KR100965467B1 - Eco-pillar debris barrier - Google Patents

Eco-pillar debris barrier Download PDF

Info

Publication number
KR100965467B1
KR100965467B1 KR1020090126291A KR20090126291A KR100965467B1 KR 100965467 B1 KR100965467 B1 KR 100965467B1 KR 1020090126291 A KR1020090126291 A KR 1020090126291A KR 20090126291 A KR20090126291 A KR 20090126291A KR 100965467 B1 KR100965467 B1 KR 100965467B1
Authority
KR
South Korea
Prior art keywords
pillar
concrete layer
dam
eco
row
Prior art date
Application number
KR1020090126291A
Other languages
Korean (ko)
Inventor
구길본
최승열
유승문
Original Assignee
대한민국
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 대한민국 filed Critical 대한민국
Priority to KR1020090126291A priority Critical patent/KR100965467B1/en
Application granted granted Critical
Publication of KR100965467B1 publication Critical patent/KR100965467B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • E02B7/04Dams across valleys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B8/00Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Revetment (AREA)

Abstract

PURPOSE: An echo-pillar debris barrier is provided to prevent the damage of the avalanche of rocks and earth. CONSTITUTION: An echo-pillar debris barrier comprises a front pillar row(30) and a rear pillar row(40). The front pillar row is formed on a footing concrete layer(20). A front pillar is located to be separated with a fixed interval right and left. A plurality of rear pillars is rearwards installed of the front pillar row in the left and right to be separated and rear pillar row is formed. The front pillar and rear pillar row crosses zigzag.

Description

에코-필라 사방댐{Eco-Pillar Debris barrier}Eco-Pillar Debris barrier

본 발명은 에코-필라 사방댐에 관한 것으로서, 보다 상세하게는 유목 및 토석류를 저지하는 스크린 사방댐에 있어서, 댐몸체와 댐어깨 등의 구성을 제거하고, 댐기초의 상부면에 다수개의 필라(Pillar)를 2중 구조로 엇갈려 설치함으로서, 평상시에는 하천의 생태환경적 안정성을 유지하기 위한 유용토사는 하류측으로 유출시키고, 집중호우시에는 하류측에 재해를 발생시키는 요인이 되는 전석 등의 토석류와 유목을 효율적으로 방지할 수 있는 것이다.The present invention relates to an eco-pillar four-side dam, and more particularly, in a screen four-side dam that prevents driftwood and soils, the structure of the dam body, dam shoulders, etc., and a plurality of pillars on the upper surface of the dam foundation. By staggering the dual structure, useful soils for maintaining the ecological and environmental stability of the streams are usually discharged to the downstream side, and during heavy rains, soils and driftwood, such as all stones, which cause disasters downstream, are caused. It can be prevented efficiently.

특히, 사방댐의 시공시 토공량을 최소화함으로써, 산림훼손을 최소화하며, 기초층에 어도를 형성하여 산란 등을 위하여 상류로 이동하는 어류에 대한 이동로를 확보하도록 함은 물론, 상류 및 하류간 생태계 자원의 보존기능을 수행할 수 있는 에코-필라 사방댐에 관한 것이다.In particular, by minimizing the amount of earthwork during construction of all four dams, it minimizes forest damage, forms fish on the base layer, secures passages for fish moving upstream for spawning, as well as upstream and downstream ecosystem resources. The present invention relates to an eco-pillar dam that can perform a preservation function.

일반적으로, 하상구배가 큰 계곡에서는 급류가 강바닥을 파고 양쪽 산기슭을 깎아서 산사태를 일으키므로, 이것을 방지하고 토사가 흘러 내려가는 것을 방지하기 위해서 사방댐(Debris barrier)을 건설하게 되며, 특히 자갈의 이동이 심한 곳에 건설하여, 댐의 상류쪽에 자갈을 퇴적시켜서 하상을 완만한 구배로 안정시키게 된다.In general, in valleys with large river slopes, rapids dug up the riverbeds and shatter both sides of the mountains, resulting in landslides. Therefore, a debris barrier is constructed to prevent this and to prevent the sediment from flowing down. Constructed here, the gravel is deposited upstream of the dam to stabilize the riverbed with a gentle gradient.

상기와 같은 사방댐은 그 역할에 따라 모래 및 토석류를 막는 저사댐과, 물을 가두는 저수댐, 그리고 바위나 통나무를 막아주는 스크린 댐 등으로 구분된다. 여기서 저수댐은 저사댐의 역할도 할 수 있음은 당연하다.According to the role of the four-sided dam is divided into a low dam to prevent sand and earth flow, a reservoir dam to confine water, and a screen dam to block rocks or logs. Naturally, the reservoir dam can also serve as a low dam.

상기 저사댐은 주로 도 1에 나타난 바와 같이, 댐몸체(1)의 상부에 댐어깨(11) 및 방수로(12)가 형성되고, 댐몸체(1)의 하류측에는 물받이부(3)가 형성되며, 양측으로는 측벽(2)이 형성된다.The low dam is mainly shown in Figure 1, the dam shoulder 11 and the waterproof path 12 is formed on the upper portion of the dam body (1), the downstream of the dam body (1) is formed with a drip (3) On both sides, side walls 2 are formed.

한편, 스크린댐의 경우, 산사태나 계안의 붕괴 등으로 발생되는 유목 및 암석류를 1차 저지하여, 토사와 유수만 천천히 배출하도록 하여 하류의 피해를 적극적으로 예방하기 위한 것으로, 댐의 중앙부가 개방된 형태이기 때문에 물이나 토사는 댐을 통과하지만 통나무, 바위 등과 같이 부피가 큰 것들은 통과하지 못하도록 되어 있다.On the other hand, screen dams are primarily used to prevent driftwood and rock flows caused by landslides and collapse of the system and to discharge only soil and runoff slowly, thereby actively preventing downstream damage. Because it is in the form of water, the water and the soil are passed through the dam, but the bulky things such as logs and rocks are not allowed to pass through.

상기와 같은 스크린 댐으로는 도 2에 나타난 바와 같은 버트리스(Buttress)댐이 있으며, 버트리스(B)의 양측으로 측벽(2)이 형성되고, 하류측으로는 물받이부(3)가 형성된다.As the screen dam as described above, there is a buttress (Buttress) dam as shown in Figure 2, the side wall (2) is formed on both sides of the buttress (B), the drip tray 3 is formed on the downstream side.

그러나, 도 1에 나타난 바와 같은 저사댐의 경우, 유용토사까지도 차단하기 때문에, 하류측의 생태계에 영향을 끼치게 되고, 도 2에 나타난 버트리스 사방댐의 경우, 유목 및 암석류에 의해 해당 구조물이 지속적으로 타격을 받게 되면, 외형이 변형되거나 구조적 강도가 약해지고, 장기간 사용시에 철강재가 부식되기 때문에, 안전성에 문제점이 발생되고, 유목 및 암석류를 저지하지 못하게 되는 등의 문제점 이 발생된다.However, in the case of the low sand dam as shown in FIG. 1, it also blocks the useful soil, and thus affects the ecosystem on the downstream side. In the case of the buttress alley dam shown in FIG. 2, the structure is sustained by driftwood and rocks. When hit by, the appearance is deformed or the structural strength is weakened, the steel is corroded during long-term use, there is a problem in the safety, there is a problem such as not to prevent driftwood and rock.

이를 방지하기 위하여, 일정 기간마다 보수, 보강, 교체작업 등을 하게 될 경우, 그에 따라 막대한 공사비용과 장기간의 공사기간이 추가로 소요되고, 이는 해당 사방댐의 유지관리 및 보수비용의 증가로 이어지는 문제점이 있었다.In order to prevent this, if a repair, reinforcement, replacement work, etc. are performed at regular intervals, a huge construction cost and a long construction period are additionally required, which leads to an increase in maintenance and repair costs of the four dams. There was this.

또한, 대부분의 사방댐은 댐몸체 및 댐어깨 등을 포함하는 대형 콘크리트구조물이기 때문에, 시공과정에서 주위 산림훼손이 크고, 주변경관이 저해됨은 물론, 상류 및 하류간의 생태단절을 초래하는 문제점이 있었다.In addition, since most of all four dams are large concrete structures including a dam body and a shoulder of the dam, the surrounding forest damage is large during the construction process, the surrounding landscape is hindered, and there is a problem of causing ecological disconnection between upstream and downstream.

상기와 같은 문제점을 해결하기 위해서, 본 발명은 스크린 사방댐의 방수로에 유목 및 암석류를 저지하기 위한 방책구조물을 형성함에 있어, 해당 사방댐의 시공이 간편하고 유지관리 및 보수가 용이한 슬릿트 형태로 구성하되, 상기한 슬릿트 사방댐의 문제점으로 지적되는 유목이나 토석류의 통과문제를 보다 효율적으로 해결할 수 있는 에코-필라 사방댐을 제공하는데 목적이 있다.In order to solve the above problems, the present invention is to form a barrier structure for preventing driftwood and rock flow in the waterproof path of the screen four sides dams, the construction of the four sides dams in the form of a slit, easy to maintain and easy to repair It is an object of the present invention to provide an eco-pillar four-side dam that can more efficiently solve the problem of passage of driftwood or soil, which is pointed out as a problem of the slit four-side dam.

다시 말해, 하천의 생태환경적 안정성을 유지하기 위하여, 유용토사는 하류측으로 유출시키고, 하류측에 재해를 발생시키는 요인이 되는 토석류와 유목은 효율적으로 방지할 수 있는 에코-필라 사방댐을 제공하는데 목적이 있다.In other words, in order to maintain the ecological and environmental stability of rivers, useful soils are discharged to the downstream side, and the purpose of providing eco-pillar dams can effectively prevent the soils and driftwood that cause disasters on the downstream side. There is this.

또한, 사방댐을 구성하는 구조물 중, 자연경관을 저해하는 요인을 갖는 구성을 최소화하고, 구조물에 야면석을 매설함으로써, 주변경관과의 조화를 지속적으로 유지할 수 있음은 물론, 시공에 의한 산림훼손을 최소화할 수 있는 에코-필라 사방댐을 제공하는데 목적이 있다.In addition, by minimizing the structure that has a factor that hinders the natural landscape among the structures constituting the four sides dam, and by embedding the night stone on the structure, it is possible to maintain the harmony with the surrounding landscape, and also to prevent forest damage due to construction The objective is to provide an eco-pillar dam that can be minimized.

상기와 같은 목적을 달성하기 위해서, 본 발명은 기초콘크리트층(20)에 다수개의 전방필라(300)가 좌우방향으로 이격되게 설치되어 전방필라열(30)이 구비되어지고, 상기 전방필라열(30)의 후방으로 다수개의 후방필라(300)가 좌우방향으로 이격되게 설치되어 후방필라열(40)이 구비되어지되, 상기 전방필라(300)와 후방필라(400)가 지그재그로 서로 교차되어지게 구비되어지는 에코-필라 사방댐에 있어서, 상기 기초콘크리트층(20)은 원지반(GL)이 터파기되어 버림콘크리트층(10)이 구비되고 상기 버림콘크리트층(10)의 상부에 구비되어지되, 상기 기초콘크리트층(20)의 종단부 하부에는 끝돌림부(200)가 수직방향으로 연장형성되고, 상기 기초콘크리트층(20)의 상부면은 상기 원지반(GL)의 상부면과 일치되는 높이로 형성되며, 상기 전방필라(300)와 후방필라(400)는 기초콘크리트층(20)의 상부로 돌출된 세로철근(82)에 다수개의 띠철근(83)이 일정간격으로 고정설치되고 콘크리트가 타설되어 상기 기초콘크리트층(20)과 일체로 철근콘크리트구조로 형성되어지되, 상기 전방필라열(30)이 후방필라열(40) 보다 높게 형성되어짐을 특징으로 한다.In order to achieve the above object, the present invention is a plurality of front pillars 300 are installed in the base concrete layer 20 to be spaced apart in the left and right direction is provided with a front pillar row 30, the front pillar row ( A plurality of rear pillars 300 are installed to be spaced apart in the left and right direction to the rear of the rear panel 30 so that the rear pillar columns 40 are provided, and the front pillars 300 and the rear pillars 400 cross each other in a zigzag. In the eco-pillar four-way dam provided, the base concrete layer (20) is provided with the discarded concrete layer (10) is disposed on top of the discarded concrete layer (10) by breaking the ground (GL) The end portion 200 extends in the vertical direction under the terminal portion of the base concrete layer 20, and the upper surface of the base concrete layer 20 is formed at the same height as the upper surface of the base GL. The front pillars 300 and the rear pillars 400 may be A plurality of strip reinforcing bars 83 are fixedly installed at regular intervals on the vertical reinforcing bars 82 protruding to the upper portion of the super concrete layer 20, and concrete is poured to form a reinforced concrete structure integrally with the foundation concrete layer 20. Although, the front pillar row 30 is characterized in that formed higher than the rear pillar row (40).

특히, 상기 기초콘크리트층(20)의 상부면에 어도(50)가 형성되어지되, 상기 어도(50)는 상기 다수개의 전방필라(300) 사이를 통과하면서 분기되어 상기 다수개의 후방필라(300) 사이를 통과하도록 형성되어지는 것을 한다.In particular, the island 50 is formed on the upper surface of the base concrete layer 20, the fish 50 is branched while passing between the plurality of front pillars 300, the plurality of rear pillars 300 It is to be formed to pass through.

또한, 상기 전방필라(300) 및 후방필라(400)는 외부의 충격 완화와 유수의 원활한 소통을 위하여 "

Figure 112009078208121-pat00001
"형 단면의 기둥인 것을 특징으로 한다.In addition, the front pillar 300 and the rear pillar 400 is for the external shock relief and smooth flow of the "
Figure 112009078208121-pat00001
It is characterized in that the pillar of the "shaped cross section.

삭제delete

더불어, 상기 기초콘크리트층(20)의 하류측에는, 상기 기초콘크리트층(20)과 연결되어 야면석(S)이 매설되어지는 야면석찰붙임부(60)가 설치되어지는 것을 특징으로 한다.In addition, the downstream surface of the base concrete layer 20, characterized in that it is connected to the base concrete layer 20 is provided with a night surface stone paste 60 is embedded in the night stone (S).

선택적으로, 상기 에코필라 사방댐의 일측 또는 양측에는 야면석(S)이 적층되어 측벽(70)이 설치되어지는 것을 특징으로 한다.Optionally, one side or both sides of the eco-pillar four-way dam is characterized in that the night stone (S) is stacked so that the side wall 70 is installed.

또한 상기 기초콘크리트층(20)의 상부로 돌출된 세로철근(82)은 상기 기초콘크리트층(20) 내부에 배근되어 매설된 격자형상의 기초철근(81)에 연결되어지는 것을 특징으로 한다. In addition, the longitudinal reinforcing bar 82 protruding to the upper portion of the base concrete layer 20 is characterized in that it is connected to the lattice-shaped base reinforcement 81 is placed in the base concrete layer 20 is embedded.

상기와 같은 해결수단에 의해, 본 발명은 상류측에서 유입되는 유용토사는 하류측으로 배출시켜, 하천의 하류에 서식하는 수생 동식물의 생태계 파괴를 방지하면서도, 하류측에 재해를 발생시키는 요인이 되는 전석 등의 토석류와 유목을 효율적으로 저지함은 물론, 해당 구조물 시공시 토공량을 최소화함으로써, 산림훼손을 최소화할 수 있는 장점이 있다.By means of the above-described solution, the present invention discharges useful earth and sand from the upstream side to the downstream side, while preventing the destruction of the ecosystem of aquatic plants and animals inhabiting the downstream, while causing a disaster in the downstream side It effectively prevents the soil and driftwood, etc., as well as by minimizing the amount of earthwork during the construction of the structure, there is an advantage that can minimize forest damage.

또한, 기초층에 형성된 어도를 통하여 산란 등을 위하여 상하류로 이동하는 어류에 대한 이동로를 확보하도록 하여, 상류 및 하류간 생태계 자원의 보존기능을 수행함은 물론, 야생동물과 파충류 및 양서류 등이 상류와 하류를 자유롭게 이동할 수 있는 장점이 있다.In addition, through the fish formed in the base layer to ensure the movement path for the fish moving up and down for spawning, such as to preserve the ecosystem resources of the upstream and downstream, as well as wildlife, reptiles and amphibians upstream There is an advantage that can move freely and downstream.

다시 말해, 생태환경을 보호하면서도 사방댐으로서의 기능을 충분히 수행함은 물론, 구조물의 건설비용 및 유지관리 비용을 최소화할 수 있는 것이다.In other words, while protecting the eco-environment, it is possible to fully function as a dam and minimize the construction cost and maintenance cost of the structure.

또한, 다른 사방댐들에 비하여 시공 시 터파기에 의한 산림훼손범위를 최소화할 수 있고, 토공물량이 적으며, 투입되는 콘크리트의 양이 최소화되어 탄소배출량을 대폭 줄일 수 있는 친환경적인 공법인 것이다.In addition, it is an environmentally friendly method that can minimize the forest damage range due to the excavation when construction, compared to other four dams, less earthwork, and minimizes the amount of concrete injected.

따라서, 토석류와 유목에 의한 하류의 피해 및 산사태 방지를 위한 토목건축물분야에 대한 경쟁력을 향상시킬 수 있는 효과가 있다.Therefore, there is an effect that can improve the competitiveness in the civil engineering field for the prevention of damage and landslides by the soil and driftwood downstream.

본 발명에 에코-필라 사방댐에 대한 예는 다양하게 적용할 수 있으며, 이하에서는 첨부된 도면을 참조하여 가장 바람직한 실시 예에 대해 설명하기로 한다.Examples of the eco-pillar four-sided dam in the present invention can be applied in various ways, hereinafter with reference to the accompanying drawings will be described the most preferred embodiment.

도 3은 본 발명에 의한 에코-필라 사방댐의 일 예를 나타낸 사시도로서, 이하에서 도 4를 참조하여 본 발명에 의한 에코필라 사방댐을 설명하기로 한다.3 is a perspective view showing an example of an eco-pillar four-way dam according to the present invention, with reference to Figure 4 below will be described eco-phila four-way dam according to the present invention.

상기와 같은 에코필라 사방댐의 시공과정을 살펴보면, 먼저, 원지반(GL)에 본 발명에 의한 에코필라 사방댐을 시공하기 위한 터파기를 수행한다.Looking at the construction process of the eco-pillar four-way dam as described above, first, to carry out the trench for the construction of the eco-pillar four-way dam according to the present invention on the original ground (GL).

이때, 터파기의 깊이는, 버림콘크리트층(10) 및 기초콘크리트층(20)의 높이를 합한 것과 같다. 이는 상기 버림콘크리트층(10) 및 기초콘크리트층(20)를 시공한 후, 상기 기초콘크리트층(20)의 상부면이 원지반(GL)의 상부면과 동일하도록 하기 위한 것이다.At this time, the depth of the trench is equal to the sum of the heights of the discarded concrete layer 10 and the foundation concrete layer 20. This is to ensure that after the discarded concrete layer 10 and the foundation concrete layer 20 are constructed, the upper surface of the foundation concrete layer 20 is the same as the upper surface of the base plate GL.

상기와 같이 상기 기초콘크리트층(20)의 상부면이 원지반(GL)의 상부면과 동일할 경우, 본 발명의 목적 및 효과인 유용토사를 하류측으로 용이하게 배출되기 때문에, 하천의 하류에 서식하는 수생 동식물의 생태계 파괴를 방지할 수 있는 것이다.As described above, when the upper surface of the foundation concrete layer 20 is the same as the upper surface of the base plate GL, since the useful soils, which are the object and effect of the present invention, are easily discharged to the downstream side, It is possible to prevent the destruction of aquatic flora and fauna.

상기와 같은 터파기 이후, 기초저면에 잡석지정을 한 후, 50~60cm의 콘크리트를 타설하여 버림콘크리트층(10)을 설치한다.After the excavation as described above, after the rubble designation on the base bottom, the concrete is laid in 50 ~ 60cm to install the discarded concrete layer (10).

상기와 같은 버림콘크리트층(10)은, 기초 등의 공사를 위해 먹매김을 하거나, 기초면을 평탄하게 하여 거푸집 등 공사를 정확하게 하기 위한 것으로, 특히, 구조콘크리트 타설 전 바닥면을 고르고 시멘트페이스트가 땅속으로 유출되는 것을 막기 위한 기능을 한다.The discarded concrete layer 10 as described above is for filling the construction of the foundation or the like, or to accurately form the foundation, such as formwork, in particular, the concrete surface is selected before the cement paste It serves to prevent spillage into the ground.

상기 버림콘크리트층(10)의 타설이 완료되면, 그 상부로 기초콘크리트층(20)을 타설하게 되는 바, 상기 기초콘크리트층(20)은 철근콘크리트 구조물로서, 기초콘크리트층(20)에 매설되는 철근구조는 도 5a 및 도 5b에 나타난 바와 같다.When the casting of the discarded concrete layer 10 is completed, the foundation concrete layer 20 is poured into the bar. The foundation concrete layer 20 is a reinforced concrete structure, which is embedded in the foundation concrete layer 20. Reinforcing bar structure is as shown in Figures 5a and 5b.

이때, 기초콘크리트층(20)의 종단부(하류측을 말하는 것으로 도 3에서는 우측하부)의 하부(기초콘크리트층의 하부)에는, 상기 기초콘크리트층(20)의 수직방향으로 끝돌림부(200)가 연장되어 형성된다.At this time, the lower end portion of the base concrete layer 20 (downstream, referred to as the lower right side in Fig. 3) (lower portion of the base concrete layer), the end portion 200 in the vertical direction of the base concrete layer 20 ) Is extended.

상기와 같은 끝돌림부(200)는 기초콘크리트층(20)의 구조적 안정성을 향상시키기 위한 것이다.The tip portion 200 as described above is to improve the structural stability of the base concrete layer (20).

그리고, 상기 기초콘크리트층(20)의 상부 전방(상류측에서 바라볼 경우에서의 전방, 다시 말해 도 3에서는 좌측상부)에 다수개의 전방필라(300)가 일정간격으로 이격되어 나란히 설치되는 전방필라열(30)이 설치된다.In addition, the front pillars in which a plurality of front pillars 300 are spaced apart at regular intervals in the upper front (the front when viewed from the upstream side, that is, the upper left in FIG. 3) of the base concrete layer 20 are installed side by side. Row 30 is installed.

여기서, 상기 전방필라열(30)은 상류측에서 유입되는 유목 등이 하류로 흘러나가는 것을 방지하기 위한 것으로, 토석류나 유목에 의한 외부충격으로부터 충분한 강도를 보장하기 위하여, 그 전면부 및 후면부는 곡면으로 형성하고, 양측면부는 평면으로 형성, 다시 말해 "

Figure 112009078208121-pat00002
"형 단면을 갖는 기둥으로 형성함으로써, 유목 등의 저지는 물론, 유용토사와 물의 하류측으로 원활히 흘러나갈 수 있도록 한다.Here, the front pillar row 30 is to prevent the driftwood, etc. flowing from the upstream side to flow downstream, in order to ensure sufficient strength from the external impact caused by earth or driftwood, the front and rear portions are curved surfaces Formed on both sides and formed on a flat surface, that is, "
Figure 112009078208121-pat00002
By forming a pillar having a "shaped cross section," it is possible to smoothly flow not only to driftwood and the like but also to the downstream side of useful soil and water.

이때, 상류측에서 유입되는 유목 중 길이방향으로 흘러드는 유목의 경우, 전방필라(300)의 사이로 통과하여, 하류측으로 흘러나가는 경우가 발생된다.At this time, in the case of driftwood flowing in the longitudinal direction of the driftwood flowing from the upstream side, the case passes through the front pillar 300, and flows out to the downstream side.

이를 방지하기 위하여, 상기 전방필라열(30)의 후방으로 다수개의 후방필라(400)가 일정간격으로 이격되어 나란히 설치되는 후방필라열(40)을 설치하되, 상기 전방필라(300)와 후방필라(400)는 서로 엇갈리도록 지그재그로 설치한다.In order to prevent this, a plurality of rear pillars 400 are installed at the rear of the front pillar row 30 at a predetermined interval, and the rear pillar columns 40 are installed side by side, and the front pillar 300 and the rear pillar are installed. 400 is installed in a staggered staggered with each other.

따라서, 상류측에서 유입되는 유목 중 일부가 전방필라열(30)을 통과한다 하더라도, 후방필라열(40)에 의해 저지됨으로써, 유목이 하류로 흘러나가는 것을 원천적으로 방지할 수 있는 것이다.Therefore, even if some of the driftwood flowing from the upstream side passes through the front pillar row 30, the driftwood can be prevented from flowing downstream by being blocked by the rear pillar row 40.

또한, 전방필라열(30)의 높이를 후방필라열(40)의 높이보다 높게 형성하여, 집중호우시 대형 토석에 의한 사방댐의 피해를 최소화함은 물론, 댐본체(기초콘크리트층)가 원지반의 높이와 일치되도록 시공함으로써, 유용토석류를 하류로 원활히 공급하여 하류의 생태를 안정시킬 수 있다.In addition, the height of the front pillar row 30 is formed higher than the height of the rear pillar row 40, minimizing the damage of the four-sided dam due to large-scale soil during heavy rains, as well as the dam body (base concrete layer) of the base By construction consistent with the height, useful soils can be smoothly supplied downstream to stabilize the ecology of the downstream.

한편, 본 발명에 의한 에코필라 사방댐의 기초콘크리트(20)의 상부면에는 어류 등이 하류측에서 상류측으로 용이하게 이동하도록 어도(50)를 형성한다.On the other hand, the upper surface of the base concrete 20 of the eco-pillar four-way dam according to the present invention forms an fishery 50 so that fish and the like easily move from the downstream side to the upstream side.

이때, 상기 어도(50)는, 상기 전방필라(300)의 사이에서 형성되어 하류측방향으로 이어지며, 상기 전방필라열(30)을 통과하게 되면, 양측으로 분기되어 후방필라열(40)의 후방필라(400) 사이를 통과하도록 형성된다.In this case, the fish 50 is formed between the front pillars 300 and continues in the downstream direction, and when passed through the front pillar rows 30, the fish 50 is branched to both sides of the rear pillar columns 40. It is formed to pass between the rear pillars (400).

따라서, 갈수기에도 하류측의 어류, 파충류 등이 상류측으로 용이하게 이동할 수 있도록 하는 효과가 있다.Therefore, there is an effect that the fish, reptiles and the like on the downstream side can easily move upstream even in the dry season.

그리고, 본 발명에 의한 에코-필라 사방댐이 주위환경과 자연스럽게 어우러질 수 있도록 하기 위하여, 상기 기초콘크리트츠(20)의 하류측에는, 아면석(S)이 매설되어지는 야면석찰붙임부(60)가 상기 기초콘크리트층(20)과 연결되도록 설치된 다.In addition, in order to allow the eco-pillar four-way dam of the present invention to naturally blend with the surrounding environment, a downstream stone attaching part 60 in which a face stone S is buried in the downstream side of the basic concrete 20 is installed. Is installed to be connected with the basic concrete layer 20.

이상에서 설명된 본 발명에 의한 에코필라 사방댐은, 주로 터파기 지역(에코필라 사방댐의 시공지역)이 암반지역인 경우에, 바람직한 구조이며, 만약, 시공지역이 토사지역인 경우, 양측면으로부터의 토사유입이 발생될 수 있다.Ecofil Sabang Dam according to the present invention described above is a preferable structure mainly when the trench area (construction area of the ecophila Sabang Dam) is a rock area, and, if the construction area is the earth and sand area, earth and sand from both sides Inflow may occur.

따라서, 본 발명에서는 시공되는 지역이 토사지역인 경우에 한하여, 도 6에 나타난 바와 같이 에코필라 사방댐의 일측 또는 양측에, 야면석(S)을 적층하여 설치되는 측벽(70)을 형성한다.Therefore, in the present invention, as long as the construction area is the soil area, as shown in FIG. 6, side walls 70 are formed on one side or both sides of the eco-pillar four-side dams by stacking the night stone (S).

상기와 같은 본 발명에 의한 에코필라 사방댐은, 도 1에 나타난 저사댐 및 도 2에 나타난 다기능 버트리스 사방댐에 비하여, 토공량은 절반정도이고, 콘크리트양은 저사댐에 비하여 1/3, 다기능 버트리스 사방댐에 비하여 1/2로 절감할 수 있는 장점이 있다.Ecophila four-sided dam according to the present invention, as compared to the low-damping dam shown in Figure 1 and multi-function buttresses shown in Figure 2, the earthwork amount is about half, the amount of concrete is 1/3, multi-function buttresses four-sided dam compared to the low dam There is an advantage that can be reduced to 1/2 compared to.

따라서, 시공지역의 산림훼손 및 생태계 파괴를 최소화함은 물론, 콘크리트 시공에 따른 탄소배출을 줄일 수 있는 효과가 있다.Therefore, there is an effect of minimizing forest damage and ecosystem destruction in the construction area, as well as reducing carbon emissions due to concrete construction.

또한, 시공비용면에서도, 저사댐에 비하여 1/2, 다기능 버트리스 사방댐에 비하여 1/3을 절감할 수 있는 장점이 있는 것이다.In addition, in terms of construction cost, there is an advantage that can be reduced to 1/2, and 1/3 compared to the multi-function buttress four-way dam compared to the low sand dam.

한편, 상류에서 유입되는 유목 등에 의하여 전방필라(300)에 지속적으로 충격이 가해지는 바, 기초콘크리트층(20)과 전방필라(300) 및 후방필라(400)의 구조적 강도를 향상시킬 필요가 있다.On the other hand, the front pillar 300 is continuously impacted by driftwood or the like flowing upstream, it is necessary to improve the structural strength of the base concrete layer 20 and the front pillar 300 and the rear pillar 400. .

이를 위하여, 상기 기초콘크리트층(20)을 타설하는 과정에서, 기초콘크리트층(20)에 매설되는 기초철근(81)을 격자형으로 형성하고, 도 5a에 나타난 바와 같 이, 매설되는 기초철근(81) 중 최하부의 기초철근(81)에 "L"형의 세로철근(82)을 고정하여 기초콘크리트층(20)을 타설한다.To this end, in the process of pouring the foundation concrete layer 20, the foundation reinforcement 81 embedded in the foundation concrete layer 20 is formed in a lattice shape, as shown in Figure 5a, the embedded foundation reinforcement ( The base concrete layer 20 is poured by fixing the "L" type longitudinal reinforcing bars 82 to the lowermost base reinforcing bars 81.

이후, 기초콘크리트층(20)의 시공이 완료되면, 기초콘크리트층(20)의 상부로 돌출된 세로철근(82)에, 다수개의 "

Figure 112010022064751-pat00003
"형의 띠철근(83)을 일정간격마다 고정설치하고, 그 외부에 거푸집을 설치한 후, 콘크리트 타설하여 전방필라(300) 및 후방필라(400)를 시공한다.Subsequently, when the construction of the foundation concrete layer 20 is completed, the longitudinal reinforcing bars 82 protruding to the upper portion of the foundation concrete layer 20, a plurality of "
Figure 112010022064751-pat00003
After fixing the band-shaped reinforcing bar (83) at regular intervals, and installing the formwork on the outside, the concrete is poured into the front pillars 300 and the rear pillars (400).

따라서, 전방필라(300) 및 후방필라(400)는 상기 기초콘크리트층(20)과 일체로 되어 철근콘크리트(reinforced concrete) 구조로 형성되어 구조적인 안정감이 확보되어진다.Therefore, the front pillars 300 and the rear pillars 400 are integrally formed with the foundation concrete layer 20 and are formed in a reinforced concrete structure to ensure structural stability.

이상에서 본 발명에 의한 에코-필라 사방댐에 대하여 설명하였다. 이러한 본 발명의 기술적 구성은 본 발명이 속하는 기술분야의 당업자가 본 발명의 그 기술적 사상이나 필수적 특징을 변경하지 않고서 다른 구체적인 형태로 실시될 수 있다는 것을 이해할 수 있을 것이다.In the above, the eco-pillar square dam by this invention was demonstrated. Such a technical configuration of the present invention will be understood by those skilled in the art that the present invention can be implemented in other specific forms without changing the technical spirit or essential features of the present invention.

그러므로 이상에서 기술한 실시 예들은 모든 면에서 예시적인 것이며, 한정적인 것이 아닌 것으로서 이해되어야 하고, 본 발명의 범위는 전술한 상세한 설명보다는 후술하는 특허청구범위에 의하여 나타내어지는 것이므로, 특허청구범위의 의미 및 범위 그리고 그 등가개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.Therefore, the embodiments described above are intended to be illustrative in all respects, and should not be considered as limiting, and the scope of the present invention is indicated by the appended claims rather than the foregoing description, and therefore the meaning of the claims. And all changes or modifications derived from the scope and equivalent concept thereof should be construed as being included in the scope of the present invention.

도 1은 일반적인 저사댐의 예를 나타낸 사시도이다.1 is a perspective view showing an example of a general low dam.

도 2는 일반적인 다기능 버트리스 사방댐의 예를 나타낸 사시도이다.2 is a perspective view showing an example of a general multi-function buttress four-way dam.

도 3은 본 발명에 의한 에코-필라 사방댐의 일 예를 나타낸 사시도이다.Figure 3 is a perspective view showing an example of the eco-pillar four sides dam according to the present invention.

도 4는 도 3에 나타난 에코-필라 사방댐의 측단면도이다.4 is a side cross-sectional view of the eco-pillar four-way dam shown in FIG.

도 5a 및 도 5b는 도 3에 나타난 에코-필라 사방댐의 철골구조에 대한 예를 나타낸 투영도이다.5A and 5B are projection views showing an example of the steel structure of the eco-pillar square dam shown in FIG. 3.

도 6은 본 발명에 의한 에코-필라 사방댐의 다른 예를 나타낸 사시도이다.Figure 6 is a perspective view showing another example of the eco-pillar square dam according to the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

GL : 원지반 S : 야면석GL: Base S: Night Stone

10 : 버림콘크리트층 20 : 기초콘크리트층10: discarded concrete layer 20: basic concrete layer

30 : 전방필라열 40 : 후방필라열30: front pillar row 40: rear pillar row

50 : 어도 60 : 아면석찰붙임부50: ado 60: face stone paste

70 : 측벽 81 : 기초철근70: side wall 81: foundation reinforcement

82 : 세로철근 83 : 띠철근82: longitudinal reinforcement 83: strip reinforcing bar

200 : 끝돌림부 300 : 전방필라200: end portion 300: the front pillar

400 : 후방필라400: rear pillar

Claims (7)

기초콘크리트층(20)에 다수개의 전방필라(300)가 좌우방향으로 이격되게 설치되어 전방필라열(30)이 구비되어지고, 상기 전방필라열(30)의 후방으로 다수개의 후방필라(300)가 좌우방향으로 이격되게 설치되어 후방필라열(40)이 구비되어지되, 상기 전방필라(300)와 후방필라(400)가 지그재그로 서로 교차되어지게 구비되어지는 에코-필라 사방댐에 있어서, A plurality of front pillars 300 are installed on the foundation concrete layer 20 so as to be spaced apart in left and right directions, and a front pillar row 30 is provided, and a plurality of rear pillars 300 are located behind the front pillar row 30. In the eco-pillar four-way dam is installed to be spaced apart in the left and right direction is provided with a rear pillar row 40, the front pillar 300 and the rear pillar 400 is zigzag to cross each other, 상기 기초콘크리트층(20)은 원지반(GL)이 터파기되어 버림콘크리트층(10)이 구비되고 상기 버림콘크리트층(10)의 상부에 구비되어지되, 상기 기초콘크리트층(20)의 종단부 하부에는 끝돌림부(200)가 수직방향으로 연장형성되고, 상기 기초콘크리트층(20)의 상부면은 상기 원지반(GL)의 상부면과 일치되는 높이로 형성되며, 상기 전방필라(300)와 후방필라(400)는 기초콘크리트층(20)의 상부로 돌출된 세로철근(82)에 다수개의 띠철근(83)이 일정간격으로 고정설치되고 콘크리트가 타설되어 상기 기초콘크리트층(20)과 일체로 철근콘크리트구조로 형성되어지되, 상기 전방필라열(30)이 후방필라열(40) 보다 높게 형성되고, 상기 기초콘크리트층(20)의 상부면에 어도(50)가 형성되어지되, 상기 어도(50)는 다수개의 전방필라(300) 사이를 통과하면서 분기되어 상기 다수개의 후방필라(300) 사이를 통과하도록 형성되어지는 것을 특징으로 하는 에코-필라 사방댐..The base concrete layer 20 is provided with the discarded concrete layer 10 by breaking the base ground GL, and is provided on the discarded concrete layer 10, but is below the terminal portion of the basic concrete layer 20. The end portion 200 is formed to extend in the vertical direction, the upper surface of the foundation concrete layer 20 is formed at the same height as the upper surface of the base plate GL, the front pillar 300 and the rear Pillar 400 is a plurality of strip reinforcement 83 is fixedly installed at a predetermined interval to the longitudinal reinforcing bar 82 protruding to the upper portion of the base concrete layer 20 and the concrete is poured into the base concrete layer 20 integrally Is formed of a reinforced concrete structure, the front pillar row 30 is formed higher than the rear pillar row 40, the airway 50 is formed on the upper surface of the base concrete layer 20, 50 is branched while passing between the plurality of front pillars (300) Eco-pillar four-way dam, characterized in that formed to pass between the rear pillars. 삭제delete 제 1항에 있어서,The method of claim 1, 상기 전방필라(300) 및 후방필라(400)는 "
Figure 112009078208121-pat00004
"형 단면의 기둥인 것을 특징으로 하는 에코-필라 사방댐.
The front pillar 300 and the rear pillar 400 is "
Figure 112009078208121-pat00004
"Eco-pillar square dam, characterized in that the pillar of the cross-section.
삭제delete 제 1항 또는 제 3항에 있어서,The method according to claim 1 or 3, 상기 기초콘크리트층(20)의 하류측에는,On the downstream side of the base concrete layer 20, 상기 기초콘크리트층(20)과 연결되어 야면석(S)이 매설되어지는 야면석찰붙임부(60)가 설치되어지는 것을 특징으로 하는 에코-필라 사방댐.Eco-pillar four-way dam, characterized in that the surface is attached to the foundation surface layer 60 is connected to the foundation concrete layer (20) is embedded. 제 1항 또는 제 3항에 있어서,The method according to claim 1 or 3, 상기 에코필라 사방댐의 일측 또는 양측에는 야면석(S)이 적층되어 측벽(70)이 설치되어지는 것을 특징으로 하는 에코-필라 사방댐.Eco-pillar four-way dam, characterized in that the side wall 70 is installed on one side or both sides of the eco-pillar four sides dam is stacked (S). 삭제delete
KR1020090126291A 2009-12-17 2009-12-17 Eco-pillar debris barrier KR100965467B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090126291A KR100965467B1 (en) 2009-12-17 2009-12-17 Eco-pillar debris barrier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090126291A KR100965467B1 (en) 2009-12-17 2009-12-17 Eco-pillar debris barrier

Publications (1)

Publication Number Publication Date
KR100965467B1 true KR100965467B1 (en) 2010-06-24

Family

ID=42370344

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090126291A KR100965467B1 (en) 2009-12-17 2009-12-17 Eco-pillar debris barrier

Country Status (1)

Country Link
KR (1) KR100965467B1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101238507B1 (en) * 2012-06-26 2013-03-04 현대건설주식회사 River structure having function of continuity for sediment and ecological life
KR101250185B1 (en) * 2010-10-20 2013-04-05 최한미 Erosion Control Dam
KR101317279B1 (en) * 2011-10-18 2013-10-10 한국도로공사 Earthflow protection structure
JP2017227031A (en) * 2016-06-22 2017-12-28 Jfe建材株式会社 Repairing method for capturing body, repaired structure of capturing body, capturing body and dam
KR20190012686A (en) 2017-07-28 2019-02-11 강남이앤씨 주식회사 A assembly type eco pillar debris barrier and construction method thereof
KR20190097459A (en) 2018-02-12 2019-08-21 가톨릭관동대학교산학협력단 A bolck-assembly type eco pillar debris barrier and construction method thereof
KR20220081491A (en) * 2020-12-09 2022-06-16 서울대학교산학협력단 Debris barrier having openable water cushion)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200440994Y1 (en) 2007-05-09 2008-07-17 산림조합중앙회 Slope method Drain for a living rock debris barrier

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200440994Y1 (en) 2007-05-09 2008-07-17 산림조합중앙회 Slope method Drain for a living rock debris barrier

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101250185B1 (en) * 2010-10-20 2013-04-05 최한미 Erosion Control Dam
KR101317279B1 (en) * 2011-10-18 2013-10-10 한국도로공사 Earthflow protection structure
KR101238507B1 (en) * 2012-06-26 2013-03-04 현대건설주식회사 River structure having function of continuity for sediment and ecological life
JP2017227031A (en) * 2016-06-22 2017-12-28 Jfe建材株式会社 Repairing method for capturing body, repaired structure of capturing body, capturing body and dam
KR20190012686A (en) 2017-07-28 2019-02-11 강남이앤씨 주식회사 A assembly type eco pillar debris barrier and construction method thereof
KR20190097459A (en) 2018-02-12 2019-08-21 가톨릭관동대학교산학협력단 A bolck-assembly type eco pillar debris barrier and construction method thereof
KR20220081491A (en) * 2020-12-09 2022-06-16 서울대학교산학협력단 Debris barrier having openable water cushion)
KR102507455B1 (en) * 2020-12-09 2023-03-07 서울대학교산학협력단 Debris barrier having openable water cushion)

Similar Documents

Publication Publication Date Title
KR100965467B1 (en) Eco-pillar debris barrier
KR100560986B1 (en) Multifunctional erosion control dam and its construction method
CN106930231B (en) A kind of construction method applied to engineering flood bank reinforcing of passing the flood period
CN104594287B (en) Ecological and economic bank protection structure
CN210975741U (en) Reinforced structure of earth and rockfill dam
CN107816050B (en) Concrete cofferdam and earth-rock cofferdam combined cofferdam and construction method thereof
CN207405576U (en) For the galvanized wire cage debris dam of mountain area RBS in channel direction
KR101289723B1 (en) Debris barrier capable of preserving scenery
RU2321701C2 (en) Weir construction method
CN102234995A (en) Ecological overtopping dam and construction method thereof
JP5097249B2 (en) Drain structure and construction method of drain structure
KR101170789B1 (en) Complex debris barrier of eco-friendly
KR101097055B1 (en) Debris barrier and plastering between rafters constructed by the cast iron panel and method of debris barrier
KR100671791B1 (en) Block in revetment to preserve river environment
CN211735258U (en) Pile type rock-fill angle bead
KR100743550B1 (en) Scour prevention block
CN105133544A (en) High-strength river channel ecological bank protection bonded brick and reinforcing and building method thereof
KR101052295B1 (en) Four-sided dam with double drips
RU121270U1 (en) SUPPORT WEIR (OPTIONS) AND FLEXIBLE CONCRETE MAT FOR ITS CREATION
CN218090948U (en) Inclined retaining wall
JP3984427B2 (en) River dam and river system using the same
CN218842992U (en) Ecological slope protection structure for channel
CN220079884U (en) Embankment protective structure
CN209854672U (en) Water conservancy flood control dam structure
CN205894060U (en) Prefabricated ecological plate stake and manger plate fender building structure for soil

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant