KR101018359B1 - A Waterway Duct - Google Patents

A Waterway Duct

Info

Publication number
KR101018359B1
KR101018359B1 KR1020080050855A KR20080050855A KR101018359B1 KR 101018359 B1 KR101018359 B1 KR 101018359B1 KR 1020080050855 A KR1020080050855 A KR 1020080050855A KR 20080050855 A KR20080050855 A KR 20080050855A KR 101018359 B1 KR101018359 B1 KR 101018359B1
Authority
KR
South Korea
Prior art keywords
slope
sloped
fastening means
waterway pipe
waterway
Prior art date
Application number
KR1020080050855A
Other languages
Korean (ko)
Other versions
KR20090124567A (en
Inventor
조항웅
Original Assignee
조항웅
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 조항웅 filed Critical 조항웅
Priority to KR1020080050855A priority Critical patent/KR101018359B1/en
Publication of KR20090124567A publication Critical patent/KR20090124567A/en
Application granted granted Critical
Publication of KR101018359B1 publication Critical patent/KR101018359B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B11/00Drainage of soil, e.g. for agricultural purposes
    • E02B11/005Drainage conduits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Agronomy & Crop Science (AREA)
  • Mechanical Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

본 발명은 도로공사와 같은 토목공사의 비탈면에 구비되는 수로관에 관한 것으로, 특히 지면에 비해 현저히 높게 형성되는 도로의 비탈면이나 기타 토목공사의 경사면에서 빗물 등이 흘러내리는 수로관을 견고하고 신속하게 설치하여 효율적인 토목공사가 이루어지도록 하는 경사면 수로관에 관한 것인바, 상기 수로관은 좌측면과 우측면 및 바닥면으로 이루어진 수로관 몸체를 콘크리트 등을 이용해 일체형으로 형성하되, 상기 바닥면의 이면에는 반(半)원통형상의 공간부가 형성되어 있고 상기 공간부에는 나사산이 형성된 긴 바아(bar) 형상의 체결수단이 설치되어 있으며, 상기 체결수단의 일단은 상기 바닥면에 매립되어 있는 로드에 연결 고정되고 타단은 경사면의 지중(地中)에 매립되어 있고 그 끝 단면에 체결구멍이 형성된 긴 플레이트 형상의 그리드에 체결되는 구조로 이루어진 특징을 제공한다. The present invention relates to a waterway pipe provided on the slope of civil engineering, such as road construction, in particular to install a waterway pipe in which rainwater flows down the slope of the road or slope of other civil engineering work that is formed significantly higher than the ground It relates to an inclined surface waterway pipe for efficient civil engineering work, the waterway pipe is formed integrally with a waterway pipe body consisting of the left and right sides and the bottom surface, such as concrete, the semi-cylindrical shape on the back surface of the bottom surface A space portion is formed, and the thread portion is provided with a fastening bar-shaped fastening means, one end of the fastening means is connected to the rod buried in the bottom surface and the other end of the ground of the slope ( Long plate shape, which is embedded in It provides a feature consisting of a structure that is fastened to the grid.

수로관, 배수관, 경사면 수로관, 비탈면 수로관 Waterway pipe, drainage pipe, sloped waterway pipe, sloped waterway pipe

Description

비탈면 조립식 수로관{A Waterway Duct}Sloped prefabricated water pipe {A Waterway Duct}

본 발명은 도로공사와 같은 토목공사의 비탈면에 구비되는 수로관에 관한 것으로, 특히 지면에 비해 현저히 높게 형성되는 도로의 비탈면이나 기타 토목공사의 경사면에서 빗물 등이 흘러내리는 수로관을 견고하고 신속하게 설치하여 효율적인 토목공사가 이루어지도록 하는 비탈면 조립식 수로관에 관한 것이다. The present invention relates to a waterway pipe provided on the slope of civil engineering, such as road construction, in particular to install a waterway pipe in which rainwater flows down the slope of the road or slope of other civil engineering work that is formed significantly higher than the ground It relates to a sloped prefabricated water pipe for efficient civil engineering.

일반적으로 수로관이라 함은, 빗물이나 고여있는 물 등을 안내하여 하천이나 저수지 등으로 유도하는 관을 총칭하여 이르는 것으로, 토목공사시에서 경사면이나 수로 또는 도로의 측면에 시공되어 사용되고 있다. In general, a waterway pipe is a generic term for a pipe leading to a river or a reservoir by guiding rainwater or standing water, and is used for construction on a slope, a waterway, or a side of a road during civil engineering.

이와 같은 수로관(30)은 도4와 같이 전방부와 상부 및 하부면이 개방되고 저면부(31)와 양측면(32,33)이 콘크리트 등과 같은 견고한 재질로 이루어져 구성되고 그 형상은 'ㄷ'자 형상으로 되어 있다. The water pipe 30 as shown in Figure 4 is the front portion and the upper and lower surfaces are open, the bottom portion 31 and both sides (32, 33) is made of a solid material such as concrete, the shape of the 'c' character It is shaped.

따라서 종래에는 상기와 같은 수로관(30)을 도로 경사면을 따라 길이 방향으로 연속하여 설치 시공하였다. 그러나 상기 수로관(30)을 시공할 경우 기존에는 현장 타설로 하여 시공하고 있는바, 여기서 현장 타설이란 도로 경사면에 상기 수로 관(30)이 시공될 공간을 구비한 다음 상기 공간에 수로관 형상의 거푸집 등을 설치하여 시멘트 등의 몰타르를 넣어 시멘트 등이 소성되면 상기 거푸집 등을 제거하는 방법으로 시공하는 것을 말한다. Therefore, in the related art, the water pipe 30 as described above was continuously installed in the longitudinal direction along the road slope. However, when the water pipe 30 is installed, it is conventionally installed as a site-pouring, where the site-pouring is provided with a space for the water pipe 30 to be installed on a slope of a road, and then form a water pipe-like formwork in the space. By installing the mortar, such as cement, when cement is fired, it refers to the construction by the method of removing the formwork and the like.

그러나 상기와 같은 종래의 토목공사시 형성되는 경사면에 시공되는 수로관은 현장타설 방식으로 시공되기 때문에, 공사진행 중 즉 시공기간에 지반강하나 기후불순 등으로 인해 경사면의 토양이 무너져 내리게 되는 경우가 많아 수로관 시공에 공기연장이나 추가 공사 비용부담 등과 같은 많은 문제가 있었다. However, because the waterway pipe that is constructed on the inclined surface formed in the conventional civil engineering as described above is constructed by the site casting method, the soil on the inclined surface is often collapsed due to ground strength or climate impurity during the construction process, that is, during the construction period. There were many problems in construction such as air extension or additional construction cost.

또한 기 조성된 경사면에 상기 수로관(30)을 시공한 경우에도 경사면 상부측으로부터 서서히 스며드는 빗물 등으로 인해 경사면 등이 함몰되고 이로 인해 수로관이 붕괴 되는 문제도 상존하게 된다. In addition, even when the water pipe 30 is installed on the inclined surface, the inclined surface is recessed due to the rain water slowly penetrating from the upper side of the inclined surface, and thus, the water pipe may collapse.

이에 본 발명은 상기와 같은 문제를 해결하기 위해 안출된 것으로, 도로공사시 지중에 지지대 역할을 하는 그리드를 매설하고 상기 그리드의 한쪽 끝을 경사면 밖으로 노출하여 경사면에 설치 시공되는 수로관에 연결 고정 시켜줌으로써 도로공사의 성토중에 경사면이 함몰되어 수로관이 붕괴 되지 않도록 하여 경사면 시공과 수로관 시공이 효율적으로 이루어지도록 하는 조립식 수로관을 제공하는 데 그 목적이 있다. Therefore, the present invention has been made to solve the above problems, by embedding the grid to serve as a support during the road construction and by fixing one end of the grid to the water pipe to be installed on the inclined surface exposed out of the inclined surface The purpose of the present invention is to provide a prefabricated water pipe for the slope construction and the water pipe construction to be efficiently carried out so that the inclined surface is not collapsed during the construction of the road construction.

본 발명의 또 다른 목적은 상기 수로관을 현장 타설이 아닌 기성제품으로 사용하여 시공하기 때문에 공기단축은 물론 지중매설된 그리드가 수로관을 지탱하고 있기 때문에 완성된 도로 경사면이 상부 측으로부터 스며드는 빗물 등에 의해 함몰되지 않아 경사면이 장기간 유지될 수 있도록 함으로써 경제성이 획기적으로 향상될 수 있도록 하는 데 있다. Still another object of the present invention is to use the water pipe as a ready-made product rather than on-site casting, so the air shortening as well as the underground buried grid supports the water pipe, so that the completed road slope is indented by rainwater that penetrates from the upper side. Therefore, it is possible to dramatically improve the economics by allowing the slope to be maintained for a long time.

상기한 목적을 달성하기 위한 본 발명은 도로나 제방과 같이 지면보다 높게 형성되는 토목공사의 비탈면에 구비되어 빗물이나 저장된 물을 안내하여 주거나 하천으로 유도할 수 있도록 하는 비탈면 수로관에 있어서, In the present invention for achieving the above object is provided on the slope of the civil engineering is formed higher than the ground, such as roads or embankments in the slope surface waterway pipe to guide rainwater or stored water or to guide to the river,

상기 수로관은 좌측면과 우측면 및 바닥면으로 이루어진 수로관 몸체를 콘크리트 등을 이용해 일체형으로 형성하되, 상기 바닥면의 이면에는 반(半)원통형상의 공간부가 형성되어 있고 상기 공간부에는 나사산이 형성된 긴 바아(bar) 형상의 체결수단이 설치되어 있으며, 상기 체결수단의 일단은 상기 바닥면에 매립되어 있는 로드에 연결 고정되고 타단은 경사면의 지중(地中)에 매립되어 있고 그 끝 단면에 체결구멍이 형성된 긴 플레이트 형상의 그리드에 체결되는 구조로 이루어진 특징을 제공한다. The waterway pipe is formed integrally with a waterway pipe body consisting of a left side, a right side, and a bottom surface using concrete, etc., and a semi-cylindrical space portion is formed on the rear surface of the bottom surface and a long bar having a thread formed on the space portion. (bar) fastening means is provided, one end of the fastening means is connected to the rod buried in the bottom surface is fixed and the other end is embedded in the ground of the inclined surface (fastening hole in the end section) It provides a feature consisting of a structure that is fastened to the formed long plate-shaped grid.

상기와 같은 본 발명의 비탈면 조립식 수로관은 지중에 매설되는 그리드에 수로관을 연결 조립하는 구조로 되어 있는바, 이는 지중에서 수로관을 당겨주는 인장력이 발생되어 수로관이 비탈면의 토사가 함몰되는 것을 막아주게 되고, 이로 인해 토사가 무너지게 되는 것을 예방할 수 있으므로 시공이 편리함은 물론 비용 절감 및 공기단축 등 경제성이 획기적으로 향상되는 효과를 가져온다. The sloped prefabricated water pipe of the present invention as described above has a structure to connect and assemble the water pipe to the grid buried in the ground, which is a tensile force is generated to pull the water pipe in the ground to prevent the water pipe to sink the slope of the slope As a result, the earth and sand can be prevented from collapsing, so that the construction is convenient and economical effects such as cost reduction and air shortening are drastically improved.

이하 본 발명을 첨부도면에 의거 상세히 설명한다. Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도1은 본 발명에 따른 비탈면 조립식 수로관이 적용된 상태의 도로공사가 완공된 상태도이고, 도2는 본 발명에 따른 비탈면 조립식 수로관이 적용되는 상태도와 중요부위 확대 사시도이고, 도3은 본 발명에 따른 비탈면 조립식 수로관의 배면도이다. 1 is a state diagram in which the road construction of the sloped prefabricated water pipe according to the present invention is applied is completed, Figure 2 is an enlarged perspective view of the state and important parts of the sloped prefabricated waterway pipe according to the present invention, Figure 3 is according to the present invention It is a rear view of a sloped prefabricated water pipe.

본 발명의 비탈면 조립식 수로관(10)은 도1 내지 도3에 도시되어 있는 바와 같이, 도로나 제방을 축조하는 공사에 있어서 보통 20~30cm 정도 흙을 조성하여 압착장비 등으로 단단하게 다지는 과정을 반복하여 도2에 도시된 바와 같이 일정높이(h)의 경사면을 완공한 다음 빗물이 흘러내리도록 형성된 구거(11)에 설치되면서 상기 구거(11)가 붕괴되지 않도록 보강하는 구조물인바, 바닥면(12)과 좌측경사면(13) 및 우측경사면(14)이 일체형으로 되어 윗쪽이 개방되는 "ㄷ" 자 형상이 이루어지도록 하되, 상기 바닥면(12)은 저면이 되고 상기 좌·우측 경사면(13,14)이 각각 측면이 되어 빗물이 흘러내리는 안내부(15)를 이루게 되며, 상기 바닥면(12)의 이면에는 반(半)원통형의 공간부(16)가 형성되고, 상기 반원통형의 공간부(16)에는 외경이 나사산이 형성된 긴 바아 형상의 체결수단(17)이 구비된 구조로 되어 있다. Sloped prefabricated waterway tube 10 of the present invention, as shown in Figures 1 to 3, in the construction of the road or embankment is usually repeated 20 to 30cm to form a soil about compaction by pressing equipment, etc. As shown in FIG. 2, after the inclined surface of the predetermined height (h) is completed, the rainwater flows down and is installed in the guggers 11 formed to reinforce the guggers 11 so as not to collapse, the bottom surface 12 ) And the left inclined surface 13 and the right inclined surface 14 are integrated to form a "c" shape, the upper side of which is open, the bottom surface 12 is the bottom surface and the left and right inclined surfaces (13, 14) ) Are each side to form a guide portion 15 in which rain water flows down, and a semi-cylindrical space portion 16 is formed on the rear surface of the bottom surface 12, and the semi-cylindrical space portion ( 16) long bar shape with outer diameter threaded It is in a structure provided with a fastening means 17.

여기서 윗쪽이라 함은 상기 바닥면(12)과 대응되는 쪽을 지칭한다. 그리고 상기 체결수단(17)은 그 한쪽 끝이 상기 바닥면(12)의 내부에 삽입된 보강철근로드(18)와 직교하도록 연결되어 매설 고정되며, 다른 한쪽 끝은 지중에 매설된 긴 바아(bar) 형상의 그리드(20)의 끝 부위에 형성된 체결구멍(19)에 너트(21,22)에 의해 체결되는 나사구조로 이루어져 있다. 그리고 상기 보강철근로드(18)는 상기 체결수단(17)과 직교하는 형태로 상기 바닥면(12)의 내부에 다수 개가 일정 간격으로 매립되어 상기 체결수단(17)의 인장력을 보강하는 구조를 이루게 되며, 그 중 제일 윗쪽에 구비된 로드(18a)는 그 양쪽 끝이 상기 바닥면(12)의 내부에 매립되고 중간부위(18aa)는 상기 체결수단(17)과 직각으로 연결 고정되어 상기 반원통형의 공간부(16)에 노출된 구조로 되어 있다. Here, the upper side refers to the side corresponding to the bottom surface 12. In addition, the fastening means 17 is connected so that one end thereof is orthogonal to the reinforcing bar rod 18 inserted into the bottom surface 12, and the other end is a long bar embedded in the ground (bar It consists of a screw structure which is fastened by the nuts 21 and 22 to the fastening hole 19 formed in the end part of the grid 20 of the shape. In addition, the reinforcing bar rod 18 is embedded in the bottom surface 12 in a form orthogonal to the fastening means 17 to form a structure to reinforce the tensile force of the fastening means 17 by a plurality of embedded in a predetermined interval. The rod 18a provided at the uppermost portion of the rod 18a is embedded at both ends of the bottom surface 12, and the middle portion 18aa is connected to the fastening means 17 at a right angle to the semi-cylindrical shape. The structure is exposed to the space 16 of the.

상기와 같은 구조는 상기 로드(18a)의 중간부위(18aa)가 걸이수단으로 활용되어 상기 수로관(10)을 용이하게 이동시킬 수 있게 된다.In the structure as described above, the middle portion 18aa of the rod 18a can be utilized as a hook means to easily move the water pipe 10.

여기서 상기 그리드(12)는 납작하고 긴 플레이트 형상이나 봉 형상의 긴 바아 형상 어느 것으로 하여도 무방하다.Here, the grid 12 may be either a flat, long plate shape or a rod-shaped long bar shape.

상기와 같은 구조로 된 본 발명의 비탈면 조립식 수로관(10)은 도2에 도시되어 있는 바와 같이 도로공사나 제방을 2~3m 높이로 쌓은 후 상기 수로관(10)을 설치하고, 다시 도로공사를 하고 또 상기 수로관(10)을 설치하는 방법으로 롤러 등의 장비를 사용하여 지반을 견고하게 다지면서 경사면에 구거(11)를 형성하게 되는데, 이때 적당한 높이의 지중에 상기 그리드(20)를 매설하되 상기 그리드(20)의 끝 부위에 형성된 상기 체결구멍(19)을 경사면 밖으로 향하게 하면서 상기 그리드(20)를 매설한다. 물론, 상기 그리드(20)는 상기 구거(11)의 경사면에 매설하게 된다. Sloped prefabricated waterway tube 10 of the present invention having the structure as described above, as shown in Figure 2 after the road construction or embankment piled 2 to 3m in height, the waterway pipe 10 is installed, and the road construction again In addition, by using the equipment such as rollers to install the waterway pipe 10 to form a grout 11 on the slope while firmly ground the ground, at this time, the grid 20 is buried in the ground of a suitable height The grid 20 is embedded while the fastening hole 19 formed at the end of the grid 20 is directed out of the inclined surface. Of course, the grid 20 is embedded in the inclined surface of the groove 11.

그리고 상기 수로관(10)의 상단부에는 상기 수로관(10)을 연이어 설치하기 용이하게 플랜지(23)가 구비되어 있다. 즉, 상기 플랜지(23)부위는 상기 수로 관(10)을 연달아 연결할 때 상기 플랜지(23)부위로 상기 수로관(10)의 하단부가 끼워져 설치가 용이하도록 약간 넓게 형성된다. And the upper end of the water pipe 10 is provided with a flange 23 to facilitate the installation of the water pipe 10 in succession. That is, the flange 23 portion is formed slightly wider so that the lower end portion of the water tube tube 10 is fitted into the flange 23 portion when the water pipe tube 10 is connected in succession.

상기와 같이 도로 경사면이 형성된 후, 상기 수로관(10)을 상기 구거(10)에 안착시켜 설치하되, 도2에서와 같이 상기 너트(21)를 상기 체결수단(17)의 나사산에 먼저 체결한 다음, 상기 그리드(20)의 체결구멍(19)을 끼우고 이어 상기 너트(22)를 위쪽에 끼워 조여줌으로써 설치가 끝나게 된다. After the road inclined surface is formed as described above, the water pipe 10 is installed by being seated on the groove 10, and as shown in FIG. 2, the nut 21 is first fastened to the thread of the fastening means 17. Installation is completed by inserting the fastening hole 19 of the grid 20 and then tightening the nut 22 to the upper side.

상기와 같은 절차로 도로나 제방을 2~3m 단위 즉 일정높이(h)로 쌓으면서 상기 수로관(10)을 설치하면 도1과 같이 도로의 경사면이 완성되게 된다. By installing the waterway pipe 10 while stacking the road or embankment in units of 2 to 3 m, that is, a predetermined height (h), the slope of the road is completed as shown in FIG. 1.

따라서 일정한 높이가 형성될 때마다 이에 맞는 상기 수로관(10)이 설치되고 그 위에 또 다른 수로관(10)이 설치되는 식으로 하여 도로나 제방의 축조공사가 이루어지게 되는 것이다, Therefore, whenever a certain height is formed, the waterway pipe 10 corresponding thereto is installed and another waterway pipe 10 is installed thereon, so that construction of the road or the embankment is made.

이와 같이 축조공사시 비탈면에서 지중에 매설되는 상기 그리드(20)가 상기 수로관(10)을 당겨 지지하여 주기 때문에 경사면에 조성된 흙 등이 무너져 내리거나 함몰되는 사고를 막아주게 된다. As such, the grid 20 buried in the ground at the slope during the construction construction supports the water pipe 10 so as to prevent an accident such as the soil formed on the inclined surface from falling down or sinking.

도1은 본 발명에 따른 비탈면 조립식 수로관이 적용된 상태의 도로공사가 완공된 상태도이고, 1 is a state diagram of the road construction completed the sloped prefabricated water pipe according to the present invention is applied,

도2는 본 발명에 따른 비탈면 조립식 수로관이 적용되는 상태도와 중요부위 확대 사시도이고, Figure 2 is an enlarged perspective view showing the state and important parts of the sloped prefabricated water pipe according to the present invention,

도3은 본 발명에 따른 비탈면 조립식 수로관의 배면도이고,Figure 3 is a rear view of the sloped prefabricated waterway tube according to the present invention,

도4는 종래의 수로관 상태도이다.4 is a conventional water pipe state diagram.

<도면의 주요부분에 대한 부호설명><Code Description of Main Parts of Drawing>

10:수로관 11:구거 12:바닥면 13:좌측경사면 14:우축경사면10: water pipe 11: residential 12: bottom 13: left inclined plane 14: right inclined plane

15:안내부 16:공간부 17:체결수단 18:로드 19:체결구멍15: guide portion 16: space portion 17: fastening means 18: rod 19: fastening holes

20:그리드 21,22:너트 23:플랜지20: Grid 21, 22: Nut 23: Flange

30:수로관 31:저면부 32,33:양측면30: water pipe 31: bottom 32, 33: both sides

Claims (4)

지면보다 높게 형성되는 도로나 제방의 토목공사 비탈면에 구비되어 빗물이나 저장된 물을 안내하여 주거나 하천으로 유도할 수 있도록 하는 비탈면 수로관(10)에 있어서, In the slope surface waterway pipe 10 is provided on the slope of the civil engineering work of roads or embankments formed higher than the ground to guide rainwater or stored water or to guide to the river, 상기 수로관(10)은 바닥면(12)과 좌측경사면(13) 및 우측경사면(14)이 일체형으로 되어 윗쪽이 개방되는 "ㄷ" 자 형상으로 되되, The water pipe 10 has a bottom surface 12, the left inclined surface 13 and the right inclined surface 14 is integrally formed into a "c" shape that the upper side is opened, 상기 바닥면(12)이 저면이 되고 상기 좌·우측 경사면(13,14)이 각각 측면이 되어 빗물이 흘러내리는 안내부(15)가 형성되며, The bottom surface 12 is a bottom surface and the left and right inclined surfaces 13 and 14 are side surfaces, respectively, and a guide portion 15 through which rain water flows is formed. 상기 바닥면(12)의 이면에는 반(半)원통형의 공간부(16)가 형성되고, The semi-cylindrical space part 16 is formed in the back surface of the bottom surface 12, 상기 반원통형의 공간부(16)에는 외경이 나사산으로 형성된 긴 바아 형상의 체결수단(17)이 구비되어 이루어진 것을 특징으로 하는 비탈면 조립식 수로관.Sloped prefabricated waterway tube characterized in that the semi-cylindrical space portion (16) is provided with a fastening means (17) of the long bar-shaped outer diameter is formed of a screw thread. 제1항에 있어서, 상기 체결수단(17)은 한쪽 끝이 상기 바닥면(12)의 내부에 삽입된 보강철근로드(18a)와 연결되면서 매설 고정된 것을 특징으로 하는 비탈면 조립식 수로관.According to claim 1, The fastening means 17 is sloped prefabricated waterway tube characterized in that the one end is fixed while buried in connection with the reinforcing reinforcing rod (18a) inserted into the bottom surface (12). 제2항에 있어서, 상기 보강철근로드(18a)는 양단부가 상기 바닥면(12)의 내 부에 매립되고, 중간부위(18aa)가 상기 체결수단(17)과 직각으로 연결 고정되어 상기 반원통형의 공간부(16)에 노출된 구조로 이루어진 것을 특징으로 하는 비탈면 조립식 수로관.The semi-cylindrical structure of claim 2, wherein both ends of the reinforcing steel rod (18a) are embedded in the bottom surface (12), and the middle portion (18aa) is connected to and fixed to the fastening means (17) at a right angle. Sloped prefabricated waterway tube, characterized in that consisting of a structure exposed to the space 16 of the. 제3항에 있어서, 상기 바닥면(12)의 내부에는 상기 체결수단(17)과 연결되는 보조철강로드(18b,18c)가 하나 이상 포함되는 것을 특징으로 하는 비탈면 조립식 수로관.The sloped prefabricated water pipe according to claim 3, wherein at least one auxiliary steel rod (18b, 18c) connected to the fastening means (17) is included in the bottom surface (12).
KR1020080050855A 2008-05-30 2008-05-30 A Waterway Duct KR101018359B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080050855A KR101018359B1 (en) 2008-05-30 2008-05-30 A Waterway Duct

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080050855A KR101018359B1 (en) 2008-05-30 2008-05-30 A Waterway Duct

Publications (2)

Publication Number Publication Date
KR20090124567A KR20090124567A (en) 2009-12-03
KR101018359B1 true KR101018359B1 (en) 2011-03-04

Family

ID=41686488

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080050855A KR101018359B1 (en) 2008-05-30 2008-05-30 A Waterway Duct

Country Status (1)

Country Link
KR (1) KR101018359B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20210128667A (en) * 2020-04-17 2021-10-27 김동열 Assembled drainage comprising drain block

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05179654A (en) * 1991-12-27 1993-07-20 Ohbayashi Corp Slope frame unit in slope surface protection
JPH0573037U (en) * 1992-03-13 1993-10-05 株式会社大林組 Legal framework for embankment method
JPH06257161A (en) * 1991-06-15 1994-09-13 Oyo Kikaku:Kk Construction method for lightweight slope frame of ceramic material
KR100629722B1 (en) 2006-03-07 2006-09-28 주식회사 오름엔지니어링 Precasted concrete for drainage canal in slope area

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06257161A (en) * 1991-06-15 1994-09-13 Oyo Kikaku:Kk Construction method for lightweight slope frame of ceramic material
JPH05179654A (en) * 1991-12-27 1993-07-20 Ohbayashi Corp Slope frame unit in slope surface protection
JPH0573037U (en) * 1992-03-13 1993-10-05 株式会社大林組 Legal framework for embankment method
KR100629722B1 (en) 2006-03-07 2006-09-28 주식회사 오름엔지니어링 Precasted concrete for drainage canal in slope area

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20210128667A (en) * 2020-04-17 2021-10-27 김동열 Assembled drainage comprising drain block
KR102331142B1 (en) * 2020-04-17 2021-11-26 김동열 Assembled drainage comprising drain block

Also Published As

Publication number Publication date
KR20090124567A (en) 2009-12-03

Similar Documents

Publication Publication Date Title
KR101696916B1 (en) Construction method of permanent wall with retaining wall combined PHC pile and steel pipe
CN103526770A (en) High-impermeable anti-floating pile raft structure and construction method
KR100904857B1 (en) A constructing method of underground structure using steel pipe and segment
CN108612110A (en) A kind of Deep Foundation Pit of Metro Stations combined type construction method for supporting
CN101929163A (en) Support construction process of lotus root-shaped segmental expanded soil anchor rod
JP2018021383A (en) Embankment slope protection method
KR101096664B1 (en) Construction method of approaching duel tunnel and pressing unit of pillar using the same
KR20140013497A (en) Method for constructing block type reinforced retaining wall in cut site
KR20130095153A (en) A removable prestressing steel pipe soil nailing structure
JP2008308945A (en) Concrete foundation combined with tension pile, and construction method thereof
KR20110060291A (en) Made of iron soil retaining plate and its support structure for form and retaining-wall vertical reinforcement
KR102149473B1 (en) Prestressing using PC steel wire apply Construction method of underground non-adhesive steel composite concrete tunnel
CN113107019A (en) Pre-buried anchor rod connecting structure passing through pre-built building and construction method thereof
KR101018359B1 (en) A Waterway Duct
CN108589769A (en) A kind of embedding rock T shapes combined type column plate high gear wall construction method of overlength
KR100995815B1 (en) Shortcrete retaining wall construction method
CN210288417U (en) Rain sewage pipe excavation foundation pit supporting structure
KR101013627B1 (en) Roof of underground structure and method for constructing the same
CN111206602B (en) Partially collapsed high slope lattice beam formwork system and construction method
KR200308379Y1 (en) Dismemberment removal type nail composition
KR101662096B1 (en) The Construction Method of Non-excavation tunnel what press in extruding Steel pipe by Arch type Precast Upperslab
KR20160053430A (en) Pile assembly and c.i.p. method using the same
KR100776620B1 (en) Bar Type Anchor
CN210216473U (en) Anti-slide pile for slope treatment
CN110629794B (en) Construction method of template on outer wall of cyclone well

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20131226

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20141209

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20151208

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20161223

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20180322

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20190211

Year of fee payment: 9