KR100775451B1 - A spherical type jag for bridge - Google Patents

A spherical type jag for bridge Download PDF

Info

Publication number
KR100775451B1
KR100775451B1 KR1020070012056A KR20070012056A KR100775451B1 KR 100775451 B1 KR100775451 B1 KR 100775451B1 KR 1020070012056 A KR1020070012056 A KR 1020070012056A KR 20070012056 A KR20070012056 A KR 20070012056A KR 100775451 B1 KR100775451 B1 KR 100775451B1
Authority
KR
South Korea
Prior art keywords
bridge
spherical
slide member
support
maintenance
Prior art date
Application number
KR1020070012056A
Other languages
Korean (ko)
Inventor
장영용
Original Assignee
(주)부일건설산업
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)부일건설산업 filed Critical (주)부일건설산업
Priority to KR1020070012056A priority Critical patent/KR100775451B1/en
Application granted granted Critical
Publication of KR100775451B1 publication Critical patent/KR100775451B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/04Bearings; Hinges
    • E01D19/042Mechanical bearings
    • E01D19/046Spherical bearings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A spherical type bridge lifting jack for maintenance is provided to support a bridge correspondingly to vertical and horizontal displacement of a bridge while lifting up a bridge at maintenance work for a bridge bearing installed between a deck and a pier of a bridge. A spherical type bridge lifting jack for maintenance for lifting up a bridge deck at maintenance work for a bridge bearing provided between a deck and a pier of a bridge includes a support member(100) located on the top of a pier and provided with a guidance chamber(140) having a fluid groove(142) to make a fluid flow in or out, a spherical member(520) inserted to the guidance chamber tightly by an O-ring, provided with a spherical groove(120) and reciprocated vertically by hydraulic pressure, a spherical friction member(200) provided with a spherical portion(220) adhered closely to the spherical groove of the spherical member to slide, an upper slide member(300) put on the spherical friction member to support the base of a bridge or a bridge beam, provided with a guide groove(320) and slid against the top of the spherical friction member to lift up a bridge when the spherical member ascends, a control block(400) coupled to the support member and located to the guide grooves of the upper slide member to control the horizontal displacement of the upper slide member, a lifting plate(600) installed to the base of the bridge or the bridge beam to support the top of the upper slide member when the spherical member ascends, many reinforcing panels(700) layered between the lifting plate and the upper slide member to regulate height, and a stopper placed between the top of the support member and the upper slide member to support the upper slide member and to maintain height.

Description

유지 보수를 위한 스페리칼형 교량 인상잭 및 이를 통한 교좌장치 보수방법{A spherical type jag for bridge}Spur type bridge jack for maintenance and repair method of bridge device through the same {A spherical type jag for bridge}

도 1은 본 발명에 따른 유지 보수를 위한 스페리칼형 교량 인상잭의 분리 사시도,1 is an exploded perspective view of a spherical bridge lifting jack for maintenance according to the present invention,

도 2는 도 1의 결합상태 단면도,2 is a cross-sectional view of the coupling state of FIG.

도 3은 도 2의 사용상태도.3 is a state diagram used in FIG.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

100: 받침부재 120: 구면홈부100: support member 120: spherical groove portion

140: 안내실140: Information Room

200: 구면마찰부재 220: 구면부200: spherical friction member 220: spherical portion

300: 상판슬라이드부재 320: 가이드홈300: top plate slide member 320: guide groove

400: 제어블럭400: control block

520: 구면부재520: spherical member

600: 인상플레이트600: impression plate

700: 보강패널700: reinforcement panel

900: 스토퍼900: stopper

본 발명은 교량을 인상하기 위한 교량 인상잭에 관한 것으로서, 더욱 상세하게는 교량의 상판 슬라브와 교각 사이에 설치된 교좌장치의 보수 및 교체 작업시 인상잭을 통해 교량을 인상시킨 상태에서 인상잭이 교량의 수직 및 수평 변위에 대응할 수 있도록 하는 유지 보수를 위한 스페리칼형 교량 인상잭 및 이를 통한 교좌장치 보수방법에 관한 것이다.The present invention relates to a bridge raising jack for raising a bridge, and more particularly, in the state in which the raising jack raises the bridge through the raising jack during repair and replacement of the bridge device installed between the upper slab of the bridge and the bridge. The present invention relates to a spherical bridge lifting jack for maintenance that can cope with vertical and horizontal displacement of a bridge, and a method of repairing a bridge device through the same.

교좌장치는, 교량의 상부에서 작용하는 충격하중 등을 하부구조로 전달하고 그 충격을 흡수하는 장치로, 교량 구조물 전체의 내구성과 안전에 있어 구조적으로 중요한 요소가 된다. The bridge device is a device that transmits the impact load and the like acting on the upper portion of the bridge to the lower structure and absorbs the impact, which is a structurally important element in the durability and safety of the entire bridge structure.

최근의 교좌장치는, 교량 가설시 온도변화, 바람, 지진 등의 충격에 의한 상대변위나 교량 상판의 수평력을 정적으로 흡수하여 교량의 내진 기능을 원활하게 하고 내구 수명을 보다 연장하고자 교량 상판과 교각 사이에 스페리칼 형의 교좌장치가 설치되고 있다.In recent years, bridge decks and bridge piers are used to smoothly seismicize the bridges and extend the service life by statically absorbing the relative displacement caused by temperature changes, wind, earthquakes, etc. A spherical type scaffolding device is provided in between.

스페리칼형의 교좌장치는, 실용신안등록 제20-0398506호 "스페리칼 타입의 교량용 교좌장치"로 출원되어 등록된 바 있다.The spherical type bridge device has been filed and registered as Utility Model Registration No. 20-0398506, "Spherical type bridge device for bridges."

교각에 매설되어지는 하답과 상판이 얹혀지는 상답의 사이에 베어링플레이트의 상면으로 불소수지판을 포함하는 고무패드가 고정부재인 볼트에 의해 설치되어 있는 스페리칼베어링이 설치된 것이 제시된 바 있다.It has been suggested that a spherical bearing having a rubber pad including a fluororesin plate is installed by a bolt as a fixing member between the lower part to be embedded in the piers and the upper part to which the upper plate is placed.

상면으로 돌출 형성된 돌기부에 베어링플레이트의 구면이 구름 회전되어지는 구면요입부가 형성되어 있고 양쪽으로 사이드블럭이 설치되는 하부스토퍼가 형성되어 있는 하답, 상기 하답의 구면요입부에 안착되어 구름회전하는 구면을 형성하고 볼트가 끼워지는 구멍이 형성되어 있는 베어링플레이트의 상면에 상부 하중을 지지하는 고무패드와 고정플레이트를 매개로 설치되어 마찰계수를 감소시키는 불소수지판이 상기 고정플레이트의 나사공에 나사결합되는 볼트에 의해 결합 형성되어 있는 스페리칼베어링, 상기 스페리칼베어링의 불소수지판에 미끄럼 되고 상판이 얹혀지며 하답의 하부스토퍼에 규제되어지는 상부스토퍼를 가지는 상답으로 구성된다.The spherical indentation part is formed in which the spherical surface of the bearing plate is rolled on the protrusion formed on the upper surface, and the lower stopper is formed on both sides of the spherical indentation part. A bolt in which a fluorine resin plate which is formed through a rubber pad for supporting an upper load and a fixing plate is formed on the upper surface of the bearing plate having a hole in which the bolt is formed and reduces the coefficient of friction. It consists of a spherical bearing which is formed by bonding, and an upper body having an upper stopper which is slid to the fluorine resin plate of the spherical bearing and is mounted on the upper plate and is restricted to the lower stopper of the lower step.

이러한 교좌장치는 교량 상판에 대해 수직 및 수평적 변위를 흡수할 수 있게 됨에 따라 최근 교량에 주로 적용되고 있다.Such bridge arrangements are mainly applied to bridges as they can absorb vertical and horizontal displacements with respect to the bridge deck.

하지만, 상기한 교좌장치는 오랜 시간 사용하게 되면 노화 현상이 발생되어 일정기간 사용후 유지 보수의 작업 또는 교체 작업을 수행하게 된다.However, the above-described teaching device is a aging phenomenon occurs when used for a long time to perform the maintenance work or replacement work after a certain period of use.

상기한 교좌장치의 해체 또는 보수 작업을 살펴보면, 먼저 잭(JACK) 설치장소를 설정한 후 잭을 통해 교량을 인상한 다음 기존의 교좌장치를 해체한다. 그런다음 무수축 몰탈 깨기 작업을 수행하고, 이후 신설 교좌장치 교체와 동시에 철근 배근 및 무수축 몰탈 타설 그리고 양생과정을 수행한 다음 교량의 인하 작업을 수행하고 연속해서 설치된 잭을 철거하게 되면 작업이 완료된다.Looking at the dismantling or maintenance of the above-described device, first set the jack (JACK) installation place, then raise the bridge through the jack and then dismantle the existing device. Then, perform the work of breaking the shrinkage mortar, and then replace the new bridge and perform the reinforcement and the shrinkage mortar casting and curing process, and then cut down the bridge and remove the jacks installed continuously. do.

상기 잭은 수직으로 승하강 되는 구조로 작업중 교량 등에 수평적 변위가 발생되면 이를 흡수하지 못해 대형 사고를 초래하는 문제점이 있게 된다.The jack has a problem of causing a large accident due to the structure to be moved up and down vertically, if the horizontal displacement occurs in the bridge, etc. during work is not absorbed.

또한, 교좌장치의 보수 작업시에는 교량 상판 위로 주행하는 차량 등이 없어야 함에 따라 그 작업이 힘든 문제점이 있어왔다. In addition, the maintenance of the bridge device has been a problem that is difficult to work as there should be no vehicle running on the bridge top plate.

이에 본 발명은 상기한 문제점을 해결하기 위해 창안된 것으로 본 발명의 목적은 교량의 상판 슬라브와 교각 사이에 설치된 교좌장치의 보수 및 교체 작업시 인상잭을 통해 교량을 인상시킨 상태에서 인상잭이 교량의 수직 및 수평 변위에 대응할 수 있도록 하는데 있다. Accordingly, the present invention has been made to solve the above problems and an object of the present invention is to raise the bridge in the state of raising the bridge through the jack jack during the repair and replacement work of the bridge device installed between the top slab of the bridge and the bridge It is to be able to cope with the vertical and horizontal displacement of.

상기 목적을 달성하기 위하여 본 발명은, 교량을 인상하기 위한 인상잭에 있어서, 교각의 상면에 위치되는 받침부재와, 이 받침부재의 상면에 형성된 구면홈부에 올려져 슬라이드 결합되도록 구면부를 갖는 구면마찰부재와, 상기 구면마찰부재의 상면에 슬라이드 가능하게 올려지며 그 상면이 교량의 저면 또는 교량의 저면에 제공된 교량빔에 지지되는 상판슬라이드부재와, 상기 받침부재에 제공되며 상단부가 상기 상판슬라이드부재의 양쪽에 형성된 가이드홈에 위치되어 수평적 변위를 제어하는 제어블럭을 포함하며;In order to achieve the above object, the present invention, in the lifting jack for raising the bridge, the spherical friction having a support member positioned on the upper surface of the pier, and a spherical portion to be mounted on the spherical groove formed on the upper surface of the support member to slide A member, an upper plate slide member slidably mounted on an upper surface of the spherical friction member, the upper surface slide member supported by a bridge beam provided on a bottom surface of the bridge or a bottom surface of the bridge, and provided on the supporting member, and an upper end of the upper plate slide member A control block positioned at guide grooves formed at both sides to control horizontal displacement;

상기 받침부재의 내측에 상향 개방되게 형성되어 외부와 연통되는 유체홀을 통해 유체를 공급받는 안내실을 형성하고, 이 안내실의 상측에 상기 받침부재로부터 축방향을 따라 분리되며 상면에 상기 구면홈부가 형성되는 구면부재가 기밀유지 상태로 승하강 가능하게 삽입되도록 하여서 된 것을 특징으로 한다.The guide chamber is formed to be opened upward in the support member to form a guide chamber for receiving fluid through a fluid hole communicating with the outside, and is separated along the axial direction from the support member on the upper side of the guide chamber, and the spherical groove is formed on the upper surface. Characterized in that the spherical member is to be inserted up and down in a state of airtight.

여기서, 상기 상판슬라이드부재의 상면에, 상측이 상기 교량의 저면 또는 교량의 저면에 제공된 교량빔에 지지 고정되도록 인상플레이트가 추가로 제공되도록 하고, 상기 인상플레이트와 상기 상판슬라이드부재 사이에 높이 조절을 위한 다수개의 보강패널이 적어도 하나 이상 적층되도록 하며, 상기 보강패널이 상기 상판슬라이드부재 또는 상기 인상플레이트에 결합되는 볼트 등의 체결구 또는 지지브래킷을 통해 이탈이 방지되도록 함이 가능하다.Here, an upper surface of the upper plate slide member, the upper side is provided with an additional impression plate to be fixed to the bridge beam provided on the bottom surface of the bridge or the bottom of the bridge, the height adjustment between the impression plate and the upper plate slide member A plurality of reinforcing panels for the at least one to be laminated, it is possible to prevent the reinforcement panel is separated through the fasteners or support brackets, such as bolts coupled to the upper plate slide member or the impression plate.

또한, 상기 받침부재의 상면과 상기 상판슬라이드부재의 사이에, 높이 유지를 위한 스토퍼가 제공되도록 함이 바람직하다.In addition, it is preferable to provide a stopper for maintaining the height between the upper surface of the support member and the upper plate slide member.

상기 특징에 따라 본 발명은, 구면부재가 삽입되고 이 구면부재의 상측에 형성된 구면홈부에 구면마찰부재가 올려진 받침부재를 교각 상면에 위치시키는 받침부재 위치 고정단계; 상기 구면마찰부재의 상면에 올려진 상판슬라이드부재와 교량의 저면 또는 교량에 형성된 교량빔과의 높이틈새를 측정한 후 이에따른 보강패널을 다수개 적층시킨 후 상기 상판슬라이드부재와 상기 교량 또는 교량빔의 저면에 고정되는 인상플레이트 사이에 적층시키는 높낮이 조절단계; 상기 받침부재에 형성된 안내실로 유체를 공급시켜 상기 받침부재내의 구면부재를 승강시키는 교량 승강단계; 상기 받침부재의 상면과 상판슬라이드부재 사이에 스토퍼를 위치시킨 후 높이를 유지하도록 하는 스토퍼 설치단계; 상기 받침부재에 제어블럭을 결합시켜 상기 상판슬라이드부재의 변위를 제어할 수 있도록 하는 제어블럭 결합단계; 교량과 교각 사이에 설치된 기존 교좌장치를 보수 또는 교체하는 유지 보수단계;를 통해 유지 보수작업을 수행한다.According to the above aspect, the present invention provides a support member position fixing step of placing a support member on which a spherical member is inserted and a spherical friction member is mounted on an upper surface of a pier in a spherical groove formed on an upper side of the spherical member; After measuring the height gap between the upper plate slide member raised on the upper surface of the spherical friction member and the bridge beam formed on the bottom surface or bridge of the bridge, after stacking a plurality of reinforcement panels according to the top plate slide member and the bridge or bridge beam Height adjustment step of laminating between the impression plate is fixed to the bottom of the; A bridge elevating step of supplying fluid to the guide chamber formed in the supporting member to elevate the spherical member in the supporting member; A stopper installation step of maintaining a height after placing a stopper between an upper surface of the support member and an upper plate slide member; A control block coupling step of controlling a displacement of the upper plate slide member by coupling a control block to the support member; Maintenance work is performed through the maintenance step of repairing or replacing the existing bridge device installed between the bridge and the bridge.

상기 높낮이 조절단계에서, 상하로 다수개 적층된 상기 보강패널들의 이탈을 방지하도록 상기 인상플레이트와 상판슬라이드부재를 볼트를 통해 연결 고정 또는 별도의 지지브래킷을 통해 좌우 밀림을 방지하도록 하는 보강패널 이탈 방지단계를 더 수행함이 바람직하다.In the height adjustment step, preventing the separation of the reinforcement panel to prevent the left and right through the fixed fixing or a separate support bracket to connect the impression plate and the upper plate slide member through bolts to prevent the separation of the plurality of laminated reinforcement panels up and down. It is preferable to carry out further steps.

또한, 상기 유지 보수단계에서, 상기 받침부재내의 안내실에 제공된 유체를 외부로 배출시키고 동시에 주입홀을 통해 안내실에 에폭시를 채움시켜 상기 스토포와 함께 상기 상판슬라이드부재의 높이가 계속해서 유지될 수 있도록 함이 가능하다.In addition, in the maintenance step, the fluid provided to the guide chamber in the support member to the outside and at the same time to fill the guide chamber through the injection hole so that the height of the upper plate slide member with the stopper can be maintained continuously This is possible.

이하, 본 발명에 따른 유지 보수를 위한 스페리칼형 교량 인상잭의 바람직 한 실시예를 첨부된 도면을 참조로 하여 상세히 설명하며 본 발명을 설명함에 있어 관련된 공지기능에 대해서는 본 발명의 요지를 흐리게 할 수 있다고 판단되는 경우 그 자세한 설명을 생략하기로 한다.Hereinafter, with reference to the accompanying drawings, a preferred embodiment of a spherical bridge lifting jack for maintenance according to the present invention will be described in detail, and the related features in the description of the present invention can blur the gist of the present invention. If it is determined that the detailed description thereof will be omitted.

본 발명은, 교량의 상판과 교각 사이에 제공되는 교좌장치의 유지 및 보수시 교량 상판을 인상하기 위한 스페리칼형의 인상잭을 제공하여서 된다.The present invention is to provide a spherical impression jack for raising the bridge top plate during maintenance and repair of the bridge device provided between the bridge top plate and the bridge.

도 1 내지 도 3의 도시에 의하여 상기 인상잭은, 안내실(140)을 갖는 받침부재(100)와, 상기 안내실(140)에 삽입되어 유압력을 통해 승하강 가능하게 제공되는 구면부재(520)와, 이 구면부재(520)의 상면 구면홈부(120)에 밀착되는 구면부(220)를 갖는 구면마찰부재(200)와, 이 구면마찰부재(200)에 올려지며 교량 또는 교량빔의 저면을 지지하는 상판슬라이드부재(300)와, 상기 받침부재(100)에 결합되어 상 기 상판슬라이드부재(300)의 수평 변위를 제어하는 제어블럭(400)을 포함하여 구성된다.1 to 3, the impression jack is a support member 100 having a guide chamber 140, and a spherical member 520 is inserted into the guide chamber 140 and provided to be able to move up and down through hydraulic pressure. And, the spherical friction member 200 having a spherical portion 220 in close contact with the upper surface spherical groove portion 120 of the spherical member 520, the spherical friction member 200 is mounted on the lower surface of the bridge or bridge beam It is configured to include a support block for supporting the upper plate slide member 300, the control block 400 is coupled to the support member 100 for controlling the horizontal displacement of the upper plate slide member (300).

상기 받침부재(100)는, 교각의 상면에 위치되어 위치 고정된 상태에서 필요에 따라 앵커보올트 등으로 상기 교각에 고정 결합되며, 그 중앙에는 상향으로 개방된 안내실(140)이 형성되고 이 안내실(140)에는 외부로부터 유체가 유입 및 배출될 수 있도록 유체홀(142)이 형성된다.The supporting member 100 is located on the upper surface of the pier and is fixedly coupled to the pier by anchor bolts, etc., if necessary, in a fixed position, and a guide chamber 140 opened upwardly is formed at the center thereof. The fluid hole 142 is formed in the 140 to allow the fluid to flow in and out from the outside.

상기 구면부재(520)는, 상기 안내실(140)에 오링 등에 의해 기밀 유지상태로 삽입 결합되며, 그 상면에 구면홈부(120)가 형성되고, 상기 유체홀(142)을 통해 안내실(140)로 유체가 공급되면 상기 구면부재(520)는 상승 동작을 하게 된다.The spherical member 520 is inserted into and coupled to the guide chamber 140 in an airtight state by an O-ring, etc., and a spherical groove 120 is formed on the upper surface of the spherical member 520 to the guide chamber 140 through the fluid hole 142. When the fluid is supplied, the spherical member 520 moves upward.

상기 구면부재(520)의 구면홈부(120)는 상기 구면마찰부재(200)의 저면에 돌출 형성된 구면부(220)가 밀착 결합되어 슬라이드 되게 된다.The spherical groove portion 120 of the spherical member 520 is slid in close contact with the spherical portion 220 protruding to the bottom surface of the spherical friction member 200.

상기 구면마찰부재(200)의 상면에는, 상판슬라이드부재(300)가 올려지며, 상기 상판슬라이드부재(300)는 외측에 가이드홈(320)이 외향으로 개방되게 형성되며 하중 또는 수평 변위 발생시 상기 구면마찰부재(200)의 상면에 대해 슬라이드 되고, 상기 구면부재(520)의 상승 동작시 교량을 들어 올리게 된다.On the upper surface of the spherical friction member 200, the upper plate slide member 300 is raised, the upper plate slide member 300 is formed so that the guide groove 320 is opened outward on the outside and the spherical surface when a load or horizontal displacement occurs The upper surface of the friction member 200 is slid, and the bridge is lifted during the ascending operation of the spherical member 520.

상기 제어블럭(400)은, 상기 받침부재(100)에 제공되며 상단부가 상기 상판슬라이드부재(300)의 양쪽에 형성된 가이드홈(320)에 위치되어 수평적 변위를 제어하게 된다. 그리고 상기 제어블럭(400)은 상기 받침부재(100)의 외측에 분리 가능하게 체결구(142)로 결합된다. 또한 상기 제어블럭(400)의 상단에는 서로 대칭되는 방향으로 걸림단(440)이 형성되어 상기 상판슬라이드부재(300)의 상대적 반력을 제 어하게 된다.The control block 400 is provided to the support member 100 and the upper end is located in the guide groove 320 formed on both sides of the upper plate slide member 300 to control the horizontal displacement. And the control block 400 is coupled to the fastener 142 detachably to the outside of the support member 100. In addition, the upper end of the control block 400 is formed with a locking end 440 in a direction symmetrical to each other to control the relative reaction force of the upper plate slide member (300).

여기서, 상기 제어블럭(400)을 상기 받침부재(100)에 체결구(142)로의 결합시 상기 걸림단(440)이 상기 상판슬라이드부재(300)의 최대 상승 위치에서도 접촉되지 않는 위치에 위치되도록 고정 결합시킨다.In this case, when the control block 400 is coupled to the support member 100 to the fastener 142, the locking end 440 is positioned at a position that is not in contact even at the maximum raised position of the upper plate slide member 300. Lock it in place.

또한, 교량의 저면 또는 교량빔의 저면에는 상기 구면부재(520)의 승강 동작시 상기 상판슬라이드부재(300)의 상면이 지지되는 인상플레이트(600)가 추가로 제공된다.In addition, the lower surface of the bridge or the bottom surface of the bridge beam is further provided with an impression plate 600 which is supported by the upper surface of the upper plate slide member 300 during the lifting operation of the spherical member 520.

상기 인상플레이트(600)는 교량의 인상시 지지되는 부분이며 후술될 상기 보강패널(700)의 상승시 안정된 지지력을 확보하기 위한 것으로 상기 교량의 저면 또는 교량빔을 감싸는 형태로 제공되는 것이다.The lifting plate 600 is a portion that is supported during the lifting of the bridge and to ensure a stable supporting force when the reinforcement panel 700 is to be described later, it is provided in the form of wrapping the bottom or bridge beam of the bridge.

그리고, 상기 인상플레이트(600)와 상기 상판슬라이드부재(300) 사이에 높이 조절을 위해 다수개 적층되는 보강패널(700)이 제공된다.In addition, a plurality of reinforcement panels 700 are provided for height adjustment between the impression plate 600 and the upper plate slide member 300.

또한, 상기 보강패널(700)은 상기 상판슬라이드부재(300)와 상기 인상플레이트(600)를 연결하는 볼트(미도시)에 의해 고정 또는 상기 상판슬라이드부재(300)와 상기 인상플레이트(600)에 결합되는 지지브래킷을 통해 위치 이탈이 방지된다.In addition, the reinforcement panel 700 is fixed or fixed to the upper plate slide member 300 and the impression plate 600 by a bolt (not shown) connecting the upper plate slide member 300 and the impression plate 600. Out of position is prevented through the support bracket to be engaged.

또한, 상기 받침부재(100)의 상면과 상기 상판슬라이드부재(300)의 사이에, 높이 유지를 위한 스토퍼(900)가 제공되도록 함이 바람직하다.In addition, it is preferable to provide a stopper 900 for maintaining the height between the upper surface of the support member 100 and the upper plate slide member 300.

상기 스토퍼(900)는, 공지의 수단이며 상기 받침부재(100)에 지지되어 그 상부가 인상된 상기 상판슬라이드부재(300)를 지지하게 된다.The stopper 900 is a known means and is supported by the support member 100 to support the upper plate slide member 300 whose upper portion is raised.

상기 스토퍼(900)는, 금속재의 링부재로 상기 받침부재(100)의 상면에 올려 져 상기 상판슬라이드부재(300)을 지지하게 된다.The stopper 900 is mounted on the upper surface of the support member 100 by a ring member made of metal to support the upper plate slide member 300.

상기 스토퍼(900)는, 다른 예로서, 상기 상기 받침부재(100)의 상면에 올려지는 몸체와, 상면이 상기 상판슬라이드부재를 지지하도록 지지편을 가지고 있고 하단부가 상기 몸체에 대해 나사결합되어 승하강 되는 높이조절바로 구성시켜 상기 높이조절바를 통해 높이가 유지될 수 있도록 함이 가능하다.As another example, the stopper 900 has a body mounted on the upper surface of the support member 100 and a support piece so that the upper surface supports the upper plate slide member, and the lower end is screwed with respect to the body. It is possible to configure the height adjustment bar to be lowered so that the height can be maintained through the height adjustment bar.

미설명부호 160은, 상기 받침부재(100)에 형성되어 상기 안내실(140)로 에폭시 등의 약액을 주입시키기 위한 주입홀(160)이다. 상기 주입홀(160)은 평상시 메꾸라 또는 역류방지용 체크밸브를 통해 막힘상태를 유지하게 되며 상기 안내실(140)에 제공된 구면부재(520)의 높이를 오랜 기간 위치 고정시키는 경우 적용하기 위한 것이다. Reference numeral 160 is an injection hole 160 formed in the support member 100 to inject a chemical solution such as epoxy into the guide chamber 140. The injection hole 160 is normally maintained in a blocked state through a check valve for preventing or countercurrent flow and is applied when fixing the height of the spherical member 520 provided in the guide chamber 140 for a long time.

이상에서와 같이 구성되는 본 발명에 따른 유지 보수를 위한 스페리칼형 교량 인상잭의 설치 방법 및 이를 통한 교좌장치 유지 보수 과정을 첨부된 도면을 참조로 하여 상세히 설명한다.With reference to the accompanying drawings, a method of installing a spherical bridge raising jack for maintenance according to the present invention constituted as described above and a method for maintaining a bridge device through the same will be described in detail.

먼저, 도 1 또는 도 2에 도시된 바와같이 승하강을 위한 구면부재(520)가 삽입되고 이 구면부재(520)의 상측에 형성된 구면홈부(120)에 구면마찰부재(200)가 올려진 받침부재(100)를 교각 상면에 위치시키는 받침부재 위치 고정단계를 수행한다. 그런다음 상기 구면마찰부재(200)의 상면에 올려진 상판슬라이드부재(300)와 교량의 저면 또는 교량에 형성된 교량빔과의 높이틈새를 측정한 후 이에따른 보강패널(700)을 다수개 적층시킨 후 상기 상판슬라이드부재(300)와 상기 교량 또는 교량빔의 저면에 고정되는 인상플레이트(600) 사이에 적층시키는 높낮이 조절단계를 수행하고, 연속해서 상기 받침부재(100)에 형성된 안내실(140)로 유체를 공급시켜 상기 받침부재(100)내의 구면부재(520)를 승강시키는 교량 승강단계를 수행한다. 이후 교량이 원하는 위치까지 승강되면 상기 받침부재(100)의 상면과 상판슬라이드부재(300) 사이에 스토퍼(900)를 위치시킨 후 높이를 유지하도록 하는 스토퍼 설치단계를 수행한다.First, as shown in FIG. 1 or FIG. 2, the spherical member 520 for lifting and lowering is inserted and the spherical friction member 200 is placed on the spherical groove 120 formed on the upper side of the spherical member 520. A support member position fixing step of placing the member 100 on the pier upper surface is performed. Then, after measuring the height gap between the upper plate slide member 300 and the lower surface of the bridge or the bridge beam formed on the bridge and then laminated a plurality of reinforcement panel 700 according to the spherical friction member 200 After performing the height adjustment step of laminating between the upper plate slide member 300 and the lifting plate 600 fixed to the bottom surface of the bridge or bridge beam, and continuously into the guide chamber 140 formed in the support member 100 A bridge elevating step of elevating the spherical member 520 in the support member 100 by supplying a fluid is performed. After the bridge is elevated to a desired position, the stopper installation step is performed to maintain the height after placing the stopper 900 between the upper surface and the upper plate slide member 300 of the support member 100.

이후, 상기 받침부재(100)에 제어블럭(400)을 결합시켜 상기 상판슬라이드부재(300)의 변위를 제어할 수 있도록 하는 제어블럭 결합단계를 수행하고, 연속된 작업으로 교량과 교각 사이에 설치된 기존 교좌장치를 보수 또는 교체하는 유지 보수단계를 수행하면 유지 보수 작업이 완료된다.Subsequently, the control block coupling step is performed to couple the control block 400 to the support member 100 to control the displacement of the upper plate slide member 300, and is installed between the bridge and the pier in a continuous operation. The maintenance work is completed by performing a maintenance step that repairs or replaces the existing teaching device.

여기서, 상기 높낮이 조절단계에서, 상하로 다수개 적층된 상기 보강패널(700)들의 이탈을 방지하도록 상기 인상플레이트(600)와 상판슬라이드부재(300)를 볼트로 연결 고정 또는 상기 인상플레이트(600)와 상판슬라이드부재(300)에 별도의 지지브래킷(340)(640)을 결합시켜 보강패널(700)들의 이탈을 방지하는 보강패널 이탈 방지단계를 더 수행한다. Here, in the height adjustment step, fixing or connecting the impression plate 600 and the upper plate slide member 300 with bolts to prevent the separation of the reinforcement panel 700 stacked in a plurality of up and down, or the impression plate 600 And the separate support brackets 340 and 640 to the upper plate slide member 300 to further perform the step of preventing departure of the reinforcement panel to prevent the separation of the reinforcement panel 700.

또한, 상기 유지 보수단계에서는, 상기 받침부재(100)내의 안내실(140)에 제공된 유체를 외부로 배출시키고 동시에 주입홀(160)을 통해 안내실(140)에 에폭시를 채움시켜 상기 상판슬라이드부재(300)의 높이가 지속적으로 유지될 수 있도록 함이 가능하다.In addition, in the maintenance step, the fluid provided in the guide chamber 140 in the support member 100 to the outside and at the same time filled the epoxy in the guide chamber 140 through the injection hole 160 to the upper plate slide member 300 It is possible to maintain the height of) continuously.

따라서, 본 발명에 따른 유지 보수를 위한 스페리칼형 교량 인상잭은, 교량의 상판 슬라브 또는 교량빔과 교각 사이에 설치된 교좌장치의 보수 및 교체 작업시 인상잭을 통해 교량을 인상시킨 상태에서 인상잭이 교량의 수직 및 수평 변위에 대응하면서 교량을 지지할 수 있도록 하는 효과가 있다. Therefore, in the spherical bridge raising jack for maintenance according to the present invention, the impression jack is in the state of raising the bridge through the lifting jack during the repair and replacement of the bridge device installed between the top slab or bridge beam and bridge of the bridge There is an effect that can support the bridge while corresponding to the vertical and horizontal displacement of the bridge.

Claims (8)

교량을 인상하기 위한 인상잭에 있어서,In the impression jack to raise the bridge, 교각의 상면에 위치되는 받침부재(100)와, 이 받침부재(100)의 상면에 형성된 구면홈부(120)에 올려져 슬라이드 결합되도록 구면부(220)를 갖는 구면마찰부재(200)와, 상기 구면마찰부재(200)의 상면에 슬라이드 가능하게 올려지며 그 상면이 교량의 저면 또는 교량의 저면에 제공된 교량빔에 지지되는 상판슬라이드부재(300)와, 상기 받침부재(100)에 제공되며 상단부가 상기 상판슬라이드부재(300)의 양쪽에 형성된 가이드홈(320)에 위치되어 수평적 변위를 제어하는 제어블럭(400)을 포함하며;A spherical friction member 200 having a support member 100 positioned on an upper surface of the piers, and a spherical portion 220 mounted on a spherical groove 120 formed on an upper surface of the support member 100 so as to slide. The upper surface slide member 300 is slidably mounted on the upper surface of the spherical friction member 200 and the upper surface slide member 300 is supported by the bridge beam provided on the bottom surface of the bridge or the bottom surface of the bridge, and the upper end portion is provided on the support member 100. A control block (400) positioned at guide grooves (320) formed at both sides of the upper plate slide member (300) to control horizontal displacement; 상기 받침부재(100)의 내측에 상향 개방되게 형성되어 외부와 연통되는 유체홀(142)을 통해 유체를 공급받는 안내실(140)을 형성하고, 이 안내실(140)의 상측에 상기 받침부재(100)로부터 축방향을 따라 분리되며 상면에 상기 구면홈부(120)가 형성되는 구면부재(520)가 기밀유지 상태로 승하강 가능하게 삽입되도록 하여서 된 것을 특징으로 하는 유지 보수를 위한 스페리칼형 교량 인상잭.The guide member 140 is formed to be opened upward in the supporting member 100 to receive the fluid through the fluid hole 142 communicating with the outside, and the supporting member 100 is disposed above the guide chamber 140. Spherical bridge impression jack for maintenance, characterized in that the spherical member 520 is separated along the axial direction and is formed so that the spherical member 520, which is formed on the upper surface of the spherical groove portion 120, can be lifted up and down in an airtight state. . 제1항에 있어서,The method of claim 1, 상기 상판슬라이드부재의 상면에, 상측이 상기 교량의 저면 또는 교량의 저면에 제공된 교량빔에 지지 고정되도록 인상플레이트(600)가 추가로 제공되도록 하 고, 상기 인상플레이트(600)와 상기 상판슬라이드부재(300) 사이에 높이 조절을 위한 다수개의 보강패널(700)이 적어도 하나 이상 적층되도록 하며, 상기 보강패널(700)이 상기 상판슬라이드부재(300)와 상기 인상플레이트(600)를 연결하는 볼트에 의해 고정 또는 상기 상판슬라이드부재(300)와 상기 인상플레이트(600)에 각각 별도로 결합되는 지지브래킷을 통해 이탈이 방지됨을 특징으로 하는 유지 보수를 위한 스페리칼형 교량 인상잭.On the upper surface of the upper plate slide member, the upper side is provided with an additional impression plate 600 to be fixed to the bridge beam provided on the bottom surface of the bridge or the bottom of the bridge, and the lifting plate 600 and the upper plate slide member At least one or more reinforcement panels 700 for height adjustment are stacked between the 300, and the reinforcement panel 700 is connected to the bolt connecting the upper plate slide member 300 and the impression plate 600. The fixed or spherical bridge lifting jack for maintenance, characterized in that the separation is prevented through the support bracket is coupled to the top plate member 300 and the lifting plate 600 separately. 제1항 또는 제2항에 있어서,The method according to claim 1 or 2, 상기 받침부재의 상면과 상기 상판슬라이드부재의 사이에, 높이 유지를 위한 스토퍼(900)가 제공됨을 특징으로 하는 유지 보수를 위한 스페리칼형 교량 인상잭.Between the upper surface of the support member and the upper plate slide member, a spherical bridge lifting jack for maintenance, characterized in that a stopper for maintaining the height is provided. 제3항에 있어서,The method of claim 3, 상기 스토퍼(900)는, The stopper 900, 상기 받침부재(100)의 상면에 올려지는 몸체와, 상면이 상기 상판슬라이드부재를 지지하도록 지지편을 가지고 있고 하단부가 상기 몸체에 대해 나사결합되어 승하강 되는 높이조절바임을 특징으로 하는 유지 보수를 위한 스페리칼형 교량 인상잭.The body is mounted on the upper surface of the support member 100, and the upper surface has a support piece to support the upper plate slide member and the lower end is screwed with respect to the body height adjustment bar characterized in that the lifting and lowering Special bridge for hike jack. 제1항에 있어서, The method of claim 1, 상기 제어블럭(400)이 상기 받침부재(100)의 외측에 분리 가능하게 체결구(420)로 결합도록 하고 상단에는 상기 상판슬라이드부재(300)의 반력을 제어하도록 걸림단(440)을 형성함을 특징으로 하는 유지 보수를 위한 스페리칼형 교량 인상잭.The control block 400 is coupled to the fastener 420 detachably to the outside of the support member 100, and the locking end 440 is formed on the upper end to control the reaction force of the upper plate slide member 300. Special type bridge raising jack for maintenance, characterized in that. 구면부재(520)가 삽입되고 이 구면부재(520)의 상측에 형성된 구면홈부(120)에 구면마찰부재(200)가 올려진 받침부재(100)를 교각 상면에 위치시키는 받침부재 위치 고정단계;A support member position fixing step of placing the support member 100 on the pier where the spherical member 520 is inserted and the spherical friction member 200 is mounted on the spherical groove 120 formed on the upper side of the spherical member 520; 상기 구면마찰부재(200)의 상면에 올려진 상판슬라이드부재(300)와 교량의 저면 또는 교량에 형성된 교량빔과의 높이틈새를 측정한 후 이에따른 보강패널(700)을 다수개 적층시킨 후 상기 상판슬라이드부재(300)와 상기 교량 또는 교량빔의 저면에 고정되는 인상플레이트(600) 사이에 적층시키는 높낮이 조절단계;After measuring the height gap between the upper plate slide member 300 and the lower surface of the bridge or the bridge beam formed on the bridge and then laminated a plurality of reinforcement panel 700 according to the spherical friction member 200 A height adjustment step of stacking the upper plate slide member 300 and an impression plate 600 fixed to the bottom surface of the bridge or the bridge beam; 상기 받침부재(100)에 형성된 안내실(140)로 유체를 공급시켜 상기 받침부재(100)내의 구면부재(520)를 승강시키는 교량 승강단계;A bridge elevating step of supplying fluid to the guide chamber 140 formed in the support member 100 to elevate the spherical member 520 in the support member 100; 상기 받침부재(100)의 상면과 상판슬라이드부재(300) 사이에 스토퍼(900)를 위치시킨 후 높이를 유지하도록 하는 스토퍼 설치단계;A stopper installation step of maintaining a height after placing the stopper 900 between the upper surface of the support member 100 and the upper plate slide member 300; 상기 받침부재(100)에 제어블럭(400)을 결합시켜 상기 상판슬라이드부 재(300)의 변위를 제어할 수 있도록 하는 제어블럭 결합단계;A control block coupling step of coupling the control block 400 to the support member 100 to control the displacement of the upper plate slide member 300; 교량과 교각 사이에 설치된 기존 교좌장치를 보수 또는 교체하는 유지 보수단계;를 수행하여 유지 보수함을 특징으로 하는 유지 보수를 위한 스페리칼형 교량 인상잭에 의한 교좌장치 보수방법.Maintenance step of repairing or replacing the existing bridge device installed between the bridge and the bridge; Method of repairing the bridge device by the spherical bridge lifting jack for maintenance characterized in that the maintenance. 제6항에 있어서,The method of claim 6, 상기 높낮이 조절단계에서, In the height adjustment step, 상하로 다수개 적층된 상기 보강패널(700)들의 이탈을 방지하도록 상기 인상플레이트(600)와 상판슬라이드부재(300)를 연결하는 볼트 또는 상기 인상플레이트(600)와 상기 상판슬라이드부재(300)에 각각 별도로 지지브래킷(340)(640)을 결합시켜 보강패널(700)의 이탈을 방지하는 보강패널 이탈 방지단계를 더 수행함을 특징으로 하는 유지 보수를 위한 스페리칼형 교량 인상잭에 의한 교좌장치 보수방법.To prevent the separation of the reinforcement panel 700 stacked in a plurality of up and down on the bolt or connecting the lifting plate 600 and the upper plate slide member 300 or the upper plate and the upper plate slide member 300 The method of repairing a bridge device by a spherical bridge raising jack for maintenance, characterized in that for performing separate step of preventing the separation of the reinforcement panel 700 by combining the support brackets 340, 640 separately. . 제6항에 있어서,The method of claim 6, 상기 유지 보수단계에서, 상기 받침부재(100)내의 안내실(140)에 제공된 유체를 외부로 배출시키고 동시에 주입홀(160)을 통해 안내실(140)에 에폭시를 채움시켜 상기 상판슬라이드부재(300)의 높이가 계속해서 유지될 수 있도록 함을 특징 으로 하는 유지 보수를 위한 스페리칼형 교량 인상잭에 의한 교좌장치 보수방법.In the maintenance step, the fluid provided in the guide chamber 140 in the support member 100 to the outside and at the same time fill the epoxy in the guide chamber 140 through the injection hole 160 of the upper slide member 300 A method of repairing a bridge system by a spherical bridge raising jack for maintenance, characterized in that the height can be maintained continuously.
KR1020070012056A 2007-02-06 2007-02-06 A spherical type jag for bridge KR100775451B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070012056A KR100775451B1 (en) 2007-02-06 2007-02-06 A spherical type jag for bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070012056A KR100775451B1 (en) 2007-02-06 2007-02-06 A spherical type jag for bridge

Publications (1)

Publication Number Publication Date
KR100775451B1 true KR100775451B1 (en) 2007-11-12

Family

ID=39061716

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070012056A KR100775451B1 (en) 2007-02-06 2007-02-06 A spherical type jag for bridge

Country Status (1)

Country Link
KR (1) KR100775451B1 (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100941748B1 (en) * 2009-04-30 2010-02-11 에스코정공(주) Separation type oilless bridge bearing
KR100991349B1 (en) 2010-03-05 2010-11-02 김동민 Manufacturing method of rahmen-type bridge structure
KR101150765B1 (en) 2012-02-21 2012-06-08 엔이티엔지니어링 주식회사 Lifting jack for exchange of bridge bearing
KR101284777B1 (en) * 2013-01-11 2013-07-17 황병호 Vertical and horizontal jack king is a possible hydraulic jack unit and bridge construction method
CN107401111A (en) * 2017-07-01 2017-11-28 温州市华宏市政园林工程建设有限公司 A kind of municipal bridge shockproof structure and method
CN107858918A (en) * 2017-10-30 2018-03-30 青岛德固特轨道装备有限公司 One kind loads and unloads castellated unstressed fixed tumbler bearing soon
KR20200001645A (en) * 2018-06-26 2020-01-07 (주)인송건설 Plate for impression of bridge
CN110904829A (en) * 2019-11-18 2020-03-24 北京市政建设集团有限责任公司 Construction method of anti-overturning adjustable support of bridge
CN111350126A (en) * 2020-03-20 2020-06-30 中铁第四勘察设计院集团有限公司 Spiral combined type adjustable bridge support
CN111411575A (en) * 2020-03-16 2020-07-14 邢台路桥建设总公司 Road and bridge shock-absorbing support and mounting method thereof
CN114016397A (en) * 2021-09-29 2022-02-08 洛阳双瑞特种装备有限公司 Damping spherical crown lining plate with lubricating grease supplementing function

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05302452A (en) * 1991-05-30 1993-11-16 Kumagai Gumi Co Ltd Earthquake free construction for building
KR20020074255A (en) * 2001-03-19 2002-09-30 김진수 Hydraulic ascending method and apparatus for repairing support device of structure
KR100660035B1 (en) 2005-08-02 2006-12-20 (주)알티에스 Bridge bearing

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05302452A (en) * 1991-05-30 1993-11-16 Kumagai Gumi Co Ltd Earthquake free construction for building
KR20020074255A (en) * 2001-03-19 2002-09-30 김진수 Hydraulic ascending method and apparatus for repairing support device of structure
KR100660035B1 (en) 2005-08-02 2006-12-20 (주)알티에스 Bridge bearing

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100941748B1 (en) * 2009-04-30 2010-02-11 에스코정공(주) Separation type oilless bridge bearing
KR100991349B1 (en) 2010-03-05 2010-11-02 김동민 Manufacturing method of rahmen-type bridge structure
KR101150765B1 (en) 2012-02-21 2012-06-08 엔이티엔지니어링 주식회사 Lifting jack for exchange of bridge bearing
KR101284777B1 (en) * 2013-01-11 2013-07-17 황병호 Vertical and horizontal jack king is a possible hydraulic jack unit and bridge construction method
CN107401111B (en) * 2017-07-01 2019-08-02 温州市华宏建设有限公司 A kind of municipal administration bridge shockproof structure and method
CN107401111A (en) * 2017-07-01 2017-11-28 温州市华宏市政园林工程建设有限公司 A kind of municipal bridge shockproof structure and method
CN107858918A (en) * 2017-10-30 2018-03-30 青岛德固特轨道装备有限公司 One kind loads and unloads castellated unstressed fixed tumbler bearing soon
CN107858918B (en) * 2017-10-30 2024-01-19 青岛德固特轨道装备有限公司 Quick-assembling and disassembling jaw type stress-free fixing ball support
KR20200001645A (en) * 2018-06-26 2020-01-07 (주)인송건설 Plate for impression of bridge
KR102280308B1 (en) * 2018-06-26 2021-07-22 (주)인송건설 Plate for impression of bridge
CN110904829A (en) * 2019-11-18 2020-03-24 北京市政建设集团有限责任公司 Construction method of anti-overturning adjustable support of bridge
CN111411575A (en) * 2020-03-16 2020-07-14 邢台路桥建设总公司 Road and bridge shock-absorbing support and mounting method thereof
CN111350126A (en) * 2020-03-20 2020-06-30 中铁第四勘察设计院集团有限公司 Spiral combined type adjustable bridge support
CN114016397A (en) * 2021-09-29 2022-02-08 洛阳双瑞特种装备有限公司 Damping spherical crown lining plate with lubricating grease supplementing function
CN114016397B (en) * 2021-09-29 2024-03-26 中船双瑞(洛阳)特种装备股份有限公司 Vibration reduction spherical crown lining plate with lubricating grease supplementing function

Similar Documents

Publication Publication Date Title
KR100775451B1 (en) A spherical type jag for bridge
KR102055925B1 (en) Two-way c.p.s jack having earthquake-proof function using for intensity reinforce mathod for bridge bearing and lifting method for structure using the same
KR101248838B1 (en) A lifting jack of upper structure of bridge and method for changing bridge bearings using them
KR100948359B1 (en) The bridge upper structure lifting method for which bridge upper structure lifter which does the bridge shue function and this were used
CN101906883B (en) Replacing method of shock-insulation supporting seat
KR100686392B1 (en) Bridge support
CN205171378U (en) Assembling lifting type construction platform for pier column construction
KR100964729B1 (en) Bridge lifting apparatus for changing bridge bearings
KR100961547B1 (en) Hydraulic lifting device, the bracket and the method for changing bridge bearings using them
CN108118620B (en) Integral self-climbing integrated platform for bridge tower construction and construction method thereof
KR101692522B1 (en) A lifting jack and bridge upper structure lifting method using the same
KR101704550B1 (en) lift method for upper structure of bridge by using computer and hydraulic jack including safety device
CN107724671B (en) Integral type sliding formwork system and construction method thereof
KR20190041131A (en) System For Lifting Bridge Upper Plate
KR102368433B1 (en) Installation apparatus for replacement equipment of the bridge supporter
KR102567073B1 (en) Synchronized lifting system for bridge superstructure and replacement method for bridge seat using the same
KR101800790B1 (en) Echo replacing method of bearings without vibration, waste, noise, deformation
KR100780888B1 (en) Bracket structure for replacing the old shoe with new one continuously and method lifting the bridge slab
KR101066837B1 (en) Lifting and bearing apparatus preventing fracture on the pier or abutment of bridge
KR101704552B1 (en) Hydraulic jack including safety device and lift method for upper structure of bridge by using hydraulic jack including safety device
JP2019124044A (en) Bridge bearing replacement method and bridge bearing structure
KR101193470B1 (en) Bearing and constructing method for bridge
KR101908713B1 (en) Method for constructing bridge shoe using computer control system for jack up bridge
KR101875578B1 (en) Lifting apparatus of hydraulic system-form for keeping balance of slab form using slave cylinder, and control method for the same
KR100760833B1 (en) The support and method of lift up for the upper structure of a birdge using a apiece prefabricated bracket

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20121105

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20131111

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20141030

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20150825

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20161027

Year of fee payment: 10