KR100720320B1
KR100720320B1 KR1020070018225A KR20070018225A KR100720320B1 KR 100720320 B1 KR100720320 B1 KR 100720320B1 KR 1020070018225 A KR1020070018225 A KR 1020070018225A KR 20070018225 A KR20070018225 A KR 20070018225A KR 100720320 B1 KR100720320 B1 KR 100720320B1
Authority
KR
South Korea
Prior art keywords
concrete
breakwater
rods
layer
fastening holes
Prior art date
Application number
KR1020070018225A
Other languages
Korean (ko)
Inventor
최진식
Original Assignee
주식회사 항도엔지니어링
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 항도엔지니어링 filed Critical 주식회사 항도엔지니어링
Priority to KR1020070018225A priority Critical patent/KR100720320B1/en
Application granted granted Critical
Publication of KR100720320B1 publication Critical patent/KR100720320B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/50Anchored foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Revetment (AREA)

Abstract

본 발명은 방파제에 관한 것으로, 더욱 상세하게는 방파제의 각 부위를 운반하여 용이하게 조립/설치 가능하도록 함으로써, 시공이 용이하며, 공사기간을 단축시켜 공사비용을 절감할 수 있도록 한 약지반용 조립식 방파제에 관한 것이다.The present invention relates to a breakwater, and more particularly, to facilitate the assembly / installation by transporting each part of the breakwater, easy construction, prefabricated breakwater for the weak ground to reduce the construction cost by reducing the construction period It is about.

본 발명에 따르면,According to the invention,

외해로부터 들이치는 파랑을 막아서 내항을 보호하기 위한 방파제에 있어서,In the breakwater to protect the inner port by preventing blue waves from the open sea,

상기 방파제는 The breakwater

방파제를 설치하기 위한 해저면과 접하도록 설치되며, 내측에 다수개의 제1 체결공을 갖는 다수개의 제1 콘크리트봉이 해저면과 접하여 등간격으로 설치되고, 상기 각 제1 체결공에 다수개의 제1 콘크리트봉을 연결할 수 있도록 제1 너트부를 갖는 제1 연결바가 삽입되어 양단에 너트가 체결된 바닥층; It is installed to be in contact with the sea bottom for installing the breakwater, a plurality of first concrete rods having a plurality of first fastening holes in the inner side is installed at equal intervals in contact with the sea bottom, a plurality of first in each of the first fastening holes A bottom layer having a nut coupled to both ends by inserting a first connection bar having a first nut part to connect concrete rods;

상기 바닥층을 해저면에 견고히 고정할 수 있도록 상기 제1 콘크리트봉)과 제1 콘크리트봉 사이에 개재되며, 하부에 상기 해저면에 매설되는 스크류가 형성되고, 상부에 유입홈이 형성되며, 양측에 상기 제1 연결바가 삽입될 수 있도록 상기 유입홈과 연통되는 통공이 일체로 형성된 고정구;Interposed between the first concrete rod) and the first concrete rod so that the bottom layer is firmly fixed to the sea bottom, a screw embedded in the sea bottom is formed at a lower portion thereof, and an inflow groove is formed at both sides thereof. Fixtures formed integrally with the through-hole communicating with the inlet groove so that the first connecting bar can be inserted;

상기 제1 콘크리트봉과 제1 콘크리트봉 사이에 다수개의 제2 체결공과 상기 제2 체결공과 연통되어 하방으로 개구된 제2 삽입홈을 갖는 다수개의 제2 콘크리트봉이 다단으로 적층되게 설치되고, 상기 각 제2 체결공에 다수개의 제2 콘크리트봉을 연결할 수 있도록 제2 너트부를 갖는 제2 연결바가 삽입되어 양단에 너트가 체 결된 중간층;A plurality of second concrete bars having a plurality of second fastening holes and a second insertion groove opened downwardly in communication with the second fastening holes between the first concrete bars and the first concrete bars are installed to be stacked in multiple stages. An intermediate layer in which nuts are fastened at both ends by inserting second connection bars having second nut parts to connect a plurality of second concrete rods to the fastening holes;

상기 중간층의 최상단 제2 콘크리트봉과 제2 콘크리트봉 사이에 다수개의 제3 체결공과 상기 제3 체결공과 연통되어 하방으로 개구된 제3 삽입홈을 갖는 복수개의 제3 콘크리트봉이 적층되게 설치되고, 상기 각 제3 체결공에 복수개의 제3 콘크리트봉을 연결할 수 있도록 제3 너트부를 갖는 제3 연결바가 삽입되어 양단에 너트가 체결된 상층 및A plurality of third concrete bars having a plurality of third fastening holes and third inserting grooves communicated with the third fastening holes and opened downwardly between the second concrete rods and the second concrete bars of the intermediate layer are stacked to be stacked; A third connecting bar having a third nut part is inserted to connect the plurality of third concrete rods to the third fastening hole, and the upper layer having the nuts fastened to both ends;

상기 복수개의 제3 콘크리트봉에 적층되게 설치되며, 내측에 상기 제3 연결바가 삽입될 수 있도록 체결홀이 형성되고, 하부에 상기 제3 콘크리트봉이 삽입될 수 있도록 하방으로 개구된 반원홈이 형성된 상부캡The upper part is installed to be stacked on the plurality of third concrete rod, the fastening hole is formed so that the third connecting bar can be inserted in the inner side, and the upper half is formed with a semi-circular groove opened downward so that the third concrete rod can be inserted in the lower portion. cap

상기 제1 연결바, 제2 연결바 및 제3 연결바를 각각 연결할 수 있도록 상기 제1,2,3 콘크리트봉들 사이에 개재되어, 상부가 각 층의 콘크리트봉에 형성된 삽입홈에 각각 삽입되고, 상부와 하부에 각각 각 층의 연결바가 삽입되는 관통공이 형성된 연결구를 포함하여 구성된다.Interposed between the first, second and third concrete bars to connect the first connecting bar, the second connecting bar and the third connecting bar, respectively, the upper portion is inserted into the insertion groove formed in the concrete rod of each layer, It is configured to include a connector formed in the through hole through which the connection bar of each layer is inserted into the upper and lower portions, respectively.

방파제, 상부캡, 스크류, 연결바 Breakwater, top cap, screw, connecting bar

Description

연약지반용 조립식 방파제{A soft ground use sectional breakwater}Prefabricated Breakwater for Soft Ground {A soft ground use sectional breakwater}

도 1은 종래 방파제를 나타낸 측단면이다.1 is a side cross-sectional view showing a conventional breakwater.

도 2는 본 발명의 바람직한 실시예에 따른 연약지반용 조립식 방파제를 나타낸 사시도,Figure 2 is a perspective view showing a prefabricated breakwater for soft ground according to a preferred embodiment of the present invention,

도 3은 본 발명의 바람직한 실시예에 따른 연약지반용 조립식 방파제를 나타낸 분해사시도,Figure 3 is an exploded perspective view showing a prefabricated breakwater for soft ground according to a preferred embodiment of the present invention,

도 4는 도 2의 요부단면도,4 is a cross-sectional view of main parts of FIG. 2;

도 5는 본 발명의 바람직한 실시예에 따른 연약지반용 조립식 방파제를 나타낸 정면도.Figure 5 is a front view showing a prefabricated breakwater for soft ground according to a preferred embodiment of the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

100 : 방파제 110 : 바닥층100: breakwater 110: floor layer

120 : 고정구 121 : 스크류120: fastener 121: screw

130 : 중간층 139 : 절개구간130: middle layer 139: incision section

140 : 상층 150 : 상부캡140: upper layer 150: upper cap

160 : 연결구 N : 너트160: connector N: nut

W : 해저면W: bottom

본 발명은 방파제에 관한 것으로, 더욱 상세하게는 방파제의 각 부위를 운반하여 용이하게 조립/설치 가능하도록 함으로써, 시공이 용이하며, 공사기간을 단축시켜 공사비용을 절감할 수 있도록 한 약지반용 조립식 방파제에 관한 것이다.The present invention relates to a breakwater, and more particularly, to facilitate the assembly / installation by transporting each part of the breakwater, easy construction, prefabricated breakwater for the weak ground to reduce the construction cost by reducing the construction period It is about.

일반적으로 방파제(防波堤, breakwater)는 외해(外海)로부터의 파랑(波浪)을 막아서 내항(內港)을 보호하는 구조물로, 방파제의 위치결정에는 다음과 같은 사항을 고려해야 한다.In general, breakwater is a structure that protects the inner port by preventing waves from the sea. The location of breakwater should be considered as follows.

이런 방파제의 배치를 살펴보면, 파랑이 진행해 오는 방향에 직각으로 놓으면 짧은 연장(延長)으로 넓은 면적이 정온하게 된다. 직각인 것보다 조금 더 경사지게 하면, 방파제에 충돌하는 파력(波力)이 매우 약해진다. 모래해변에서는 모래가 항내로 유입하여 침전퇴적하는 것을 방지하기 위해 상당히 깊은 곳까지 내밀어 방파제를 구축한다. Looking at the arrangement of these breakwaters, when placed at right angles to the direction of the blue waves, a large area is settled with a short extension. If it is inclined a little more than a right angle, the wave force which collides with a breakwater becomes very weak. On sandy beaches, breakwater is built up to a very deep level to prevent sand from entering the harbor and causing sedimentation.

얕은 곳을 따라서 방파제를 만드는 경우는 공사비가 적게 든다. 항구에서 해안까지 너무 가까우면 선박이 해안에 충돌한다. 선박이 항구를 통행할 때는 지그재그가 되지 않도록 빠른 속력으로 지나가야 하므로 해안까지 800~1,000m가 필요하다. Making breakwater along shallow areas costs less. If you are too close to the coast from the port, the ship will hit the shore. When the ship passes through the port, it must pass at high speed so that it does not become zigzag, so 800 ~ 1,000m to the coast is required.

날씨가 좋지 않을 때 1만t급 이하의 선박이 전부 들어갈 수 있을 만큼의 항내면적이 있어야 한다. 이런 방파제의 구조는 다음과 같이 구분된다.In bad weather, there should be enough harbor area to accommodate all vessels below 10,000t class. The structure of these breakwaters is classified as follows.

첫째, 직립제(直立堤)는 밑에서 직립한 콘크리트 덩어리로, 파랑을 잘 방지 하지만 지반이 약하면 침하하거나 기초부분이 세굴되는 경우가 있다. 어항 등 일반적으로 소규모의 것에 적합하다.First, the uprights are concrete blocks erected from the bottom, and they prevent blue waves well, but if the soil is weak, it may sink or the foundation may be washed. It is generally suitable for small tanks and the like.

둘째, 경사제(傾斜堤)는 사석(捨石)이나 테트라포드(tetrapod)를 쌓아 올린 것으로, 사면에서 쇄파(碎波)되므로 월파(越波)가 많다. 지반이 약한 곳에도 축조되는데, 깊은 곳에서는 많은 재료가 필요하여 비경제적이다.Secondly, the decanter is a pile of sandstone or tetrapod, and the wave is broken on the slope, so there are many waves. It is constructed in the weak ground, but it is uneconomical because it requires a lot of materials in the deep.

셋째, 혼성제(混成堤)는 경사제 위에 직립제를 놓은 것으로, 직립제와 경사제의 장점을 겸비하고 있으므로 한국에서 많이 채택되고 있는 것으로, 사석(捨石) 방파제라고도 한다. 사석으로 제체(堤體)의 하부를 축조하고 그 위에 콘크리트 케이슨이나 방괴(方塊)를 설치한 구조의 방파제이다. 기본적으로는 상단의 직립제는 파도를 반사시키고 사석제는 사면에서 파도를 쇄파(碎波)시키는 기능을 가지지만, 직립제는 지반이 좋은 곳이 아니면 축조할 수 없다. 그래서 사석제와 직립제의 장점을 따서 기초지반의 조건에 관계없이 또한 제체의 단면적도 적게 축조할 수 있는 구조체로서, 방파제에는 이 혼성제가 많이 사용되고있다. 사석제의 상부의 높이는 설치수심, 지반조건, 공사비 등을 고려하여 결정하지만 가능한 한 낮게 하여 강렬한 쇄파를 일으키지 않게 한다.Third, a hybrid agent (混成 堤) is placed on top of the inclined agent, because it combines the advantages of the upright agent and the inclined agent is widely adopted in Korea, it is also known as the sandstone breakwater. It is a breakwater with a structure in which the lower part of the body is made of sandstone, and a concrete caisson or a fireproof structure is installed thereon. Basically, the upper upright reflects the waves and the sandstone has the function of breaking up the waves on the slope, but the upright cannot be built unless the ground is good. Therefore, this hybrid is widely used in breakwaters as a structure capable of constructing a small cross-sectional area of the body regardless of the condition of the foundation ground by taking advantage of the sand stone and the upright agent. The height of the upper part of the sandstone is determined in consideration of the installation depth, the ground condition, the construction cost, etc., but it is made as low as possible so as not to cause intense breaking.

도 1은 종래 방파제를 나타낸 측단면이다.1 is a side cross-sectional view showing a conventional breakwater.

도 1을 참조하면, 종래 방파제는 통상 해안은 방파제를 기준으로 외해측과 내해측으로 나누어지고 외해측에서 끊임없이 밀려오는 크고 작은 파랑은 콘크리트블록에 의하여 파랑이 차단되어 내해측에 정박하고 있는 각종 선박 및 항만시설물들을 파랑으로부터 보호될 수 있도록 정온이 유지되고, 외해측과 내해측의 해수가 교류되어 청정한 해수가 이루어지도록 하고 있다.Referring to Figure 1, the conventional breakwater is usually divided into the outer sea side and the inland sea side on the basis of the breakwater, the large and small blue waves constantly pushed from the outer sea side is a variety of ships anchored on the inner sea side by the blue blocks blocked by concrete blocks and Constant temperature is maintained so that port facilities are protected from the blue, and seawater from the outside sea side and the inland sea side is exchanged to achieve clean seawater.

그러나, 이와 같은 종래 방파제는 다음과 같은 문제점이 있었다.However, such a conventional breakwater had the following problems.

시공이 어려워 높은 공비가 소요되는 문제점이 있었다. 즉, 종래 방파제를 이루는 콘크리트블록은 해수에 소정깊이 침수되도록 설치되기 때문에 시공시 해수의 밀물과 썰물시간을 고려하여 썰물시간에 맞추어 시공을 하거나, 콘크리트블록이 응고될 수 있도록 해수의 유입을 막기 위한 별도의 시설물을 설치해야 했기 때문이다.There was a problem that high construction cost is difficult due to difficult construction. In other words, the concrete block forming the conventional breakwater is installed to be immersed in the seawater to a predetermined depth, so that the construction according to the ebb tide time in consideration of the tide and ebb tide time of the sea water during construction, or to prevent the inflow of sea water so that the concrete block can solidify This is because a separate facility had to be installed.

또한, 종래 방파제는 바닥면과의 지지력이 약하여 기상악화로 인한 높은 파랑이 계속해서 밀려올 경우 방파제가 유실되는 문제점이 있었다.In addition, the conventional breakwater has a problem in that the breakwater is lost when the high wave due to bad weather due to the poor bearing capacity with the bottom surface is continuously pushed.

본 발명은 종래 방파제의 문제점을 감안하여 안출한 것으로, 그 목적은 방파제의 각 부위를 운반하여 용이하게 조립/설치 가능하도록 함으로써, 시공이 용이하며, 공사기간을 단축시켜 공사비용을 절감할 수 있도록 한 연약지반용 조립식 방파제를 제공한다.The present invention has been made in view of the problems of the conventional breakwater, the purpose of which is to be easy to assemble / install by transporting each part of the breakwater, so that the construction is easy, to shorten the construction period to reduce the construction cost Provides prefabricated breakwater for soft ground.

본 발명이 다른 목적은 방파제를 구성하는 최하부에 해저면에 매설되는 스크류를 갖는 고정구를 설치함으로써, 상기 방파제와 해저면 사이에 긴밀한 결속관계를 이룰 수 있도록 한 연약지반용 조립식 방파제를 제공한다.Another object of the present invention is to provide a prefabricated breakwater for soft ground, which is able to achieve a close binding relationship between the breakwater and the bottom by installing a fastener having a screw embedded in the bottom of the breakwater.

상기 목적을 달성시키기 위한 본 발명은The present invention for achieving the above object

외해로부터 들이치는 파랑을 막아서 내항을 보호하기 위한 방파제에 있어서,In the breakwater to protect the inner port by preventing blue waves from the open sea,

상기 방파제는 The breakwater

방파제를 설치하기 위한 해저면과 접하도록 설치되며, 내측에 다수개의 제1 체결공을 갖는 다수개의 제1 콘크리트봉이 해저면과 접하여 등간격으로 설치되고, 상기 각 제1 체결공에 다수개의 제1 콘크리트봉을 연결할 수 있도록 제1 너트부를 갖는 제1 연결바가 삽입되어 양단에 너트가 체결된 바닥층; It is installed to be in contact with the sea bottom for installing the breakwater, a plurality of first concrete rods having a plurality of first fastening holes in the inner side is installed at equal intervals in contact with the sea bottom, a plurality of first in each of the first fastening holes A bottom layer having a nut coupled to both ends by inserting a first connection bar having a first nut part to connect concrete rods;

상기 바닥층을 해저면에 견고히 고정할 수 있도록 상기 제1 콘크리트봉)과 제1 콘크리트봉 사이에 개재되며, 하부에 상기 해저면에 매설되는 스크류가 형성되고, 상부에 유입홈이 형성되며, 양측에 상기 제1 연결바가 삽입될 수 있도록 상기 유입홈과 연통되는 통공이 일체로 형성된 고정구;Interposed between the first concrete rod) and the first concrete rod so that the bottom layer is firmly fixed to the sea bottom, a screw embedded in the sea bottom is formed at a lower portion thereof, and an inflow groove is formed at both sides thereof. Fixtures formed integrally with the through-hole communicating with the inlet groove so that the first connecting bar can be inserted;

상기 제1 콘크리트봉과 제1 콘크리트봉 사이에 다수개의 제2 체결공과 상기 제2 체결공과 연통되어 하방으로 개구된 제2 삽입홈을 갖는 다수개의 제2 콘크리트봉이 다단으로 적층되게 설치되고, 상기 각 제2 체결공에 다수개의 제2 콘크리트봉을 연결할 수 있도록 제2 너트부를 갖는 제2 연결바가 삽입되어 양단에 너트가 체결된 중간층;A plurality of second concrete bars having a plurality of second fastening holes and a second insertion groove opened downwardly in communication with the second fastening holes between the first concrete bars and the first concrete bars are installed to be stacked in multiple stages. An intermediate layer in which a nut is fastened at both ends by inserting a second connection bar having a second nut part to connect a plurality of second concrete rods to the fastening hole;

상기 중간층의 최상단 제2 콘크리트봉과 제2 콘크리트봉 사이에 다수개의 제3 체결공과 상기 제3 체결공과 연통되어 하방으로 개구된 제3 삽입홈을 갖는 복수개의 제3 콘크리트봉이 적층되게 설치되고, 상기 각 제3 체결공에 복수개의 제3 콘크리트봉을 연결할 수 있도록 제3 너트부를 갖는 제3 연결바가 삽입되어 양단에 너트가 체결된 상층 및A plurality of third concrete bars having a plurality of third fastening holes and third inserting grooves communicated with the third fastening holes and opened downwardly between the second concrete rods and the second concrete bars of the intermediate layer are stacked to be stacked; A third connecting bar having a third nut part is inserted to connect the plurality of third concrete rods to the third fastening hole, and the upper layer having the nuts fastened to both ends;

상기 복수개의 제3 콘크리트봉에 적층되게 설치되며, 내측에 상기 제3 연결바가 삽입될 수 있도록 체결홀이 형성되고, 하부에 상기 제3 콘크리트봉이 삽입될 수 있도록 하방으로 개구된 반원홈이 형성된 상부캡The upper part is installed to be stacked on the plurality of third concrete rod, the fastening hole is formed so that the third connecting bar can be inserted in the inner side, and the upper half is formed with a semi-circular groove opened downward so that the third concrete rod can be inserted in the lower portion. cap

상기 제1 연결바, 제2 연결바 및 제3 연결바를 각각 연결할 수 있도록 상기 제1,2,3 콘크리트봉들 사이에 개재되어, 상부가 각 층의 콘크리트봉에 형성된 삽입홈에 각각 삽입되고, 상부와 하부에 각각 각 층의 연결바가 삽입되는 관통공이 형성된 연결구를 포함하여 구성된다.Interposed between the first, second and third concrete bars to connect the first connecting bar, the second connecting bar and the third connecting bar, respectively, the upper portion is inserted into the insertion groove formed in the concrete rod of each layer, It is configured to include a connector formed in the through hole through which the connection bar of each layer is inserted into the upper and lower portions, respectively.

한편, 상기 중간층을 이루는 제2 콘크리트봉에는 내해와 외해의 해수교환이 가능하도록 절개구간이 형성되는 것이 바람직하다.On the other hand, the second concrete rod constituting the intermediate layer is preferably formed with an incision section to enable seawater exchange between the inner sea and the outer sea.

도 2는 본 발명의 바람직한 실시예에 따른 연약지반용 조립식 방파제를 나타낸 사시도이고, 도 3은 본 발명의 바람직한 실시예에 따른 연약지반용 조립식 방파제를 나타낸 분해사시도이며, 도 4는 도 2의 요부단면도이고, 도 5는 본 발명의 바람직한 실시예에 따른 연약지반용 조립식 방파제를 나타낸 정면도이다.Figure 2 is a perspective view showing a prefabricated breakwater for soft ground according to a preferred embodiment of the present invention, Figure 3 is an exploded perspective view showing a prefabricated breakwater for soft ground according to a preferred embodiment of the present invention, Figure 4 is a main part of Figure 2 5 is a sectional view showing a prefabricated breakwater for soft ground according to a preferred embodiment of the present invention.

도 2 내지 도 5를 참조하면, 상기 연약지반용 조립식 방파제(100)는 바닥층(110), 고정구(120), 중간층(130), 상층(140), 상부캡(150) 및 연결구(160)를 포함하여 구성된다.2 to 5, the soft ground prefabricated breakwater 100 is a bottom layer 110, fixture 120, the middle layer 130, the upper layer 140, the upper cap 150 and the connector 160 It is configured to include.

상기 바닥층(110)은 방파제(100)를 설치하기 위한 해저면(W)과 접하도록 설치된다.The bottom layer 110 is installed in contact with the sea bottom (W) for installing the breakwater (100).

이때, 상기 바닥층(110)은 다수개의 제1 콘크리트봉(111)이 해저면(W)과 접하여 등간격으로 설치된다. 여기서, 상기 각 제1 콘크리트봉(111)은 그 내측에 다수개의 제1 체결공(113)이 형성된다.At this time, the bottom layer 110 is provided with a plurality of first concrete rods 111 at equal intervals in contact with the sea bottom (W). In this case, each of the first concrete rods 111 has a plurality of first fastening holes 113 formed therein.

또한, 상기 각 제1 체결공(113)에는 상기 다수개의 제1 콘크리트봉(111)을 연결할 있도록 양단에 제1 너트부(115)가 형성된 제1 연결바(117)가 삽입된다. 이때, 상기 제1 연결바(117)의 제1 너트부(15)에는 너트(N)가 체결된다.In addition, first connection bars 117 having first nut parts 115 formed at both ends thereof are inserted into the first fastening holes 113 to connect the plurality of first concrete rods 111. At this time, the nut N is fastened to the first nut part 15 of the first connecting bar 117.

한편, 상기 바닥층(110)을 해저면(W)에 견고히 고정할 수 있도록 상기 제1 콘크리트봉(111)과 제1 콘크리트봉(111) 사이에 개재되는 고정구(120)는 그 하부에 상기 해저면(W)에 매설되는 스크류(121)가 형성되고, 상부에 유입홈(123)이 형성되며, 양측에 상기 제1 연결바(117)가 삽입될 수 있도록 상기 유입홈(123)과 연통되는 통공(125)이 일체로 형성된다.Meanwhile, the fastener 120 interposed between the first concrete rod 111 and the first concrete rod 111 so that the bottom layer 110 can be firmly fixed to the bottom surface W is located at the bottom of the bottom surface 110. A screw 121 embedded in the (W) is formed, the inlet groove 123 is formed in the upper portion, the through-hole communicating with the inlet groove 123 so that the first connecting bar 117 can be inserted in both sides 125 is integrally formed.

이때, 상기 유입홈(123)에는 후술할 상기 연결구(160)의 하부가 삽입된다.At this time, the inlet groove 123 is inserted into the lower portion of the connector 160 to be described later.

그리고, 상기 중간층(130)은 상기 제1 콘크리트봉(111)과 제1 콘크리트봉(111) 사이에 다수개의 제2 콘크리트봉(131)이 다단으로 적층되게 설치된다. 이때, 상기 다수개의 제2 콘크리트봉(131)은 그 내측에 각각 다수개의 제2 체결공(133)이 형성되고, 하부에 상기 다수개의 제2 체결공(133)과 연통되어 하방으로 개구된 제2 삽입홈(134)이 형성된다.In addition, the intermediate layer 130 is installed such that a plurality of second concrete rods 131 are stacked in multiple stages between the first concrete rods 111 and the first concrete rods 111. In this case, each of the plurality of second concrete rods 131 has a plurality of second fastening holes 133 formed therein, and communicates with the plurality of second fastening holes 133 at the bottom thereof to be opened downward. 2 insertion groove 134 is formed.

또한, 상기 각 제2 체결공(133)에는 다수개의 제2 콘크리트봉(131)을 연결할 수 있도록 양단에 제2 너트부(135)가 형성된 제2 연결바(137)가 삽입된다. 이때, 상기 제2 연결바(137)의 제2 너트부(135)에는 너트(N)가 체결된다.In addition, second connection bars 137 having second nut parts 135 formed at both ends are inserted into the second fastening holes 133 to connect a plurality of second concrete rods 131. At this time, the nut N is fastened to the second nut part 135 of the second connection bar 137.

이때, 상기 중간층(130)을 이루는 제2 콘크리트봉(131)에는 내해와 외해의 해수교환이 가능하도록 절개구간(139)이 형성되는 것이 바람직하다.At this time, the second concrete rod 131 constituting the intermediate layer 130, it is preferable that the incision section 139 is formed to enable seawater exchange between the inner sea and the outer sea.

한편, 상기 상층(140)은 상기 중간층(130)의 최상단 제2 콘크리트봉(131)과 제2 콘크리트봉(131) 사이에 복수개의 제3 콘크리트봉(141)이 적층되게 설치된다. 이때, 상기 각 제3 콘크리트봉(141)은 그 내측에 다수개의 제3 체결공(143)이 형성되고, 하부에 상기 제3 체결공(143)과 연통되어 하방으로 개구된 제3 삽입홈(144)이 형성된다.On the other hand, the upper layer 140 is installed so that a plurality of third concrete rods 141 are stacked between the uppermost second concrete rod 131 and the second concrete rod 131 of the intermediate layer 130. In this case, each of the third concrete rods 141 has a plurality of third fastening holes 143 formed therein, and a third insertion groove opened downwardly in communication with the third fastening holes 143 at a lower portion thereof. 144 is formed.

또한, 상기 각 제3 체결공(143)에는 다수개의 제3 콘크리트봉(141)을 연결할 수 있도록 양단에 제3 너트부(145)가 형성된 제3 연결바(147)가 삽입된다. 이때, 상기 제3 연결바(147)의 제3 너트부(145)에는 너트(N)가 체결된다.In addition, third connecting bars 147 having third nut parts 145 formed at both ends are inserted into the third fastening holes 143 to connect a plurality of third concrete bars 141. At this time, the nut N is fastened to the third nut part 145 of the third connection bar 147.

한편, 상기 상부캡(150)은 상기 복수개의 제3 콘크리트봉(141)에 적층되게 설치된다. 이때, 상기 상부캡(150)은 그 내측에 상기 제3 연결바(147)가 삽입될 수 있도록 체결홀(151)이 형성되고, 하부에 상기 제3 콘크리트봉(141)이 삽입될 수 있도록 하방으로 개구된 반원홈(153)이 일체로 형성된다.On the other hand, the upper cap 150 is installed to be stacked on the plurality of third concrete rods (141). At this time, the upper cap 150 has a fastening hole 151 is formed so that the third connecting bar 147 can be inserted in the inner side, the lower portion so that the third concrete rod 141 can be inserted in the lower portion The semicircular groove 153 opened in the form is integrally formed.

그리고, 상기 연결구(160)는 상기 제1 연결바(117), 제2 연결바(137) 및 제3 연결바(147)를 각각 연결할 수 있도록 상기 제1,2,3 콘크리트봉(111,131,141)들 사이에 각각 개재되어 설치된다.The first and second concrete bars 160, 111, 131, and 141 may be connected to the first connection bar 117, the second connection bar 137, and the third connection bar 147, respectively. It is installed between each one.

이때, 상기 연결구(160)는 그 상부가 각 층의 콘크리트봉(131,141)에 형성된 삽입홈(134,144)에 각각 삽입되고, 상부와 하부에 각각 각 층의 연결바(117,137,147)가 삽입되는 관통공(161)이 일체로 형성된다.In this case, the connector 160 is inserted into the insertion grooves 134 and 144 formed in the concrete rods 131 and 141 of each layer, respectively, and through holes through which the connection bars 117, 137 and 147 of each layer are respectively inserted into the upper and lower portions thereof. 161 is integrally formed.

이에 상기와 같은 결합구성으로 이루어진 본 발명의 연약지반용 조립식 방파제는 방파제의 각 부위를 운반하여 용이하게 조립/설치 가능하도록 함으로써, 시공이 용이하며, 공사기간을 단축시켜 공사비용을 절감할 수 있도록 한 것으로, 이에 따른 시공관계를 살펴보기로 한다.Accordingly, the soft ground prefabricated breakwater of the present invention having the above-described constitution can be easily assembled / installed by transporting each part of the breakwater, so that construction is easy and construction time can be shortened to reduce construction costs. As a result, the construction relationship will be examined.

먼저, 방파제(100)를 설치하기 위한 해저면(W)에 등간격을 갖도록 다수개의 고정구(120)를 매설한다.First, a plurality of fasteners 120 are embedded so as to have an equal interval on the sea bottom surface W for installing the breakwater 100.

이때, 상기 고정구(120)의 스크류(121)는 해저면(W)에 매설되어 상기 고정구(120)가 견고한 지지력을 갖게 된다.At this time, the screw 121 of the fastener 120 is embedded in the sea bottom (W) so that the fastener 120 has a solid support force.

이후, 상기 고정구(120)와 고정구(120) 사이에 다수개의 제1 콘크리트봉(111)을 위치시킨다. 이때, 상기 제1 체결공(113)은 고정구(120)의 통공(125)과 연통되도록 한다.Thereafter, a plurality of first concrete rods 111 are positioned between the fixture 120 and the fixture 120. At this time, the first fastening hole 113 is in communication with the through-hole 125 of the fixture 120.

이후, 상기 고정구(120)의 유입홈(123)에 연결구(160)를 삽입하여 연결한다. 이때, 상기 연결구(160)의 하부에 형성된 관통공(161)은 상기 통공(125)과 연통되도록 한다.Thereafter, the connector 160 is inserted into and connected to the inlet groove 123 of the fixture 120. At this time, the through hole 161 formed in the lower portion of the connector 160 to communicate with the through hole (125).

이후, 상기 제1 체결공(113), 통공(125) 및 관통공(161)에 이들을 연결하는 제1 연결바(117)를 삽입한 후 그 양단에 형성된 제1 너트부(115)에 너트(N)를 체결한다. 이에 따라 상기 바닥층(110)은 고정구(120)에 의해 해저면(W)에 견고히 고정된다.Subsequently, the first connection bar 117 is inserted into the first fastening hole 113, the through hole 125, and the through hole 161, and then the nut (1) is formed in the first nut part 115 formed at both ends thereof. Fasten N). Accordingly, the bottom layer 110 is firmly fixed to the sea bottom (W) by the fixture 120.

이후, 상기 제1 콘크리트봉(111)과 제1 콘크리트봉(111) 사이에 다수개의 제2 콘크리트봉(131)을 다단으로 적층시킨다. 이때, 상기 제2 콘크리트봉(131)의 하부에 형성된 제2 삽입홈(134)에는 그 하부에 설치되는 연결구(160)가 삽입되어 연결된다.Thereafter, a plurality of second concrete rods 131 are stacked in multiple stages between the first concrete rods 111 and the first concrete rods 111. At this time, the second insertion groove 134 formed in the lower portion of the second concrete rod 131 is inserted and connected to the connector 160 installed in the lower portion.

이때, 상기 연결구(160)의 상부에 형성된 관통공(161)은 상기 제2 콘크리트 봉(131)에 형성된 제2 체결공(133)과 연통된다.In this case, the through hole 161 formed in the upper portion of the connector 160 communicates with the second fastening hole 133 formed in the second concrete rod 131.

이후, 상기 제2 콘크리트봉(131)과 제2 콘크리트봉(131) 사이에 연결구(160)를 상방으로 돌출되게 설치한다. 이때, 상기 연결구(160)의 하부에 형성된 관통공(161)은 상기 제2 콘크리트봉(131)에 형성된 제2 체결공(133)과 연통관계를 이루게 된다.Thereafter, the connector 160 is installed to protrude upward between the second concrete rod 131 and the second concrete rod 131. At this time, the through hole 161 formed in the lower portion of the connector 160 is in communication with the second fastening hole 133 formed in the second concrete rod 131.

이후, 상기 제2 체결공(133)과 제2 콘크리트봉(131) 측으로 돌출된 연결구(160)의 관통공(161)에 이들을 연결하기 위한 제2 연결바(137)를 삽입한 후 그 양단에 형성된 제2 너트부(135)에 너트(N)를 체결한다. 이에 따라 상기 중간층(130)은 상기 연결구(160)에 의해 바닥층(110)과 긴밀한 연결관계를 이루게 된다.Subsequently, the second connection bar 137 is inserted into the through hole 161 of the connector 160 protruding toward the second fastening hole 133 and the second concrete rod 131, and then, at both ends thereof. The nut N is fastened to the formed second nut part 135. Accordingly, the intermediate layer 130 is in close contact with the bottom layer 110 by the connector 160.

이때, 상기 중간층(130)을 이루는 제2 콘크리트봉(131)에는 내해와 외해의 해수가 교환가능하도록 절개구간(139)이 형성된다.In this case, an incision section 139 is formed in the second concrete rod 131 constituting the intermediate layer 130 so that the seawater of the inner sea and the outer sea can be exchanged.

이후, 상기 중간층(130)의 최상단에 설치된 제2 콘크리트봉(131)과 제2 콘크리트봉(131) 사이에 복수개의 제3 콘크리트봉(141)을 적층되게 설치한다. Thereafter, a plurality of third concrete rods 141 are installed to be stacked between the second concrete rods 131 and the second concrete rods 131 installed at the top of the intermediate layer 130.

이때, 상기 제3 콘크리트봉(141)의 하부에 형성된 제3 삽입홈(144)에는 그 하부에 설치된 연결구(160)의 상부가 삽입된다. 이때, 상기 제3 콘크리트봉(141)에 형성된 제3 체결공(143)은 그 하부에 설치된 연결구(160)의 관통공(161)과 연통관계를 이루게 된다.At this time, the upper portion of the connector 160 installed in the lower portion is inserted into the third insertion groove 144 formed in the lower portion of the third concrete rod 141. At this time, the third fastening hole 143 formed in the third concrete rod 141 is in communication with the through hole 161 of the connector 160 installed in the lower portion thereof.

이후, 상기 복수개의 제3 콘크리트봉(141)의 상부에 상부캡(150)이 설치된다. 이때, 상기 상부캡(150)의 하부에 형성된 반원홈(153)에는 상기 제3 콘크리트 봉(141)이 삽입되고, 상기 상부캡(150)에 형성된 체결홀(151)은 제3 콘크리트봉(141)의 제3 체결공(143)과 연통관계를 이루게된다.Thereafter, the upper cap 150 is installed on the plurality of third concrete rods 141. In this case, the third concrete rod 141 is inserted into the semicircular groove 153 formed at the lower portion of the upper cap 150, and the fastening hole 151 formed in the upper cap 150 is the third concrete rod 141. It will be in communication with the third fastening hole (143).

이후, 상기 제3 체결공(143)과 제3 콘크리트봉(141) 측으로 돌출된 연결구(160)의 관통공(161) 및 체결홀(151)에 제3 연결바(147)를 삽입한 후 그 양단에 형성된 제2 너트부(135)에 너트(N)를 체결한다. 이에 따라 상층(140)과 중간층(130) 및 상부캡(150)은 긴밀한 연결관계를 이루게 된다.Thereafter, after inserting the third connection bar 147 into the through hole 161 and the fastening hole 151 of the connector 160 protruding toward the third fastening hole 143 and the third concrete rod 141. The nut N is fastened to the second nut part 135 formed at both ends. Accordingly, the upper layer 140 and the intermediate layer 130 and the upper cap 150 has a close connection.

이에 따라, 본 발명의 연약지반용 조립식 방파제(100)는 각 구성요소들의 조립관계를 통해 용이하게 방파제를 시공할 수 있도록 함으로써, 시공이 용이하며, 공사기간을 단축시켜 공사비용을 절감할 수 있도록 한다.Accordingly, the prefabricated breakwater 100 for the soft ground of the present invention can be easily installed through the assembly relationship of each component, so that the construction is easy, to shorten the construction period to reduce the construction cost do.

본 발명에 의하면, 방파제의 각 부위를 운반하여 용이하게 조립/설치 가능하도록 함으로써, 시공이 용이하며, 공사기간을 단축시켜 공사비용을 절감할 수 있는 효과가 있다.According to the present invention, by carrying each part of the breakwater to be easily assembled / installed, the construction is easy, there is an effect that can reduce the construction cost by shortening the construction period.

또한, 방파제를 구성하는 최하부에 해저면에 매설되는 스크류를 갖는 고정구를 설치함으로써, 상기 방파제와 해저면 사이에 긴밀한 결속관계를 이룰 수 있는 효과가 있다.In addition, by providing a fastener having a screw embedded in the sea bottom at the bottom of the breakwater, there is an effect that can achieve a close binding relationship between the breakwater and the sea bottom.

Claims (2)

외해로부터 들이치는 파랑을 막아서 내항을 보호하기 위한 방파제에 있어서,In the breakwater to protect the inner port by preventing blue waves from the open sea, 상기 방파제(100)는 The breakwater 100 is 방파제(100)를 설치하기 위한 해저면(W)과 접하도록 설치되며, 내측에 다수개의 제1 체결공(113)을 갖는 다수개의 제1 콘크리트봉(111)이 해저면(W)과 접하여 등간격으로 설치되고, 상기 각 제1 체결공(113)에 다수개의 제1 콘크리트봉(111)을 연결할 수 있도록 제1 너트부(115)를 갖는 제1 연결바(117)가 삽입되어 양단에 너트(N)가 체결된 바닥층(110); It is installed to be in contact with the sea bottom surface (W) for installing the breakwater 100, a plurality of first concrete rods 111 having a plurality of first fastening holes 113 in contact with the sea bottom (W), etc. Is installed at intervals, the first connecting bar 117 having a first nut portion 115 is inserted into each of the first fastening hole 113 to connect a plurality of first concrete rods 111 and nuts at both ends. Bottom layer 110 to which N is fastened; 상기 바닥층(110)을 해저면(W)에 견고히 고정할 수 있도록 상기 제1 콘크리트봉(111)과 제1 콘크리트봉(111) 사이에 개재되며, 하부에 상기 해저면(W)에 매설되는 스크류(121)가 형성되고, 상부에 유입홈(123)이 형성되며, 양측에 상기 제1 연결바(117)가 삽입될 수 있도록 상기 유입홈(123)과 연통되는 통공(125)이 일체로 형성된 고정구(120);A screw is interposed between the first concrete rod 111 and the first concrete rod 111 to securely fix the bottom layer 110 to the sea bottom (W), the screw embedded in the bottom (W) 121 is formed, the inlet groove 123 is formed on the upper portion, the through-hole 125 in communication with the inlet groove 123 is integrally formed so that the first connecting bar 117 can be inserted into both sides Fixture 120; 상기 제1 콘크리트봉(111)과 제1 콘크리트봉(111) 사이에 다수개의 제2 체결공(133)과 상기 제2 체결공(133)과 연통되어 하방으로 개구된 제2 삽입홈(134)을 갖는 다수개의 제2 콘크리트봉(131)이 다단으로 적층되게 설치되고, 상기 각 제2 체결공(133)에 다수개의 제2 콘크리트봉(131)을 연결할 수 있도록 제2 너트부(135)를 갖는 제2 연결바(137)가 삽입되어 양단에 너트(N)가 체결된 중간층(130);The second insertion groove 134 which is opened downwardly in communication with the plurality of second fastening holes 133 and the second fastening holes 133 between the first concrete rods 111 and the first concrete rods 111. A plurality of second concrete rods 131 having a multi-stage is installed to be stacked, the second nut portion 135 to connect a plurality of second concrete rods 131 to each of the second fastening hole 133 An intermediate layer 130 having a second connection bar 137 inserted therein and fastened with nuts N at both ends thereof; 상기 중간층(130)의 최상단 제2 콘크리트봉(131)과 제2 콘크리트봉(131) 사 이에 다수개의 제3 체결공(143)과 상기 제3 체결공(134)과 연통되어 하방으로 개구된 제3 삽입홈(144)을 갖는 복수개의 제3 콘크리트봉(141)이 적층되게 설치되고, 상기 각 제3 체결공(143)에 복수개의 제3 콘크리트봉(141)을 연결할 수 있도록 제3 너트부(145)를 갖는 제3 연결바(147)가 삽입되어 양단에 너트(N)가 체결된 상층(140);The third opening between the second concrete rod 131 and the second concrete rod 131 of the intermediate layer 130 and the third fastening hole 143 and the third fastening hole 134 in communication with the lower opening A plurality of third concrete rods 141 having three insertion grooves 144 are installed to be stacked, and the third nut part to connect the plurality of third concrete rods 141 to the respective third fastening holes 143. An upper layer 140 into which a third connection bar 147 having a 145 is inserted and fastened with nuts N at both ends thereof; 상기 복수개의 제3 콘크리트봉(141)에 적층되게 설치되며, 내측에 상기 제3 연결바(137)가 삽입될 수 있도록 체결홀(151)이 형성되고, 하부에 상기 제3 콘크리트봉(141)이 삽입될 수 있도록 하방으로 개구된 반원홈(153)이 형성된 상부캡(150) 및It is installed to be stacked on the plurality of third concrete rods 141, the fastening hole 151 is formed so that the third connecting bar 137 is inserted in the inner side, the third concrete rod 141 in the lower portion The upper cap 150 is formed with a semi-circular groove 153 opened downward so that it can be inserted and 상기 제1 연결바(117), 제2 연결바(137) 및 제3 연결바(147)를 각각 연결할 수 있도록 상기 제1,2,3 콘크리트봉(111,131,141)들 사이에 개재되어, 상부가 각 층의 콘크리트봉(131,141)에 형성된 삽입홈(134,144)에 각각 삽입되고, 상부와 하부에 각 층의 연결바(117,137,147)가 삽입되는 관통공(161)이 형성된 연결구(160)를 포함하여 구성됨을 특징으로 하는 연약지반용 조립식 방파제.Interposed between the first, second and third concrete rods 111, 131 and 141 to connect the first connection bar 117, the second connection bar 137 and the third connection bar 147, respectively, Inserted into the grooves 134, 144 formed in the concrete rods (131, 141) of the layer, respectively, and comprises a connector 160 formed with a through hole 161 is inserted into the connection bar (117, 137, 147) of each layer at the top and bottom Prefabricated breakwater for soft ground, characterized in that. 제 1항에 있어서,The method of claim 1, 상기 중간층(130)을 이루는 제2 콘크리트봉(131)에는 내해와 외해의 해수교환이 가능하도록 절개구간(139)이 형성됨을 특징으로 하는 연약지반용 조립식 방파제.The second concrete rod 131 constituting the intermediate layer 130 is a prefabricated breakwater for soft ground, characterized in that the incision section (139) is formed to enable seawater exchange between the inner sea and the outer sea.
KR1020070018225A 2007-02-23 2007-02-23 A soft ground use sectional breakwater KR100720320B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070018225A KR100720320B1 (en) 2007-02-23 2007-02-23 A soft ground use sectional breakwater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070018225A KR100720320B1 (en) 2007-02-23 2007-02-23 A soft ground use sectional breakwater

Publications (1)

Publication Number Publication Date
KR100720320B1 true KR100720320B1 (en) 2007-05-21

Family

ID=38277782

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070018225A KR100720320B1 (en) 2007-02-23 2007-02-23 A soft ground use sectional breakwater

Country Status (1)

Country Link
KR (1) KR100720320B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101052056B1 (en) 2011-02-28 2011-07-26 주식회사 삼안 A soft ground use sectional breakwater
KR101177016B1 (en) 2009-12-30 2012-08-24 화림에이치앤이 주식회사 Frame structure in a crib and crib
KR101282219B1 (en) * 2013-01-31 2013-07-09 주식회사 세광종합기술단 A soft ground use sectional breakwater
KR20210054612A (en) 2019-11-05 2021-05-14 이생기 Harbor structure having block unit

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010076861A (en) * 2000-01-28 2001-08-16 원 회 양 Base structure of a breakwater or embankment for the ground having a soft layer deeply
KR20010103178A (en) * 2000-04-26 2001-11-23 원 회 양 A breakwater which makes the possible seawater moves in a cycle
KR20010107425A (en) * 2000-05-29 2001-12-07 원 회 양 Breakwater circulating seawater
KR20030067446A (en) * 2002-05-10 2003-08-14 원 회 양 Breakwater for seawater exchange
KR100642336B1 (en) * 2006-08-11 2006-11-10 주식회사 도화종합기술공사 Assembling honeycomb type breakwater

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010076861A (en) * 2000-01-28 2001-08-16 원 회 양 Base structure of a breakwater or embankment for the ground having a soft layer deeply
KR20010103178A (en) * 2000-04-26 2001-11-23 원 회 양 A breakwater which makes the possible seawater moves in a cycle
KR20010107425A (en) * 2000-05-29 2001-12-07 원 회 양 Breakwater circulating seawater
KR20030067446A (en) * 2002-05-10 2003-08-14 원 회 양 Breakwater for seawater exchange
KR100642336B1 (en) * 2006-08-11 2006-11-10 주식회사 도화종합기술공사 Assembling honeycomb type breakwater

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
공개특허10-2001-76861,103178,107425,2003-67446,등록특허10-642336

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101177016B1 (en) 2009-12-30 2012-08-24 화림에이치앤이 주식회사 Frame structure in a crib and crib
KR101052056B1 (en) 2011-02-28 2011-07-26 주식회사 삼안 A soft ground use sectional breakwater
KR101282219B1 (en) * 2013-01-31 2013-07-09 주식회사 세광종합기술단 A soft ground use sectional breakwater
KR20210054612A (en) 2019-11-05 2021-05-14 이생기 Harbor structure having block unit

Similar Documents

Publication Publication Date Title
KR100993631B1 (en) A Bridge Structure of Floating Type
KR100720320B1 (en) A soft ground use sectional breakwater
KR102368919B1 (en) Floating wave absorbing revetment using concrete pontoons with adjustable buoyancy
KR101609463B1 (en) Submerged Breakwater Block for Preventing Sand Erosion Equipped with Function of the Artificial Fish-reef
CN113737714B (en) Construction method of ecological floating breakwater
KR100363225B1 (en) Upright block break water having the function of removing waves and cycling seawater
KR100607234B1 (en) A struture for preventing break river bank
KR200429685Y1 (en) Prefabricated floating bridge
KR100720312B1 (en) A breakwater incline cover taking assembling-type sofa - block
KR100586635B1 (en) Breakwater exchanging seawater which tide stream cango in and out
KR101282219B1 (en) A soft ground use sectional breakwater
KR101052056B1 (en) A soft ground use sectional breakwater
KR100461584B1 (en) Breakwater using of buoyancy of deep softground
KR100547001B1 (en) Embankment block structure of river
US20090154999A1 (en) Floating Pier
KR200185629Y1 (en) The cephalic structure of a breakwater
KR102368917B1 (en) Floating breakwater using concrete pontoons with adjustable buoyancy
KR100595961B1 (en) Mounting structure of artificial plant islend for river
KR100586636B1 (en) Breakwater exchanging seawater
KR200267989Y1 (en) Breakwater using of buoyancy of deep softground
US10954641B2 (en) Beach erosion inhibitor
KR200350402Y1 (en) Ecological embankment construction of river
JP4036315B2 (en) Sand beach stabilization and seawater purification methods
KR100195783B1 (en) Multi structure breakwater
KR20100070631A (en) Floating type breakwater structure having improved riffles capacity

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
N231 Notification of change of applicant
N231 Notification of change of applicant
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130613

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20140515

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20150507

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20160412

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20170508

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20180406

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20190321

Year of fee payment: 13