KR101040003B1 - Installation-workshop constructing method for steel frame construction - Google Patents

Installation-workshop constructing method for steel frame construction Download PDF

Info

Publication number
KR101040003B1
KR101040003B1 KR1020100005853A KR20100005853A KR101040003B1 KR 101040003 B1 KR101040003 B1 KR 101040003B1 KR 1020100005853 A KR1020100005853 A KR 1020100005853A KR 20100005853 A KR20100005853 A KR 20100005853A KR 101040003 B1 KR101040003 B1 KR 101040003B1
Authority
KR
South Korea
Prior art keywords
block
steel
steel frame
delete delete
workshop
Prior art date
Application number
KR1020100005853A
Other languages
Korean (ko)
Inventor
고준현
Original Assignee
고준현
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 고준현 filed Critical 고준현
Priority to KR1020100005853A priority Critical patent/KR101040003B1/en
Application granted granted Critical
Publication of KR101040003B1 publication Critical patent/KR101040003B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/46Foundations for supply conduits or other canals
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

PURPOSE: An installation method of a workshop for installing a steel skeleton structure is provided to install a workshop which is strong and has high bearing capacity. CONSTITUTION: An installation method of a workshop for installing a steel skeleton structure comprises the steps of: draining off water from the soft ground for installing a workshop including a passage to install a billboard, a poster column and a transmission tower on the soft ground; joining many steel skeletons to form many blocks having the appointed length; arranging each block along a workshop to be installed; and fixing many blocks mutually using a fixture.

Description

철골구조물 설치용 작업장 설치방법{Installation-workshop constructing method for steel frame construction}Installation-workshop constructing method for steel frame construction}

본 발명은 작업장 설치방법에 관한 것으로, 더욱 상세하게는 철골구조물의 설치를 위한 이동로를 포함한 작업장을 다수의 철골을 갖는 각 블럭을 이용하여 설치 및 제거함에 따라 공사기간을 단축하고, 논의 형질을 변형시키지 않으며, 각 철골과 블럭을 재활용하여 추가비용을 방지 및 최소화하여 작업 효율을 향상시킬 수 있는 철골구조물 설치용 작업장 설치방법에 관한 것이다.
The present invention relates to a workplace installation method, and more particularly, to reduce the construction period by installing and removing the workshop, including the moving path for the installation of the steel structure using each block having a plurality of steel frame, and the discussion characteristics It does not deform, and recycles each steel frame and block to prevent and minimize the additional cost relates to the installation method of the workplace for steel structure installation can improve the work efficiency.

일반적으로, 각 지역의 지명이나 특산품 및 각 업체의 광고를 위해 고속도로나 도로 주변에 광고판과 광고탑 및 송전탑 등의 철골구조물이 설치되어 진다.In general, steel structures such as billboards, advertising towers, and transmission towers are installed around highways or roads for place names or specialties of each region and advertisement of each company.

이러한 광고판과 광고탑 및 송전탑은 산이나 언덕 등에 설치될 수 있지만, 도로의 설치 특성상 설치가 용이한 평지에 주로 설치됨에 따라 광고판도 평지에 설치되고 있으며, 광고탑과 송전탑의 경우도, 평지에 설치되고 있다.Such billboards, advertising towers, and transmission towers can be installed in mountains, hills, etc., but due to the nature of the road installation, billboards are installed on flat lands, and billboards and transmission towers are also installed on flat lands. .

이와 같이 설치되는 광고판과 광고탑 및 송전탑 중 논 및 밭 등의 연약지반에 설치되는 경우, 그에 따라 시설물들이 이동될 수 있는 이동로를 포함한 작업장을 확보해야된다.When installed on the soft ground such as rice fields and fields among the billboards and advertising towers and transmission towers installed in this way, it is necessary to secure a workplace including a moving path through which facilities can be moved.

이에 따라, 광고판과 광고탑 및 송전탑이 설치될 위치에 각 시설물과 설치를 위한 장비를 이동시키기 위한 가장 적당한 이동로를 포함한 작업장의 위치를 설정하고, 이 작업장이 설치될 연약지반에 이동로를 설치하여 각 시설물과 설치를 위한 장비들이 이동 및 설치할 수 있다.Accordingly, the location of the workplace including the most suitable moving path for moving each facility and the equipment for installation at the location where the billboard and the advertising tower and the transmission tower will be installed is set, and the moving path is installed in the soft ground where this workshop will be installed. Each facility and equipment for installation can be moved and installed.

도 1은 종래 철골구조물 설치를 위한 작업장을 도시한 도면이다.1 is a view showing a workshop for installing a conventional steel structure.

여기서, 광고판은 연약지반 중 논에 설치되는 경우를 일 실시 예로 설명하며, 이러한 경우, 작업장을 설치하기 위해 논에 토사를 쌓아 다짐에 따라 형성되고, 이 토사로 이루어진 작업장은 그 지지력이 좋지만, 공사기간이 길어지고, 사용된 논을 망치는 문제점이 있다.Here, the billboard is described as an embodiment of the case installed in the paddy field of the soft ground, in this case, is formed as the soil piled up in the paddy field to install the workshop, the workshop consisting of the soil is good support, but construction The length of time is long, and there is a problem ruining the paddy used.

다시 말해, 토사를 가져와서 쌓고 다지기까지의 기간이 최소 1주일이 필요하고, 광고판과 광고탑 및 송전탑 설치 후, 제거기간도 소요된다.In other words, it takes at least one week to collect and pile up the earth and sand, and after the installation of the billboard, the advertising tower and the transmission tower, it takes a removal period.

그리고 토사로 형성된 작업장에서 비산먼지가 발생되어 그 논은 물론, 주변 논으로 날아가 섞이는 것이다.In addition, scattering dust is generated in the work site formed by the soil and it is blown to the rice paddies and surrounding rice fields.

이와 같이, 비산먼지가 주변 논에 쌓이거나 작업장 제거시, 토사가 완벽하게 제거하지 못해, 토사가 논과 섞여 형질이 변경되는 문제점이 있는 것이다.As such, when scattering dust accumulates in the surrounding paddy field or the workplace is removed, the soil may not be completely removed, and the soil may be mixed with the rice paddy to change characteristics.

이러한 형질이 변경된 논은 함유한 영양분이 적고, 벼의 성장환경을 망치게 되어 벼 농사 시, 그 수확량이 현저히 저하됨에 따라 많은 민원이 발생되고 있다.Paddy fields with altered traits are low in nutrients, ruin the growth environment of rice and during the rice farming, a lot of complaints are generated as the yield is significantly reduced.

또한 이러한 광고판이나 철탑 등은 그 설치 결정 시, 동시에 다수 개를 순차적으로 설치하게 되는데, 먼저 설치되는 작업장의 토사를 다른 작업장에 사용할 수는 있지만, 그 량이 감소되어 매 번 토사를 더 충당함에 따라 비용이 증가되는 문제점이 있다.In addition, such billboards and steel towers are installed in sequential order at the same time, when the decision is made to install them. There is an increasing problem.

이에 따라, 작업장 설치 공사기간을 단축하도록 신속하게 설치 및 제거함은 물론, 충분한 지지력을 갖고, 논을 망치지 않으며, 다른 작업장 설치시, 추가비용을 방지 및 최소화시킬 수 있는 작업장 설치가 절실하게 요구되는 상황이다.
Accordingly, the situation is urgently required to install and remove the workshop to shorten the construction period of the workplace, to have enough support, to not destroy the rice fields, and to prevent and minimize the additional costs when installing other workshops. to be.

이에 본 발명은 상기와 같은 문제점들을 해소하기 위해 안출된 것으로써, 광고탑 설치를 위한 작업장 설치 위치인 연약지반의 물을 배수시키고, 다수의 철골을 이용하여 다수의 블럭을 제조한 다음, 이 블럭을 배치하고 고정시킴에 따라 견고하고 지지력이 높은 작업장을 설치할 수 있다.Therefore, the present invention has been devised to solve the above problems, to drain the water of the soft ground, which is the workplace installation location for the installation of advertising towers, and to manufacture a plurality of blocks using a plurality of steel frame, and then the block By placing and securing, a firm and supportive workplace can be installed.

특히, 다수의 블럭은 고정수단에 의해 상호 고정됨에 따라 다수의 블럭이 고정된 하나의 작업장으로 설치할 수 있어 그 지지력은 더욱 향상시킬 수 있다.In particular, as the plurality of blocks are fixed to each other by the fixing means, the plurality of blocks can be installed as a fixed workplace, so that the bearing capacity can be further improved.

그리고 각 블럭은 형성하고자 하는 작업장의 폭과 길이에 따라 철골의 절단 길이를 설정하거나 규격화된 길이로 절단하여 제조함에 따라, 지역 특성에 따라 용이하게 대처할 수 있다.And each block can be easily coped with according to the characteristics of the region by setting the cut length of the steel frame according to the width and length of the workplace to be formed or cut to a standardized length.

또한 광고판 설치 후, 용이하게 제거하여 다른 작업장 설치에 사용될 수 있어 종래 추가비용을 방지 및 최소화시키고, 공사기간을 단축시켜 작업의 효율성을 향상시킬 수 있는 철골구조물 설치용 작업장 설치방법을 제공하는 것이 목적이다.
It is also an object of the present invention to provide a method for installing a steel structure workshop that can be easily removed after installation of a billboard and used to install other workplaces, thereby preventing and minimizing additional costs in the past and improving work efficiency by shortening the construction period. .

상기 목적을 이루기 위한 본 발명은, 광고판과 광고탑 및 송전탑을 연약지반에 설치하기 위한 이동로를 포함한 작업장을 설치할 연약지반의 물을 배수시키는 배수단계, 다수의 철골을 일정개수 접합시켜 일정길이를 갖는 다수의 블럭으로 제작하는 블럭 제작단계, 제작된 각 블럭을 설치하고자 하는 작업장을 따라 배치시키는 블럭 배치단계, 및 배치된 다수의 블럭을 고정수단에 의해 상호 고정시키는 블럭 고정단계를 포함하여 이루어진다.The present invention for achieving the above object, the drainage step of draining the water of the soft ground to install the workshop, including a moving path for installing the billboard and the advertising tower and transmission tower on the soft ground, a certain number of steel frames are bonded to a certain number It includes a block manufacturing step of manufacturing a plurality of blocks, a block arrangement step of placing each produced block along the workplace to be installed, and a block fixing step of fixing a plurality of arranged blocks to each other by a fixing means.

바람직하게, 상기 블럭 제작단계는, 다수의 철골을 작업장 설치위치로 이송시키는 철골 이송단계, 이송된 철골을 일정길이로 절단하는 철골 절단단계, 절단된 다수의 철골을 일정개수 병렬로 배치시키는 철골 배치단계, 및 병렬로 배열된 철골의 각 접합부를 용접하여 상호 접합시켜 블럭을 형성시키는 철골 접합단계를 포함하여 이루어진다.Preferably, the block manufacturing step, the steel frame transfer step for transferring a plurality of steel frame to the workplace installation location, the steel cutting step for cutting the transported steel to a predetermined length, the steel frame arrangement to arrange a plurality of cut steel in parallel And a steel joining step of forming a block by welding each joint of the steel frames arranged in parallel to each other.

그리고 상기 철골은 H형강이고, 상기 각 블럭의 양단에 위치된 각 철골에는 그 길이 방향을 따라 상하단을 연결하는 다수의 지지편이 더 구비된다.And the steel frame is H-shaped steel, each of the steel frame located at both ends of the block is further provided with a plurality of support pieces for connecting the upper and lower ends in the longitudinal direction.

또한, 상기 철골의 상면과 하면에는 격자형상의 돌출부가 일체로 형성된다.In addition, the upper surface and the lower surface of the steel frame is formed integrally with a grid-like protrusion.

그리고 상기 블럭 제작단계에서, 하나의 블럭을 제작하기 위한 철골의 개수는 5개이고, 상기 철골의 길이방향과 동일한 블럭의 길이는 폭보다 1.8 ~ 2.2배이다.And in the block manufacturing step, the number of steel frame for producing one block is five, the length of the same block as the longitudinal direction of the steel frame is 1.8 ~ 2.2 times the width.

또한, 상기 블럭은 상기 블럭 배치단계에서, 그 길이가 설치하고자 하는 작업장의 길이방향을 향하도록 배치된다.In addition, in the block arrangement step, the block is arranged such that its length faces the longitudinal direction of the workplace to be installed.

그리고 상기 블럭 제작단계에서, 하나의 블럭은 10개의 철골이 용접되어 제조되고, 상기 철골의 길이방향과 동일한 블럭의 길이는 폭보다 1.8 ~ 2.2배이다.In the block manufacturing step, one block is manufactured by welding 10 steel frames, and the length of the same block as the length direction of the steel frame is 1.8 to 2.2 times greater than the width.

또한, 상기 블럭은 상기 블럭 배치단계에서, 그 길이가 설치하고자 하는 작업장의 폭방향을 향하도록 배치되되, 길이방향으로 다수의 블럭이 배치된다.In addition, the block is arranged in the block arrangement step, the length of the block facing the width direction of the workplace to be installed, a plurality of blocks are arranged in the longitudinal direction.

그리고 상기 블럭 고정단계의 고정수단은, 인접 배치된 각 블럭을 용접하거나, 볼트와 너트를 이용하여 각 블럭을 고정시키거나, 각 블럭의 각 모서리로부터 일정거리에 설치공을 각각 상하방향으로 통공하고, 인접한 네 개의 블럭 모서리에 형성된 각 설치공과 대응되는 고정공이 형성된 체결판을 그 상측에 거치시킨 후, 각 고정공과 설치공을 관통하도록 각 체결파이프를 설치한 다음 상기 체결판과 각 블럭 및 체결파이프와 체결판을 용접시키거나, 또는 인접한 두 개의 블럭에 걸치도록 평철판을 거치시킨 후, 용접하는 것 중 선택된 어느 하나 이상이다.And the fixing means of the block fixing step, welding each of the adjacent blocks, fixing each block using bolts and nuts, or through the installation holes in a predetermined distance from each corner of each block in the vertical direction After mounting the fastening plate formed with the fixing hole corresponding to each installation hole formed in the four adjacent block corners on the upper side, and then install each fastening pipe to pass through each of the fixing hole and the installation hole, and then the fastening plate, each block and the fastening pipe And at least one selected from among welding the fastening plate, or mounting the flat iron plate to span two adjacent blocks.

또한, 상기 블럭 배치단계 전에, 설치하고자 하는 작업장에 다수의 H형강의 받침철골을 일정간격으로 더 배치시키는 받침철골 배치단계가 더 형성된다.In addition, before the block arrangement step, the supporting steel arrangement step for further placing the support steel of the plurality of H-shaped steel at a predetermined interval in the workplace to be installed is further formed.

그리고 상기 블럭 배치단계 전에, 설치하고자 하는 작업장에 하나 또는 다수의 받침부재를 더 거치시키는 받침부재 배치단계가 더 형성된다.And before the block arrangement step, the support member arrangement step for further mounting one or more support members in the workplace to be installed is further formed.

또한, 상기 받침부재는 부직포, 인조천, 지오그리드 중 선택된 어느 하나 이상이다.In addition, the supporting member is any one or more selected from a nonwoven fabric, an artificial cloth, and a geogrid.

그리고 상기 블럭 고정단계 후에, 고정된 블럭의 외측을 따라 다수의 고정프레임이 더 설치되어 설치된 블럭의 위치를 고정시키는 위치고정단계가 더 형성된다.After the block fixing step, a plurality of fixing frames are further installed along the outside of the fixed block to further fix the position of the installed block.

또한, 상기 철골구조물은, 광고판, 광고탑 및 송전탑 중 선택된 어느 하나 이상이다.
In addition, the steel structure is any one or more selected from the billboard, advertising tower and transmission tower.

상기한 바와 같이, 본 발명에 의한 철골구조물 설치용 작업장 설치방법에 의하면, 설치하고자 하는 작업장의 길이에 따라 필요한 철골의 량을 공사 전에 결정할 수 있어 불필요한 재료나 운송비를 절감시킬 수 있고, 각각의 블럭을 제작하여 고정수단에 의해 상호 고정시킴에 따라 용이하게 설치 및 제거함은 물론, 지지력을 확보할 수 있으며, 종래 토사를 사용하지 않아 작업장 설치위치의 형질변형을 방지하고, 제거된 철골이나 블럭은 다른 작업장 설치시 재사용될 수 있어 추가비용을 방지 및 최소화시켜 작업의 효율성을 향상시킬 수 있게 하는 매우 유용하고 효과적인 발명이다.
As described above, according to the workshop installation method for steel structure installation according to the present invention, it is possible to determine the required amount of steel frame according to the length of the workplace to be installed before the construction can reduce unnecessary materials or transportation costs, each block It can be easily installed and removed as well as secured by supporting means by fixing means, and it is possible to secure supporting power. It prevents transformation of work site installation location without using conventional earth and sand, or removed steel frame or block. It is a very useful and effective invention that can be reused during installation, thereby preventing and minimizing additional costs and improving the efficiency of the work.

도 1은 종래 철골구조물 설치를 위한 작업장을 도시한 도면이고,
도 2는 본 발명에 따른 철골구조물 설치용 작업장 설치방법의 순서도를 도시한 도면이며,
도 3은 본 발명에 따른 철골구조물 설치용 작업장 설치방법을 도시한 도면이고,
도 4는 본 발명에 따른 철골구조물 설치용 작업장 설치방법의 블럭 제조단계의 순서도를 도시한 도면이며,
도 5는 도 4의 블럭 제조단계를 도시한 도면이고,
도 6은 본 발명에 따른 철골구조물 설치용 작업장 설치방법의 제작된 블럭의 일실시 예를 도시한 도면이며,
도 7은 도 6의 블럭에 의한 블럭 배치를 도시한 도면이고,
도 8은 본 발명에 따른 철골구조물 설치용 작업장 설치방법의 제작된 블럭의 다른 실시예를 도시한 도면이며,
도 9는 도 8의 블럭에 의한 블럭 배치를 도시한 도면이고,
도 10은 본 발명에 따른 철골구조물 설치용 작업장 설치방법의 고정수단의 일 실시 예를 도시한 도면이며,
도 11은 본 발명에 따른 철골구조물 설치용 작업장 설치방법의 고정수단의 다른 실시 예를 도시한 도면이고,
도 12는 본 발명에 따른 철골구조물 설치용 작업장 설치방법의 고정수단의 또 다른 실시 예를 도시한 도면이며,
도 13은 본 발명에 따른 철골구조물 설치용 작업장 설치방법의 고정수단의 또 다른 실시 예를 도시한 도면이고,
도 14는 본 발명에 따른 철골구조물 설치용 작업장 설치방법의 고정수단에 따른 블럭 고정단계를 도시한 도면이며,
도 15는 본 발명에 따른 철골구조물 설치용 작업장 설치방법에 받침철골와 받침부재가 더 설치된 상태를 도시한 도면이다.
1 is a view showing a workshop for installing a conventional steel structure,
2 is a view showing a flowchart of a method for installing a steel frame construction workplace according to the present invention,
3 is a view showing a work place installation method for steel structure installation according to the present invention,
Figure 4 is a view showing a flow chart of the block manufacturing step of the steelwork structure installation workshop installation method according to the invention,
5 is a view illustrating a block manufacturing step of FIG.
Figure 6 is a view showing an embodiment of the produced block of the workshop installation method for steel structure installation according to the present invention,
FIG. 7 is a diagram illustrating a block arrangement by blocks of FIG. 6;
8 is a view showing another embodiment of the produced block of the workshop installation method for steel structure installation according to the present invention,
FIG. 9 is a diagram illustrating a block arrangement by blocks of FIG. 8;
10 is a view showing an embodiment of the fixing means of the workshop installation method for steel structure installation according to the present invention,
11 is a view showing another embodiment of the fixing means of the workshop installation method for steel structure installation according to the present invention,
12 is a view showing another embodiment of the fixing means of the workshop installation method for steel structure installation according to the present invention,
13 is a view showing another embodiment of the fixing means of the workshop installation method for steel structure installation according to the present invention,
14 is a view showing a block fixing step according to the fixing means of the workshop installation method for steel structure installation according to the present invention,
15 is a view showing a state in which the supporting steel frame and the supporting member is further installed in the workshop installation method for steel structure installation according to the present invention.

이하, 본 발명의 바람직한 실시 예를 첨부된 도면을 참조하여 설명한다.Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings.

또한, 본 실시 예는 본 발명의 권리범위를 한정하는 것은 아니고 단지 예시로 제시된 것이며, 그 기술적 요지를 이탈하지 않는 범위 내에서 다양한 변경이 가능하다.In addition, the present embodiment is not intended to limit the scope of the present invention, but is presented by way of example only, and various modifications may be made without departing from the technical gist of the present invention.

도 2는 본 발명에 따른 철골구조물 설치용 작업장 설치방법의 순서도를 도시한 도면이고, 도 3은 본 발명에 따른 철골구조물 설치용 작업장 설치방법을 도시한 도면이며, 도 4는 본 발명에 따른 철골구조물 설치용 작업장 설치방법의 블럭 제조단계의 순서도를 도시한 도면이고, 도 5는 도 4의 블럭 제조단계를 도시한 도면이며, 도 6은 본 발명에 따른 철골구조물 설치용 작업장 설치방법의 제작된 블럭의 일실시 예를 도시한 도면이고, 도 7은 도 6의 블럭에 의한 블럭 배치를 도시한 도면이며, 도 8은 본 발명에 따른 철골구조물 설치용 작업장 설치방법의 제작된 블럭의 다른 실시예를 도시한 도면이고, 도 9는 도 8의 블럭에 의한 블럭 배치를 도시한 도면이며, 도 10은 본 발명에 따른 철골구조물 설치용 작업장 설치방법의 고정수단의 일 실시 예를 도시한 도면이고, 도 11은 본 발명에 따른 철골구조물 설치용 작업장 설치방법의 고정수단의 다른 실시 예를 도시한 도면이며, 도 12는 본 발명에 따른 철골구조물 설치용 작업장 설치방법의 고정수단의 또 다른 실시 예를 도시한 도면이고, 도 13은 본 발명에 따른 철골구조물 설치용 작업장 설치방법의 고정수단의 또 다른 실시 예를 도시한 도면이며, 도 14는 본 발명에 따른 철골구조물 설치용 작업장 설치방법의 고정수단에 따른 블럭 고정단계를 도시한 도면이고, 도 15는 본 발명에 따른 철골구조물 설치용 작업장 설치방법에 받침철골와 받침부재가 더 설치된 상태를 도시한 도면이다.Figure 2 is a view showing a flow chart of the installation method for steel structure installation workshop according to the present invention, Figure 3 is a view showing a method for installing a steel structure installation workshop according to the present invention, Figure 4 is for installing a steel structure according to the present invention FIG. 5 is a flowchart illustrating a block manufacturing step of a workshop installation method, FIG. 5 is a view illustrating a block manufacturing step of FIG. 4, and FIG. 6 is one embodiment of a manufactured block of a workshop installation method for steel structure installation according to the present invention. 7 is a view showing a block arrangement by the block of Figure 6, Figure 8 is a view showing another embodiment of the produced block of the workshop installation method for steel structure installation according to the invention 9 is a view showing a block arrangement by the block of FIG. 8, FIG. 10 is a view showing an embodiment of a fixing means of a workshop installation method for steel structure installation according to the present invention. Figure 11 is a view showing another embodiment of the fixing means of the workshop installation method for steel structure installation according to the present invention, Figure 12 is another embodiment of the fixing means of the workshop installation method for steel structure installation according to the present invention 13 is a view showing another embodiment of the fixing means of the workshop installation method for steel structure installation according to the present invention, Figure 14 is a fixing means of the workshop installation method for steel structure installation according to the present invention Fig. 15 is a view illustrating a block fixing step according to the present invention, and Fig. 15 is a view showing a state in which a supporting steel frame and a supporting member are further installed in a method for installing a steel structure structure according to the present invention.

도 2 내지 도 3에서 도시한 바와 같이, 철골구조물 설치용 작업장 설치방법은 배수단계(S100)와 블럭 제작단계(S200), 블럭 배치단계(S300) 및 블럭 고정단계(S400)로 구성된다.As shown in Figures 2 to 3, the steelwork structure installation workshop installation method is composed of a drainage step (S100), block production step (S200), block arrangement step (S300) and block fixing step (S400).

배수단계(S100)는 광고판이나 광고탑 및 송전탑 등의 철골구조물을 설치할 위치에 각 구조물과 지지구조물 및 설치장치와 작업자의 작업 및 이동을 위한 이동로가 포함된 작업장(100)을 설치할 연약지반(30)의 물을 배수시키는 것으로, 작업장(100) 설치 후, 작업장(100)의 일부 또는 전체가 빠져 기우는 것을 방지하기 위함이다.Drainage step (S100) is a soft ground (30) to be installed in the workplace 100, each of the structure and the supporting structure and the installation device and the movement path for the work and movement of workers in the position to install the steel frame structures, such as billboards, advertising towers and transmission towers (30) By draining the water of), after installation of the workplace 100, part or the whole of the workplace 100 is to prevent falling out.

다시 말해, 연약지반(30)에서 작업장 설치위치(10) 측면을 따라 배수로(20)를 각각 형성하여 작업장 설치위치(10)의 물을 배수시키게 된다.In other words, in the soft ground 30, the drainage paths 20 are formed along the side of the workplace installation location 10, respectively, to drain the water at the workplace installation location 10.

그리고 블럭 제작단계(S200)는 다수의 철골(200)을 일정개수 접합시켜 일정길이를 갖는 다수의 블럭(300)으로 제작하는 것으로, 설치하고자 하는 작업장(100)의 크기에 따라 철골(200)의 개수와 길이가 결정되고, 이 다수의 철골(200)로 다수의 블럭(300)이 제작되는 것이다.And the block manufacturing step (S200) is to produce a plurality of blocks 300 having a predetermined length by joining a plurality of steel frames 200, the size of the steel frame 200 according to the size of the workplace 100 to be installed The number and length are determined, and a plurality of blocks 300 are manufactured by the plurality of steel frames 200.

블럭 배치단계(S300)는 제작된 각 블럭(300)을 설치하고자 하는 작업장(100)을 따라 배치시키는 것으로, 작업장 설치위치(10)를 따라 각 블럭(300)을 순차적으로 배치하게 된다.Block arrangement step (S300) is to arrange the produced blocks 300 along the workplace 100 to be installed, it is arranged to sequentially arrange each block 300 along the workshop installation position (10).

그리고 블럭 고정단계(S400)는 배치된 다수의 블럭(300)을 고정수단(400)에 의해 상호 고정시키는 것으로, 배치된 각 블럭(300)들을 고정시킴에 따라 작업장(100)이 설치되는 것이다.And the block fixing step (S400) is to fix the plurality of blocks 300 arranged by the fixing means 400, the work place 100 is installed in accordance with fixing each of the arranged blocks (300).

이때, 고정된 블럭의 외측을 따라 다수의 고정프레임(미 도시)이 더 설치되어 고정된 블럭의 위치를 고정시키는 위치고정단계가 더 형성될 수 있다.At this time, a plurality of fixing frames (not shown) may be further installed along the outer side of the fixed block, and a position fixing step of fixing the position of the fixed block may be further formed.

다시 말해, 다수의 블럭이 고정되어 설치된 작업장(100)의 외측을 따라 다수의 고정프레임이 더 설치되는 것이다.In other words, a plurality of fixed frames are further installed along the outside of the workshop 100 in which a plurality of blocks are fixed.

이러한 고정프레임은 작업장(100) 상면으로 이동되는 다수의 시설들에 의해 위치가 이동되는 것을 방지 및 최소화시키기 위함이다.
This fixed frame is to prevent and minimize the position is moved by a plurality of facilities that are moved to the upper surface of the workplace (100).

여기서, 블럭 제작단계(S200)을 더 자세히 살펴보면, 도 4 및 도 5에서 도시한 바와 같이, 철골 이송단계(S210)와 철골 절단단계(S220), 철골 배치단계(S230) 및 철골 접합단계(S240)로 구성된다.Here, look at the block manufacturing step (S200) in more detail, as shown in Figures 4 and 5, steel transfer step (S210) and steel cutting step (S220), steel arrangement step (S230) and steel bonding step (S240) It is composed of

철골 이송단계(S210)는 다수의 철골(200)을 작업장 설치위치(10)로 이송시키는 것이고, 철골 절단단계(S220)는 이송된 철골(200)을 일정길이로 절단하는 것으로, 형성하고자 하는 블럭(300)의 크기에 따라 그 절단 길이가 결정된다.Steel conveying step (S210) is to transfer a plurality of steel frame 200 to the workplace installation location 10, steel cutting step (S220) is to cut the transported steel frame 200 to a certain length, to form a block The cut length is determined by the size of 300.

그리고 철골 배치단계(S230) 절단된 다수의 철골(200)을 일정개수 병렬로 배치시키는 것으로, 어느 하나의 철골(200)은 인접한 다른 철골(200)과 측면이 접하도록 배치되는 것이다.And the steel frame arrangement step (S230) by arranging a plurality of cut steel frame 200 in parallel, any one of the steel frame 200 is arranged so that the side and the other adjacent steel frame 200.

철골 접합단계(S240)는 병렬로 배열된 철골(200)의 각 접합부를 용접(230)하여 상호 접합시킴에 따라 하나의 블럭(300)을 형성시키게 된다.Steel frame joining step (S240) is to form a block 300 by welding each of the joints 230 of the steel frame 200 arranged in parallel to each other.

이때, 철골(200)은 H형강이고, 각 블럭(300)의 양단에 위치된 각 철골(200)에는 그 길이 방향을 따라 상하단을 연결하는 다수의 지지편(220)이 더 구비된다.At this time, the steel frame 200 is H-shaped steel, each of the steel frame 200 located at both ends of each block 300 is further provided with a plurality of support pieces 220 for connecting the upper and lower ends in the longitudinal direction.

그리고 철골(200)의 상면과 하면에는 격자형상의 돌출부(210)가 형성되는 것으로, 철골(200) 제작 시, 일체로 형성된다.And the upper surface and the lower surface of the steel frame 200 is formed with a lattice-shaped protrusion 210, is formed integrally at the time of manufacturing the steel frame 200.

이러한 블럭 제작단계(S200)에서는 설치하고자 하는 작업장(100)의 크기에 따라 블럭(300)의 제작크기를 결정하여 제작하는 것으로, 도 6 내지 도 9에서 도시한 바와 같이, 제작된 블럭의 각 실시 예와 그에 따른 배치를 설명하기로 한다.In the block manufacturing step (S200) to determine the manufacturing size of the block 300 according to the size of the work place 100 to be installed, as shown in Figures 6 to 9, each embodiment of the produced block An example and the arrangement thereof will be described.

먼저 도 6에서 도시한 바와 같이, 블럭(300)의 일 실시 예로, 동일한 길이로 절단된 5개의 철골(200)을 상호 용접하여 제작되는 것으로, 철골(200)의 길이방향과 동일한 블럭(300)의 길이는 폭보다 1.8 ~ 2.2배이다.First, as shown in FIG. 6, as an example of the block 300, five steel frames 200 cut to the same length are manufactured by mutual welding, and the same block 300 as the longitudinal direction of the steel frame 200 is provided. The length of is 1.8 ~ 2.2 times the width.

다시 말해, 블럭(300)의 길이가 폭보다 1.8 ~ 2.2배 큰 것으로, 본 발명에서는 길이가 폭보다 2배로 제작됨이 바람직하다.In other words, the length of the block 300 is 1.8 to 2.2 times larger than the width, in the present invention, the length is preferably made twice the width.

이에 따라 제작된 블럭(300)의 일 실시에 따른 길이(a)는 1990mm로 약 2m이고, 폭(b)은 1m로 제작된다.Accordingly, the length a according to one embodiment of the manufactured block 300 is about 2 m at 1990 mm, and the width b is about 1 m.

이러한 블럭(300)은 도 7에서 도시한 바와 같이, 그 길이(a)가 설치하고자 하는 작업장(100)의 이동로 길이방향을 향하도록 배치되며, 그 일 실시 예로 작업장(100)의 이동로 설치 시, 폭방향으로 4개 이상의 블럭(300)이 배치된다.
As shown in FIG. 7, the block 300 is disposed such that its length (a) is directed toward the longitudinal direction of the movement path of the workplace 100 to be installed, and in one embodiment, the movement path of the workplace 100 is installed. Four or more blocks 300 are disposed in the width direction.

한편, 도 8에서 도시한 바와 같이, 블럭(300)의 다른 실시 예로, 동일한 길이로 절단된 10개의 철골(200)을 상호 용접하여 제작되는 것으로, 철골(200)의 길이방향과 동일한 블럭(300)의 길이는 폭보다 1.8 ~ 2.2배이다.On the other hand, as shown in Figure 8, in another embodiment of the block 300, to be manufactured by welding each of the ten steel frame 200 cut to the same length, the same block 300 as the longitudinal direction of the steel frame 200 ) Is 1.8 to 2.2 times the width.

다시 말해, 블럭(300)의 길이가 폭보다 1.8 ~ 2.2배 큰 것으로, 본 발명에서는 길이가 폭보다 2배로 제작됨이 바람직하다.In other words, the length of the block 300 is 1.8 to 2.2 times larger than the width, in the present invention, the length is preferably made twice the width.

이에 따라 제작된 블럭(300)의 일 실시 예에 따른 길이(c)는 4m이고, 폭(d)은2m로 제작된다.Accordingly, the length c according to an embodiment of the manufactured block 300 is 4 m, and the width d is 2 m.

이러한 블럭(300)은 도 9에서 도시한 바와 같이, 그 길이(c)가 설치하고자 하는 작업장(100)의 이동로 폭방향을 향하도록 배치되되, 길이방향으로 다수의 블럭(300)이 배치된다.
As shown in FIG. 9, the block 300 is arranged such that its length c faces the width direction of the movement of the workplace 100 to be installed, and a plurality of blocks 300 are disposed in the longitudinal direction. .

이와 같이 배치된 다수의 블럭(300)은 고정수단(400)에 의해 고정되는 것으로, 이 고정수단(400)은 도 10 내지 13에서 도시된 바와 같이, 인접 배치된 각 블럭(300)을 용접(410)하는 것과, 볼트(430)와 너트(432)를 이용하여 각 블럭(300)을 고정시키는 것이 있다.The plurality of blocks 300 disposed as described above are fixed by the fixing means 400, and the fixing means 400 welds each adjacently disposed block 300 to each other as illustrated in FIGS. 10 to 13. 410, and each block 300 is fixed using the bolt 430 and the nut 432.

그리고 각 블럭(300)의 각 모서리로부터 일정거리에 설치공(424)을 각각 상하방향으로 통공하고, 인접한 네 개의 블럭 모서리에 형성된 각 설치공(424)과 대응되는 고정공(422)이 형성된 체결판(420)을 그 상측에 거치시킨 후, 각 고정공(422)과 설치공(424)을 관통하도록 각 체결파이프(426)를 설치한 다음 체결판(420)과 각 블럭(300) 및 체결파이프(426)와 체결판(420)을 용접(428)시키는 것도 있다.And fastening the installation hole 424 through the installation hole 424 at a predetermined distance from each corner of each block 300, respectively, and the fixing hole 422 corresponding to each installation hole 424 formed in the four adjacent block corners After mounting the plate 420 on its upper side, each fastening pipe 426 is installed so as to pass through each fixing hole 422 and the installation hole 424, and then the fastening plate 420 and each block 300 and fastening There is also a welding 428 of the pipe 426 and the fastening plate 420.

또한 인접한 두 개의 블럭(300)에 걸치도록 평철판(440)을 거치시킨 후, 용접(442)하는 것도 있다.In addition, after mounting the flat plate 440 to span two adjacent blocks 300, there is also a welding (442).

이러한 고정수단(400)은 상기 각 방법 중 선택된 어느 하나 이상으로 사용되는 것으로, 도 3과 도 14에서 각 실시 예의 블럭(300)에 따른 고정수단(400)의 사용상태를 확인할 수 있다.The fixing means 400 is used in at least one selected from each of the above methods, it is possible to check the state of use of the fixing means 400 according to the block 300 of each embodiment in FIGS. 3 and 14.

여기서는, 도 14에 도시된 내용으로 설명하도록 한다.Here, the description will be given with reference to FIG. 14.

먼저, 도 8 내지 도 9에서 도시된 다른 실시 예의 블럭(300) 배치 후, 각 블럭(300)의 접합부를 용접(410)에 의해 접합시키게 된다.First, after the arrangement of the block 300 of another embodiment illustrated in FIGS. 8 to 9, the joints of the respective blocks 300 are joined by welding 410.

그리고 접합된 각 블럭(300)의 지지편(220)에 통공을 형성하고, 이 통공을 통해 볼트(430)와 너트(432)를 체결함에 따라 인접한 블럭(300)들의 접합력을 향상시킬 수 있다.And a through hole is formed in the support piece 220 of each bonded block 300, and through this through the fastening bolt 430 and the nut 432 can improve the bonding force of the adjacent blocks (300).

또한 인접한 각 블럭(300)의 모서리에 설치공(424)를 각각 형성하고, 이 설치공(424)과 대응되는 고정공(422)이 형성된 체결판(420)을 그 상측에 거치시킨 후, 체결파이프(426)를 삽입하여 체결판(420)과 각 블럭(300) 및 체결파이프(426)와 체결판(420)을 용접(428)시키게 된다.In addition, the mounting holes 424 are formed at the corners of the adjacent blocks 300, respectively, and the fastening plate 420 having the fixing holes 422 corresponding to the mounting holes 424 is mounted on the upper side thereof. The pipe 426 is inserted to weld 428 the fastening plate 420, each block 300, the fastening pipe 426, and the fastening plate 420.

이때, 체결판(420)의 고정공(422)은 각 설치공(424)에 대응되도록 현장에서 형성시킬 수 있으며, 체결파이프(426)는 블럭(300)의 두께보다 더 크게 제작하여 설치 시, 단부가 논에 박혀 블럭(300)의 위치를 고정시키는 기능도 부가할 수 있다.At this time, the fixing hole 422 of the fastening plate 420 can be formed in the field so as to correspond to each installation hole 424, the fastening pipe 426 is made larger than the thickness of the block 300 when installed, An end may be embedded in the paddy to add a function of fixing the position of the block 300.

그리고 각 블럭(300)의 용접(410)된 부위를 따라 다수의 평철판(440)을 거치시킨 후, 용접(442)하여 접합력을 더욱 향상시킬 수 있는 것이다.
And after mounting a plurality of flat iron plate 440 along the welded portion 410 of each block 300, by welding 442 it is possible to further improve the bonding force.

또한 도 15에서 도시한 바와 같이, 블럭 배치단계(S300) 전에, 설치하고자 하는 작업장(100)에 다수의 H형강의 받침골조(500)를 일정간격으로 더 배치시키는 받침골조 배치단계가 더 형성될 수 있다.In addition, as shown in Figure 15, before the block arrangement step (S300), a supporting frame arrangement step for further placing a plurality of support frame 500 of the H-shaped steel at a predetermined interval in the workplace 100 to be installed to be further formed Can be.

그리고 설치하고자 하는 작업장(100)에 하나 또는 다수의 받침부재(600)를 더 거치시키는 받침부재 배치단계도 더 형성될 수 있다.And a supporting member arrangement step for further mounting one or a plurality of supporting members 600 in the workshop 100 to be installed may be further formed.

이는, 배수단계(S100)에서 연약지반의 물을 배수시키지만, 비가 잦고, 습기가 많은 계절 또는 충분한 배수까지 여유 시간이 없을 경우, 사용될 수 있으며, 받침골조(500)와 받침부재(600)를 선택적으로 하나 이상 사용하게 된다.This drains the soft ground water in the draining step (S100), but it may be used when there is no rain, a wet season or when there is no time for sufficient drainage, and the support frame 500 and the support member 600 are optional. You can use more than one.

동시에 사용되는 경우를 설명하면, 하나 또는 다수의 받침부재(600)를 이동로 설치위치(10)에 깔고, 이 받침부재(600) 위에 다수의 받침골조(500)를 일정간격으로 더 배치시킨다.In the case of using at the same time, one or a plurality of the supporting member 600 is laid on the moving path installation position 10, and the plurality of the supporting frame 500 is further arranged at a predetermined interval on the supporting member 600.

그리고 다수의 받침골조(500) 상측에 작업장(100)을 설치하는 것이다.And it is to install the workshop 100 on the upper side of the plurality of support frame (500).

여기서, 받침부재(600)는 토목섬유를 사용하며, 이 토목섬유로 부직포, 인조천 및 지오그리드 중 선택된 어느 하나 이상이다.
Here, the supporting member 600 uses a geotextile, which is at least one selected from a nonwoven fabric, an artificial cloth, and a geogrid.

10 : 작업장 설치위치 20 : 배수로
30 : 연약지반 100 : 작업장
200 : 철골 300 : 블럭
400 : 고정수단 500 : 받침철골
600 : 받침부재
10: workplace installation position 20: drainage
30: soft ground 100: workplace
200: steel frame 300: block
400: fixing means 500: supporting steel frame
600: support member

Claims (14)

철골구조물을 연약지반에 설치하기 위한 이동로를 포함한 작업장을 설치할 연약지반의 물을 배수시키는 배수단계;
다수의 철골을 일정개수 접합시켜 일정길이를 갖는 다수의 블럭으로 제작하는 블럭 제작단계;
제작된 각 블럭을 설치하고자 하는 작업장을 따라 배치시키는 블럭 배치단계; 및
배치된 다수의 블럭을 고정수단에 의해 상호 고정시키는 블럭 고정단계를 포함하여 이루어지고,
상기 블럭 제작단계는,
다수의 철골을 작업장 설치위치로 이송시키는 철골 이송단계;
이송된 철골을 일정길이로 절단하는 철골 절단단계;
절단된 다수의 철골을 일정개수 병렬로 배치시키는 철골 배치단계; 및
병렬로 배열된 철골의 각 접합부를 용접하여 상호 접합시켜 블럭을 형성시키는 철골 접합단계를 포함하여 이루어지며,
상기 철골은 H형강이고, 상기 각 블럭의 양단에 위치된 각 철골에는 그 길이 방향을 따라 상하단을 연결하는 다수의 지지편이 더 구비되고,
상기 철골의 상면과 하면에는 격자형상의 돌출부가 일체로 형성되며,
상기 블럭 고정단계의 고정수단은,
인접 배치된 각 블럭을 용접하거나,
볼트와 너트를 이용하여 각 블럭을 고정시키거나,
각 블럭의 각 모서리로부터 일정거리에 설치공을 각각 상하방향으로 통공하고, 인접한 네 개의 블럭 모서리에 형성된 각 설치공과 대응되는 고정공이 형성된 체결판을 그 상측에 거치시킨 후, 각 고정공과 설치공을 관통하도록 각 체결파이프를 설치한 다음 상기 체결판과 각 블럭 및 체결파이프와 체결판을 용접시키거나,
또는 인접한 두 개의 블럭에 걸치도록 평철판을 거치시킨 후, 용접하는 것 중 선택된 어느 하나 이상이고,
상기 블럭 배치단계 전에,
설치하고자 하는 작업장에 다수의 H형강의 받침철골을 일정간격으로 더 배치시키는 받침철골 배치단계가 더 형성되는 것을 특징으로 하는 철골구조물 설치용 작업장 설치방법.
A drainage step of draining the water of the soft ground to install a workshop including a moving path for installing the steel structure on the soft ground;
Block manufacturing step of producing a plurality of blocks having a predetermined length by joining a plurality of steel frame to a certain number;
A block arrangement step of placing each produced block along a workplace to be installed; And
It comprises a block fixing step of fixing the plurality of blocks arranged by the fixing means,
The block production step,
Steel frame transfer step of transferring a plurality of steel frame to the workplace installation location;
Steel cutting step of cutting the transported steel frame to a certain length;
Steel frame arrangement step of arranging a plurality of cut steel frame in parallel; And
It comprises a steel joining step of forming a block by welding each joint of the steel frame arranged in parallel to each other,
The steel frame is H-shaped steel, each of the steel frame located at both ends of the block is further provided with a plurality of support pieces for connecting the upper and lower ends in the longitudinal direction,
The upper and lower surfaces of the steel frame is formed integrally with a grid-like protrusion,
The fixing means of the block fixing step,
Weld each adjacent block,
Fix each block using bolts and nuts,
The holes are installed in the vertical direction at a distance from each corner of each block, and the mounting plate formed with the fixing holes corresponding to the respective installation holes formed at the four adjacent block edges is mounted on the upper side thereof. Install each fastening pipe to penetrate and weld the fastening plate and each block and the fastening pipe and the fastening plate,
Or by mounting a flat iron plate over two adjacent blocks, and then welding one or more selected ones.
Before the block placement step,
Workshop installation method for steel structure installation, characterized in that the support steel frame arrangement step of further placing the support steel of a plurality of H-shaped steel at a predetermined interval in the workplace to be installed.
삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete
KR1020100005853A 2010-01-22 2010-01-22 Installation-workshop constructing method for steel frame construction KR101040003B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100005853A KR101040003B1 (en) 2010-01-22 2010-01-22 Installation-workshop constructing method for steel frame construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100005853A KR101040003B1 (en) 2010-01-22 2010-01-22 Installation-workshop constructing method for steel frame construction

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR1020110010742A Division KR20110086526A (en) 2011-02-07 2011-02-07 Installation-workshop constructing method for steel frame construction

Publications (1)

Publication Number Publication Date
KR101040003B1 true KR101040003B1 (en) 2011-06-09

Family

ID=44405252

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100005853A KR101040003B1 (en) 2010-01-22 2010-01-22 Installation-workshop constructing method for steel frame construction

Country Status (1)

Country Link
KR (1) KR101040003B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6043529A (en) 1983-08-18 1985-03-08 Sekisui Prefab Homes Ltd Mat foundation and its construction
JPS63112544U (en) 1987-01-09 1988-07-20
JP2005048460A (en) 2003-07-29 2005-02-24 Fujita Corp Construction method of foundation structure
KR20090006160U (en) * 2009-05-30 2009-06-22 대성정밀공업 주식회사 Deck Plate for Soft Ground

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6043529A (en) 1983-08-18 1985-03-08 Sekisui Prefab Homes Ltd Mat foundation and its construction
JPS63112544U (en) 1987-01-09 1988-07-20
JP2005048460A (en) 2003-07-29 2005-02-24 Fujita Corp Construction method of foundation structure
KR20090006160U (en) * 2009-05-30 2009-06-22 대성정밀공업 주식회사 Deck Plate for Soft Ground

Similar Documents

Publication Publication Date Title
KR101179770B1 (en) Soil protection against build structure and the method
JP5592514B2 (en) How to install the solar panel mount
JP6595891B2 (en) Steel slit dam
KR101751496B1 (en) Cut and cover retain of earth using light weight decking panel and support plate, and method for constructing this same
JP2007177467A (en) Debris flow blocking work and its construction method
JP2015127501A (en) Unit construction method for solar panel
KR20180137268A (en) Aseismatic Reinforcement Steel Frame with Friction Slip Brace and Aseismatic Reinforcement Method using thereof
KR101040003B1 (en) Installation-workshop constructing method for steel frame construction
KR101020856B1 (en) Underground steel pipe structure and constructing method thereof
KR101330145B1 (en) Longitudinal direction bridge structures carrying system and rapid replacing method of the bridge using the same
JP6233769B2 (en) Rock fall prevention fence
KR20110086526A (en) Installation-workshop constructing method for steel frame construction
JP2010059647A (en) Steel slit dam and method of repairing the same
KR102244079B1 (en) prefabricated debris flow countermeasuring hollow structure
KR101313868B1 (en) A debris barrier with plural empty structure
JP2008095332A (en) Levee widening/raising construction method for existing concrete wall for retaining earth
JP5448582B2 (en) Support frame and method for constructing support frame
JP5161648B2 (en) Steel slit dam and its repair method
KR20180135656A (en) Aseismatic Reinforcement Steel Frame with Anchor Plate and Aseismatic Reinforcement Method using thereof
KR101908371B1 (en) Temporary earth retaining structure
JP2001214410A (en) Construction method for artificial ground
CN220619828U (en) Land table assembly
KR200492358Y1 (en) Supporting assembly for temporary soundproofing walls
KR102055233B1 (en) Debris barrier and method for installing the same
JP2014177848A (en) Building method of building and structure

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
A107 Divisional application of patent
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20140423

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20160419

Year of fee payment: 6

FPAY Annual fee payment