KR100981091B1 - Construction method for repairing/reinforcing concrete structure - Google Patents

Construction method for repairing/reinforcing concrete structure Download PDF

Info

Publication number
KR100981091B1
KR100981091B1 KR1020090101362A KR20090101362A KR100981091B1 KR 100981091 B1 KR100981091 B1 KR 100981091B1 KR 1020090101362 A KR1020090101362 A KR 1020090101362A KR 20090101362 A KR20090101362 A KR 20090101362A KR 100981091 B1 KR100981091 B1 KR 100981091B1
Authority
KR
South Korea
Prior art keywords
reinforcement
reinforcing
culvert
concrete structure
repair
Prior art date
Application number
KR1020090101362A
Other languages
Korean (ko)
Inventor
정재운
Original Assignee
리플래시기술 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 리플래시기술 주식회사 filed Critical 리플래시기술 주식회사
Priority to KR1020090101362A priority Critical patent/KR100981091B1/en
Application granted granted Critical
Publication of KR100981091B1 publication Critical patent/KR100981091B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F5/00Draining the sub-base, i.e. subgrade or ground-work, e.g. embankment of roads or of the ballastway of railways or draining-off road surface or ballastway drainage by trenches, culverts, or conduits or other specially adapted means
    • E01F5/005Culverts ; Head-structures for culverts, or for drainage-conduit outlets in slopes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Sewage (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

PURPOSE: A repair work of concrete structure and a reinforcing method thereof, which structurally stabilizes a culvert used as a concrete structure, is provided to improve the adhesive force of a reinforcing support and to increase a resistance load force effect. CONSTITUTION: A repair work of concrete structure repairing and a reinforcing method are as follows. A plurality of anchors is established in the adjusted repair, and the reinforcing support phase surface. A reinforcement material(20) is established in the outside of the installed anchor. A finishing material(40) is established in the outside of the installed reinforcing member. A filling space is formed between repair, and the reinforcing support phase surface. Mortar is injected into the formed space.

Description

콘크리트 구조물 보수ㆍ보강공법{Construction Method for Repairing/Reinforcing Concrete Structure}Construction Method for Repairing / Reinforcing Concrete Structure

본 발명은 콘크리트 구조물, 특히 사각의 박스 형상으로 형성되고 하수관 또는 공동구, 전력구 등으로 이용되는 암거(이하, 박스암거라 한다)를 구조적으로 안정화시키는 보수ㆍ보강공법에 관한 것이다.BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a repair and reinforcement method for structurally stabilizing a culvert (hereinafter referred to as a box culvert), which is formed in a concrete structure, particularly in a rectangular box shape, and is used as a sewer pipe, a cavity tool, or an electric power tool.

일반적으로, 콘크리트 구조물은 시간이 경과함에 따라 사용 콘크리트의 품질 문제, 소홀한 관리, 기계적ㆍ물리적ㆍ화학적 작용, 주변환경의 영향 등을 원인으로 하는 열화에 의하여 그 수명이 급속히 단축된다. 즉, 열화현상에 따르면, 콘크리트 구조물에는 미세균열이 발생되는데, 이 미세균열은 콘크리트 구조물의 표면에서 내부까지 침투되어 콘크리트의 박리, 탈락 등을 촉진하고, 이 문제는 곧 콘크리트 구조물의 단면 감소로 이어져서, 콘크리트 구조물은 내하력(구조물의 하중을 견딜 수 있는 힘)이 저하된다.In general, concrete structures are rapidly shortened over time due to deterioration caused by quality problems, neglected management, mechanical, physical and chemical effects, and the influence of the surrounding environment. That is, according to the deterioration phenomenon, microcracks are generated in the concrete structure, and the microcracks penetrate from the surface of the concrete structure to the inside to promote the peeling and dropping of the concrete, which leads to the reduction of the cross section of the concrete structure. As a result, the concrete structure has a lower load capacity (a force that can withstand the load of the structure).

내하력이 저하된 콘크리트 구조물은 그 사용수명을 장구히 할 목적으로 보수하고 보강한다. 특히나, 박스암거와 같이 천장부분을 가지는 콘크리트 구조물의 경우, 천장부분의 단면 감소는 구조물의 붕괴를 유발할 수 있으므로 반드시 보수ㆍ보 강하여야 한다.Concrete structures with reduced load capacity are repaired and reinforced for the purpose of prolonging their service life. In particular, in the case of concrete structures with ceiling parts, such as box culverts, the reduction of the cross-section of the ceiling parts may cause the structure to collapse, which must be repaired and reinforced.

그러나 이전까지의 콘크리트 구조물 보수ㆍ보강공법을 살펴보면, 벌어지거나 패인 부분(보수ㆍ보강대상)에 모르타르를 채워 메우거나 보수ㆍ보강대상 표면에 모르타르를 일정한 두께로 덧씌워서 단면을 증가시키는 수준의 방식 정도가 고작이었는바, 우수한 내하력 증진효과를 기대할 수 없었다. 물론, 이 밖으로는 보수ㆍ보강대상 표면에 철판이나 수지 함침 강화섬유판을 부착하는 방식도 있으나, 철판의 경우에는 부식 등으로 인하여 강도가 급격하게 저하되어 빈번한 유지ㆍ보수가 요구된다는 문제가 있었고, 강화섬유판의 경우에는 보수ㆍ보강대상 표면으로부터 쉽게 탈락되어 부착력 보완이 요구된다는 문제가 있었다.However, if you look at the repair and reinforcement methods of the concrete structure before, the level of the method of increasing the cross-section by filling the mortar in the gap or indented part (object to be repaired and reinforced) or by covering the surface of the object to be repaired and reinforced with a certain thickness. At best, it was not possible to expect an excellent load-bearing effect. Of course, there is a method of attaching an iron plate or a resin impregnated reinforced fiber board to the surface to be repaired or reinforced, but in the case of an iron plate, there is a problem that the strength is sharply lowered due to corrosion and frequent maintenance and repair is required. In the case of the fiberboard, there is a problem in that it is easily detached from the surface to be repaired and reinforced, and the supplementation of the adhesive force is required.

본 발명의 목적은 보수ㆍ보강대상과의 우수한 부착력, 향상된 내하력 증진효과 등을 기대할 수 있는 콘크리트 구조물 보수ㆍ보강공법을 제공하는 데 있다.An object of the present invention is to provide a concrete structure repair and reinforcement method that can be expected to have excellent adhesion to the repair and reinforcement object, improved load capacity enhancement effect.

본 발명의 실시예에 따르면, 콘크리트 구조물의 보수ㆍ보강대상 표면을 정리하는 단계와; 상기 정리된 보수ㆍ보강대상 표면에 복수 개의 앵커를 설치하는 단계와; 상기 설치된 앵커의 외측에 보강재를 설치하는 단계와; 상기 보수ㆍ보강대상 표면과의 사이에 모르타르 충전공간이 형성되도록 상기 설치된 보강재의 외측에 마감재를 설치하는 단계와; 상기 형성된 모르타르 충전공간에 모르타르를 충전하여 모르타르 층을 형성하는 단계를 포함하는 콘크리트 구조물 보수ㆍ보강공법이 제공 된다. 이것에 의하면, 콘크리트 슬래브 등 각종 콘크리트 구조물의 콘크리트 면(예를 들어, 천장이나 바닥, 또는 측벽 등)을 보수ㆍ보강하여 콘크리트 구조물의 내하력을 증진시킬 수 있다.According to an embodiment of the invention, the step of arranging the surface to be repaired and reinforced the concrete structure; Providing a plurality of anchors on the summarized maintenance and reinforcement surface; Installing a reinforcing material on an outer side of the installed anchor; Providing a finishing material on an outer side of the installed reinforcing material such that a mortar filling space is formed between the surface to be repaired and reinforced; There is provided a repair and reinforcement method for a concrete structure including filling a mortar with the formed mortar filling space to form a mortar layer. According to this, the concrete surface (for example, ceiling, floor, side wall, etc.) of various concrete structures, such as a concrete slab, can be repaired and reinforced, and the load capacity of a concrete structure can be improved.

상기 콘크리트 구조물은 박스형의 암거이고, 상기 보수ㆍ보강대상 표면은 상기 암거의 천장이며, 상기 마감재는 가운데가 좌우에 비하여 높은 아치형의 구조를 가지도록 구성되어, 상기 모르타르 층은 하부가 오목한 곡선형의 구조를 가질 수 있다.The concrete structure is a box-shaped culvert, the surface to be repaired / reinforced is the ceiling of the culvert, and the finishing material is configured to have a high arcuate structure compared to the left and right in the middle, and the mortar layer has a curved concave bottom. It may have a structure.

여기에서, 상기 보강재는 상기 암거의 횡방향으로 배열된 주력근과; 상기 주력근 위에 상기 암거의 종방향으로 배열된 배력근을 포함하고, 상기 주력근과 배력근은 복수 개씩 구비되어, 상기 보강재는 격자 구조를 가질 수 있다.Here, the reinforcing member and the main power cord arranged in the transverse direction of the culvert; It includes a lifting muscles arranged in the longitudinal direction of the culvert on the main muscles, the main muscles and a plurality of power muscles are provided in plurality, the reinforcement may have a lattice structure.

또한, 상기 주력근은 가운데가 양단에 비하여 높은 아치형으로 형성될 수 있다. 또, 상기 주력근의 배근작업에는 상기 암거의 좌우 측벽에 서로 대향하도록 설치되는 것으로 상기 주력근의 끝 부분과 결합됨과 아울러 상기 암거의 횡방향과 나란한 축선을 중심으로 회전하는 회전유닛을 갖춘 마운팅장치가 이용될 수 있다. 그리고 상기 마운팅장치는 상기 암거의 측벽에 앞부분이 매몰되는 앵커 바디와; 상기 앵커 바디의 뒷부분에 회전 가능하도록 결합된 회전부재와; 상기 회전부재의 바깥둘레에 구멍이 상기 회전부재의 회전중심과 수직을 이루도록 장착되며 상기 주력근의 끝 부분이 삽입되는 고리부재를 포함하되, 상기 회전부재 및 고리부재는 상기 회전유닛을 구성하고, 상기 주력근은 양쪽 끝 부분이 아치의 곡률중심과 나란하도록 절곡될 수 있다. 이 때, 상기 앵커 바디와 회전부재는 서로 나사 결합될 수 있 다. 상기 마감재와 주력근은 아치의 곡률과 곡률중심이 서로 동일할 수 있다.In addition, the main muscle may be formed in a high arcuate shape compared to both ends in the middle. In addition, the reinforcement work of the main muscles is installed so as to face each other on the left and right side walls of the culvert is coupled with the end portion of the main muscle and a mounting device having a rotation unit that rotates about an axis parallel to the transverse direction of the culvert Can be used. The mounting apparatus includes an anchor body in which a front portion is buried in the side wall of the culvert; A rotating member rotatably coupled to a rear portion of the anchor body; A hole is mounted on the outer periphery of the rotating member to be perpendicular to the center of rotation of the rotating member and includes a ring member into which the end portion of the main muscle is inserted, wherein the rotating member and the ring member constitute the rotating unit. The main muscle may be bent such that both ends are parallel to the center of curvature of the arch. At this time, the anchor body and the rotating member may be screwed together. The finish and the main muscle may be the same as the curvature and the center of curvature of the arch.

한편, 상기 앵커는 상기 보수ㆍ보강대상에 앞부분이 매몰되는 앵커 바디와; 상기 앵커의 앵커 바디의 뒷부분에 사각의 망상부재를 포함하고, 상기 망상부재는 그 가로재 및 세로재의 일부가 상측으로 볼록하도록 가공된 것일 수 있다.On the other hand, the anchor and the anchor body is buried in the front portion to the maintenance and reinforcement object; A rectangular network member is included at the rear portion of the anchor body of the anchor, and the network member may be processed so that a part of the horizontal member and the vertical member are convex upward.

상기 마감재는 상기 보수ㆍ보강대상 표면과 마주하는 내측에 요철 구조가 마련될 수 있다. 이 때, 상기 요철 구조의 볼록한 철(凸)부는 횡단면이 T자형일 수 있다. 또, 상기 마감재는 상기 요철 구조와 결합되는 보강용 강재를 포함할 수 있다.The finishing material may be provided with an uneven structure on the inner side facing the repair and reinforcement surface. At this time, the convex convex portion of the concave-convex structure may have a T-shaped cross section. In addition, the finishing material may include a reinforcing steel material coupled with the uneven structure.

다른 한편, 상기 콘크리트 구조물은 박스형의 암거이고, 상기 보수ㆍ보강대상 표면은 상기 암거의 바닥이며, 상기 마감재는 상기 모르타르 충전공간이 상기 암거의 좌우 측벽의 하단부에 걸쳐 형성되도록 좌우가 상측으로 구부러진 구조를 가질 수 있다. 이 때, 상기 보강재는 철망 또는 격자형으로 배근된 철근으로 구성될 수 있다.On the other hand, the concrete structure is a box-shaped culvert, the surface to be repaired / reinforced is the bottom of the culvert, and the finishing material has a structure in which the left and right bent upwards so that the mortar filling space is formed over the lower end portions of the left and right sidewalls of the culvert. It can have At this time, the reinforcing material may be composed of reinforcing bar reinforced with a wire mesh or grid.

본 발명에 따른 콘크리트 구조물 보수ㆍ보강공법에 의하면, 안정성 측면에서 한층 향상된 보수ㆍ보강구조를 제공할 수 있다는 이점이 있다.According to the concrete structure repair and reinforcement method according to the present invention, there is an advantage that a repair and reinforcement structure can be further improved in terms of stability.

이하에서는 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 설명한다. 참고로, 본 발명을 설명함에 있어서, 참조하는 도면에 도시된 구성요소의 크기, 선의 두께 등은 이해의 편의를 위하여 다소 과장되게 표현되어 있을 수 있다. 또, 본 발명의 설명에 사용되는 용어들은 본 발명에서의 기능을 고려하여 정의한 것이므로 사용자, 운용자의 의도, 관례 등에 따라 달라질 수 있다. 따라서 이러한 용어에 대한 정의는 이 명세서의 전반에 걸친 내용을 토대로 내리는 것이 마땅하겠다.Hereinafter, with reference to the accompanying drawings will be described a preferred embodiment of the present invention. For reference, in describing the present invention, the size of the components shown in the accompanying drawings, the thickness of the line, etc. may be somewhat exaggerated for convenience of understanding. In addition, since terms used in the description of the present invention are defined in consideration of functions in the present invention, they may be changed according to intentions of users, operators, and the like. Therefore, the definition of these terms should be based on the contents throughout the specification.

[제1실시예][First Embodiment]

도 1은 본 발명의 제1실시예에 따른 공법으로 보수ㆍ보강된 콘크리트 구조물을 나타내는 사시도로, 여기에 도시된 콘크리트 구조물은 박스암거(5)이다. 도 1에 도시된 바와 같이, 제1실시예에 따른 공법은 박스암거(5)의 천장(5c)을 보수ㆍ보강대상 표면으로 한다. 그리고 제1실시예에 따른 공법에 의하여 시공된 보수ㆍ보강구조는 박스암거(5)의 천장(이하, 제1대상표면이라 한다)(5c)에 설치된 앵커(10), 제1대상표면(5c)과의 사이에 모르타르 충전공간(이하, 제1공간이라 한다)(도 6a 내지 도 6c의 도면부호 S1 참조)을 마련하는 마감재(40), 제1공간(S1)에 설치된 보강재(20) 및 제1공간(S1)에 충전된 모르타르 층(70)을 포함한다.1 is a perspective view showing a concrete structure repaired and reinforced by the method according to the first embodiment of the present invention, wherein the concrete structure shown here is a box culvert 5. As shown in Fig. 1, the method according to the first embodiment makes the ceiling 5c of the box culvert 5 a surface to be repaired and reinforced. The repair and reinforcement structure constructed by the construction method according to the first embodiment includes the anchor 10 and the first target surface 5c installed on the ceiling (hereinafter referred to as the first target surface) 5c of the box culvert 5. And a finishing material 40 to provide a mortar filling space (hereinafter referred to as a first space) (see reference numeral S1 in FIGS. 6A to 6C), a reinforcing material 20 installed in the first space S1, and It includes a mortar layer 70 filled in the first space (S1).

도 2는 본 발명의 제1실시예에 따른 보수ㆍ보강공법을 나타내는 순서도이고, 도 3 내지 도 7은 도 2에 도시된 보수ㆍ보강공법의 각 단계를 구체적으로 나타내는 도면이다. 제1실시예에 따른 보수ㆍ보강공법은 다음과 같이 진행된다.2 is a flowchart showing a repair and reinforcement method according to the first embodiment of the present invention, and FIGS. 3 to 7 are views showing in detail each step of the repair and reinforcement method shown in FIG. The repair and reinforcement method according to the first embodiment proceeds as follows.

1. 보수ㆍ보강대상 표면 정리단계(도 3 참조)1. Surface cleaning step for repair and reinforcement (see Fig. 3)

박스암거(5)의 천장(5c) 중 보수ㆍ보강이 필요한 구간을 선정, 이를 제1대상표면(5c)으로 한다. 이에 따라, 제1대상표면(5c)은 박스암거(5)의 천장(5c) 전체가 될 수도 있고 일부가 될 수도 있다.A section requiring repair and reinforcement is selected from the ceiling 5c of the box culvert 5, and this is the first target surface 5c. Accordingly, the first target surface 5c may be the whole or part of the ceiling 5c of the box culvert 5.

다음, 제1대상표면(5c)의 이물질을 그라인더(grinder)나 브러시(brush) 등으 로 깨끗하게 제거한다. 또, 제1대상표면(5c)에 열화부위가 있을 시, 이 열화부위는 콘크리트 치핑(chipping) 작업으로 양호한 콘크리트가 나타날 때까지 제거한다. 아울러, 필요한 경우에는 방청(防??)작업을 할 수도 있다. 끝으로, 에어 건(air gun) 따위를 이용하여 제1대상표면(5c)의 먼지를 제거하는 등 제1대상표면(5c)을 세정한다.Next, the foreign matter on the first target surface 5c is removed with a grinder or a brush. In addition, when there is a deterioration site | part on the 1st target surface 5c, this deterioration site is removed by concrete chipping operation until good concrete appears. In addition, if necessary, rust prevention (防 ??) can also be performed. Finally, the first target surface 5c is cleaned by using an air gun or the like to remove dust from the first target surface 5c.

2. 앵커(anchor)(10) 설치단계(도 4a, 4b 참조)2. Anchor (10) installation step (see Figure 4a, 4b)

도 4a는 앵커(10) 설치단계가 도시된 정단면도이고, 도 4b는 앵커(10)가 도시된 사시도이다.Figure 4a is a front sectional view showing the anchor 10 installation step, Figure 4b is a perspective view showing the anchor 10.

정리된 제1대상표면(5c)에 스테인리스 스틸이나 황동으로 이루어진 앵커(10)를 설치한다. 이 때, 바람직하게는 1㎡당 적어도 두 개가 배치되도록 균일간격으로 설치한다.An anchor 10 made of stainless steel or brass is installed on the arranged first target surface 5c. At this time, preferably at least two per m 2 are installed at uniform intervals.

앵커(10)는 앵커 바디(12) 및 망상부재(14)를 포함한다. 앵커 바디(12)는 제1대상표면(5c)에 앞부분(선단 부분)이 매몰되어 뒷부분이 노출된다. 망상부재(14)는 납작한 사각판상으로 형성되고 앵커 바디(12)의 노출부인 후단 측에 이 앵커 바디(12)와 수직을 이루도록 장착되어, 앵커(10)는 전체적으로 보았을 때 대략 T자형으로 형성된다. 망상부재(14)는 또, 복수의 가로재(15)와 세로재(16)로 구성되고 이 가로재(15)와 세로재(16)에 의하여 망상 구조를 가지는데, 각 가로재(15)와 세로재(16)는 그 일부가 상측으로 볼록하도록 가공된다. 이 때, 가로재(15)와 세로재(16)의 볼록한 부분(15p)(16p)은 호형으로 형성된다.The anchor 10 includes an anchor body 12 and a reticular member 14. The anchor body 12 is buried in the front portion (leading end portion) on the first target surface 5c, and the rear portion is exposed. The reticular member 14 is formed in a flat rectangular plate shape and is mounted on the rear end side of the exposed portion of the anchor body 12 so as to be perpendicular to the anchor body 12, and the anchor 10 is generally formed in a T shape when viewed as a whole. . The reticular member 14 is also composed of a plurality of cross members 15 and vertical members 16 and has a reticulated structure by the cross members 15 and the vertical members 16, each of which has a mesh member 15. The vertical member 16 is processed so that a portion thereof is convex upward. At this time, the convex portions 15p and 16p of the horizontal member 15 and the vertical member 16 are formed in an arc shape.

3. 보강재(20) 설치단계(도 5a 내지 도 5d 참조)3. Reinforcing material 20 installation step (see Fig. 5a to 5d)

도 5a, 도 5b는 보강재(20) 설치단계가 도시된 정단면도이고, 도 5c는 보강재(20)의 설치에 이용되는 마운팅장치(30)가 도시된 사시도이며, 도 5d는 도 5의 B 부분 확대도이다.5a and 5b are front cross-sectional views showing the installation step of the reinforcement 20, Figure 5c is a perspective view showing a mounting apparatus 30 used for the installation of the reinforcement 20, Figure 5d is a portion B of Figure 5 It is an enlarged view.

이 단계에서는 앵커(10) 설치단계에서 설치된 앵커(10)의 하측에 보강재(20)로서 철근(바람직하게는, 이형철근)을 설치하는데, 이 보강재(20)로서의 철근은 주력근(22) 및 배력근(24)을 포함한다.In this step, the reinforcing bar (preferably, deformed reinforcing bar) is installed as the reinforcing material 20 under the anchor 10 installed in the anchor 10 installation step. A back muscle 24 is included.

주력근(22)은 박스암거(5)의 횡방향으로 설치되고 복수 개 구비되며 이 박스암거(5)의 종방향을 따라 서로 이격되도록 일정한 간격(바람직하게는, 동일간격)을 두고 배치된다. 이러한 주력근(22)은 만곡하게 구부러져 그 가운데가 좌우(양단)에 비하여 높은 아치형 구조를 가진다.The main roots 22 are installed in the transverse direction of the box culvert 5 and are provided in plurality, and are arranged at regular intervals (preferably equal intervals) to be spaced apart from each other along the longitudinal direction of the box culvert 5. The main root 22 is bent in a curved shape has a high arcuate structure compared to the left and right (both ends).

이와 같은 주력근(22)의 배근에는 마운팅장치(30)가 이용된다. 이 마운팅장치(30)는 박스암거(5)의 측벽(5s)에 선단 부분인 앞부분이 매몰되어 뒷부분이 외부로 노출된 상태로 정착되는 앵커 바디(32), 이 마운팅장치(30)의 앵커 바디(32)의 노출 부분인 뒷부분에 회전 가능하도록 결합된 회전부재(34), 이 회전부재(34)의 바깥둘레에 장착된 고리부재(36)를 포함한다.The mounting apparatus 30 is used for the reinforcement of the main muscle 22 as described above. The mounting device 30 has an anchor body 32 in which the front part, which is a tip part, is buried in the side wall 5s of the box culvert 5 and is fixed while the rear part is exposed to the outside, the anchor body of the mounting device 30. Rotating member 34 rotatably coupled to the rear portion, which is an exposed portion of (32), and a ring member 36 mounted on the outer circumference of the rotating member 34.

여기에서, 앵커 바디(32)의 뒷부분은 스크루 로드(32s)로 구성되어 수나사를 가진다. 회전부재(34)는 이 스크루 로드(32s)와 나사 결합되는 너트로 구성되어 스크루 로드(32s)의 중심을 기준으로 하여 회전하고 회전방향에 이 스크루 로드(32s)의 길이방향을 따라 이동한다. 고리부재(36)에는 주력근(22)의 끝 부분이 삽입되어 결합된다. 고리부재(36)는 주력근(22)이 삽입되는 구멍이 회전부재(34)의 회전중심 과 수직을 이루도록 배치된다.Here, the rear part of the anchor body 32 is composed of a screw rod 32s to have a male screw. The rotating member 34 is comprised of the nut which is screwed with this screw rod 32s, rotates about the center of the screw rod 32s, and moves along the longitudinal direction of this screw rod 32s in a rotational direction. The end of the main muscle 22 is inserted into the ring member 36 is coupled. The ring member 36 is disposed such that the hole into which the main muscle 22 is inserted is perpendicular to the center of rotation of the rotating member 34.

이 같은 마운팅장치(30)는 박스암거(5)의 좌우 측벽(5s)에 서로 정면으로 마주 하는 것과 동시에, 박스암거(5)의 종방향을 따라 일정한 간격을 두고 설치된다. 물론, 마운팅장치(30)가 박스암거(5)의 종방향을 따라 배치되는 간격은 주력근(22)의 배치간격과 동일하다. 서로 대향하는 두 마운팅장치(30)의 고리부재(36)에는 주력근(22)의 양단부가 각각 삽입되고, 주력근(22)의 양단 부분은 이것이 가능하도록 주력근(22)의 아치부분의 곡률중심과 나란하도록 절곡된다.The mounting apparatus 30 faces the front left and right side walls 5s of the box culvert 5 at the same time, and is installed at regular intervals along the longitudinal direction of the box culvert 5. Of course, the interval at which the mounting apparatus 30 is disposed along the longitudinal direction of the box culvert 5 is the same as the interval at which the main muscle 22 is disposed. Both ends of the main root 22 are respectively inserted into the ring members 36 of the two mounting apparatus 30 facing each other, and both ends of the main root 22 are curvature of the arch portion of the main root 22 so that this is possible. It is bent parallel to the center.

주력근(22)의 경우, 고리부재(36)에 절곡된 양단 부분을 삽입 시에는 상하가 뒤바뀌도록 뒤집은 상태에서 작업이 이루어지고, 이후에는 약 180도 회전시켜(회전부재와 고리부재도 함께 동일방향으로 회전된다) 아치부분의 가운데가 상측을 향하도록 한다.(도 5b 참조) 이 과정에서, 서로 마주 보는 두 마운팅장치(30)는 회전부재(34)를 회전시키면 고리부재(36) 사이의 간격이 이격되거나 접근되도록 변경되는바, 두 고리부재(36) 사이의 간격을 적절히 조절할 수 있다.In the case of the main muscle (22), when the bent end portion is inserted into the ring member 36, the work is performed in a state of upside down to reverse, and then rotated about 180 degrees (rotating member and the ring member together with The center of the arch portion is directed upward (see FIG. 5B). In this process, the two mounting apparatuses 30 facing each other rotate the rotating member 34 between the ring members 36. The interval of the bar is changed to be spaced or approached, it is possible to appropriately adjust the interval between the two ring member (36).

배력근(24)은 주력근(22)의 상측에 박스암거(5)의 종방향으로 배근되고 복수 개 구비되며 박스암거(5)의 횡방향을 따라 일정한 간격(바람직하게는, 동일간격)을 두고 배치되어 서로 이격된다. 이렇게 배근되는 배력근(24)은 주력근(22)과 교차하여 이 주력근(22)과 함께 격자 구조를 이루며 이 상태로 결속와이어에 의하여 주력근(22)과 결속된다.The back muscles 24 are arranged in the longitudinal direction of the box culvert 5 on the upper side of the main root 22, and are provided in plurality, and have a predetermined interval (preferably the same interval) along the transverse direction of the box culvert 5. Spaced apart from one another. The reinforcement muscles 24 thus arranged intersect with the main muscles 22 to form a lattice structure with the main muscles 22, and are bound to the main muscles 22 by the binding wires in this state.

한편, 여기에서는 앵커(10) 설치단계 이후, 보강재(20) 설치단계를 진행하는 것으로 설명하였으나, 이 두 단계는 병행될 수도 있다.On the other hand, it is described here that after the anchor 10 installation step, proceed to the installation step of the reinforcing material 20, these two steps may be performed in parallel.

4. 마감재(40) 설치단계(도 6a 내지 도 6c 참조)4. Finishing step 40 installation step (see Fig. 6a to 6c)

도 6a는 마감재(40) 설치단계가 도시된 정단면도이고, 도 6b는 도 6a의 C-C선 단면도이며, 도 6c는 도 6a의 D 부분 확대도이다.FIG. 6A is a front sectional view showing the finishing material 40 installation step, FIG. 6B is a sectional view taken along the line C-C of FIG. 6A, and FIG. 6C is an enlarged view of part D of FIG. 6A.

이 마감재(40) 설치단계에서는 격자형으로 배근된 철근(22)(24)의 하측에 거푸집의 역할을 하는 마감재(40)를 설치하여 이 마감재(40)와 제1대상표면(5c) 사이에 제1공간(S1)을 마련한다.In the finishing material 40 installation step, a finishing material 40 serving as a formwork is installed below the reinforcing bars 22 and 24 arranged in a lattice shape, between the finishing material 40 and the first target surface 5c. The first space S1 is provided.

마감재(40)는 경질 염화비닐수지로 이루어진다. 마감재(40)는 박스암거(5)와 유사한 좌우 너비를 가지며 그 가운데가 좌우에 비하여 높은 아치 형상으로 형성된다. 이 때, 마감재(40)는 바람직하게는 그 아치의 곡률 및 그 중심이 주력근(22)의 그것과 동일하도록 형성된다.Finishing material 40 is made of a hard vinyl chloride resin. Finishing material 40 has a left and right width similar to the box culvert 5 and the center is formed in a high arch shape compared to the left and right. At this time, the finishing material 40 is preferably formed such that the curvature of the arch and its center are the same as that of the main muscle 22.

이와 같은 아치형의 마감재(40)는 제1대상표면(5c)과 마주 보는 내측에 요철 구조가 마련되는데, 이 요철 구조의 오목한 요(凹)부(42)와 볼록한 철(凸)부(44)는 마감재(40)의 둘레방향(박스암거의 횡방향)으로 형성된다. 이 때, 철부(44)는 횡단면이 T자형으로 형성되고, 이에 따라 요부(42)의 경우에는 2단으로 형성되어 홈의 폭이 입구에 비하여 확장된 구조를 가진다.The arcuate finishing material 40 is provided with a concave-convex structure on the inner side facing the first target surface 5c, the concave concave portion 42 and the convex convex portion 44 of the concave-convex structure. Is formed in the circumferential direction of the finishing material 40 (the transverse direction of the box culvert). At this time, the convex portion 44 has a T-shaped cross section, and thus, in the case of the recessed portion 42, the concave portion 42 is formed in two stages so that the width of the groove is extended compared to the entrance.

마감재(40)는 요철 구조와 결합되는 보강용 강재(46)를 포함하는데, 이 보강용 강재(46)는 그 횡단면이 W자형으로 형성되어 가운데 부분은 철부(44)를 커버하고 양쪽 부분은 이 철부(44)와 이웃하는 요부(42)에 각각 삽입(삽입되면 탄성에 의하여 벌어져 의도하지 않은 결합 해제가 방지된다)됨으로써 마감재(40)를 구조적으로 보강한다.Finishing material 40 includes a reinforcing steel 46 coupled with the uneven structure, the reinforcing steel 46 is formed in a U-shaped cross section, the middle portion covers the convex portion 44 and both parts are The insert 44 is inserted into the convex portion 44 and the neighboring recessed portion 42, respectively.

마감재(40)의 설치에는 복수 개의 행거(50)가 이용되는바, 이 행거(50)에 의하여 철근(22)(24)에 매달려 있도록 설치된다. 행거(50)는 바람직하게는 그 상단이 배력근(24)에 연결된다. 행거(50)의 하단에는 후크(52)가 마련되는데, 이 후크(52)는 마감재(40)의 요부(42)에 끼워져 결합된다.A plurality of hangers 50 are used for the installation of the finishing material 40, and the hangers 50 are installed to be suspended from the rebars 22 and 24 by the hangers 50. The hanger 50 is preferably connected at its upper end to the power muscle 24. The lower end of the hanger 50 is provided with a hook 52, the hook 52 is fitted to the recessed portion 42 of the finishing material 40 is coupled.

마감재(40)의 세팅이 완료되면, 마감재(40)와 박스암거(5)의 좌우 측벽(5s) 사이에 밀봉재(60)를 주입하여 틈새를 메운다. 또, 제1대상표면(5c)과 마감재(40) 사이의 공간(제1공간)도 그 개방된 전후를 밀봉재에 의하여 차폐한다.(도시되지 않음) 이 때, 밀봉재로는 모르타르가 이용된다. 그리고 도시된 바는 없으나, 어느 한 밀봉 부분에는 모르타르 주입관이 박힌다.When the setting of the finish 40 is completed, the sealing material 60 is injected between the finish 40 and the left and right side walls 5s of the box culvert 5 to fill the gap. In addition, the space (first space) between the first target surface 5c and the finishing material 40 also shields the opened front and back with a sealing material (not shown). At this time, mortar is used as the sealing material. And although not shown, one of the sealing portion is embedded with a mortar injection tube.

참고로, 마감재(40)는 다른 마감재(40)와 박스암거(5)의 종방향을 따라 서로 일렬로 결합 가능하도록 구성된다.For reference, the finishing material 40 is configured to be coupled in series with each other along the longitudinal direction of the other finishing material 40 and the box culvert (5).

5. 모르타르 충전단계(도 7a, 7b 참조)5. Mortar filling step (see FIGS. 7A and 7B)

도 7a는 모르타르 충전단계가 도시된 정단면도이고, 도 7b는 도 7a의 E-E선 단면도이다.7A is a front sectional view showing a mortar filling step, and FIG. 7B is a sectional view taken along the line E-E of FIG. 7A.

마감재(40) 설치단계에서 설치하여 둔 모르타르 주입관을 이용, 제1대상표면(5c)과 마감재(40) 사이, 즉 제1공간(S1)에 모르타르를 주입하여 이 제1공간(S1)에 모르타르를 충전한다. 이에 따르면, 제1대상표면(5c)과 마감재(40) 사이에는 하부가 곡선형으로 오목한 모르타르 층(70)이 형성된다. 즉, 아치 구조를 가지는 모르타르 층(70)이 형성되는 것이다.Mortar is injected into the first space S1 between the first target surface 5c and the finish material 40, that is, the first space S1, using the mortar injection tube installed in the finishing material 40 installation step. Charge the mortar. According to this, a mortar layer 70 having a curved concave bottom is formed between the first target surface 5c and the finish 40. That is, the mortar layer 70 having an arch structure is formed.

살펴본 바와 같은 제1실시예에 따른 공법에 의하여 시공된 보수ㆍ보강구조에 서, 아치 구조를 가지는 모르타르 층(70)은 상부로부터의 각종 하중을 박스암거(5)의 좌우 측벽(5s)으로 분산하여 전달하는바, 구조적으로 한층 향상된 안정성을 제공한다. 이 때, 모르타르 층(70)의 아치 곡률 및 곡률중심이 주력근(22) 및 마감재(40)와 동일한 구조는 응력전달의 균일화를 보장한다.In the repair and reinforcement structure constructed by the method according to the first embodiment as described above, the mortar layer 70 having an arch structure distributes various loads from the upper side to the left and right side walls 5s of the box culvert 5. As delivered, the structure provides further improved stability. At this time, the structure in which the arch curvature and the center of curvature of the mortar layer 70 are the same as the main root 22 and the finish 40 ensures the uniformity of stress transmission.

앵커(10)는 박스암거(5)와 모르타르 층(70) 간의 부착력을 증대시켜 양자 간의 일체화를 돕는다. 격자 구조의 철근(22)(24)은 모르타르 층(70)을 보강하는 한편, 제1공간(S1)에 모르타르 주입 시 모르타르 주입압력으로 인한 마감재(40)의 변형을 방지한다. 마감재(40)는 제1공간(S1)에 모르타르 주입 시 주입되는 모르타르가 요부(42)에 충전되므로 모르타르 층(70)과 견고히 결합된다. 이러한 마감재(40)는 보수ㆍ보강구조에서 표면에 해당하는 것이므로 외부 유해환경(가스나 각종 오염원 등)으로부터 모르타르 층(70) 등 보수ㆍ보강구조를 보호한다.The anchor 10 increases the adhesion between the box culvert 5 and the mortar layer 70 to help integrate between the two. The reinforcing bars 22 and 24 of the lattice structure reinforce the mortar layer 70 and prevent deformation of the finish 40 due to the mortar injection pressure when the mortar is injected into the first space S1. The finishing material 40 is firmly coupled to the mortar layer 70 because the mortar injected into the mortar in the first space S1 is filled in the recess 42. Since the finishing material 40 corresponds to the surface in the repair and reinforcement structure, the finish 40 is protected from the external harmful environment (gas and various pollutants, etc.) and the repair and reinforcement structure such as the mortar layer 70.

도 8은 모르타르 층(70)의 바람직한 아치형 비율을 나타낸다. 아치형 구조물은 가로(span)(L)-세로(rise)(H)의 비에 따라 그 구조부재에 발생하는 축력과 모멘트의 비가 다르게 된다. 이에, 모르타르 층(70)은 그 아치의 가로(L)-세로(H) 비를 12:1 이하로 하여 그 구조에 발생하는 부재력에서 축력이 주를 이루도록 하는 것이 바람직하다.8 shows a preferred arcuate ratio of mortar layer 70. The arcuate structure has a different ratio of axial force and moment generated in the structural member according to the ratio of span (L) to rise (H). Accordingly, the mortar layer 70 preferably has a horizontal (L) -vertical (H) ratio of the arch of 12: 1 or less so that the axial force is dominant in the member force generated in the structure.

[제2실시예][Second Embodiment]

도 9는 본 발명의 제2실시예에 따른 공법으로 보수ㆍ보강된 콘크리트 구조물을 나타내는 사시도이고, 도 10 내지 14는 본 발명의 제2실시예에 따른 보수ㆍ보강공법을 단계별로 나타내는 도면이다. 이에 도시된 바와 같이, 제2실시예에 따른 공 법은 제1실시예와 비교하여 볼 때 기타 구성 및 그 작용은 모두 동일한 데 대하여, 박스암거(5)의 바닥(5b)을 보수ㆍ보강대상 표면으로 한다는 점, 보강재(20A) 및 마감재(40A)가 달리 구성된다는 점만이 상이하다.9 is a perspective view showing a concrete structure repaired and reinforced by the method according to the second embodiment of the present invention, Figures 10 to 14 is a step showing the repair and reinforcement method according to a second embodiment of the present invention. As shown in the drawing, the construction according to the second embodiment is similar to the first embodiment in that all other configurations and the functions thereof are the same, and the bottom 5b of the box culvert 5 is to be repaired and reinforced. The only difference is that it is a surface, and that the reinforcement 20A and the finish 40A are configured differently.

이를 설명하면, 제2실시예에 따른 공법 역시, 보수ㆍ보강대상 표면 정리단계(도 10 참조), 앵커(10A) 설치단계(도 11 참조), 보강재(20A) 설치단계(도 12 참조), 마감재(40A) 설치단계(도 13 참조) 및 모르타르 충전단계(도 14 참조)를 포함하는바, 우선, 박스암거(5)의 바닥(이하, 제2대상표면이라 한다)(5b)에 대한 콘크리트 치핑작업을 하고 세정하여 이 제2대상표면(5b)을 정리하고, 이 정리된 제2대상표면(5b)에 앵커(10A)를 설치한다.To explain this, the construction method according to the second embodiment also includes the surface cleanup step (see FIG. 10), anchor 10A installation step (see FIG. 11), reinforcement 20A installation step (see FIG. 12), The finishing material 40A installation step (see Fig. 13) and the mortar filling step (see Fig. 14), first, concrete for the bottom (hereinafter referred to as the second target surface) 5b of the box culvert 5 The second object surface 5b is arranged by chipping and washing, and an anchor 10A is provided on the arranged second object surface 5b.

다음, 앵커(10A)의 상측에 위치하도록 제2대상표면(5b) 상에 보강재(20A)로서 격자형의 철망을 설치한 후, 제2대상표면(5b)과의 사이에 모르타르 충전공간(이하, 제2공간이라 한다)(S2)이 형성되도록 보강재(20A)의 상측에 마감재(40A)를 설치함과 아울러 제1실시예와 마찬가지로 밀봉재(60A)에 의하여 틈새를 밀봉한다.Next, after installing a grid-shaped wire mesh as the reinforcing material 20A on the second target surface 5b so as to be located above the anchor 10A, the mortar filling space (hereinafter, referred to as the reinforcing material 20A) is disposed between the second target surface 5b. In order to form the second space (S2) (S2), the finishing material 40A is installed on the upper side of the reinforcing material 20A, and the gap is sealed by the sealing material 60A as in the first embodiment.

여기에서, 마감재(40A)는 제1실시예에서 그것과 비교하여 볼 때 아치형이 아닌, 가운데는 평평하고 좌우 양쪽은 상측으로 구부러진 U자형으로 형성되어, 제2공간(S2)은 제2대상표면(5b) 상에서 그 좌우인 박스암거의 좌측 측벽(5s)의 하단부에 걸쳐 마련된다. 보강재(20A)의 경우에도 바람직하게는 이 마감재(40A)와 마찬가지의 형상을 가지도록 형성된다. 보강재(20A)의 설치에는 보강재(20A)를 제2대상표면(5b)으로부터 상측으로 일정한 거리 이격시키는 지지대가 이용될 수 있다.Here, the finishing material 40A is not arcuate in comparison with that in the first embodiment, but is formed in a U-shape that is flat in the middle and both left and right bent upwards, so that the second space S2 is the second target surface. On 5b, it is provided over the lower end part of the left side wall 5s of the box culvert which is right and left. Also in the case of the reinforcing material 20A, it is preferably formed to have the same shape as the finishing material 40A. In the installation of the reinforcing material 20A, a support for separating the reinforcing material 20A from the second target surface 5b by a predetermined distance may be used.

한편, 여기에서 보강재(20A)로서 철망을 적용한 것은 박스암거(5)의 내하력 보강을 크게 요하지 않기 때문이나, 이와 반대로 내하력 보강을 요할 시에는 보강재(20A)로서 격자형으로 배근된 철근이 이용될 수 있다. 물론, 여기에서의 철근 배근에도 철망 설치와 마찬가지로 지지대가 이용될 수 있다.On the other hand, the application of the wire mesh as the reinforcing material (20A) here is because it does not require the load capacity reinforcement of the box culvert 5, on the contrary, when the load capacity reinforcement is required, the reinforcement reinforced in a grid shape as a reinforcing material (20A) can be used Can be. Of course, the support can also be used in the reinforcement reinforcement as in the wire mesh installation.

끝으로, 제2공간(S2)에 모르타르를 주입, 모르타르 층(70)을 형성하면, 박스암거(5)의 바닥(5b)에 대한 보수ㆍ보강이 완료된다.Finally, when mortar is inject | poured into the 2nd space S2 and the mortar layer 70 is formed, repair and reinforcement with respect to the bottom 5b of the box culvert 5 will be completed.

이상, 본 발명을 설명하였으나, 본 발명은 이 명세서에 개시된 실시예 및 첨부된 도면에 의하여 한정되지 않으며 본 발명의 기술적 사상을 벗어나지 않는 범위 이내에서 당업자에 의하여 다양하게 변형될 수 있다.While the present invention has been described in connection with what is presently considered to be the most practical and preferred embodiments, it is to be understood that the invention is not limited to the disclosed embodiments, but, on the contrary, is intended to cover various modifications and equivalent arrangements included within the spirit and scope of the invention.

도 1은 본 발명의 제1실시예에 따른 공법으로 보수ㆍ보강한 콘크리트 구조물이 도시된 사시도이다.1 is a perspective view showing a concrete structure repaired and reinforced by the method according to the first embodiment of the present invention.

도 2는 본 발명의 제1실시예에 따른 보수ㆍ보강공법이 도시된 순서도이다.2 is a flowchart showing a repair and reinforcement method according to a first embodiment of the present invention.

도 3 내지 도 7은 도 2에 도시된 보수ㆍ보강공법의 각 단계별 도면으로,3 to 7 are diagrams for each step of the repair and reinforcement method shown in FIG.

도 3은 보수ㆍ보강대상 표면 정리단계를 나타내고,3 shows a surface cleaning step for maintenance and reinforcement,

도 4a, 4b는 앵커 설치단계를 나타내며,4a and 4b show the anchor installation step,

도 5a 내지 도 5d는 보강재 설치단계를 나타내고,5a to 5d show the reinforcement installation step,

도 6a 내지 도 6c는 마감재 설치단계를 나타내며,6a to 6c show the finishing material installation step,

도 7a, 7b는 모르타르 충전단계를 나타낸다.7A and 7B show the mortar filling step.

도 8은 본 발명의 제1실시예에 따른 공법으로 형성된 모르타르 층에 대한 아치형 비율을 나타낸다.8 shows an arcuate ratio for the mortar layer formed by the method according to the first embodiment of the present invention.

도 9는 본 발명의 제2실시예에 따른 공법으로 보수ㆍ보강한 콘크리트 구조물이 도시된 사시도이다.9 is a perspective view showing a concrete structure repaired and reinforced by the method according to the second embodiment of the present invention.

도 10 내지 도 14는 본 발명의 제2실시예에 따른 보수ㆍ보강공법을 단계적으로 나타내는 도면이다.10 to 14 are diagrams showing step by step repair and reinforcement methods according to a second embodiment of the present invention.

<도면의 주요 부분에 관한 부호의 설명><Explanation of symbols on main parts of the drawings>

5 : 박스암거 5b : 박스암거의 바닥5: box culvert 5b: bottom of the box culvert

5c : 박스암거의 천장 5s : 박스암거의 측벽5c: ceiling of box culvert 5s: side wall of box culvert

10, 10A : 앵커 20, 20A : 보강재10, 10A: anchor 20, 20A: reinforcement

22 : 주력근 24 : 배력근22: the main muscle 24: large muscle

30 : 마운팅장치 32 : 앵커 바디30: mounting device 32: anchor body

34 : 회전부재 36 : 고리부재34: rotating member 36: ring member

40, 40A : 마감재 50 : 행거40, 40A: Finish 50: Hanger

50A : 지지대 60, 60A : 밀봉재50A: support 60, 60A: sealing material

70, 70A : 모르타르 층 S1, S2 : 모르타르 충전공간70, 70A: Mortar layer S1, S2: Mortar filling space

Claims (15)

콘크리트 구조물인 박스형 암거의 보수ㆍ보강을 위하여 보수ㆍ보강대상 표면인 상기 암거의 천장을 정리하는 단계와;Arranging the ceiling of the culvert, which is the surface to be repaired and reinforced, for repairing and reinforcing the box-type culvert which is a concrete structure; 상기 정리된 보수ㆍ보강대상 표면에 복수의 앵커를 설치하는 단계와;Providing a plurality of anchors on the summarized maintenance and reinforcement surface; 상기 설치된 앵커의 외측에 보강재로서 복수의 철근을 상기 암거의 횡방향으로 배근되도록 설치하는 단계와;Installing a plurality of reinforcing bars in the transverse direction of the culvert as reinforcing materials on the outside of the installed anchor; 상기 보수ㆍ보강대상 표면과의 사이에 모르타르 충전공간이 형성되도록 상기 설치된 철근의 외측에 마감재를 설치하는 단계와;Providing a finishing material on an outer side of the installed reinforcing bar such that a mortar filling space is formed between the surface to be repaired and reinforced; 상기 형성된 모르타르 충전공간에 모르타르를 충전하여 모르타르 층을 형성하는 단계를 포함하고,Filling the mortar with the formed mortar filling space to form a mortar layer, 상기 설치된 철근은 가운데가 양단에 비하여 높은 아치형이며,The installed reinforcing bar has a high arch shape at both ends thereof, 상기 철근의 배근작업에는 상기 암거의 좌우 측벽에 서로 대향하도록 설치되는 것으로서 상기 철근의 양단 부분과 각각 결합됨과 아울러 상기 암거의 횡방향과 나란한 축선을 중심으로 회전하는 회전유닛을 갖춘 마운팅장치가 이용되고,The reinforcement work of the reinforcing bar is installed on the left and right side walls of the culvert as opposed to each other, and the mounting device having a rotary unit that is coupled to both ends of the reinforcement and rotates about an axis parallel to the transverse direction of the culvert , 상기 설치된 마감재는 가운데가 좌우에 비하여 높은 아치형 구조를 가지도록 구성되어, 상기 모르타르 층은 하부가 오목한 곡선형 구조를 가지는 콘크리트 구조물 보수ㆍ보강공법.The installed finishing material is configured to have a high arcuate structure in the center of the left and right, and the mortar layer has a concave curved structure of the lower concave. 삭제delete 청구항 1에 있어서,The method according to claim 1, 상기 보강재는 주력근인 상기 철근 위에 상기 암거의 종방향으로 배근된 복수의 배력근을 더 포함하여 격자 구조를 가지는 콘크리트 구조물 보수ㆍ보강공법.And the reinforcing material further comprises a plurality of reinforcing bars arranged in the longitudinal direction of the culvert on the reinforcing bars as the main reinforcing bars. 삭제delete 삭제delete 청구항 1에 있어서,The method according to claim 1, 상기 마운팅장치는, 상기 암거의 측벽에 앞부분이 매몰되는 앵커 바디와; 상기 앵커 바디의 뒷부분에 회전 가능하게 결합된 회전부재와; 상기 회전부재의 바깥둘레에 구멍이 상기 회전부재의 회전중심과 수직을 이루도록 장착되며 상기 철근의 끝 부분이 삽입되는 고리부재를 포함하되, 상기 회전부재 및 상기 고리부재는 상기 회전유닛을 구성하고,The mounting apparatus includes an anchor body in which a front portion is buried in the side wall of the culvert; A rotating member rotatably coupled to a rear portion of the anchor body; A hole is mounted on the outer periphery of the rotating member to be perpendicular to the center of rotation of the rotating member and includes a ring member into which the end of the reinforcing bar is inserted, wherein the rotating member and the ring member constitute the rotating unit. 상기 철근은 양끝 부분이 아치의 곡률중심과 나란하도록 절곡된 콘크리트 구조물 보수ㆍ보강공법.The reinforcing bar is a concrete structure repair and reinforcement method, both ends of which are bent in parallel with the center of curvature of the arch. 청구항 6에 있어서,The method according to claim 6, 상기 앵커 바디와 회전부재는 서로 나사 결합된 콘크리트 구조물 보수ㆍ보강공법.The anchor body and the rotating member is screwed to each other concrete structure repair and reinforcement method. 청구항 1에 있어서,The method according to claim 1, 상기 마감재와 철근은 아치의 곡률과 곡률중심이 서로 동일한 콘크리트 구조물 보수ㆍ보강공법.The finishing material and the reinforcing bar is a concrete structure repair and reinforcement method of the same curvature and center of curvature of the arch. 삭제delete 청구항 1에 있어서,The method according to claim 1, 상기 앵커는 상기 암거에 앞부분이 매몰되는 앵커 바디 및 상기 앵커 바디의 뒷부분에 상기 앵커 바디와 수직을 이루도록 장착된 사각의 망상부재를 포함하고,The anchor includes an anchor body in which the front portion is buried in the culvert, and a rectangular mesh member mounted on the rear portion of the anchor body so as to be perpendicular to the anchor body. 상기 망상부재는 그 가로재 및 세로재의 일부가 상측으로 볼록하도록 가공된 콘크리트 구조물 보수ㆍ보강공법.The reticular member repairs and reinforces a concrete structure processed so that a part of the cross member and the longitudinal member are convex upward. 청구항 1에 있어서,The method according to claim 1, 상기 마감재는 상기 보수ㆍ보강대상 표면과 마주하는 내측에 요철 구조가 마련된 콘크리트 구조물 보수ㆍ보강공법.The finishing material is a repair and reinforcement method for a concrete structure provided with an uneven structure on the inner side facing the repair and reinforcement surface. 청구항 11에 있어서,The method of claim 11, 상기 요철 구조의 볼록한 철(凸)부는 횡단면이 T자형인 콘크리트 구조물 보수ㆍ보강공법.The convex convex portions of the concave-convex structure have a T-shaped cross section. 청구항 11에 있어서,The method of claim 11, 상기 마감재는 상기 요철 구조와 결합되는 보강용 강재를 포함하는 콘크리트 구조물 보수ㆍ보강공법.The finishing material repair and reinforcement method of a concrete structure comprising a reinforcing steel coupled to the uneven structure. 삭제delete 삭제delete
KR1020090101362A 2009-10-23 2009-10-23 Construction method for repairing/reinforcing concrete structure KR100981091B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090101362A KR100981091B1 (en) 2009-10-23 2009-10-23 Construction method for repairing/reinforcing concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090101362A KR100981091B1 (en) 2009-10-23 2009-10-23 Construction method for repairing/reinforcing concrete structure

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR1020100052741A Division KR101073880B1 (en) 2010-06-04 2010-06-04 Anchor and Reinforcing Bar mounting device for Concrete Structure Repairing/Reinforcing, Construction Method for Repairing/Reinforcing Concrete Structure

Publications (1)

Publication Number Publication Date
KR100981091B1 true KR100981091B1 (en) 2010-09-09

Family

ID=43009899

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090101362A KR100981091B1 (en) 2009-10-23 2009-10-23 Construction method for repairing/reinforcing concrete structure

Country Status (1)

Country Link
KR (1) KR100981091B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264725A (en) * 2014-09-02 2015-01-07 杭永山 Post-tensioning prestressing reinforcement method for preventing lock chamber wall from cracking
KR101626395B1 (en) * 2015-07-28 2016-06-01 리플래시기술 주식회사 Method for Repairing or Reinforcing Concrete Structure
CN106544962A (en) * 2016-10-28 2017-03-29 同济大学 The prestress reinforced construction method of xoncrete structure

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11193640A (en) * 1997-11-04 1999-07-21 Ozawa Concrete Ind Co Ltd Repairing method of existing concrete structure and construction method of newly provided concrete structure
KR100777795B1 (en) * 2006-11-15 2007-11-22 주식회사 젠트로 Reinforcement assembly of concrete and construction method thereof
JP2008223335A (en) 2007-03-13 2008-09-25 Kajima Corp Tunnel reinforcing method by use of fiber reinforced cement board

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11193640A (en) * 1997-11-04 1999-07-21 Ozawa Concrete Ind Co Ltd Repairing method of existing concrete structure and construction method of newly provided concrete structure
KR100777795B1 (en) * 2006-11-15 2007-11-22 주식회사 젠트로 Reinforcement assembly of concrete and construction method thereof
JP2008223335A (en) 2007-03-13 2008-09-25 Kajima Corp Tunnel reinforcing method by use of fiber reinforced cement board

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264725A (en) * 2014-09-02 2015-01-07 杭永山 Post-tensioning prestressing reinforcement method for preventing lock chamber wall from cracking
KR101626395B1 (en) * 2015-07-28 2016-06-01 리플래시기술 주식회사 Method for Repairing or Reinforcing Concrete Structure
CN106544962A (en) * 2016-10-28 2017-03-29 同济大学 The prestress reinforced construction method of xoncrete structure
CN106544962B (en) * 2016-10-28 2018-07-03 同济大学 The prestress reinforced construction method of concrete structure

Similar Documents

Publication Publication Date Title
KR101073880B1 (en) Anchor and Reinforcing Bar mounting device for Concrete Structure Repairing/Reinforcing, Construction Method for Repairing/Reinforcing Concrete Structure
KR101904204B1 (en) The method of the earthquake-resistant or strengthening structurally using basalt fiber sheet and metal reinforcement for masonry wall system
KR101626395B1 (en) Method for Repairing or Reinforcing Concrete Structure
JP3180817U (en) Building structure without formwork removal
CN210827541U (en) Center section of thick bamboo component of tower section of thick bamboo basis, center section of thick bamboo that has it and tower section of thick bamboo basis
KR200460186Y1 (en) Subterranean storage tank structure
KR100981091B1 (en) Construction method for repairing/reinforcing concrete structure
KR101732669B1 (en) Reinforcement member, concrete box reinforced with the same and the construction method thereof
JP2019052424A (en) JOINT STRUCTURE OF PCa SLAB AND ITS CONSTRUCTION METHOD
JP3554299B2 (en) Composite segment in pipe burial method
JP6755655B2 (en) Seismic reinforcement method for existing tubular walls made of reinforced concrete
JP2010216162A (en) Pressure receiving device for anchoring method, and the anchoring method
KR101054450B1 (en) Precasting structure
KR20180101678A (en) Anchor bolt for wall form supporter
KR200472767Y1 (en) Easy Interchangeable Prefabricated Precast Culvert Block
JP2013019171A (en) Pole
KR100659641B1 (en) construction method using corrugated steel plate and structure utilizing the same
KR100728265B1 (en) Concrete charge concavo-convex steel sheet circular structure
KR200420494Y1 (en) precast concrete culvert block
KR102026112B1 (en) Pre-cast concrete segment blocks for vertical structures with various bracket connection means
JP6874051B2 (en) Groove construction method
KR20200006329A (en) Reinforcing structure of block type retaining wall and construction method thereof
KR20120133871A (en) Support for a upper reinforcing bar of footings
KR100968222B1 (en) Supporting device
CN115596238B (en) Concrete floor reinforcing structure and construction method

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
A107 Divisional application of patent
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130823

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20140902

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20150917

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20170926

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20180822

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20190813

Year of fee payment: 10