KR100984898B1 - The Construction Method of Descenting Underground Structure - Google Patents

The Construction Method of Descenting Underground Structure Download PDF

Info

Publication number
KR100984898B1
KR100984898B1 KR1020080053431A KR20080053431A KR100984898B1 KR 100984898 B1 KR100984898 B1 KR 100984898B1 KR 1020080053431 A KR1020080053431 A KR 1020080053431A KR 20080053431 A KR20080053431 A KR 20080053431A KR 100984898 B1 KR100984898 B1 KR 100984898B1
Authority
KR
South Korea
Prior art keywords
underground structure
underground
ground
hydraulic
soil
Prior art date
Application number
KR1020080053431A
Other languages
Korean (ko)
Other versions
KR20090127450A (en
Inventor
위성배
Original Assignee
위성배
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 위성배 filed Critical 위성배
Priority to KR1020080053431A priority Critical patent/KR100984898B1/en
Publication of KR20090127450A publication Critical patent/KR20090127450A/en
Application granted granted Critical
Publication of KR100984898B1 publication Critical patent/KR100984898B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/04Guide devices; Guide frames
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/388Separate connecting elements
    • E04B2001/389Brackets

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

지하구조물을 지중에 시공하는 공법에 있어서, 상기 지하구조물을 시공할 위치의 지상에서 지하구조물을 제작한 다음 상기 지하구조물 내의 하부 토사를 굴착하고 상기 지하구조물을 지중에 하강시켜 시공하는 지하구조물 하강 시공공법에 관한 것이다.In the method of constructing underground structures in the ground, the underground structure is constructed by constructing the underground structure on the ground at the location where the underground structure is to be constructed, then excavating the lower soil in the underground structure and lowering the underground structure in the ground. It is about public law.

본 발명에 따른 지하구조물 하강 시공공법은, 상기 지하구조물의 형상과 크기에 맞춰 라인을 설정한 후 철판으로 제작되는 선단슈를 상기 라인을 따라 조립 설치하는 제 1단계; 상기 조립된 선단슈를 따라 상측에 내, 외벽체로 구성되는 지하구조물을 형성하고, 상기 지하구조물 하부의 내측면에 다수의 브라켓를 설치하며, 상기 브라켓의 하측면에 유압식 압입장치를 설치하는 제 2단계; 상기 지하구조물 내의 하부 토사를 굴착한 후 상기 유압식 압입장치를 작동시켜 상기 압입장치의 하단을 상기 굴착된 하부 지면까지 이동시킨 후 상기 지하구조물을 지지토록 하는 제 3단계; 상기 지하구조물에 장착된 선단슈의 하부 토사를 굴착하는 제 4단계; 상기 유압식 압입장치를 작동시켜 상부에 위치한 상기 지하 구조물을 하측방향으로 이동시키는 제 5단계; 및 상기 제 3단계 내지 제 5단계를 반복 실시하여 상기 지하구조물을 소정의 깊이까지 하강 시공하는 제 6단계;로 이루어진다.Underground structure lowering construction method according to the invention, the first step of assembling and installing along the line the tip shoe made of steel plate after setting the line in accordance with the shape and size of the underground structure; A second step of forming an underground structure consisting of the inner, outer wall body along the assembled tip shoe, install a plurality of brackets on the inner side of the lower base structure, and install a hydraulic indentation device on the lower side of the bracket ; A third step of excavating the lower soil in the underground structure to operate the hydraulic indentation device to move the lower end of the indentation device to the excavated lower ground and to support the underground structure; A fourth step of digging the bottom soil of the tip shoe mounted on the underground structure; A fifth step of operating the hydraulic press-fit device to move the underground structure located above the lower direction; And a sixth step of repeatedly constructing the underground structure to a predetermined depth by repeatedly performing the third to fifth steps.

유압식 압입장치, 지하구조물, 브라켓, 차수 그라우팅, 가이드 파일 Hydraulic Indenter, Underground Structure, Bracket, Order Grouting, Guide Pile

Description

지하구조물 하강 시공공법 {The Construction Method of Descenting Underground Structure}{The Construction Method of Descenting Underground Structure}

지하구조물을 지중에 시공하는 공법에 있어서, 상기 지하구조물을 시공할 위치의 지상에서 지하구조물을 제작한 다음 상기 지하구조물 내의 하부 토사를 굴착하고 상기 지하구조물을 지중에 하강시켜 시공하는 지하구조물 하강 시공공법에 관한 것이다.In the method of constructing underground structures in the ground, the underground structure is constructed by constructing the underground structure on the ground at the location where the underground structure is to be constructed, then excavating the lower soil in the underground structure and lowering the underground structure in the ground. It is about public law.

일반적인 자하구조물의 축조공법은 지하실 축조 위치의 가시설 시공 후 토사를 굴착하여 소정의 공간을 마련한 다음 다수의 H형강과 토류판을 이용하여 토사 붕괴를 방지하는 벽체를 설치한 후 거푸집을 조립하고 콘크리트를 타설하여 지하실 벽체를 시공하는 등 지하구조물을 시공하는, 소위 가설 흙막이 공법이 주류를 이루고 있다.In general construction method of self-structure, excavation of earth and sand is provided after construction of temporary facility at basement construction location, and after installing wall to prevent soil collapse by using a number of H-beams and earth plate, assembling formwork and placing concrete The so-called temporary earthquake construction, which constructs underground structures such as basement walls, is the mainstream.

그러나, 상기한 바와 같은 가설 흙막이 공법에 의한 지하구조물 축조공법은 연약지반이나 지하수 유입이 과다하여 지하 터파기 공사가 곤란한 경우, H형강과 차수 그라우팅 토류판을 이용하여 토사 붕괴 방지 구조를 시공한 다음 터파기 굴착 작업을 하고 지하구조물을 시공해야 하는 등 공정수의 증가에 따른 공기 연장의 단점이 있다.However, when the underground structure construction method by the temporary earthquake construction method as described above is difficult for underground excavation work due to excessive inflow of soft ground or groundwater, the earth and earth grouting prevention plate is used to construct the earth and earth collapse prevention structure. There is a drawback of air extension due to the increase of the number of processes such as digging and excavation work and construction of underground structures.

이에 따라, 동 출원인이 기 특허출원하여 등록받은 특허등록번호 제 10-0781809호의 '지하구조물 축조공법'은 상기와 같은 단점을 보완하여 안출된 발명으로 공기를 단축할 수 있을 뿐만 아니라 또한, 주변 지반 침하 현상이 발생되지 않도록 하는 효과는 있으나, 그 구성이 복잡하고 공사비가 증가되는 문제점이 있다.Accordingly, the 'underground structure construction method' of Patent Registration No. 10-0781809, which the applicant has already applied for and registered the patent, can solve the above disadvantages and shorten the air to the invention. Although there is an effect of preventing the sinking phenomenon, the configuration is complicated and there is a problem that the construction cost increases.

본 발명은 상기와 같은 점을 감안하여 안출된 것으로, 공기를 단축할 수 있을 뿐만 아니라 주변지반 침하현상이 발생 되지않게 하고, 지하구조물을 시공할 토질의 조건에 상관없이 지하구조물을 평행상태로 유지시켜 정확한 위치에 시공할 수 있도록하며, 또한, 공사비를 절감할 수 있게 한다.The present invention has been devised in view of the above, it can not only shorten the air, but also prevent the ground subsidence, and keep the underground structures in parallel regardless of the soil conditions to construct the underground structures. The construction can be installed in the correct position, and the construction cost can be reduced.

본 발명의 일 형태에서는, 지하구조물을 시공할 위치의 지상에서 지하구조물을 제작한 다음 상기 지하구조물 내의 하부 토사를 굴착하고 상기 지하구조물을 지중에 하강시켜 시공하는 지하구조물 하강 시공공법에 있어서, 상기 지하구조물의 형상과 크기에 맞춰 라인을 설정한 후 철판으로 제작되는 선단슈를 상기 라인을 따라 조립 설치하는 제 1단계; 상기 조립된 선단슈를 따라 상측에 내, 외벽체로 구성되는 지하구조물을 형성하고, 상기 지하구조물 하부의 내측면에 다수의 브라켓를 설치하며, 상기 브라켓의 하측면에 유압식 압입장치를 설치하는 제 2단계; 상기 지하구조물 내의 하부 토사를 굴착한 후 상기 유압식 압입장치를 작동시켜 상기 압입장치의 하단을 상기 굴착된 하부 지면까지 이동시킨 후 상기 지하구조물을 지지토록 하는 제 3단계; 상기 지하구조물에 장착된 선단슈의 하부 토사를 굴착하는 제 4단계; 상기 유압식 압입장치를 작동시켜 상부에 위치한 상기 지하 구조물을 하측방향으로 이동시키는 제 5단계; 및 상기 제 3단계 내지 제 5단계를 반복 실시하여 상 기 지하구조물을 소정의 깊이까지 하강 시공하는 제 6단계;로 이루어지는 것을 특징으로 하는 지하구조물 하강 시공공법을 제공한다.In one embodiment of the present invention, in the underground structure lowering construction method of manufacturing an underground structure on the ground of the position where the underground structure is to be constructed, excavating the bottom soil in the underground structure and lowering the underground structure in the ground A first step of assembling and installing a tip shoe made of a steel plate after setting a line according to a shape and size of an underground structure; A second step of forming an underground structure consisting of the inner, outer wall body along the assembled tip shoe, install a plurality of brackets on the inner side of the lower base structure, and install a hydraulic indentation device on the lower side of the bracket ; A third step of excavating the lower soil in the underground structure to operate the hydraulic indentation device to move the lower end of the indentation device to the excavated lower ground and to support the underground structure; A fourth step of digging the bottom soil of the tip shoe mounted on the underground structure; A fifth step of operating the hydraulic press-fit device to move the underground structure located above the lower direction; And a sixth step of repeatedly performing the third to fifth steps to lower the underground structure to a predetermined depth.

본 발명의 일 형태에 따른 지하구조물 하강 시공공법에서, 제 1단계는, 주변 지하수가 상기 시공 현장 내 유입되는 것을 방지하기 위하여 상기 라인을 따라 외곽으로 차수 그라우팅하는 단계;를 더 포함하여 이루어질 수 있다.In the underground structure lowering construction method according to one embodiment of the present invention, the first step may further comprise the step of grouting the order along the line to prevent the surrounding ground water from flowing into the construction site; .

본 발명의 일 형태에 따른 지하구조물 하강 시공공법에서, 제 1단계는, 상기 지하구조물의 지중 하강을 안내하는 가이드 파일을 시공하는 단계;를 더 포함하여 이루어질 수 있다.In the underground structure lowering construction method according to one embodiment of the present invention, the first step may further include constructing a guide file for guiding the underground structure of the underground structure.

본 발명의 일 형태에 따른 지하구조물 하강 시공공법에서, 제 1단계는, 지하구조물이 시공될 지반이 연약층인 경우에는, 유압식 압입장치의 하단에 위치하여 견고하게 상기 지하구조물을 지지토록 하기 위한 다수의 반력파일을 상기 라인을 따라 내부에 시공하는 단계;를 더 포함하고, 제 2단계는, 상기 브라켓의 하측면에 설치되는 유압식 압입장치의 하단이 상기 반력파일에 지지되도록 상기 유압식 압입장치를 설치할 수 있다.In the underground structure lowering construction method according to one embodiment of the present invention, in the case where the ground to be constructed is a soft layer, the first step is located at the lower end of the hydraulic indentation device to securely support the underground structure. And constructing a reaction force pile therein along the line, wherein the second step includes installing the hydraulic pressure injector so that the lower end of the hydraulic pressure injector installed on the lower side of the bracket is supported by the reaction force pile. Can be.

바람직하게는, 상기 제 3단계와 제 4단계는, 토사를 굴착하는 경우에, 토사 이송기를 이용하여 굴착된 토사를 지상으로 이송할 수 있다.Preferably, in the third and fourth steps, when excavating the soil, the excavated soil may be transferred to the ground using a soil transfer machine.

좀 더 바람직하게는, 상기 제 6단계 후에, 소정의 깊이로 하강 시공된 상기 지하구조물의 상부에 다수의 지하구조물을 적층하여 다수의 지하층으로 시공할 수도 있다.More preferably, after the sixth step, a plurality of underground structures may be stacked on top of the underground structures which are constructed to descend to a predetermined depth to be constructed in a plurality of underground layers.

본 발명에 따른 지하구조물 하강 시공공법은, 지반이 연약층이든 또는 암반이든 토질의 조건에 상관없이 지하구조물을 평행상태로 유지하며 지중으로 하강시켜 시공할 수 있게 하고, 지하구조물의 시공 후에도 주변지반 침하현상이 발생 되지않게 한다.Underground structure lowering construction method according to the present invention, whether the ground is a soft layer or rock, regardless of the condition of the soil to keep the underground structure in parallel and to be constructed by lowering the ground, and the ground subsidence even after construction of the underground structure It does not happen.

또한, 본 발명에 따른 지하구조물 하강 시공공법을 적용 시키기 위한 추가 구성을 단순화하여 종래 공법과 비교하여 공기를 단축 시키고, 공사비를 절감할 수 있게 한다.In addition, by simplifying the additional configuration for applying the underground construction falling construction method according to the present invention it is possible to shorten the air compared to the conventional construction method, and reduce the construction cost.

이하 상기 목적이 구제적으로 실현될 수 있는 본 발명의 실시예들을 첨부된 도면을 참조하여 설명한다. 본 실시예들을 설명함에 있어서, 동일 구성에 대해서는 동일 명칭 및 부호가 사용되며, 이에 따른 부가적인 설명은 하기에서 생략된다.DETAILED DESCRIPTION Hereinafter, embodiments of the present invention in which the above object can be realized in detail will be described with reference to the accompanying drawings. In describing the embodiments, the same names and symbols are used for the same components, and additional description thereof will be omitted below.

도 1은 본 발명에 따른 선단슈(10)의 조립 상태를 나타내는 사시도이고, 도 2는 본 발명에 따른 라인(30)의 외곽에 차수 그라우팅(40)한 상태를 나타내는 평면도이며, 도 3a는 본 발명에 따른 라인(30)의 내부에 반력파일(60)을 시공한 상태를 나타내는 평면도이고, 도 3b 내지 도 3d는 도 3a의 반력파일(60)을 시공하는 과정을 나타내는 정면도이다. 도 4는 본 발명에 따른 선단슈(10)의 상측에 지하구조물(20)과 브라켓(70) 및 유압식 압입장치(80)가 설치된 상태를 나타내는 횡단면도 이고, 도 5는 도 4의 지하구조물(20) 내의 하부를 굴착하고 유압식 압입장치(80)를 작동시켜 지하구조물(20)을 지지토록 한 상태를 나타내는 횡단면도이고며, 도 6은 도 5의 선단슈(10) 하부를 굴착한 상태를 나타내는 횡단면도이고, 도 7과 도 8은 유압식 압입장치(80)를 작동시켜 지하구조물(20)을 지면으로 하강시키는 과정을 나타내는 횡단면도이다. 또한, 도 9a는 본 발명에 따른 가이드 파일(50)을 시공한 상태를 나타내는 평면도이며, 도 9b 내지 도 9d는 도 9a의 가이드 파일(50)을 시공하는 과정을 나타내는 정면도이고, 도 10은 본 발명에 따른 토사 이송기(100)를 이용하여 토사를 이송하고 다수의 지하구조물(20)을 적층하여 복수의 지하층으로 시공한 상태를 나타내는 횡단면도이다.1 is a perspective view showing the assembled state of the tip shoe 10 according to the present invention, Figure 2 is a plan view showing a state grouting 40 in the outline of the line 30 according to the present invention, Figure 3a 3 is a plan view illustrating a state in which the reaction force pile 60 is constructed in the line 30 according to the present invention, and FIGS. 3B to 3D are front views illustrating a process of constructing the reaction force pile 60 of FIG. 3A. 4 is a cross-sectional view showing a state in which the underground structure 20, the bracket 70, and the hydraulic press-fit device 80 are installed on the upper side of the tip shoe 10 according to the present invention, and FIG. 5 is the underground structure 20 of FIG. ) Is a transverse cross-sectional view showing a state to support the underground structure 20 by excavating the lower part in the inside and operating the hydraulic press-fit device 80, Figure 6 is a cross-sectional view showing a state that excavated the lower end shoe 10 of FIG. 7 and 8 are cross-sectional views showing a process of lowering the underground structure 20 to the ground by operating the hydraulic indentation device (80). 9A is a plan view showing a state in which the guide file 50 is constructed in accordance with the present invention. FIGS. 9B to 9D are front views illustrating a process of constructing the guide file 50 in FIG. 9A, and FIG. It is a cross-sectional view showing a state in which the soil is transported using the soil feeder 100 according to the present invention and a plurality of underground structures 20 are stacked and constructed in a plurality of underground layers.

본 발명의 지하구조물(20) 하강 시공공법의 제 1단계는, 먼저 지하구조물(20)을 설치할 위치에 상기 지하구조물(20)의 형상과 크기에 맞춰 라인(30)을 설정하고, 상기 설정된 라인(30)을 따라 철판(11)으로 선단슈(10)를 조립하여 설치한다.In the first step of the underground construction 20 descending construction method of the present invention, first set the line 30 in accordance with the shape and size of the underground structure 20 in the position to install the underground structure 20, the set line The tip shoe 10 is assembled and installed with the iron plate 11 along the 30.

도 1에 도시된 바와 같이, 선단슈(10)는 단면이 하부 모서리 부분이 개방된 사각형의 형상으로 철판(11)을 절곡하여 형성하고, 상측면에는 길이방향을 따라 한 쌍의 철근 고정홀이 다수 마련되고, 소정의 간격으로 다수의 H형강(22)의 플랜지가 나사결합되도록 결합홀이 마련되며, 절곡된 선단슈(10)의 내부에는 칸막이 철판(12)을 일정 간격으로 칸막이 형식으로 상기 선단슈(10)에 용접 결합하여 절곡 형성된 선단슈(10)의 길이방향 처짐을 방지한다. 바람직하게는, 차후 지중에 쉽게 하강 될 수 있도록 외측면에 선단슈(10)의 길이방향을 따라 끝단이 뾰족한 압입 날(13)을 결합함으로써, 지반과 상기 지하구조물(20)과의 측면마찰을 최소화하며 상기 지하구조물(20)이 용이하게 하강할 수 있도록 한다.As shown in Figure 1, the tip shoe 10 is formed by bending the iron plate 11 in the shape of a rectangular cross-section of the lower edge open, the upper side of the pair of reinforcing bars fixed along the longitudinal direction A plurality of coupling holes are provided to thread the flanges of the plurality of H-shaped steels 22 at predetermined intervals, and the partitioned iron plate 12 is partitioned at a predetermined interval inside the bent tip shoe 10. Welded to the tip shoe 10 to prevent the longitudinal sagging of the tip shoe 10 is bent. Preferably, the side friction between the ground and the underground structure 20 by engaging the indentation blade 13, the end of which is pointed along the longitudinal direction of the tip shoe 10 to the outer side so that it can be easily lowered later in the ground. Minimize and allow the underground structure 20 to easily descend.

바람직하게는, 도 2에 도시된 바와 같이, 설정된 상기 라인(30)의 외곽으로는 시공현장 주변의 지하수가 상기 시공 현장 내로 유압되는 것을 방지하기 위하여 차수 그라우팅(40)을 한다.Preferably, as shown in Figure 2, the outer line of the set line 30 is the order grout 40 to prevent groundwater around the construction site to be hydraulically into the construction site.

또한, 바람직하게는, 도 3a에 도시된 바와 같이, 지상에서 형성된 상기 지하구조물(20)이 소정의 위치에서 정확하게 하강할 수 있도록 상기 지하구조물(20)의 지중 하강을 안내하는 가이드 파일(50)을 시공한다. 도 3a에 도시된 바와 같이, 상기 지하구조물(20)의 단면 형상이 사각형인 경우에는 각 모서리의 외곽에 한 쌍의 가이드 파일(50)을 시공한다. 도 3b 내지 3d는 상기 가이드 파일(50)을 지중에 시공하는 과정을 도시한 것으로, 먼저 중공의 가이드 파이프(51)를 지중에 압입하고 오거(52)로 파이프 내의 토사를 굴착한 후 콘크리트로 타설하고, 상기 가이드 파이프(51)를 인출함으로써 가이드 파일(50)을 지중에 시공하게 된다.In addition, preferably, as shown in Figure 3a, the guide file 50 for guiding the underground structure 20 of the underground structure 20 so that the underground structure 20 formed on the ground can be accurately lowered at a predetermined position Construct it. As shown in FIG. 3A, when the cross-sectional shape of the underground structure 20 is a quadrangle, a pair of guide files 50 are constructed at the outer edges of each corner. 3B to 3D illustrate the process of constructing the guide file 50 in the ground, firstly inserting the hollow guide pipe 51 into the ground, excavating the soil in the pipe with the auger 52, and then placing it in concrete. Then, the guide file 50 is constructed in the ground by drawing out the guide pipe 51.

본 발명의 지하구조물(20) 하강 시공공법의 제 2단계는, 도 5에 도시된 바와 같이, 조립 형성된 상기 선단슈(10)의 상기 철근홀에는 철근(21)을 끼워 'L'자형으로 굽혀 선단슈(10)와는 용접으로 결합하고, H형강(22)은 끝단에 형성된 플랜지를 상기 결합홀에 볼트와 너트로 상기 선단슈(10)에 결합하며, 상기 선단슈(10)의 상측면의 좌우측 양 끝단에는 내·외벽체(23)를 결합함으로써 지하구조물(20)을 상기 선단슈(10)의 상측에 형성한다. 또한, 형성된 상기 지하구조물(20) 내부의 하단에는 다수의 브라켓(70)을을 설치하고, 상기 브라켓(70)의 하측면으로는 유압식 압입 장치(80)를 설치한다.In the second step of the underground construction 20 descending construction method of the present invention, as shown in FIG. Coupled to the tip shoe 10 by welding, the H-shaped steel 22 is coupled to the tip shoe 10 with a bolt and nut to the coupling hole formed at the end of the end shoe 10, the upper side of the tip shoe 10 The inner and outer wall bodies 23 are coupled to both ends of the left and right sides to form the underground structure 20 above the tip shoe 10. In addition, a plurality of brackets 70 are installed at a lower end of the formed underground structure 20, and a hydraulic indentation device 80 is installed at a lower side of the bracket 70.

또한, 지하구조물(20)이 시공될 지반이 연약층인 경우에는, 바람직하게는, 도 4a에 도시된 바와 같이, 상기 유압식 압입장치(80)의 하단에 위치하여 견고하게 상기 지하구조물(20)을 지지토록 하기 위한 다수의 반력파일(60)을 상기 라인(30)을 따라 상기 라인(30)의 내부에 시공하고, 도 5에 도시된 바와 같이, 상기 브라켓(70)의 하측면에 설치되는 유압식 압입장치(80)의 하단이 상기 반력파일(60)에 접하도록 설치하여 상기 반력파일(60)이 상기 유압식 압입장치(80)를 지지토록 한다. 상기 반력파일(60)의 시공과정은, 도 4b 내지 도 4d에 도시된 바와 같이, 먼저 중공의 가이드 파이프(61)를 지중에 압입하고 오거(62)로 파이프 내의 토사를 굴착한 후 자갈과 모래를 혼합하여 콘크리트 타설하고 상기 가이드 파이프(61)를 인출함으로써 반력파일(60)을 지중에 시공하게 된다. 또한, 바람직하게는, 대향하는 상기 브라켓(70) 사이에 하부 보강재(90)를 게재하여 상기 지하구조물(20)의 지중 하강시 토압에 의한 변형을 방지한다.In addition, in the case where the ground on which the underground structure 20 is to be constructed is a soft layer, preferably, as shown in FIG. 4A, the underground structure 20 is firmly positioned at the lower end of the hydraulic indentation device 80. A plurality of reaction force piles 60 for supporting are constructed in the interior of the line 30 along the line 30, and as shown in Figure 5, the hydraulic type is installed on the lower side of the bracket 70 The lower end of the press-fit device 80 is installed to contact the reaction force pile 60 so that the reaction force pile 60 supports the hydraulic press-fit device 80. The construction process of the reaction pile 60, as shown in Figure 4b to 4d, first press the hollow guide pipe 61 in the ground and excavate the soil in the pipe with auger 62, then gravel and sand The concrete is poured by pouring and the reaction pipe 60 is constructed in the ground by drawing out the guide pipe 61. In addition, the lower reinforcing member 90 is disposed between the brackets 70 facing each other to prevent deformation due to earth pressure when the underground structure 20 is lowered underground.

본 발명의 지하구조물(20) 하강 시공공법의 제 3단계는, 도 5 내지 도 6에 도시된 바와 같이, 먼저 상기 지하구조물(20) 내의 하부 토사를 굴착한 후 상기 유압식 압입장치(80)를 작동시켜 상기 압입장치(80)의 하단을 상기 굴착된 하부 지면까지 이동시킨 후 상기 지하구조물(20)을 지지토록 한다. 바람직하게는, 하부 굴착을 지면이 평형상태가 유지되도록 시공한다. 시공중 불가피하게 불균형상태가 발생한 경우라면 차후 상기 압입장치(80)의 하강시 이를 고려하여 각각의 상기 압입장치(80)의 하강 행정거리를 조정함으로써 상기 지하구조물(20)의 평행을 유지시키면 서 지중으로 상기 지하구조물(20)을 하강 시킬 수 있게 된다. 이때, 상기 지하구조물(20) 내의 하부 토사를 굴착하고 난 후라도 상기 선단슈(10)의 하측은 굴착 되지않은 상태로 남아 있어 상기 지하구조물(20)을 지지하게 되며, 또한, 상기 압입장치(80)를 작동시켜 하단을 지면에 닿도록 하여 상기 지하구조물(20)을 견고하게 지지하게 한다.In the third step of the underground construction 20 descending construction method of the present invention, as shown in Figure 5 to 6, first excavating the lower soil in the underground structure 20, and then the hydraulic indentation device 80 By operating the lower end of the indentation device 80 to the excavated lower ground to support the underground structure 20. Preferably, the bottom excavation is constructed so that the ground is in equilibrium. If an unbalanced condition inevitably occurs during construction, while maintaining the parallelism of the underground structure 20 by adjusting the downward stroke of each indentation device 80 in consideration of this when the indentation device 80 is lowered later The underground structure 20 can be lowered to the ground. At this time, even after excavating the lower soil in the underground structure 20, the lower side of the tip shoe 10 remains unexcavated to support the underground structure 20, and the indentation apparatus 80 By operating the bottom to touch the ground to support the underground structure 20 firmly.

본 발명의 지하구조물(20) 하강 시공공법의 제 4단계는, 도 7에 도시된 바와 같이, 상기 지하구조물(20)을 유압식 압입장치(80)로 지지토록 한 후에 상기 지하구조물(20)에 장착된 선단슈(10)의 하부 토사를 굴착한다.In the fourth step of the underground construction 20 descending construction method of the present invention, as shown in FIG. 7, the underground structure 20 is supported by the hydraulic indentation apparatus 80 and then applied to the underground structure 20. Excavate the bottom soil of the mounted tip shoe 10.

바람직하게는, 상기 제 3단계와 제 4단계에서, 토사를 굴착하는 경우에, 도 10에 도시된 바와 같이, 토사 이송기(100)를 이용하여 굴착된 토사를 지상으로 이송한다. 이로써, 토사 굴착의 작업시간을 월등히 단축 시킬 수 있으며 전체 지하구조물(20) 시공의 공기를 단축 시킬 수 있게 된다. 상기 토사 이송기(100)는 토사 이송용 버켓(101)이 소정 간격을 두고 다수가 체인벨트에 설치되며, 하부 끝단에는대용량의 호퍼(103)을 설치하고, 상기 호퍼(103)의 측면으로는 진동모터(104)를 설치하여 굴착된 토사가 균일하게 호퍼(103)에 담기도록 한다. 또한, 바람직하게는, 지하로 내려오는 체인벨트의 지지대(102)는 수직하게 구성하여 지하 작업 깊이에 따라 이송기의 지지대(102)와 체인벨트 길이를 증가시켜 설치하고, 지상에서는 위쪽으로 경사지게 형성하여 토사를 운반하는 트럭등의 짐칸에 바로 굴착된 토사를 이송시킬 수 있게 한다Preferably, in the third step and the fourth step, when excavating the earth and sand, as shown in FIG. 10, the excavated earth and sand using the soil feeder 100 is transported to the ground. As a result, the work time of earth and sand excavation can be significantly shortened and the air of the entire underground structure 20 construction can be shortened. The earth and sand feeder 100 is a plurality of earth and sand transporting bucket 101 is installed in the chain belt at a predetermined interval, the lower end is installed a large capacity hopper 103, the side of the hopper 103 The vibration motor 104 is installed so that the excavated soil is uniformly contained in the hopper 103. In addition, preferably, the support belt 102 of the chain belt descending to the base is configured to be vertically installed to increase the length of the support belt 102 and the chain belt of the conveyor according to the underground working depth, and formed to be inclined upward from the ground So that the excavated earth and sand can be transported directly to a luggage compartment such as a truck carrying soil.

본 발명의 지하구조물(20) 하강 시공공법의 제 5단계는, 도 8에 도시된 바와 같이, 지하구조물(20)을 지지하고 있는 상기 유압식 압입장치(80)를 작동시켜 압입장치(80)의 상부에 위치한 지하구조물(20)을 하측방향으로 서서히 이동·하강 시킨다.The fifth step of the underground construction 20 descending construction method of the present invention, as shown in Figure 8, by operating the hydraulic indentation device 80 supporting the underground structure 20 of the indentation device 80 The underground structure 20 located on the upper side is gradually moved downward.

상기 전술한 바와 같이, 지하구조물(20) 내의 하부 지면을 평행되게 굴착한 경우라면 다수의 브라켓(70)에 설치된 각각의 상기 압입장치(80)를 동일 행정거리로 이동시켜 지하구조물(20)을 평행상태를 유지시키며 하강할 수 있고, 불가피하게 불균형상태로 하부 지면을 굴착한 경우라도 차후 소정 깊이로 굴착하여 지하구조물(20)을 시공하는 과정에서 각각의 상기 압입장치(80)의 행정거리를 조정하여 평행상태로 조정이 가능하게 된다.As described above, when the lower ground in the underground structure 20 is excavated in parallel, each of the indentation devices 80 installed in the plurality of brackets 70 is moved to the same stroke to move the underground structure 20. It can be lowered while maintaining a parallel state, even if the bottom ground is inevitably unbalanced to excavate to a predetermined depth in the process of constructing the underground structure 20, the stroke distance of each indentation device 80 It can be adjusted in parallel by adjusting.

본 발명의 지하구조물(20) 하강 시공공법의 제 6단계는, 상기 제 3단계 내지 제 5단계를 반복 실시하여 상기 지하구조물(20)을 소정의 깊이까지 하강 시공한다. 상기 지하구조물(20)을 단일 구조물을 형성하여 제 6단계로 지하구조물(20)의 시공을 마무리 할수도 있으나, 바람직하게는, 지하구조물(20)을 다수의 지하구조물들로 분리·형성하여, 도 10에 도시된 바와 같이, 먼저 첫 지하구조물(20)에 대해서는 상기 제 1단계에서 제 6단계까지 실시하여 소정의 깊이만큼 지하구조물(20)을 지중으로 하강시켜 시공하고, 지중에 시공된 상기 첫 지하구조물(20)의 상측에는 상기 첫 지하구조물(20)에 결합된 선단슈(10)의 조립 시공은 생략하고 형성된 다수의 지하구조물들을 적층하여 다수의 지하층으로 전체 지하구조물을 시공한다. 이때, 설치된 상기 유압식 압입장치(80)를 제거하고, 상기 선단슈(10)에 끝단이 'L'형으로 용접 결합된 상기 철근(21)들을, 대향하고 있는 선단슈(10)의 철근(21)들의 끝단과 상호 철근 연결한 후에 맨 하층 슬래브 콘크리트를 타설한다. 바람직하게는, 이때, 지중에 소구경 파이프를 박아 이 파이프를 이용하여 전체 바닥밑을 시멘트 밀크로 충진 그라우팅하여 구조물의 침하를 방지할 수 있다. 이후 각 지하층을 이루는 각각의 지하구조물 사이에 평행보(110)를 연결하여 슬래브를 시공한다.In the sixth step of the underground construction 20 descending construction method of the present invention, by repeating the third step to the fifth step, the underground structure 20 is lowered to a predetermined depth. Although the underground structure 20 may be formed in a single structure, the construction of the underground structure 20 may be finished in the sixth step. Preferably, the underground structure 20 is separated and formed into a plurality of underground structures. As shown in FIG. 10, first, the first underground structure 20 is carried out from the first step to the sixth step, and the underground structure 20 is lowered to the ground by a predetermined depth. On the upper side of the first underground structure 20, the assembly construction of the tip shoe 10 coupled to the first underground structure 20 is omitted, and the entire underground structure is constructed by stacking a plurality of underground structures. At this time, the hydraulic press-fit device 80 is removed, and the reinforcing bar 21 of the front end shoe 10 facing the reinforcing bar 21 welded to the front end shoe 10 in an 'L' shape. The bottom slab concrete is poured after the rebar ends are connected to each other. Preferably, at this time, it is possible to prevent the settlement of the structure by embedding a small diameter pipe in the ground and filling the entire bottom with cement milk using this pipe. Then, the slab is constructed by connecting parallel beams 110 between the respective underground structures forming each basement layer.

상기 이와 같이 본 발명의 지하구조물(20) 하강 시공공법에 의해 지반이 연약층이든 또는 암반이든 토질의 조건에 상관없이 지하구조물(20)을 평행상태로 유지하며 시공할 수 있게 되고, 지하구조물(20)의 시공 후에도 주변지반 침하현상이 발생하지 않으며, 또한, 지하구조물(20)에 대해 본 발명의 시공공법을 적용하기 위한 추가 구성을 단순화하여 공기를 단축시키고, 공사비를 절감할 수 있게 된다.As described above, the underground structure 20 descending construction method of the present invention enables the construction of the underground structure 20 in parallel, regardless of soil conditions, whether the ground is a soft layer or a rock, and the underground structure 20 The ground subsidence phenomenon does not occur even after the construction of), and further, by simplifying the additional configuration for applying the construction method of the present invention to the underground structure 20, it is possible to shorten the air, and reduce the construction cost.

위에서 몇몇의 실시예가 예시적으로 설명되었음에도 불구하고, 본 발명이 이의 취지 및 범주에서 벗어남 없이 다른 여러 형태로 구체화 될 수 있다는 사실은 해당 기술에 통상의 지식을 가진 이들에게는 자명한 것이다.Although some embodiments have been described above by way of example, it will be apparent to those skilled in the art that the present invention may be embodied in many other forms without departing from the spirit and scope thereof.

따라서, 상술된 실시예는 제한적인 것이 아닌 예시적인 것으로 여겨져야 하며, 첨부된 청구항 및 이의 동등 범위 내의 모든 실시예는 본 발명의 범주내에 포함된다.Accordingly, the described embodiments are to be considered as illustrative and not restrictive, and all embodiments within the scope of the appended claims and their equivalents are included within the scope of the present invention.

도 1은 본 발명에 따른 선단슈의 조립 상태를 나타내는 사시도;1 is a perspective view showing the assembled state of the tip shoe according to the present invention;

도 2는 본 발명에 따른 라인의 외곽에 차수 그라우팅한 상태를 나타내는 평면도;2 is a plan view showing a state grouted to the outside of the line according to the present invention;

도 3a는 본 발명에 따른 라인의 내부에 반력파일을 시공한 상태를 나타내는 평면도;Figure 3a is a plan view showing a state in which a reaction force pile is constructed inside the line according to the present invention;

도 3b 내지 도 3d는 도 3a의 반력파일을 시공하는 과정을 나타내는 정면도;3B to 3D are front views illustrating a process of constructing the reaction force pile of FIG. 3A;

도 4는 본 발명에 따른 선단슈의 상측에 지하구조물과 브라켓 및 유압식 압입장치가 설치된 상태를 나타내는 횡단면도;4 is a cross-sectional view showing a state in which an underground structure, a bracket, and a hydraulic press-fit device are installed on an upper side of a tip shoe according to the present invention;

도 5는 도 4의 지하구조물 내의 하부를 굴착하고 유압식 압입장치를 작동시켜 지하구조물을 지지토록 한 상태를 나타내는 횡단면도;FIG. 5 is a cross-sectional view showing a state in which a lower portion of the underground structure of FIG. 4 is excavated and a hydraulic indentation device is operated to support the underground structure; FIG.

도 6은 도 5의 선단슈 하부를 굴착한 상태를 나타내는 횡단면도;FIG. 6 is a cross-sectional view illustrating a state in which the lower end shoe of FIG. 5 is excavated; FIG.

도 7 및 도 8은 유압식 압입장치를 작동시켜 지하구조물을 지면으로 하강시키는 과정을 나타내는 횡단면도;7 and 8 are cross-sectional views showing a process of lowering the underground structure to the ground by operating the hydraulic indentation device;

도 9a는 본 발명에 따른 가이드 파일을 시공한 상태를 나타내는 평면도;9A is a plan view showing a state in which a guide file is constructed according to the present invention;

도 9b 내지 도 9d는 도 9a의 가이드 파일을 시공하는 과정을 나타내는 정면도; 및9B to 9D are front views illustrating a process of constructing the guide file of FIG. 9A; And

도 10은 본 발명에 따른 토사 이송기를 이용하여 토사를 이송하고 다수의 지하구조물을 적층하여 복수의 지하층으로 시공한 상태를 나타내는 횡단면도;이다.10 is a cross-sectional view illustrating a state in which soil is transported using a soil transporter according to the present invention, and a plurality of underground structures are stacked and constructed in a plurality of underground floors.

* 도면의 주요 부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

10 : 선단슈 11 : 철판10: tip shoe 11: iron plate

12 : 칸막이 철판 13 : 압입날12: partition steel sheet 13: press-in blade

20 : 지하구조물 21 : 철근20: underground structure 21: rebar

22 : H형강 23 : 벽체22: H-beam 23: wall

30 : 라인 40 : 차수 그라우팅30: line 40: order grouting

50 : 가이드 파일 51 : 가이드 파이프50: guide file 51: guide pipe

52 : 오거52: Auger

60 : 반력 파일 61 : 가이드 파이프60: Reaction File 61: Guide Pipe

62 : 오거62: Auger

70 : 브라켓 80 : 유압식 압입장치70: bracket 80: hydraulic press-fit device

90 : 하부 보강재 90: lower reinforcement

100 :토사 이송기 101 : 토사 이송용 버켓100: soil transfer machine 101: bucket for soil transfer

102 : 지지대 103 : 호퍼102: support 103: hopper

104 : 진동모터 104: vibration motor

110 : 평행보110: parallel beam

Claims (6)

지하구조물을 시공할 위치의 지상에서 지하구조물을 제작한 다음 상기 지하구조물 내의 하부 토사를 굴착하고 상기 지하구조물을 지중에 하강시켜 시공하는 지하구조물 하강 시공공법에 있어서,In the underground structure lowering construction method of manufacturing an underground structure on the ground of the location where the underground structure is to be constructed, excavating the bottom soil in the underground structure and lowering the underground structure in the ground, 상기 지하구조물의 형상과 크기에 맞춰 라인을 설정한 후 철판으로 제작되는 선단슈를 상기 라인을 따라 조립 설치하는 제 1단계;A first step of assembling and installing a tip shoe made of a steel plate after setting a line according to the shape and size of the underground structure; 상기 조립된 선단슈를 따라 상측에 내, 외벽체로 구성되는 지하구조물을 형성하고, 상기 지하구조물 하부의 내측면에 다수의 브라켓를 설치하며, 상기 브라켓의 하측면에 유압식 압입장치를 설치하는 제 2단계;A second step of forming an underground structure consisting of the inner, outer wall body along the assembled tip shoe, install a plurality of brackets on the inner side of the lower base structure, and install a hydraulic indentation device on the lower side of the bracket ; 상기 지하구조물 내의 하부 토사를 굴착한 후 상기 유압식 압입장치를 작동시켜 상기 압입장치의 하단을 상기 굴착된 하부 지면까지 이동시킨 후 상기 지하구조물을 지지토록 하는 제 3단계;A third step of excavating the lower soil in the underground structure to operate the hydraulic indentation device to move the lower end of the indentation device to the excavated lower ground and to support the underground structure; 상기 지하구조물에 장착된 선단슈의 하부 토사를 굴착하는 제 4단계;A fourth step of digging the bottom soil of the tip shoe mounted on the underground structure; 상기 유압식 압입장치를 작동시켜 상부에 위치한 상기 지하 구조물을 하측방향으로 이동시키는 제 5단계; 및A fifth step of operating the hydraulic press-fit device to move the underground structure located above the lower direction; And 상기 제 3단계 내지 제 5단계를 반복 실시하여 상기 지하구조물을 소정의 깊이까지 하강 시공하는 제 6단계;로 이루어지는 것을 특징으로 하는 지하구조물 하강 시공공법.Repeating the third to fifth steps to the sixth step of constructing the underground structure down to a predetermined depth; Underground structure falling construction method comprising the. 제 1항에 있어서,The method of claim 1, 제 1단계는,The first step is 주변 지하수가 상기 시공 현장 내 유입되는 것을 방지하기 위하여 상기 라인을 따라 외곽으로 차수 그라우팅하는 단계;를 더 포함하여 이루어지는 것을 특징으로 하는 지하구조물 하강 시공공법.And ground grouting along the line to prevent the surrounding ground water from entering the construction site. 제 1항에 있어서,The method of claim 1, 제 1단계는,The first step is 상기 지하구조물의 지중 하강을 안내하는 가이드 파일을 시공하는 단계;를 더 포함하여 이루어지는 것을 특징으로 하는 지하구조물 하강 시공공법.And constructing a guide file for guiding the underground descent of the underground structure. 제 1항에 있어서,The method of claim 1, 제 1단계는,The first step is 지하구조물이 시공될 지반이 연약층인 경우에는,If the ground where the underground structure is to be constructed is a soft layer, 유압식 압입장치의 하단에 위치하여 견고하게 상기 지하구조물을 지지토록 하기 위한 다수의 반력파일을 상기 라인을 따라 내부에 시공하는 단계;를 더 포함하고,Located at the bottom of the hydraulic indentation device for constructing a plurality of reaction force pile therein along the line for supporting the underground structure firmly; 제 2단계는,The second step is 상기 브라켓의 하측면에 설치되는 유압식 압입장치의 하단이 상기 반력파일에 지지되도록 상기 유압식 압입장치를 설치하는 것을 특징으로 하는 지하구조물의 하강 시공공법.Falling construction method of the underground structure, characterized in that for installing the hydraulic indentation device so that the lower end of the hydraulic indentation device installed on the lower side of the bracket is supported by the reaction force pile. 제 1항 내지 제 4항의 어느 하나의 항에 있어서,The method according to any one of claims 1 to 4, 제 3단계와 제 4단계는,The third and fourth stages are 토사를 굴착하는 경우에, 토사 이송기를 이용하여 굴착된 토사를 지상으로 이송하는 것을 특징으로 하는 지하구조물의 하강 시공공법.In the case of excavation of earth and sand, the construction method for descending underground structures, characterized in that the excavated earth and sand to be transported to the ground using a soil transporter. 제 5항에 있어서,The method of claim 5, 상기 제 6단계 후에,After the sixth step, 소정의 깊이로 하강 시공된 상기 지하구조물의 상부에 다수의 지하구조물을 적층하여 다수의 지하층으로 시공하는 지하구조물의 하강 시공공법.Falling construction method of the underground structure to be constructed in a plurality of basement by stacking a plurality of underground structures on top of the underground structure to be constructed to a predetermined depth.
KR1020080053431A 2008-06-09 2008-06-09 The Construction Method of Descenting Underground Structure KR100984898B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080053431A KR100984898B1 (en) 2008-06-09 2008-06-09 The Construction Method of Descenting Underground Structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080053431A KR100984898B1 (en) 2008-06-09 2008-06-09 The Construction Method of Descenting Underground Structure

Publications (2)

Publication Number Publication Date
KR20090127450A KR20090127450A (en) 2009-12-14
KR100984898B1 true KR100984898B1 (en) 2010-10-01

Family

ID=41688120

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080053431A KR100984898B1 (en) 2008-06-09 2008-06-09 The Construction Method of Descenting Underground Structure

Country Status (1)

Country Link
KR (1) KR100984898B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101209392B1 (en) 2010-11-29 2012-12-06 위성배 The Pressing Device of Underground Structure
KR101314300B1 (en) 2012-02-01 2013-10-02 위성배 The Front Header for Pressing Underground Structure
KR102113117B1 (en) * 2019-10-22 2020-05-20 김준성 Structure construction method using guide wall
KR20210014938A (en) 2019-07-31 2021-02-10 위성배 The Pressing Device of Underground Structure

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101222348B1 (en) * 2010-04-22 2013-01-16 위성배 The Supporting Structure and Pressing device of Underground Structure
KR101292671B1 (en) * 2012-02-15 2013-08-16 삼성물산 주식회사 Elevator pit construction method using vir method
CN106436806A (en) * 2016-08-26 2017-02-22 上海建工二建集团有限公司 Perpendicular spiral conveying soil crushing mechanical device and usage method thereof
KR102127487B1 (en) 2020-01-17 2020-06-29 영인산업 주식회사 Construction method of vertical shaft structure using elastic shoe and segment-weight and vertical shaft structure therewith
CN111576444B (en) * 2020-06-01 2021-02-09 广东佰业泰建设工程有限公司 Underground supporting structure of foundation pit and construction process thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07180164A (en) * 1993-12-22 1995-07-18 Taisei Corp Construction method of underground concrete body
JPH08177055A (en) * 1994-12-26 1996-07-09 Daiho Constr Co Ltd Press-in caisson
JP2003293378A (en) 2002-04-02 2003-10-15 Yamaha Kako Kensetsu Kk Jacking device and method for caisson
JP2007023618A (en) 2005-07-15 2007-02-01 Zenitaka Corp Caisson skeleton, caisson jacking method using the caisson skeleton, and frication reducing sheet

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07180164A (en) * 1993-12-22 1995-07-18 Taisei Corp Construction method of underground concrete body
JPH08177055A (en) * 1994-12-26 1996-07-09 Daiho Constr Co Ltd Press-in caisson
JP2003293378A (en) 2002-04-02 2003-10-15 Yamaha Kako Kensetsu Kk Jacking device and method for caisson
JP2007023618A (en) 2005-07-15 2007-02-01 Zenitaka Corp Caisson skeleton, caisson jacking method using the caisson skeleton, and frication reducing sheet

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101209392B1 (en) 2010-11-29 2012-12-06 위성배 The Pressing Device of Underground Structure
KR101314300B1 (en) 2012-02-01 2013-10-02 위성배 The Front Header for Pressing Underground Structure
KR20210014938A (en) 2019-07-31 2021-02-10 위성배 The Pressing Device of Underground Structure
KR102113117B1 (en) * 2019-10-22 2020-05-20 김준성 Structure construction method using guide wall

Also Published As

Publication number Publication date
KR20090127450A (en) 2009-12-14

Similar Documents

Publication Publication Date Title
KR100984898B1 (en) The Construction Method of Descenting Underground Structure
KR100788623B1 (en) Top-down method using precast-concrete colum
RU2414563C1 (en) Method to erect multistory subsurface structure
KR20060092552A (en) The non-strut down framework construction method of having used cast in place concrete pile
KR20140055639A (en) A execution method of architecture beam
KR101843023B1 (en) Shear connector for temporary retaining wall file and building outer wall, and method for constructing an underground structure using thereof
US20040096277A1 (en) Subterranean structrues and methods for constructing subterranean structures
KR101296857B1 (en) Underground structure having slab beam with enhanced bearing power against earth pressure and construction methods of the same
KR101296856B1 (en) Reinforcement structure for wall of underground structure and construction method of underground structure using the same
JP2000352296A (en) Method o constructing passage just under underground structure
KR100673475B1 (en) A pc girder member for frame of underground layer and assembling structure of frame of underground by using of it and the method therof
KR20080025219A (en) Underground outer wall construction method using deck-plate and deck-plate for constructing underground outer wall
KR20100118482A (en) To use reclamation steel perimeter beam and slab diaphragm effect in order for one side of the basement outer wall continuous construct was possible ,which the basement infrastructure construction method
KR102021496B1 (en) Retaining wall construction method and retaining wall structure by the method
KR101222348B1 (en) The Supporting Structure and Pressing device of Underground Structure
KR101128955B1 (en) The Construction Method of Pressing Underground Structure
KR20190012368A (en) Smallcaliber composite pile wall using small drilling rig at adjacent building proximity section and construction method of the same
KR101168803B1 (en) The Method for constructing Underground Structure
KR101151052B1 (en) The deepened sheet plate made of an iron reinforcing rod and the method of installation
JP6938198B2 (en) Construction method
JP6534026B2 (en) Seismic isolation building and its construction method
KR20200088659A (en) Top-down type underground structure construction method using earth support plate
KR101079188B1 (en) The Method for Construction Walls of Underground Structure
KR102608174B1 (en) Pre-stressed rectangular pile structure for rataining wall and rataining wall constructing method using the pre-stressed rectangular pile structure
KR102149709B1 (en) Deformation prevention method of files for retaining wall of underground

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20140929

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20150930

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20161123

Year of fee payment: 7

LAPS Lapse due to unpaid annual fee