KR101008606B1 - Preveting process of falling bridge-beam and constructon there of - Google Patents

Preveting process of falling bridge-beam and constructon there of Download PDF

Info

Publication number
KR101008606B1
KR101008606B1 KR1020080041167A KR20080041167A KR101008606B1 KR 101008606 B1 KR101008606 B1 KR 101008606B1 KR 1020080041167 A KR1020080041167 A KR 1020080041167A KR 20080041167 A KR20080041167 A KR 20080041167A KR 101008606 B1 KR101008606 B1 KR 101008606B1
Authority
KR
South Korea
Prior art keywords
plate
bridge
bridge beam
stopper
support
Prior art date
Application number
KR1020080041167A
Other languages
Korean (ko)
Other versions
KR20090115350A (en
Inventor
심현보
Original Assignee
(주)안풍건설
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)안풍건설 filed Critical (주)안풍건설
Priority to KR1020080041167A priority Critical patent/KR101008606B1/en
Publication of KR20090115350A publication Critical patent/KR20090115350A/en
Application granted granted Critical
Publication of KR101008606B1 publication Critical patent/KR101008606B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/04Bearings; Hinges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 발명은 교좌장치의 노후에 의한 파손시 교량빔이 전도되는 것을 방지하고, 홍수 및 지진시 교량빔의 유동을 제한하는 견고한 스토퍼를 구비하여 홍수 및 지진의 횡력에 의한 낙교를 방지할 수 있는 교량빔의 낙교방지 방법 및 그 구조에 관한 것이다.The present invention is to prevent the bridge beam from falling over when the bridge device is damaged due to aging, and to provide a rigid stopper for restricting the flow of the bridge beam during floods and earthquakes, preventing bridges from falling due to the lateral force of the flood and earthquake. The present invention relates to a beam anti-falloff method and a structure thereof.

교각(300)의 상면에 교좌장치(200)를 개재하여 설치된 교량빔(100)의 낙교를 방지하는 구조에 있어서,In the structure of preventing the falling of the bridge beam 100 provided via the bridge device 200 on the upper surface of the bridge 300,

천공된 다수개의 볼트구멍(10a)에 앵커볼트(11)로 고정되어 교량빔(100)의 단부 양 측면에 부착되는 사각형상의 측면 플레이트(10)와;A rectangular side plate 10 fixed to the plurality of perforated bolt holes 10a by anchor bolts 11 and attached to both sides of an end of the bridge beam 100;

상기 측면 플레이트(10)와 대응되는 위치의 교각(300) 상면에 일정넓이와 일정두께의 무수축 모르타르를 타설하여 형성되는 무수축 모르타르부(50)와;A non-contraction mortar part 50 formed by pouring non-contraction mortar of a predetermined width and a predetermined thickness on an upper surface of the pier 300 corresponding to the side plate 10;

상기 무수축 모르타르부(50) 상면에 앵커볼트(11)로 고정할 수 있도록 다수개의 볼트구멍(10a)이 천공되고 전, 후측에 스토퍼(40)가 구비된 베이스플레이트(30)와; A base plate 30 having a plurality of bolt holes 10a perforated to be fixed to an upper surface of the non-shrink mortar portion 50 by an anchor bolt 11 and having a stopper 40 at the front and rear sides thereof;

상기 베이스플레이트(30)의 전, 후측에 구비된 스토퍼 사이에 뜬 상태로 위치하여 상기 스토퍼에 의해서 이동이 제한되는 사각형상의 지지판(22)과, 상기 지지판(20)에 일측 하부가 용접되어 수직하게 설치되고, 타측이 상기 측면 플레이트(10)에 수평으로 용접되어 고정되는 버팀판(24)과, 상기 버팀판(24)을 보강하기 위하여 상기 버팀판(24)와 버팀판(24)의 사이를 수평으로 연결하는 다수개의 연결 편(26)으로 이루어지는 지지아암(20)으로 구성되는 것을 특징으로 하는 교량빔의 낙교방지 구조에 관한 것이다.Positioned in the state of floating between the stopper provided in the front, rear of the base plate 30, the rectangular support plate 22 is limited to the movement by the stopper, and one side lower portion is welded vertically to the support plate 20 It is installed, the other side between the brace plate 24 is welded and fixed horizontally to the side plate 10 and between the brace plate 24 and the brace plate 24 to reinforce the brace plate 24 It relates to a bridge beam fall prevention structure, characterized in that consisting of a support arm 20 consisting of a plurality of connecting pieces 26 connected horizontally.

교량빔, 교좌장치, 측면 플레이트, 베이스 플레이트, 스토퍼, 지지아암 Bridge beam, bridge arrangement, side plate, base plate, stopper, support arm

Description

교량빔의 낙교방지 방법 및 그 구조{PREVETING PROCESS OF FALLING BRIDGE-BEAM AND CONSTRUCTON THERE OF}Bridge beam prevention method and its structure {PREVETING PROCESS OF FALLING BRIDGE-BEAM AND CONSTRUCTON THERE OF}

본 발명은 교좌장치의 노후에 의한 파손시 교량빔이 전도되는 것을 방지하고, 홍수 및 지진시 교량빔의 유동을 제한하는 견고한 스토퍼를 구비하여 홍수 및 지진의 횡력에 의한 낙교를 방지할 수 있는 교량빔의 낙교방지 방법 및 그 구조에 관한 것이다.The present invention is to prevent the bridge beam from falling over when the bridge device is damaged due to aging, and to provide a rigid stopper for restricting the flow of the bridge beam during floods and earthquakes, preventing bridges from falling due to the lateral force of the flood and earthquake. The present invention relates to a beam anti-falloff method and a structure thereof.

본 발명은 교량빔의 낙교방지를 위한 방법 및 그 구조에 관한 것으로서, 교량은 교각 상부에 교좌장치를 개재하여 교량빔을 안치하고 교량빔 상부에 콘크리트를 타설하여 교량 상부구조물을 설치한 것이므로 교량빔을 견고하게 고정하는 수단이 없어 홍수와 지진 등의 횡력에 의한 낙교를 방지할 수 있는 방법이 없는 것이 현실이다.The present invention relates to a method and a structure for preventing falling bridge of the bridge beam, the bridge is a bridge beam because the bridge beam is placed through the bridge device on the top of the bridge and concrete is installed on top of the bridge beam bridge bridge beam The reality is that there is no way to prevent the fallout from the lateral forces such as floods and earthquakes.

따라서, 본 출원인은 도1에서와 같이, 등록번호 제10-0402954호로 교량빔의 인상과 낙교방지를 위한 교좌장치 및 그 설치방법을 제안한 바 있다.Accordingly, the present applicant has proposed a bridge arrangement and a method of installing the bridge beam for preventing the lifting and falling of the bridge beam, as shown in Figure 1, registration number 10-0402954.

교각(300)과 교량빔(100)의 사이에 안착되어 교량빔(100)의 하중을 받아주는 교좌장치(200)가 구비된 교량에 있어서,In the bridge is provided between the bridge 300 and the bridge beam 100 is provided with a bridge device 200 for receiving the load of the bridge beam 100,

다수개의 홀(12a)이 형성된 연결편(12)이 복수개 부착되며 교량빔(100)의 단부 양 측면에 앵커볼트(11) 및 에폭시 수지로 고정되는 측면 플레이트(10)와,A plurality of connection pieces 12 having a plurality of holes 12a are attached to the side plates 10 fixed to anchor bolts 11 and epoxy resins on both sides of the end of the bridge beam 100,

상기 측면 플레이트(10)의 연결편(12)에 볼트(13)와 너트(13a)로 결합되도록 홀(21a)이 다수개 형성되는 버팀부재(21)가 상면에 부착되며 상기 버팀부재(21)의 일측으로 가이드홈(20a)이 형성된 사각형의 지지부재(20)와,A brace member 21 having a plurality of holes 21a is attached to an upper surface of the connecting piece 12 of the side plate 10 so as to be coupled to the bolt 13 and the nut 13a. A rectangular support member 20 having a guide groove 20a formed at one side thereof,

상기 지지부재(20)의 유동이 제한되도록 모서리부에 일정한 크기의 스토퍼(31)가 부착되어 교각(300) 두부에 고정되는 베이스 플레이트(30)로 구성되는 것을 특징으로 하는 교량빔의 인상과 낙교방지를 위한 장치이다.Lifting and falling bridge of the bridge beam, characterized in that consisting of a base plate 30 is fixed to the head of the bridge 300 is attached to the stopper 31 of a predetermined size in the corner so that the flow of the support member 20 is limited It is a device for prevention.

그러나, 상기 특허 기술은, “ㄱ"자형 스토퍼가 취약하여 파손되므로서 지지부재(20)를 이동을 제한하지 못하였다.However, the patented technology does not restrict the movement of the support member 20 as the "a" shaped stopper is fragile and broken.

상기 특허 기술은 지지부재(20)의 버팀판의 내측이 절결되어 있지 않으므로상, 하부가 양측으로 돌출된 “I"형 교량빔에 적용할 수 없고, 빔의 폭 보다 큰 교좌장치를 가진 교량빔에 사용할 수 없었다.Since the patented technology does not cut the inner side of the support plate of the support member 20, the beam cannot be applied to the “I” type bridge beam protruding to both sides, and has a bridge beam having a bridge device larger than the width of the beam. Could not be used for

상기 특허 기술은 한 개의 교량빔 일측 단부에 한 개의 커다란 무수축 모르타르부와 베이스플레이트를 형성하므로서 작업성과 경제성이 나뻐 비용이 증가되었다.The patent technology increases the cost due to poor workability and economic efficiency by forming one large non-shrinkable mortar portion and a base plate at one end of one bridge beam.

본 발명의 목적은 베이스플레이트의 전, 후측에 용접 부착되어 지지아암의 이동을 제한하는 지지편에 삼각형상의 보강편을 보강하여 견고한 스토퍼를 구비하여 홍수 또는 지진의 횡력에 의한 낙교를 방지하는데 그 목적이 있다.An object of the present invention is to provide a rigid stopper by welding the front and rear sides of the base plate to limit the movement of the support arm, and to provide a rigid stopper to prevent falling from the lateral force of the flood or earthquake. There is this.

본 발명의 다른 목적은 상기와 같은 문제점을 해결하기 위해 베이스플레이트에 부착된 전, 후측 스토퍼의 외측에 일자형 스토퍼를 더 부착하여 홍수 또는 지진의 횡력에 의한 낙교를 방지하는데 그 목적이 있다.Another object of the present invention is to further prevent the fallout by the lateral force of the flood or earthquake by attaching a straight stopper to the outside of the front and rear stopper attached to the base plate to solve the above problems.

본 발명의 또 다른 목적은 지지아암의 버팀판의 내측을 일부 절결하여 상, 하부가 양측으로 돌출된 “I"형 교량빔에 적용할 수 있고, 빔의 폭 보다 큰 교좌장치를 가진 교량빔에 사용할 수 있도록 하는데 그 목적이 있다.Another object of the present invention can be applied to a bridge beam having a bridge device having a larger than the width of the beam can be applied to the "I" bridge beam of which the upper and lower portions protrude to both sides by partially cutting the inner side of the support plate of the support arm. Its purpose is to make it available.

본 발명의 또 다른 목적은 한 개의 교량빔 단부에 한 개의 커다란 무수축 모르타르부와 베이스플레이트를 형성하던 것을 교량빔의 양측에 각각 작은 무수축 모르타르부와 작은 베이스플레이트를 설치하여 작업성과 경제성을 향상시키는데 그 목적이 있다.It is still another object of the present invention to form one large non-shrinkable mortar portion and a base plate at one bridge beam end by installing small non-shrinkage mortar portion and a small base plate on both sides of the bridge beam, thereby improving workability and economic efficiency. The purpose is to.

교각(300)의 상면에 교좌장치(200)를 개재하여 설치된 교량빔(100)의 낙교를 방지하는 구조에 있어서,In the structure of preventing the falling of the bridge beam 100 provided via the bridge device 200 on the upper surface of the bridge 300,

천공된 다수개의 볼트구멍(10a)에 앵커볼트(11)로 고정되어 교량빔(100)의 단부 양 측면에 부착되는 사각형상의 측면 플레이트(10)와;A rectangular side plate 10 fixed to the plurality of perforated bolt holes 10a by anchor bolts 11 and attached to both sides of an end of the bridge beam 100;

상기 측면 플레이트(10)와 대응되는 위치의 교각(300) 상면에 일정넓이와 일 정두께의 무수축 모르타르를 타설하여 형성되는 무수축 모르타르부(50)와;A non-contraction mortar portion 50 formed by pouring non-contraction mortar of a predetermined width and a predetermined thickness on an upper surface of the pier 300 corresponding to the side plate 10;

상기 무수축 모르타르부(50) 상면에 앵커볼트(11)로 고정할 수 있도록 다수개의 볼트구멍(10a)이 천공되고 전, 후측에 스토퍼(40)가 구비된 베이스플레이트(30)와; A base plate 30 having a plurality of bolt holes 10a perforated to be fixed to an upper surface of the non-shrink mortar portion 50 by an anchor bolt 11 and having a stopper 40 at the front and rear sides thereof;

상기 베이스플레이트(30)의 전, 후측에 구비된 스토퍼 사이에 뜬 상태로 위치하여 상기 스토퍼에 의해서 이동이 제한되는 사각형상의 지지판(22)과, 상기 지지판(20)에 일측 하부가 용접되어 수직하게 설치되고, 타측이 상기 측면 플레이트(10)에 수평으로 용접되어 고정되는 버팀판(24)과, 상기 버팀판(24)을 보강하기 위하여 상기 버팀판(24)와 버팀판(24)의 사이를 수평으로 연결하는 다수개의 연결편(26)으로 이루어지는 지지아암(20)으로 구성되는 것을 특징으로 하는 교량빔의 낙교방지 구조이다.Positioned in the state of floating between the stopper provided in the front, rear of the base plate 30, the rectangular support plate 22 is limited to the movement by the stopper, and one side lower portion is welded vertically to the support plate 20 It is installed, the other side between the brace plate 24 is welded and fixed horizontally to the side plate 10 and between the brace plate 24 and the brace plate 24 to reinforce the brace plate 24 The bridge beam prevention structure of the bridge beam, characterized in that composed of a support arm (20) consisting of a plurality of connecting pieces (26) connected horizontally.

본 발명은 베이스플레이트의 전, 후측에 용접 부착되어 지지아암의 이동을 제한하는 스토퍼의 지지편에 삼각형상의 보강편을 보강하여 견고한 스토퍼를 구비하여 홍수 또는 지진의 횡력에 의한 낙교를 방지하는 효과가 있다.The present invention has the effect of preventing falling by the lateral force of the flood or earthquake by providing a solid stopper by welding a reinforcing triangular reinforcement on the support piece of the stopper that is welded to the front and rear sides of the base plate to limit the movement of the support arm. have.

본 발명은 상기와 같은 문제점을 해결하기 위해 베이스플레이트에 부착된 전, 후측 스토퍼의 외측에 일자형 스토퍼를 더 부착하여 홍수 또는 지진의 횡력에 의한 낙교를 방지하는 효과가 있다.The present invention has the effect of preventing the fall by the lateral force of the flood or earthquake by further attaching a straight stopper to the outside of the front and rear stoppers attached to the base plate in order to solve the above problems.

본 발명은 지지아암의 버팀판의 내측을 일부 절결하여 상, 하부가 양측으로 돌출된 “I"형 교량빔에 적용할 수 있고, 빔의 폭 보다 큰 교좌장치를 가진 교량빔에 사용할 수 있도록 하는 효과가 있다.The present invention can be applied to a bridge beam having a bridge device having a larger than the width of the beam can be applied to the "I" bridge beam of the upper and lower portions protruding to both sides by partially cutting the inner side of the support plate of the support arm It works.

본 발명은 한 개의 교량빔 단부에 한 개의 커다란 무수축 모르타르부와 베이스플레이트를 형성하던 것을 교량빔의 양측에 각각 작은 무수축 모르타르부와 작은 베이스플레이트를 설치하여 작업성과 경제성을 좋게 하는 효과가 있다.The present invention has the effect of improving the workability and economy by installing one large non-shrinkable mortar portion and a base plate at one end of the bridge beam at both sides of the bridge beam. .

도 2는 본 발명 제1실시예의 분해 사시도, 도 3은 본 발명 제1실시예의 설치 상태도, 도 4는 본 발명 제2실시예의 설치 상태도, 도 5는 본 발명 지지암의 다른 실시예 사시도이다.Figure 2 is an exploded perspective view of the first embodiment of the present invention, Figure 3 is an installation state diagram of the first embodiment of the present invention, Figure 4 is an installation state diagram of the second embodiment of the present invention, Figure 5 is another embodiment perspective view of the support arm of the present invention to be.

먼저, 본 발명의 교량빔의 낙교방지 방법을 도1, 2를 참조하여 상세히 설명하면 다음과 같다.First, a method of preventing falling of a bridge beam according to the present invention will be described in detail with reference to FIGS. 1 and 2 as follows.

본 발명은 교각(300)의 상면에 교좌장치(200)를 개재하여 설치된 교량빔(100)의 낙교를 방지하는 방법에 있어서,In the present invention, in the method for preventing falling of the bridge beam 100 installed through the bridge device 200 on the upper surface of the bridge 300,

상기 교량빔(100)의 단부 양측면에 앵커볼트(11)를 이용하여 사각형상의 측면 플레이트(10)를 각각 부착하는 측면 플레이트(10) 부착단계와;A side plate (10) attaching step of attaching square side plates (10) to each side of both ends of the bridge beam (100) using anchor bolts (11);

상기에서 부착된 각각의 측면 플레이트(10)에 대응되는 위치의 교각(300) 상면에 일정넓이와 일정두께의 무수축 모르타르를 타설하여 각각의 무수축 모르타르부(50)를 형성하는 단계와;Forming non-contraction mortar portions 50 by pouring non-contraction mortar of a predetermined width and a predetermined thickness on an upper surface of the piers 300 corresponding to the side plates 10 attached thereto;

상기 무수축 모르타르부(50)의 상부에 전, 후측으로 한쌍의 스토퍼(40)가 구 비된 각각의 베이스 플레이트(30)를 앵커볼트(11)로 고정하는 단계와;Fixing each base plate (30) provided with a pair of stoppers (40) to the upper and rear sides of the non-contraction mortar portion (50) with an anchor bolt (11);

상기 베이스 플레이트(30)에 전, 후측으로 구비된 한쌍의 스토퍼(40) 사이에 뜬 상태로 위치하는 사각형상의 지지판(22)의 상부에 일정간격으로 다수개의 버팀판(24)의 하부를 수직으로 용접 부착하고, 상기 버팀판(24)을 보강하기 위하여 상기 버팀판(24)과 버팀판(24)사이에 다수개의 연결편(26)을 수평으로 용접 부착하여 지지아암(20)을 제작하는 단계와;The lower portion of the plurality of support plates 24 at regular intervals vertically on an upper portion of the rectangular support plate 22 positioned in a state of floating between a pair of stoppers 40 provided in the base plate 30 before and after. Welding and attaching a plurality of connecting pieces 26 horizontally between the bracing plate 24 and the bracing plate 24 to reinforce the bracing plate 24 to produce a support arm 20; ;

상기에서 제작된 지지아암(20)의 버팀판(24) 일측을 상기 측면 플레이트(10)에 수평으로 용접 부착하여 상기 지지아암(20)이 상기 베이스 플레이트(30)의 전, 후측에 형성된 한쌍의 스토퍼(40) 사이에 위치하도록 하는 단계로 이루어지는 교량빔의 낙교방지 방법이다.One pair of support plates 20 of the support arm 20 manufactured above is welded horizontally to the side plate 10 so that the support arms 20 are formed on the front and rear sides of the base plate 30. It is a method for preventing falling of the bridge beam, which is made to be positioned between the stoppers 40.

먼저, 상기 교량빔(100)의 단부 양측면에 앵커볼트(11)를 이용하여 사각형상의 측면 플레이트(10)를 부착하는 측면 플레이트(10) 부착단계를 설명하면, 철, 스텐레스 스틸 등의 금속재로 되고 다수개의 앵커볼트 구멍(10a)이 천공된 사각형상의 측면 플레이트(10)를 앵커볼트(11)로 상기 교량빔(100)의 단부 양측면에 부착하게 되는데, 먼저 에폭시수지 등의 강력 접착제로 상기 측면 플레이트(10)를 교량빔(100)에 부착한 후 앵커볼트 고정 작업을 하면 접착력도 증가되고 움직이지 않아 작업도 편리하다.First, the step of attaching the side plate 10 for attaching the square side plate 10 using the anchor bolts 11 on both sides of the end of the bridge beam 100 will be made of metal such as iron or stainless steel. A plurality of anchor bolt holes 10a are formed by attaching a rectangular side plate 10 perforated to both sides of the end of the bridge beam 100 with anchor bolts 11. First, the side plates with a strong adhesive such as epoxy resin. After attaching 10 to the bridge beam 100, anchor bolt fixing work increases adhesion and does not move, which is convenient.

다음, 상기에서 부착된 측면 플레이트(10)에 대응되는 위치의 교각(300) 상면에 일정넓이와 일정두께의 무수축 모르타르를 타설하여 무수축 모르타르부(50)를 형성하는 단계를 설명하면, 상기에서 측면 플레이트(10)에 대응되는 위치에 무수축 모르타르부(50)를 형성하는 것은 스토퍼(40)가 구비된 베이스 플레이트(30)를 상기 무수축 모르타르부(50) 상부에 설치하기 위한 것이고, 상기 무수축 모르타르부(50)로 인하여 계절의 온도 변화에도 불구하고 상기 베이스 플레이트(30)는 제 위치를 지키게 된다.Next, the step of forming the non-contraction mortar portion 50 by pouring a non-contraction mortar of a predetermined width and a predetermined thickness on the upper surface of the pier 300 corresponding to the side plate 10 attached above, Forming the non-shrink mortar portion 50 in the position corresponding to the side plate 10 in the is to install the base plate 30 with the stopper 40 on the non-shrink mortar portion 50, The base plate 30 remains in place despite the seasonal temperature change due to the non-shrinkable mortar portion 50.

다음, 상기 무수축 모르타르부(50)의 상부에 전, 후측으로 한쌍의 스토퍼(40)가 구비된 베이스 플레이트(30)를 앵커볼트(11)로 고정하는 단계를 설명하면, 상기 베이스 플레이트(30)는 상기 무수축 모르타르부(50)의 상부에 고정할 수 있도록 다수개의 앵커볼트구멍(10a)이 형성되어 있고, 상기 베이스 플레이트(30)의 전, 후측에 수직으로 지지편(42)이 용접 부착되고 상기 지지편(42)의 외측에는 지지편(42)을 보강하는 다수개의 삼각형상의 보강편(44)이 용접 부착되어 있어 지지력이 매우 견고하다.Next, the step of fixing the base plate 30 provided with a pair of stoppers 40 in the upper and rear sides of the non-contraction mortar portion 50 with the anchor bolt 11, the base plate 30 ) Is formed with a plurality of anchor bolt holes (10a) to be fixed to the upper portion of the non-shrink mortar portion 50, the support piece 42 is welded vertically to the front and rear of the base plate 30 A plurality of triangular reinforcement pieces 44 are attached to the outer side of the support piece 42 to reinforce the support piece 42, and thus the bearing force is very solid.

그리고, 상기 전, 후측에 설치된 지지편(42)의 외측에 일정두께의 긴 직사각형상의 일자형 스토퍼(41)가 더 용접 부착되어 견고함을 더해 준다.Further, a long rectangular straight stopper 41 of a constant thickness is further welded to the outside of the support piece 42 provided at the front and rear sides to add strength.

따라서, 상기 일자형 스토퍼(41)는 폭방향 이동을 제한하여 지진이나 홍수시 낙교를 방지한다.Thus, the straight stopper 41 prevents fallout during an earthquake or flood by limiting the widthwise movement.

다음, 상기 베이스 플레이트(30)에 전, 후측으로 구비된 한쌍의 스토퍼(40) 사이에 뜬 상태로 위치하는, 사각형상의 지지판(22)의 상부에 일정간격으로 다수개의 버팀판(24)의 하부를 수직으로 용접 부착하고, 상기 버팀판(24)을 보강하기 위하여 상기 버팀판(24)과 버팀판(24)사이에 다수개의 연결편(26)을 수평으로 용접 부착하여 지지아암(20)을 제작하는 단계를 설명하면, 상기 지지아암(20)은 일측이 수평으로 상기 측면 플레이트(10)에 용접 부착되고 타측이 상기 베이스 플레이트(30)에 전, 후측으로 구비된 한쌍의 스토퍼(40) 사이에 뜬 상태로 위치하여 상기 스토퍼(40)에 의하여 상기 지지아암(20)은 전, 후측으로의 이동이 제한된다.Next, the lower portion of the plurality of support plates 24 at regular intervals on the upper portion of the rectangular support plate 22, which is positioned in a state of floating between the pair of stoppers 40 provided on the base plate 30 before and after. Welded vertically, and a plurality of connecting pieces 26 are welded horizontally between the bracing plate 24 and the bracing plate 24 so as to reinforce the bracing plate 24 to produce a support arm 20. When explaining the step, the support arm 20 is horizontally welded to the side plate 10, one side is horizontally and the other side between the pair of stoppers 40 provided before and after the base plate 30, Positioned in the floating state, the support arm 20 by the stopper 40 is limited to the front, rear movement.

따라서, 상기 지지아암(20)이 교량빔(100)의 양단부에 부착되어 있으므로 상기 지지아암(20)의 이동이 상기 스토퍼(40)에 의하여 제한되므로 교량빔(100)의 이동이 제한되어 낙교가 방지되는 것이다.Therefore, since the support arm 20 is attached to both ends of the bridge beam 100, the movement of the support arm 20 is limited by the stopper 40, so that the movement of the bridge beam 100 is restricted, resulting in a fallout. To be prevented.

상기 지지아암(20)은 사각형상의 지지판(22)의 상부에 일정간격으로 다수개의 버팀판(24)의 하부를 수직으로 용접 부착하고, 상기 버팀판(24)들을 보강하기 위하여 상기 버팀판(24)과 버팀판(24)사이에 다수개의 연결편(26)을 수평으로 용접 부착하여 제작된다.The support arm 20 vertically welds and attaches the lower portions of the plurality of support plates 24 to the upper portions of the rectangular support plates 22 at regular intervals, and reinforces the support plates 24. And a plurality of connecting pieces 26 are horizontally welded between the support plate and the support plate 24.

상기 지지아암(20)의 버팀판(24)은 사분의일 원호형상 또는 사각형상 부재를 사용할 수 있으며, 또한 상기 사분의일 원호형상은 내측을 일부 절결한 절결부(25)를 형성할 수 있고, 사각형상의 버팀판(24)은 내측을 일부 절결한 절결부(25)를 형성하여 “ㄱ"자 형상으로 형성할 수 있다.The support plate 24 of the support arm 20 may use a quadrature arc shape or a quadrangular member, and the quadrant arc shape may form a cutout portion 25 having a part of a cutout inward. , The rectangular bracing plate 24 may be formed in a "b" shape by forming a cutout portion 25 of which the inside is partially cut out.

상기에서 버팀판(24)을 사분의일 원호형상 및 사각형상의 버팀판(24)의 내측을 일부 절결한 것은, 본 발명에서와 같이, 교량빔의 상,하부 양측에 돌출부(101)가 형성된 “I”형 교량빔(100)에 적용하거나, 큰 교좌장치가 사용되어 교량빔(100)의 하부 폭 외측으로 교좌장치가 노출된 경우에 적용하기 위한 것이다.In the above, the cutout plate 24 partially cuts the inside of the quarter-shaped arc-shaped and square-shaped bracing plate 24, as in the present invention, wherein the protrusions 101 are formed on both upper and lower sides of the bridge beam. It is applied to the I ”bridge beam 100, or when a large bridge device is used to expose the bridge device outside the lower width of the bridge beam 100.

상기 지지아암(20)의 버팀판(24) 일측을 상기 측면 플레이트(10)에 수평으로 용접 부착하여 상기 지지아암(20)의 지지판(22)을 상기 베이스 플레이트(30)에 전, 후측 으로 구비된 한쌍의 스토퍼(40) 사이에 뜬 상태로 위치시키면 본 발명의 교량빔의 낙교방지 방법 및 구조가 완료되는 것이다.One side of the support plate 20 of the support arm 20 is horizontally welded to the side plate 10 so that the support plate 22 of the support arm 20 is provided on the base plate 30 before and after. When placed in a state floating between the pair of stoppers 40 is completed, the method and structure of the fall prevention of the bridge beam of the present invention is completed.

다음은, 본 발명의 교량빔의 낙교방지 구조에 대하여 설명한다.Next, the fall prevention structure of the bridge beam of the present invention will be described.

본 발명은 교각(300)의 상면에 교좌장치(200)를 개재하여 설치된 교량빔(100)의 낙교를 방지하는 구조에 있어서,The present invention in the structure to prevent the falling of the bridge beam 100 is installed on the upper surface of the bridge 300 via the bridge device 200,

천공된 다수개의 볼트구멍(10a)에 앵커볼트(11)로 고정되어 교량빔(100)의 단부 양 측면에 각각 부착되는 사각형상의 측면 플레이트(10)와;A rectangular side plate 10 fixed to the plurality of perforated bolt holes 10a by anchor bolts 11 and attached to both sides of an end of the bridge beam 100;

상기 측면 플레이트(10)와 대응되는 위치의 교각(300) 상면에 일정넓이와 일정두께의 무수축 모르타르를 타설하여 형성되는 각각의 무수축 모르타르부(50)와;Each of the non-contraction mortars 50 formed by pouring non-contraction mortar of a predetermined width and a predetermined thickness on an upper surface of the pier 300 corresponding to the side plate 10;

상기 무수축 모르타르부(50) 상면에 앵커볼트(11)로 고정할 수 있도록 다수개의 볼트구멍(10a)이 천공되고 전, 후측에 스토퍼(40)가 구비된 각각의 베이스플레이트(30)와; A base plate 30 having a plurality of bolt holes 10a perforated to be fixed to the top surface of the non-shrink mortar part 50 by an anchor bolt 11 and having stoppers 40 at the front and rear sides thereof;

상기 베이스플레이트(30)의 전, 후측에 구비된 스토퍼(40) 사이에 뜬 상태로 위치하여 상기 스토퍼(40)에 의해서 이동이 제한되는 사각형상의 지지판(22)과, 상기 지지판(20)에 하부가 용접되어 수직하게 설치되고, 일측이 상기 측면 플레이트(10)에 수평으로 용접되어 고정되는 버팀판(24)과, 상기 버팀판(24)을 보강하기 위하여 상기 버팀판(24)와 버팀판(24)의 사이를 수평으로 연결하는 다수개의 연결편(26)으로 이루어지는 지지아암(20)으로 구성되는 것을 특징으로 하는 교량빔의 낙교방지 구조이다.A rectangular support plate 22 positioned between the stoppers 40 provided at the front and rear sides of the base plate 30 and limited in movement by the stopper 40, and lowered to the support plate 20. Is welded and installed vertically, one side of the bracing plate 24 is welded and fixed horizontally to the side plate 10, and the bracing plate 24 and the bracing plate to reinforce the bracing plate 24 ( The bridge beam prevention structure of the bridge beam, characterized in that it is composed of a support arm (20) consisting of a plurality of connecting pieces 26 for horizontally connecting between the 24.

본 발명의 교량빔의 낙교방지 구조는 상기 교량빔의 낙교방지 방법에서 방법 과 더불어 구조를 상세히 설명하였으므로 상세한 설명은 생략한다.The fall prevention structure of the bridge beam of the present invention has been described in detail with the method in the fall prevention method of the bridge beam, so a detailed description thereof will be omitted.

이해가 쉽도록 다음에서 본 발명의 작용을 설명한다.For ease of understanding, the operation of the present invention will be described below.

먼저, 상기 교량빔(100)의 단부 양측면에 앵커볼트(11)를 이용하여 사각형상의 측면 플레이트(10)를 각각 부착하는 측면 플레이트(10) 부착하고, 상기에서 부착된 각각의 측면 플레이트(10)에 대응되는 위치의 교각(300) 상면에 일정넓이와 일정두께의 무수축 모르타르를 타설하여 각각의 무수축 모르타르부(50)를 형성하고, 상기 무수축 모르타르부(50)의 상부에 전, 후측으로 한쌍의 스토퍼(40)가 구비된 각각의 베이스 플레이트(30)를 앵커볼트(11)로 고정하고, 상기 베이스 플레이트(30)에 전, 후측으로 구비된 한쌍의 스토퍼(40) 사이에 뜬 상태로 위치하는 사각형상의 지지판(22)의 상부에 일정간격으로 다수개의 버팀판(24)의 하부를 수직으로 용접 부착하고, 상기 버팀판(24)을 보강하기 위하여 상기 버팀판(24)과 버팀판(24)사이에 다수개의 연결편(26)을 수평으로 용접 부착하여 지지아암(20)을 제작하하고, 상기에서 제작된 지지아암(20)의 버팀판(24) 일측을 상기 측면 플레이트(10)에 수평으로 용접 부착하여 상기 지지아암(20)이 상기 베이스 플레이트(30)의 전, 후측에 형성된 한쌍의 스토퍼(40) 사이에 위치하도록 하면 본 발명의 교량빔의 낙교방지 구조가 완료되는 것이다.First, the side plate 10 is attached to each side of the end of the bridge beam 100 using the anchor bolt 11 to attach the rectangular side plate 10, respectively, and each side plate 10 attached above A non-shrink mortar having a predetermined width and a thickness is poured on the upper surface of the pier 300 at a position corresponding thereto to form respective non-shrink mortar portions 50, and before and after the upper portion of the non-shrink mortar portion 50. Each base plate 30 provided with a pair of stoppers 40 on the side is fixed with anchor bolts 11, and the base plate 30 is floated between the pair of stoppers 40 provided in the front and rear sides. Vertically welded lower portions of the plurality of bracing plates 24 at regular intervals to the upper portion of the rectangular support plate 22 which is positioned to the brace plate 24 and the bracing plate to reinforce the bracing plate 24. Multiple connecting pieces 26 horizontally between 24 The support arm 20 is attached to the support arm 20, and the support arm 20 is horizontally welded to the side plate 10 by attaching one side of the support plate 20 to the side plate 10. When placed between the pair of stoppers 40 formed on the front and rear sides of the base plate 30, the fall prevention structure of the bridge beam of the present invention is completed.

도 1은 종래 발명의 분해 사시도.1 is an exploded perspective view of a conventional invention.

도 2는 본 발명 제1실시예의 분해 사시도.2 is an exploded perspective view of the first embodiment of the present invention.

도 3은 본 발명 제1실시예의 설치 상태도.3 is an installation state diagram of the first embodiment of the present invention.

도 4는 본 발명 제2실시예의 설치 상태도.Figure 4 is an installation state of the second embodiment of the present invention.

도 5는 본 발명 지지아암의 다른 실시예 사시도.5 is a perspective view of another embodiment of the support arm of the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

(10) : 측면 플레이트 (11) : 앵커볼트(10): side plate (11): anchor bolt

(20) : 지지아암 (22) : 지지판(20): support arm (22): support plate

(24) : 버팀판 (30) : 베이스 플레이트24: bracing plate 30: base plate

(40) : 스토퍼 (42) : 지지편40: stopper 42: support piece

(44) : 보강편 (100) :교량빔(44): reinforcement piece (100): bridge beam

(200) : 교좌장치 (300) : 교각 200: bridge device 300: bridge

Claims (7)

삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 교각(300)의 상면에 교좌장치(200)를 개재하여 설치된 교량빔(100)의 낙교를 방지하는 구조에 있어서,In the structure of preventing the falling of the bridge beam 100 provided via the bridge device 200 on the upper surface of the bridge 300, 천공된 다수개의 볼트구멍(10a)에 앵커볼트(11)로 고정되어 교량빔(100)의 단부 양 측면에 각각 부착되는 사각형상의 측면 플레이트(10)와;A rectangular side plate 10 fixed to the plurality of perforated bolt holes 10a by anchor bolts 11 and attached to both sides of an end of the bridge beam 100; 상기 측면 플레이트(10)와 대응되는 위치의 교각(300) 상면에 일정넓이와 일정두께의 무수축 모르타르를 타설하여 형성되는 각각의 무수축 모르타르부(50)와;Each of the non-contraction mortars 50 formed by pouring non-contraction mortar of a predetermined width and a predetermined thickness on an upper surface of the pier 300 corresponding to the side plate 10; 상기 무수축 모르타르부(50) 상면에 앵커볼트(11)로 고정할 수 있도록 다수개의 볼트구멍(10a)이 천공되고 전, 후측에 스토퍼(40)가 구비된 각각의 베이스플레이트(30)와; A base plate 30 having a plurality of bolt holes 10a perforated to be fixed to the top surface of the non-shrink mortar part 50 by an anchor bolt 11 and having stoppers 40 at the front and rear sides thereof; 상기 베이스플레이트(30)의 전, 후측에 수직으로 용접된 지지편(42)과 상기 지지편(42)을 외측에서 보강하는 다수개의 보강편(44)이 구비된 스토퍼(40) 사이에 뜬 상태로 위치하여 상기 스토퍼(40)에 의해서 이동이 제한되는 사각형상의 지지판(22)과, 상기 지지판(22)에 하부가 용접되어 수직하게 설치되고, 일측이 상기 측면 플레이트(10)에 수평으로 용접되어 고정되는 버팀판(24)과, 상기 버팀판(24)을 보강하기 위하여 상기 버팀판(24)와 버팀판(24)의 사이를 수평으로 연결하는 다수개의 연결편(26)으로 이루어지는 지지아암(20)으로 구성되는 것을 특징으로 하는 교량빔의 낙교방지 구조.Floating state between the support piece 42 welded vertically to the front and rear sides of the base plate 30 and the stopper 40 provided with a plurality of reinforcing pieces 44 for reinforcing the support piece 42 from the outside. The support plate 22 of the rectangular position is limited to the movement by the stopper 40, the lower portion is welded to the support plate 22 is installed vertically, one side is welded horizontally to the side plate 10 Support arm 20 consisting of a fixed support plate 24 and a plurality of connecting pieces 26 for horizontally connecting the support plate 24 and the support plate 24 to reinforce the support plate 24 The fall prevention structure of the bridge beam, characterized in that consisting of).
KR1020080041167A 2008-05-02 2008-05-02 Preveting process of falling bridge-beam and constructon there of KR101008606B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080041167A KR101008606B1 (en) 2008-05-02 2008-05-02 Preveting process of falling bridge-beam and constructon there of

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080041167A KR101008606B1 (en) 2008-05-02 2008-05-02 Preveting process of falling bridge-beam and constructon there of

Publications (2)

Publication Number Publication Date
KR20090115350A KR20090115350A (en) 2009-11-05
KR101008606B1 true KR101008606B1 (en) 2011-01-17

Family

ID=41556494

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080041167A KR101008606B1 (en) 2008-05-02 2008-05-02 Preveting process of falling bridge-beam and constructon there of

Country Status (1)

Country Link
KR (1) KR101008606B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102644244A (en) * 2012-05-04 2012-08-22 北京市市政工程设计研究总院 Antidumping reinforcing reinforce device for bridge and construction method thereof
CN106638273A (en) * 2016-11-30 2017-05-10 长江师范学院 Column pier type bridge anti-shifting device and column pier type bridge anti-shifting method

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111155417B (en) * 2019-12-30 2021-09-24 浙江大学 Beam falling prevention device based on paper folding and rebounding mechanism
CN112227235B (en) * 2020-11-13 2022-02-22 重庆交通大学 Bridge is consolidated and is prevented roof beam body structure that falls
CN114753242B (en) * 2022-05-07 2024-05-14 北京工业大学 Bridge beam falling prevention device with buffering effect

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62120505U (en) 1986-01-16 1987-07-31
JPH09195226A (en) * 1996-01-18 1997-07-29 Tokyo Fabric Kogyo Kk Base isolation bridge falling preventing device
KR20040076348A (en) * 2003-02-25 2004-09-01 주식회사 오케이컨설턴트 Apparatus and method for pulling up and prevention of falling down of bridge beam
KR100656769B1 (en) * 2006-06-28 2006-12-14 (주)피엔알시스템 Shear key structure for prevention of falling down of bridge beam

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62120505U (en) 1986-01-16 1987-07-31
JPH09195226A (en) * 1996-01-18 1997-07-29 Tokyo Fabric Kogyo Kk Base isolation bridge falling preventing device
KR20040076348A (en) * 2003-02-25 2004-09-01 주식회사 오케이컨설턴트 Apparatus and method for pulling up and prevention of falling down of bridge beam
KR100656769B1 (en) * 2006-06-28 2006-12-14 (주)피엔알시스템 Shear key structure for prevention of falling down of bridge beam

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102644244A (en) * 2012-05-04 2012-08-22 北京市市政工程设计研究总院 Antidumping reinforcing reinforce device for bridge and construction method thereof
CN106638273A (en) * 2016-11-30 2017-05-10 长江师范学院 Column pier type bridge anti-shifting device and column pier type bridge anti-shifting method
CN106638273B (en) * 2016-11-30 2018-06-08 长江师范学院 A kind of stub formula bridge anti-deviation device and its Anti-deviation method

Also Published As

Publication number Publication date
KR20090115350A (en) 2009-11-05

Similar Documents

Publication Publication Date Title
KR101008606B1 (en) Preveting process of falling bridge-beam and constructon there of
KR101560253B1 (en) Precast bridge construction method using pile and precast coping
WO2010051379A1 (en) Construction frame shear lug
KR102072685B1 (en) Bridge using connecting member and method of construction
KR101066424B1 (en) Bridge structure using wood deck and its construction method
KR101573734B1 (en) Multi-span steel girder and constructing method thereof
KR100722220B1 (en) Bridge of pot beraing for aseismativ strengthened device
KR20130042526A (en) Attachment plates adjoining ends of concrete beam with walls of abutments, and method of building concrete structure using the same
JP2007239321A (en) Groin work and its installation construction
CN210066767U (en) Waist rail mounting structure
CN208632939U (en) A kind of steel reinforced concrete assembled steel hanging box structure
KR101282333B1 (en) Cross-type supporting structure and method for super-structure of bridge
KR101341847B1 (en) Seismic reinforce device structure for bridge and construction method
CN208346650U (en) A kind of double-deck steel trestle for the construction of water Bridge
KR100393418B1 (en) Bridge elasticity supporter with earthquake-resistant and constructing method of the same
KR101881075B1 (en) Constructing Method of Support Part for Pipe
JP4372642B2 (en) Construction method of columnar structures
KR101804071B1 (en) Apparatus and method for connecting concrete floating structure in sea
KR100743729B1 (en) Reinforcing apparatus for head of steel pipe pile
KR101683216B1 (en) Construction method of pier
KR102308853B1 (en) Repair and rehabilitation system of structures using Seismic retrofit member and FRP formwork panels
JP2003213622A (en) Steel girder bridge using concrete cross beam
KR20090066561A (en) Apparatus of prevention from psc beam from turning over
KR101119214B1 (en) Waterproof plate equipment
KR100588447B1 (en) Unification structure for pier and girder of bridge and construction method thereof

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20131025

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20141222

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20160104

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20170110

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20181115

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20191128

Year of fee payment: 10