KR100846571B1 - Messer construction method with grouting means - Google Patents

Messer construction method with grouting means Download PDF

Info

Publication number
KR100846571B1
KR100846571B1 KR1020070011193A KR20070011193A KR100846571B1 KR 100846571 B1 KR100846571 B1 KR 100846571B1 KR 1020070011193 A KR1020070011193 A KR 1020070011193A KR 20070011193 A KR20070011193 A KR 20070011193A KR 100846571 B1 KR100846571 B1 KR 100846571B1
Authority
KR
South Korea
Prior art keywords
mesa
grouting
soil
membrane
steel pipe
Prior art date
Application number
KR1020070011193A
Other languages
Korean (ko)
Inventor
김학표
Original Assignee
김학표
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=39824580&utm_source=***_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=KR100846571(B1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by 김학표 filed Critical 김학표
Priority to KR1020070011193A priority Critical patent/KR100846571B1/en
Application granted granted Critical
Publication of KR100846571B1 publication Critical patent/KR100846571B1/en

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47CCHAIRS; SOFAS; BEDS
    • A47C3/00Chairs characterised by structural features; Chairs or stools with rotatable or vertically-adjustable seats
    • A47C3/16Chairs characterised by structural features; Chairs or stools with rotatable or vertically-adjustable seats of legless type, e.g. with seat directly resting on the floor; Hassocks; Pouffes
    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47CCHAIRS; SOFAS; BEDS
    • A47C27/00Spring, stuffed or fluid mattresses or cushions specially adapted for chairs, beds or sofas
    • A47C27/14Spring, stuffed or fluid mattresses or cushions specially adapted for chairs, beds or sofas with foamed material inlays
    • A47C27/142Spring, stuffed or fluid mattresses or cushions specially adapted for chairs, beds or sofas with foamed material inlays with projections, depressions or cavities
    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47GHOUSEHOLD OR TABLE EQUIPMENT
    • A47G9/00Bed-covers; Counterpanes; Travelling rugs; Sleeping rugs; Sleeping bags; Pillows
    • AHUMAN NECESSITIES
    • A61MEDICAL OR VETERINARY SCIENCE; HYGIENE
    • A61FFILTERS IMPLANTABLE INTO BLOOD VESSELS; PROSTHESES; DEVICES PROVIDING PATENCY TO, OR PREVENTING COLLAPSING OF, TUBULAR STRUCTURES OF THE BODY, e.g. STENTS; ORTHOPAEDIC, NURSING OR CONTRACEPTIVE DEVICES; FOMENTATION; TREATMENT OR PROTECTION OF EYES OR EARS; BANDAGES, DRESSINGS OR ABSORBENT PADS; FIRST-AID KITS
    • A61F7/00Heating or cooling appliances for medical or therapeutic treatment of the human body
    • A61F2007/0001Body part
    • A61F2007/0048Genitals
    • A61F2007/005Genitals female

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

A tunnel construction messer construction method using grouting is provided to obtain strong support by making grouting steel pipes form horizontal parts and shoulder vertical parts. A tunnel construction messer construction method using grouting includes the steps of: inserting messers, which is supported by timberings(2), in a facing, and digging earth as deep as the messers are inserted; inserting grouting steel pipe(101) in an inner wall of the facing to prevent arc sliding at horizontal parts(H) and shoulder vertical parts(V); digging earth at the facing and forwarding the messer; and inserting grouting steel pipes at the messer upper area of the facing to prevent earth from collapsing at the facing, when bottom and the upper surface of the facing form an angle of repose.

Description

그라우팅 공법을 이용하는 토사터널 구축 메사공법{Messer construction method with grouting means}Messer construction method with grouting means

도 1 은 일반적인 메사공법을 보이는 단면도,1 is a cross-sectional view showing a general mesa method;

도 2a는 일반적인 그라우팅 공법의 천공도면,Figure 2a is a perforated drawing of a general grouting method,

도 2b는 천공된 구멍에 그라우팅용 강관을 주입한 상태를 보인 도면,Figure 2b is a view showing a state injecting a grouting steel pipe in the perforated hole,

도 2c는 도 2b의 강관 주입구측의 패킹상태를 보이는 요부 확대 단면도,Figure 2c is an enlarged cross-sectional view showing the main part showing the packing state of the steel pipe inlet side of Figure 2b,

도 2d는강관에 그라우팅재를 주입하는 상태의 결선도,2d is a connection diagram of a state injecting grouting material into the steel pipe,

도 3 은 본 발명의 그라우팅 공법이 적용된 메사공법을 보이는 정단면도,3 is a front sectional view showing a mesa method to which the grouting method of the present invention is applied;

도 4 는 도 3 의 수직 측단면도,4 is a vertical side cross-sectional view of FIG.

도 5 는 본 발명의 다른 예를 보이는 정단면도5 is a front sectional view showing another example of the present invention;

도 6 은 도 5의 수직 측단면도이다.6 is a vertical side cross-sectional view of FIG. 5.

도면의 주요 부분에 대한 부호의 설명Explanation of symbols for the main parts of the drawings

1;메사 2;지보공 3;결합홈 5;콘크리트 세그먼트 6;막장 11;유압잭 101;강관 102;커플링 103;코르킹재 104;실링호스 105;패커 1; Mesa 2; Jibo 3; Coupling groove 5; Concrete segment 6; Bar 11; Hydraulic jack 101; Steel pipe 102; Coupling 103; Caulking material 104; Sealing hose 105; Packer

본 발명은 그라우팅 공법을 이용하는 토사터널 구축 메사공법에 관한 것으로, 메사공법을 수행하는 막장부위에 그라우팅공법을 부가하여 토사의 흘러내림 없이 터널을 구축 가능토록 하는 그라우팅 공법을 이용하는 토사터널 구축 메사공법에 관한 것이다.The present invention relates to a earth and sand tunnel construction mesa method using a grouting method, and to a ground and earth tunnel construction mesa method using a grouting method for adding a grouting method to the membrane portion where the mesa method is carried out so that a tunnel can be constructed without the flow of earth and sand. It is about.

일반적으로 지하공간을 보강하면서 구축하는 공법으로 메사 시일드 공법과 그라우팅 공법이 알려져 있다.In general, the mesa shield method and the grouting method are known as a method for constructing while reinforcing the underground space.

메사 시일드(Messer Shield) 공법에 의해 터널을 구축하는 방법은, 메사(Meser, 鋼矢板)를 추진시켜 굴진 작업을 한뒤 일정간격으로 철강지보공(支保工)을 세우고, 이들 인접한 지보공 사이 종래의 메사시일드공법은 터널 막장을 굴착할 때 터널의 형상에 따라 지보공 위에 메사를 병렬로 배열하고, 유압잭(JACK)으로 각 메사를 압입 전진시키면서 막장을 굴착한 다음, 그 후방에 상기 메사가 진행됨에 따라 일정간격으로 설치한 지보공과 지보공 사이에 토류판을 끼워 굴착면에 따라 받쳐가는 공법으로서, 이 공법은 막장 굴착과 토류판 설치 및 지보공 설치 등의 작업이 메사라는 복공철갑 내에서 연속적으로 안전하게 이루어진다는 점에서 시일드공법과 산악터널공법의 조합공법이라 할 수 있는바, 이러한 메사시일드 공법은 대형굴착공사나 하수로관 등을 매설하는 공사 등 각종 굴착공사를 무소음, 무진동으로 시공할 수 있고, 높은 안전성과, 정확한 굴진, 신속한 작업진행, 굴착면과의 공간을 없애줌으로써 굴착면 침하의 극소화, 다양한 굴착공사에 응용가능, 작업장비의 단순화, 공사방법용이 및 경제적인 시공 가능 등 그 효과가 매우 좋은 것으로 평가되기는 하였다The method of constructing the tunnel by the Mesaser Shield method is to push the mesa and excavate the work, and then establish the steel support at regular intervals, and the conventional mesa between the adjacent supporters. When the shielding method excavates the tunnel face, the mesas are arranged in parallel on the support hole according to the shape of the tunnel, and the membranes are excavated while the mesa is pushed forward with a hydraulic jack, and then the mesa proceeds behind it. It is a method to support the earth according to the excavation surface by sandwiching the earth plate between the earth hole and the earth hole which is installed at regular intervals. It can be said that it is a combination method of seal method and mountain tunnel method, and this mesa shield method is used to sell large excavation works or sewer pipes. Various excavation works can be constructed without noise and vibration, and high safety, accurate excavation, rapid work progress, minimizing the settlement of the excavation surface by eliminating the space with the excavation surface, and applicable to various excavation works, work equipment The effectiveness of the construction was simplified and the construction method and economical construction were considered to be very good.

그러나 이러한 방식은 지보공과 토류판 등 막대한 지보재(支保材)가 라이닝 콘크리이트 속으로 매몰됨으로 인해 지보재의 낭비가 심하게 되고, 둘째,다량의 지보재를 운반하거나 설치하는데 따른 공사비의 부담이 크며, 셋째, 시공과정이 복잡하여 공However, this method is a waste of support materials due to the burial of huge support materials such as paperwork and earth plate into lining concrete, and secondly, the burden of construction cost for carrying or installing a large amount of support materials is high. The process is complicated

사가 어렵고 또 공사기간이 오래 걸리는 등의 문제점이 있었다. 이를 위하여 국내특허등록공고1990-0007883호로 알려진 바와 같이 도 1 처럼 토사층에다 메사를 막장 내로 압입 전진시키면서 지하터널을 구축함에 있어서, 메사(1)를 전진시키면서 다수개의 지보공(2a,2b,2c…)을 차례로 설치하고, 이들 지보공(2a)과 지보공(2b) 사이에 결합홈(3)과 결합돌기와 같은 연결부위를 갖춘 콘크리이트 세그먼트(5)를 연속적으로 끼워 결속하여 벽체를 형성시킨 다음, 막장(6)을 굴착해 나감에 따라 발진기지측 즉, 상기 메사(1)의 뒷쪽에 설치된 지보공(2a,2b,2c…,2f)을 차례로 해체하고, 이들 해체된 지보공(2a,2b,2c…,2f)을 메사(1)의 앞쪽에 새로이 굴착된 막장(6)에다 차례로 설치하여 새로운 지보공(2a',2b',2c'…,2f')으로 재사용하면서 이들 사이에 콘크리이트 세그먼트(5)를 끼워 굴착작업을 계속해 나가는 한편, 상기와 같이 지보공(2a,2b,2c…,2f)이 해체되고 콘크리트세그먼트(5)만이 연속조립되어 일련의 벽체로 남게된 콘크리이트세그먼트(5)에 단 한번의 라이닝콘크리이트를 시공함으로써 굴착공사를 마무리한다.There were problems such as difficult to buy and long construction period. To this end, as known in the Korean Patent Registration Publication No. 1990-0007883, in constructing an underground tunnel while pushing the mesa into the membrane into the sediment layer as shown in FIG. 1, while moving the mesa (1), a plurality of jibo (2a, 2b, 2c…) In order, the concrete segments 5 having the connection portions such as the engaging grooves 3 and the engaging projections are continuously inserted between these support holes 2a and the support holes 2b to form walls. 6) As the excavation is carried out, the support bases 2a, 2b, 2c ..., 2f installed on the oscillation base side, i.e., the rear side of the mesa 1 are sequentially disassembled, and these disassembled support holes 2a, 2b, 2c ..., 2f. ) Are installed in the newly excavated bar (6) in front of the mesa (1) and reused as new support holes (2a ', 2b', 2c '..., 2f') while sandwiching the concrete segments (5) between them. While continuing the excavation work, as described above, the support ball (2a, 2b, 2c ..., 2) f) is dismantled and only one concrete segment 5 is continuously assembled to finish the excavation work by constructing only one lining concrete in the concrete segment 5 which remains as a series of walls.

그러나 이러한 방식 역시 메사시일드공법의 특성상 막장(6)부분의 지반이 약하거나 모래재질인 경우, 막장의 토사가 흘러내려 작업자가 작업이 어렵고 토사를 파내는 작업과 메사(1)를 전진시키는 작업을 동시에 수행할 수 없는 문제점이 있다.However, this method is also the nature of the mesa shield method, if the ground of the membrane (6) part is weak or sand material, the sediment of the membrane is flowing down, it is difficult for the worker to work, digging the soil and advancing the mesa (1) There is a problem that cannot be performed at the same time.

도시 지하 구조물의 안정성 증대와 인접 구조물의 손상 방지를 위하여는 지하 굴착 보조 공법을 사용하고 있으며, 이러한 효과를 얻기 위한 종래의 관련 기술로서는 파이프 루프(pipe roof) 공법과, 그라우팅(grouting) 공법을 들 수 있으며, 강관 보강형 다단 그라우팅 공법이 대표적이다.In order to increase the stability of urban underground structures and to prevent damage to adjacent structures, underground excavation assistance methods are used, and related related technologies for obtaining such effects include pipe roofing and grouting. Steel pipe reinforcement multi-stage grouting method is typical.

강관 보강형 다단 그라우팅 공법은 통상 천공, 강관삽입, 코르킹(corking) 및 실링(sealing), 그라우팅(grouting)수순으로 진행하여 주로 연약 풍화암층의 차수 및 보강용으로 사용되고 있다.Steel pipe reinforcement multi-stage grouting method is generally used for the order and reinforcement of the soft weathered rock layer by proceeding in the drilling, steel pipe insertion, corking (sealing), sealing (groouting) procedure.

이러한 공법은 도2a도 내지 도2d도를 참조하여 간략히 설명한다.This method will be briefly described with reference to FIGS. 2A to 2D.

도면에서 101은 강관, 101a는 분사공, 102는 커플링, 103은 코르킹재, 104는 실링호스, 105는 패커, 106는 천공면을 각각 나타낸 것이다.In the figure, 101 is a steel pipe, 101a is an injection hole, 102 is a coupling, 103 is a corking material, 104 is a sealing hose, 105 is a packer, 106 is a perforated surface.

도면에 도시된 바와 같이, 터널 굴착에 선행하여 터널 원주면을 따라 직경 100㎜ 정도의 빈 공을 일정 간격으로 천공면(106)에 천공한다(도2a).As shown in the figure, prior to the tunnel excavation, holes 100 mm in diameter are drilled in the drilling surface 106 at regular intervals along the tunnel circumferential surface (FIG. 2A).

상기 천공 수행 후 중공형상을 가지되, 소정간격마다 고무밴드가 끼워진 분사공(101a)이 형성된 일반 구조용인 소구경 강관(101)을 소정길이만큼 커플링(102)을 매개로 연결하여 빈 공(hole)에 삽입시킨다(도2b).After the drilling is performed, the hollow hole is formed, and the hollow hole is formed by connecting the small-diameter steel pipe 101, which is a general structural member, having the injection hole 101a fitted with a rubber band at predetermined intervals through the coupling 102 by a predetermined length. hole) (Fig. 2b).

그리고, 상기 강관에 패커(packer)(105)를 설치하되, 강관(101)과 천공면(106)사이에 그라우트재 역류방지를 위한 급결시멘트 또는 발포제 등의 코르킹(corking)재(103)를 주입한다(도2c).In addition, a packer 105 is installed in the steel pipe, and a coring material 103 such as a fastening cement or foaming agent for preventing grout backflow between the steel pipe 101 and the perforated surface 106 is provided. Inject (FIG. 2C).

상기 패커(105)내측에 다단으로 그라우트재를 주입하여 강관(101)의 분사공(101a)으로 유출시켜 지반을 차수, 보강한다.(도2d)The grout material is injected into the packer 105 in multiple stages and flows into the injection hole 101a of the steel pipe 101 to order and reinforce the ground. (FIG. 2D)

상기 종래 시공방법의 도2d에서 강관과 천공면 사이에 설치되는 그라우팅은 규산소다와 시멘트를 주재료로 하는 그라우트재와, 규산소다, 시멘트 등에 약제를 혼합하여 주입성을 좋게 한 화학 그라우팅 타입(chemical grouting type)을 들 수 있다.The grouting installed between the steel pipe and the perforated surface in FIG. 2d of the conventional construction method is a chemical grouting type in which a grout material including sodium silicate and cement as a main material, a compound of sodium silicate, cement, and the like are injected to improve injection properties (chemical grouting). type).

물론 그라우팅 공법의 세부적으로는 천공을 하고 관을 삽입한 후 그라우팅을 하거나, 국내특허등록 제10-0166423호와 같이 천공관에 그라우팅 가능한 노즐을 역류방지 가능토록 일체로 형성한 방식의 단일 천공관방식 등이 세부적으로 개발되어 사용되는 현실이다.Of course, the grouting method is specifically drilled and inserted into the tube, followed by grouting, or as a single perforated tube method in which a groutable nozzle is integrally formed to prevent backflow as per Korean Patent Registration No. 10-0166423. The reality is that the back is developed and used in detail.

그러나 이러한 방식은 주로 암반층에서 낙석 등을 방지하도록 사용하는 기술로 탁월한 효과가 있으며, 주로 토사층에는 메사시일드 공법을 사용하여 각 공법이 단독으로 사용된다. However, this method is mainly used to prevent rockfall, etc. in the rock layer has an excellent effect, mainly using the mesa shield method in the soil layer, each method is used alone.

본 발명은 이를 해결하고자 하는 것으로, 본 발명의 목적은 토사층의 터널을 메사시일드공법을 이용하여 수행하되, 막장부위의 토사 흘러내림(Arc Sliding)을 방지하도록 그라우팅공법을 추가 수행하여, 메사시일드 공법 중 막장의 토사 흘러내림과 지반침하를 방지하는 공법을 제공하려는 것이다.The present invention is to solve this problem, an object of the present invention is to carry out the tunnel of the soil layer using the mesa shield method, by adding a grouting method to prevent arc sliding of the membrane portion, mesaci It is to provide a method to prevent the sediment flow and ground subsidence of the dead end of the yield method.

본 발명의 다른 목적은 메사시일드 공법 중 막장의 토질에 따라 막장의 정면 및 어깨 부부까지도 토사의 흐름을 막아 작업의 효용성을 극대화시킨 공법을 제공하려는 것이다.Another object of the present invention is to provide a method of maximizing the effectiveness of the work by preventing the flow of soil to the front and shoulders of the membrane according to the soil quality of the membrane in the mesa shield method.

이를 위하여 본원발명은 지보공을 측벽에 세우고, 각 지보공 사이는 토류판 으로 막고 상부면은 메사를 집입시켜 막장의 흙을 파내는 방식의 메사 시일드 공법에서,To this end, the present invention erects the jibo ball on the side wall, between each jibo ball to block the earth plate and the upper surface of the mesa shield method of digging the soil by inserting the mesa,

지보공에 지지되는 메사를 막장으로 진입시키고 진입한 만큼 막장의 흙을 파내는 제 1 과정;A first process of entering the mesa supported by the Jibo-Gong into the curtain and digging the soil of the curtain as it enters;

막장의 메사 상면 부위의 수평부 및 어개 수직부에 막장의 흙이 흘러내리는 것을 막아줄 정도의 깊이로 그라우팅관을 주입하는 그라우팅 공법에 의한 제 2 과정;A second process by a grouting method of injecting the grouting tube to a depth sufficient to prevent the film from flowing down to the horizontal and vertical portions of the upper surface of the mesa of the membrane;

제 2 과정에 이어 막장부터 흙을 파내고 메사를 진입하는 제 3 과정; 및A third process of digging soil into the mesa following the second process; And

막장의 바닥과 상면이 안식각을 이룰 때 막장의 메사 상면 부위에 막장의 흙이 흘러내리는 것을 막아줄 정도의 깊이로 그라우팅관을 주입하는 그라우팅 공법에 의한 제 4 과정을 순차 수행한다.When the bottom and the upper surface of the curtain wall form an angle of repose, the fourth process by the grouting method of injecting the grouting tube into the depth of the membrane to prevent the flow of dirt from the curtain wall is sequentially performed.

본 발명의 다른 예로는 지보공을 측벽에 세우고, 각 지보공 사이는 토류판으로 막고 상부면은 메사를 진입시켜 막장의 흙을 파내는 방식의 메사 시일드 공법에서,In another example of the present invention, the ground hole is placed on the side wall, and each ground hole is blocked by a earth plate and the upper surface of the mesa shield method of digging the soil of the membrane by entering the mesa,

막장의 메사 상면 부위에 막장의 흙이 흘러내리는 것을 막아줄 정도의 깊이 및 간격으로 그라우팅 강관(101)을 터널 대응부위의 상면 수평부와 어깨 수직부에 분산 주입하여 그라우팅하는 그라우팅 공법의 제 1 공정; 및The first process of the grouting method in which the grouting steel pipe 101 is dispersed and grouted by injecting the grouting steel pipe 101 into the horizontal and shoulder vertical portions of the tunnel corresponding portion at a depth and a gap that prevents the soil from flowing down on the upper surface of the mesa. ; And

그라우팅 공법을 수행한 다음 그라우팅 하부를 터널을 파며, 지보공에 지지되는 메사(1)를 막장으로 진입시키고 진입한 만큼 막장의 흙을 파내는 메사공법의 제 2 공정을 수행하는 토사터널 구축 메사공법을 제공하려는 것이다.After the grouting method, tunneling the lower part of the grouting, and entering the mesa (1) supported by the jibogong to enter the barrier, to provide the earthwork tunnel construction mesa method to carry out the second process of the mesa construction method to excavate the soil of the membrane. I will.

이하 본원발명의 실시예를 도면을 참조하여 상세히 설명한다.Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.

도 3 은 본 발명의 그라우팅 공법이 적용된 메사공법을 보이는 정단면도, 도 4 는 도 3 의 수직 측단면도로, 지보공(2)으로 측벽에 수직의 지보공(2-1)과, 각 수직의 지보공(2-1) 사이의 측벽 양측 사이에 설치되는 수평의 지보공(2-2)으로 공간을 이루도록 구축하고, 각 수직의 지보공(2-1) 사이는 토류판으로 막고 상부면은 메사를 집입시켜 막장의 흙을 파내는 방식의 메사 시일드 공법에서,3 is a front sectional view showing a mesa method to which the grouting method of the present invention is applied, and FIG. 4 is a vertical side cross-sectional view of FIG. 3, wherein the support hole 2-1 is perpendicular to the side wall with the support hole 2, and each vertical support hole ( 2-1) is constructed so as to make a space with horizontal support balls (2-2) installed between both sides of the side wall between, and between each vertical support balls (2-1) with a earth plate and the upper surface is mesas to insert In the mesa seal method of digging soil,

지보공(2)에 지지되는 메사(1)를 막장(6)으로 진입시키고 진입한 만큼 막장(6)의 흙을 파내는 제 1 과정;A first process of entering the mesa 1 supported by the support ball 2 into the curtain wall 6 and digging the soil of the curtain wall 6 as much as it enters;

막장(6)의 메사(1) 상면 수평부(H) 및 어깨 수직부(V)에 막장의 흙이 흘러내리는 것을 막아줄 정도의 깊이 및 간격으로 그라우팅 강관(101)을 주입하여 그라우팅하는 그라우팅 공법의 제 2 과정;Grouting method of injecting and grouting the grouting steel pipe 101 at a depth and an interval that prevents the soil of the curtain from flowing down to the horizontal portion H and the shoulder vertical portion V of the mesa 1 of the membrane 6. 2nd process of;

제 2 과정에 이어 막장(6)부터 흙을 파내고 메사(1)를 진입하는 제 3 과정; 및A third process of digging soil into the mesa 1 after the second process; And

막장(6)의 바닥과 상면이 안식각(∂)을 이룰 때 막장(6)의 메사(1) 상면부위에 막장의 흙이 흘러내리는 것을 막아줄 정도의 깊이로 그라우팅 강관(101)을 주입하는 그라우팅 공법에 의한 제 4 과정을 순차 수행한다.Grouting to inject grouting steel pipe 101 to a depth that prevents the soil from flowing down on the upper surface of the mesa 1 of the membrane 6 when the bottom and the upper surface of the membrane 6 form an angle of repose ∂. 4th process by the method is performed sequentially.

제 4 과정에서 막장의 경사는 토사가 흘러내리는 것을 막아주는 안식각(∂)을 이루도록 그라우팅을 반복 수행한다.In the fourth process, the slope of the barrier is repeatedly grouted to form a repose angle ∂ to prevent the soil from flowing down.

상기 그라우팅 공법을 수행하는 그라우팅 강관(101)은 선단부 토사 압력을 견디도록 막장 수직 단면상에서 메사(1) 상면의 수평부(H)와 메사(1) 상면 양단에서 아래로 이어지는 어깨 수직부(V)가 일정간격으로 연이어진 형상을 이룬다. 이는 선단부의 토사 압력을 그라우팅강관(101)어셈브리로 인한 그라우팅면이 수평부(H)와 그 양단에서 수직으로 절곡된 어깨 수직부(V)가 연이어진 형상을 하여 절곡 부위를 이룸으로 토사 압력을 잘 견디도록 기능 한다. 아울러 막장의 상면의 수직부(H) 및 그 측면 어깨 수직부(V)에서 흘러내리는 토사를 막아주어 지보공을 잘 설치하고 메사(1)의 진입이 용이하도록 하여 안전 사고 없이 안정적으로 시공을 가능토록 한다.The grouting steel pipe 101, which performs the grouting method, has a horizontal portion H of the upper surface of the mesa 1 and a vertical shoulder portion V extending downward from both ends of the upper surface of the mesa 1 in order to withstand the tip soil pressure. Form a continuous shape at regular intervals. This is the earth and sand pressure of grouting surface of grouting steel pipe 101 by the assembly of horizontal part (H) and the shoulder vertical part (V) vertically bent at both ends. Function to endure well. In addition, it prevents soil from flowing down from the vertical part (H) of the top of the curtain and the vertical shoulder part (V) of the side of the curtain, and installs the jibo ball well and facilitates the entry of the mesa (1) so that the construction can be stably performed without safety accidents. do.

도 5 는 본원발명의 다른 실시예로, 지반이 지표면에 노출된 면에서 지보공(2)을 측벽에 세우고, 각 지보공(2) 사이는 토류판으로 막고 상부면은 메사를 집입시켜 막장의 흙을 파내는 방식의 메사 시일드 공법에서,5 is another embodiment of the present invention, in which the ground surface is exposed to the ground surface, the support ball (2) is erected on the side wall, between each support hole (2) to block the earth plate and the upper surface to insert a mesa to dig the soil of the membrane In the mesa shield method of the method,

막장의 메사 상면 부위에 막장의 흙이 흘러내리는 것을 막아줄 정도의 깊이 및 간격으로 메사(1) 상면에서 그라우팅 강관(101)을 터널 대응부위의 메사(1) 상면의 수평부(H) 및 어깨 수직부(V)에 분산 주입하여 그라우팅하는 그라우팅 공법의 제 1 공정; 및The horizontal portion (H) and the shoulder of the upper surface of the mesa (1) of the grouting steel pipe 101 at the upper surface of the mesa (1) at the depth of the mesa (1) at the depth and the interval to prevent the dirt of the membrane from flowing down on the upper part of the mesa. A first step of a grouting method of dispersion injection and grouting in the vertical portion (V); And

그라우팅 공법을 수행한 다음 그라우팅 하부로 터널을 파며, 지보공에 지지되는 메사(1)를 막장으로 진입시키고 진입한 만큼 막장의 흙을 파내는 메사공법의 제 2 공정을 수행한다.After performing the grouting method, the tunnel is dug into the lower part of the grouting, and the second step of the mesa method is performed by digging the mesa (1) supported by the jibo-hole into the membrane and digging the soil of the membrane.

상기 제 1 공정의 그라우팅 깊이는 제 2 공법의 막장 바닥면의 토사가 안식각(∂)을 이루도록 하는 깊이를 이루도록 수행한다.The grouting depth of the first process is performed so that the soil of the bottom surface of the second method achieves an angle of repose (∂).

상기 그라우팅 공법을 수행하는 그라우팅 강관은 선단부 토사 압력을 견디도록 막장 수직 단면상에서 메사(1) 상면의 수평부(H)와 메사(1) 상면 양단에서 아래로 이어지는 어깨 수직부(V)가 일정간격으로 연이어진 형상을 이룬 것이 좋다.The grouting steel pipe for performing the grouting method has a horizontal gap (H) of the upper surface of the mesa (1) and a vertical shoulder portion (V) extending downward from both ends of the upper surface of the mesa (1) on the membrane vertical section so as to withstand the tip soil pressure. It is good to form a continuous shape.

이를 수행함에 있어서, 터널을 이루는 상부면에 그리우팅강관(101)을 수평으로 뚫고, 그라우팅을 채운다(그라우팅 자체의 공정은 통상의 기술이므로 생략한다). 그리고 상부 면을 안정적으로 토사의 흘러내림을 막은 상태에서 일반적인 메사공법을 수행한다. 이는 도 5 와 같은 정면상의 단면을 이루고, 측면상에서 보아도, 막장(6)의 바닥이 안식각(∂)을 이루므로, 토사의 흘러내립 없이 안정적으로 메사(1)의 집입을 가능토록 한다. 아울러 본원발명은 그라우팅강관(101)이 도 5 와 같이 수평부(H)와 수평부(H)양단에서 아래로 이어진 어깨 수직부(V)를 이루므로 이는 단부에서 입체적인 압력의 증가를 이루어 안정적으로 토사의 흐름을 막아주고, 내구성을 가진다.In performing this, the grouting steel pipe 101 is horizontally drilled on the upper surface constituting the tunnel, and the grouting is filled (the process of grouting itself is a conventional technique and thus omitted). And the general mesa method is performed while the upper surface is stably prevented from flowing down the soil. This forms a cross section on the front side as shown in FIG. 5, and even when viewed from the side, the bottom of the membrane 6 forms an angle of repose ∂, so that the mesa 1 can be stably inserted without flowing down the soil. In addition, the present invention, since the grouting steel pipe 101 forms a shoulder vertical portion (V) extending downward from both ends of the horizontal portion (H) and the horizontal portion (H), as shown in FIG. Prevents soil from flowing and has durability.

이상과 같이 본원발명은 토사층의 터널 구축용 메사공법과 암반층의 암반낙하 방지용 그라우팅공법을 이용하되, 메사공법을 수행하는 막장부위의 토사 흘러내림을 방지토록 막장 주변의 상부 및 어깨 부분에 그라우팅공벙을 수행하여, 토사의 흘러내림을 방지하고, As described above, the present invention uses a mesa method for tunnel construction of a soil layer and a grouting method for preventing rock fall of a rock layer, but grouting balls are applied to the upper and shoulder portions around the membrane to prevent the soil from flowing down at the membrane portion that performs the mesa method. To prevent runoff of sediment,

항상 막장이 안식각을 이루도록 하는 길이 및 면적을 이루도록 그라우팅공법을 적용하고 그라우팅의 형태가 메사 상면의 수평부와, 그 양단이 아래로 수직으로 이어지는 절곡형상을 이루도록 함으로써 토사의 양에 상관없이 강한 지지력을 확보토록 하여 안전 사고 방지에 기여하고 막장의 흙의 진입을 차단하는 별도의 수단이 필요 없거나 강한 힘을 요하지 않아 설치가 용이하다.The grouting method is applied to achieve the length and area of the membrane to make the angle of repose at all times, and the grouting forms a horizontal portion of the upper surface of the mesa, and both ends are bent vertically downward, so that a strong bearing force is maintained regardless of the amount of soil. It contributes to the prevention of safety accidents by securing it, and it is easy to install because it does not need a separate means to block the entry of dirt into the curtain or does not require strong force.

따라서 연약지반의 토사터널 시공시, 보다 안전하게 굴착함은 물론 공사원가 절감 및 시공의 효율성 향상이 기여하여, 지장물 및 교통량이 많은 도심지의 연결통로 및 중요시설 횡단 등에 광범위하게 적용될 수 있다.Therefore, when constructing soft earth and sand tunnels, it contributes not only to excavation more safely, but also to reducing construction cost and improving efficiency, so that it can be widely applied to connecting passages and important facility crossings in urban areas with high obstacles and heavy traffic.

즉, 토사터널 시공시 메사실드 공법의 장점을 그대로 유지하면서 터널 굴착에 앞서 안전한 루프 형태의 그라우팅관을 통한 그라우팅을 미리 형성하므로 상부지반 침하를 최대한 억제하여 주변 구조물의 안정성을 확보하면서 직업자의 안전은 물론 작업 능률이 향상되어 원가절감 및 공기단축에도 기여할 수 잇는 획기적인 지하터널 구축 방법을 제공한다.In other words, while maintaining the advantages of the mesa shield method during the construction of earth and sand tunnels, grouting is formed in advance through the safe loop-type grouting pipe prior to the excavation of the tunnel. Of course, it provides an innovative underground tunnel construction method that can contribute to cost reduction and air shortening by improving work efficiency.

Claims (5)

지보공을 측벽에 세우고, 각 지보공 사이는 토류판으로 막고 상부면은 메사를 집입시켜 막장의 흙을 파내는 방식의 메사 시일드 공법에서,In the mesa shielding method of placing the jibo ball on the side wall, blocking each earth ball with the earth plate, and inserting the mesa into the mesa to excavate the soil of the membrane. 지보공(2)에 지지되는 메사(1)를 막장으로 진입시키고 진입한 만큼 막장의 흙을 파내는 제 1 과정;A first process of entering the mesa (1) supported by the jibo ball (2) into the makmak and digging soil of the makmak as entered; 막장의 메사(1) 상면의 수평부(H) 및 어깨 수직부(V)에 막장의 흙이 흘러내리는 것을 막아줄 정도의 깊이 및 간격으로 막장 내벽에서 그라우팅 강관(101)을 주입하여 그라우팅하는 그라우팅 공법의 제 2 과정;Grouting by injecting and grouting the grouting steel pipe 101 from the inner wall of the membrane at a depth and a distance that prevents the soil from flowing down into the horizontal portion H and the shoulder vertical portion V of the upper surface of the mesa 1 of the membrane. Second process of public law; 제 2 과정에 이어 막장부터 흙을 파내고 메사를 진입하는 제 3 과정; 및A third process of digging soil into the mesa following the second process; And 막장의 바닥과 상면이 안식각을 이룰 때 막장의 메사 상면 부위에 막장의 흙이 흘러내리는 것을 막아줄 정도의 깊이로 그라우팅관을 주입하는 그라우팅 공법에 의한 제 4 과정을 순차 수행하는 그라우팅 공법을 이용하는 토사터널 구축 메사공법.Earth and sand using grouting method which performs the 4th process by grouting method which injects grouting tube to depth that prevents the soil of the curtain from flowing down to the mesa upper part of the membrane when the bottom and the upper surface of the membrane make an angle of repose. Tunnel construction mesa method. 제 1 항에 있어서, 제 4 과정에서 막장의 경사는 토사가 흘러내리는 것을 막아주는 안식각(∂)을 이루도록 그라우팅을 반복 수행하는 것을 특징으로 하는 그라우팅 공법을 이용하는 토사터널 구축 메사공법.The mesa method of claim 1, wherein the slope of the barrier in the fourth process is repeatedly grouted to form an angle of repose (∂) to prevent soil from flowing down. 지보공을 측벽에 세우고, 각 지보공 사이는 토류판으로 막고 상부면은 메사를 집입시켜 막장의 흙을 파내는 방식의 메사 시일드 공법에서,In the mesa shielding method of placing the jibo ball on the side wall, blocking each earth ball with the earth plate, and inserting the mesa into the mesa to excavate the soil of the membrane. 막장의 메사 상면 부위에 막장의 흙이 흘러내리는 것을 막아줄 정도의 깊이 및 간격으로 메사 상면에서 그라우팅 강관(101)을 터널 대응부위의 상면의 수평부(H)와 그 어깨 수직부(V)에 분산 주입하여 그라우팅하는 그라우팅 공법의 제 1 공정; 및The grouting steel pipe 101 is placed on the horizontal portion (H) and the shoulder vertical portion (V) of the upper surface of the tunnel corresponding portion at the depth of the mesa at the depth and interval to prevent the dirt from flowing down on the upper surface of the membrane. A first step of a grouting method of dispersion injection and grouting; And 그라우팅 공법을 수행한 다음 그라우팅 하부를 터널을 파며, 지보공에 지지되는 메사(1)를 막장으로 진입시키고 진입한 만큼 막장의 흙을 파내는 메사공법의 제 2 공정을 수행하는 그라우팅 공법을 이용하는 토사터널 구축 메사공법.After the grouting method, tunneling the lower part of the grouting, and entering the mesa (1) supported by the jiboong into the membrane, the earthwork tunnel using the grouting method that performs the second process of the mesa method to excavate the soil of the membrane. Mesa method. 제 3 항에 있어서, 제 1 공정의 그라우팅 깊이는 제 2 공법의 막장 바닥면의 토사가 안식각(∂)을 이루도록 하는 깊이를 이루도록 수행하는 것을 특징으로 하는 그라우팅 공법을 이용하는 토사터널 구축 메사공법.4. The earthwork tunnel construction mesa method according to claim 3, wherein the grouting depth of the first process is performed such that the soil of the bottom surface of the second method achieves a depth of repose (∂). 제 1 항 또는 3항에 있어서, 그라우팅 공법을 수행하는 그라우팅 강관은 선단부 토사 압력을 견디도록 막장 수직 단면상에서 메사(1) 상면의 수평부(H)와 메사(1) 상면 양단에서 아래로 이어지는 어깨 수직부(V)가 일정간격으로 연이어진 형상을 이룬 것을 특징으로 하는 그라우팅 공법을 이용하는 토사터널 구축 메사공법.4. The grouting steel pipe of the grouting method according to claim 1 or 3, wherein the grouting steel pipe is subjected to a horizontal portion (H) of the upper surface of the mesa (1) and a shoulder extending from both ends of the upper surface of the mesa (1) on the membrane vertical cross section so as to withstand the tip soil discharge pressure. Tosa tunnel construction mesa method using the grouting method, characterized in that the vertical portion (V) formed a continuous shape at a predetermined interval.
KR1020070011193A 2007-02-02 2007-02-02 Messer construction method with grouting means KR100846571B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070011193A KR100846571B1 (en) 2007-02-02 2007-02-02 Messer construction method with grouting means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070011193A KR100846571B1 (en) 2007-02-02 2007-02-02 Messer construction method with grouting means

Publications (1)

Publication Number Publication Date
KR100846571B1 true KR100846571B1 (en) 2008-07-15

Family

ID=39824580

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070011193A KR100846571B1 (en) 2007-02-02 2007-02-02 Messer construction method with grouting means

Country Status (1)

Country Link
KR (1) KR100846571B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100949774B1 (en) 2009-07-28 2010-03-30 염명호 Messer tunnel construction method using upper first excavation method
KR101440258B1 (en) 2013-08-22 2014-09-17 정재민 Messer construction method with grouting means
KR101825039B1 (en) * 2016-05-11 2018-02-27 강릉건설(주) Ground reinforcement method of messer shield tunnel

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR880012860A (en) * 1987-04-27 1988-11-29 강덕희 Drilling method of underground tunnel
KR900003084U (en) * 1988-07-07 1990-02-07 강덕희 Shield Mesa for underground excavation
KR900007883B1 (en) * 1985-07-25 1990-10-22 임병구 Excavating method of turnel
KR900011113Y1 (en) * 1987-04-27 1990-12-15 강덕희 Tunnel driving apparatus
JPH072600U (en) * 1993-05-24 1995-01-13 在仁 宋 Messer shield
KR0166423B1 (en) * 1995-11-29 1999-03-20 이재명 Grouting method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR900007883B1 (en) * 1985-07-25 1990-10-22 임병구 Excavating method of turnel
KR880012860A (en) * 1987-04-27 1988-11-29 강덕희 Drilling method of underground tunnel
KR900011113Y1 (en) * 1987-04-27 1990-12-15 강덕희 Tunnel driving apparatus
KR900003084U (en) * 1988-07-07 1990-02-07 강덕희 Shield Mesa for underground excavation
JPH072600U (en) * 1993-05-24 1995-01-13 在仁 宋 Messer shield
KR0166423B1 (en) * 1995-11-29 1999-03-20 이재명 Grouting method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100949774B1 (en) 2009-07-28 2010-03-30 염명호 Messer tunnel construction method using upper first excavation method
KR101440258B1 (en) 2013-08-22 2014-09-17 정재민 Messer construction method with grouting means
KR101825039B1 (en) * 2016-05-11 2018-02-27 강릉건설(주) Ground reinforcement method of messer shield tunnel

Similar Documents

Publication Publication Date Title
KR100866162B1 (en) Chair-type self-supported earth retaining wall constructing method
KR101834847B1 (en) Echo-environmental construction method of tunnel portal area using mini pipe-roof
CN107060803B (en) Tunnel construction method by utilizing pipe curtain grouting
KR100936471B1 (en) A circular structure supported by the segment with A drainage structure and method constructing the shield tunnel
CN112502734B (en) Construction method for water-rich sand layer shield zone connecting channel
KR200415268Y1 (en) Tubular arch tunnel for underground tunnelling
KR100927186B1 (en) Method of constructing cantilevered continuous wallsfor retaining earth and cutting off water
KR20170102397A (en) The Tunnel construction method to use retangular pipe
KR101021915B1 (en) A method for constructing cut-off temporary structure for sheathing work
KR20030024130A (en) precast pile for braced wall and the method using the same
KR101440258B1 (en) Messer construction method with grouting means
KR100846571B1 (en) Messer construction method with grouting means
JP2019015100A (en) Removing method of earth retaining wall
KR101078080B1 (en) Earth retaining wall and it's construction method using the precast pile and ground reinforcement
KR102195203B1 (en) Soil blocking method using horizontal Strut and slope Strut
KR20050020451A (en) Shield tunneling construction method and tunnel structure
CN113958322B (en) Tunnel excavation method under existing subway line
CN112502717B (en) Construction method for excavating connecting channels between shield sections of water-rich sand layer
KR100926501B1 (en) Roof and shield tunneling construction method (rsm) and tunnel structure
KR101194102B1 (en) The Excavation Method of Concrete Tunnel Construction
KR102243586B1 (en) Two-side semicircle arch type leading pipe and structure of non-excavation type tunnel using thereof and method of constructing thereof
KR100701885B1 (en) Non-open cut pipe installation method
KR101523948B1 (en) Construction method of underground structure under the established building
KR100418366B1 (en) Tunnel formation tunnel structure form of construction work and tunnel structure
KR200296444Y1 (en) Underaround continued wall structure using a large diameter cast-in-place pile installed by Benoto method

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130709

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20140703

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20150119

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20160617

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20170703

Year of fee payment: 10

J204 Invalidation trial for patent
J121 Written withdrawal of request for trial
FPAY Annual fee payment