KR100696882B1 - Column-construction method for applying guide casing to column - Google Patents

Column-construction method for applying guide casing to column Download PDF

Info

Publication number
KR100696882B1
KR100696882B1 KR1020040073071A KR20040073071A KR100696882B1 KR 100696882 B1 KR100696882 B1 KR 100696882B1 KR 1020040073071 A KR1020040073071 A KR 1020040073071A KR 20040073071 A KR20040073071 A KR 20040073071A KR 100696882 B1 KR100696882 B1 KR 100696882B1
Authority
KR
South Korea
Prior art keywords
guide casing
column
guide
ground
concrete
Prior art date
Application number
KR1020040073071A
Other languages
Korean (ko)
Other versions
KR20060024185A (en
Inventor
홍원기
금동성
황기수
김근환
Original Assignee
홍원기
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 홍원기 filed Critical 홍원기
Priority to KR1020040073071A priority Critical patent/KR100696882B1/en
Publication of KR20060024185A publication Critical patent/KR20060024185A/en
Application granted granted Critical
Publication of KR100696882B1 publication Critical patent/KR100696882B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1671Shapes helical or spiral
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0061Production methods for working underwater
    • E02D2250/0076Drilling

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

본 발명은 가이드 케이싱을 수직기둥의 일부로 활용하는 기둥시공공법에 관한 것으로서, 각종 토목공사시 지반에 철근 콘크리트 기둥을 박기 위하여 오가구동장치가 진동하면서 가이드 스크류와 가이드 케이싱을 통해 지반을 굴착한 다음, 상기 가이드 케이싱 내에 콘크리트를 타설하되, 콘크리트의 타설후 별도의 해체과정에 의해 해체되는 가이드 케이싱을 배제하고, 대신에 굴착공 내에 지지되는 철근 콘크리트 기둥과 함께 그대로 기둥용 영구구조물 강관으로 사용함으로써, 상기 가이드 케이싱의 해체공정이 불필요하게 되어 작업성이 향상될 뿐만 아니라, 전체적으로 공기 단축 및 시공성을 향상시킬 수 있으며, 궁극적으로 건축물의 구조적인 안정을 도모할 수 있는 가이드 케이싱을 수직기둥의 일부로 활용하는 기둥시공공법에 관한 것이다. The present invention relates to a pillar construction method using a guide casing as part of a vertical column, and excavating the ground through the guide screw and the guide casing while oscillating the oscillating device to put a reinforced concrete column in the ground during various civil works, By placing concrete in the guide casing, by excluding the guide casing which is dismantled by a separate dismantling process after the concrete is poured, instead of using as a permanent structural steel pipe for the column as it is with the reinforced concrete pillars supported in the excavation hole, This eliminates the need for the dismantling process of the guide casing, which improves workability, improves overall air shortening and constructability, and ultimately utilizes the guide casing as part of the vertical column, which can promote structural stability of the structure. It is about construction method.

지반 굴착기, 오가구동장치, 오가 스크류, 가이드 케이싱, 굴착공Ground Excavator, Oga Drive, Oga Screw, Guide Casing, Excavator

Description

가이드 케이싱을 수직기둥의 일부로 활용하는 기둥시공공법{Column-construction method for applying guide casing to column} Column-construction method for applying guide casing to column}             

도 1은 본 발명에 따른 지반 굴착기를 나타내는 구성도,1 is a block diagram showing a ground excavator according to the present invention,

도 2 내지 도 4는 본 발명에 따른 지반 굴착기로 굴착공을 굴착하고, 이어서 가이드 케이싱 내에 콘크리트를 타설하여 보강하는 방법을 나타내는 공정도이다.2 to 4 is a process diagram showing a method of excavating the excavation hole with a ground excavator according to the present invention, and then pouring concrete to reinforce it in the guide casing.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

10 : 크레인 11 : 백스테이10 crane 11 backstay

12 : 리더 13 : 오가구동장치12: reader 13: organ drive device

14 : 케이블 15 : 가이드 케이싱14 cable 15 guide casing

16 : 오가 스크류 17 : 가이드 지지체16: Oga screw 17: guide support

18 : 가이드 레일 19 : 굴착 비트18: guide rail 19: excavation bit

20 : 굴착공20: excavator

본 발명은 가이드 케이싱을 수직기둥의 일부로 활용하는 기둥시공공법에 관한 것으로서, 더욱 상세하게는 각종 토목공사시 지반에 철근 콘크리트 기둥을 박기 위하여 오가구동장치가 진동하면서 가이드 스크류와 가이드 케이싱을 통해 지반을 굴착한 다음, 상기 가이드 케이싱 내에 콘크리트를 타설하되, 콘크리트의 타설후 별도의 해체과정에 의해 해체되는 가이드 케이싱을 배제하고, 대신에 굴착공 내에 지지되는 철근 콘크리트 기둥과 함께 그대로 기둥용 영구구조물 강관으로 사용함으로써, 가이드 케이싱의 해체공정이 불필요하게 되어 작업성이 향상되는 가이드 케이싱을 수직기둥의 일부로 활용하는 기둥시공공법에 관한 것이다. The present invention relates to a pillar construction method using a guide casing as part of a vertical column, and more particularly, to ground the ground through a guide screw and a guide casing while the oscillating device vibrates to put a reinforced concrete column in the ground during various civil works. After excavation, cast concrete in the guide casing, but exclude the guide casing which is dismantled by a separate dismantlement process after the concrete is poured, and instead with a reinforced concrete column supported in the excavation hole as a permanent structural steel pipe It is related with the column construction method which utilizes the guide casing which becomes a part of a vertical column which improves workability by the disassembly process of a guide casing being unnecessary by using it.

일반적으로 도심의 빌딩, 고층복합시설 등과 같은 건축물을 시공하는 경우, 골격작업을 위하여 지반 굴착기를 통해 일정한 간격을 두고 지반 굴착 후 콘크리트로 타설하여 기둥을 세우고 H-빔 등으로 보를 연결하는 작업을 수행한다. In general, in the case of constructing buildings such as urban buildings and high-rise complexes, for the skeletal work, after excavating the ground at regular intervals through the ground excavator, the concrete is laid, the columns are erected, and the beams are connected by H-beams. do.

여기서, 지상층 및 지하층에 매설되는 철근 콘크리트 기둥은, 지반 굴착기의 오가구동장치에 기본적으로 설치되어 있는 오가 스크류와 가이드 케이싱(강관기둥)(CFT:Concrete Filled steel tube)을 통해 회전하면서 지반을 굴착하게 되며, 이후 굴착한 일정한 크기의 원형 굴착공에 상기 가이드 케이싱을 남겨둔 채로 오가구동장치를 해체한 다음, 상기 굴착공의 가이드 케이싱 내에 콘크리트를 타설하는 것으로 이를 완성하게 된다. Here, the reinforced concrete columns embedded in the ground and basement layers, excavate the ground while rotating through the Oga screw and guide casing (CFT: Concrete Filled steel tube) that is basically installed in the Oga driving device of the earth excavator Then, after dismantling the organo driving device while leaving the guide casing in a circular excavation hole of a constant size excavated, it is completed by placing concrete in the guide casing of the excavation hole.

이때, 상기 콘크리트를 타설하기 전에 그 굴착공에 철근을 설치하는 배근 작업을 거친 다음, 거푸집 역할을 하는 가이드 케이싱 내에 콘크리트를 타설하는 것이다.At this time, before placing the concrete after the reinforcement work to install the reinforcing bars in the excavation hole, and then to pour the concrete in the guide casing serving as a formwork.

상기와 같이 콘크리트를 가이드 케이싱 내에 타설한 뒤 이를 경화시키고, 경화 후에는 상기 가이드 케이싱을 지반에서 해체하여 원형 형태의 구조물, 즉 철근 콘크리트 기둥을 완성하게 되는데, 이때 상기 별도의 해체과정을 거쳐 지반 위로 들어 올려진 가이드 케이싱은 작업장의 일정 위치에 야적하게 된다. As described above, the concrete is placed in the guide casing and then hardened. After curing, the guide casing is dismantled from the ground to complete a circular structure, that is, a reinforced concrete column. The raised guide casing is loaded at a certain position in the workshop.

그런데, 기존의 가이드 케이싱은 중량이 상당히 많이 나감에 따라 오가구동장치를 매달아 작업하는 크레인을 사용하여 작업장에 야적하고 있는 바, 별도의 야적 작업시, 안전 사고의 위험성이 대단히 높을 뿐만 아니라, 특히 야적하기 위한 부지가 부족할 경우 야적 공간의 부족 문제는 항상 발생하게 되며, 결국 유지 관리 차원에서 많은 손실 요인이 발생하게 된다. By the way, the existing guide casing is heavily loaded with a crane that works by hanging the Oga drive system as the weight increases considerably, and in the case of a separate yard work, the risk of a safety accident is not only very high, but especially a yard. When there is not enough space for this purpose, there is always a problem of shortage of yard space, which leads to a lot of loss factors for maintenance.

따라서, 시공성 측면에서, 절대적으로 불리하며, 이로 인하여 공기(工期)가 길어질 수 밖에 없는 문제점이 있다. Therefore, in terms of workability, it is absolutely disadvantageous, thereby causing a problem that the air (long run) will be long.

따라서, 본 발명은 상기와 같은 문제점을 해결하기 위해 발명한 것으로서, 각종 토목공사시 지반에 철근 콘크리트 기둥을 박기 위하여 오가구동장치가 진동하면서 가이드 스크류와 가이드 케이싱을 통해 지반을 굴착한 다음, 가이드 케이싱 내에 콘크리트를 타설하되, 상기 가이드 케이싱을 굴착공 내에 지지되는 철근 콘크리트 기둥과 함께 그대로 기둥용 영구구조물 강관으로 사용함으로써, 가이드 케이싱의 해체공정이 불필요하게 되어 작업성이 향상될 뿐만 아니라, 전체적으로 공기 단축 및 시공성을 향상시킬 수 있으며, 궁극적으로 건축물의 구조적인 안정을 도모 할 수 있는 가이드 케이싱을 수직기둥의 일부로 활용하는 기둥시공공법을 제공하는데 그 발명의 목적이 있다.
Therefore, the present invention was invented to solve the above problems, and excavated the ground through the guide screw and the guide casing while oscillating the oscillating device in order to put the reinforced concrete pillar in the ground during various civil works, and then the guide casing By placing concrete in the interior, the guide casing is used together with the reinforced concrete column supported in the excavation hole as a permanent structural steel pipe for the pillar, thereby eliminating the need for the disassembly of the guide casing, thereby improving workability and reducing overall air. And it is possible to improve the workability, and ultimately to provide a pillar construction method that utilizes a guide casing that can achieve structural stability of the building as part of the vertical column.

이하, 상기와 같은 목적을 달성하기 위한 본 발명의 특징에 대해 설명하면 다음과 같다. Hereinafter, the features of the present invention for achieving the above object are as follows.

본 발명에 따른 가이드 케이싱을 수직기둥의 일부로 활용하는 기둥시공공법은, 오가구동장치(13)가 진동하면서 가이드 스크류와 가이드 케이싱(15)을 통해 지반을 굴착한 다음, 상기 가이드 케이싱(15) 내에 콘크리트를 타설하되, 상기 가이드 케이싱(15)을 굴착공(20) 내에 지지되는 철근 콘크리트 기둥과 함께 그대로 기둥용 영구구조물 강관으로 사용하는 것을 특징으로 한다. In the pillar construction method using the guide casing according to the present invention as a part of the vertical pillar, the ground through the guide screw and the guide casing 15 while the organ driving device 13 vibrates, and then into the guide casing 15. While pouring concrete, the guide casing (15) is characterized in that it is used as a permanent structural steel pipe for the column as it is with the reinforced concrete pillars supported in the excavation hole (20).

특히, 상기 가이드 케이싱(15)의 단면은 원형 또는 4각형인 것을 특징으로 한다. In particular, the cross section of the guide casing 15 is characterized in that the circular or quadrilateral.

이하, 첨부도면을 참조하여 본 발명의 구성에 대해 상세하게 설명하면 다음과 같다. Hereinafter, the configuration of the present invention with reference to the accompanying drawings in detail.

첨부한 도 1은 본 발명에 따른 지반 굴착기를 나타내는 구성도이며, 도 2 내지 도 4는 본 발명에 따른 지반 굴착기로 굴착공(20)을 굴착하고, 이어서 가이드 케이싱 내에 콘크리트를 타설하여 보강하는 방법을 나타내는 공정도이다.1 is a configuration diagram showing a ground excavator according to the present invention, Figures 2 to 4 is a method for excavating the excavation hole 20 with a ground excavator according to the present invention, and then pour concrete in the guide casing to reinforce It is a process chart which shows.

도 1에 도시된 바와 같이, 지반 굴착기의 기술적 구성에 대하여 설명하면, 크레인(10)의 지지부에 설치된 리더(12)가 백스테이(11)에 의해 수직 방향으로 직 립한 상태를 유지하도록 설치되고, 오가구동장치(13)를 케이블(14)로 매달아 설치하게 된다.As illustrated in FIG. 1, when the technical configuration of the ground excavator is described, the leader 12 installed in the support of the crane 10 is installed to maintain the upright state in the vertical direction by the backstay 11, The organo drive device 13 is suspended by a cable 14 to be installed.

여기서, 상기 오가구동장치(13)는 가이드 케이싱(guide casing)(15)이 고정되어 지반을 굴착하게 되고, 그 오가구동장치(13)의 내부에 삽입되어 회전하는 구동체인 오가 스크류(16)에 의해 상기 가이드 케이싱(15) 내부에서 회전하면서 지반을 굴착하게 된다. Here, the miso driving device 13 is a guide casing (15) is fixed to excavate the ground, and is inserted into the inside of the miso driving device (13) to the rotating screw Oga screw 16 As a result, the ground is excavated while rotating in the guide casing 15.

이때, 상기 가이드 케이싱(15)의 수평 단면 형상은 원형 또는 4각형 형상임이 무방하다.At this time, the horizontal cross-sectional shape of the guide casing 15 may be a circular or quadrangular shape.

그리고, 상기 오가구동장치(13)의 후방에는 가이드 지지체(17)가 설치되어 리더(12)에 수직 방향으로 설치된 가이드 레일(18)에 상기 가이드 지지체(17)가 슬라이딩 안내되면서 상하로 승하강 작동하게 된다.In addition, a guide support 17 is installed at the rear of the miso driving device 13 so that the guide support 17 slides up and down while slidingly guided to the guide rail 18 installed in a direction perpendicular to the reader 12. Done.

이와 같이 구성된 오가구동장치(13)를 이용하여 지반에 굴착공(20)을 굴착하고자 하는 경우, 상기 오가구동장치(13)의 가이드 지지체(17)가 리더(12)에 수직으로 설치된 가이드 레일(18)에 안내될 수 있도록 오가구동장치(13)를 가이드 레일(18)에 설치한 뒤에 오가구동장치(13)가 상측으로 위치할 수 있도록 케이블(14)을 상측으로 감아 올리게 된다.When the excavation hole 20 is to be excavated in the ground using the organo driving device 13 configured as described above, the guide rail 17 of the organo driving device 13 is vertically installed on the leader 12 ( After installing the organo driver 13 on the guide rail 18 so as to be guided by 18), the cable 14 is wound up so that the organo driver 13 can be positioned upward.

이후, 상기 가이드 케이싱(15)의 내부에 오가 스크류(16)를 삽입한 상태에서, 상기 가이드 케이싱(15)을 오가 스크류(16)와 함께, 직립되도록 세워 고정시키게 된다.Subsequently, in the state in which the organo screw 16 is inserted into the guide casing 15, the guide casing 15 together with the organo screw 16 is fixed to stand upright.

이 상태에서, 오가 스크류(16)를 회전시키게 될 경우, 그 하단에 장착된 굴 착 비트(19)가 회전 방식으로 회전하면서 지반을 굴착하게 되며, 이로 인한 진동력이 가이드 케이싱(15)에 전달되어 그 진동력으로 상기 가이드 케이싱(15)의 단부가 지반과 반복적으로 진동하면서 타격하여 지반을 굴착하게 된다. In this state, when the oga screw 16 is rotated, the excavation bit 19 mounted at the bottom thereof rotates in a rotational manner to excavate the ground, thereby transmitting the vibration force to the guide casing 15. As a result of the vibration force, the end of the guide casing 15 vibrates with the ground repeatedly, thereby hitting the ground.

이와 같이, 상기 오가 스크류(16)의 굴착 비트(19)가 지반을 회전식으로 굴착하고, 그와 동시에 가이드 케이싱(15)이 지반을 진동력으로 굴착함에 따라 지반이 파헤쳐 지면서 토사가 발생하게 되는데, 이러한 토사는 상기 오가 스크류(16)의 외주연에 형성되어 있는 나선형으로 이루어진 스크류 날개에 실려서 가이드 케이싱(15) 내의 공간으로부터 상측으로 배출된다.As such, the excavation bit 19 of the Oga screw 16 to excavate the ground in rotation, and at the same time as the guide casing 15 excavates the ground with a vibratory force, the ground is dug up, the earth and sand is generated, This soil is discharged upward from the space in the guide casing 15 by being carried on a spiral screw blade formed on the outer periphery of the oga screw 16.

이와 같이, 지반을 굴착하다가 목적하는 깊이만큼 굴착이 완료되면 크레인(10)의 케이블(14)을 상측으로 감아 올려 오가 스크류(16)만을 지반 위로 상승되도록 하고, 가이드 케이싱(15)은 그대로 남겨 두게 된다.As such, when the ground is excavated and the excavation is completed to the desired depth, the cable 14 of the crane 10 is rolled upward so that only the screw 16 is raised above the ground, and the guide casing 15 is left as it is. do.

이후, 굴착공(20)의 가이드 케이싱(15) 내에 콘크리트를 타설하게 되는 바, 본 발명의 바람직한 구현예에서는, 상기 가이드 케이싱(15)을 해체하지 않고, 대신에 굴착공(20) 내에 지지되는 철근 콘크리트 기둥과 함께 그대로 기둥용 영구구조물 강관으로 매설하게 된다.Then, the concrete is placed in the guide casing 15 of the excavation hole 20, in a preferred embodiment of the present invention, instead of dismantling the guide casing 15, instead is supported in the excavation hole 20 Along with the reinforced concrete column, it will be embedded as a permanent structural steel pipe for the column.

이때, 상기와 같이 콘크리트가 타설되는 가이드 케이싱(15)의 내부공간, 즉 원형 또는 4각형 단면 형상의 성형공간 내에 철근들을 설치하는 배근 작업을 하거나 철근없이 무근으로 하여 상기 성형공간 내에 콘크리트(40)를 타설하여 철근 콘크리트 기둥을 시공하게 된다.At this time, the interior of the guide casing (15) where the concrete is cast as described above, that is, the reinforcement work to install the reinforcing bars in the molding space of the circular or quadrilateral cross-sectional shape or the concrete without the reinforcement concrete 40 in the molding space Reinforced concrete pillars will be constructed by pouring.

이와 같이, 철근 콘크리트 기둥과 함께 매설되는 상기 가이드 케이싱(15)은 영구 구조체로 사용되어 철근 역할을 보완하는 기능을 하게 되어 철근의 물량 감소를 기대할 수 있으며, 작업 공정 및 시공 시간을 줄일 수 있게 되며, 야적하기 위한 부지의 확보가 필요없게 되어 유지 관리 차원에서 많은 장점이 있다. As such, the guide casing 15 embedded with the reinforced concrete column is used as a permanent structure to complement the role of the reinforcing bar can be expected to reduce the amount of rebar, it is possible to reduce the work process and construction time There is a lot of advantages in terms of maintenance, since there is no need to secure a site for stockpiling.

상술한 바와 같이, 본 발명에 따른 가이드 케이싱을 수직기둥의 일부로 활용하는 기둥시공공법에 의하면, 가이드 케이싱의 해체공정이 불필요하게 되어 해체시 소요되는 시간을 절감할 수 있으며, 철근 콘크리트 기둥의 매설작업을 보다 능률적으로 진행할 수 있어 전체적으로 공기 단축 및 시공성을 향상시킬 수 있는 효과가 있으며, 궁극적으로 건축물의 구조적인 안정을 도모할 수 있다. As described above, according to the column construction method using the guide casing according to the present invention as part of the vertical column, the dismantling process of the guide casing is unnecessary, thereby reducing the time required for dismantling and laying the reinforced concrete column. It is possible to proceed more efficiently to improve the overall air shortening and construction, and ultimately to achieve structural stability of the building.

Claims (3)

오가구동장치(13)가 진동하면서 가이드 스크류와 가이드 케이싱(15)을 통해 지반을 굴착한 다음, 상기 가이드 케이싱(15) 내에 콘크리트를 타설하되, 상기 가이드 케이싱(15)을 이 가이드 케이싱의 내부공간에 철근을 배근하고 콘크리트를 타설하여 시공되는 철근 콘크리트 기둥과 함께 그대로 기둥용 영구구조물로 사용하는 것을 특징으로 하는 가이드 케이싱을 수직기둥의 일부로 활용하는 기둥시공공법.When the organ driving device 13 vibrates, the ground is excavated through the guide screw and the guide casing 15, and then concrete is poured into the guide casing 15, but the guide casing 15 is placed inside the guide casing. A pillar construction method that utilizes a guide casing as part of a vertical column, which is used as a permanent structure for columns along with reinforced concrete columns that are constructed by reinforcing reinforcement and placing concrete. 삭제delete 삭제delete
KR1020040073071A 2004-09-13 2004-09-13 Column-construction method for applying guide casing to column KR100696882B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040073071A KR100696882B1 (en) 2004-09-13 2004-09-13 Column-construction method for applying guide casing to column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040073071A KR100696882B1 (en) 2004-09-13 2004-09-13 Column-construction method for applying guide casing to column

Publications (2)

Publication Number Publication Date
KR20060024185A KR20060024185A (en) 2006-03-16
KR100696882B1 true KR100696882B1 (en) 2007-03-20

Family

ID=37130169

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040073071A KR100696882B1 (en) 2004-09-13 2004-09-13 Column-construction method for applying guide casing to column

Country Status (1)

Country Link
KR (1) KR100696882B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170370067A1 (en) * 2014-12-12 2017-12-28 Maik Kettner Methods and devices for improving the subsoil

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101796897B1 (en) 2017-05-31 2017-12-01 강한주 Apparatus of guide casing for a ground excavator and drilling method using thereof
KR102484062B1 (en) 2020-11-27 2023-01-06 (주)엔아이스틸 Casing guider device for continuous wall construction

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55119820A (en) * 1979-03-07 1980-09-13 Takenaka Komuten Co Ltd Steel pipe soil concrete pile and its construction

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55119820A (en) * 1979-03-07 1980-09-13 Takenaka Komuten Co Ltd Steel pipe soil concrete pile and its construction

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
55119820 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170370067A1 (en) * 2014-12-12 2017-12-28 Maik Kettner Methods and devices for improving the subsoil
US10774494B2 (en) * 2014-12-12 2020-09-15 Maik Kettner Methods and devices for improving the subsoil

Also Published As

Publication number Publication date
KR20060024185A (en) 2006-03-16

Similar Documents

Publication Publication Date Title
KR101014796B1 (en) Top-down underground construction method using prefabricated concrete column member as temporary bridge column
KR20110043017A (en) The earth retaining wall and waterproof construction technique for which cast in place concrete pile and grouting column was used
KR20200098362A (en) tunnel shaft and Construction Method forstructures according to the excavation.
CN101158153A (en) Construction method for manual digging pile
JP4611113B2 (en) Integrated construction method of pile and column
JP3625892B2 (en) Construction method of underground structure using precast concrete column
RU2375521C1 (en) Method of erecting piled foundation designed for high loads
KR100696882B1 (en) Column-construction method for applying guide casing to column
KR100376589B1 (en) Underground construction method using permanent reinforced concrete girders as temporary struts
JP2011157719A (en) Earth retaining method
JP2004100281A (en) Positioning method for permanent substructural column without using casing
KR100898812B1 (en) Atch tunnel structure construction method
JPH0517955A (en) Execution method for direct foundation and form panel for direct foundation
KR102408334B1 (en) The construction method of underground structure using foundation of existing undergound structure
CN109469087A (en) Cesspool strengthening of foundation system and its construction method in a kind of industrial premises room
JP2736542B2 (en) Construction method of underground structure omitting temporary materials
JP3681817B2 (en) Support structure and support method for existing underground structures
KR101279009B1 (en) Bored pile method
CN104631878B (en) Aluminum casting machine well construction method
KR102392517B1 (en) Top-down method using by double beam system
KR101028695B1 (en) A method of PC-girder jointing for top down-construction
JP2004218292A (en) Auxiliary device for buried pile construction method and buried pile construction method
KR200291370Y1 (en) Concrete caisson structure for earth and sand guard of pier&#39;s basis
JP6832761B2 (en) How to rebuild the building
KR20140036076A (en) Method of construction for underground permanent concrete wall structure using cast-in-place concrete pile

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
N231 Notification of change of applicant
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee