CN109469087A - Cesspool strengthening of foundation system and its construction method in a kind of industrial premises room - Google Patents

Cesspool strengthening of foundation system and its construction method in a kind of industrial premises room Download PDF

Info

Publication number
CN109469087A
CN109469087A CN201811583646.1A CN201811583646A CN109469087A CN 109469087 A CN109469087 A CN 109469087A CN 201811583646 A CN201811583646 A CN 201811583646A CN 109469087 A CN109469087 A CN 109469087A
Authority
CN
China
Prior art keywords
cesspool
strengthening
pile
base expanding
industrial premises
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811583646.1A
Other languages
Chinese (zh)
Inventor
***
周玉青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Polytechnic Institute
Original Assignee
Nanjing Polytechnic Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Polytechnic Institute filed Critical Nanjing Polytechnic Institute
Priority to CN201811583646.1A priority Critical patent/CN109469087A/en
Publication of CN109469087A publication Critical patent/CN109469087A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/38Foundations for large tanks, e.g. oil tanks
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses cesspool strengthening of foundation system and its construction methods in a kind of industrial premises room, system includes cesspool and several manually digging hole filling piles, the sewage bottom of pond portion is equipped with bottom plate, and the manually digging hole filling pile includes bored concrete pile capital and bored concrete pile shaft.The bored concrete pile capital is fixedly connected with bottom plate, and the bored concrete pile shaft is equipped with concrete column and steel reinforcement cage.Build the construction method of cesspool strengthening of foundation system in industrial premises room, comprising the following steps: (1) clear up bottom of pond, unwrapping wire fixed pile;(2) earth excavation simultaneously installs dado template simultaneously, and the bottom that manually digging hole is excavated to bored concrete pile shaft artificially expand capitiform into shaft base expanding and base expanding;(3) dado template is removed;(4) steel reinforcement cage, the casting concrete in hole are installed.The present invention carries out consolidation process to cesspool basis using manually digging hole filling pile, efficiently solves the inclined safety problem of genuine house post, while being not required to big machinery, saves operating expenses.

Description

Cesspool strengthening of foundation system and its construction method in a kind of industrial premises room
Technical field
The present invention relates to ground construction fields, and in particular to cesspool strengthening of foundation system in a kind of industrial premises room.
Background technique
In the built-in down-stream pond in genuine room, the cesspool that formwork erection pours 7.5 meters of height or more does large-scale material pond, in original Foundation excavation is carried out in industrial premises need to dig 7-8 meters deeply.In original usage mining machine slope excavation or excavation section by section steel sheet pile Between plus support, but these methods make the load-bearing pillar in genuine room that can generate inclined danger.If using static pressure pile-driving method It is that piling machine can not be driven into in workshop piling of constructing, it is therefore desirable to which one kind can be to cesspool strengthening of foundation and without any Big machinery enters the device of narrow workshop.
Summary of the invention
To solve the above problems, the invention proposes cesspool strengthening of foundation system in a kind of industrial premises room, it is main Content is as follows.
This system includes cesspool and several manually digging hole filling piles, and the sewage bottom of pond portion is equipped with bottom plate, the people Work digging hole filling pile includes bored concrete pile capital and bored concrete pile shaft;The bored concrete pile capital is fixedly connected with bottom plate, the perfusion Concrete column and steel reinforcement cage are equipped with pile.
Preferably, the distance between each described manually digging hole filling pile is 2 meters.
Preferably, the steel reinforcement cage is welded by crossbeam and vertical beam, and the crossbeam is circular ring shape steel ring and vertical beam exists On the outer ring of crossbeam and and beam vertical.
Preferably, the diameter of the bored concrete pile shaft is 1 meter, a height of 7 meters.
Preferably, the bottom of the concrete column is shaft base expanding and base expanding.
Preferably, the shaft base expanding and base expanding is circular platform type, and the top diameter of shaft base expanding and base expanding is 1 meter, and base diameter is 1.2 meters.
A kind of construction method for building cesspool strengthening of foundation system in industrial premises room, comprising the following steps:
(1) bottom of pond, unwrapping wire fixed pile are cleared up;
(2) earth excavation simultaneously installs dado template simultaneously, and the bottom that manually digging hole is excavated to bored concrete pile shaft is artificially expanded Capitiform is at shaft base expanding and base expanding;
(3) dado template is removed;
(4) steel reinforcement cage, the casting concrete in hole are installed.
Preferably, borehole divides two-segment type borehole in the step (2), and first segment has dug installation dado template, in retaining wall mould Then casting concrete in plate excavates the second section and installs dado template casting concrete, finally carry out people in the second section bottom Work base expanding and base expanding.
Preferably, removing in the step (3) after dado template by gap concrete or should lay bricks stifled tight, and surface makes It is smoothed out with cement mortar.
It is furthermore preferred that being vertically put into steel reinforcement cage alignment hole location in the step (4), concrete and same is then slowly poured into Layered vibrates, until shaft base expanding and base expanding, bored concrete pile shaft, bored concrete pile capital, bottom plate successively form.
The utility model has the advantages that the present invention carries out consolidation process to cesspool basis using manually digging hole filling pile, efficiently solve The inclined safety problem of genuine house post, while it being not required to big machinery, save operating expenses.
Detailed description of the invention
Fig. 1 is overall structure of the present invention;
Fig. 2 is the top view of manually digging hole filling pile 2;
Fig. 3 is the front view of manually digging hole filling pile 2;
1, cesspool, 2, manually digging hole filling pile, 3, bottom plate, 4, bored concrete pile capital, 5, bored concrete pile shaft, 6, concrete column, 7, Steel reinforcement cage, 8, crossbeam, 9, vertical beam, 10, shaft base expanding and base expanding.
Specific embodiment
Present invention combination attached drawing proposes a specific embodiment:
This system includes cesspool 1 and several manually digging hole filling piles 2, and 1 bottom of cesspool is equipped with bottom plate 3, and manually digging hole fills Infusing stake 2 includes bored concrete pile capital 4 and bored concrete pile shaft 5.Bored concrete pile capital 4 is fixedly connected with bottom plate 3, is set on bored concrete pile shaft 5 There are concrete column 6 and steel reinforcement cage 7.Bottom plate 3 and 4 formed by integrally casting of bored concrete pile capital, which form, makes cesspool 1 and manually digging hole filling pile 2 In conjunction with instead of using the method for adding support among excavator slope excavation or excavation section by section steel sheet pile, can originally not break Stablize cesspool 1 in the case where bad original factory building foundation.
The distance between each manually digging hole filling pile 2 of the present embodiment is 2 meters.
The steel reinforcement cage 7 of the present embodiment is welded by crossbeam 8 and vertical beam 9, and crossbeam 8 is circular ring shape steel ring and vertical beam 9 exists It is on the outer ring of crossbeam 8 and vertical with crossbeam 8.
The diameter of the bored concrete pile shaft 5 of the present embodiment is 1 meter, a height of 7 meters.
The bottom of the concrete column 6 of the present embodiment is shaft base expanding and base expanding 10.
The shaft base expanding and base expanding 10 of the present embodiment is circular platform type, and the top diameter of shaft base expanding and base expanding 10 is 1 meter, base diameter 1.2 Rice.
A kind of construction method for building cesspool strengthening of foundation system in industrial premises room, comprising the following steps:
(1) bottom of pond, unwrapping wire fixed pile are cleared up;
(2) earth excavation simultaneously installs dado template simultaneously, and the bottom that manually digging hole is excavated to bored concrete pile shaft 5 is artificially expanded Capitiform is at shaft base expanding and base expanding 10;
(3) dado template is removed;
(4) steel reinforcement cage 7, the casting concrete in hole are installed.
Borehole divides two-segment type borehole in the step (2), and first segment has dug installation dado template, poured in dado template Then concrete excavates the second section and installs dado template casting concrete, finally carry out artificial base expanding and base expanding in the second section bottom.
Removing in the step (3) after dado template by gap concrete or should lay bricks stifled tight, and surface uses cement Mortar smoothes out.
The alignment of steel reinforcement cage 7 hole location is vertically put into the step (4), then slowly pour into concrete and is shaken with layered It smashes, until shaft base expanding and base expanding 10, bored concrete pile shaft 5, bored concrete pile capital 4, bottom plate 3 successively form.
The present invention does cesspool basis using manually digging hole filling pile and changes previous excavator slope excavation, or segmentation is opened Among digging steel sheet pile plus support these can be to the method that genuine house post has an impact, and the solution of the present invention can be narrow It is used in narrow workshop, is not necessarily to big machinery, construction method is simple and easy, saves a large amount of operating expenses.
The above description is only an embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair The equivalent structure that bright specification is done, is applied directly or indirectly in other relevant technical fields, and is similarly included in this hair Within bright scope of patent protection.

Claims (10)

1. cesspool strengthening of foundation system in a kind of industrial premises room, including cesspool (1) and several manually digging hole filling piles (2), it is characterised in that: cesspool (1) bottom is equipped with bottom plate (3), and the manually digging hole filling pile (2) includes perfusion pile Push up (4) and bored concrete pile shaft (5);The bored concrete pile capital (4) is fixedly connected with bottom plate (3), sets on the bored concrete pile shaft (5) There are concrete column (6) and steel reinforcement cage (7).
2. cesspool strengthening of foundation system in industrial premises room as described in claim 1, it is characterised in that: each described artificial The distance between digging hole filling pile (2) is 2 meters.
3. cesspool strengthening of foundation system in industrial premises room as described in claim 1, it is characterised in that: the steel reinforcement cage (7) it is welded by crossbeam (8) and vertical beam (9), the crossbeam (8) is circular ring shape steel ring and vertical beam (9) is in the outer of crossbeam (8) It is on circle and vertical with crossbeam (8).
4. cesspool strengthening of foundation system in industrial premises room as described in claim 1, it is characterised in that: the perfusion pile The diameter of body (5) is 1 meter, a height of 7 meters.
5. cesspool strengthening of foundation system in industrial premises room as described in claim 1, it is characterised in that: the concrete column (6) bottom is shaft base expanding and base expanding (10).
6. cesspool strengthening of foundation system in industrial premises room as described in claim 1, it is characterised in that: the shaft base expanding and base expanding It (10) is circular platform type, the top diameter of shaft base expanding and base expanding (10) is 1 meter, and base diameter is 1.2 meters.
7. a kind of construction method for building cesspool strengthening of foundation system in industrial premises room described in claim 1-6, special Sign be the following steps are included:
(1) bottom of pond, unwrapping wire fixed pile are cleared up;
(2) earth excavation simultaneously installs dado template simultaneously, and the bottom that manually digging hole is excavated to bored concrete pile shaft (5) is manually expanded Major part forms shaft base expanding and base expanding (10);
(3) dado template is removed;
(4) steel reinforcement cage (7) are installed, the casting concrete in hole.
8. the construction method of cesspool strengthening of foundation system in industrial premises room as claimed in claim 7, it is characterised in that: institute It states borehole in step (2) and divides two-segment type borehole, first segment has dug installation dado template, the casting concrete in dado template, so After excavate the second section and dado template casting concrete be installed, finally carry out artificial base expanding and base expanding in the second section bottom.
9. the construction method of cesspool strengthening of foundation system in industrial premises room as claimed in claim 7, it is characterised in that: institute Stating after removing dado template in step (3) by gap concrete or should lay bricks stifled tight, and surface is smoothed out using cement mortar.
10. the construction method of cesspool strengthening of foundation system in industrial premises room as claimed in claim 7, it is characterised in that: Steel reinforcement cage (7) alignment hole location is vertically put into the step (4), then concrete is slowly poured into and vibrates with layered, directly To shaft base expanding and base expanding (10), bored concrete pile shaft (5), bored concrete pile capital (4), bottom plate (3) is successively formed.
CN201811583646.1A 2018-12-24 2018-12-24 Cesspool strengthening of foundation system and its construction method in a kind of industrial premises room Pending CN109469087A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811583646.1A CN109469087A (en) 2018-12-24 2018-12-24 Cesspool strengthening of foundation system and its construction method in a kind of industrial premises room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811583646.1A CN109469087A (en) 2018-12-24 2018-12-24 Cesspool strengthening of foundation system and its construction method in a kind of industrial premises room

Publications (1)

Publication Number Publication Date
CN109469087A true CN109469087A (en) 2019-03-15

Family

ID=65676853

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811583646.1A Pending CN109469087A (en) 2018-12-24 2018-12-24 Cesspool strengthening of foundation system and its construction method in a kind of industrial premises room

Country Status (1)

Country Link
CN (1) CN109469087A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960752A (en) * 2022-05-30 2022-08-30 浙江省天正设计工程有限公司 Underground anti-floating water pool and integrated construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1082133A (en) * 1993-07-26 1994-02-16 北京市第三城市建设工程公司 Cross castinplace pile and piling method thereof
CN101748728A (en) * 2008-10-10 2010-06-23 上海强劲基础工程有限公司 Soil cement expanding uplift pile
CN102444142A (en) * 2011-09-20 2012-05-09 新世纪建设集团有限公司 Pile group column replacement expanded basement and construction method of same
CN103195114A (en) * 2013-03-29 2013-07-10 中国建筑第八工程局有限公司 High-rise building foundation strengthening construction method on weak geological conditions
CN103741963A (en) * 2014-01-06 2014-04-23 北京筑福国际工程技术有限责任公司 Industrial plant foundation strengthening method
CN104895057A (en) * 2015-05-15 2015-09-09 上海长凯岩土工程有限公司 Big diameter steel pipe protective wall artificial digging-hole bottom expanding pile and building foundation reinforcement method
CN106930277A (en) * 2017-04-14 2017-07-07 华煜建设集团有限公司 A kind of construction of manual-excavation cast-in-place pile method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1082133A (en) * 1993-07-26 1994-02-16 北京市第三城市建设工程公司 Cross castinplace pile and piling method thereof
CN101748728A (en) * 2008-10-10 2010-06-23 上海强劲基础工程有限公司 Soil cement expanding uplift pile
CN102444142A (en) * 2011-09-20 2012-05-09 新世纪建设集团有限公司 Pile group column replacement expanded basement and construction method of same
CN103195114A (en) * 2013-03-29 2013-07-10 中国建筑第八工程局有限公司 High-rise building foundation strengthening construction method on weak geological conditions
CN103741963A (en) * 2014-01-06 2014-04-23 北京筑福国际工程技术有限责任公司 Industrial plant foundation strengthening method
CN104895057A (en) * 2015-05-15 2015-09-09 上海长凯岩土工程有限公司 Big diameter steel pipe protective wall artificial digging-hole bottom expanding pile and building foundation reinforcement method
CN106930277A (en) * 2017-04-14 2017-07-07 华煜建设集团有限公司 A kind of construction of manual-excavation cast-in-place pile method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960752A (en) * 2022-05-30 2022-08-30 浙江省天正设计工程有限公司 Underground anti-floating water pool and integrated construction method thereof

Similar Documents

Publication Publication Date Title
CN105840207B (en) Construction method for comprehensive tunnel entering structure of large-span tunnel penetrating shallow-buried bias-pressure loose accumulation body
CN107313431B (en) Close on not contour foundation pit method for synchronously constructing
CN107542108B (en) A kind of reverse construction method of building basement structure
KR100957599B1 (en) Basement-structure construction method to use temporary earth retaining structure
CN204491626U (en) The foundation pit enclosure structure that Larsen steel sheet pile and prestressed anchor combine
JP2018024982A (en) Reinforcement method and reinforcement structure of existing pile foundation
CN104264688A (en) Manual hole digging non-uniform pile support construction technology
KR101341679B1 (en) Device for constructing an underground structure and method thereof
KR100722665B1 (en) Steel guide wall for construction of underground diaphragm wall and construction method of underground diaphragm wall using the same
CN106930277A (en) A kind of construction of manual-excavation cast-in-place pile method
CN108532586A (en) A kind of construction method of garage parking diaphram wall
CN111560962A (en) Backfill area foundation pit supporting structure and construction method thereof
CN103321246A (en) Underground diaphragm wall based foundation pit construction method
CN104480929B (en) A kind of pile wall interaction construction method that interlocking pile is applied to permanent outer wall of basement
CN203411993U (en) Simple and fast retaining wall
CN103410152A (en) Construction method for long, narrow and deep foundation pit soil excavation
CN101824825B (en) Deep foundation pit open cutting construction method
CN111827280B (en) Ex-situ pouring, jacking and in-place hole digging pile retaining wall device and construction method thereof
CN100443673C (en) Method of construction
CN109469087A (en) Cesspool strengthening of foundation system and its construction method in a kind of industrial premises room
KR102277470B1 (en) Basement Composite Wall Using Retaing Wall And Method for Constructing the Same
CN114922195A (en) Construction method of soft soil deep and large foundation pit adjacent to protected object
KR20130073336A (en) Pile structure and construction methods
JPH0559728A (en) Sheathing work above underground structure
KR20120088627A (en) Temporary pile using bending restoring force and temporary structure construction method therewith

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190315