KR100560986B1 - Multifunctional erosion control dam and its construction method - Google Patents
Multifunctional erosion control dam and its construction method Download PDFInfo
- Publication number
- KR100560986B1 KR100560986B1 KR1020050104077A KR20050104077A KR100560986B1 KR 100560986 B1 KR100560986 B1 KR 100560986B1 KR 1020050104077 A KR1020050104077 A KR 1020050104077A KR 20050104077 A KR20050104077 A KR 20050104077A KR 100560986 B1 KR100560986 B1 KR 100560986B1
- Authority
- KR
- South Korea
- Prior art keywords
- blocking
- blocking portion
- block
- concrete
- dam
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
- E02B7/02—Fixed barrages
- E02B7/04—Dams across valleys
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B8/00—Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
- E02B8/08—Fish passes or other means providing for migration of fish; Passages for rafts or boats
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Revetment (AREA)
Abstract
본 발명은 다기능 사방댐 및 그 시공방법에 관한 것으로, 토석차단부(100)의 좌ㆍ우측에 소정높이의 땜어깨(110)가 형성되고, 상기 토석차단부(100) 전방에 워터쿠션부(300)가 형성되는 철근 콘크리트 구조물의 사방댐에서 상기 토석차단부(100)와 상기 토석차단부(100)의 좌ㆍ우측에 형성된 땜어깨(110) 사이에 금속재의 유목차단부(200)가 설치되어지는 사방댐에 있어서, 상기 토석차단부(100)의 하부에는 하나 이상의 어도가 형성되고, 상기 토석차단부(100)는 제1차단부(101), 제2차단부(102) 및 제3차단부(103)로 콘크리트가 순차적으로 타설되어 형성되어지되, 상기 제1차단부(101), 제2차단부(102) 및 제3차단부(103)의 수직 이음부에는 가로방향으로 지수판(120)의 상ㆍ하부가 서로 묻히도록 콘크리트가 타설되고 상기 제2차단부(102)에 앵커(130)가 설치되고 상기 앵커(130)에 유목차단부(200)가 설치되어 상기 앵커(130)와 유목차단부(200)의 하부가 묻히도록 제3차단부(103)의 콘크리트가 타설되고, 상기 토석차단부(100)의 중앙부의 수평 이음부에는 세로방향으로 필라(140)가 설치되고, 상기 필라(140) 중앙부에는 다수의 신축이음환봉(150)이 상기 필라(140)를 관통하여 상ㆍ하로 설치된 것이다.The present invention relates to a multi-functional four-way dam and its construction method, the solder shoulder 110 of a predetermined height is formed on the left and right sides of the earth blockage portion 100, the water cushion portion 300 in front of the earth blockage portion (100) The driftwood block 200 of the metal material is installed between the ground block 100 and the ground shoulder 110 formed on the left and right sides of the ground block 100 at the dams of the reinforced concrete structure in which is formed. In the four-sided dam, at least one fishery is formed at the lower portion of the soil blocking portion 100, and the soil blocking portion 100 includes a first blocking portion 101, a second blocking portion 102, and a third blocking portion ( Concrete is formed by sequentially pouring 103, but the vertical joints of the first blocking portion 101, the second blocking portion 102 and the third blocking portion 103 in the horizontal direction of the index plate 120 Concrete is poured so that the upper part and the lower part are buried together, and the anchor 130 is installed in the second blocking part 102 and the anchor 130 The driftwood block 200 is installed so that the bottom of the anchor 130 and the driftwood block 200 is buried, and the concrete of the third block 103 is poured, and the center portion of the earth block 100 is horizontal. Pillar 140 is provided in the joint portion in the longitudinal direction, and a plurality of expansion joint ring rods 150 are installed at the center of the pillar 140 through the pillar 140 and up and down.
사방댐, 토석차단부, 유목차단부, 배수구, 어도, 지수판, 필라 Four-sided dam, earth block, driftwood block, drain, fish, water plate, pillar
Description
도 1은 종래기술에 따른 이중벽댐의 일례를 도시한 도면,1 is a view showing an example of a double wall dam according to the prior art,
도 2는 종래기술에 따른 스크린댐의 일례를 도시한 도면,2 is a view showing an example of a screen dam according to the prior art,
도 3은 본 발명에 따른 다기능 사방댐의 사시도,3 is a perspective view of a multifunctional four-way dam in accordance with the present invention;
도 4는 본 발명에 따른 다기능 사방댐의 정면도,4 is a front view of the multifunctional four-way dam in accordance with the present invention;
도 5a는 본 발명에 따른 다기능 사방댐의 평면도,Figure 5a is a plan view of a multi-functional four-sided dam in accordance with the present invention,
도 5b는 본 발명의 다른 실시예에 따른 다기능 사방댐의 평면도,Figure 5b is a plan view of a multi-functional four-sided dam in accordance with another embodiment of the present invention,
도 6은 도 5a의 A-A선 단면의 확대도,6 is an enlarged view of a section A-A of FIG. 5A,
도 7은 본 발명에 따른 토목차단부의 세부 사시도,7 is a detailed perspective view of a civil engineering cutout unit according to the present invention;
도 8은 본 발명에 따른 다기능 사방댐의 시공 흐름도이다.8 is a construction flowchart of the multi-functional four-way dam in accordance with the present invention.
- 도면의 주요부분에 대한 부호의 설명 --Explanation of symbols for the main parts of the drawings-
100 : 토석차단부 101 : 제1차단부100: earth blockage portion 101: the first block
102 : 제2차단부 103 : 제3차단부102: second blocking portion 103: third blocking portion
110 : 땜어깨 120 : 지수판110: shoulder 120: index plate
130 : 앵커 140 : 필라130: anchor 140: pillar
150 : 신축이음환봉 151 : 환봉150: expansion joint round bar 151: round bar
152 : 캡 160a,160b : 어도152:
161 : 자연석 162 : 수초식재블럭161: natural stone 162: aquatic plant block
163 : 격벽 163a :꺽임부163: bulkhead 163a: bent portion
170 : 배수구 180 : 측벽부170: drain port 180: side wall portion
200 : 유목차단부 210 : 주부재 220 : 버트리스부재 230 : 스크린재 240 : 스트럿부재 300 : 워터쿠션부 301 : 끝돌림 310 : 소제구 320 : 이형철근200: driftwood cutout 210: main member 220: buttress member 230: screen member 240: strut member 300: water cushion portion 301: end 310: small section 320: deformed rebar
본 발명은 다기능 사방댐에 관한 것으로, 더욱 상세하게는 토석의 하류유출을 차단하는 기능과 유목의 흐름을 차단하는 기능을 동시에 수행할 수 있도록 된 다기능 사방댐 및 그 시공방법에 관한 것이다.The present invention relates to a multi-functional four-sided dam, and more particularly to a multi-functional four-sided dam and its construction method that can be performed at the same time to block the flow of drift and block the flow of driftwood.
일반적으로, 하상구배(河床勾配)가 큰 계곡에서는 급류가 강바닥을 파고 양쪽 산기슭을 깎아서 산사태를 유발하므로 이를 방지하고 급류를 따라 토석(土石)이 하류로 흘러 내려가는 것을 방지하기 위해서 사방(砂防)댐을 건설하게 된다.In general, in valleys with large river gradients, rapids digging riverbeds and shattering both sides of the mountains cause landslides, and to prevent this from happening. Will be built.
이렇게 산간계곡 등의 수해방지용으로 설치하는 사방댐은 크게 2가지 종류로 구분할 수 있는데, 하나는 중력식 댐인 콘크리트댐으로, 도 1에서 보는 바와 같이, 이 콘크리트댐(10)은 통상 댐의 상류에서 흘러 내려오는 물과 토석을 가두어 댐 하류의 피해를 예방하는 기능을 수행하게 된다.Thus, four-sided dams installed for preventing floods such as mountain valleys can be divided into two types. One is a concrete dam which is a gravity dam, and as shown in FIG. 1, the
다른 하나는 유목방지용 댐인 버트리스댐(Buttress Dam)으로, 도 2에서 보는 바와 같이, 이 버트리스댐(20)은 산간계곡 등의 상류에서 산사태가 발생하여 뿌리 채 뽑힌 유목(流木)이 떠 내려와 댐에 걸려서 댐 하류의 유로를 변경시키거나 교량에 걸려 유로를 변경시켜 인명과 주택 및 농경지에 피해를 주는 것을 방지하는 기능을 수행한다.The other is a driftwood prevention buttress (Buttress Dam), as shown in Figure 2, the
한편, 수해를 효과적으로 예방하기 위해서는 계통적으로 사방댐을 설치해야 하는데, 통상적으로 산간계류의 상류에는 유목방지에 효과가 뛰어난 버트리스댐(20)을 설치하고, 하류에는 토석의 하류유출을 방지하는 콘크리트댐(10)을 설치하게 된다.On the other hand, in order to effectively prevent flooding, it is necessary to systematically install four-sided dams. Typically, upstream mountain streams are provided with a
하지만, 전술한 바와 같이 하나의 계류에 2개 이상의 사방댐을 설치하게 되면 산간계곡의 훼손이 불가피한 문제점과 아울러, 여러 개의 사방댐 설치로 인해 설치비용이 증가하는 문제점이 있었다.However, as described above, when two or more four-sided dams are installed in one mooring, damage to the mountain valleys is inevitable, and installation costs increase due to the installation of several four-sided dams.
이에 본 발명은 상기와 같은 문제점을 해결하기 위해 창출된 것으로, 토석의 하류유출을 차단하는 기능과 유목의 흐름을 차단하는 기능을 동시에 수행할 수 있는 다기능 사방댐을 제공하여, 집중호우 및 태풍 등으로 산사태가 발생하여 토석과 유목이 하천 하류의 인명, 가옥, 농경지 및 기타 산업기반시설에 피해를 주는 것을 방지함은 물론, 자연경관의 훼손을 최소화할 수 있도록 된 다기능 사방댐 및 그 시 공방법을 제공하는데 그 목적이 있다.Accordingly, the present invention was created to solve the above problems, by providing a multi-functional four-way dam that can simultaneously perform the function of blocking the flow of downstream and blocking the flow of driftwood, such as heavy rain and typhoon Provides a multifunctional all-round dam and its construction method that prevents landslides and drifts from damaging lives, houses, farmland and other industrial infrastructure downstream of the river, and minimizes damage to natural landscapes Its purpose is to.
상기와 같은 목적을 달성하기 위해 본 발명에 따른 다기능 사방댐은, 토석차단부의 좌ㆍ우측에 소정높이의 땜어깨가 형성되고, 상기 토석차단부 전방에 워터쿠션부가 형성되는 철근 콘크리트 구조물의 사방댐에서 상기 토석차단부와 상기 토석차단부의 좌ㆍ우측에 형성된 땜어깨 사이에 금속재의 유목차단부가 설치되어지는 사방댐에 있어서, 상기 토석차단부의 하부에는 하나 이상의 어도가 형성되고, 상기 토석차단부는 제1차단부, 제2차단부 및 제3차단부로 콘크리트가 순차적으로 타설되어 형성되어지되, 상기 제1차단부, 제2차단부 및 제3차단부의 수직 이음부에는 가로방향으로 지수판의 상ㆍ하부가 서로 묻히도록 콘크리트가 타설되고 상기 제2차단부에 앵커가 설치되고 상기 앵커에 유목차단부가 설치되어 상기 앵커와 유목차단부의 하부가 묻히도록 제3차단부의 콘크리트가 타설되고, 상기 토석차단부의 중앙부의 수평 이음부에는 세로방향으로 필라가 설치되고, 상기 필라 중앙부에는 다수의 신축이음환봉이 상기 필라를 관통하여 상ㆍ하로 설치되어지는 것을 특징으로 한다.In order to achieve the above object, the multifunctional four-way dam in accordance with the present invention, a solder shoulder having a predetermined height is formed on the left and right sides of the earth block, and the water cushion portion is formed in front of the earth block. In a four-way dam in which a driftwood block of metal is provided between a ground block and a shoulder formed on the left and right sides of the ground block, one or more fishes are formed under the ground block, and the ground block includes a first block. The concrete is formed by sequentially pouring the second blocking portion and the third blocking portion. The vertical joints of the first blocking portion, the second blocking portion, and the third blocking portion are buried with each other in the horizontal direction. The concrete is poured so that the anchor is installed in the second blocking portion and the driftwood blocking portion is installed in the anchor to bury the lower portion of the anchor and the driftwood blocking portion. Concrete is poured to the third blocking portion, the pillars are installed in the vertical direction in the horizontal joint portion of the central portion of the earth block, and a plurality of expansion joint rods are installed up and down through the pillar in the central portion of the pillar. It is characterized by.
본 발명의 일실시예에 따르면, 상기 어도는 양측벽을 자연석 찰쌓기로 하여 'S'자형의 어도를 형성하되, 상기 어도의 양측 바닥에는 수초식재블럭이 지그재그로 설치되는 것을 특징으로 한다.According to one embodiment of the present invention, the fish is to form a 'S' shaped fish by the natural stone piles on both sides of the wall, characterized in that the plants on both sides of the fish is installed in a zigzag block.
본 발명의 다른 실시예에 따르면, 상기 어도는 양측벽을 콘크리트로 하여'|'자형의 어도를 형성하되, 상기 어도 바닥의 양측벽에는 다수의 격벽이 지그재그로 설치되어지고 일측벽에 설치된 격벽의 단부는 상부로 꺽임부가 형성되는 것을 특징으로 한다.According to another embodiment of the present invention, the fishery forms a '|' shaped fishery with both side walls of concrete, and a plurality of bulkheads are zigzag on both sidewalls of the bottom of the fishery. The end is characterized in that the bent portion is formed in the upper portion.
본 발명에 따르면, 상기 유목차단부는 상기 앵커에 고정된 다수의 주부재와 버트리스부재 및 스크린재로 구성되어지되, 상기 버트리스부재의 일단은 상기 주부재의 후방에 연결되고 타단은 상기 앵커에 고정되며, 상기 주부재와 주부재 사이에는 다수의 스크린재가 결합되고, 상기 주부재와 상기 버트리스부재 사이에 스트럿부재가 연결되어지는 것이 바람직하다.According to the present invention, the driftwood block is composed of a plurality of main members, buttress member and the screen member fixed to the anchor, one end of the buttress member is connected to the rear of the main member and the other end is fixed to the anchor Preferably, a plurality of screen members are coupled between the main member and the main member, and a strut member is connected between the main member and the buttress member.
또한 본 발명에 따르면, 상기 토석차단부의 하부에는 가로방향으로 격자형의 이형철근이 배근되고, 상기 워터쿠션부의 중앙하부에는 세로방향으로 격자형의 이형철근이 배근되며 상기 땜어깨에는 격자형의 이형철근이 종방향으로 배근되어지되, 상기 토석차단부 또는 땜어깨의 하부에는 하나 이상의 배수구가 형성되며, 상기 워터쿠션부의 하부 끝돌림에는 소제구가 구비되고, 상기 토석차단부의 전면에는 자연석 찰쌓기 또는 자연석 문양 거푸집을 이용한 자연석 문양이 형성되는 것이 바람직하다.Further, according to the present invention, a lattice-shaped deformed reinforcing bar is disposed in the horizontal direction at the lower part of the earth block, and a lattice-shaped reinforcing bar is reinforced in the longitudinal direction at the center lower portion of the water cushion part, and lattice-shaped deforming is formed on the solder shoulder. Reinforcing bars are longitudinally reinforcement, one or more drain holes are formed in the lower portion of the earth block or solder shoulder, a lower end of the water cushion portion is provided with a jig, and the front of the earth block is a natural stone stacking or It is preferable that natural stone patterns are formed using natural stone pattern formwork.
한편 본 발명에 따른 다기능 사방댐의 시공방법은, 토석차단부의 좌ㆍ우측에 소정높이의 땜어깨가 형성되고, 상기 토석차단부 전방에 워터쿠션부가 형성되는 철근 콘크리트 구조물의 사방댐에서 상기 토석차단부와 상기 토석차단부의 좌ㆍ우측에 형성된 땜어깨 사이에 금속재의 유목차단부가 설치되어지는 사방댐의 시공방법에 있어서, 상기 사방댐의 대상지를 굴착하고 정지한 후 잡석다짐하는 단계; 상기 잡석다짐한 대상지에 토석차단부의 제1차단부와 워터쿠션부의 기초 콘크리트를 타설하는 단계; 상기 제1차단부에는 가로방향으로 격자형의 이형철근을 배근하고 상 기 워터쿠션부의 중앙부에는 세로 방향으로 격자형의 이형철근을 배근한 후 콘크리트를 타설하는 단계; 상기 토석차단부의 제1차단부의 가로방향으로 좌ㆍ우측에 땜어깨를 형성하는 단계; 상기 제1차단부 상부에 제2차단부의 콘크리트를 타설하는 단계; 상기 제2차단부 또는 땜어깨의 하부에 어도 또는 배수구를 설치하는 단계; 상기 제2차단부에 앵커를 설치하고, 상기 앵커에 유목차단부를 설치한 후 상기 앵커와 상기 유목차단부의 하부가 묻히도록 제3차단부의 콘크리트를 타설하는 단계; 상기 제1차단부, 제2차단부 및 제3차단부의 수직 이음부에는 가로방향으로 지수판을 설치하는 단계; 상기 토석차단부의 중앙부의 수평 이음부에는 세로방향으로 필라를 설치하고 상기 필라의 중앙부에는 다수의 신축이음환봉이 상기 필라를 관통하여 설치하는 단계; 및 상기 워터쿠션부의 하부에 소제구가 형성된 끝돌림을 형성하는 단계를 포함하는 것을 특징으로 한다.On the other hand, the construction method of the multi-functional four-sided dam in accordance with the present invention, the ground and shoulders of a predetermined height is formed on the left and right sides of the earth block, and the earth block in the four-way dam of reinforced concrete structure in which the water cushion is formed in front of the earth block Claims [1] A method of constructing a four-sided dam, wherein a driftwood-blocking portion of a metal is installed between solders formed on the left and right sides of the earth-blocking portion, the method comprising the steps of digging and stopping the target site of the four-sided dam; Placing foundation concrete of the first cut-off portion and the water-cushion portion of the soil cut-off portion on the rubble target site; Reinforcing the lattice-shaped deformed reinforcing bars in the horizontal direction to the first cut-off part and placing the lattice-shaped deformed reinforcing bars in the vertical direction in the center of the water cushion part; Forming a solder shoulder on the left and right sides in the horizontal direction of the first blocking portion of the earth block; Placing concrete on the first blocking portion on the second blocking portion; Installing an airway or a drain at a lower portion of the second blocking portion or solder shoulder; Installing an anchor on the second blocking part, installing a driftwood blocking part on the anchor, and placing concrete on the third blocking part so that the lower part of the anchor and the driftwood blocking part are buried; Installing a water stop plate in a horizontal direction on the vertical joint of the first blocking part, the second blocking part, and the third blocking part; Installing a pillar in the longitudinal direction in the horizontal joint portion of the center portion of the earth block, and a plurality of expansion joint ring rod is installed through the pillar in the central portion of the pillar; And characterized in that it comprises the step of forming the end of the water cushion is formed in the lower portion of the water cushion.
이하 본 발명을 첨부된 예시도면을 참조로 상세히 설명한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.
도 3은 본 발명에 따른 다기능 사방댐의 사시도이고, 도 4는 본 발명에 따른 다기능 사방댐의 정면도이며, 도 5a 및 도 5b는 본 발명에 따른 다기능 사방댐의 평면도이고, 도 6은 도 5a의 A-A선 단면의 확대도이며, 도 7은 본 발명에 따른 토목차단부의 세부 사시도이고, 도 8은 본 발명에 따른 다기능 사방댐의 시공 흐름도이다.Figure 3 is a perspective view of a multi-functional four-way dam in accordance with the present invention, Figure 4 is a front view of the multi-functional four-way dam in accordance with the present invention, Figures 5a and 5b is a plan view of the multi-function four-way dam in accordance with the present invention, Figure 6 is a line AA of Figure 5a 7 is an enlarged cross-sectional view, and FIG. 7 is a detailed perspective view of the civil engineering cutout unit according to the present invention, and FIG. 8 is a construction flowchart of the multifunctional four-way dam according to the present invention.
본 발명에 따른 다기능 사방댐은, 도 3에서 보는 바와 같이, 토석차단부(100)의 좌ㆍ우측에 소정높이의 땜어깨(110)가 형성되고, 상기 토석차단부(100) 전방 및 좌ㆍ우측의 측벽부(180) 사이에 워터쿠션부(300)가 형성되는 철근 콘크리트 구조물의 사방댐으로서, 상기 토석차단부(100)와 상기 토석차단부(100)의 좌ㆍ우측에 형성된 땜어깨(110) 사이에 금속재의 유목차단부(200)가 설치된다.As shown in FIG. 3, the multifunctional four-sided dam according to the present invention has a
도 6 및 도 7에서 보는 바와 같이, 상기 토석차단부(100)는 제1차단부(101), 제2차단부(102) 및 제3차단부(103)로 콘크리트가 순차적으로 타설되어 형성되는데, 이것은 한 번의 콘크리트 타설을 통해 토석차단부(100)를 형성하는 것이 곤란하기 때문에 제1차단부(101), 제2차단부(102) 및 제3차단부(103)로 나누어서 콘크리트를 타설하게 되는 것이며, 이때 각 차단부(101,102,103)의 수직 이음부에는 가로방향으로 지수판(120)을 설치하여 수직 이음부의 누수를 방지하게 된다.As shown in FIG. 6 and FIG. 7, the
즉, 상기 제1차단부(101), 제2차단부(102) 및 제3차단부(103)의 수직 이음부에는 가로방향으로 지수판(120)의 상ㆍ하부가 서로 묻히도록 콘크리트가 타설되며, 상기 제2차단부(102)에 앵커(130)가 설치되고, 상기 앵커(130)에 상기 유목차단부(200)가 설치되어 상기 앵커(130)와 유목차단부(200)의 하부가 묻히도록 제3차단부(103)의 콘크리트가 타설된다.That is, concrete is poured on the vertical joints of the first blocking
여기서, 상기 지수판(120)의 중앙부는 볼록하게 형성되어 작업자가 상기 지수판(120)의 설치위치를 시각적으로 용이하게 인지할 수 있다.Here, the central portion of the
이러한 지수판(120)의 재질은 자연 생고무, 고밀도 합성고무, 폴리에틸렌 또는 E.V.A 등을 이용할 수 있으며, 상기 지수판(120)의 두께는 구조물의 크기에 따라 변경될 수 있으나, 본 발명의 사방댐에서는 10mm 내외가 바람직하다.The
그리고, 상기 토석차단부(100)의 중앙부의 수평 이음부에는 세로방향으로 필라(140)가 설치되고, 상기 필라(140) 중앙부에는 다수의 신축이음환봉(150)이 상기 필라(140)를 관통하여 상ㆍ하로 설치된다.In addition,
여기서, 상기 필라(140)는 신축이음채움재(Expansion Joint Filler)라고도 불리우며, 콘크리트 타설시의 연속타설 불능, 지반의 부동침하, 지진 및 온도변화 등에 대응하기 위해 신축이음(Expansion Joint) 부분에 미리 채워져 콘크리트의 수축, 팽창 및 진동에 의한 구조물의 변위에 적응할 수 있도록 하기 위한 것이다.Here, the
이러한 필라(140)의 재질은 전술한 지수판(120)의 재질과 동일하며, 상기 필라(140)의 두께는 구조물의 크기에 따라 변경될 수 있으나, 본 발명의 사방댐에서는 20mm 내외가 바람직하다.The material of the
그리고, 상기 신축이음환봉(150)은 다웰바(Dowel Bar)라고도 불리우며, 환봉(151)과 캡(152)으로 이루어진다. 상기 환봉(151) 측은 콘크리트에 고정되며, 상기 캡(152) 측은 콘크리트에 직접 닿지 않게 위치된다. 상기 캡(152) 내부에는 그리스 등이 충진되어 방청작용 및 콘크리트 타설시 캡(152) 내부로 콘크리트가 들어가는 것을 방지하게 된다. 이러한 신축이음환봉(150)은 비연속적인 콘크리트 타설시 또는 연결부위에 시공하는 것으로, 콘크리트의 온도변화에 따른 수축 또는 팽창시 크랙 등을 방지하기 위하여 사용된다.The
상기 신축이음환봉(150)은 필라(140)의 중앙부에 상기 필라(140)를 관통하여 상하로 소정의 간격을 두고 설치하되, 상기 신축이음환봉(150)의 캡(152)이 서로 교차되도록 설치하는 것이 바람직하며, 상기 신축이음환봉(150)은 열간압연처리된 원형봉강이 이용될 수 있다.The expansion
여기서, 상기 토석차단부(100)는 다수의 자연석을 포함하는 콘크리트 구조물 로 이루어질 수 있으며, 이를 통해 본 발명에 따른 다기능 사방댐을 주변 자연환경과 보다 더 잘 어우러지게 조성할 수 있다.Here, the
본 발명에 따르면, 상기 토석차단부(100)의 하부에는 가로방향으로 격자형의 이형철근이 배근되고, 상기 워터쿠션부(300)의 중앙하부에는 세로방향으로 격자형의 이형철근(320)이 배근되며, 상기 땜어깨(110) 및 측벽부(180)에는 격자형의 이형철근이 종방향으로 배근될 수 있다.According to the present invention, a lattice-shaped deformed reinforcing bar is disposed in the horizontal direction at the lower portion of the
이렇게 상기 토석차단부(100) 또는 워터쿠션부(300)에 설치되는 격자형의 철근인 상기 이형철근(320)은 구조물의 부동침하나 균열 및 크랙이 예상될 경우에 사용되는 것으로, 일종의 신축이음(Expansion Joint)이라 할 수 있으며, 콘크리트를 끊어치기 할 때 사용되는 것이어서 시공이음(Construction Joint)이라고도 한다. Thus, the deformed reinforcing
또한 본 발명에 따르면, 상기 토석차단부(100) 또는 땜어깨(110)의 하부에는 하나 이상의 배수구(170)가 형성되며, 상기 워터쿠션부(300)의 하부 끝돌림(301)에는 소제구(310)가 구비되고, 상기 토석차단부(100) 또는 땜어깨(110)의 전면에는 자연석(161) 찰쌓기 또는 자연석 문양 거푸집을 이용한 자연석 문양이 형성될 수 있다.In addition, according to the present invention, one or more drain holes 170 are formed at the lower portion of the
그리고 본 발명에 따르면, 상기 토석차단부(100)의 하부에는 하나 이상의 어도를 형성할 수 있는데, 이러한 어도는 다기능 사방댐의 설치에 따른 어류의 이동제한을 해결하여 보다 환경 친화적인 사방댐을 구축하기 위한 것이다.And according to the present invention, one or more fish can be formed in the lower portion of the
본 발명의 일실시예에 따르면, 도 5a에서 보는 바와 같이, 상기 어도는 양측 벽을 자연석(161) 찰쌓기로 하여 'S'자형의 어도(160a)를 형성하되, 상기 어도(160a)의 양측 바닥에는 수초식재블럭(162)이 지그재그로 설치될 수 있다.According to one embodiment of the invention, as shown in Figure 5a, the fishery is to form a 'S' shaped
여기서, 상기 수초식재블럭(162) 내에는 흙이 그물망에 채워진 상태로 제공되어 다양한 수초가 쉽게 활착할 수 있다.Here, in the
한편, 본 발명의 다른 실시예에 따르면, 도 5b에서 보는 바와 같이, 어도는 양측벽을 콘크리트로 하여 '|'자형의 어도(160b)를 형성하되, 상기 어도(160b) 바닥의 양측벽에는 다수의 격벽(163)이 지그재그로 설치되어지고 일측벽에 설치된 격벽(163)의 단부는 상부로 꺽임부(163a)가 형성되도록 구성할 수 있는데, 상기 꺽임부(163a)는 물의 급격한 흐름을 방지하는 기능을 수행한다.On the other hand, according to another embodiment of the present invention, as shown in Figure 5b, the fishery to form a '|' shaped
본 발명에 따르면, 도 6에서 보는 바와 같이, 유목차단부(200)는 상기 앵커(130)에 고정된 다수의 주부재(210)와 버트리스부재(220) 및 스크린재(230)로 구성되며, 상기 버트리스부재(220)의 일단은 상기 주부재(210)의 후방에 연결되고 타단은 상기 앵커(130)에 고정된다.According to the present invention, as shown in Figure 6, the
그리고, 상기 주부재(210)와 주부재(210) 사이에는 다수의 스크린재(230)가 결합되고, 상기 주부재(210)와 상기 버트리스부재(220) 사이에 스트럿부재(240)가 연결되어 이루어져 상류로부터 흘러내리는 유목 등을 안정적으로 차단할 수 있게 된다.Further, a plurality of
그리고, 본 발명에 따른 다기능 사방댐의 시공방법을 살펴보면, 먼저 본 발명에 따른 다기능 사방댐의 최적 대상지를 선정하여 상기 사방댐의 대상지를 굴착하고 정지한 후 잡석다짐(S10)을 하고, 상기 잡석다짐한 대상지에 토석차단부(100) 의 제1차단부(101)와 워터쿠션부(300)의 기초 콘크리트를 타설하게 된다(S20).And, looking at the construction method of the multi-functional four-way dam according to the present invention, first select the optimal target site of the multi-function four-way dam in accordance with the present invention to excavate and stop the target site of the four-sided dam and then rubble (S10), the rubble on the target site The foundation concrete of the
그리고, 상기 제1차단부(101)에는 가로방향으로 격자형의 이형철근을 배근하고, 상기 워터쿠션부(300)의 중앙부에는 세로 방향으로 격자형의 이형철근(320)을 배근한 후 콘크리트를 타설(S30)한 다음, 상기 토석차단부(100)의 제1차단부(101)의 가로방향으로 좌ㆍ우측에 땜어깨(110)를 형성한다(S40).In addition, the
또한, 상기 제1차단부(101) 상부에 제2차단부(102)의 콘크리트를 타설(S50)하고, 상기 제2차단부(102) 또는 땜어깨(110)의 하부에 어도 또는 배수구(170)를 설치(S60)하며, 상기 제2차단부(102)에 앵커(130)를 설치하고, 상기 앵커(130)에 유목차단부(200)를 설치한 후 상기 앵커(130)와 상기 유목차단부(200)의 하부가 묻히도록 제3차단부(103)의 콘크리트를 타설한다(S70).In addition, the concrete of the
그리고, 상기 제1차단부(101), 제2차단부(102) 및 제3차단부(103)의 수직 이음부에는 가로방향으로 지수판(120)을 설치하며(S80), 상기 토석차단부(100)의 중앙부의 수평 이음부에는 세로방향으로 필라(140)를 설치하고, 상기 필라(140)의 중앙부에는 다수의 신축이음환봉(150)이 상기 필라(140)를 관통하여 설치한다(S90).In addition, the vertical joint portion of the
이후, 상기 워터쿠션부(300)의 하부에 소제구(310)가 형성된 끝돌림(301)을 형성하는 과정(S100)을 거치게 되며, 필요에 따라 물받이 및 주변 경관을 조성하여 마무리하게 된다.Subsequently, a process (S100) of forming a
전술한 바와 같이, 본 발명에 따른 다기능 사방댐은 산간계곡 등의 상류에서 물을 따라 함께 이동하는 토석과 유목을 동시에 차단할 수 있는데, 즉 상기 토석차단부(100)에서는 상류로부터 흘러내리는 물을 따라 함께 이동하는 토석을 차단하는 동시에, 소정량의 물을 저수하는 기능을 수행하게 되며, 상기 유목차단부(200)에서는 물을 따라 떠 내려오는 유목을 차단하는 한편, 유목차단부(200)의 틈새를 통해 물은 통과시킬 수 있게 된다.As described above, the multi-functional four-way dam in accordance with the present invention can simultaneously block the soil and driftwood moving along the water upstream, such as mountain valleys, that is, in the
이후, 상기 토석차단부(100)의 배수구(170) 및 유목차단부(200)를 통과한 물은 상기 워터쿠션부(300)를 거쳐 하류로 흐르게 되는데, 이 워터쿠션부(300)에 저장된 물은 필요에 따라 상기 소제구(310)를 개방하여 적절히 이용할 수 있다.Subsequently, the water passing through the
이상 설명한 바와 같이 본 발명에 따르면, 상류에서 흘러 내려오는 토석과 유목을 동시에 차단할 수 있는 다기능 사방댐을 통해 우리나라의 급경사지 지형과 여름철 집중되는 폭우에 가장 적합한 사방댐을 제공할 수 있으며, 단일의 사방댐으로 토석과 유목을 동시에 차단할 수 있으므로 예산을 절감하고, 자연경관의 훼손을 최소화할 수 있다.As described above, according to the present invention, through the multi-functional four-way dam that can block the soil and driftwood flowing down from the upstream at the same time can provide the best four-sided dam for the steep terrain of the country and the heavy rains concentrated in summer, as a single four-sided dam It can cut both civil and driftwood at the same time, saving budget and minimizing the damage of natural landscape.
그리고, 본 발명에 따른 다기능 사방댐에는 어도가 구비되어 사방댐의 설치에 따른 어류 및 소생물의 이동제한을 해결하여 보다 환경 친화적인 사방댐을 구축할 수 있다.In addition, the multifunctional four-way dam in accordance with the present invention is provided with a fish can solve the restrictions on the movement of fish and microorganisms due to the installation of the four-way dam to build a more environmentally friendly four-way dam.
또한, 본 발명에 따른 다기능 사방댐의 토석차단부를 구성하는 각 차단부의 수직 이음부에는 지수판이 설치되므로 수직 이음부에서 발생하는 누수를 효과적으로 방지할 수 있음은 물론, 토석차단부의 중앙부에는 필라 및 신축이음환봉이 설치되어 콘크리트의 수축, 팽창 및 진동에 의한 구조물의 변위에 적절히 대응할 수 있어 콘크리트 구조물의 안정성을 크게 향상시킬 수 있는 효과가 있다.In addition, since the water discharge plate is installed in the vertical joints of each blocking portion constituting the soil blocking portion of the multi-functional four-way dam according to the present invention, it is possible to effectively prevent leakage occurring in the vertical joint portion, as well as pillars and expansion joints in the central portion of the soil blocking portion The round bar is installed to properly respond to the displacement of the structure due to the contraction, expansion and vibration of the concrete has the effect of greatly improving the stability of the concrete structure.
이상에서는 본 발명을 특정의 바람직한 실시예에 대해서 도시하고 설명하였지만, 본 발명은 상술한 실시예에만 한정되는 것은 아니며, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 이하의 특허청구범위에 기재된 본 발명의 기술적 사상의 요지를 벗어나지 않고 얼마든지 다양하게 변경 실시할 수 있을 것이다.Although the present invention has been illustrated and described with respect to specific preferred embodiments, the present invention is not limited to the above-described embodiments, and those of ordinary skill in the art to which the present invention pertains should have the following claims. Various modifications can be made without departing from the spirit of the technical spirit of the invention described.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020050104077A KR100560986B1 (en) | 2005-11-02 | 2005-11-02 | Multifunctional erosion control dam and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020050104077A KR100560986B1 (en) | 2005-11-02 | 2005-11-02 | Multifunctional erosion control dam and its construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100560986B1 true KR100560986B1 (en) | 2006-03-17 |
Family
ID=37179686
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020050104077A KR100560986B1 (en) | 2005-11-02 | 2005-11-02 | Multifunctional erosion control dam and its construction method |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100560986B1 (en) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100704415B1 (en) | 2006-09-13 | 2007-04-09 | 대한민국 | Sliclean debris barrier in which screen and slit are combined |
KR100741371B1 (en) * | 2007-04-12 | 2007-07-27 | 대한민국 | The rhombic dam having the crossing fishway |
KR100750386B1 (en) | 2006-09-30 | 2007-08-27 | 주식회사 삼안 | Dam concrete injection method |
KR100794922B1 (en) | 2007-05-10 | 2008-01-21 | 대한민국 | The beam creen rhombic dam which h-steel and screen are combined |
KR100797779B1 (en) | 2006-11-22 | 2008-01-24 | 주식회사 삼안 | Fish way of turbine structure and gate structure for tidal power plant |
KR100996518B1 (en) | 2010-02-22 | 2010-11-24 | 최태수 | A debris barrier and construction method thereof |
KR101052295B1 (en) * | 2008-09-24 | 2011-07-27 | 오점곤 | Four-sided dam with double drips |
KR101137942B1 (en) * | 2009-09-21 | 2012-06-27 | 대한민국 | Devris Barrier with fishway |
KR101170789B1 (en) * | 2010-01-15 | 2012-08-02 | 영남대학교 산학협력단 | Complex debris barrier of eco-friendly |
KR101171014B1 (en) * | 2010-01-15 | 2012-08-08 | 영남대학교 산학협력단 | Debris barrier having small hydropower generating apparatus |
KR101581806B1 (en) * | 2015-03-27 | 2015-12-31 | 주식회사 대흥미래기술 | Multi-Function Complex Module Dam |
KR102561322B1 (en) | 2022-12-20 | 2023-07-31 | (주)인텔리지오 | Bypass type sanddam |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5859825U (en) | 1981-10-15 | 1983-04-22 | 住金鋼材工業株式会社 | metal dam |
-
2005
- 2005-11-02 KR KR1020050104077A patent/KR100560986B1/en active IP Right Grant
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5859825U (en) | 1981-10-15 | 1983-04-22 | 住金鋼材工業株式会社 | metal dam |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100704415B1 (en) | 2006-09-13 | 2007-04-09 | 대한민국 | Sliclean debris barrier in which screen and slit are combined |
KR100750386B1 (en) | 2006-09-30 | 2007-08-27 | 주식회사 삼안 | Dam concrete injection method |
KR100797779B1 (en) | 2006-11-22 | 2008-01-24 | 주식회사 삼안 | Fish way of turbine structure and gate structure for tidal power plant |
KR100741371B1 (en) * | 2007-04-12 | 2007-07-27 | 대한민국 | The rhombic dam having the crossing fishway |
KR100794922B1 (en) | 2007-05-10 | 2008-01-21 | 대한민국 | The beam creen rhombic dam which h-steel and screen are combined |
KR101052295B1 (en) * | 2008-09-24 | 2011-07-27 | 오점곤 | Four-sided dam with double drips |
KR101137942B1 (en) * | 2009-09-21 | 2012-06-27 | 대한민국 | Devris Barrier with fishway |
KR101170789B1 (en) * | 2010-01-15 | 2012-08-02 | 영남대학교 산학협력단 | Complex debris barrier of eco-friendly |
KR101171014B1 (en) * | 2010-01-15 | 2012-08-08 | 영남대학교 산학협력단 | Debris barrier having small hydropower generating apparatus |
KR100996518B1 (en) | 2010-02-22 | 2010-11-24 | 최태수 | A debris barrier and construction method thereof |
KR101581806B1 (en) * | 2015-03-27 | 2015-12-31 | 주식회사 대흥미래기술 | Multi-Function Complex Module Dam |
KR102561322B1 (en) | 2022-12-20 | 2023-07-31 | (주)인텔리지오 | Bypass type sanddam |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100560986B1 (en) | Multifunctional erosion control dam and its construction method | |
US9644334B2 (en) | Methods of and systems for controlling water flow, breaking water waves and reducing surface erosion along rivers, streams, waterways and coastal regions | |
US20100054859A1 (en) | Hydraulic Sliding Insertion Panel and Its Using Method | |
KR100965467B1 (en) | Eco-pillar debris barrier | |
CN107816050B (en) | Concrete cofferdam and earth-rock cofferdam combined cofferdam and construction method thereof | |
JP4979797B2 (en) | Superstructure to raise the top of the dam | |
CN108018828B (en) | Slope protection structure | |
RU2321701C2 (en) | Weir construction method | |
KR100654936B1 (en) | Method for constructing retaining wall | |
KR101170789B1 (en) | Complex debris barrier of eco-friendly | |
CN114687321A (en) | Construction method of energy dissipation type gabion retaining wall revetment structure | |
CN210134438U (en) | Seasonal river soaks embankment side slope protective structure | |
CN112854131A (en) | Ecological revetment for water source protection area and construction method thereof | |
CN106522163A (en) | Ecological brick for riverway | |
CN108411851B (en) | construction method of concrete slab facing structure for slope dike of river and sea reclamation area | |
KR100461664B1 (en) | Structures and system of construction based on the use of plants growing block that protect a shore | |
CN109898403A (en) | The underwater canal case steel suspension bridge of urban rives construction method nested with double steel sheet-pile cofferdam | |
KR101052295B1 (en) | Four-sided dam with double drips | |
JPH06280239A (en) | Fabricated fish way | |
CN210857100U (en) | Landscape type dike reinforcing structure | |
KR102437778B1 (en) | Gabion wall block | |
JP2020100988A (en) | Construction method of water-permeable wall for reinforcing sloped face | |
CN219490834U (en) | Riverway retaining wall restoration structure | |
CN213773318U (en) | Row pile structure and river bank dam body | |
KR200357964Y1 (en) | Block for retaining wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant |