed in a predetermined width and depth along the inner surface and the mortar insertion groove 21 so as to be accommodated inside the mortar (M) injected from the outside is mortar (M) and With the exhaust groove 22 to allow the air (A) to be discharged to the outside, extending in the longitudinal direction from one end of the body portion 10, the outer width is the same as the outer width of the body portion 10, the inner width is A first connection part 20 formed relatively wider than an inner width of the main body part 10;
Equipped with a mortar insertion groove 31 corresponding to the mortar insertion groove 21 of the first connection portion 20 on the outer surface, extends in the longitudinal direction from the other end of the main body portion 10, the outer width of the first connection portion 20 It is the same as the inner width of the inner width of the main body portion 10, the jawless water pipe tube without a jaw in the connection portion, characterized in that consisting of the second connection portion 30.
제1항에 있어서,
상기 제2연결부(30)에는,
제1연결부(20)의 배기홈(22)에 대응되는 배기홈(32)이 더 보강 구비되는 것을 특징으로 하는 연결부위에 턱이 없는 개거수로관.
The method of claim 1,
In the second connecting portion 30,
A trough without a jaw in the connection part, characterized in that the exhaust groove 32 corresponding to the exhaust groove 22 of the first connection portion 20 is further reinforced.
제2항에 있어서,
상기 제1연결부(20)와 제2연결부(30)에는,
다수의 몰탈삽입홈(21,31)과 배기홈(22,32)이 보강 구비되는 것을 특징으로 하는 연결부위에 턱이 없는 개거수로관.
The method of claim 2,
In the first connector 20 and the second connector 30,
A plurality of mortar insertion grooves (21, 31) and exhaust grooves (22, 32) reinforcement is provided with a reinforcement pipe without a jaw characterized in that the connection part.
길이방향을 따라 지반(E)을 일정 폭과 깊이로 굴삭하여 개거수로관(1)이 설치될 공간을 형성하는 터파기단계(S1):
일정 폭과 깊이로 굴삭된 공간의 울퉁불퉁한 지면을 평평해지도록 다지는 평탄화단계(S2):
길이방향을 따라 굴삭된 공간으로 개거수로관(1,1')을 순차적으로 삽입시켜 주는 개거수로관 삽입단계(S3):
선 삽입된 개거수로관(1)의 제1연결부(20)로 후 삽입되는 개거수로관(1')의 제2연결부(30)를 결합하여 연결시켜 주는 개거수로관 조립단계(S5):
상호 조립된 개거수로관(1,1')의 몰탈삽입홈(21,31)으로 몰탈(M)을 주입하여 몰탈삽입홈(21,31) 및 배기홈(22,32)이 몰탈(M)에 의해 채워지도록 하면서 배기홈(22,32)을 통해 공기가 배출될 때에 함께 배출되는 몰탈(M)에 의해 제1연결부(20)와 제2연결부(30) 간의 이격된 틈을 메우도록 하는 몰탈주입단계(S7)를 포함하는 것을 특징으로 하는 개거수로관 시공방법.
Excavation step (S1) to form a space to be installed in the clearing canal pipe (1) by excavating the ground (E) in a predetermined width and depth along the longitudinal direction:
Flattening step (S2) to flatten the uneven ground of the excavated space to a certain width and depth:
Opening channel pipe inserting step (S3) for sequentially inserting the open channel pipe (1, 1 ') into the space excavated along the longitudinal direction:
Assembly line (S5) to connect and connect the second connection portion 30 of the open channel canal (1 ') to be inserted into the first connection portion 20 of the line inserted channel (1) (S5):
The mortar (M) is injected into the mortar insertion grooves (21, 31) of the mutually assembled gas channel pipe (1, 1 ') so that the mortar insertion grooves (21, 31) and the exhaust grooves (22, 32) to the mortar (M) Mortar injection to fill the spaced gap between the first connection portion 20 and the second connection portion 30 by the mortar (M) which is discharged together when the air is discharged through the exhaust grooves (22, 32) while being filled by Opening canal pipe construction method comprising the step (S7).
제4항에 있어서,
상기 개거수로관 삽입단계(S3)와 개거수로관 조립단계(S5) 사이에는, 상호 연결되는 개거수로관(1)의 제1연결부(20) 내면 또는 개거수로관(1')의 제2연결부(30) 외면에 몰탈(M)을 얇게 발라주는 몰탈도포단계(S4)를 더 포함하는 것을 특징으로 하는 개거수로관 시공방법.
The method of claim 4, wherein
Between the channel opening channel insertion step (S3) and the channel opening pipe assembly step (S5), the first connection portion 20 of the open waterway pipe (1) to be interconnected or the outer surface of the second connection portion 30 of the open waterway pipe (1 '). Opening canal pipe construction method characterized in that it further comprises a mortar coating step (S4) to apply a thin mortar (M).
제4항 또는 제5항에 있어서,
상기 개거수로관 조립단계(S5)와 몰탈주입단계(S7) 사이에는, 개거수로관(1,1')이 안착된 공간의 벽면과 개거수로관(1,1')의 외부 벽면 사이로 토사를 부어 틈을 메우는 제1복토단계(S6)를 더 포함하는 것을 특징으로 하는 개거수로관 시공방법.
The method according to claim 4 or 5,
Between the open water channel pipe assembly step (S5) and the mortar injection step (S7), the soil is poured into the gap between the wall surface of the space in which the open water channel pipe (1,1 ') and the outer wall surface of the open water channel pipe (1,1'). The filling method is an open water pipe, characterized in that it further comprises a first cover step (S6).
제4항 또는 제5항에 있어서,
상기 몰탈주입단계(S7) 이후에는, 개거수로관(1,1')이 안착된 공간의 벽면과 개거수로관(1,1')의 외부 벽면 사이로 토사를 부어 틈을 메우는 제2복토단계(S8)를 더 포함하는 것을 특징으로 하는 개거수로관 시공방법.
The method according to claim 4 or 5,
After the mortar injection step (S7), the second soil cover step (S8) to fill the gap by pouring the earth and sand between the wall surface of the space on which the clearing canal pipe (1,1 ') is seated and the outer wall of the open waterway pipe (1,1') Open waterway pipe construction method characterized in that it further comprises a.
KR1020120052761A 2012-05-18 2012-05-18 Open water channel and construction method KR101165347B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120052761A KR101165347B1 (en) 2012-05-18 2012-05-18 Open water channel and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120052761A KR101165347B1 (en) 2012-05-18 2012-05-18 Open water channel and construction method

Publications (1)

Publication Number Publication Date
KR101165347B1 true KR101165347B1 (en) 2012-07-18

Family

ID=46716757

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120052761A KR101165347B1 (en) 2012-05-18 2012-05-18 Open water channel and construction method

Country Status (1)

Country Link
KR (1) KR101165347B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101209837B1 (en) * 2012-07-03 2012-12-07 유한회사 삼흥산업 Open water channel construction method and open water channel
KR101609811B1 (en) 2015-08-19 2016-04-06 합자회사 대청인더스트리 Eco-friendly irrigation canal

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200333057Y1 (en) 2003-08-20 2003-11-12 (주)서영기술단 A built up type drain for cutting area slope
KR100922874B1 (en) 2008-12-22 2009-10-20 광주광역시 남구 Water conduit

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200333057Y1 (en) 2003-08-20 2003-11-12 (주)서영기술단 A built up type drain for cutting area slope
KR100922874B1 (en) 2008-12-22 2009-10-20 광주광역시 남구 Water conduit

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101209837B1 (en) * 2012-07-03 2012-12-07 유한회사 삼흥산업 Open water channel construction method and open water channel
KR101609811B1 (en) 2015-08-19 2016-04-06 합자회사 대청인더스트리 Eco-friendly irrigation canal

Similar Documents

Publication Publication Date Title
KR100743369B1 (en) Precast culvert assembly for both culvert and utility-pipe conduit
KR101088158B1 (en) Method for underground roadway using slurry wall method
KR100973770B1 (en) Non-excavation type constructed tunnels and conduits using arc-shaped divided segments and its construccting methods thereof
KR100824833B1 (en) The Prefabricated Precast Concrete Culvert Connecting By Inserting Steel Rod Into Ring.
KR20210119861A (en) Slurry wall, construction method for the same and wire mesh assembly
KR100862977B1 (en) Precast concrete file and method for constructing thereof
KR100936668B1 (en) A composite pile for earth retaining wall and centrifugal force type earth retaining wall using it
KR100411659B1 (en) Precast Culvert Including a Grout Tube and Connecting Method Precast Culverts by Filling Mortar in the Female and Male Shearing Key
KR101165347B1 (en) Open water channel and construction method
KR101817712B1 (en) A Culvert and method for constructing the culvert
KR102229586B1 (en) Precast concrete wall structure for underground using steel water-stop
JP3829319B2 (en) Construction method of underground hollow structure and its underground hollow structure
KR101209837B1 (en) Open water channel construction method and open water channel
KR101267688B1 (en) The shore protection construction method using a precast finish panel
KR102443623B1 (en) fabricated culvert for sewage road of soft ground
KR20120134677A (en) The precast concrete closed conduit that is reinforced by the shear connector and constructing method of it
KR200255650Y1 (en) Sealing device for ground concrete work
KR20110037320A (en) Retaining wall and method for constructing the same
JP2004019100A (en) Construction method for underground structure, and underground structure
CN106854874B (en) Underground spliced wall and precast concrete pile for same
KR102623877B1 (en) Protector box structure and method for construction of slurry wall using the same
KR101068626B1 (en) Undrilled laying method for pipeline and tunnel using complex excavator
KR102371284B1 (en) Slurry wall, construction method for the same and wire mesh assembly
CN107059839A (en) A kind of construction method of armored concrete waveform sheet pile underground structure
KR102517949B1 (en) Buried box structure for staggered lapping and method for construction of slurry wall using the same

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150427

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20160624

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170621

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20180611

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20190808

Year of fee payment: 8