KR101090755B1 KR1020090048393A KR20090048393A KR101090755B1 KR 101090755 B1 KR101090755 B1 KR 101090755B1 KR 1020090048393 A KR1020090048393 A KR 1020090048393A KR 20090048393 A KR20090048393 A KR 20090048393A KR 101090755 B1 KR101090755 B1 KR 101090755B1
Authority
KR
South Korea
Prior art keywords
unit
excavation
structural unit
tunnel structure
ground
Prior art date
Application number
KR1020090048393A
Other languages
Korean (ko)
Other versions
KR20100129839A (en
Inventor
위성배
Original Assignee
홍익컨스텍(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 홍익컨스텍(주) filed Critical 홍익컨스텍(주)
Priority to KR1020090048393A priority Critical patent/KR101090755B1/en
Publication of KR20100129839A publication Critical patent/KR20100129839A/en
Application granted granted Critical
Publication of KR101090755B1 publication Critical patent/KR101090755B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/02Driving inclined tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/005Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by forcing prefabricated elements through the ground, e.g. by pushing lining from an access pit
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • E21D9/1006Making by using boring or cutting machines with rotary cutting tools
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions
    • E21F13/006Equipment transport systems

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

본 발명은 비개착식 터널 구조물의 시공방법에 관한 것으로서, 좀 더 상세하게는, 터널 구조물을 시공할 지중에 암반이 존재하는 경우라도 터널 구조물단위체를 지중에 압입하여 일자형태로 시공하여 터널 시공작업의 단순화 및 공사기간을 단축하고, 터널 시공 중에 발생 될 수 있는 지반침하를 사전에 방지하며, 터널 구조물의 압입방향으로의 직진성을 유지시켜 정밀 시공이 가능하고, 다수의 상기 구조물 단위체가 서로 견고하게 결합 되어 터널 구조물의 안전성을 향상시킨 비개착식 터널 구조물의 시공방법에 관한 것이다.

본 발명에 따른 비개착식 터널 구조물의 시공방법은, 지중에 터널 구조물을 비개착식으로 시공하는 터널 구조물의 시공방법에 있어서, 터널 구조물을 시공할 장소의 양편을 수직 방향으로 굴착하여 소정깊이의 발진구(10) 및 도달구(20)를 형성하는 제 1단계; 상기 발진구(10)의 저면에 터널 구조물이 압입되는 방향으로 다수개의 플로어레일(30)을 소정간격으로 설치하는 제 2단계; 외곽면을 따라 다수의 굴착파이프(44)가 소정간격으로 형성되는 몸체부(41)와, 상기 몸체부(41)의 선단에는 지중 압입을 위한 선단슈(42)를 장착하며, 상기 몸체부(41)의 상부측 내부에는 지중에 압입되는 방향으로 다수의 가이드파일(43)의 일측이 매설되는 터널 구조물의 선단 구조물단위체(40)를 형성하고, 상기 굴착파이프(44)의 전방에는 굴착기구부(50)를 장착하는 제 3단계; 상기 선단 구조물단위체(40)를 플로어레일(30) 상에 위치시킨 후에 상기 굴착기구부(50)를 작동시켜 선단 구조물단위체(40)의 외곽을 따라 소정지름의 홀을 지중에 굴착하고, 상기 선단 구조물단위체(40)와 함께 굴착파이프(44)를 압입 전진 시킨 후, 상기 선단 구조물단위체(40)의 전방을 굴착하는 제 4단계; 상기 선단 구조물단위체 몸체부(41)의 단면과 동일형상으로 형성되고 상기 선단 구조물단위체 몸체부(41)에 형성된 상기 다수의 굴착파이프(44)의 연장선상에 외곽면을 따라 굴착파이프(44)가 형성되는 몸체부(61)와, 상기 몸체부(61)의 상부측 내부에는 상기 가이드파일(43)이 관통되도록 관통홀(62)이 마련되는 후단 구조물단위체(60)를 형성하는 제 5단계; 상기 후단 구조물단위체(60)를 상기 선단 구조물단위체(40)의 후방에 상기 플로어레일(30) 상에 위치시키고, 상기 관통홀(62)에 가이드파일(43)이 관통되도록 하며, 상기 선단 구조물단위체(40)와 상기 후단 구조물단위체(60)의 굴착파이프(44)를 서로 연결한 후, 후단 구조물단위체(60)를 압입 전진시키는 제 6단계; 및 상기 제 4단계와 제 6단계를 상기 굴착기구부(50)가 상기 도달구(20)에 도달할 때 까지지 반복적으로 작업하여 다수의 상기 후단 구조물단위체(60)를 하나씩 순차적으로 지중에 압입 전진시키고, 상기 선단 및 다수의 구조물단위체를 접합시켜 전체 터널 구조물을 완성하는 제 7단계;로 이루어지는 것을 특징으로 한다.

Figure R1020090048393

비개착식, 터널 구조물, 구조물단위체, 굴착파이프, 굴착기구부, 가이드파일

The present invention relates to a method of constructing a non-adhesive tunnel structure, and more particularly, even when a rock is present in the ground to construct the tunnel structure, the tunnel structure unit is pressed into the ground and constructed in a straight form to construct the tunnel construction work. Simplifies and shortens the construction period, prevents ground subsidence that may occur during tunnel construction, and maintains straightness in the indentation direction of the tunnel structure, enabling precise construction, and the plurality of structural units firmly The present invention relates to a construction method of a non-adhesive tunnel structure that is coupled to improve the safety of the tunnel structure.

In the construction method of the non-adhesive tunnel structure according to the present invention, in the construction method of the tunnel structure in the underground construction of the non-adhesive structure, excavating both sides of the place to be installed in the tunnel structure in the vertical direction of a predetermined depth A first step of forming the oscillation opening 10 and the reaching opening 20; A second step of installing a plurality of floor rails 30 at predetermined intervals in a direction in which the tunnel structure is pressed into the bottom surface of the oscillation opening 10; Along the outer surface, a plurality of excavation pipes 44 are formed at predetermined intervals, and the front end of the body portion 41 is equipped with a tip shoe 42 for press-fitting the ground, and the body portion ( Inside the upper side of 41, a front end structure unit 40 of the tunnel structure in which one side of the plurality of guide piles 43 is buried in the direction to be pressed into the ground, and in front of the excavating pipe 44 A third step of mounting 50); After positioning the tip structural unit 40 on the floor rail 30 to operate the excavation mechanism unit 50 to excavate a hole having a predetermined diameter in the ground along the periphery of the tip structural unit 40, the tip structure A fourth step of digging forward the excavation pipe 44 together with the unit 40 and then excavating the front of the distal structure unit 40; Excavation pipe 44 is formed along the outer surface on the extension line of the plurality of excavating pipes 44 formed in the same shape as the cross-section of the tip structural unit body portion 41 and formed on the tip structural unit body portion 41. A fifth step of forming a body unit 61 formed therein and a rear end unit 60 having a through hole 62 through the guide file 43 in the upper side of the body 61; The rear end structural unit 60 is positioned on the floor rail 30 at the rear of the front end structural unit 40, and the guide pile 43 penetrates through the through hole 62, and the front end structural unit 40. A sixth step of connecting the excavation pipes 44 of the rear end structure unit 60 to each other and press-advancing the rear end structure unit 60; And repeatedly performing the fourth and sixth steps until the excavation mechanism part 50 reaches the reaching hole 20 to sequentially press the plurality of rear end structural units 60 one by one in the ground. And a seventh step of completing the entire tunnel structure by joining the tip and the plurality of structural units.

Figure R1020090048393

Non-adhesive, tunnel structure, structural unit, excavation pipe, excavation mechanism part, guide pile

Description

비개착식 터널 구조물의 시공방법{The Construction Method of Shield Tunneling}The Construction Method of Shield Tunneling

본 발명은 비개착식 터널 구조물의 시공방법에 관한 것으로서, 좀 더 상세하게는, 터널 구조물을 시공할 지중에 암반이 존재하는 경우라도 터널 구조물단위체를 지중에 압입하여 일자형태로 시공하여 터널 시공작업의 단순화 및 공사기간을 단축하고, 터널 시공 중에 발생 될 수 있는 지반침하를 사전에 방지하며, 터널 구조물의 압입방향으로의 직진성을 유지시켜 정밀 시공이 가능하고, 다수의 상기 구조물 단위체가 서로 견고하게 결합 되어 터널 구조물의 안전성을 향상시킨 비개착식 터널 구조물의 시공방법에 관한 것이다.The present invention relates to a method of constructing a non-adhesive tunnel structure, and more particularly, even when a rock is present in the ground to construct the tunnel structure, the tunnel structure unit is pressed into the ground and constructed in a straight form to construct the tunnel construction work. Simplifies and shortens the construction period, prevents ground subsidence that may occur during tunnel construction, and maintains straightness in the indentation direction of the tunnel structure, enabling precise construction, and the plurality of structural units firmly The present invention relates to a construction method of a non-adhesive tunnel structure that is coupled to improve the safety of the tunnel structure.

일반적으로 지하도, 터널 등의 터널 구조물을 시공하기 위해서 다양한 시공 방법이 사용되고 있으며, 대표적인 터널 구조물 시공방법으로는 터널을 시공하고자 하는 곳의 땅을 완전히 개착하여 터널 구조물을 시공한 후 개착되어진 토사를 시공된 터널 구조물의 위로 덮어 시공을 완성하는 오픈 트렌치 공법(Open Trench Method ; 이하 OTM)이 있다. 또한, 터널을 시공하고자 하는 곳의 땅을 개착하지 않고 쉴드 터널링 머신(Shield Tunneling Machine)을 사용하여 비개착 방식으로 터널을 형성한 후, 형성된 터널 내측에 터널 구조물을 시공하여 완성하는 터널 보링 공법(Tunneling Boring Method ; 이하 TBM)이 있으며. 그밖에 도로 또는 철도 레일 밑에 터널을 구축하는 방법으로써, 파이프를 이용하여 상부의 토층을 지지한 상태에서 그 하부에 지하 구조물을 시공하는 루프 파이프 공법(Roof Pipe of Method)등이 있다.In general, various construction methods are used to construct tunnel structures such as underpasses and tunnels.A typical tunnel structure construction method is to completely reattach the land where a tunnel is to be constructed and to construct the tunnel structure after constructing the tunnel structure. There is an Open Trench Method (OTM) that covers the top of the tunnel structure and completes the construction. In addition, the tunnel boring method is completed by constructing the tunnel structure inside the formed tunnel after the tunnel is formed in a non-opening manner by using a shield tunneling machine without shielding the land where the tunnel is to be constructed. Tunneling Boring Method (TBM). In addition, as a method of constructing a tunnel under a road or railway rail, there is a roof pipe method for constructing an underground structure under the state of supporting the upper soil layer using a pipe.

상기한 오픈 트렌치 공법(OTM)과 터널보링공법(TBM) 중에서 현재 대표적으로 쓰이는 공법은 터널보링공법으로, 주로 도시지역 또는 지반이 암반층으로 이루어진 곳에서 널리 사용되는데, 이는 터널을 시공하는 과정에서 지상 구조물(도로, 건물 등)과 지하 구조물(하수도, 가스관 등) 및 지상의 교통 흐름에 최소한의 영향을 끼치면서 터널을 시공할 수 있기 때문이다.Among the above-mentioned open trench method (OTM) and tunnel boring method (TBM), the representative method currently used is the tunnel boring method, which is widely used in urban areas or where the ground is composed of rock layers. This is because tunnels can be constructed with minimal impact on structures (roads, buildings, etc.), underground structures (sewers, gas pipes, etc.) and ground traffic.

그러나, 이와 같은 오픈 트렌치 공법은 터널 시공시에 지반을 개착한 상태에서 터널 시공이 진행되어 지상의 도로나 건물 등에 의해 터널 시공장소가 큰 제약을 받게 되는 문제점이 있었고, 쉴드 보링 공법의 경우에는 주로 암반층에 터널을 비개착 상태로 시공하는 방식으로 지중에는 적용하기 어려운 문제점이 있었다. 이에 본 출원인은 대한민국 특허등록 제 10-0562121호에서 지중에 비개착식으로 터널을 시공하기 위해 터널 구조물을 지중 내부에 연속적으로 밀어 넣으면서 터널을 시공함과 동시에, 터널 시공에 따른 바닥면의 침하현상을 방지하여 구조적으로 안정된 비개착식 터널 구조물의 시공방법을 제안한 바 있다.However, this open trench method has a problem that the tunnel factory is severely restricted by roads or buildings on the ground due to the construction of the tunnel while the ground is attached during the tunnel construction. In the case of the shield boring method, There was a problem that it is difficult to apply to the underground in a way that the tunnel is not attached to the rock bed. In this regard, the present applicant, in the Republic of Korea Patent Registration No. 10-0562121, pushes the tunnel structure into the ground continuously in order to construct the tunnel in the ground, and simultaneously installs the tunnel and sinks the floor according to the construction of the tunnel. We have proposed a construction method of structurally stable unattached tunnel structure.

그러나, 이와 같은 선행기술에 따른 비개착식 터널 시공방법을 이용하여 터널을 시공할 경우, 터널 구조물과는 별도로 루프 파이프만을 압입 시공에 함에 따라 공사기간이 증가하고, 측면의 토사붕괴를 막을 수 없는 문제점이 있었고, 터널을 시공할 지반이 암반인 경우에는 굴착시공하기가 어려운 문제점이 있었다.However, in the case of constructing a tunnel using the non-adhesive tunnel construction method according to the prior art, the construction period is increased by indenting only the roof pipe separately from the tunnel structure, and the earth and sand collapse of the side cannot be prevented. There was a problem, and if the ground to be constructed in the tunnel is a rock, there was a problem difficult to excavate construction.

본 발명은 상기와 같은 문제점을 보완하기 위해 안출된 것으로, 터널 구조물의 시공에 따른 지반 침하를 방지함과 아울러, 터널 구조물의 상부뿐만 아니라 좌우측에서도 시공현장의 붕괴를 방지하고, 지반이 암반인 경우에도 굴착파이프를 구조물과 함께 굴착 압입 시공할 수 있도록 하여 터널 시공작업을 단순화하며, 공사기간을 단축하고,The present invention has been made to solve the above problems, to prevent ground subsidence due to the construction of the tunnel structure, and to prevent the collapse of the construction site in the upper and left sides as well as the top of the tunnel structure, when the ground is rock Edo excavation pipe can be excavated and pressed together with the structure to simplify the tunnel construction work, shorten the construction period,

터널 구조물의 구조물단위체간의 결속을 견고히 하도록 하여 전체 터널 구조물의 안정성이 향상되도록 하며,By strengthening the binding between the structural unit of the tunnel structure to improve the stability of the entire tunnel structure,

터널 구조물의 상·하뿐만 아니라 좌우측에도 보강면이 형성되어 터널 구조물의 내진성이 향상되도록 하고, 터널이 시공되는 상부 지표면의 구조물에 대한 진동 등의 터널 시공에 의한 영향을 최소화할 수 있도록 한다.Reinforcement surfaces are formed on the left and right sides as well as the top and bottom of the tunnel structure to improve the seismic resistance of the tunnel structure and to minimize the effects of tunnel construction such as vibration on the structure of the upper ground surface where the tunnel is constructed.

본 발명의 일 형태에서는, 지중에 터널 구조물을 비개착식으로 시공하는 터널 구조물의 시공방법에 있어서, 터널 구조물을 시공할 장소의 양편을 수직 방향으로 굴착하여 소정깊이의 발진구(10) 및 도달구(20)를 형성하는 제 1단계; 상기 발진구(10)의 저면에 터널 구조물이 압입되는 방향으로 다수개의 플로어레일(30)을 소정간격으로 설치하는 제 2단계; 외곽면을 따라 다수의 굴착파이프(44)가 소정간격으로 형성되는 몸체부(41)와, 상기 몸체부(41)의 선단에는 지중 압입을 위한 선 단슈(42)를 장착하며, 상기 몸체부(41)의 상부측 내부에는 지중에 압입되는 방향으로 다수의 가이드파일(43)의 일측이 매설되는 터널 구조물의 선단 구조물단위체(40)를 형성하고, 상기 굴착파이프(44)의 전방에는 굴착기구부(50)를 장착하는 제 3단계; 상기 선단 구조물단위체(40)를 플로어레일(30) 상에 위치시킨 후에 상기 굴착기구부(50)를 작동시켜 선단 구조물단위체(40)의 외곽을 따라 소정지름의 홀을 지중에 굴착하고, 상기 선단 구조물단위체(40)와 함께 굴착파이프(44)를 압입 전진 시킨 후, 상기 선단 구조물단위체(40)의 전방을 굴착하는 제 4단계; 상기 선단 구조물단위체 몸체부(41)의 단면과 동일형상으로 형성되고 상기 선단 구조물단위체 몸체부(41)에 형성된 상기 다수의 굴착파이프(44)의 연장선상에 외곽면을 따라 굴착파이프(44)가 형성되는 몸체부(61)와, 상기 몸체부(61)의 상부측 내부에는 상기 가이드파일(43)이 관통되도록 관통홀(62)이 마련되는 후단 구조물단위체(60)를 형성하는 제 5단계; 상기 후단 구조물단위체(60)를 상기 선단 구조물단위체(40)의 후방에 상기 플로어레일(30) 상에 위치시키고, 상기 관통홀(62)에 가이드파일(43)이 관통되도록 하며, 상기 선단 구조물단위체(40)와 상기 후단 구조물단위체(60)의 굴착파이프(44)를 서로 연결한 후, 후단 구조물단위체(60)를 압입 전진시키는 제 6단계; 및 상기 제 4단계와 제 6단계를 상기 굴착기구부(50)가 상기 도달구(20)에 도달할 때 까지지 반복적으로 작업하여 다수의 상기 후단 구조물단위체(60)를 하나씩 순차적으로 지중에 압입 전진시키고, 상기 선단 및 다수의 구조물단위체를 접합시켜 전체 터널 구조물을 완성하는 제 7단계;로 이루어지는 것을 특징으로 하는 비개착식 터널 구조물의 시공방법을 제공한다.In one aspect of the present invention, in the construction method of a tunnel structure in which a tunnel structure is constructed in a groundless manner, both sides of a place where the tunnel structure is to be constructed are excavated in a vertical direction to oscillation openings 10 and reach to a predetermined depth. A first step of forming the sphere 20; A second step of installing a plurality of floor rails 30 at predetermined intervals in a direction in which the tunnel structure is pressed into the bottom surface of the oscillation opening 10; A body portion 41 having a plurality of excavation pipes 44 formed at predetermined intervals along an outer surface thereof, and a tip shoe 42 for press-fitting underground are mounted on the tip of the body portion 41, and the body portion ( Inside the upper side of 41, a front end structure unit 40 of the tunnel structure in which one side of the plurality of guide piles 43 is buried in the direction to be pressed into the ground, and in front of the excavating pipe 44 A third step of mounting 50); After positioning the tip structural unit 40 on the floor rail 30 to operate the excavation mechanism unit 50 to excavate a hole having a predetermined diameter in the ground along the periphery of the tip structural unit 40, the tip structure A fourth step of digging forward the excavation pipe 44 together with the unit 40 and then excavating the front of the distal structure unit 40; Excavation pipe 44 is formed along the outer surface on the extension line of the plurality of excavating pipes 44 formed in the same shape as the cross-section of the tip structural unit body portion 41 and formed on the tip structural unit body portion 41. A fifth step of forming a body unit 61 formed therein and a rear end unit 60 having a through hole 62 through the guide file 43 in the upper side of the body 61; The rear end structural unit 60 is positioned on the floor rail 30 at the rear of the front end structural unit 40, and the guide pile 43 penetrates through the through hole 62, and the front end structural unit 40. A sixth step of connecting the excavation pipes 44 of the rear end structure unit 60 to each other and press-advancing the rear end structure unit 60; And repeatedly performing the fourth and sixth steps until the excavation mechanism part 50 reaches the reaching hole 20 to sequentially press the plurality of rear end structural units 60 one by one in the ground. And, the seventh step of completing the entire tunnel structure by joining the front end and a plurality of structural units provides a construction method of the non-adhesive tunnel structure, characterized in that consisting of.

본 발명의 일 형태에 따른 비개착식 터널 시공방법에서, 제 3단계에서, 상기 굴착기구부(50)를, 상기 선단 구조물단위체(40)의 굴착파이프(44) 내를 관통하여 길이방향으로 이동가능하게 구비되는 굴착파일(51)과, 상기 굴착파일(51)의 일측 선단에 형성되는 굴착헤드(52)와, 상기 굴착파일(51)과 타측 후단에 연결되어 굴착헤드(52)가 지반을 굴착하도록 작동시키는 작동모터(53) 및 상기 굴착파일(51)의 타측에 연결되어 상기 굴착파일(51)을 상기 굴착파이프(44)의 길이방향으로 전후진시키는 이동잭(54)으로 형성하는 단계;를 더 포함하여 이루어질 수 있고,In the non-adhesive tunnel construction method of one embodiment of the present invention, in the third step, the excavation mechanism part 50 can be moved in the longitudinal direction through the excavation pipe 44 of the tip structural unit 40. The excavation pile 51 and the excavation head 52 formed at one end of the excavation pile 51 and the excavation pile 51 and the other rear end are connected to the excavation head 52 to excavate the ground. Forming a movable jack (54) connected to the other side of the operation motor (53) and the excavation pile (51) to operate so as to advance the excavation pile (51) in the longitudinal direction of the excavation pipe (44); It may be made to include more;

바람직하게는, 제 3단계는, 상기 선단 구조물단위체 몸체부(41)의 후방 하부에는 소정길이의 걸림홈(80)을 마련하는 단계;를 더 포함하고, 제 5단계는, 상기 후단 구조물단위체 몸체부(61)의 전방 하부에는 상기 걸림홈(80)에 대응하여 끼워져 결합 될 수 있도록 걸림돌기(81)를 마련하고, 후방 하부에는 상기 걸림홈(80)을 마련하는 단계;를 더 포함하여 이루어질 수 있으며,Preferably, the third step, further comprising the step of providing a locking groove 80 of a predetermined length in the rear lower portion of the front end structure unit body portion 41, the fifth step, the rear end structure unit body And providing a locking protrusion 81 at the front lower portion of the portion 61 so as to be fitted and coupled in correspondence with the locking groove 80, and providing the locking groove 80 at the rear lower portion. Can and

또한, 제 3단계는, 상기 선단 구조물단위체 몸체부(41)의 후방 상부면에는 소정길이로 일측이 일체로 매설되어 결합되는 결합어댑터(82)를 마련하는 단계;를 더 포함하고, 제 5단계는, 상기 후단 구조물단위체 몸체부(61)의 전방 상부면에는 상기 결합어댑터(82)에 대응하여 상기 결합어댑터(82)가 끼워져 결합 될 수 있도록 결합어댑터홈(83)을 마련하고, 후방 상부에는 상기 결합어댑터(82)를 마련하는 단계;를 더 포함하여 이루어질 수 있고,The third step may further include providing a coupling adapter 82 in which one side is integrally embedded and coupled to the rear upper surface of the front end body unit 41 at a predetermined length. In the front upper surface of the rear structure unit body portion 61 is provided with a coupling adapter groove 83 so that the coupling adapter 82 can be fitted in response to the coupling adapter 82, the rear upper portion The method may further include providing the coupling adapter 82.

좀 더 바람직하게는, 제 4단계는, 상기 발진구(10)에 버팀반력벽(11)을 마련하고, 중공의 파이프로 형성되며, 일측이 상기 선단 구조물단위체 몸체부(41)의 후 방에 결합되는 이송파이프(12)를 구비하며, 일측은 상기 이송파이프(12)의 타측과 결합되고, 타측은 상기 버팀반력벽(11)에 고정설치되는 후단압입 유압장치(71)를 마련하고, 상기 후단압입 유압장치(71)를 작동시켜 상기 선단 구조물단위체(40)를 지중에 전진압입 시키는 단계;를 더 포함하며, 제 6단계는, 상기 선단 구조물단위체 몸체부(41)의 후방에 결합된 상기 이송파이프(12)를 제거한 후, 상기 후단 구조물단위체 몸체부(61)의 후방에 상기 이송파이프(12)의 일측을 결합시키고, 상기 이송파이프(12)의 타측은 상기 후단압입 유압장치(71)의 일측과 결합시키며, 상기 후단압입 유압장치(71)를 작동시켜 상기 후단 구조물단위체(60)를 지중에 전진압입 시키는 단계;를 더 포함하여 이루어질 수 있으며,More preferably, the fourth step is provided with a bracing reaction wall 11 in the oscillation opening 10, and formed of a hollow pipe, one side of the front end of the front end unit body portion 41 It is provided with a conveying pipe 12, one side is coupled to the other side of the conveying pipe 12, the other side is provided with a post-stage press-fitting hydraulic device 71 is fixed to the bracing reaction wall 11, And forward-injecting the front end structure unit body 40 into the ground by operating a rear end press hydraulic device 71. The sixth step includes the rear end coupled to the rear of the front end body unit 41. After removing the conveying pipe 12, one side of the conveying pipe 12 is coupled to the rear of the rear end structure unit body 61, the other side of the conveying pipe 12 is the rear end press-fitting hydraulic device (71) It is coupled to one side of the upper stage by operating the hydraulic press unit 71 It can further comprise a,; the step of the rear end structure unit 60 is press-fitted in the ground forward

더 바람직하게는, 상기 이송파이프(12) 중에서 상기 선단 구조물단위체(40) 및 후단 구조물단위체(60)의 후방의 상부에 위치하는 이송파이프(12)는, 상기 가이드파일(43)이 상기 이송파이프(12)를 관통하도록 구비될 수 있다.More preferably, the conveying pipe 12 located in the upper portion of the rear end of the front structural unit 40 and the rear end structural unit 60 of the conveying pipe 12, the guide pile 43 is the conveying pipe It may be provided to penetrate through 12.

본 발명에 따른 비개착식 터널 구조물의 시공방법은, 터널 구조물의 시공에 따른 지반 침하를 방지함과 아울러, 터널 구조물의 상부뿐만 아니라 좌우측에서도 시공현장의 붕괴를 방지하고, 지반이 암반인 경우에도 굴착파이프를 구조물과 함께 굴착 압입 시공할 수 있도록 하여 터널 시공작업을 단순화할 수 있으며, 공사기간을 단축할 수 있고,The construction method of the non-adhesive tunnel structure according to the present invention prevents ground subsidence due to the construction of the tunnel structure, and prevents the collapse of the construction site not only on the upper side of the tunnel structure but also on the left and right sides, even when the ground is rock. The excavation pipe can be excavated and pressed together with the structure to simplify the tunnel construction work, shorten the construction period,

터널 구조물의 구조물단위체간의 결속을 견고히 하도록 하여 전체 터널 구조 물의 안정성을 향상시킬 수 있으며,It is possible to improve the stability of the entire tunnel structure by strengthening the binding between the structural units of the tunnel structure.

터널 구조물의 상·하뿐만 아니라 좌우측에도 보강면이 형성되어 터널 구조물의 내진성을 향상시킬 수 있고,As the reinforcement surface is formed on the left and right sides as well as the upper and lower parts of the tunnel structure, the seismic resistance of the tunnel structure can be improved,

터널이 시공되는 상부 지표면의 구조물에 대한 진동 등의 터널 시공에 의한 영향을 최소화할 수 있다.The influence of tunnel construction such as vibration on the structure of the upper surface where the tunnel is constructed can be minimized.

이하 상기 목적이 구체적으로 실현될 수 있는 본 발명의 실시예들을 첨부된 도면을 참조하여 설명한다. 본 실시예들을 설명함에 있어서, 동일 구성에 대해서는 동일 명칭 및 부호가 사용되며, 이에 따른 부가적인 설명은 하기에서 생략된다.DETAILED DESCRIPTION Hereinafter, embodiments of the present invention in which the above object can be specifically realized are described with reference to the accompanying drawings. In describing the embodiments, the same names and symbols are used for the same components, and additional description thereof will be omitted below.

도 1은 본 발명에 따른 비개착식 터널 구조물의 시공방법에 있어서, 선단 구조물단위체(40)를 나타내는 사시도이고, 도 2는 도 1의 선단 구조물단위체(40)의 정면도이며, 도 3는 도 1의 선단 구조물단위체(40)의 우측단면도이고, 도 4는 도 1의 굴착파이프(44)의 전방에 장착되는 굴착기구부(50)를 나타내는 단면도이다. 1 is a perspective view showing the tip structural unit 40 in the construction method of the non-adhesive tunnel structure according to the present invention, FIG. 2 is a front view of the tip structural unit 40 of FIG. 1, and FIG. 3 is FIG. 1. 4 is a cross-sectional view showing the excavation mechanism part 50 mounted in front of the excavation pipe 44 of FIG. 1.

또한, 도 5는 본 발명에 따른 비개착식 터널 구조물의 시공방법에 있어서, 후단 구조물단위체(60)를 나타내는 사시도이고, 도 6은 도 5의 후단 구조물단위체(60)의 정면도이며, 도 7은 도 5의 후단 구조물단위체(60)의 우측단면도이다.In addition, Figure 5 is a perspective view showing a rear end structure unit 60 in the construction method of the non-attached tunnel structure according to the present invention, Figure 6 is a front view of the rear end structure unit 60 of Figure 5, Figure 7 Right cross-sectional view of the rear end structure unit 60 of FIG.

도 8은 본 발명에 따른 비개착식 터널 구조물의 시공방법에 있어서, 선단 구조물단위체(40)를 발진구(10)에 위치시키는 것을 나타내는 시공상태도이고, 도 9는 도 8에서 굴착기구부(50)를 작동시켜 굴착파이프(44) 전방의 지반을 굴착하는 것을 나타내는 시공상태도이며, 도 10은 도 9에서 선단 구조물단위체(40)와 함께 굴착파이프(44)를 전방으로 압입 전진 시키는 것을 나타내는 시공상태도이고, 도 11은 도 9의 선단 구조물단위체(40)의 전방을 굴착하는 것을 나타내는 시공상태도이며, 도 12은 도 9의 선단 구조물단위체(40)의 후방에 후단 구조물단위체(60)를 위치시키고, 상기 후단 구조물단위체(60)를 이송전진 시키는 것을 나타내는 시공상태도이며, 도 13은 선단 구조물단위체(40)를 완전히 반대편 도달구(20)로 이송전진 시켜 터널 구조물을 완성하는 것을 나타내는 시공상태도이다.8 is a construction state diagram showing the position of the distal end structure unit 40 in the oscillation opening 10 in the construction method of the non-adhesive tunnel structure according to the present invention, Figure 9 is a drilling mechanism portion 50 in FIG. FIG. 10 is a construction state diagram illustrating the excavation of the ground in front of the excavation pipe 44 by operating a, and FIG. 10 is a construction state diagram illustrating the advancement of the excavation pipe 44 together with the tip structure unit 40 in the forward direction. 11 is a construction state diagram showing the excavation of the front of the front end structure unit 40 of FIG. 9, FIG. 12 is a rear end unit unit 60 is located behind the front end structure unit 40 of FIG. FIG. 13 is a view illustrating the construction of the rear end structural unit 60 for moving forward, and FIG. 13 illustrates the completion of the tunnel structure by forwarding the front end structural unit 40 to the completely opposite entrance 20. It is construction state figure inside.

또한, 도 14는 본 발명에 따른 비개착식 터널 구조물의 시공방법에 있어서, 이송파이프(12)를 나타낸 사시도이고, 도 15는 터널의 길이기 긴 경우에 중간압입 유압장치(70)를 사용하여 구조물단위체(40, 60)를 이송전진 시키는 것을 나타내는 시공상태도이다.In addition, Figure 14 is a perspective view showing a conveying pipe 12 in the construction method of the non-adhesive tunnel structure according to the present invention, Figure 15 is using the intermediate pressurized hydraulic device 70 when the length of the tunnel is long This is a construction state diagram showing the movement of the structural units 40 and 60 forward.

본 발명에 의한 비개착식 터널 구조물의 시공방법의 제 1단계는, 먼저 터널을 시공하고자 하는 장소의 양편을 수직 방향으로 소정깊이 굴착하여 터널 굴착을 시작하는 발진구(10) 및 터널 굴착을 종료하는 도달구(20)를 형성한다.In the first step of the method of constructing a non-adhesive tunnel structure according to the present invention, first, excavation of the oscillation opening 10 and tunnel excavation which starts excavation of the tunnel by excavating both sides of the place where the tunnel is to be constructed in a predetermined depth in the vertical direction is completed. To form the reach (20).

상기 형성된 발진구(10)의 내부에서, 도 1과 도 8에 도시된 바와 같이, 시공될 터널 구조물의 하단과 접하는 바닥면에 터널 구조물이 압입되는 방향으로 다수개의 플로어레일(30)을 소정간격으로 매설한다. 상기 플로어레일(30)은 공사현장에 서 통상적으로 사용되는 H형강(45)을 사용할 수 있다. 상기 플로어레일(30) 상에 터널 구조물을 이루는 구조물단위체가 접하게 되어 지면과의 직접 마찰에 비해 압입에 따른 마찰력을 현저히 줄일 수 있게 된다.1 and 8, inside the formed oscillation opening 10, a plurality of floor rails 30 are spaced apart from each other in a direction in which the tunnel structure is press-fitted to the bottom surface contacting the bottom of the tunnel structure to be constructed. Buried in. The floor rail 30 may be used H-shaped steel 45 commonly used in construction sites. The structural unit constituting the tunnel structure on the floor rail 30 is in contact with each other, it is possible to significantly reduce the frictional force due to the indentation compared to the direct friction with the ground.

발진구(10)의 내부 바닥면에 플로어레일(30)을 시공한 후에는 터널 구조물을 이루면서 최선단에 위치하게 되는 선단 구조물단위체(40)를 형성하는 제 3단계 시공이 진행된다. 선단 구조물단위체(40)를 제조하는 제 3단계에서는, 도 1과 도 2에 도시된 바와 같이, 콘크리트로 몸체부(41)를 형성하고, 상기 몸체부(41) 상부 내부에는 상기 선단 구조물단위체(40)가 지붕에 압입되는 방향으로 다수의 가이드파일(43)의 일측이 매설되고, 몸체부(41)의 선단에는 선단 구조물의 지중압입을 위한 선단슈(42)가 고정되며, 상기 몸체부(41)의 외곽면을 따라서 다수의 굴착파이프(44)가 소정간격으로 고정장착되고, 상기 굴착파이프(44)의 선단에는 굴착기구부(50)를 장착한다.After the floor rail 30 is installed on the inner bottom surface of the oscillation opening 10, the third stage construction is performed to form the tip structural unit 40 positioned at the top of the tunnel structure. In the third step of manufacturing the tip structural unit 40, as shown in Figures 1 and 2, to form a body portion 41 from the concrete, the upper portion of the body unit 41 inside the tip structural unit ( One side of the plurality of guide piles 43 are embedded in the direction in which 40 is pressed into the roof, and the tip shoe 42 is fixed to the tip of the body portion 41 for underground press-in of the tip structure, and the body portion ( A plurality of excavation pipes 44 are fixedly mounted at predetermined intervals along the outer surface of 41, and an excavation mechanism part 50 is mounted at the tip of the excavation pipe 44.

상기 굴착파이프(44)의 구성은, 도 1 내지 도 3에 도시된 바와 같이, 먼저 선단 구조물단위체(40)의 외측면의 외곽을 따라 몸체부(41)의 좌측, 상측 및 우측에 H형강(45)을 상기 몸체부(41)와 일체로 결합시키고, 철판을 상기 H형강(45)의 상부면을 따라 결합시켜 일방이 개방된 고리형태로 절곡형성되는 고리철판(46)을 마련하고, 몸체부(41)의 하측면에는 길이방향을 가로질러 다수의 이송철판(47)을 일체로 결합시킨다. 몸체부(41)의 외곽을 따라 형성된 상기 고리철판(46)과 이송철판(47) 상에는 몸체부(41)의 길이방향으로 다수의 상기 굴착파이프(44)를 용접 등 으로 소정간격으로 이격시켜 상기 몸체부(41)의 전면보다 소정거리 돌출되도록 하여 고리철판(46)과 이송철판(47) 상에 결합시킨다. 몸체부(41)의 외곽을 따라 다수 고정설치된 굴착파이프(44)의 선단에는 터널 시공의 초기굴착을 위한 굴착기구부(50)를 장착시킨다. 도 1 내지 도 4에 도시된 바와 같이, 굴착기구부(50)는, 상기 굴착파이프(44) 내를 관통하여 길이방향으로 이동가능하게 굴착파일(51)이 구비되고, 상기 굴착파일(51)의 일측 선단에는 지반, 특히 암반을 굴착하기 위한 굴착헤드(52)가 형성되며, 상기 굴착파일(51)의 타측 후단에는 굴착파일(51)을 회전시켜 굴착파일(51) 선단의 굴착헤드(52)를 작동시키는 작동모터(53)가 연결되고, 상기 굴착파일(51)의 타측에 연결되어 상기 굴착파일(51)을 상기 굴착파이프(44)의 길이방향으로 전후진시키는 이동잭(54)을 몸체부(41)의 선단슈(42)에 고정장착한다.The construction of the drilling pipe 44, as shown in Figures 1 to 3, first H-shaped steel on the left side, the upper side and the right side of the body portion 41 along the outer surface of the front end structure unit 40 45 is integrally coupled with the body portion 41, and the iron plate is coupled along the upper surface of the H-shaped steel 45 to provide an annular iron plate 46 that is bent in an open ring shape to one side, and the body The lower side of the portion 41 is integrally coupled to the plurality of transfer iron plate 47 across the longitudinal direction. On the annular iron plate 46 and the transfer iron plate 47 formed along the outer portion of the body portion 41, the plurality of the excavating pipes 44 in the longitudinal direction of the body portion 41 are spaced at a predetermined interval by welding or the like. It is coupled to the ring iron plate 46 and the transfer iron plate 47 so as to project a predetermined distance from the front of the body portion (41). A plurality of excavation pipe parts 50 for the initial drilling of the tunnel construction are mounted at the tip of the excavation pipe 44 fixedly installed along the outer portion of the body part 41. As shown in Figures 1 to 4, the excavation mechanism 50, the excavation pile 51 is provided to be movable in the longitudinal direction through the excavation pipe 44, the excavation pile 51 An excavation head 52 for excavating the ground, in particular a rock, is formed at one end, and the excavation head 52 at the tip of the excavation pile 51 is rotated at the rear end of the excavation pile 51 by the excavation pile 51. An operating motor 53 for operating the body is connected to the other side of the excavation pile 51, the moving jack 54 for advancing the excavation pile 51 in the longitudinal direction of the excavation pipe 44 body It is fixedly attached to the tip shoe 42 of the part 41.

제 4단계에서는, 상기 선단 구조물단위체(40)를 상기 플로어레일(30) 상에 위치시킨 후에 상기 굴착기구부(50)를 작동시켜 선단 구조물단위체(40)의 외곽을 따라 소정지름의 홀을 지중에 굴착하고, 상기 선단 구조물단위체(40)와 함께 굴착파이프(44)을 압입 전진 시킨 후, 상기 선단 구조물단위체(40)의 전방을 굴착한다. 즉, 도 9 내지 도 11에 도시된 바와 같이, 터널 구조물을 시공할 상기 발진구(10)에 선단 구조물단위체(40)를 위치시키고, 상기 굴착파이프(44)의 전방에 형성되는 굴착기구부(50)의 굴착헤드(52)를 작동시켜 먼저, 굴착헤드(52) 및 굴착파일(51)을 전진 굴착시킨 후에, 상기 굴착파이프(44)와 함께 상기 굴착파이프(44)가 장착된 선단 구조물단위체 몸체부(41)를 상기 몸체부(41)의 전면에 지반이 닿을 때까지 전진 압입시키고, 상측으로 상기 굴착파이프(44)의 선단측이 보일 때까지 몸체부(41) 전방의 지반을 굴착한다. In the fourth step, after positioning the tip structure unit 40 on the floor rail 30, the excavation mechanism 50 is operated to make holes of a predetermined diameter along the periphery of the tip structure unit 40 in the ground. After the excavation, the drilling pipe 44 is pushed forward together with the tip structural unit 40, and then the front of the tip structural unit 40 is excavated. That is, as shown in Figures 9 to 11, the end structure unit 40 is located in the oscillation opening 10 to be constructed in the tunnel structure, excavation mechanism portion 50 formed in front of the excavation pipe 44 First, the excavation head 52 and the excavation head 52 and the excavation pile 51 are forward excavated, and then the excavation pipe 44 together with the excavation pipe 44 is mounted to the end structure unit body. The part 41 is pushed forward until the ground reaches the front of the body portion 41, and the ground in front of the body portion 41 is excavated until the front end side of the excavation pipe 44 is visible.

이 과정에서, 굴착기를 사용하거나, 발파를 통하여 지반이 암반인 경우라도 신속하게 지반굴착을 할 수 있으며, 상기 굴착파이프(44)가 루프파이프의 역할을 하게 되어 지반의 붕괴 위험을 미연에 방지하여 안전하게 지반굴착 작업을 할 수 있게 된다. 또한, 구조물단위체 몸체부(41)의 외곽을 따라 미리 굴착헤드(52)로 선굴착한 후 선 굴착한 부위의 내부에 해당하는 몸체부(41)의 전방을 굴착하게 됨으로써, 굴착작업이나 발파 등에 의해 발생 되는 진동이 지표에 위치한 구조물에 전달되는 것을 막을 수 있게 되며, 터널 구조물의 시공에 따른 지표 구조물에 대한 영향을 최소화할 수 있게 된다,In this process, even if the ground is a rock through the use of an excavator or blasting can be quickly ground excavation, the excavation pipe 44 serves as a loop pipe to prevent the risk of ground collapse in advance Safely excavate the ground. In addition, by digging in advance with the excavation head 52 along the periphery of the structural unit body portion 41, the front of the body portion 41 corresponding to the inside of the pre-excavated portion is excavated, such as excavation work or blasting It is possible to prevent the vibration generated by the transmission to the structure located on the surface, and to minimize the impact on the surface structure due to the construction of the tunnel structure,

또한, 상기 선단 구조물단위체(40)를 지중에 전진시키기 위해서, 도 9 내지 도 11에 도시된 바와 같이, 먼저 상기 발진구(10)에 버팀반력벽(11)을 마련하고, 중공의 파이프로 형성된 일측이 상기 선단 구조물단위체 몸체부(41)의 후방에 결합 되는 이송파이프(12)를 구비하고, 일측은 상기 이송파이프(12)의 타측과 결합되며 타측은 상기 버팀반력벽(11)에 고정설치되는 후단압입 유압장치(71)를 마련하여 상기 후단압입 유압장치(71)를 작동시켜 전방의 이송파이프(12)를 가압하여 상기 선단 구조물단위체(40)를 지중으로 이송전진 시키게 된다. 상기 선단 구조물단위체(40)의 전전 거리가 상기 후단압입 유압장치(71)의 이송거리보다 긴 경우에는, 상기 이송파이프(12)를 다수개 구비한 후 나사결합을 통해 원하는 거리만큼 다수개 로 구성되는 이송파이프(12)를 상기 후단압입 유압장치(71) 전방에 위치시켜서 추가 구성된 이송파이프(12)의 길이만큼 상기 선단 구조물단위체(40)를 전진 압입 시킬 수 있게 된다.In addition, in order to advance the front end structure unit 40 in the ground, as shown in Figure 9 to 11, first to provide a bracing reaction wall 11 in the oscillation opening 10, formed of a hollow pipe One side is provided with a conveying pipe 12 coupled to the rear of the front end structure unit body portion 41, one side is coupled to the other side of the conveying pipe 12 and the other side is fixed to the brace reaction wall 11 The rear stage press-fitting hydraulic apparatus 71 is provided to operate the rear stage press-fitting hydraulic apparatus 71 to pressurize the front transfer pipe 12 to transfer the front end structure unit 40 to the ground. When the forward distance of the front end structural unit 40 is longer than the transport distance of the rear end press hydraulic device 71, the transport pipe 12 is provided with a plurality of as many as the desired distance through the screw coupling. Positioning the transfer pipe 12 is located in front of the rear end press-fitting hydraulic apparatus 71 to be able to press-fit the forward structural unit 40 by the length of the additionally configured transfer pipe 12.

바람직하게는, 도 13과 도 14에 도시된 바와 같이, 상기 이송파이프(12)의 하부 좌우측에는 하측에 안내홈(85)이 형성되는 한 쌍의 안내어댑터(84)를 결합시키고, 상기 안내홈(85)에 상기 플로어레일(30)의 상부면의 좌우측 돌기부에 끼워 결합시켜 상기 플로어레일(30)의 안내를 받으며 상기 이송파이프(12)가 전진 되도록 하여 후단압입 유압장치(71)의 가압에 따른 이송파이프(12)의 전진 직진성을 향상시킬 수 있도록 한다.Preferably, as shown in FIGS. 13 and 14, a pair of guide adapters 84 in which guide grooves 85 are formed at the lower left and right sides of the transfer pipe 12 are coupled to each other, and the guide grooves are formed. It is coupled to the left and right protrusions of the upper surface of the floor rail 30 to the 85 to guide the floor rail 30 and to advance the conveying pipe 12 to pressurize the rear end press-fitting hydraulic device 71. To improve the forward straightness of the conveying pipe 12 according to.

제 5단계에서는, 상기 선단 구조물단위체 몸체부(41)의 단면과 동일형상의 몸체부(41)를 형성하고, 상기 선단 구조물단위체 몸체부(41)에 형성된 상기 다수의 굴착파이프(44)의 연장선상에 외곽면을 따라 굴착파이프(44)가 몸체부(61)에 형성된다. 상기 몸체부(61)의 상부측 내부에는 상기 가이드파일(43)이 관통되도록 관통홀(62)이 마련되는 후단 구조물단위체(60)를 형성한다.In the fifth step, the body portion 41 having the same shape as the cross-section of the tip structure unit body portion 41, the extension of the plurality of excavating pipes 44 formed in the tip structure unit body portion 41 Excavation pipe 44 along the outer surface on the line is formed in the body portion (61). Inside the upper side of the body portion 61 is formed a rear end structure unit 60 is provided with a through hole 62 so that the guide pile 43 passes.

바람직하게는, 제 3단계에서, 상기 선단 구조물단위체 몸체부(41)의 후방 하부에 소정길이의 걸림홈(80)을 마련하고, 후단 구조물단위체(60)를 가공하는 제 5단계에서는, 후단 구조물단위체 몸체부(61)의 전방 하부에 상기 걸림홈(80)에 대응하여 끼워져 결합 될 수 있도록 걸림돌기(81)를 마련하며, 후방 하부에는 상기 걸림홈(80)을 마련하여 상기 다수의 구조물단위체의 하부의 접합부위가 견고하게 결 합 될 수 있도록 하여 전체 터널 구조물의 구조적 안정성을 향상시킬 수 있도록 한다. 또한, 제 3단계에서, 상기 선단 구조물단위체 몸체부(41)의 후방 상부면에는 일측이 소정길이만큼 몸체부(41)와 일체로 매설되어 결합되는 결합어댑터(82)를 마련하고, 제 5단계에서는, 상기 후단 구조물단위체 몸체부(61)의 전방 상부면에는 결합어댑터(82)에 대응하여 상기 결합어댑터(82)가 끼워져 결합될 수 있도록 결합어댑터홈(83)을 마련하며, 후방 상부면에는 상기 결합어댑터(82)를 마련하여 상기 다수의 구조물단위체 상부의 접합부위를 견고하게 할 수 있도록 한다. 상기 후단 구조물단위체(60) 또한, 도 5 내지 도 7에 도시된 바와 같이, H형강(45), 고리철판(46), 이송철판(47) 및 중공의 굴착파이프(44)를 상기 선단 구조물단위체(40)와 동일하게 구성하여 형성시킨 후 선단 구조물단위체(40)의 굴착파이프(44)와 후단 구조물단위체(60)의 굴착파이프(44)를 연결어댑터 등을 사용하여 연결시킨다.Preferably, in a third step, in the fifth step of providing a catching groove 80 of a predetermined length in the rear lower portion of the front end structure unit body portion 41, and processing the rear end structure unit 60, the rear end structure The locking projection 81 is provided at the front lower portion of the unit body portion 61 so as to be fitted and coupled to the locking groove 80, and the locking groove 80 is provided at the rear lower portion of the plurality of structural units. The joints at the bottom of the joint can be firmly joined to improve the structural stability of the entire tunnel structure. In addition, in the third step, a coupling adapter 82 is provided on the rear upper surface of the front end of the body unit 41, one side is integrally embedded and coupled to the body portion 41 by a predetermined length, and the fifth step In the front upper surface of the rear structure unit body portion 61 is provided with a coupling adapter groove 83 so that the coupling adapter 82 is fitted in response to the coupling adapter 82, the rear upper surface The coupling adapter 82 is provided so as to secure a joint portion of the upper portion of the plurality of structural units. The rear end structural unit 60, as shown in Figures 5 to 7, the H-shaped steel 45, the ring iron plate 46, the transfer steel plate 47 and the hollow drilling pipe 44, the front end structure unit After forming and forming in the same manner as in (40), the drilling pipe 44 of the front structural unit 40 and the drilling pipe 44 of the rear structural unit 60 are connected using a connection adapter or the like.

제 6단계에서는, 상기 후단 구조물단위체(60)를 상기 선단 구조물단위체(40)의 후방에 상기 플로어레일(30) 상에 위치시키고, 상기 관통홀(62)에 가이드파일(43)이 관통되도록 하며, 상기 선단 구조물단위체(40)와 상기 후단 구조물단위체(60)의 굴착파이프(44)를 서로 연결한 후, 후단 구조물단위체(60)를 압입 전진시킨다.In the sixth step, the rear structural unit 60 is positioned on the floor rail 30 at the rear of the front structural unit 40, and the guide pile 43 passes through the through hole 62. After connecting the excavation pipe 44 of the front structural unit 40 and the rear structural unit 60, the rear structural unit 60 is pushed forward.

상기 후단 구조물단위체(60)의 지중 추진방법을 구체적으로 설명하면, 제 4단계에서, 상기 선단 구조물단위체(40)의 이송시 사용된 이송파이프(12)를 선단 구조물단위체(40)에서 제거한 후, 후단 구조물단위체(60)의 관통홀(62)에 선단 구조 물단위체(40)의 가이드파일(43)이 관통되도록 끼워넣고, 후단 구조물단위체(60)의 굴착파이프(44)를 선단 구조물단위체(40)의 굴착파이프(44)와 연결하여 선단 구조물단위체(40)의 후방에 위치시킨다. 또한, 후단 구조물단위체 몸체부(61)의 후방에 상기 이송파이프(12)의 일측을 결합시키고, 상기 이송파이프(12)의 타측은 후단압입 유압장치(71)의 일측과 결합시키며, 상기 후단압입 유압장치(71)를 작동시켜 후단 구조물단위체(60)를 지중에 전진 압입 시킨다. 터널 구조물을 이루는 구조물단위체의 수가 많아 상기 후단압입 유압장치(71)만으로 다수의 구조물단위체(40, 60)를 전진 압입 시키기 어려운 경우에는, 도 14에 도시된 바와 같이, 구조물단위체(40, 60) 간에 다수의 중간압입 유압장치(70)를 마련하여 구조물단위체(40, 60)를 전진 이송시키고 소정거리만큼 이송시킨 후에는 제거 후, 콘크리트 타설하여 구조물단위체(40, 60) 간의 간격을 견고하게 결합시킬 수 있다. 이때, 가이드파일(43)이 길이가 짧은 경우에는 용접에 의하여 각각의 파일의 길이를 연장할 수 있다.The ground propulsion method of the rear end structural unit 60 will be described in detail. In the fourth step, after removing the conveying pipe 12 used in the transfer of the front structural unit 40 from the front structural unit 40, The guide pile 43 of the tip structural unit 40 is penetrated into the through hole 62 of the rear structural unit 60, and the excavating pipe 44 of the rear structural unit 60 is inserted into the front structural unit 40. In connection with the excavation pipe 44 of the) is positioned in the rear of the front structural unit 40. In addition, one side of the conveying pipe 12 is coupled to the rear of the rear end unit body portion 61, the other side of the conveying pipe 12 is coupled to one side of the rear end press-fitting hydraulic apparatus 71, the rear end press-in The hydraulic unit 71 is operated to press forwardly press the structural unit 60 into the ground. When the number of structural units forming the tunnel structure is large and it is difficult to press-fit the plurality of structural units 40 and 60 only by the rear end pressing hydraulic device 71, as shown in FIG. 14, the structural unit 40 and 60. After providing a plurality of intermediate indentation hydraulic device 70 between the forward and transfer the structural unit (40, 60) by a predetermined distance after removal, after pouring the concrete firmly coupled the gap between the structural unit (40, 60) You can. At this time, when the guide pile 43 is short in length, the length of each pile may be extended by welding.

또한, 제 7단계에서는, 상기 제 4단계와 제 6단계를 상기 굴착기구부(50)가 상기 도달구(20)에 도달할 때 까지지 반복적으로 작업하여 다수의 상기 후단 구조물단위체(60)를 하나씩 순차적으로 지중에 압입 전진시키고, 상기 선단(40) 및 다수의 구조물단위체(60)를 접합시켜 전체 터널 구조물을 완성한다.In addition, in the seventh step, the fourth and sixth steps are repeatedly performed until the excavation mechanism part 50 reaches the reaching port 20 so that the plurality of rear end unit units 60 are one by one. In order to sequentially press-in advance into the ground, the front end 40 and the plurality of structural unit 60 are joined to complete the entire tunnel structure.

이와 같이, 반대편 도달구(20)까지 이송된 상기 선단 구조물단위체(40)와 상기 선단 구조물단위체(40)의 후방에 연속적으로 이어져 접하는 다수의 후단 구조물 단위체(60)를 공고히 결합시켜 전체 터널 구조물을 완성 시키게 되며, 이때, 선단 구조물단위체(40) 및 후단 구조물단위체 몸체부(61) 후방의 상부에 조립되는 이송파이프(12)의 경우에는 상기 가이드파일(43)이 중공의 이송파이프(12)에 관통되도록 하여 이송파이프(12)가 구조물단위체의 몸체부(41, 61)의 후방의 상부에 조립될 수 있다.In this way, the front structure unit unit 40 and the plurality of rear end unit units 60 continuously connected to the rear end of the front end unit 40 to be transported to the opposite reach 20 is firmly coupled to the entire tunnel structure In this case, in the case of the conveying pipe 12 that is assembled to the upper portion of the front structure unit body 40 and the rear structure unit body body 61, the guide pile 43 is provided in the hollow conveying pipe 12. The conveying pipe 12 may be assembled to an upper portion of the rear of the body parts 41 and 61 of the structural unit so as to be penetrated therethrough.

상기 상술한 바와 같은 본 발명에 의하 비개착식 터널 구조물의 시공방법을 통해 선·후단 구조물단위체 몸체부(61)의 외곽을 따라 굴착파이프(44)가 형성됨으로써, 터널 시공현장에서의 지반붕괴를 방지하고, 상기 굴착기구부(50)를 통하여 구조물단위체 외곽을 선 굴착한 후에 상기 구조물단위체를 압입시킴으로써, 지반이 암반인 경우에도 터널 시공작업을 단순화할 수 있으며, 공사기간을 단축할 수 있고,The excavation pipe 44 is formed along the outer periphery of the front and rear structural unit body parts 61 through the construction method of the non-adhesive tunnel structure according to the present invention as described above, so that the ground collapse at the tunnel construction site By pre-excavating the outside of the structural unit through the excavation mechanism unit 50 and pressing the structural unit, the tunnel construction work can be simplified even if the ground is rock, and the construction period can be shortened.

또한, 상기 결합어댑터(82), 결합어댑터홈(83), 결합돌기 및 결합홈을 형성시킴으로써, 터널 구조물의 구조물단위체간의 결속을 견고히 하도록 하여 전체 터널 구조물의 안정성을 향상시킬 수 있으며,In addition, by forming the coupling adapter 82, coupling adapter groove 83, coupling projection and coupling groove, it is possible to strengthen the binding between the structural unit of the tunnel structure, thereby improving the stability of the entire tunnel structure,

구조물단위체 외곽을 선 굴착한 후에 상기 구조물단위체의 전방을 발파 등의 작업을 통해 굴착함으로써, 터널이 시공되는 상부 지표면의 구조물에 대한 진동 등의 터널 시공에 의한 영향을 최소화할 수 있게 된다.After digging the outer periphery of the structural unit, the front of the structural unit is excavated by blasting or the like, thereby minimizing the effect of the tunnel construction such as vibration on the structure of the upper ground surface where the tunnel is constructed.

위에서 몇몇의 실시예가 예시적으로 설명되었음에도 불구하고, 본 발명이 이 의 취지 및 범주에서 벗어남 없이 다른 여러 형태로 구체화될 수 있다는 사실은 해당 기술에 통상의 지식을 가진 이들에게는 자명한 것이다.Although some embodiments have been described above by way of example, it will be apparent to those skilled in the art that the present invention may be embodied in many other forms without departing from the spirit and scope thereof.

따라서, 상술된 실시예는 제한적인 것이 아닌 예시적인 것으로 여겨져야 하며, 첨부된 청구항 및 이의 동등 범위 내의 모든 실시예는 본 발명의 범주 내에 포함된다.Accordingly, the above-described embodiments should be considered as illustrative and not restrictive, and all embodiments within the scope of the appended claims and their equivalents are included within the scope of the present invention.

도 1은 본 발명에 따른 비개착식 터널 구조물의 시공방법에 있어서, 선단 구조물단위체(40)를 나타내는 사시도;1 is a perspective view showing the front end structure unit 40 in the construction method of the non-adhesive tunnel structure according to the present invention;

도 2는 도 1의 선단 구조물단위체(40)의 정면도;2 is a front view of the tip structural unit 40 of FIG.

도 3는 도 1의 선단 구조물단위체(40)의 우측단면도;3 is a right cross-sectional view of the tip structural unit 40 of FIG.

도 4는 도 1의 굴착파이프(44)의 전방에 장착되는 굴착기구부(50)를 나타내는 단면도;4 is a cross-sectional view showing an excavation mechanism portion 50 mounted in front of the excavation pipe 44 of FIG.

도 5는 본 발명에 따른 비개착식 터널 구조물의 시공방법에 있어서, 후단 구조물단위체(60)를 나타내는 사시도;5 is a perspective view showing a rear end unit 60 in the construction method of the non-adhesive tunnel structure according to the present invention;

도 6은 도 5의 후단 구조물단위체(60)의 정면도;6 is a front view of the rear structure unit 60 of FIG.

도 7은 도 5의 후단 구조물단위체(60)의 우측단면도;7 is a right cross-sectional view of the rear end structure unit 60 of FIG.

도 8은 본 발명에 따른 비개착식 터널 구조물의 시공방법에 있어서, 선단 구조물단위체(40)를 발진구(10)에 위치시키는 것을 나타내는 시공상태도;8 is a construction state diagram showing the position of the front end structure unit 40 in the oscillation opening in the construction method of the non-adhesive tunnel structure according to the present invention;

도 9는 도 8에서 굴착기구부(50)를 작동시켜 굴착파이프(44) 전방의 지반을 굴착하는 것을 나타내는 시공상태도;9 is a construction state showing the excavation of the ground in front of the excavation pipe 44 by operating the excavation mechanism part 50 in FIG.

도 10은 도 9에서 선단 구조물단위체(40)와 함께 굴착파이프(44)를 전방으로 압입 전진 시키는 것을 나타내는 시공상태도;FIG. 10 is a construction state diagram illustrating the forward movement of the excavation pipe 44 together with the tip structural unit 40 in FIG. 9; FIG.

도 11은 도 9의 선단 구조물단위체(40)의 전방을 굴착하는 것을 나타내는 시공상태도;Figure 11 is a construction state showing the excavation of the front of the front end structural unit 40 of Figure 9;

도 12는 도 9의 선단 구조물단위체(40)의 후방에 후단 구조물단위체(60)를 위치시키고, 상기 후단 구조물단위체(60)를 이송전진 시키는 것을 나타내는 시공상태도;FIG. 12 is a construction state diagram showing the rear end structure unit 60 being positioned behind the front end structure unit 40 of FIG. 9 and moving forward of the rear end structure unit 60; FIG.

도 13은 선단 구조물단위체(40)를 완전히 반대편 도달구(20)로 이송전진 시켜 터널 구조물을 완성하는 것을 나타내는 시공상태도;13 is a state diagram showing the completion of the tunnel structure by moving the front end of the structural unit 40 completely to the opposite end opening 20;

도 14는 본 발명에 따른 비개착식 터널 구조물의 시공방법에 있어서, 이송파이프(12)를 나타낸 사시도; 및14 is a perspective view showing a conveying pipe 12 in the construction method of the non-adhesive tunnel structure according to the present invention; And

도 15는 터널의 길이기 긴 경우에 중간압입 유압장치(70)를 사용하여 구조물단위체(40, 60)를 이송전진 시키는 것을 나타내는 시공상태도;이다.FIG. 15 is a construction state diagram showing the movement of the structural unit bodies 40 and 60 using the intermediate press hydraulic device 70 when the length of the tunnel is long.

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

10 : 발진구 11 : 버팀반력벽10: oscillation hole 11: bracing wall

12 : 이송파이프12: conveying pipe

20 : 도달구 30 : 플로어레일20: reach 30: floor rail

40 : 선단 구조물단위체 41 : 선단 구조물단위체 몸체부40: tip structure unit 41: tip structure unit body

42 : 선단슈 43 : 가이드파일42: tip shoe 43: guide file

44 : 굴착파이프 45 : H형강44: excavation pipe 45: H section steel

46 : 고리철판 47 : 이송철판46: iron plate 47: transfer iron plate

50 : 굴착기구부 51 : 굴착파일50: excavation mechanism 51: excavation pile

52 : 굴착헤드 53 : 작동모터52: excavation head 53: operating motor

54 : 이동잭54: moving jack

60 : 후단 구조물단위체 61 : 후단 구조물단위체 몸체부60: rear end unit body 61: rear end unit body

62 : 관통홀62: through hole

70 : 중간압입 유압장치 71 : 후단압입 유압장치70: intermediate press hydraulic device 71: post press hydraulic device

80 : 걸림홈 81 : 걸림돌기80: locking groove 81: locking projection

82 : 결합어댑터 83 : 결합어댑터홈82: coupling adapter 83: coupling adapter groove

84 : 안내어댑터 85 : 안내홈84: guide adapter 85: guide home

Claims (6)

지중에 터널 구조물을 비개착식으로 시공하는 터널 구조물의 시공방법에 있어서,In the construction method of the tunnel structure in the underground construction of the tunnel structure, 터널 구조물을 시공할 장소의 양편을 수직 방향으로 굴착하여 소정깊이의 발진구(10) 및 도달구(20)를 형성하는 제 1단계;A first step of digging both sides of the place where the tunnel structure is to be constructed in the vertical direction to form the oscillation opening 10 and the reaching opening 20 having a predetermined depth; 상기 발진구(10)의 저면에 터널 구조물이 압입되는 방향으로 다수개의 플로어레일(30)을 소정간격으로 설치하는 제 2단계;A second step of installing a plurality of floor rails 30 at predetermined intervals in a direction in which the tunnel structure is pressed into the bottom surface of the oscillation opening 10; 외곽면을 따라 다수의 굴착파이프(44)가 소정간격으로 형성되는 몸체부(41)와, 상기 몸체부(41)의 선단에는 지중 압입을 위한 선단슈(42)를 장착하며, 상기 몸체부(41)의 상부측 내부에는 지중에 압입되는 방향으로 다수의 가이드파일(43)의 일측이 매설되는 터널 구조물의 선단 구조물단위체(40)를 형성하고, Along the outer surface, a plurality of excavation pipes 44 are formed at predetermined intervals, and the front end of the body portion 41 is equipped with a tip shoe 42 for press-fitting the ground, and the body portion ( Inside the upper side of 41) to form the front end structure unit 40 of the tunnel structure in which one side of the plurality of guide piles 43 are embedded in the direction to be pressed into the ground, 상기 굴착파이프(44)의 전방에 상기 선단 구조물단위체(40)의 굴착파이프(44) 내를 관통하여 길이방향으로 이동가능하게 구비되는 굴착파일(51)과, 상기 굴착파일(51)의 일측 선단에 형성되는 굴착헤드(52)와, 상기 굴착파일(51)과 타측 후단에 연결되어 굴착헤드(52)가 지반을 굴착하도록 작동시키는 작동모터(53) 및 상기 굴착파일(51)의 타측에 연결되어 상기 굴착파일(51)을 상기 굴착파이프(44)의 길이방향으로 전후진시키는 이동잭(54)으로 형성되는 굴착기구부(50)를 장착하는 제 3단계;An excavation pile 51 provided in the front of the excavation pipe 44 so as to be movable in the longitudinal direction through the excavation pipe 44 of the tip structural unit 40, and one end of the excavation pile 51. Excavation head 52 formed in the connection, and the operation motor 53 and the other end of the excavation pile 51 is connected to the excavation pile 51 and the other rear end to operate the excavation head 52 to excavate the ground A third step of mounting an excavation mechanism part 50 formed by a moving jack 54 for advancing and drilling the excavation pile 51 in the longitudinal direction of the excavation pipe 44; 상기 선단 구조물단위체(40)를 플로어레일(30) 상에 위치시킨 후에 상기 굴착기구부(50)를 작동시켜 선단 구조물단위체(40)의 외곽을 따라 소정지름의 홀을 지중에 굴착하고, 상기 선단 구조물단위체(40)와 함께 굴착파이프(44)를 압입 전진 시킨 후, 상기 선단 구조물단위체(40)의 전방을 굴착하는 제 4단계;After positioning the tip structural unit 40 on the floor rail 30 to operate the excavation mechanism unit 50 to excavate a hole having a predetermined diameter in the ground along the periphery of the tip structural unit 40, the tip structure A fourth step of digging forward the excavation pipe 44 together with the unit 40 and then excavating the front of the distal structure unit 40; 상기 선단 구조물단위체 몸체부(41)의 단면과 동일형상으로 형성되고 상기 선단 구조물단위체 몸체부(41)에 형성된 상기 다수의 굴착파이프(44)의 연장선상에 외곽면을 따라 굴착파이프(44)가 형성되는 몸체부(61)와, 상기 몸체부(61)의 상부측 내부에는 상기 가이드파일(43)이 관통되도록 관통홀(62)이 마련되는 후단 구조물단위체(60)를 형성하는 제 5단계;Excavation pipe 44 is formed along the outer surface on the extension line of the plurality of excavating pipes 44 formed in the same shape as the cross-section of the tip structural unit body portion 41 and formed on the tip structural unit body portion 41. A fifth step of forming a body unit 61 formed therein and a rear end unit 60 having a through hole 62 through the guide file 43 in the upper side of the body 61; 상기 후단 구조물단위체(60)를 상기 선단 구조물단위체(40)의 후방에 상기 플로어레일(30) 상에 위치시키고, 상기 관통홀(62)에 가이드파일(43)이 관통되도록 하며, 상기 선단 구조물단위체(40)와 상기 후단 구조물단위체(60)의 굴착파이프(44)를 서로 연결한 후, 후단 구조물단위체(60)를 압입 전진시키는 제 6단계; 및The rear end structural unit 60 is positioned on the floor rail 30 at the rear of the front end structural unit 40, and the guide pile 43 penetrates through the through hole 62, and the front end structural unit 40. A sixth step of connecting the excavation pipes 44 of the rear end structure unit 60 to each other and press-advancing the rear end structure unit 60; And 상기 제 4단계와 제 6단계를 상기 굴착기구부(50)가 상기 도달구(20)에 도달할 때 까지지 반복적으로 작업하여 다수의 상기 후단 구조물단위체(60)를 하나씩 순차적으로 지중에 압입 전진시키고, 상기 선단 및 다수의 구조물단위체를 접합시켜 전체 터널 구조물을 완성하는 제 7단계;로 이루어지는 것을 특징으로 하는 비개착식 터널 구조물의 시공방법.The fourth step and the sixth step are repeatedly performed until the excavation mechanism part 50 reaches the reaching port 20, and the plurality of the rear end structural units 60 are sequentially pushed forward one by one in the ground. The seventh step of completing the entire tunnel structure by joining the front end and the plurality of structural unit; Construction method of the non-removable tunnel structure, characterized in that consisting of. 삭제delete 제 1항에 있어서,The method of claim 1, 제 3단계는,The third step is 상기 선단 구조물단위체 몸체부(41)의 후방 하부에는 소정길이의 걸림홈(80)을 마련하는 단계;를 더 포함하고,Providing a locking groove 80 of a predetermined length in the lower rear portion of the front end body unit 41; 제 5단계는,The fifth step is 상기 후단 구조물단위체 몸체부(61)의 전방 하부에는 상기 걸림홈(80)에 대응하여 끼워져 결합 될 수 있도록 걸림돌기(81)를 마련하고, 후방 하부에는 상기 걸림홈(80)을 마련하는 단계;를 더 포함하여 이루어지는 것을 특징으로 하는 비개착식 터널 구조물의 시공방법.Providing a locking protrusion (81) at the front lower portion of the rear structure unit body (61) so as to be fitted and coupled corresponding to the locking groove (80), and providing the locking groove (80) at the rear lower portion; Construction method of the non-adhesive tunnel structure, characterized in that further comprises. 제 1항에 있어서,The method of claim 1, 제 3단계는,The third step is 상기 선단 구조물단위체 몸체부(41)의 후방 상부면에는 소정길이로 일측이 일체로 매설되어 결합되는 결합어댑터(82)를 마련하는 단계;를 더 포함하고,And providing a coupling adapter 82 on one side of which is integrally embedded at a predetermined length on a rear upper surface of the front end of the body unit 41. 제 5단계는,The fifth step is 상기 후단 구조물단위체 몸체부(61)의 전방 상부면에는 상기 결합어댑터(82)에 대응하여 상기 결합어댑터(82)가 끼워져 결합 될 수 있도록 결합어댑터홈(83)을 마련하고, 후방 상부에는 상기 결합어댑터(82)를 마련하는 단계;를 더 포함하여 이루어지는 것을 특징으로 하는 비개착식 터널 구조물의 시공방법.In the front upper surface of the rear structure unit body portion 61 is provided with a coupling adapter groove 83 so that the coupling adapter 82 is fitted in response to the coupling adapter 82, the coupling at the rear upper portion Preparing an adapter (82); Construction method of the non-removable tunnel structure characterized in that it further comprises. 제 1항, 제3항 내지 제 4항 중 어느 한 항에 있어서,The method according to any one of claims 1 and 3 to 4, 제 4단계는,The fourth step is 상기 발진구(10)에 버팀반력벽(11)을 마련하고,Providing a bracing reaction wall 11 in the oscillation opening 10, 중공의 파이프로 형성되며, 일측이 상기 선단 구조물단위체 몸체부(41)의 후방에 결합되는 이송파이프(12)를 구비하며,Is formed of a hollow pipe, one side is provided with a conveying pipe 12 coupled to the rear of the front end unit body portion 41, 일측은 상기 이송파이프(12)의 타측과 결합되고, 타측은 상기 버팀반력벽(11)에 고정설치되는 후단압입 유압장치(71)를 마련하고,One side is coupled to the other side of the transfer pipe 12, the other side is provided with a post-stage press-fitting hydraulic device 71 is fixed to the bracing reaction wall 11, 상기 후단압입 유압장치(71)를 작동시켜 상기 선단 구조물단위체(40)를 지중에 전진압입 시키는 단계;를 더 포함하며,Operating the rear stage press-fitting hydraulic apparatus 71 to advance press-fitting of the front end structure unit 40 into the ground; 제 6단계는,The sixth step is 상기 선단 구조물단위체 몸체부(41)의 후방에 결합된 상기 이송파이프(12)를 제거한 후, 상기 후단 구조물단위체 몸체부(61)의 후방에 상기 이송파이프(12)의 일측을 결합시키고, 상기 이송파이프(12)의 타측은 상기 후단압입 유압장치(71)의 일측과 결합시키며, 상기 후단압입 유압장치(71)를 작동시켜 상기 후단 구조물단위체(60)를 지중에 전진압입 시키는 단계;를 더 포함하여 이루어지는 것을 특징으로 하는 비개착식 터널 구조물의 시공방법.After removing the conveying pipe 12 coupled to the rear of the front structural unit body portion 41, the one side of the conveying pipe 12 is coupled to the rear of the rear structural unit body portion 61, the transfer The other side of the pipe 12 is coupled to one side of the rear end press-fitting hydraulic apparatus 71, by operating the rear-end press-fitting hydraulic apparatus 71 for forward-injecting the rear end unit unit 60 in the ground; Construction method of the non-adhesive tunnel structure, characterized in that consisting of. 제 5항에 있어서,The method of claim 5, 상기 이송파이프(12) 중에서 상기 선단 구조물단위체(40) 및 후단 구조물단위체(60)의 후방의 상부에 위치하는 이송파이프(12)는, 상기 가이드파일(43)이 상기 이송파이프(12)를 관통하도록 구비되는 것을 특징으로 하는 비개착식 터널 구조물의 시공방법.In the conveying pipe 12, the conveying pipe 12 positioned above the front end of the front structural unit 40 and the rear structural unit 60 has the guide pile 43 penetrating the conveying pipe 12. Construction method of the non-adhesive tunnel structure, characterized in that it is provided to.
KR1020090048393A 2009-06-02 2009-06-02 The Construction Method of Shield Tunneling KR101090755B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090048393A KR101090755B1 (en) 2009-06-02 2009-06-02 The Construction Method of Shield Tunneling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090048393A KR101090755B1 (en) 2009-06-02 2009-06-02 The Construction Method of Shield Tunneling

Publications (2)

Publication Number Publication Date
KR20100129839A KR20100129839A (en) 2010-12-10
KR101090755B1 true KR101090755B1 (en) 2011-12-13

Family

ID=43506314

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090048393A KR101090755B1 (en) 2009-06-02 2009-06-02 The Construction Method of Shield Tunneling

Country Status (1)

Country Link
KR (1) KR101090755B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104653186A (en) * 2013-11-25 2015-05-27 天津城建隧道股份有限公司 Method of earth pressure balance shield crossing reinforced concrete pile foundation building

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101273788B1 (en) * 2011-10-18 2013-06-11 위성배 The Construction Method of Shield Tunneling
KR102608601B1 (en) * 2023-07-26 2023-12-01 정영수 Sheet non excavation method for drilling a tunnel having a file reinforcing structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104653186A (en) * 2013-11-25 2015-05-27 天津城建隧道股份有限公司 Method of earth pressure balance shield crossing reinforced concrete pile foundation building

Also Published As

Publication number Publication date
KR20100129839A (en) 2010-12-10

Similar Documents

Publication Publication Date Title
KR100984883B1 (en) The construction method of shield tunneling
KR101069705B1 (en) Method for installing waterproofing steel plate in construction of undergound tunnel
KR101179778B1 (en) Method for constructing underground structure
KR200415268Y1 (en) Tubular arch tunnel for underground tunnelling
KR20170102397A (en) The Tunnel construction method to use retangular pipe
KR101090755B1 (en) The Construction Method of Shield Tunneling
KR101156613B1 (en) The Construction Method of Shield Tunneling for long distacne
KR101021867B1 (en) The front header for constructing non-excavation type tunnel structure
KR20180071632A (en) Underground structure pressing system for reducing friction and construction method using the same
KR101289392B1 (en) The tunnel pressing method
KR100639789B1 (en) Structure main pipe form of construction work and the space-time to establish tunnel formation tunnel structrue
KR100926501B1 (en) Roof and shield tunneling construction method (rsm) and tunnel structure
KR101007089B1 (en) The pressing apparatus for constructing non-excavation type tunnel structure
KR101255517B1 (en) The tunel execution method and the using fabric
KR101133734B1 (en) Method for tunneling construction and tunnel structure
KR101194102B1 (en) The Excavation Method of Concrete Tunnel Construction
KR102191503B1 (en) The Tunnel construction method to use retangular pipe
KR100846571B1 (en) Messer construction method with grouting means
KR101487312B1 (en) underground excavation plate and its underground excavation construction method
JP4833089B2 (en) Water stop device for underground penetrating body and construction method of underground penetrating body using the same
KR101772276B1 (en) The front structure for non-open cut type tunnel pressing
KR100725952B1 (en) It establishes the tunnel formation tunnel structure the Maine pipe construction method
KR100920256B1 (en) Apparatus for pressing front end of steel pipe loop structure
KR100983114B1 (en) Apparatus for pressing fore-end in steel pipe's loop structure
KR102013783B1 (en) Steel pipe, underground structure and cast messer shield method

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150114

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20160201

Year of fee payment: 5

LAPS Lapse due to unpaid annual fee