KR101098260B1 - Constructing method of nature-friendly artificial grass - Google Patents

Constructing method of nature-friendly artificial grass Download PDF

Info

Publication number
KR101098260B1
KR101098260B1 KR1020100000714A KR20100000714A KR101098260B1 KR 101098260 B1 KR101098260 B1 KR 101098260B1 KR 1020100000714 A KR1020100000714 A KR 1020100000714A KR 20100000714 A KR20100000714 A KR 20100000714A KR 101098260 B1 KR101098260 B1 KR 101098260B1
Authority
KR
South Korea
Prior art keywords
layer
pipe
concrete
artificial turf
gravel
Prior art date
Application number
KR1020100000714A
Other languages
Korean (ko)
Other versions
KR20110080467A (en
Inventor
김동현
Original Assignee
김동현
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김동현 filed Critical 김동현
Priority to KR1020100000714A priority Critical patent/KR101098260B1/en
Publication of KR20110080467A publication Critical patent/KR20110080467A/en
Application granted granted Critical
Publication of KR101098260B1 publication Critical patent/KR101098260B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • E01C13/02Foundations, e.g. with drainage or heating arrangements
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • E01C13/08Surfaces simulating grass ; Grass-grown sports grounds
    • E01C13/083Construction of grass-grown sports grounds; Drainage, irrigation or heating arrangements therefor
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C2201/00Paving elements
    • E01C2201/20Drainage details

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

본 발명은 친환경 인조잔디 구장의 시공방법에 관한 것으로, 지반에 침하방지용 보강매트를 적층하는 단계; 상기 보강매트 상에 외부의 물을 내부로 유입시켜 집수관으로 이동시키기 위하여 측부 및 상부에 다수개의 구멍이 관통 형성된 유공관을 설치하는 단계; 상기 유공관을 덮도록 상기 보강매트 상에 직경 25~40㎜의 자갈로 이루어지는 배수층을 형성하는 단계; 상기 배수층에 50~100㎜ 길이의 파이프를 일정간격을 두고 수직으로 설치하는 단계; 상기 파이프 상면과 동일하거나 낮은 높이로 상기 배수층 상에 콘크리트를 타설하여 콘크리트층을 형성하는 단계; 상기 파이프를 상기 콘크리트층으로부터 제거하여 상기 콘크리트층에 상기 배수층에 연통되는 관통공을 형성하는 단계; 상기 관통공에 미세한 입자 또는 공극을 갖는 물질을 적층하는 제1층과, 상기 제1층상에 직경 20~30㎜의 자갈과 상기 자갈에 대해 2~8중량%의 바인더를 혼합한 제2층을 적층하여 상기 콘크리트층의 상면과 일치시키는 단계; 및 상기 콘크리트층과 제2층 상에 인조잔디를 조성하는 단계;를 포함한다.The present invention relates to a construction method of environmentally friendly artificial turf ball, laminating a reinforcement mat for preventing settlement on the ground; Installing a perforated tube having a plurality of holes penetrated at the side and the upper portion to move external water into the collection pipe on the reinforcing mat; Forming a drainage layer made of gravel having a diameter of 25 to 40 mm on the reinforcing mat to cover the hole pipe; Vertically installing a pipe having a length of 50 to 100 mm in the drainage layer at a predetermined interval; Placing concrete on the drainage layer at a height equal to or lower than the upper surface of the pipe to form a concrete layer; Removing the pipe from the concrete layer to form a through hole communicating with the drainage layer in the concrete layer; A first layer for laminating a material having fine particles or voids in the through hole, and a second layer in which a gravel having a diameter of 20 to 30 mm and a binder of 2 to 8 wt% of the gravel are mixed on the first layer. Stacking and matching the upper surface of the concrete layer; And forming artificial turf on the concrete layer and the second layer.

Description

친환경 인조잔디 구장의 시공방법{CONSTRUCTING METHOD OF NATURE-FRIENDLY ARTIFICIAL GRASS}Construction method of eco-friendly artificial turf field {CONSTRUCTING METHOD OF NATURE-FRIENDLY ARTIFICIAL GRASS}

본 발명은 친환경 인조잔디 구장의 시공방법에 관한 것으로, 보다 상세하게는, 인조잔디 조성 구장에 원활한 배수 및 저수, 수질개선 및 평활도 유지를 위한 구조를 갖는 친환경 인조잔디 구장의 시공방법에 관한 것이다.The present invention relates to a construction method of an environmentally friendly artificial turf field, and more particularly, to a construction method of an environmentally friendly artificial turf field having a structure for smooth drainage and storage of water, improved water quality and maintain smoothness.

최근 여가 생활에 대한 비중이 높아짐에 따라 운동장 또는 경기장에 인조잔디를 조성하는 경우가 늘고 있다. 이때 인조잔디는 인조잔디 위에 고무칩을 뿌려서 쿠션을 주는 충진용과 인조잔디 위에 고무칩을 뿌리지 않고 하부에 고무칩을 시공하는 무충진용으로 구분할 수 있다. Recently, as the proportion of leisure life increases, artificial turf is being built on the playground or the stadium. At this time, the artificial turf can be divided into filling for cushioning by spraying rubber chips on the artificial turf, and no filling for spraying rubber chips on the bottom without spraying the rubber chips on the artificial turf.

그리고 종래에 일반적으로 시공되던 인조잔디의 구성을 보면 도 1에 도시된 바와 같다. And the configuration of the artificial turf generally constructed in the past is as shown in FIG.

도시된 바와 같이, 종래의 인조잔디 구장은, 충진용으로서, 운동장 바닥을 일정간격을 두고 터파기한 후, 유공관(1)을 매설하고, 그 위에 45~50㎜ 자갈(쇠석)로 이루어지는 배수층(3)을 적층하며, 그 위에 20~25㎜ 자갈(쇠석)로 이루어지는 중간층(5)을 적층하고, 그 위에 5~7㎜ 자갈(쇠석)과 석분을 혼합한 식재층(7)을 적층한 상태에서 인조잔디(9)를 조성하는 방식으로 제작된다. As shown in the figure, the conventional artificial turf field is for filling, after the bottom of the playground is severed at a predetermined interval, the perforated pipe 1 is embedded, and a drainage layer 3 made of 45-50 mm gravel (stone) thereon. ), The intermediate layer 5 consisting of 20 to 25 mm gravel (stone) is laminated thereon, and a planting layer 7 in which 5 to 7 mm gravel (stone) and stone powder are laminated thereon. The artificial turf 9 is produced in such a manner as to form the artificial turf 9.

그런데, 종래의 방식과 같은 충진용 인조잔디 구장은 인조잔디 위에 탄성을 주기 위한 고무칩이 뿌리는 것으로 시공이 완료되므로, 시공이 용이한 반면에 운동 중에 피부, 옷 및 신발에 고무칩이 묻는 문제점이 있었다. However, the artificial turf field for filling like the conventional method is completed by spraying rubber chips to give elasticity on the artificial turf so that construction is easy, while rubber chips are applied to the skin, clothes and shoes during exercise. There was this.

그리고 스포츠 경기장 또는 운동장에는 집중강우 또는 인공 관수에 의한 경기장 표면의 물을 제거하기 위하여 신속한 배수성이 요구됨과 동시에 운동선수 및 잔디관리방법의 답압에 의한 지면경화에 견뎌내야 하는 내답압성이 요구될 뿐만 아니라 운동선수에게 충격 등에 의한 신체를 보호하기 쉬워야 하며, 표면이 평탄한 특성을 가져야 한다.In addition, the sports stadium or playground requires rapid drainage to remove the water from the surface of the stadium by intensive rainfall or artificial watering, and at the same time, it is required to resist the hardening of the ground caused by the pressure of athletes and lawn care methods. It should be easy for the athlete to protect the body from impact and have a flat surface.

그러나 종래의 인조잔디 구장 조성방법에서는, 장기간 사용시 식재층(7)의 자갈과 석분이 중간층(5)의 자갈의 공극을 메워 투수불량이 발생함으로써, 인조잔디에 물이 고이는 문제점이 있었다.However, in the conventional artificial turf field construction method, the gravel and stone powder of the planting layer 7 fills the pores of the gravel of the intermediate layer 5 during long-term use, resulting in poor water permeation, resulting in a problem of water in the artificial turf.

또한 종래의 인조잔디 구장 조성방법에서는, 자갈에 의한 기초를 형성함으로써 지반이 안정되지 않아 일부가 침하함으로써 역시 물고임이 발생하는 문제점이 있었다.In addition, in the conventional artificial turf field construction method, the ground is not stabilized by forming a foundation by gravel, so there is a problem that the water pool is also generated by subsidence.

아울러, 종래의 인조잔디 구장 조성방법에서는, 장기간 사용시 평활도가 유지되지 않아, 물고임 현상뿐만 아니라, 함몰되는 부분이 발생하여 그 부분에 운동 중 발이 걸리거나 발목에 부상을 입게 되는 문제점이 있었다.In addition, in the conventional artificial turf field composition method, the smoothness is not maintained during long-term use, as well as the water swelling phenomenon, there is a problem that the part is caught, the foot is caught during the exercise or the ankle is injured.

본 발명은 상기와 같은 문제점을 해소하기 위한 것으로, 본 발명의 목적은 빗물을 모아 저장할 수 있는 친환경 인조잔디 구장의 시공방법을 제공하는 데 있다.The present invention is to solve the above problems, an object of the present invention is to provide a construction method of environmentally friendly artificial turf field that can collect and store rain water.

본 발명의 다른 목적은, 물을 정화할 수 있는 물질을 사용하여 빗물을 저수하는 과정에서 빗물에 포함된 오염물질을 걸러낼 수 있는 친환경 인조잔디 구장의 시공방법을 제공하는 데 있다.Another object of the present invention is to provide an environmentally friendly artificial turf construction method that can filter out contaminants contained in rainwater in the process of storing rainwater using a material capable of purifying water.

본 발명의 또 다른 목적은, 지반침하의 우려가 없고 평활도의 확보가 용이한 친환경 인조잔디 구장의 시공방법을 제공하는 데 있다.It is still another object of the present invention to provide a method for constructing an environmentally friendly artificial turf field, which is free of ground subsidence and which is easy to secure smoothness.

본 발명의 또 다른 목적은, 장기간 사용에도 불구하고 투수성이 지속적으로 유지될 수 있는 친환경 인조잔디 구장의 시공방법을 제공하는 데 있다.Still another object of the present invention is to provide a method for constructing an environmentally friendly artificial turf field where permeability can be continuously maintained despite long-term use.

상기한 바와 같은 목적을 달성하기 위한 본 발명의 특징에 따르면, 제1발명은, 친환경 인조잔디 구장의 시공방법에 관한 것으로, 지반에 침하방지용 보강매트를 적층하는 단계; 상기 보강매트 상에 외부의 물을 내부로 유입시켜 집수관으로 이동시키기 위하여 측부 및 상부에 다수개의 구멍이 관통 형성된 유공관을 설치하는 단계; 상기 유공관을 덮도록 상기 보강매트 상에 직경 25~40㎜의 자갈로 이루어지는 배수층을 형성하는 단계; 상기 배수층에 50~100㎜ 길이의 파이프를 일정간격을 두고 수직으로 설치하는 단계; 상기 파이프 상면과 동일하거나 낮은 높이로 상기 배수층 상에 콘크리트를 타설하여 콘크리트층을 형성하는 단계; 상기 파이프를 상기 콘크리트층으로부터 제거하여 상기 콘크리트층에 상기 배수층에 연통되는 관통공을 형성하는 단계; 상기 관통공에 미세한 입자 또는 공극을 갖는 물질을 적층하는 제1층과, 상기 제1층상에 직경 20~30㎜의 자갈과 상기 자갈에 대해 2~8중량%의 바인더를 혼합한 제2층을 적층하여 상기 콘크리트층의 상면과 일치시키는 단계; 및 상기 콘크리트층과 제2층 상에 인조잔디를 조성하는 단계;를 포함한다.According to a feature of the present invention for achieving the object as described above, the first invention relates to a construction method of environmentally friendly artificial turf, laminating a reinforcement mat for preventing settlement on the ground; Installing a perforated tube having a plurality of holes penetrated at the side and the upper portion to move external water into the collection pipe on the reinforcing mat; Forming a drainage layer made of gravel having a diameter of 25 to 40 mm on the reinforcing mat to cover the hole pipe; Vertically installing a pipe having a length of 50 to 100 mm in the drainage layer at a predetermined interval; Placing concrete on the drainage layer at a height equal to or lower than the upper surface of the pipe to form a concrete layer; Removing the pipe from the concrete layer to form a through hole communicating with the drainage layer in the concrete layer; A first layer for laminating a material having fine particles or voids in the through hole, and a second layer in which a gravel having a diameter of 20 to 30 mm and a binder of 2 to 8 wt% of the gravel are mixed on the first layer. Stacking and matching the upper surface of the concrete layer; And forming artificial turf on the concrete layer and the second layer.

또한 본 발명의 다른 특징에 따르면, 제2발명은 지반에 침하방지용 보강매트를 적층하는 단계; 상기 보강매트 상에 외부의 물을 내부로 유입시켜 집수관으로 이동시키기 위하여 측부 및 상부에 다수개의 구멍이 관통 형성된 유공관을 설치하는 단계; 상기 유공관을 덮도록 상기 보강매트 상에 직경 25~40㎜의 자갈로 이루어지는 배수층을 형성하는 단계; 상기 배수층에 50~100㎜ 길이의 파이프를 일정간격을 두고 수직으로 설치하는 단계; 상기 파이프 상면과 동일하거나 낮은 높이로 상기 배수층 상에 콘크리트를 타설하여 콘크리트층을 형성하는 단계; 상기 파이프 내에 미세한 입자 또는 공극을 갖는 물질을 적층하는 제1층과, 상기 제1층상에 직경 20~30㎜의 자갈과 상기 자갈에 대해 2~8중량%의 바인더를 혼합한 제2층을 적층하여 상기 콘크리트층의 상면과 일치시키는 단계; 및 상기 콘크리트층과 제2층 상에 인조잔디를 조성하는 단계;를 포함한다.In addition, according to another feature of the present invention, the second invention comprises the steps of stacking a reinforcing mat for settlement on the ground; Installing a perforated tube having a plurality of holes penetrated at the side and the upper portion to move external water into the collection pipe on the reinforcing mat; Forming a drainage layer made of gravel having a diameter of 25 to 40 mm on the reinforcing mat to cover the hole pipe; Vertically installing a pipe having a length of 50 to 100 mm in the drainage layer at a predetermined interval; Placing concrete on the drainage layer at a height equal to or lower than the upper surface of the pipe to form a concrete layer; Laminating a first layer of laminating a material having fine particles or pores in the pipe, and a second layer of 20 to 30 mm diameter gravel and 2 to 8% by weight of binder based on the gravel on the first layer To match the upper surface of the concrete layer; And forming artificial turf on the concrete layer and the second layer.

상기 제1발명과 제2발명의 차이점은, 제1발명에서는 파이프를 제거하는 단계가 포함되지만, 제2발명에서는 파이프를 제거하지 않고 파이프를 내장한 상태로 인조잔디 구장을 시공한다는 것이다.The difference between the first invention and the second invention, the first invention includes the step of removing the pipe, in the second invention is to construct the artificial turf field with the pipe embedded without removing the pipe.

제3발명은, 제1발명 또는 제2발명에서, 상기 배수층의 형성단계 이후에는, 타설된 콘크리트가 상기 배수층으로 침투하지 않도록 상기 배수층 상에 침투방지막을 형성하는 단계와, 상기 침투방지막 상에 와이어 메쉬를 설치하는 단계를 더 포함하는 것을 특징으로 한다.The third invention, in the first or second invention, after the step of forming the drainage layer, forming a penetration barrier on the drainage layer so that the poured concrete does not penetrate into the drainage layer, and a wire on the penetration barrier It further comprises the step of installing the mesh.

이때 타설되는 콘크리트의 점도가 높은 경우 등에는 침투방지막의 설치를 생략할 수 있고, 이 경우 와이어 메쉬는 배수층 상에 설치된다. 또한 철근 등 다른 자재가 사용되거나, 콘크리트층에 인장력의 부가가 필요치 않은 경우 또는 구장의 넓이가 그다지 넓지 않은 경우에는 와이어 메쉬의 설치도 생략할 수 있다.In this case, when the viscosity of the concrete to be poured is high, the installation of the penetration barrier may be omitted, and in this case, the wire mesh is installed on the drainage layer. In addition, when other materials such as reinforcing bars are used, or when a tensile force is not required to be added to the concrete layer, or when the area of the ballpark is not so large, the installation of the wire mesh may be omitted.

제4발명은 제1발명 또는 제2발명에서, 상기 파이프 설치단계에서는, 타설되는 콘크리트가 상기 파이프로 유입되지 않도록 상기 파이프의 상부에 차단막을 형성하는 단계를 더 포함하는 것을 특징으로 한다.The fourth invention is the first invention or the second invention, in the pipe installation step, characterized in that it further comprises the step of forming a blocking film on the upper portion of the pipe so that the concrete to be poured into the pipe.

이때 파이프 상단에 미리 차단막이 설치되어 있는 경우라면 차단막의 형성단계는 생략 가능하다.At this time, if the blocking film is previously installed on the pipe top, the forming step of the blocking film may be omitted.

제5발명은 제1발명 또는 제2발명에서, 상기 제1층 및 제2층 형성단계 이후에는, 상기 콘크리트층과 제2층 상에 탄성층을 형성하는 단계를 더 포함하는 것을 특징으로 한다.The fifth invention, in the first or second invention, after the first layer and the second layer forming step, characterized in that it further comprises the step of forming an elastic layer on the concrete layer and the second layer.

제6발명은 제5발명에서, 상기 탄성층은 직경 5~8㎜의 고무칩 80~85중량%와 바인더 15~20중량%를 혼합하여 적층되는 것을 특징으로 한다.The sixth invention is the fifth invention, the elastic layer is characterized in that the rubber chip is laminated by mixing 80 to 85% by weight and 15 to 20% by weight of the rubber chip 5-8 mm in diameter.

제7발명은 제5발명에서, 상기 탄성층은 직경 5~8㎜의 코르크 35~45중량%와 바인더 55~65중량%를 혼합하여 적층되는 것을 특징으로 한다.According to a seventh invention, in the fifth invention, the elastic layer is laminated by mixing 35 to 45% by weight of cork with a diameter of 5 to 8mm and 55 to 65% by weight of a binder.

제8발명은 제1발명 또는 제2발명에서, 상기 콘크리트층의 형성단계에서는, 상기 콘크리트층의 상면에 파이프를 향하여 낮아지는 구배를 형성하는 것을 특징으로 한다.Eighth invention is the first or second invention, in the step of forming the concrete layer, characterized in that to form a gradient lowered toward the pipe on the upper surface of the concrete layer.

본 발명에 따른 친환경 인조잔디 구장의 시공방법에 의하면, 빗물을 모아 저장할 수 있어 저장된 빗물을 활용함으로써 에너지 절감 및 온실가스 배출을 감소시킬 수 있는 효과가 있다.According to the construction method of the environmentally friendly artificial turf ballpark according to the present invention, by collecting the rain water can be stored there is an effect that can reduce the energy saving and greenhouse gas emissions by utilizing the stored rain water.

그리고 본 발명에 따르면, 물을 정화할 수 있는 물질을 사용하여 빗물을 저수하는 과정에서 빗물에 포함된 오염물질을 걸러낼 수 있음으로써, 일정 수준의 수질이 확보될 수 있어 해당 수준으로의 정화를 위한 별도의 수질정화 공정이 필요치 않아 그에 따른 비용 절감 및 수질개선의 장점이 있다.And according to the present invention, by filtering the pollutants contained in the rainwater in the process of storing the rainwater using a material that can purify the water, a certain level of water quality can be secured to purify to the corresponding level Since there is no need for a separate water purification process, there are advantages of cost reduction and water quality improvement.

또한 본 발명에 따르면, 지반침하의 우려가 없고 평활도의 확보가 용이하여 장기간 사용에도 함몰에 의한 하자 및 사고 발생을 방지할 수 있는 효과가 있다. In addition, according to the present invention, there is no fear of ground subsidence, it is easy to ensure the smoothness, there is an effect that can prevent the occurrence of defects and accidents by sinking even in long-term use.

아울러, 본 발명에 따르면, 장기간 사용에도 불구하고 투수성이 지속적으로 유지될 수 있어 하자 보수비용이 현저히 절감될 뿐만 아니라, 물 고임 현상을 방지할 수 있는 잇점이 있다.In addition, according to the present invention, the water permeability can be continuously maintained despite long-term use, as well as the rehabilitation costs significantly reduced, there is an advantage that can prevent the water pooling phenomenon.

도 1은 종래기술에 따른 인조잔디 구장의 시공방법을 도시한 단면도,
도 2는 본 발명에 따른 친환경 인조잔디 구장의 시공방법을 도시한 순서도,
도 3은 본 발명에 따른 친환경 인조잔디 구장의 시공방법을 도시한 단면도,
도 4 내지 도 10은 본 발명에 따른 친환경 인조잔디 구장의 시공방법의 시공순서를 단계별로 도시한 사시도,
도 11은 제2실시예에 따른 친환경 인조잔디 구장의 시공방법을 도시한 단면 사시도이다.
1 is a cross-sectional view showing a construction method of artificial turf ball according to the prior art,
Figure 2 is a flow chart illustrating a construction method of eco-friendly artificial turf stadium according to the present invention,
3 is a cross-sectional view showing a construction method of an environmentally friendly artificial turf ballpark according to the present invention;
4 to 10 is a perspective view showing step by step of the construction procedure of the construction method of environmentally friendly artificial turf stadium according to the present invention,
11 is a cross-sectional perspective view showing a construction method of an environmentally friendly artificial turf stadium according to the second embodiment.

이하에서는 본 발명에 따른 친환경 인조잔디 구장의 시공방법에 관하여 첨부되어진 도면과 더불어 설명하기로 한다.
Hereinafter will be described with the accompanying drawings with respect to the construction method of the environmentally friendly artificial turf stadium according to the present invention.

<제1실시예>First Embodiment

도 2는 본 발명에 따른 친환경 인조잔디 구장의 시공방법을 도시한 순서도이고, 도 3은 본 발명에 따른 친환경 인조잔디 구장의 시공방법을 도시한 단면도이며, 도 4 내지 도 10은 본 발명에 따른 친환경 인조잔디 구장의 시공방법의 시공순서를 단계별로 도시한 사시도이다. 2 is a flow chart illustrating a construction method of eco-friendly artificial turf stadium according to the present invention, Figure 3 is a cross-sectional view showing a construction method of the eco-friendly artificial turf stadium according to the present invention, Figures 4 to 10 according to the present invention This is a perspective view showing the construction procedure step by step of the construction method of eco-friendly artificial turf.

도시된 바와 같이, 본 발명에 따른 친환경 인조잔디 구장의 시공방법은, 작업대상 지반(10)에 침하방지용 보강매트(12)를 적층하는 단계로부터 개시된다. 상기 침하방지용 보강매트(12)는, 연약지반의 지지력을 보강하여 주고, 부동침하를 방지하며, 성토재유실 방지 및 여과기능뿐만 아니라, 도로노반 균등화 및 크랙(crack)을 방지할 수 있다(단계 S10). As shown, the construction method of eco-friendly artificial turf ball field according to the present invention, is started from the step of laminating the reinforcement mat 12 for settlement on the ground (10). The settlement settlement reinforcement mat 12, reinforces the bearing capacity of the soft ground, prevents the floating settlement, and prevents the ground material loss and filtration, as well as road roadbed equalization and crack (step S10) ).

상기 보강매트(12) 상에는 외부의 물을 내부로 유입시켜 집수관으로 이동시키기 위하여 측부 및 상부에 다수개의 구멍이 관통 형성된 유공관(14)을 설치한다. 상기 유공관(14)은 병렬로 일정 간격을 두고 설치되고, 각 일단은 유입된 물이 집수관(미도시)으로 유입되도록 집수관의 측면에 연결된다(단계 S20). On the reinforcing mat 12, a hole hole 14 having a plurality of holes penetrates the side and the upper part is installed in order to move external water into the collection pipe. The perforated pipe 14 is installed at a predetermined interval in parallel, each end is connected to the side of the collecting pipe so that the water introduced into the collecting pipe (not shown) (step S20).

상기 유공관(14) 주위에는 자갈을 덮는다. 보다 상세히 설명하면, 상기 보강매트(12) 상에 직경 25~40㎜의 자갈을 상기 유공관(14)이 덮여질 정도로 적층하여 배수층(16)을 형성한다. 이러한 배수층(16)은 대략 50~150㎜의 두께로 형성되고, 상기 자갈은 쇠석을 사용할 수 있다. The perforated pipe 14 is covered with gravel. In more detail, the gravel having a diameter of 25 to 40 mm is laminated on the reinforcing mat 12 to the extent that the hole tube 14 is covered to form a drainage layer 16. The drainage layer 16 is formed to a thickness of approximately 50 ~ 150mm, the gravel may be used a keystone.

이와 같이 유공관(14) 주위에 비교적 직경이 큰 자갈로 이루어진 배수층(16)을 형성하는 것은, 상부의 압력으로부터 유공관(14)을 보호함과 아울러, 상부로부터 흘러 내리는 물이 자갈 사이의 공극을 통해 유공관(14)으로 보다 용이하게 진입할 수 있도록 하기 위함이다(단계 S30).The formation of the drainage layer 16 made of relatively large diameter gravel around the perforated pipe 14 thus protects the perforated pipe 14 from the pressure at the top, and the water flowing from the top through the voids between the gravel. This is to allow easier entry into the hole 14 (step S30).

상기 배수층(16) 상에는, 이후에 타설되는 콘크리트가 배수층(16)으로 침투하지 않도록 침투방지막(18)을 설치한다. 상기 침투방지막(18)은 콘크리트의 통과를 방지하기 위한 것이므로, 그 재료에는 특별한 한정이 없지만, 일반적으로 비닐이 사용될 수 있다. On the drainage layer 16, a penetration preventing film 18 is provided so that the concrete to be poured later does not penetrate into the drainage layer 16. Since the penetration barrier 18 is for preventing the passage of concrete, the material is not particularly limited, and generally vinyl may be used.

그리고 침투방지막(18)은, 콘크리트의 점성이 크거나 배수층(16)의 다짐이 잘 되어 있어 콘크리트의 침투의 정도가 크지 않다고 판단되는 경우에는 설치하지 않을 수도 있다(단계 S31).And the penetration prevention film 18 may not be provided when it is determined that the viscosity of the concrete is large or the drainage layer 16 is well compacted and the degree of penetration of the concrete is not large (step S31).

또한 침투방지막(18)이 형성되면, 그 위에 와이어 메쉬(20)를 설치한다. 상기 와이어 메쉬(20)는 타설되는 콘크리트와 결합하여 콘크리트에 대해 인장력을 보강해 줄 뿐만 아니라, 이후에 설치되는 파이프(22)를 지지해 주는 역할도 수행한다(단계 S32). In addition, when the penetration prevention film 18 is formed, a wire mesh 20 is installed thereon. The wire mesh 20 combines with the concrete to be poured to not only reinforce the tensile force for the concrete, but also serves to support the pipe 22 to be installed later (step S32).

상기 와이어 메쉬(20)가 설치되면, 파이프(22)를 상기 침투방지막(18) 상에 설치한다. 이때 침투방지막(18)이 설치되지 않는 경우라면, 상기 파이프(22)는 배수층(16) 상에 설치될 것이다. When the wire mesh 20 is installed, the pipe 22 is installed on the penetration barrier 18. In this case, if the penetration barrier 18 is not installed, the pipe 22 will be installed on the drainage layer 16.

상기 파이프(22)는 대략 50~100㎜ 길이를 갖는 PVC관을 사용할 수 있고, 수직으로 세워 설치하며, 대략 1m 간격을 두고 격자형으로 설치한다. 이때 상기 파이프(22)는 콘크리트 타설시 이동하거나 쓰러지지 않아야 하므로, 임시적으로 고정되는 것이 바람직하다. 이를 위해 상기 파이프(22) 내측으로 바(미도시)가 통과하여 배수층(16)에 삽입되도록 할 수도 있고, 상기 와이어 메쉬(20)를 이용할 수도 있다. 와이어 메쉬(20)를 이용하는 경우에는, 격자형의 와이어 메쉬(20) 상에 상기 파이프(22)를 끼우거나, 상기 와이어 메쉬(20)의 일부를 절개하여 절곡함으로써 절곡된 부분에 의해 상기 파이프(22)가 지지되도록 할 수 있다. 여기서, 상기 파이프(22)를 임시 고정하는 방식은 예시일 뿐이고, 본 기술분야의 통상의 지식을 가진 자가 적용 가능한 다른 방식을 배제하는 것은 아니다(단계 S40).The pipe 22 may use a PVC pipe having a length of about 50 to 100 mm, installed vertically, and installed in a lattice shape at intervals of about 1 m. At this time, since the pipe 22 should not move or fall when placing concrete, it is preferable to temporarily fix it. To this end, a bar (not shown) may be inserted into the pipe 22 to be inserted into the drainage layer 16, or the wire mesh 20 may be used. In the case of using the wire mesh 20, the pipe 22 is formed by bending the pipe 22 on the lattice-shaped wire mesh 20 or by cutting a portion of the wire mesh 20 and bending it. 22) can be supported. Here, the manner of temporarily fixing the pipe 22 is only an example, and does not exclude other methods applicable to those skilled in the art (step S40).

파이프(22)가 설치되면, 상기 파이프(22) 상부에 차단막(미도시)을 설치한다. 상기 차단막은 타설되는 콘크리트가 상기 파이프(22)로 유입되지 않도록 하기 위한 것으로, 비닐 등을 활용하여 상기 파이프(22)의 상부에 장착될 수 있다. When the pipe 22 is installed, a blocking film (not shown) is installed on the pipe 22. The blocking film is to prevent the concrete to be poured into the pipe 22, and may be mounted on the pipe 22 using vinyl or the like.

이때 상기 파이프(22)의 상면이 막혀진 상태의 파이프(22)를 사용한다면, 상기 차단막의 설치단계는 생략 가능하다(단계 S41).At this time, if the pipe 22 in a state where the upper surface of the pipe 22 is blocked, the installation step of the blocking film can be omitted (step S41).

그 후 콘크리트를 타설하는데, 콘크리트의 타설 두께는 상기 파이프(22)의 상면과 콘크리트의 상면이 동일하거나 상기 파이프(22)의 상면보다 콘크리트의 상면이 낮도록 결정하는 것이 바람직하다. 이는 상기 파이프(22)에 의해 콘크리트의 상면으로부터 배수층(16)으로 관통공(28)의 형성을 용이하게 하기 위함이다(단계 S50).Thereafter, concrete is poured, and the thickness of the concrete is preferably determined so that the upper surface of the pipe 22 and the upper surface of the concrete are the same or lower than the upper surface of the pipe 22. This is to facilitate the formation of the through hole 28 from the upper surface of the concrete to the drainage layer 16 by the pipe 22 (step S50).

그리고 콘크리트가 타설되어 형성된 콘크리트층(26)으로부터 상기 파이프(22)를 제거한다. 상기 파이프(22)가 제거되면 콘크리트층(26)에는 관통공(28)이 형성되는데, 상기 콘크리트층(26)의 상면으로부터 배수층(16)으로 상기 관통공(28)이 연통되도록 하기 위하여, 상기 파이프(22)가 제거됨에 따라 노출된 침투방지막(18)은 제거되어야 한다(단계 S60). And the pipe 22 is removed from the concrete layer 26 formed by pouring concrete. When the pipe 22 is removed, the through hole 28 is formed in the concrete layer 26. In order to allow the through hole 28 to communicate with the drainage layer 16 from the upper surface of the concrete layer 26, As the pipe 22 is removed, the exposed penetration barrier 18 must be removed (step S60).

상기 관통공(28)에는 미세한 입자 또는 공극을 갖는 물질, 예를 들면 숯 또는 숯 알갱이를 적층하는 제1층(30)과, 상기 제1층(30)상에 직경 20~30㎜의 자갈과 상기 자갈에 대해 2~8중량%의 바인더를 혼합한 제2층(32)을 적층한다. 이때 상기 제2층(32)의 상면은 콘크리트층(26)의 상면과 일치되는 것이 바람직하다(단계 S70).The through hole 28 includes a first layer 30 for laminating fine particles or pores, for example, charcoal or charcoal granules, gravel having a diameter of 20 to 30 mm on the first layer 30, and The second layer 32 is mixed with a binder of 2 to 8% by weight based on the gravel. At this time, the upper surface of the second layer 32 is preferably coincided with the upper surface of the concrete layer 26 (step S70).

이와 같이 관통공(28)이 채워진 콘크리트층(26)의 상면에는 인조잔디(36)가 조성된다(단계 S90). 이때 인조잔디(36) 위에 고무칩이 뿌려진 충진용 인조잔디인 경우에는 상기 콘크리트층(26)에 인조잔디를 바로 조성할 수 있지만, 무충진용 인조잔디인 경우에는 인조잔디를 조성하기 이전에 탄성층(34)을 적층한다. 본 발명은 충진용과 무충진용으로 모두 사용 가능하지만, 현재 무충진용 인조잔디를 조성하는 것이 일반적이므로, 무충진용을 중심으로 설명한다.Thus, artificial turf 36 is formed on the upper surface of the concrete layer 26 filled with the through hole 28 (step S90). At this time, in the case of the artificial turf for filling the rubber chip on the artificial turf 36 can be artificially formed in the concrete layer 26, but in the case of the artificial turf without filling, it is elastic before forming the artificial turf. Layer 34 is laminated. The present invention can be used for both filling and non-filling, but since it is common to form artificial grass for filling at present, the present invention will be described based on filling.

상기 탄성층(34)은 직경 5~8㎜의 고무칩 80~85중량%와 바인더 15~20중량%를 혼합하여 구성될 수도 있고, 직경 5~8㎜의 코르크 35~45중량%와 바인더 55~65중량%를 혼합하여 구성될 수도 있다(단계 S80).The elastic layer 34 may be configured by mixing 80 to 85% by weight of the rubber chip 5 to 8mm in diameter and 15 to 20% by weight of the binder, and 35 to 45% by weight of the cork 5 to 8mm and binder 55 It may be configured by mixing ~ 65% by weight (step S80).

이상과 같은 방식으로 인조잔디(36)를 조성하면, 인조잔디 구장에 떨어지는 빗물을 저장하여 활용할 수 있게 되고, 자갈 및 숯과 같은 친환경 재료를 통과하면서 물에 포함된 오염 물질이 걸러지는 효과가 있다. 또한 본 발명에 따른 인조잔디 구장에는 콘크리트 기반에 조성되므로, 지반침하의 우려가 없고, 평활도의 확보가 용이하다. 또한, 콘크리트층(26)의 중간에 관통공(28)에 의한 투수공간이 마련되므로, 콘크리트층(26)이 투수공간을 지지해 주어서 투수공간이 좁아지지 않고, 투수공간에 적층된 자갈이 그대로 유지될 수 있으므로, 장기간 사용에도 투수성이 그대로 유지될 수 있다.
If the artificial turf 36 is formed in the above manner, rainwater falling on the artificial turf can be stored and utilized, and the pollutants contained in the water are filtered while passing through eco-friendly materials such as gravel and charcoal. . In addition, since the artificial turf field according to the present invention is formed on a concrete base, there is no fear of ground subsidence, and it is easy to secure smoothness. In addition, since the permeation space is provided by the through hole 28 in the middle of the concrete layer 26, the concrete layer 26 supports the permeation space so that the permeation space does not become narrow, and the gravel stacked in the permeation space is intact. Since it can be maintained, the water permeability can be maintained even in the long term use.

<제2실시예>Second Embodiment

다음으로 본 발명에 따른 친환경 인조잔디 구장의 시공방법의 제2실시예에 대해 설명한다. 본 실시예에서 제1실시예와 대응되는 구성요소에 대해서는 동일한 도면부호를 사용하기로 한다.Next, a second embodiment of the construction method of the environmentally friendly artificial turf stadium according to the present invention will be described. In the present embodiment, the same reference numerals are used for the components corresponding to the first embodiment.

도 11은 제2실시예에 따른 친환경 인조잔디 구장의 시공방법을 도시한 단면 사시도이다. 여기서 도 11에서는 인조잔디는 생략되어 있다.11 is a cross-sectional perspective view showing a construction method of an environmentally friendly artificial turf stadium according to the second embodiment. In FIG. 11, the artificial turf is omitted.

도시된 바와 같이, 본 실시예에서는, 파이프(22')의 형태가 제1실시예와 상이하다. 즉, 본 실시예에서의 파이프(22')는, 직사각형 형태로 이루어지고 상부와 하부가 개방된 형태로 구성된다. 그러나 본 실시예의 파이프(22')는 제1실시예와 동일하게 구성되되, 도 11에 도시된 형태와 유사하게 되도록 근접 배치되는 것도 가능하다.As shown, in this embodiment, the shape of the pipe 22 'is different from that of the first embodiment. In other words, the pipe 22 'in the present embodiment has a rectangular shape and is configured in such a manner that the upper part and the lower part are open. However, the pipe 22 'of the present embodiment may be configured similarly to the first embodiment, but may be disposed in close proximity to be similar to the shape shown in FIG.

그리고 상기 파이프(22') 주변에 타설되는 콘크리트는 콘크리트 상면에 구배가 형성되어 탄성층(34)을 통해 유입된 물이 상기 구배를 따라 관통공(28)으로 유입되도록 구성된다. In addition, the concrete poured around the pipe 22 ′ is configured to have a gradient formed on the upper surface of the concrete so that water introduced through the elastic layer 34 flows into the through hole 28 along the gradient.

또한 콘크리트층(26)의 상면에 설치되는 탄성층(34)은 콘크리트층(26)의 구배를 매워 그 상면은 평활하게 형성된다.In addition, the elastic layer 34 installed on the upper surface of the concrete layer 26 fills the gradient of the concrete layer 26 so that the upper surface is smoothly formed.

상기와 같이 이루어지는 인조잔디 구장에서는, 탄성층(34)을 통과한 빗물이 콘크리트층(26)의 구배를 따라 관통공(28)으로 쉽게 유입될 수 있으므로, 인조잔디(36) 상에 물이 고이는 현상을 완전히 해소할 수 있게 된다. 아울러, 유공관(14)을 통해 보다 쉽고 빠르게 많은 물을 집수정으로 저수할 수 있으므로, 빗물의 활용도가 그만큼 증대되는 장점이 있다.
In the artificial turf ball field formed as described above, since rainwater having passed through the elastic layer 34 can easily flow into the through hole 28 along the gradient of the concrete layer 26, water is accumulated on the artificial turf 36. The phenomenon can be completely solved. In addition, since the water pipe 14 can more easily and quickly store a large amount of water into the sump, there is an advantage that the utilization of rain water is increased that much.

<제3실시예>Third Embodiment

다음으로 본 발명에 따른 친환경 인조잔디 구장의 시공방법의 제3실시예에 대해 설명한다.Next, a third embodiment of the construction method of the environmentally friendly artificial turf stadium according to the present invention will be described.

본 실시예는 제1실시예 및 제2실시예와 실질적으로 동일하지만, 설치된 파이프(22, 22')를 제거하지 않는다는 점에서 상이하다. 즉, 본 실시예에서는 파이프(22, 22')를 콘크리트층(26)으로부터 제거하지 않고 상기 파이프(22, 22') 내에 제1층(30)과 제2층(32)을 형성함으로써 파이프(22, 22') 제거 과정을 생략할 수 있는 장점이 생기게 된다. 다만, 본 실시예에서는 파이프(22, 22')를 제거하지 않음으로써, 파이프(22, 22')가 콘크리트층(26)의 상부로 노출되어 탄성층(34) 내에 파묻혀 장기간 사용시 탄성층(34)의 파손을 유발할 수 있기 때문에, 파이프(22, 22') 상면과 콘크리트층(26)의 상면을 동일 높이로 시공하는 것이 바람직하다. This embodiment is substantially the same as the first and second embodiments, but differs in that it does not remove the installed pipes 22 and 22 '. That is, in the present embodiment, the pipes 22 and 22 'are formed by forming the first layer 30 and the second layer 32 in the pipes 22 and 22' without removing the pipes 22 and 22 'from the concrete layer 26. 22, 22 ') has the advantage that the elimination process can be omitted. In this embodiment, however, the pipes 22 and 22 'are not removed, so that the pipes 22 and 22' are exposed to the upper portion of the concrete layer 26 and buried in the elastic layer 34 so that the elastic layer 34 can be used for a long time. It is preferable to construct the upper surfaces of the pipes 22 and 22 'and the upper surface of the concrete layer 26 at the same height because they may cause breakage.

그 외의 과정 및 작용효과는 제1실시예 및 제2실시예와 동일하므로 그에 대한 상세한 설명은 생략한다.
Since other processes and effects are the same as in the first and second embodiments, detailed description thereof will be omitted.

본 발명의 권리는 위에서 설명된 실시예에 한정되지 않고 청구범위에 기재된 바에 의해 정의되며, 본 발명의 분야에서 통상의 지식을 가진 자가 청구범위에 기재된 권리범위 내에서 다양한 변형과 개작을 할 수 있다는 것은 자명하다.The rights of the present invention are not limited to the embodiments described above, but are defined by the claims, and those skilled in the art can make various modifications and adaptations within the scope of the claims. It is self-evident.

10 : 지반 12 : 보강매트
14 : 유공관 16 : 배수층
18 : 침투방지막 20 : 와이어 메쉬
22 : 파이프 26 : 콘크리트층
28 : 관통공 30 : 제1층
32 : 제2층 34 : 탄성층
36 : 인조잔디
10: ground 12: reinforcement mat
14: hole pipe 16: drainage layer
18: penetration barrier 20: wire mesh
22: pipe 26: concrete layer
28: through hole 30: first layer
32: second layer 34: elastic layer
36: artificial turf

Claims (8)

지반에 침하방지용 보강매트를 적층하는 단계;
상기 보강매트 상에 외부의 물을 내부로 유입시켜 집수관으로 이동시키기 위하여 측부 및 상부에 다수개의 구멍이 관통 형성된 유공관을 설치하는 단계;
상기 유공관을 덮도록 상기 보강매트 상에 직경 25~40㎜의 자갈로 이루어지는 배수층을 형성하는 단계;
상기 배수층에 50~100㎜ 길이의 파이프를 일정간격을 두고 수직으로 설치하는 단계;
상기 파이프 상면과 동일하거나 낮은 높이로 상기 배수층 상에 콘크리트를 타설하여 콘크리트층을 형성하는 단계;
상기 파이프를 상기 콘크리트층으로부터 제거하여 상기 콘크리트층에 상기 배수층에 연통되는 관통공을 형성하는 단계;
상기 관통공에 미세한 입자 또는 공극을 갖는 물질을 적층하는 제1층과, 상기 제1층상에 직경 20~30㎜의 자갈과 상기 자갈에 대해 2~8중량%의 바인더를 혼합한 제2층을 적층하여 상기 콘크리트층의 상면과 일치시키는 단계; 및
상기 콘크리트층과 제2층 상에 인조잔디를 조성하는 단계;를 포함하는 것을 특징으로 하는 친환경 인조잔디 구장의 시공방법.
Stacking a reinforcing mat for preventing settlement on the ground;
Installing a perforated tube having a plurality of holes penetrated at the side and the upper portion to move external water into the collection pipe on the reinforcing mat;
Forming a drainage layer made of gravel having a diameter of 25 to 40 mm on the reinforcing mat to cover the hole pipe;
Vertically installing a pipe having a length of 50 to 100 mm in the drainage layer at a predetermined interval;
Placing concrete on the drainage layer at a height equal to or lower than the upper surface of the pipe to form a concrete layer;
Removing the pipe from the concrete layer to form a through hole communicating with the drainage layer in the concrete layer;
A first layer for laminating a material having fine particles or voids in the through hole, and a second layer in which a gravel having a diameter of 20 to 30 mm and a binder of 2 to 8 wt% of the gravel are mixed on the first layer. Stacking and matching the upper surface of the concrete layer; And
Constructing artificial turf on the concrete layer and the second layer; Construction method of eco-friendly artificial turf stadium comprising a.
지반에 침하방지용 보강매트를 적층하는 단계;
상기 보강매트 상에 외부의 물을 내부로 유입시켜 집수관으로 이동시키기 위하여 측부 및 상부에 다수개의 구멍이 관통 형성된 유공관을 설치하는 단계;
상기 유공관을 덮도록 상기 보강매트 상에 직경 25~40㎜의 자갈로 이루어지는 배수층을 형성하는 단계;
상기 배수층에 50~100㎜ 길이의 파이프를 일정간격을 두고 수직으로 설치하는 단계;
상기 파이프 상면과 동일하거나 낮은 높이로 상기 배수층 상에 콘크리트를 타설하여 콘크리트층을 형성하는 단계;
상기 파이프 내에 미세한 입자 또는 공극을 갖는 물질을 적층하는 제1층과, 상기 제1층상에 직경 20~30㎜의 자갈과 상기 자갈에 대해 2~8중량%의 바인더를 혼합한 제2층을 적층하여 상기 콘크리트층의 상면과 일치시키는 단계; 및
상기 콘크리트층과 제2층 상에 인조잔디를 조성하는 단계;를 포함하는 것을 특징으로 하는 친환경 인조잔디 구장의 시공방법.
Stacking a reinforcing mat for preventing settlement on the ground;
Installing a perforated tube having a plurality of holes penetrated at the side and the upper portion to move external water into the collection pipe on the reinforcing mat;
Forming a drainage layer made of gravel having a diameter of 25 to 40 mm on the reinforcing mat to cover the hole pipe;
Vertically installing a pipe having a length of 50 to 100 mm in the drainage layer at a predetermined interval;
Placing concrete on the drainage layer at a height equal to or lower than the upper surface of the pipe to form a concrete layer;
Laminating a first layer of laminating a material having fine particles or pores in the pipe, and a second layer of 20 to 30 mm diameter gravel and 2 to 8% by weight of binder based on the gravel on the first layer To match the upper surface of the concrete layer; And
Constructing artificial turf on the concrete layer and the second layer; Construction method of eco-friendly artificial turf stadium comprising a.
제1항 또는 제2항에 있어서,
상기 배수층의 형성단계 이후에는, 타설된 콘크리트가 상기 배수층으로 침투하지 않도록 상기 배수층 상에 침투방지막을 형성하는 단계와, 상기 침투방지막 상에 와이어 메쉬를 설치하는 단계를 더 포함하는 것을 특징으로 하는 친환경 인조잔디 구장의 시공방법.
The method according to claim 1 or 2,
After the step of forming the drainage layer, forming an infiltration barrier on the drainage layer so that the poured concrete does not penetrate into the drainage layer, and further comprising the step of installing a wire mesh on the penetration barrier Construction method of artificial turf field.
제1항 또는 제2항에 있어서,
상기 파이프 설치단계에서는, 타설되는 콘크리트가 상기 파이프로 유입되지 않도록 상기 파이프의 상부에 차단막을 형성하는 단계를 더 포함하는 것을 특징으로 하는 친환경 인조잔디 구장의 시공방법.
The method according to claim 1 or 2,
In the pipe installation step, the construction method of eco-friendly artificial turf ball, characterized in that it further comprises the step of forming a barrier on the upper portion of the pipe so that the concrete is not poured into the pipe.
제1항 또는 제2항에 있어서,
상기 제1층 및 제2층 형성단계 이후에는, 상기 콘크리트층과 제2층 상에 탄성층을 형성하는 단계를 더 포함하는 것을 특징으로 하는 친환경 인조잔디 구장의 시공방법.
The method according to claim 1 or 2,
After the first layer and the second layer forming step, the construction method of eco-friendly artificial turf stadium further comprising the step of forming an elastic layer on the concrete layer and the second layer.
제5항에 있어서,
상기 탄성층은 직경 5~8㎜의 고무칩 80~85중량%와 바인더 15~20중량%를 혼합하여 적층되는 것을 특징으로 하는 친환경 인조잔디 구장의 시공방법.
The method of claim 5,
The elastic layer is a construction method of eco-friendly artificial turf ball, characterized in that laminated by mixing 80 to 85% by weight and 15 to 20% by weight of the rubber chip 5-8 mm in diameter.
제5항에 있어서,
상기 탄성층은 직경 5~8㎜의 코르크 35~45중량%와 바인더 55~65중량%를 혼합하여 적층되는 것을 특징으로 하는 친환경 인조잔디 구장의 시공방법.
The method of claim 5,
The elastic layer is a construction method of eco-friendly artificial turf ball, characterized in that laminated by mixing 35 ~ 45% by weight of the cork 5 ~ 8mm and 55 ~ 65% by weight of the binder.
제1항 또는 제2항에 있어서,
상기 콘크리트층의 형성단계에서는, 상기 콘크리트층의 상면에 파이프를 향하여 낮아지는 구배를 형성하는 것을 특징으로 하는 친환경 인조잔디 구장의 시공방법.
The method according to claim 1 or 2,
In the step of forming the concrete layer, the construction method of eco-friendly artificial turf ball, characterized in that to form a gradient lowered toward the pipe on the upper surface of the concrete layer.
KR1020100000714A 2010-01-06 2010-01-06 Constructing method of nature-friendly artificial grass KR101098260B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100000714A KR101098260B1 (en) 2010-01-06 2010-01-06 Constructing method of nature-friendly artificial grass

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100000714A KR101098260B1 (en) 2010-01-06 2010-01-06 Constructing method of nature-friendly artificial grass

Publications (2)

Publication Number Publication Date
KR20110080467A KR20110080467A (en) 2011-07-13
KR101098260B1 true KR101098260B1 (en) 2011-12-28

Family

ID=44919372

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100000714A KR101098260B1 (en) 2010-01-06 2010-01-06 Constructing method of nature-friendly artificial grass

Country Status (1)

Country Link
KR (1) KR101098260B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101131909B1 (en) 2010-04-26 2012-04-03 김동현 Constructing method of nature-friendly ground storing and using rain by permeability and evaporation

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105696688A (en) * 2016-01-21 2016-06-22 大连久鼎祥瑞特种工程技术研究院有限公司 Rapid collecting and conveying system of urban road or surface layer rainwater
GB201818513D0 (en) 2018-11-13 2018-12-26 Imperial Innovations Ltd High strength porous cement-based materials
KR102436740B1 (en) * 2022-04-27 2022-08-26 주식회사 주목씨지알 Floor structure of tennis court with excellent vertical drainage and method of floor structure construction

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100798960B1 (en) 2006-08-09 2008-01-30 김동현 The water storage reduction space playground structural altificial grass body

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100798960B1 (en) 2006-08-09 2008-01-30 김동현 The water storage reduction space playground structural altificial grass body

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101131909B1 (en) 2010-04-26 2012-04-03 김동현 Constructing method of nature-friendly ground storing and using rain by permeability and evaporation

Also Published As

Publication number Publication date
KR20110080467A (en) 2011-07-13

Similar Documents

Publication Publication Date Title
US8221029B2 (en) Water drainage and harvesting system for an artificial turf environment
US8852009B2 (en) Activity surfaces using structural modules
EP2454416A1 (en) Surfaces using structural modules
KR101783950B1 (en) Drain structure for planting grass and construction method thereof
KR101098260B1 (en) Constructing method of nature-friendly artificial grass
KR101020718B1 (en) Seepaging structure using absorbent pavement geo-cell for material and rainforced of ground
EP2514870A1 (en) Site surfacing and the use thereof
KR100835339B1 (en) Hollow type bridge pier drain structure
JP6362998B2 (en) Playground drainage structure
KR101206728B1 (en) Nature-friendly artificial grass structure set for enable to rain-watwe utilization and construction method thereof
KR101152212B1 (en) construction process of porus style of block
KR101309827B1 (en) Drain structure body of ground using line and construction method thereof
JP2014105508A (en) Structure for laying artificial lawn
KR20140001756U (en) A permeable block and a rainwater pipe permeable structure
KR200460322Y1 (en) Draining Structure using Floor Drain
KR100966468B1 (en) The water run-through-base combine armature mat with invisible water punctured pipe`s construction process
JP5396368B2 (en) Pavement structure
CN109457569A (en) A kind of drainage asphalt road structure and its construction method
CN109423937A (en) A kind of residential quarters system for reclaiming rainwater
KR101483744B1 (en) Manufacturing method of nature-friendly permeable structure restraining ground subsidence
JP3668869B2 (en) Stacking member for underground water tank
KR20090129319A (en) Structure of invisible waterway and construction method thereof including punctured pipes
KR101138004B1 (en) Constructing method of artificial turf
CN219670991U (en) Baseball stadium structure on soft soil foundation
KR102436740B1 (en) Floor structure of tennis court with excellent vertical drainage and method of floor structure construction

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20141204

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20160325

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20161114

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee