KR100955411B1 - Drain execution equipment and execution method using of the same - Google Patents

Drain execution equipment and execution method using of the same Download PDF

Info

Publication number
KR100955411B1
KR100955411B1 KR1020070131168A KR20070131168A KR100955411B1 KR 100955411 B1 KR100955411 B1 KR 100955411B1 KR 1020070131168 A KR1020070131168 A KR 1020070131168A KR 20070131168 A KR20070131168 A KR 20070131168A KR 100955411 B1 KR100955411 B1 KR 100955411B1
Authority
KR
South Korea
Prior art keywords
bottom plate
drain
construction equipment
drain construction
soft ground
Prior art date
Application number
KR1020070131168A
Other languages
Korean (ko)
Other versions
KR20090063708A (en
Inventor
허태영
배병갑
Original Assignee
(주)지티이건설
배병갑
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)지티이건설, 배병갑 filed Critical (주)지티이건설
Priority to KR1020070131168A priority Critical patent/KR100955411B1/en
Publication of KR20090063708A publication Critical patent/KR20090063708A/en
Application granted granted Critical
Publication of KR100955411B1 publication Critical patent/KR100955411B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

본 발명은 드레인시공장비 일측에 바닥판이송수단을 구비하여 바닥판의 자주적 이송이 가능한 드레인시공장비 및 이를 이용한 드레인 시공방법에 관한 것이다.The present invention relates to a drain construction apparatus having a bottom plate transfer means on one side of the drain construction equipment, which enables independent transfer of the bottom plate, and a drain construction method using the same.

본 발명은 연약지반(L)을 주행하며 드레인(D)을 시공하는 드레인시공장비(100)에 있어서, 상기 드레인시공장비(100) 일측에는, 연약지반(L)으로부터 상기 드레인시공장비(100)를 지지하기 위한 바닥판(50)을 선택적으로 승/하강하기 위한 바닥판이송수단(180)이 구비된다. 본 발명에 의한 드레인시공장비를 이용한 드레인 시공방법은, 바닥판(50)의 일측에 바닥판이송수단(180)의 와이어(186)를 연결하는 바닥판결합단계(S100)와, 상기 바닥판(50)을 들어올린 후 드레인시공장비(100)의 상부를 회전시켜 바닥판(50)을 이송하는 바닥판이송단계(S200)와, 이송된 바닥판(50)을 연약지반(L) 상면에 안착하는 바닥판안착단계(S300)와, 연약지반(L)에 안착된 바닥판(50)과 와이어(186)를 분리하는 바닥판분리단계(S400)와, 상기 드레인시공장비(100)로 연약지반(L)에 드레인(D)을 타설하는 드레인타설단계(S500)로 이루어진다. 이와 같은 구성에 의하면 드레인 타설 시공성이 향상되며, 시공 기간이 현저히 단축되는 이점이 있다.According to the present invention, in the drain construction equipment 100 which travels the soft ground L and constructs the drain D, one side of the drain construction equipment 100 is located at one side of the drain construction equipment 100 from the soft ground L. Bottom plate transfer means 180 for selectively lifting / lowering the bottom plate 50 for supporting the. The drain construction method using the drain construction equipment according to the present invention, the bottom plate coupling step (S100) for connecting the wire 186 of the bottom plate transfer means 180 to one side of the bottom plate 50, and the bottom plate ( After lifting 50) and rotating the upper portion of the drain construction equipment 100, the bottom plate transfer step (S200) for transferring the bottom plate 50, and the transferred bottom plate 50 is seated on the soft ground (L) upper surface The bottom plate seating step (S300), the bottom plate 50 and the wire 186 to separate the bottom plate 50 and the wire 186 seated on the soft ground (L), and the soft ground as the drain construction equipment (100) A drain pouring step (S500) of pouring the drain (D) to (L) is made. According to such a structure, there exists an advantage that the drain pouring workability improves and a construction period is remarkably shortened.

드레인, 시공장비, 바닥판, 이송수단 Drain, Construction Equipment, Floor Plates, Transport Means

Description

드레인시공장비 및 이를 이용한 드레인 시공 방법 {Drain execution equipment and execution method using of the same}Drain construction equipment and drain construction method using the same {Drain execution equipment and execution method using of the same}

도 1 은 종래 기술에 의한 연약지반 드레인 시공 방법을 개략적으로 보인 종단면도.1 is a longitudinal sectional view schematically showing a soft ground drain construction method according to the prior art.

도 2 는 종래 기술에 의한 연약지반 드레인용 토목섬유의 외관 구성을 보인 사시도.Figure 2 is a perspective view showing the external appearance of the geotechnical fiber for soft ground drain according to the prior art.

도 3 은 본 발명에 의한 드레인시공장비의 외관 구성을 보인 사시도.Figure 3 is a perspective view showing the external configuration of the drain construction equipment according to the present invention.

도 4 는 본 발명에 의한 드레인시공장비에서 요부를 구성하는 바닥판이송수단의 외관 구성을 보인 사시도.Figure 4 is a perspective view showing the external appearance of the bottom plate transport means constituting the main portion in the drain construction equipment according to the present invention.

도 5 는 본 발명에 의한 드레인시공장비에서 일 구성인 흔들림방지수단의 구성을 보인 사시도.Figure 5 is a perspective view showing the configuration of the anti-shake means that is one configuration in the drain construction equipment according to the present invention.

도 6 은 본 발명에 의한 드레인시공장비를 이용한 드레인 시공방법을 나타낸 순서도.6 is a flow chart showing a drain construction method using the drain construction equipment according to the present invention.

도 7 은 본 발명에 의한 드레인시공장비를 이용하여 드레인을 타설하는 못브을 보인 사시도.Figure 7 is a perspective view showing a nail for pouring the drain using the drain construction equipment according to the present invention.

도 8 은 본 발명에 의한 드레인시공장비와 바닥판을 결합한 상태를 보인 사시도.Figure 8 is a perspective view showing a state combined with the drain construction equipment and the bottom plate according to the present invention.

도 9 는 본 발명에 의한 드레인시공장비를 이용하여 바닥판이 들어올려진 모습을 보인 사시도.Figure 9 is a perspective view showing a state that the bottom plate is lifted using the drain construction equipment according to the present invention.

도 10 은 본 발명에 의한 드레인시공장비를 이용하여 바닥판을 옮기는 모습을 보인 사시도.10 is a perspective view showing a state of moving the bottom plate using the drain construction equipment according to the present invention.

도 11 은 본 발명에 의한 드레인시공장비를 이용하여 바닥판을 안착하는 모습을 보인 사시도.Figure 11 is a perspective view showing a state of seating the bottom plate using the drain construction equipment according to the present invention.

* 도면의 주요 부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

50. 바닥판 52. 걸림홈50. Bottom plate 52. Locking groove

54. 걸림봉 100. 드레인시공장비54. Hanging rod 100. Drain construction equipment

120. 하부몸체 122. 무한궤도120. Lower Body 122. Caterpillar

140. 상부몸체 160. 타설수단140. Upper body 160. Pouring means

164. 리프터 180. 바닥판이송수단164. Lifter 180. Bottom plate transport

182. 길이조절구 183. 결합부182. Length adjuster 183. Coupling part

184. 지지구 185. 승하강롤러184. Supporters 185. Lifting rollers

186. 와이어 187. 걸림고리186.Wire 187. Hook

190. 흔들림방지수단 192. 안내롤러190. Anti-shake means 192. Guide roller

D . 드레인 L . 연약지반 D. Drain L. Soft ground

S100. 바닥판결합단계 S200. 바닥판이송단계S100. Bottom plate joining step S200. Bottom plate transfer step

S220. 바닥판승강과정 S240. 바닥판회전과정S220. Bottom plate lifting process S240. Bottom plate rotation process

S300. 바닥판안착단계 S400. 바닥판분리단계S300. Bottom plate mounting step S400. Baseplate Separation Step

S500. 드레인타설단계S500. Drain pouring step

본 발명은 드레인시공장비 일측에 바닥판이송수단을 더 구비하여 자주적으로 바닥판의 이송이 가능하도록 한 드레인시공장비 및 이를 이용한 드레인 시공 방법에 관한 것이다.The present invention relates to a drain construction equipment and a drain construction method using the same, further comprising a bottom plate transfer means on one side of the drain construction equipment to independently transfer the bottom plate.

근래에는 한정된 국토를 확장하기 위한 방법으로 해안의 매립이 진행되고 있다. 매립은 해안의 갯벌과 같은 연약지반에 매립하고자 하는 일정범위의 매립지를 설정한 후, 인근의 바닷가에서 준설한 준설토와 토목섬유를 일정한 두께로 반복 살포하여 연약지반의 지지력이 강화되도록 하는 것이다.In recent years, coastal reclamation is proceeding as a way to expand the limited land. Reclamation is to set up a certain range of landfills to be buried in soft grounds such as coastal tidal flats, and then repeatedly spray dredged soil and geotextiles dredged at a nearby beach to a certain thickness to reinforce the support of soft grounds.

이러한 연약지반의 매립을 위해서는 먼저 장비의 진입이 가능하도록 연약지반의 표층을 개량해야만 하며, 표층의 개량을 위해 일반적으로 대나무를 엮어 만든 대나무망을 깔고 경량장비를 이용하여 모래를 포설하는 방법을 적용하였다.For reclamation of the soft ground, the surface of the soft ground must be improved so that the equipment can be entered, and in order to improve the surface, a method of laying sand using bamboo equipment and laying a bamboo net made of light weight equipment is generally applied. It was.

그러나, 이러한 방법은 지반의 지지력이 견고하지 못해서 중장비의 진입이 불가함은 물론 경장비의 작업 속도가 느리므로 결국 시공기간이 길어지게 되는 문제점이 있다.However, this method has a problem that the construction period is long because the support of the ground is not strong, the entry of heavy equipment is impossible, as well as the work speed of light equipment is slow.

이를 보완하기 위해 다양한 방법이 시행되고 있으며, 도 1에는 대한민국 등록특허 제0155668호에 게시된 연약지반의 물재하공법이 도시되어 있다.Various methods are being implemented to compensate for this, and FIG. 1 illustrates a water refilling method of soft ground posted in Korean Patent Registration No. 0155668.

도 1을 참조하여 종래 기술에 의한 연약지반 준설용 토목섬유의 구성 및 설 치방법에 대하여 간략히 살펴보면, 먼저 연약지반 가장자리에 둑을 쌓아 저수못(1)을 조성하고, 상기 저수못(1)의 내부 벽면과 바닥면에 토목섬유(3)를 넓게 편 다음 상기 토목섬유(3)의 상면에 배수층(4)을 형성하게 된다.Referring briefly to the configuration and installation method of the geotechnical fiber for soft ground dredging according to the prior art with reference to Figure 1, first to form a reservoir on the edge of the soft ground to form a reservoir nail (1), of the reservoir nail (1) The geotextile (3) is widened to the inner wall and the bottom surface to form a drainage layer (4) on the top surface of the geotextile (3).

상기 배수층(4)의 상면에는 불투수성 시트(2)가 씌워진다. 상기 불투수성 시트(2)는 상측에 물이 고여 있는 상태로 유지되도록 함으로써 고여 있는 물의 하중을 이용하여 상기 배수층(4)에 압력을 가하게 된다.An impermeable sheet 2 is covered on the upper surface of the drainage layer 4. The water impermeable sheet 2 maintains a state in which water is accumulated on the upper side, thereby applying pressure to the drainage layer 4 by using a load of accumulated water.

그리고, 상기 배수층(4)의 내부에는 유공관(6)이 삽입 설치된다. 상기 유공관(6)은 불투수성 시트(2)의 상측에 고여 있는 물의 하중에 의해서 상기 배수층(4)에 포함되어 있는 해수(海水)가 압력을 받을 때 저수못 외부로 해수가 유출되도록 한다.In addition, a hole tube 6 is inserted into the drainage layer 4. The perforated pipe 6 allows the seawater to flow out of the reservoir pond when the seawater contained in the drainage layer 4 is pressurized by the load of water accumulated on the upper side of the impermeable sheet 2.

그러나, 상기와 같은 종래 기술에서는 토목섬유(3) 및 불투수성 시트(2)의 시공이 난해하고 과다한 투자비가 요구되는 문제점이 있다.However, in the prior art as described above, there is a problem in that construction of the geotextile 3 and the impervious sheet 2 is difficult and excessive investment cost is required.

한편, 대한 민국 공개 특허 제 10-2004-0065828호에는 표층강화 매트의 시공법 및 표층강화 매트가 게시되어 있다.On the other hand, the Republic of Korea Patent Publication No. 10-2004-0065828 discloses the construction method and surface strengthening mat of the surface strengthening mat.

상기된 표층강화 매트(10)는 도 2에 도시된 바와 같이, 토목 섬유로 제작한 상부매트(12)와 하부매트(14)를 상하로 층접하고 일측 모서리에 주입구(16)가 형성된다. As shown in FIG. 2, the surface-reinforced mat 10 contacts the upper mat 12 and the lower mat 14 made up of geotextiles up and down, and an injection hole 16 is formed at one edge thereof.

그리고, 상기 상부매트(12)와 하부매트(14)를 관통하여 지그재그형 위치마다 구멍(18)을 뚫고 상기 구멍(18)의 둘레를 재봉함으로써 상기 구멍(18)은 상부매트(12)와 하부매트(14) 사이의 공간과 연통된다.In addition, the hole 18 penetrates through the upper mat 12 and the lower mat 14 at every zigzag position and sews the periphery of the hole 18 so that the hole 18 is connected to the upper mat 12 and the lower mat. In communication with the space between the mat (14).

따라서, 상기 표층강화 매트(10)를 연약지반의 표층에 깔아 설치한 다음 상기 주입구(16)를 통해서 표층강화 매트(10) 내부로 시멘트몰탈 또는 모래나 토석류를 가압 충진함으로써 표층을 강화시키게 된다.Therefore, the surface layer strengthening mat 10 is installed on the surface layer of the soft ground, and then the cemented mortar or sand or earthen flow is pressurized to fill the surface layer strengthening mat 10 through the injection hole 16 to strengthen the surface layer.

그러나 상기한 표층강화 매트(10)를 이용한 표층 강화 방법은 시멘트몰탈을 가압충진하기 위한 별도의 장비가 더 구비되어야 하며, 넓은 매립지에 적용하기 위해서는 다수의 표층강화 매트(10)에 각각 가압 충진되어야 하므로 작업 효율이 저하되는 문제점이 있다.However, the surface reinforcement method using the surface reinforcement mat 10 should be further equipped with a separate equipment for pressurized and filled cement mortar, and to be applied to a plurality of surface reinforcement mat 10 to be applied to a large landfill, respectively. Therefore, there is a problem that the work efficiency is lowered.

또한, 상기 표층강화 매트(10)는 테두리의 봉합 작업을 비롯하여 구멍(18) 및 주입구(16) 형성 작업이 수행되어야 하므로 표층강화 매트(10) 자체의 단가 상승을 야기하여 결국 시공비가 상승하게 되는 문제점이 있다.In addition, the surface reinforcement mat 10 has to be performed to form the hole 18 and the injection hole 16, including the sealing operation of the rim, causing a rise in the unit cost of the surface reinforcement mat 10 itself, the construction cost eventually rises There is this.

이에 따라 표층강화 매트를 철재바닥판으로 대체하고 이러한 철재바닥판은 크레인 등을 이용하여 연약 지반 상면에 설치함으로써 드레인 시공장비의 진입이 가능하도록 하는 방법도 제시되어 있다.Accordingly, the method of replacing the surface reinforcement mat with the steel floor plate and installing the steel floor plate on the soft ground surface using a crane or the like is also proposed to allow the entry of the drain construction equipment.

그러나, 이러한 방법은 연약지반에 철재바닥판을 설치하기 위한 별도의 장비가 요구되므로 막대한 추가 비용이 발생하게 되며, 시공 시간이 길어지게 되어 바람직하지 못하다.However, such a method requires extra equipment for installing the iron bottom plate on the soft ground, which leads to enormous additional costs, and is not preferable because the construction time becomes long.

상기와 같은 문제점을 해결하기 위한 본 발명의 목적은, 드레인시공장비 일측에 바닥판이송수단을 더 구비하여 드레인 시공 뿐만 아니라, 자주적으로 바닥판의 이송이 가능하도록 하는 드레인시공장비를 제공하는 것에 있다.An object of the present invention for solving the above problems is to provide a drain construction equipment further comprises a bottom plate transfer means on one side of the drain construction equipment to enable the transfer of the bottom plate as well as the drain construction. .

본 발명의 다른 목적은, 드레인시공장비를 이용하여 보다 빠르고 효율적으로 드레인 시공이 이루어질 수 있도록 한 드레인시공장비를 이용한 드레인 시공방법을 제공하는 것에 있다.Another object of the present invention is to provide a drain construction method using a drain construction equipment to enable drain construction more quickly and efficiently using the drain construction equipment.

본 발명은, 연약지반을 주행하며 드레인을 시공하는 드레인시공장비에 있어서, 상기 드레인시공장비 일측에는, 연약지반으로부터 상기 드레인시공장비를 지지하기 위한 바닥판을 선택적으로 승/하강하기 위한 바닥판이송수단이 구비됨을 특징으로 한다.The present invention, in the drain construction equipment to run the drain while constructing the soft ground, one side of the drain construction equipment, the bottom plate transport for selectively lifting / lowering the bottom plate for supporting the drain construction equipment from the soft ground Means are provided.

상기 바닥판이송수단은 드레인시공장비의 후방으로 돌출 형성됨을 특징으로 한다.The bottom plate transport means is characterized in that the projecting to the rear of the drain construction equipment.

상기 바닥판이송수단은 다수 개로 구성됨을 특징으로 하는 한다.The bottom plate transport means is characterized in that composed of a plurality.

상기 바닥판이송수단은, 선택적으로 길이 변경 가능한 길이조절구와, 상기 바닥판 및 길이조절구를 지지하는 지지구와, 양단부가 상기 길이조절구 및 바닥판 일측에 결합되어 상기 길이조절구의 길이 변경시에 바닥판이 선택적으로 승강 또는 하강되도록 하는 와이어를 포함하여 구성됨을 특징으로 한다.The bottom plate conveying means, the length adjusting device for selectively changing the length, the support for supporting the bottom plate and the length adjusting device, both ends are coupled to the length adjusting device and the bottom plate one side when changing the length of the length adjusting device Characterized in that the bottom plate is configured to include a wire to selectively lift or lower.

상기 와이어 일측에는, 상기 와이어의 흔들림을 제한하는 흔들림방지수단이 구비됨을 특징으로 한다.One side of the wire, characterized in that the shake preventing means for limiting the shaking of the wire is provided.

본 발명에 의한 드레인시공장비를 이용한 드레인 시공방법은, 바닥판의 일측에 바닥판이송수단의 와이어를 연결하는 바닥판결합단계와, 상기 바닥판을 들어올린 후 드레인시공장비의 상부를 회전시켜 바닥판을 이송하는 바닥판이송단계와, 이 송된 바닥판을 연약지반 상면에 안착하는 바닥판안착단계와, 연약지반에 안착된 바닥판과 와이어를 분리하는 바닥판분리단계와, 상기 드레인시공장비로 연약지반에 드레인을 타설하는 드레인타설단계로 이루어지는 것을 특징으로 한다.In the drain construction method using the drain construction equipment according to the present invention, the bottom plate coupling step of connecting the wire of the bottom plate transfer means to one side of the bottom plate, and after lifting the bottom plate by rotating the top of the drain construction equipment floor A bottom plate transfer step of transferring the plate, a bottom plate seating step of seating the transferred bottom plate on the upper surface of the soft ground, a bottom plate separating step of separating the bottom plate and wires seated on the soft ground, and the drain construction equipment Characterized in that it consists of a drain pouring step of pouring a drain on the soft ground.

상기 바닥판이송단계는, 상기 와이어의 일단부가 결합되고 선택적으로 길이 조절이 가능한 길이조절구의 길이를 축소하는 바닥판승강과정과, 상기 드레인시공장비의 상부몸체를 회전시켜 상기 바닥판이송수단이 드레인시공장비의 시공 진행 방향을 향하도록 하는 바닥판회전과정으로 이루어지는 것을 특징으로 한다.The bottom plate transfer step, the bottom plate lifting process for reducing the length of the length control opening is coupled to one end of the wire and selectively adjustable length, and by rotating the upper body of the drain construction equipment the bottom plate transfer means is drained Characterized in that the bottom plate rotating process to face the construction progress direction of the construction equipment.

상기 드레인타설단계는, 상기 연약지반에 안착된 바닥판의 위치에 대향되는 방향의 연약지반에 드레인을 타설하는 과정임을 특징으로 한다.The drain pouring step is characterized in that the process of pouring the drain on the soft ground in a direction opposite to the position of the bottom plate seated on the soft ground.

이와 같은 구성을 가지는 본 발명에 의하면, 드레인 타설 시공성이 향상되며, 시공 기간이 현저히 단축되는 이점이 있다.According to this invention which has such a structure, there exists an advantage that the drain pouring workability improves and a construction period is remarkably shortened.

이하에서는 본 발명에 의한 드레인시공장비의 구성을 첨부된 도 3 내지 도 5를 참조하여 설명한다.Hereinafter, with reference to Figures 3 to 5 attached to the configuration of the drain construction equipment according to the present invention.

도 3에는 본 발명에 의한 드레인시공장비의 외관 구성을 보인 사시도가 도시되어 있다.3 is a perspective view showing the external configuration of the drain construction equipment according to the present invention.

도면에 도시된 바와 같이, 드레인시공장비(100)는 연약지반(L)에 드레인(D)을 시공하기 위한 장비로서, 무한궤도(122)가 설치되어 드레인시공장비(100)가 진행할 수 있도록 하는 하부몸체(120)와, 상기 하부몸체(120) 상측에서 하부몸체(120)의 중앙부를 기준으로 회전 가능하게 결합되는 상부몸체(140)와, 상기 상부몸체(140)의 전방에 직립되게 설치되어 상기 드레인(D)을 타설하는 타설수단(160) 과, 상기 상부몸체(140)의 후방에 설치되어 바닥판(50)을 승강 또는 하강하는 바닥판이송수단(180)을 포함하여 구성된다.As shown in the figure, the drain construction equipment 100 is a device for constructing the drain (D) on the soft ground (L), the endless track 122 is installed to allow the drain construction equipment 100 to proceed The lower body 120, the upper body 140 is rotatably coupled to the center of the lower body 120 from the upper side of the lower body 120, and is installed upright in front of the upper body 140 It includes a pouring means 160 for pouring the drain (D), and a bottom plate transfer means 180 is installed in the rear of the upper body 140 to raise or lower the bottom plate 50.

상기 상부몸체(140)의 전반부에는 운전자가 탑승하여 상기 드레인시공장비(100)를 운전 및 조작할 수 있도록 한 운전실(142)이 구비된다.The first half of the upper body 140 is provided with a cab 142 that allows the driver to drive and operate the drain construction equipment 100.

즉, 상기 운전실(142)은 탑승한 운전자에 의해 무한궤도(122)의 회전 방향 및 회전속도, 하부몸체(120)에 대한 상부몸체(140)의 회전운동, 타설수단(160)의 타설작업 및 바닥판이송수단(180)의 바닥판(50) 이송작업 등의 모든 작업이 가능하도록 다수의 조작구성품이 구비된다.That is, the cab 142 is a rotational direction and the rotational speed of the caterpillar 122, the rotational movement of the upper body 140 relative to the lower body 120, the pouring operation of the pouring means 160 A plurality of operation components are provided to enable all operations such as the bottom plate 50 transfer operation of the bottom plate transfer means 180.

상기 타설수단(160)의 하단부 양측에는 상/하방향으로 길이가 변경되어 상기 타설수단(160)을 이용한 드레인(D)의 타설 작업시에 타설수단(160)의 흔들림을 방지하기 위한 리프터(164)가 구비되며, 상기 타설수단(160)의 구성은 일반적인 구성과 크게 다르지 않으므로 상세한 설명은 생략하기로 한다.Lifter 164 for preventing the shaking of the pouring means 160 during the pouring operation of the drain (D) using the pouring means 160 by changing the length in the up / down direction on both sides of the lower end of the pouring means (160) ) Is provided, and the configuration of the placing means 160 is not very different from the general configuration, so a detailed description thereof will be omitted.

상기 바닥판이송수단(180)은 상부몸체(140)의 상면 후반부에서 후방으로 상향 경사를 가지도록 돌출 형성되며, 좌/우측에 각각 한 개씩 동일한 형상을 가지도록 구성된다.The bottom plate conveying means 180 is formed to protrude to have an upward inclination toward the rear from the rear half of the upper surface of the upper body 140, it is configured to have the same shape, one each on the left / right.

따라서, 상기 바닥판(50)의 승강 또는 하강 작업이 안전하게 진행될 수 있도록 한다.Therefore, the lifting or lowering operation of the bottom plate 50 can be safely proceeded.

이하 상기 바닥판이송수단(180)의 구성을 첨부된 도 4 및 도 5를 참조하여 설명한다.Hereinafter, the configuration of the bottom plate transfer means 180 will be described with reference to FIGS. 4 and 5.

도 4에는 본 발명에 의한 드레인시공장비에서 요부를 구성하는 바닥판이송수 단의 외관 구성을 보인 사시도가 도시되어 있고, 도 5에는 본 발명에 의한 드레인시공장비에서 일 구성인 흔들림방지수단의 구성을 보인 사시도가 도시되어 있다.Figure 4 is a perspective view showing the external configuration of the bottom plate transport stage constituting the main portion in the drain construction equipment according to the present invention, Figure 5 is a configuration of the anti-shake means that is one configuration in the drain construction equipment according to the present invention The perspective view shown is shown.

이들 도면과 같이, 상기 바닥판이송수단(180)은, 크게 선택적으로 길이 변경 가능한 길이조절구(182)와, 상기 바닥판(50) 및 길이조절구(182)를 지지하는 지지구(184)와, 양단부가 상기 길이조절구(182) 및 바닥판(50) 일측에 결합되어 상기 길이조절구(182)의 길이 변경시에 바닥판(50)이 선택적으로 승강 또는 하강되도록 하는 와이어(186)를 포함하여 구성된다.As shown in these figures, the bottom plate conveying means 180 is a length adjusting device 182 which can be selectively changed in length, and a support tool 184 for supporting the bottom plate 50 and the length adjusting device 182. And, both ends are coupled to one side of the length adjusting device 182 and the bottom plate 50, the wire 186 to selectively raise or lower the bottom plate 50 when the length of the length adjusting device 182 is changed. It is configured to include.

상기 길이조절구(182)는 운전실(142) 내부에 구비된 조작부를 조작시에 길이 조작이 가능하도록 구성되며, 유압 또는 공압실린더가 적용된다.The length adjusting mechanism 182 is configured to allow the length operation when operating the operation unit provided in the cab 142, a hydraulic or pneumatic cylinder is applied.

그리고, 상기 길이조절구(182)의 하단부는 상기 지지구(184)의 상면 하부에 회전 가능하도록 고정되며, 상기 지지구(184)의 상단부는 와이어(186)의 일단부와 결합된다.In addition, the lower end of the length adjusting tool 182 is fixed to the lower surface of the upper surface of the support 184, the upper end of the support 184 is coupled to one end of the wire 186.

따라서, 상기 길이조절구(182)의 길이가 신장 또는 축소되면 상기 와이어(186)는 길이조절구(182)의 변화된 길이만큼 길어지거나 작아지게 된다.Therefore, when the length of the length adjusting device 182 is extended or shortened, the wire 186 is lengthened or shortened by the changed length of the length adjusting device 182.

그리고, 상기 길이조절구(182)의 상단부에는 와이어(186)의 단부와 결합되기 위한 결합부(183)가 구비된다. 상기 결합부(183)는 길이조절구(182)와 분리되지 않도록 고정되어 상기 길이조절구(182)의 길이 변화시에 상기 와이어(186)에 선택적으로 인장력이 전달될 수 있도록 한다.In addition, the upper end of the length adjusting mechanism 182 is provided with a coupling portion 183 for engaging with the end of the wire 186. The coupling part 183 is fixed so as not to be separated from the length adjusting tool 182 so that a tensile force can be selectively transmitted to the wire 186 when the length of the length adjusting device 182 is changed.

상기 길이조절구(182)의 하측에는 지지구(184)가 구비된다. 상기 지지구(184)는 상방향으로 갈수록 단면적이 좁아지는 형상을 가지며, 하단부는 상기 상 부몸체(140)의 상면에 움직이지 않도록 결합된다.The support 184 is provided on the lower side of the length adjusting mechanism 182. The support 184 has a shape in which the cross-sectional area is narrowed toward the upper direction, the lower end is coupled so as not to move on the upper surface of the upper body 140.

상기 지지구(184)의 상단부에는 승하강롤러(185)가 구비된다. 상기 승하강롤러(185)는 길이조절구(182)의 상단에 결합된 와이어(186)가 길이조절수단의 길이 변화에 따라 움직일 때 이를 안내하기 위한 것으로, 중앙부는 함몰 형성되며 중앙을 기준으로 회전 가능하게 결합된다.The lifting roller 185 is provided at the upper end of the support 184. The lifting roller 185 is for guiding when the wire 186 coupled to the upper end of the length adjusting mechanism 182 moves according to the change in the length of the length adjusting means. Possibly combined.

따라서, 상기 길이조절수단이 신장 또는 축소되어 상기 와이어(186)가 움직이게 되면, 상기 와이어(186)는 승하강롤러(185)의 중앙부 외주면을 따라 안내되어 상/하 방향으로 움직이게 된다.Therefore, when the length adjusting means is extended or contracted so that the wire 186 is moved, the wire 186 is guided along the outer peripheral surface of the center portion of the elevating roller 185 to move in the up / down direction.

상기 와이어(186)는 일단부가 결합부(183)에 결합된 상태를 유지하며, 하단부에는 걸림고리(187)가 구비된다. 상기 걸림고리(187)는 와이어(186)와 바닥판(50)을 결합하기 위한 구성으로, 바닥판(50)에 형성된 걸림홈(52)에 걸림 결합된다.One end of the wire 186 is coupled to the coupling part 183, and a hook 187 is provided at a lower end of the wire 186. The locking ring 187 is configured to couple the wire 186 and the bottom plate 50, and is engaged with the locking groove 52 formed in the bottom plate 50.

즉, 상기 걸림홈(52)은 바닥판(50)의 상면으로부터 상측으로 돌출되지 않도록 함몰 형성되며, 상기 걸림홈(52) 내부에는 걸림고리(187)와 걸림 결합되기 위한 걸림봉(54)이 구비된다.That is, the locking groove 52 is formed to be recessed so as not to protrude upward from the upper surface of the bottom plate 50, and the locking bar 54 for engaging with the locking ring 187 inside the locking groove 52 is provided. It is provided.

따라서, 상기 걸림고리(187)는 걸림홈(52) 내부에 삽입된 상태로 걸림봉(54)에 걸림 결합되어 상기 와이어(186)는 바닥판이송수단(180)에 의해 승강 또는 하강이 가능하게 된다.Therefore, the locking ring 187 is coupled to the locking bar 54 while being inserted into the locking groove 52 so that the wire 186 can be lifted or lowered by the bottom plate transfer means 180. do.

또한, 상기 연약지반(L)에 설치된 바닥판(50) 상면에 드레인시공장비(100)가 위치하게 되더라도, 상기 걸림홈(52)과 걸림봉(54)은 바닥판(50) 상면으로부터 돌 출되지 않게 형성되어 있으므로, 드레인시공장비(100)의 하중으로 인한 파손이 방지될 수 있게 된다.In addition, even if the drain construction equipment 100 is located on the top surface of the bottom plate 50 installed on the soft ground (L), the locking groove 52 and the locking bar 54 protrudes from the top surface of the bottom plate 50. Since it is not formed, the damage due to the load of the drain construction equipment 100 can be prevented.

상기 와이어(186) 하부에는 흔들림방지수단(190)이 구비된다. 상기 흔들림방지수단(190)은 와이어(186)의 흔들림을 최소화하기 위한 구성으로, 도 5와 같이 좌/우 방향으로 길게 형성되며, 양측 내부에는 방지하기 위한 구성으로 안내롤러(192)가 회전 가능하게 구비된다.An anti-shake means 190 is provided below the wire 186. The anti-shake means 190 is configured to minimize the shaking of the wire 186, is formed long in the left / right direction as shown in Figure 5, the guide roller 192 is rotatable in the configuration for preventing the inside of both sides It is provided.

따라서, 상기 흔들림방지수단(190) 내부에 한 쌍의 와이어(186)가 통과하여 안내롤러(192)에 의해 하방향으로 안내되면, 상기 와이어(186)는 흔들림방지수단(190)의 하중에 의해 흔들림이 최소화되며, 안전사고를 미연에 방지할 수 있게 된다.Therefore, when a pair of wires 186 pass through the inside of the anti-shake means 190 and are guided downward by the guide roller 192, the wires 186 are loaded by the anti-shake means 190. Shake is minimized and safety accidents can be prevented beforehand.

이하 상기와 같이 구성되는 드레인시공장비를 이용하여 드레인을 시공하는 방법을 첨부된 도 6 내지 도 11을 참조하여 설명한다.Hereinafter, a method of constructing a drain using the drain construction device configured as described above will be described with reference to FIGS. 6 to 11.

도 6에는 본 발명에 의한 드레인시공장비를 이용한 드레인 시공방법을 나타낸 순서도가 도시되어 있고, 도 7 내지 도 11에는 드레인시공장비를 이용한 드레인시공방법에 따라 시공시에 드레인시공장비의 상태를 순서대로 나타낸 사시도가 도시되어 있다.6 is a flowchart illustrating a drain construction method using the drain construction equipment according to the present invention, and FIGS. 7 to 11 sequentially illustrate the state of the drain construction equipment during construction according to the drain construction method using the drain construction equipment. The perspective view shown is shown.

먼저, 드레인(D) 시공이 요구되는 연약지반(L)에 드레인시공장비(100)를 진입시키기 위해서 상기 바닥판(50)은 폭방향으로 붙여 나란히 배열했을 때 드레인시공장비의 무한궤도(122) 길이보다 조금 긴 길이를 가지는 개수만큼 요구된다(도 7 참조).First, when the bottom plate 50 is arranged side by side in the width direction in order to enter the drain construction equipment 100 into the soft ground (L) requiring the drain (D) construction, the endless track 122 of the drain construction equipment It is required by the number having a length slightly longer than the length (see Fig. 7).

그리고, 상기 드레인시공장비(100)는 연약지반(L)이 시작되는 곳에서 드레인(D) 시공을 진행하는 방향은 연약지반(L)이 있는 방향(도 7의 화살표 참조)이 되므로, 상기 걸림봉(54)에 걸림고리(187)를 걸어 결합(도 8 참조)함으로써 바닥판결합단계(S100)를 실시하게 된다.In addition, the drain construction equipment 100 is the direction in which the drain (D) construction in the place where the soft ground (L) begins to be the direction of the soft ground (L) (see the arrow in Figure 7), the locking By engaging the hook 187 to the rod 54 (see Fig. 8) to perform the bottom plate coupling step (S100).

이때 상기 길이조절구(182)는 길이가 신장된 상태이며, 상기 걸림봉(54)과 걸림고리(187)의 걸림 결합에 따라 상기 바닥판(50)은 와이어(186)로부터 분리되지 않게 된다.At this time, the length adjustment port 182 is in a state in which the length is extended, the bottom plate 50 is not separated from the wire 186 according to the engaging engagement of the locking rod 54 and the hook 187.

이런 상태에서 운전실(142)의 운전자는 도 9와 같이 길이조절구(182)의 길이를 축소시켜 바닥판(50)을 들어올린 후 드레인시공장비(100)의 상부를 회전(도 10 참조)시켜 바닥판(50)을 이송하게 된다.(S200:바닥판이송단계)In this state, the driver of the cab 142 shortens the length of the length adjusting tool 182 to lift the bottom plate 50 as shown in FIG. 9, and then rotates the upper portion of the drain construction equipment 100 (see FIG. 10). The bottom plate 50 is transferred. (S200: bottom plate transfer step)

보다 상세하게 살펴보면 상기 바닥판이송단계(S200)는 도 9와 같이 길이조절구(182)의 길이를 축소하여 바닥판(50)을 들어올리는 바닥판승강과정(S220)과, 상기 상부몸체(140)를 도 10과 같이 회전시켜 도 11과 같이 상기 바닥판이송수단(180)이 드레인시공장비(100)의 시공 진행 방향을 향하도록 하는 바닥판회전과정(S240)으로 이루어진다.Looking at in detail the bottom plate transfer step (S200) is a bottom plate lifting process (S220) for lifting the bottom plate 50 by reducing the length of the length adjustment opening 182 as shown in Figure 9 and the upper body 140 Rotate) as shown in Figure 10 consists of a bottom plate rotation process (S240) so that the bottom plate conveying means 180 to face the construction progress direction of the drain construction equipment 100 as shown in FIG.

상기 바닥판승강과정(S220)은 바닥판(50)이 바닥 또는 지지구(184)에 닿지 않는 범위의 높이까지 승강하는 과정이며, 상기 바닥판회전과정(S240)은 상부몸체(140) 회전시에 타설수단(160)과 장애물의 간섭이 발생되지 않는 범위 내에서 회전하는 과정이다.The bottom plate elevating process (S220) is a process of elevating the height of the bottom plate 50 does not reach the floor or the support 184, the bottom plate rotating process (S240) when the upper body 140 rotates In the process of rotating within the range that the interference of the placing means 160 and the obstacle does not occur.

그리고, 상기 바닥판회전과정(S240)이 완료되면, 상기 길이조절구(182)는 길 이를 축소시켜 바닥판(50)을 하방향으로 하강시킴으로써 연약지반(L) 상면에 안착하는 바닥판안착단계(S300)가 실시된다.Then, when the bottom plate rotation process (S240) is completed, the length adjustment port 182 is reduced to the length of the bottom plate seating step seated on the soft ground (L) by lowering the bottom plate 50 in the downward direction S300 is performed.

상기 바닥판(50)이 연약지반(L)에 안착되면 상기 걸림봉(54)과 걸림고리(187)의 결합을 해지한 후 상기 걸림고리(187)를 걸림홈(52)으로부터 분리함으로써 상기 바닥판(50)과 와이어(186)를 분리하는 바닥판분리단계(S400)가 진행된다.When the bottom plate 50 is seated on the soft ground (L), after the engagement bar 54 and the locking ring 187 is released, the locking ring 187 is separated from the locking groove 52 by the bottom. The bottom plate separating step S400 for separating the plate 50 and the wire 186 is performed.

상기 바닥판분리단계(S400)가 완료되면, 상기 드레인시공장비(100)는 바닥판(50)이 새로 놓여진 방향으로 한 개의 바닥판(50) 폭만큼 진행이 가능하게 되며, 상기 바닥판(50)이 제거된 면적 상에 상기 타설수단(160)은 드레인(D)을 타설하게 된다.(S500:드레인타설단계)When the bottom plate separating step (S400) is completed, the drain construction equipment 100 is allowed to proceed by the width of one bottom plate 50 in the direction in which the bottom plate 50 is newly placed, the bottom plate 50 ), The pouring means 160 pours the drain (D) on the removed area. (S500: drain pouring step)

즉, 상기 드레인타설단계(S500)는 상기 연약지반(L)에 새로 안착된 바닥판(50)의 위치에 대향되는 방향의 연약지반(L)에 드레인(D)을 타설하는 과정이 된다.That is, the drain pouring step (S500) is a process of pouring the drain (D) to the soft ground (L) in the direction opposite to the position of the bottom plate 50 newly seated on the soft ground (L).

따라서, 상기 드레인시공장비(100)는 전술한 바와 같은 과정을 반복 수행함으로써 일정 개수만큼의 바닥판(50)을 옮겨가며 이동하고 타설하게 되어 연약지반(L)에 드레인(D)의 시공은 완료 가능하게 된다.Therefore, the drain construction equipment 100 is moved and poured by moving the bottom plate 50 by a predetermined number by repeating the above-described process is completed construction of the drain (D) on the soft ground (L) It becomes possible.

이러한 본 발명의 범위는 상기에서 예시한 실시예에 한정하지 않고, 상기와 같은 기술범위 안에서 당업계의 통상의 기술자에게 있어서는 본 발명을 기초로 하는 다른 많은 변형이 가능할 것이다.The scope of the present invention is not limited to the above-exemplified embodiments, and many other modifications based on the present invention may be made by those skilled in the art within the above technical scope.

예를 들어 본 발명의 실시예에서는 와이어(186)의 길이를 조절하기 위한 길이조절구(182)가 실린더로 적용되어 있으나, 필요에 따라서는 정방향 및 역방향의 회전 방향 조절이 가능한 모터와 풀리를 축결합하고 와이어를 풀리에 선택적으로 권취되도록 구성할 수도 있음은 물론이다. For example, in the embodiment of the present invention, the length adjusting device 182 for adjusting the length of the wire 186 is applied as a cylinder, but if necessary, the motor and the pulley which can adjust the rotation direction in the forward and reverse directions Of course, it can also be configured to engage and selectively wound the wire to the pulley.

위에서 상세히 설명한 바와 같이 본 발명에서는, 드레인시공장비 일측에 바닥판이송수단이 더 구비된다.In the present invention as described in detail above, the bottom plate transport means is further provided on one side of the drain construction equipment.

따라서, 드레인 타설 작업 뿐만 아니라, 자주적으로 바닥판의 이송이 가능하게 되므로 시공 기간이 단축되는 이점이 있다.Therefore, not only the drain pouring operation, but also the transfer of the bottom plate can be independently, there is an advantage that the construction period is shortened.

또한, 바닥판을 설치하기 위한 별도의 경장비가 불필요하게 되므로 공사 비용이 절감되는 이점이 있다.In addition, since there is no need for a separate light equipment for installing the bottom plate there is an advantage that the construction cost is reduced.

Claims (8)

연약지반을 주행하며 드레인을 시공하는 드레인시공장비에 있어서,In the drain construction equipment that runs the soft ground and constructs the drain, 상기 드레인시공장비는,The drain construction equipment, 무한궤도가 설치되어 드레인시공장비가 진행할 수 있도록 하는 하부몸체와,A lower body allowing the crawler to proceed with the drain construction equipment, 상기 하부몸체 상측에 회전 가능하게 결합되는 상부몸체와,An upper body rotatably coupled to the upper lower body, 상기 상부몸체의 전방에 직립되게 설치되어 상기 드레인을 타설하는 타설수단과,Placing means installed in front of the upper body to pour the drain; 연약지반으로부터 상기 드레인시공장비를 지지하기 위한 바닥판을 선택적으로 승/하강하기 위한 바닥판이송수단을 포함하여 구성됨을 특징으로 하는 드레인시공장비.And a bottom plate transfer means for selectively raising / lowering the bottom plate for supporting the drain construction equipment from the soft ground. 제 1 항에 있어서, 상기 바닥판이송수단은 드레인시공장비의 후방으로 돌출 형성됨을 특징으로 하는 드레인시공장비.The drain construction equipment according to claim 1, wherein the bottom plate transport means protrudes to the rear of the drain construction equipment. 제 2 항에 있어서, 상기 바닥판이송수단은 다수 개로 구성됨을 특징으로 하는 드레인시공장비.The drain construction equipment according to claim 2, wherein the bottom plate transfer means comprises a plurality of means. 제 1 항 내지 제 3 항 중 어느 한 항에 있어서, 상기 바닥판이송수단은,The bottom plate transport means according to any one of claims 1 to 3, 선택적으로 길이 변경 가능한 길이조절구와,Length adjuster which can change length selectively, 상기 바닥판 및 길이조절구를 지지하는 지지구와,A support for supporting the bottom plate and the length adjusting tool; 양단부가 상기 길이조절구 및 바닥판 일측에 결합되어 상기 길이조절구의 길이 변경시에 바닥판이 선택적으로 승강 또는 하강되도록 하는 와이어를 포함하여 구성됨을 특징으로 하는 드레인시공장비.Both ends are coupled to one side of the length adjustment device and the bottom plate drain construction equipment characterized in that it comprises a wire to selectively raise or lower the bottom plate when the length adjustment of the length adjustment device. 제 4 항에 있어서, 상기 와이어 일측에는,According to claim 4, One side of the wire, 상기 와이어의 흔들림을 제한하는 흔들림방지수단이 구비됨을 특징으로 하는 드레인시공장비.Drain construction equipment characterized in that the shaking preventing means for limiting the shaking of the wire is provided. 무한궤도가 구비되어 연약지반을 주행하며 드레인을 타설하는 타설수단이 구비된 드레인시공장비를 이용한 드레인 시공방법에 있어서,In the drain construction method using a drain construction equipment is provided with an endless track is provided to run the soft ground and pour the drain, 상기 타설수단과 별개로 구성되고, 연약지반으로부터 드레인시공장비를 지지하기 위한 바닥판을 선택적으로 승/하강하는 바닥판이송수단에 구비된 와이어를 바닥판에 연결하는 바닥판결합단계와,A bottom plate coupling step configured to be connected to the bottom plate separately from the placing means, and to connect the wire provided in the bottom plate transfer means to selectively lift / lower the bottom plate for supporting the drain construction equipment from the soft ground; 상기 바닥판을 들어올린 후 드레인시공장비의 상부를 회전시켜 바닥판을 이송하는 바닥판이송단계와,A bottom plate transfer step of transporting the bottom plate by rotating the upper portion of the drain construction equipment after lifting the bottom plate; 이송된 바닥판을 연약지반 상면에 안착하는 바닥판안착단계와,A bottom plate seating step of seating the transferred bottom plate on the upper surface of the soft ground; 연약지반에 안착된 바닥판과 와이어를 분리하는 바닥판분리단계와,A bottom plate separating step of separating the bottom plate and the wire seated on the soft ground; 상기 드레인시공장비로 연약지반에 드레인을 타설하는 드레인타설단계로 이루어지는 것을 특징으로 하는 드레인시공장비를 이용한 드레인 시공방법.A drain construction method using a drain construction equipment characterized in that it comprises a drain pouring step of pouring a drain on the soft ground with the drain construction equipment. 제 6 항에 있어서, 상기 바닥판이송단계는,The method of claim 6, wherein the bottom plate transfer step, 상기 와이어의 일단부가 결합되고 선택적으로 길이 조절이 가능한 길이조절구의 길이를 축소하는 바닥판승강과정과,A bottom plate elevating process for reducing the length of the length adjuster which is coupled to one end of the wire and is selectively adjustable in length; 상기 드레인시공장비의 상부몸체를 회전시켜 상기 바닥판이송수단이 드레인시공장비의 시공 진행 방향을 향하도록 하는 바닥판회전과정으로 이루어지는 것을 특징으로 하는 드레인시공장비를 이용한 드레인 시공방법.And a bottom plate rotating process for rotating the upper body of the drain construction equipment so that the bottom plate transfer means faces the construction progress direction of the drain construction equipment. 제 6 항에 있어서, 상기 드레인타설단계는,The method of claim 6, wherein the drain pouring step, 상기 연약지반에 안착된 바닥판의 위치에 대향되는 방향의 연약지반에 드레인을 타설하는 과정임을 특징으로 하는 드레인시공장비를 이용한 드레인 시공방법.Drain construction method using a drain construction equipment characterized in that the process of pouring the drain on the soft ground in the direction opposite to the position of the bottom plate seated on the soft ground.
KR1020070131168A 2007-12-14 2007-12-14 Drain execution equipment and execution method using of the same KR100955411B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070131168A KR100955411B1 (en) 2007-12-14 2007-12-14 Drain execution equipment and execution method using of the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070131168A KR100955411B1 (en) 2007-12-14 2007-12-14 Drain execution equipment and execution method using of the same

Publications (2)

Publication Number Publication Date
KR20090063708A KR20090063708A (en) 2009-06-18
KR100955411B1 true KR100955411B1 (en) 2010-05-10

Family

ID=40992615

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070131168A KR100955411B1 (en) 2007-12-14 2007-12-14 Drain execution equipment and execution method using of the same

Country Status (1)

Country Link
KR (1) KR100955411B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101651663B1 (en) 2016-01-13 2016-08-26 이상준 Eave Trough For Vinyl Greenhouse And Method For Manufacturing The Same

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200145515Y1 (en) * 1994-09-09 1999-06-15 배병갑 Steel plate

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200145515Y1 (en) * 1994-09-09 1999-06-15 배병갑 Steel plate

Also Published As

Publication number Publication date
KR20090063708A (en) 2009-06-18

Similar Documents

Publication Publication Date Title
EP0563472B1 (en) Excavator and methods of use thereof
JPS62233328A (en) Method and apparatus for setting retaining wall by excavator
US7559161B2 (en) Soil working method and apparatus
JP2016199345A (en) Boom attaching/detaching device and attaching/detaching method
KR100722495B1 (en) Caisson manufacturing and launching method using fully submerged launcher
JP7166487B2 (en) deep foundation excavator
JP4044767B2 (en) Tunnel invert construction method and apparatus
KR100955411B1 (en) Drain execution equipment and execution method using of the same
CN111042173B (en) Quicksand layer open caisson construction method
CN113123362A (en) Design and construction method for side wall with fabricated underground diaphragm wall serving as main structure
US6030150A (en) Method and apparatus for constructing subterranean walls comprised of granular material
CN108118728B (en) Efficient soil excavating device and method for special-shaped deep foundation pit
CN104718328B (en) Multi-stage expansion arm assembly and there is the deep excavator of multi-stage expansion arm assembly
TWI740251B (en) Low-headroom excavator and assembly method thereof
CN113668628A (en) Self-adaptive soil excavation and transportation integrated device and construction method thereof
KR100652525B1 (en) The land-side protection bar setting apparatus
KR20050115835A (en) Vertical drainage apparatus and method for improvement of the sea ground and dredged soil area
JP7166308B2 (en) deep foundation excavator
CN219343350U (en) Telescopic pressurizing grab bucket
CN215908535U (en) Pipeline hoisting structure that slides
JPH10159171A (en) Method and device for dredging silted deposit in inverted siphon manhole
JPH11229394A (en) Open caisson construction system
KR200408034Y1 (en) Vertical drainage apparatus for improvement of the sea ground and dredged soil area
JP2908738B2 (en) Sheet pile press-in / draw-out device
JP3897239B2 (en) Slope working machine

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130227

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20140310

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20150302

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20160226

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20170421

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20190418

Year of fee payment: 10