KR100917395B1 - Shelf apparatus in power hole enabling both sides folding and height adjusting for installing power distributing cable - Google Patents

Shelf apparatus in power hole enabling both sides folding and height adjusting for installing power distributing cable Download PDF

Info

Publication number
KR100917395B1
KR100917395B1 KR1020090019461A KR20090019461A KR100917395B1 KR 100917395 B1 KR100917395 B1 KR 100917395B1 KR 1020090019461 A KR1020090019461 A KR 1020090019461A KR 20090019461 A KR20090019461 A KR 20090019461A KR 100917395 B1 KR100917395 B1 KR 100917395B1
Authority
KR
South Korea
Prior art keywords
shelf
post
cable
posts
wiring
Prior art date
Application number
KR1020090019461A
Other languages
Korean (ko)
Inventor
김용순
Original Assignee
(주)엘피티이엔지
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)엘피티이엔지 filed Critical (주)엘피티이엔지
Priority to KR1020090019461A priority Critical patent/KR100917395B1/en
Application granted granted Critical
Publication of KR100917395B1 publication Critical patent/KR100917395B1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G9/00Installations of electric cables or lines in or on the ground or water
    • H02G9/08Installations of electric cables or lines in or on the ground or water in tunnels
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/04Protective tubing or conduits, e.g. cable ladders or cable troughs
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/30Installations of cables or lines on walls, floors or ceilings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Installation Of Indoor Wiring (AREA)

Abstract

A shelf apparatus is provided to improve convenience of operations by minimizing interference of a shelf in installing and repairing a cable. A shelf apparatus includes a plurality of posts(10), one or more support beams(40), a plurality of shelves(20), and a wiring duct(30). The post is installed on a wall of one side inside an underground conduit with a longitudinal direction. A plurality of coupling holes is formed in the post. The support beam is fixed to the post by a coupling unit. The shelf includes a main body, an insertion hole, a guardrail anchor, and a locking anchor. The insertion hole is formed in an end part of one side of the main body. The guardrail anchor is formed in an end part of the other side of the main body. The locking anchor fixes the main body to the post. The wiring duct is installed on the shelf. A cable is installed in the wiring duct.

Description

송배전 케이블 설치를 위한 양방향 접이식과 높이 조정이 가능한 전력구 내부 선반장치{SHELF APPARATUS IN POWER HOLE ENABLING BOTH SIDES FOLDING AND HEIGHT ADJUSTING FOR INSTALLING POWER DISTRIBUTING CABLE}SHELF APPARATUS IN POWER HOLE ENABLING BOTH SIDES FOLDING AND HEIGHT ADJUSTING FOR INSTALLING POWER DISTRIBUTING CABLE}

본 발명은 지중 전력구 내 송배전 케이블 선반장치에 관한 것으로서, 더욱 상세하게는 지중 전력구 내에 많은 수량의 케이블을 배선할 수 있으면서 케이블의 추가 배선을 용이하게 하고, 케이블의 배선과 보수 등의 작업시 간섭을 최소화할 수 있는 송배전 케이블 설치를 위한 양방향 접이식과 높이 조정이 가능한 전력구 내부 선반장치에 관한 것이다.The present invention relates to a transmission / distribution cable shelving apparatus in an underground power port, and more particularly, it is possible to wire a large number of cables in an underground power port, and to facilitate the additional wiring of the cable, and to perform the wiring and maintenance of the cable. The present invention relates to a bidirectional foldable and height-adjustable internal shelving device for installing transmission and distribution cables that can minimize interference.

최근에 산업화가 가속됨에 따라 전력 사용량이 급속도로 증가하고 있는 실정이며, 이들의 공급은 배전케이블을 통해 생산지로부터 소비지로 공급되는 것인바, 이러한 케이블들은 도시 미관 및 사람이나 차량의 이동장해 등 여러 가지를 고려하여 지중에 매설하는 방식으로 설치되어 지고 있는 것으로, 지상으로부터 일정깊이 이격된 지중에 매설되는 것이다. 이처럼 송배전 케이블을 지중에 배선하기 위하여 관로인 지중 전력구가 사용된다.In recent years, as the industrialization accelerates, the power consumption is rapidly increasing, and their supply is supplied from the place of production to the place of consumption through distribution cables. These cables are used for various purposes such as urban aesthetics and mobility of people or vehicles. It is being installed in the ground in consideration of this, and it is buried in the ground spaced a certain distance from the ground. As such, underground power ports, which are pipelines, are used to wire transmission and distribution cables in the ground.

전력구는 한 번 시공되면 임의로 확장할 수 없는 반면에, 상기 지하 전력구를 통과해야 하는 케이블은 증가하기 마련이다. 즉 상기 전력구의 내부 벽면 공간을 활용하여 더 이상 케이블을 추가 배선할 공간이 없게 되면 추가 배선되는 케이블을 기존에 배선된 케이블에 올려놓는 등의 방법으로 배선함에 따라 다수의 케이블이 쌓이게 되어 가장 아래 측에 배치된 케이블의 유지보수가 필요한 경우 그 위에 적층된 케이블을 모두 치워야 하므로 유지보수 작업이 매우 번거롭고 복잡한 단점이 있다.The power cord cannot be arbitrarily expanded once constructed, whereas the cables required to pass through the underground power cord will increase. That is, when there is no more space for additional cables by utilizing the inner wall space of the power outlet, a plurality of cables are stacked by laying the additionally wired cable on the previously wired cable. If the maintenance of the cables arranged in the need to remove all the cables stacked on it, maintenance work is very cumbersome and complicated disadvantages.

그리고, 제한된 공간의 전력구 내에 보다 많은 케이블을 배선하기 위한 케이블 배열대가 제안된 바 있다.In addition, a cable arranging device for wiring more cables in a power outlet of a limited space has been proposed.

종래 기술에 의한 케이블 배열대는 전력구 내벽면을 따라 케이블을 배선할 수 있도록 구성되는데, 이때 케이블의 유지보수를 위하여 케이블 간에 간섭이 없어야 할 것이기 때문에 케이블의 배선 수량을 늘리는데 한계가 있고, 작업통로를 확보하지 못하여 유지보수작업이 매우 번거로운 문제점이 있다.The cable arrangement according to the prior art is configured to wire the cable along the inner wall of the power port, but there is a limit to increase the number of wiring of the cable because there should be no interference between the cables for maintenance of the cable, There is a problem that maintenance work is very troublesome because it can not be secured.

본 발명은 상기와 같은 문제점을 해결하기 위한 것으로, 지중 전력구 내에 많은 수량의 케이블을 배선할 수 있으면서 케이블의 추가 배선을 용이하게 하고, 케이블의 배선과 보수 등의 작업시 간섭을 최소화할 수 있는 송배전 케이블 설치를 위한 양방향 접이식과 높이 조정이 가능한 전력구 내부 선반장치를 제공하는데 그 목적이 있다. The present invention is to solve the above problems, while it is possible to wire a large number of cables in the underground power port to facilitate the additional wiring of the cable, it is possible to minimize the interference during work such as wiring and maintenance of the cable The purpose of the present invention is to provide an internal shelving device for power outlets that can be bidirectionally folded and height-adjusted for installation of transmission and distribution cables.

전술한 바와 같은 목적을 달성하기 위한 본 발명에 의한 송배전 케이블 설치를 위한 양방향 접이식과 높이 조정이 가능한 전력구 내부 선반장치는, 지중 전력구의 내부 일측 벽면에 길이방향을 따라 일정 간격을 두고 세워지는 다수의 포스트와; 상기 포스트에 고정되는 다수의 선반과; 상기 선반 위에 올려지며 케이블을 배선하는 배선 덕트를 포함하고, 상기 포스트는 전구간에 걸쳐 일정 간격을 두고 다수의 체결홀이 형성되며, 상기 선반은 상기 삽입홀을 통해 상기 포스트에 양방향으로 회전 및 승강 가능하게 끼워지고 상기 체결홀에 체결되는 체결구를 매개로 하여 상기 포스트에 고정되는 것을 특징으로 한다.Two-way folding and height-adjustable power tool internal shelving device for the transmission and distribution cable installation according to the present invention for achieving the object as described above, a plurality of erected at regular intervals along the longitudinal direction on one inner wall surface of the underground power ball With posts; A plurality of shelves fixed to the posts; And a wiring duct mounted on the shelf to wire the cables, wherein the posts are provided with a plurality of fastening holes at regular intervals throughout the light bulb, and the shelves are rotatable and liftable in both directions to the posts through the insertion holes. It is characterized in that it is fixed to the post via a fastener fastened to be fastened to the fastening hole.

본 발명에 따른 송배전 케이블 설치를 위한 양방향 접이식과 높이 조정이 가능한 전력구 내부 선반장치에 의하면, 지중 전력구 내부에 다단으로 갖추어진 케이블 선반을 통해 케이블을 배선함으로써 케이블의 배선 수량을 늘릴 수 있고, 케이블을 자유롭게 원하는 위치로 셋팅하여 케이블 배선 등의 작업시 선반에 의한 간섭을 피할 수 있으므로 여유로운 작업 공간을 확보함으로써 작업의 편의성을 향상할 수 있다.In accordance with the present invention, the power outlet internal shelving apparatus for bidirectional folding and height adjustment for the transmission and distribution cable installation according to the present invention can increase the number of wiring of the cable by wiring the cable through a cable shelf equipped with multiple stages in the underground power sphere, By freely setting the cable to a desired position, interference by shelves can be avoided during cable wiring, etc., thus improving the convenience of work by securing a comfortable working space.

도 1과 도 2에서 보이는 것처럼, 본 발명에 의한 송배전 케이블 설치를 위한 양방향 접이식과 높이 조정이 가능한 전력구 내부 선반장치는, 전력구(1) 내부에 세워지는 다수의 포스트(10), 포스트(10)에 결합되는 선반(20) 및 선반(20) 위에 장착되며 케이블(2)의 배선을 안내하는 배선 덕트(30)로 구성되며, 이하 각 구성요소의 구체화를 통해 선반(20)의 양방향 접이식과 높이 조정을 명확하게 설명한다.As shown in Figure 1 and 2, the power outlet internal shelving device for bidirectional folding and height adjustment for the transmission and distribution cable installation according to the present invention, a plurality of posts (10), post ( 10) and a wiring duct 30 mounted on the shelf 20 coupled to the shelf 20 and guiding the wiring of the cable 2, hereinafter bidirectional folding of the shelf 20 through the specification of each component And height adjustment clearly.

포스트(10)는 지중 전력구(1)의 내부 일측 벽면에 길이방향을 따라 일정 간격을 두고 세워지며, 선반(20)을 지지한다.The post 10 is erected at regular intervals along the longitudinal direction on one inner wall surface of the underground power tool 1, and supports the shelf 20.

전력구(1)는 콘크리트 구조물로서, 동일한 제원의 거푸집을 이용하여도 내부의 높이 등이 조금씩 차이가 있을 수 있으며, 이처럼 전력구(1)의 내부 높이가 다르더라도 포스트(10)는 견고하게 설치될 수 있도록 다음과 같이 구성된다.The power bulb 1 is a concrete structure, the height of the inside may be slightly different even if using the formwork of the same specifications, the post 10 is installed firmly even if the internal height of the power bulb 1 is different. It can be configured as follows.

포스트(10)는 봉 형상의 포스트 본체(11), 포스트 본체(11)에 승강(설치 상태 기준) 가능하게 결합되는 상부 고정봉(12)으로 구성이며, 예컨대, 상부 고정봉(12)은 포스트 본체(11)의 상부에 형성된 홀(11a)에 승강 가능하게 결합된 구성이다.The post 10 is composed of a rod-shaped post body 11 and an upper fixing rod 12 which is coupled to the post body 11 so as to be lifted and lowered (based on an installation state). For example, the upper fixing rod 12 is a post. The structure is coupled to the hole 11a formed in the upper portion of the main body 11 to be lifted and lowered.

포스트 본체(11)와 상부 고정봉(12)은 각각 전력구(1)의 바닥부와 천정부에 앵커로 고정될 것이며, 따라서, 각각 타구간보다 단면적이 넓은 하부 받침부(13)와 상부 받침부(14)가 일체로 형성된다.The post body 11 and the upper fixing rod 12 will be anchored to the bottom and ceiling of the electric power tool 1, respectively, and thus the lower support 13 and the upper support respectively having a larger cross-sectional area than the other sections. 14 is integrally formed.

포스트(10)는 선반(20)이 케이블(2)의 배선용으로 사용될 때에는 포스트(10) 에 대해 일렬로 배열되지 않고 예컨대 직각으로 배열되도록 하고, 배선용으로 사용되지 않을 때에는 포스트(10)와 일렬로 배열되어 간섭을 일으키지 않도록 하며, 또한, 케이블(2)의 수량이나 배선 위치에 맞춰 승강 가능하도록 하기 위하여 다수의 체결홀(15)이 형성된다.The post 10 is arranged such that the shelf 20 is not arranged in line with the post 10 when used for the wiring of the cable 2 but is arranged at a right angle, and in line with the post 10 when not used for wiring. A plurality of fastening holes 15 are formed so as to be arranged so as not to cause interference, and to be able to move up and down in accordance with the number of cables 2 or the wiring position.

체결홀(15)은 그 목적에 따라 포스트(10)의 전구간에 걸쳐 일정 간격을 두고 형성된다.The fastening hole 15 is formed at regular intervals over the entire span of the post 10 according to the purpose.

지금까지 설명한 선반(20)은 삽입홀(22)을 통해서만 포스트 본체(11)에 연결할 수 있기 때문에 선반(20)을 추가하거나 분리하기 위해서는 상부 받침부(14)를 반드시 포스트 본체(11)에서 제거하여야 하는 불편함이 있으며, 이를 해결하기 위하여 도 5에서처럼, 선반(20)은 일측 단부가 힌지(25)를 통해 절첩 가능하게 연결되면서 타측 단부가 체결구에 의해 고정되는 한 쌍의 선반부재(20A,20B)로 이루어질 수 있다. 포스트(10)에 연결하기 위한 삽입홀(22) 등의 구성은 전술한 것과 동일하게 적용되므로 구체적인 설명을 생략하며, 선반(20)의 설치시 선반부재(20A,20B)를 벌려 포스트(10)에 연결한 후 다시 모아 체결구로 고정함으로써 선반(20)이 포스트(10)에 연결되며, 반대로, 선반(20)의 분리시 체결구를 해제하면 선반부재(20A,20B)가 자유자재로 절첩가능하므로 벌려서 포스트(10)에서 분리할 수 있다.Since the shelf 20 described so far can be connected to the post body 11 only through the insertion hole 22, in order to add or remove the shelf 20, the upper base portion 14 must be removed from the post body 11. In order to solve this problem, as illustrated in FIG. 5, the shelf 20 has a pair of shelf members 20A on which one end is fixed by a fastener while the other end is foldably connected through the hinge 25. 20B). Since the configuration of the insertion hole 22 and the like for connecting to the post 10 is applied in the same manner as described above, a detailed description thereof will be omitted, and when the shelf 20 is installed, the shelf members 20A and 20B are opened to open the post 10. After connecting to the shelf 20 is connected to the post 10 by fixing again with fasteners, on the contrary, shelf members 20A, 20B can be folded freely when the fastener is released when the shelf 20 is removed. Therefore, it can be separated from the post 10 by opening.

본 발명은 2개 이상의 포스트(10)를 서로 결속하여 지지기반을 확보함으로써 케이블(2)의 하중이나 케이블(2)의 배선 작업시 실수로 인하여 포스트(10)가 쓰러지지 않도록 지지보(40)가 적용된다.The present invention binds two or more posts 10 to each other to secure a support base, so that the support beams 40 are prevented from collapsing due to the load of the cable 2 or a mistake in the wiring work of the cable 2. Apply.

지지보(40)는 "L" 형강, 앵글 등이 사용 가능하며 근접되는 2개 이상의 포스 트(10)에 횡방향으로 배열되어 체결구(41)로 고정된다.Support beam 40 is used in the "L" shape steel, angles, etc. and is arranged in two or more posts (10) in close proximity to be fixed with fasteners 41.

선반(20)은 케이블(2)이 안착(실질적으로는 배선 덕트(30)가 안착)되는 막대 형태의 선반 본체(21), 선반 본체(21)의 일측 단부에 형성되며 포스트(10)에 제자리 회전 가능하게 결합되는 삽입홀(22), 선반 본체(21)의 타측 단부에 상부로 돌출되도록 체결되는 난간 앵커(23)로 이루어진다.The shelf 20 is formed at one end of the shelf main body 21 in the form of a rod in which the cable 2 is seated (substantially the wiring duct 30 is seated) and the shelf main body 21 and is in place in the post 10. Insertion hole 22 is rotatably coupled, the railing anchor 23 is fastened so as to protrude upwards to the other end of the shelf body (21).

이와 같은 구성의 선반(20)은 삽입홀(22)을 통해 포스트(10)에 끼워진 상태에서 자유롭게 회전 및 승강 가능하도록 삽입홀(22)의 직경이 포스트 본체(11)의 외경보다 약간 크게 형성된다. The shelf 20 of such a configuration has a diameter of the insertion hole 22 slightly larger than the outer diameter of the post body 11 so that the shelf 20 can be freely rotated and lifted while being inserted into the post 10 through the insertion hole 22. .

선반(20)은 삽입홀(22)을 통해 포스트 본체(11)에 끼워진 상태에서 포스트 본체(11)의 체결홀(15)에 체결되는 잠금앵커(24)에 의해 고정된다. 즉, 선반(20)의 위치를 결정하면 선반(20)을 제자리에서 돌리거나 승강시켜 위치를 옮기고 잠금앵커(24)를 선반(20)과 포스트 본체(11)에 체결하여 선반(20)을 고정한다.The shelf 20 is fixed by the locking anchor 24 fastened to the fastening hole 15 of the post body 11 in a state of being fitted into the post body 11 through the insertion hole 22. That is, when the position of the shelf 20 is determined, the shelf 20 is rotated or lifted in place to move the position, and the locking anchor 24 is fastened to the shelf 20 and the post body 11 to fix the shelf 20. do.

난간 앵커(23)는 선반 본체(21) 위에 올려지는 배선 덕트(30)가 선반 본체(21)의 바깥쪽으로 이탈하지 않도록 지지한다.The handrail anchor 23 supports the wiring duct 30 mounted on the shelf main body 21 so as not to escape to the outside of the shelf main body 21.

배선 덕트(30)는 바닥부(31), 바닥부(31)의 저부에 폭방향을 따라 일정 간격을 두고 하부로 연장 형성되는 다수의 다리부(32), 바닥부(31)의 상부 양측 단부에 상부를 향해 돌출 형성된 가드(33)로 이루어진다.The wiring duct 30 includes a bottom portion 31 and a plurality of leg portions 32 and bottom portions 31 formed on the bottom of the bottom portion 31 extending downwardly at regular intervals along the width direction. The guard 33 is formed to protrude toward the top.

본 발명에 따른 송배전 케이블 설치를 위한 양방향 접이식과 높이 조정이 가능한 전력구 내부 선반장치의 작용은 다음과 같다.Bidirectional folding and height-adjustable power tool internal shelf device for the transmission and distribution cable installation according to the present invention is as follows.

전력구(1) 내부에 케이블(2)을 배선하기 위하여 다수의 포스트(10)를 등간격으로 설치한다. 포스트(10)는 포스트 본체(11)와 상부 고정봉(12)으로 분리 구성되어 있으며, 상부 고정봉(12)은 포스트 본체(11)에서 이탈되지 않고 승강 가능한 상태이다. 먼저 포스트 본체(11)의 위치를 잡고 하부 받침부(13)를 앵커로 고정하고, 상부 고정봉(12)을 천정부측으로 올려 상부 받침부(14)를 천정부에 앵커로 고정하여 포스트(10)를 설치한다. 포스트 본체(11)에는 다수의 선반(20)이 끼워진 상태일 수 있다.In order to wire the cable 2 inside the power port 1, a plurality of posts 10 are provided at equal intervals. The post 10 is divided into a post body 11 and an upper fixing rod 12, and the upper fixing rod 12 is in a state capable of lifting up and down without being separated from the post body 11. First, the position of the post body 11 is fixed, and the lower support part 13 is fixed with an anchor, and the upper fixing rod 12 is lifted to the ceiling side to fix the upper support part 14 to the ceiling to anchor the post 10. Install. The post body 11 may be in a state in which a plurality of shelves 20 are fitted.

따라서, 포스트(10)는 전력구(1)의 높이에 상관없이 전력구(1) 내부에 견고하게 고정될 수 있다.Thus, the post 10 can be firmly fixed inside the power tool 1 regardless of the height of the power tool 1.

포스트(10)의 설치가 완료되면 지지보(40)를 일렬로 배열되는 포스트(10)들에 연결하여 포스트(10)들을 서로 결속한다.When the installation of the post 10 is completed, the support beams 40 are connected to the posts 10 arranged in a row to bind the posts 10 to each other.

선반(20)은 케이블(2)의 배선 수량을 감안하여 포스트(10)에 다단으로 설치되어 있으며, 이때, 다수의 선반(20) 중 케이블(2)의 배선에 사용되는 선반(20)은 도 3에서 실선의 형태로 배열되고 케이블(2)의 배선에 사용되지 않는 선반(20)은 가상선의 형태로 배열된다. 즉, 케이블(2)의 배선에 사용되지 않는 선반(20)은 전력구(1)의 내벽면측에 근접되어 케이블(2)의 배선시 간섭을 일으키지 않는다.The shelf 20 is installed in multiple stages in the post 10 in consideration of the quantity of wiring of the cable 2, and at this time, the shelf 20 used for the wiring of the cable 2 among the plurality of shelves 20 is shown in FIG. The shelves 20 arranged in the form of solid lines in 3 and not used for the wiring of the cable 2 are arranged in the form of virtual lines. That is, the shelf 20 which is not used for the wiring of the cable 2 is close to the inner wall surface side of the electric power tool 1 and does not cause interference in the wiring of the cable 2.

케이블(2)의 배선시 선반(20)을 배선을 위한 위치(케이블(2)은 전력구(1)를 따라 배선되므로 배선을 위한 위치는 포스트(10)에 대해 직각을 유지하는 것이 바람직하다)로 셋팅하며, 따라서, 다수의 선반(20)은 일렬로 배열된다.When wiring the cable 2, the position for wiring the shelf 20 (the cable 2 is wired along the power outlet 1, so the position for the wiring is preferably kept at right angles to the post 10) Therefore, the plurality of shelves 20 are arranged in a line.

그리고, 선반(20)의 방향과 함께 높이를 셋팅하여야 하며 셋팅작업은 다음과 같이 이루어질 수 있다. 선반(20)을 고정하는 잠금앵커(24)를 풀면 선반(20)은 자유롭게 승강 및 회전할 수 있으며, 도 4에서와 같이, 선반(20)을 원하는 높이로 올리거나 내려 적정 위치를 셋팅한 후 잠금앵커(24)를 체결하여 선반(20)을 고정한다.And, the height should be set along with the direction of the shelf 20, the setting operation can be made as follows. When the locking anchor 24 fixing the shelf 20 is released, the shelf 20 can be freely lifted and rotated, and as shown in FIG. 4, after setting the proper position by raising or lowering the shelf 20 to a desired height. Fasten the locking anchor 24 to fix the shelf (20).

이상의 방법을 통해 선반(20)의 위치가 셋팅되면 일렬로 배열되는 선반(20) 위에 배선 덕트(30)를 올리고, 배선 덕트(30) 위에 케이블(2)을 배선한다.When the position of the shelf 20 is set by the above method, the wiring duct 30 is raised on the shelves 20 arranged in a line, and the cable 2 is wired on the wiring duct 30.

케이블(2)은 배선 덕트(30)의 가드(33)에 의해 배선 덕트(30)의 외부로 이탈되지 않으며, 배선 덕트(30)는 선반(20)의 난간앵커(23)에 의해 선반(20)에서 이탈되지 않는다.The cable 2 is not separated out of the wiring duct 30 by the guard 33 of the wiring duct 30, and the wiring duct 30 is the shelf 20 by the railing anchor 23 of the shelf 20. ) Does not deviate.

한편, 배선 중인 케이블(2)을 전력구(1) 내부에서 제거할 경우 배선에 사용되던 선반(20)은 다른 선반(20)에 케이블(2)을 배선할 때와 보수할 때 간섭을 일으킬 것이므로 초기 위치로 셋팅된다. 즉, 잠금앵커(24)를 풀고, 선반(20)을 전력구(1)의 벽면에 근접되도록 돌리면 선반(20)은 도 3의 가상선과 같이 배열되며 이 상태에서 잠금앵커(24)를 체결하여 선반(20)을 고정한다.On the other hand, when the cable 2 being wired is removed from the power outlet 1, the shelf 20 used for wiring will cause interference when the cable 2 is wired to another shelf 20 and when it is being repaired. It is set to the initial position. That is, when the lock anchor 24 is loosened and the shelf 20 is turned to be close to the wall surface of the electric power tool 1, the shelf 20 is arranged as shown in FIG. 3 and the lock anchor 24 is fastened in this state. Fix the shelf 20.

도 1은 본 발명에 의한 송배전 케이블 설치를 위한 양방향 접이식과 높이 조정이 가능한 전력구 내부 선반장치의 설치 상태도.1 is a state diagram of the installation of the electric power tool shelf inside the bidirectional folding and height adjustment for the transmission and distribution cable installation according to the present invention.

도 2는 본 발명에 의한 송배전 케이블 설치를 위한 양방향 접이식과 높이 조정이 가능한 전력구 내부 선반장치의 분해 사시도.Figure 2 is an exploded perspective view of an electric power tool shelf inside the bidirectional folding and height adjustment for the transmission and distribution cable installation according to the present invention.

도 3은 본 발명에 의한 송배전 케이블 설치를 위한 양방향 접이식과 높이 조정이 가능한 전력구 내부 선반장치의 평면도.Figure 3 is a plan view of the electric power tool shelf inside the bidirectional folding and height adjustment for the transmission and distribution cable installation according to the present invention.

도 4는 본 발명에 의한 송배전 케이블 설치를 위한 양방향 접이식과 높이 조정이 가능한 전력구 내부 선반장치에 적용된 선반의 승강을 보인 도면.Figure 4 is a view showing the lifting of the shelf applied to the electric power tool internal shelf device that can be adjusted bi-directional folding and height for the transmission and distribution cable installation according to the present invention.

도 5는 본 발명에 의한 송배전 케이블 설치를 위한 양방향 접이식과 높이 조정이 가능한 전력구 내부 선반장치에 선반의 다른 예시도.Figure 5 is another exemplary view of the shelf in the power tool internal shelving capable of bidirectional folding and height adjustment for the transmission and distribution cable installation according to the present invention.

< 도면의 주요 부분에 대한 부호 설명><Description of Signs for Main Parts of Drawings>

10 : 포스트, 11 : 포스트 본체10: post, 11: post body

12 : 상부 고정봉, 13,14 : 받침부12: upper fixing rod, 13, 14: supporting portion

20 : 선반, 24 : 잠금 앵커20: shelf, 24: locking anchor

30 : 배선 덕트, 30: wiring duct,

Claims (3)

삭제delete 지중 전력구(1)의 내부 일측 벽면에 길이방향을 따라 일정 간격을 두고 세워지며 전구간에 걸쳐 일정 간격을 두고 다수의 체결홀(15)이 형성된 다수의 포스트(10)와;A plurality of posts 10 which are erected at regular intervals along the longitudinal direction on one inner wall surface of the underground electric power tool 1 and have a plurality of fastening holes 15 formed at regular intervals throughout the light bulb; 상기 포스트와 직교하는 방향으로 배열되며 상기 다수의 포스트에 체결구로 고정되는 하나 이상의 지지보(40)와;One or more support beams 40 arranged in a direction orthogonal to the posts and fixed to the plurality of posts by fasteners; 폭보다 길이가 긴 막대 형태의 선반 본체(21), 상기 선반 본체의 일측 단부에 형성되며 상기 포스트에 제자리 회전 가능하게 결합되는 삽입홀(22), 상기 선반 본체의 타측 단부에 상부로 돌출되도록 체결되는 난간 앵커(23), 상기 선반의 체결홀에 체결되어 상기 선반 본체를 상기 포스트에 고정하는 잠금앵커(24)로 이루어져 상기 포스트에 고정되는 다수의 선반(20)과; 그리고, A shelf body 21 having a rod shape longer than a width, an insertion hole 22 formed at one end of the shelf body and rotatably coupled to the post, and fastened to protrude upward from the other end of the shelf body. A plurality of shelves 20 fixed to the post by a railing anchor 23 to be fastened to the fastening holes of the shelves and to lock the rack body 24 to fix the shelves to the posts; And, 바닥부(31), 상기 바닥부의 저부에 폭방향을 따라 일정 간격을 두고 하부로 연장 형성되는 다수의 다리부(32), 상기 바닥부의 상부 양측 단부에 상부를 향해 돌출 형성된 가드(33)로 이루어져, 상기 선반 위에 올려지며 케이블을 배선하는 배선 덕트를 포함하고,The bottom portion 31, the bottom portion of the bottom portion is formed with a plurality of legs 32 extending downwards at regular intervals along the width direction, the guard 33 formed protruding upwards on both sides of the upper end of the bottom portion A wiring duct mounted on the shelf for wiring the cable, 상기 포스트는, 저부에 타구간보다 단면적이 넓으며 지중 전력구의 바닥부에 앵커로 고정되는 하부 받침부(13)가 구비되며 상부에 홀이 형성된 포스트 본체(11), 상기 포스트 본체의 홀에 끼워 고정되며 상부에 타구간보다 단면적이 넓으며 상기 지중 전력구의 천정부에 앵커로 고정되는 상부 받침부(14)가 구비되어 상기 포스트 본체를 지중 전력구에 고정하는 상부 고정봉(12)으로 이루어진 것을 특징으로 하는 송배전 케이블 설치를 위한 양방향 접이식과 높이 조정이 가능한 전력구 내부 선반장치.The post has a lower end portion 13 having a wider cross-sectional area than the other section at the bottom and is anchored at the bottom of the underground power sphere, and includes a post main body 11 having a hole formed therein, and a hole in the post main body. It is fixed and has a wider cross-sectional area than the other section in the upper portion is provided with an upper support portion 14 is fixed to the ceiling of the underground power sphere with an anchor, consisting of an upper fixing rod 12 for fixing the post body to the underground power sphere Two-way folding and height-adjustable power outlet internal shelving for power distribution cable installation. 청구항 2에 있어서, 상기 선반(20)은 일측 단부가 힌지(25)를 통해 절첩 가능하게 연결되면서 타측 단부가 체결구로 고정되는 한 쌍의 선반부재(20A,20B)로 이루어져, 상기 포스트에 연결되는 것을 특징으로 하는 송배전 케이블 설치를 위한 양방향 접이식과 높이 조정이 가능한 전력구 내부 선반장치.The method according to claim 2, The shelf 20 is made of a pair of shelf members (20A, 20B) is fixed to the other end is fastened by a fastener while the other end is foldably connected through the hinge 25, is connected to the post Two-way folding and height-adjustable power outlet internal shelving device for the transmission and distribution cable installation.
KR1020090019461A 2009-03-06 2009-03-06 Shelf apparatus in power hole enabling both sides folding and height adjusting for installing power distributing cable KR100917395B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090019461A KR100917395B1 (en) 2009-03-06 2009-03-06 Shelf apparatus in power hole enabling both sides folding and height adjusting for installing power distributing cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090019461A KR100917395B1 (en) 2009-03-06 2009-03-06 Shelf apparatus in power hole enabling both sides folding and height adjusting for installing power distributing cable

Publications (1)

Publication Number Publication Date
KR100917395B1 true KR100917395B1 (en) 2009-09-17

Family

ID=41355756

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090019461A KR100917395B1 (en) 2009-03-06 2009-03-06 Shelf apparatus in power hole enabling both sides folding and height adjusting for installing power distributing cable

Country Status (1)

Country Link
KR (1) KR100917395B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101347882B1 (en) 2013-10-31 2014-01-07 창전이앤시 주식회사 Protective apparatus of underground cable in utility-pipe conduit
CN110311336A (en) * 2019-07-18 2019-10-08 中信国安建工集团有限公司 A kind of intelligent construction comprehensive wiring device and application method
CN112490970A (en) * 2020-11-27 2021-03-12 闵信忠 Cable bridge with adjustable clamping force

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100656174B1 (en) 2006-08-29 2006-12-13 대한전기감리(주) Shelf for maintenance and management of underground power cable
KR100822869B1 (en) 2007-11-16 2008-04-16 (주)동우기술단 Structure for wiring cable in underground
KR100859013B1 (en) 2008-04-21 2008-09-22 주식회사 한국전설기술단 Installing apparatus of power-transmission and distribution and transformation cable tunnel and method thereof
KR100881352B1 (en) 2008-06-12 2009-02-09 (주)호남전기설계감리 Insulated type hanger for underground distribution line fixation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100656174B1 (en) 2006-08-29 2006-12-13 대한전기감리(주) Shelf for maintenance and management of underground power cable
KR100822869B1 (en) 2007-11-16 2008-04-16 (주)동우기술단 Structure for wiring cable in underground
KR100859013B1 (en) 2008-04-21 2008-09-22 주식회사 한국전설기술단 Installing apparatus of power-transmission and distribution and transformation cable tunnel and method thereof
KR100881352B1 (en) 2008-06-12 2009-02-09 (주)호남전기설계감리 Insulated type hanger for underground distribution line fixation

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101347882B1 (en) 2013-10-31 2014-01-07 창전이앤시 주식회사 Protective apparatus of underground cable in utility-pipe conduit
CN110311336A (en) * 2019-07-18 2019-10-08 中信国安建工集团有限公司 A kind of intelligent construction comprehensive wiring device and application method
CN112490970A (en) * 2020-11-27 2021-03-12 闵信忠 Cable bridge with adjustable clamping force
CN112490970B (en) * 2020-11-27 2022-03-29 闵信忠 Cable bridge with adjustable clamping force

Similar Documents

Publication Publication Date Title
AU2012202022B2 (en) Modular Pedestrian Tunnel
KR101177528B1 (en) Articulated shock-absorbing fence
KR100917395B1 (en) Shelf apparatus in power hole enabling both sides folding and height adjusting for installing power distributing cable
US20130001493A1 (en) Safety Barrier
KR20180090228A (en) Corner structure of scaffold apparatus
KR102225875B1 (en) Cable duct of apartment building
CN107508245A (en) Foldable cable bearer
KR101347883B1 (en) Power cable tray of utility-pipe conduit
KR100882775B1 (en) Electric cable support in a passage of an electric power line under ground for distribution of electricity
US7344458B2 (en) Overhead-supported net system
KR20140068641A (en) Scaffold for construction and launching method of the scaffold
KR200442924Y1 (en) Cable supporter
CN111255221B (en) Supporting structure for erecting pipe fittings
CN212406121U (en) Masonry frame for pre-embedding equipment
KR101631566B1 (en) Crossbar coupling device of handrail and the installation method
AU2019100903B4 (en) Improvements Relating to Barriers and Barrier Supports
KR20110107936A (en) Height adjustment structure for partition wall construction system
JP7488044B2 (en) Movable platform fence installation structure and movable platform fence installation method
KR20120035800A (en) Fixing apparatus for the street light posts
KR101225743B1 (en) A wire rope fixing device prevention of falling rock structure and method for constructing prevention of falling rock structure using it
KR101131933B1 (en) Adjusted device a parking garage entrance and exit for height control
WO2008031902A1 (en) Safety anchoring system for the construction of buildings
JP3125281U (en) Tile leakage check device
CN206053271U (en) Overhanging type movable Scaffold
CN110984834A (en) Ground pile type pole upper operation platform

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
N231 Notification of change of applicant
E902 Notification of reason for refusal
N231 Notification of change of applicant
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee