CN103758352A - Tensioning method for pre-stress steel strand - Google Patents

Tensioning method for pre-stress steel strand Download PDF

Info

Publication number
CN103758352A
CN103758352A CN201110459539.XA CN201110459539A CN103758352A CN 103758352 A CN103758352 A CN 103758352A CN 201110459539 A CN201110459539 A CN 201110459539A CN 103758352 A CN103758352 A CN 103758352A
Authority
CN
China
Prior art keywords
stress
stretch
value
draw
tensioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201110459539.XA
Other languages
Chinese (zh)
Inventor
顾振良
孙召龙
唐永峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGSHU ANCIENT STYLE GARDEN CONSTRUCTION Corp
Original Assignee
CHANGSHU ANCIENT STYLE GARDEN CONSTRUCTION Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGSHU ANCIENT STYLE GARDEN CONSTRUCTION Corp filed Critical CHANGSHU ANCIENT STYLE GARDEN CONSTRUCTION Corp
Priority to CN201110459539.XA priority Critical patent/CN103758352A/en
Publication of CN103758352A publication Critical patent/CN103758352A/en
Pending legal-status Critical Current

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention discloses a tensioning method for pre-stress steel strands. The tensioning method for the pre-stress steel strands includes: 1) selecting a matched anchorage device according to the strand number of each beam, mounting a clamping piece, and making the steel strands pass through the center of a jack; 2) transversely tensioning in double directions without tensioning completely, wherein the initial tensioning stress is controlled at 13% sigma con; 3) lasting for 4 minutes, and continuing to tension to arrive at 26% of the designed stress value (double initial stress); 4) lasting for 4 minutes, and continuing to tension to arrive at the designed stress value; 5) lengthwise tensioning in double directions to arrive at the initial stress 13%; 6) lasting for 4 minutes, and continuing to tension to arrive at 26% of the designed stress; 7) lasting for 4 minutes, and continuing to tension to arrive at 50% of the designed tonnage; 8) measuring the elongation and recording when the jack is tensioned to 50% from 0 again, tensioning to arrive at 100% stress, measuring and recording the final elongation value. The tensioning method for the pre-stress steel strands enables the quality of the steel strands to be improved.

Description

Prestress wire method for stretching
Technical field
The invention discloses a kind of prestress wire method for stretching.
Background technology
Prestress wire is the stranded steel cable consisting of 2,3,7 or 19 high-tensile steel wires, and through the processing (stabilization processes) that eliminates stress, is applicable to prestressed concrete or similar applications.
At present, in Bridges in Our Country construction, generally adopt prestressing techniques, but its technique more complicated, technical difficulty are larger., there is qualitatively very large problem in for example stretch-draw of prestress wire.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of prestress wire method for stretching, and the method is that the quality of steel strand is controlled.
In order to solve above-mentioned technical problem, technical scheme of the present invention is: a kind of prestress wire method for stretching, and it comprises the following steps:
1) first supporting with corresponding ground tackle by every bundle radical, be with intermediate plate, steel strand are passed from jack center;
2) laterally two directions tension does not need down top, and stretch-draw initial stress is controlled at 14% σ con, fuel cut-off when initial stress is arrived in stretch-draw, after checking that intermediate plate situation is intact, the elongation that the dry jin of record pushes up;
3) hold lotus 4min, continuing stretch-draw is double initial stress to 26% of design stress value, measures stretch value;
4) hold lotus 4min, continue to be stretched to design stress value, measure the final stretch value of steel strand, after fastening intermediate plate, unload top;
5) when longitudinally two directions tension stretch value surpasses oil pump stroke, need to push up, during initial stress 13%, surveying record stretch value;
6) hold lotus 4min, continue stretch-draw to design stress 26% time, measure stretch value;
7) hold lotus 4min, then continue to be stretched to 50% of builder's tonnage, then measure elongation, oil return, fall top, while pushing up, note work anchor is again fastening, after work clip sheet retightens, can again carry out stretch-draw;
8) when dry jin top again measures elongation and makes a record when stretch-draw is to 50% stress again from 0, be finally stretched to again 100% stress, the final stretch value of surveying record.
The inventive method has improved the quality of steel strand, and the construction quality of whole use steel strand is also got a promotion.
The specific embodiment
First supporting with corresponding ground tackle by every bundle radical, be with intermediate plate, steel strand are passed from jack center.Laterally two directions tension does not need down top, and stretch-draw initial stress is controlled at 13% σ con, fuel cut-off when initial stress is arrived in stretch-draw, after checking that intermediate plate situation is intact, the elongation that the dry jin of record pushes up.
Hold lotus 4min, continuing stretch-draw is double initial stress to 26% of design stress value, measures stretch value, holds lotus 4min, continues to be stretched to design stress value, measures the final stretch value of steel strand, after fastening intermediate plate, unloads top.
When longitudinally two directions tension stretch value surpasses oil pump stroke, need to push up, during initial stress 13%, surveying record stretch value, holds lotus 4min, continue stretch-draw to design stress 26% time, measure stretch value, hold lotus 4min,
Then continue to be stretched to 50% of builder's tonnage, then measure elongation, oil return, fall top, while pushing up, note work anchor is again fastening, after work clip sheet retightens, can again carry out stretch-draw.
When dry jin top again measures elongation and makes a record when stretch-draw is to 50% stress again from 0, be finally stretched to again 100% stress, the final stretch value of surveying record.
Above-described embodiment does not limit the present invention in any way, and every employing is equal to replaces or technical scheme that the mode of equivalent transformation obtains all drops in protection scope of the present invention.

Claims (1)

1. a prestress wire method for stretching, is characterized in that comprising the following steps:
1) first supporting with corresponding ground tackle by every bundle radical, be with intermediate plate, steel strand are passed from jack center;
2) laterally two directions tension does not need down top, and stretch-draw initial stress is controlled at 13% σ con, fuel cut-off when initial stress is arrived in stretch-draw, after checking that intermediate plate situation is intact, the elongation that the dry jin of record pushes up;
3) hold lotus 4min, continuing stretch-draw is double initial stress to 26% of design stress value, measures stretch value;
4) hold lotus 4min, continue to be stretched to design stress value, measure the final stretch value of steel strand, after fastening intermediate plate, unload top;
5) when longitudinally two directions tension stretch value surpasses oil pump stroke, need to push up, during initial stress 13%, surveying record stretch value;
6) hold lotus 4min, continue stretch-draw to design stress 26% time, measure stretch value;
7) hold lotus 4min, then continue to be stretched to 50% of builder's tonnage, then measure elongation, oil return, fall top, while pushing up, note work anchor is again fastening, after work clip sheet retightens, can again carry out stretch-draw;
8) when dry jin top again measures elongation and makes a record when stretch-draw is to 50% stress again from 0, be finally stretched to again 100% stress, the final stretch value of surveying record.
CN201110459539.XA 2011-12-31 2011-12-31 Tensioning method for pre-stress steel strand Pending CN103758352A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110459539.XA CN103758352A (en) 2011-12-31 2011-12-31 Tensioning method for pre-stress steel strand

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110459539.XA CN103758352A (en) 2011-12-31 2011-12-31 Tensioning method for pre-stress steel strand

Publications (1)

Publication Number Publication Date
CN103758352A true CN103758352A (en) 2014-04-30

Family

ID=50525658

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110459539.XA Pending CN103758352A (en) 2011-12-31 2011-12-31 Tensioning method for pre-stress steel strand

Country Status (1)

Country Link
CN (1) CN103758352A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114061402A (en) * 2021-11-23 2022-02-18 中国二十二冶集团有限公司 Method for measuring elongation of prestressed tendon

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1201384A1 (en) * 2000-10-24 2002-05-02 Pfleiderer Infrastrukturtechnik GmbH & Co. KG Tensioning method and device for tensioning of tensioning members especially for prestressed concrete sleepers
CN1837469A (en) * 2006-03-30 2006-09-27 中铁八局集团有限公司 Stretching method for applying prestress on track slab
CN101476392A (en) * 2008-12-30 2009-07-08 中铁大桥局集团第三工程有限公司 Stretch-drawing method for prestressed ribs of concrete bridge
KR100963488B1 (en) * 2009-07-29 2010-06-17 노윤근 Negative moment floor slab prestress introduction method for which precast concrete pc wire anchorage block and this were used
CN102003073A (en) * 2010-12-11 2011-04-06 中冶建工有限公司 Constructing method for threading pre-stress structure steel strands
CN102011366A (en) * 2009-12-29 2011-04-13 中交第一航务工程局有限公司 Construction method for mud jacking of post-tensioning pre-stressed concrete box girder pipe

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1201384A1 (en) * 2000-10-24 2002-05-02 Pfleiderer Infrastrukturtechnik GmbH & Co. KG Tensioning method and device for tensioning of tensioning members especially for prestressed concrete sleepers
CN1837469A (en) * 2006-03-30 2006-09-27 中铁八局集团有限公司 Stretching method for applying prestress on track slab
CN101476392A (en) * 2008-12-30 2009-07-08 中铁大桥局集团第三工程有限公司 Stretch-drawing method for prestressed ribs of concrete bridge
KR100963488B1 (en) * 2009-07-29 2010-06-17 노윤근 Negative moment floor slab prestress introduction method for which precast concrete pc wire anchorage block and this were used
CN102011366A (en) * 2009-12-29 2011-04-13 中交第一航务工程局有限公司 Construction method for mud jacking of post-tensioning pre-stressed concrete box girder pipe
CN102003073A (en) * 2010-12-11 2011-04-06 中冶建工有限公司 Constructing method for threading pre-stress structure steel strands

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张辉: "浅谈悬臂浇注纵向张拉工艺控制", 《公路交通科技(应用技术版)》 *
王玺: "特大桥连续梁后张法预应力张拉技术", 《技术与市场》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114061402A (en) * 2021-11-23 2022-02-18 中国二十二冶集团有限公司 Method for measuring elongation of prestressed tendon

Similar Documents

Publication Publication Date Title
NZ607676A (en) System for anchoring a load
CN103967008A (en) Clip type pre-stress anchor cable active clip feeding and tension locking device and use method
CN103938627B (en) A kind of method for stretching of scatteredload anchor rope
CN204081520U (en) Pre-stress stretching device
CN1837469A (en) Stretching method for applying prestress on track slab
CN113459274A (en) Manufacturing method of fiber woven mesh reinforced concrete composite board
CN114201796A (en) Accurate calculation method for prestress loss considering tensioning sequence influence
CN103243863A (en) Tension anchoring system of pre-stressed wire reinforcing column and construction method
CN103758352A (en) Tensioning method for pre-stress steel strand
CN203065973U (en) Stretch-draw device for monofilament epoxy coating steel strands
CN105568856A (en) Synchronous construction method for sparse-cable-stayed bridge cable beam
CN101476392A (en) Stretch-drawing method for prestressed ribs of concrete bridge
CN104806031A (en) Wood structure reinforcement construction method
CN111456449A (en) Construction device and method for guaranteeing uniform stress of each bundle of steel strands through beam body post-tensioning method
JP6232300B2 (en) Re-fixing method for existing PC steel
CN110595884A (en) ECC (error correction code) crack surface shear stress test method and system based on double-sided pure shear
CN212562545U (en) Construction device for guaranteeing uniform stress of each bundle of steel strands by beam body post-tensioning method
CN105181580A (en) Device for testing steel bar bond stress in concrete filled steel tube and testing method thereof
CN104992030A (en) Testing method for shearing capability numerical value of fiber enhanced cement-based composite material component
CN204940273U (en) A kind of Prestressed anchor rope with pressure dispersing construction equipment
CN203794944U (en) Stay rope circular tensioning device
CN107503472A (en) A kind of combination type prestressed anchorage
CN109083022B (en) System and method for monitoring construction cable force uniformity of parallel steel strand stay cable
CN103321158A (en) Steel strand post-tensioning construction method without damaging working clamping piece
ATE366223T1 (en) METHOD FOR SECURING AND MEASURING THE INTERNAL TENSION OF A LIFT ROPE AND CORRESPONDING LIFT FOR USING THIS METHOD

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140430

WD01 Invention patent application deemed withdrawn after publication