KR100593786B1 - The construction of waterway for tunnel - Google Patents

The construction of waterway for tunnel Download PDF

Info

Publication number
KR100593786B1
KR100593786B1 KR1020050091970A KR20050091970A KR100593786B1 KR 100593786 B1 KR100593786 B1 KR 100593786B1 KR 1020050091970 A KR1020050091970 A KR 1020050091970A KR 20050091970 A KR20050091970 A KR 20050091970A KR 100593786 B1 KR100593786 B1 KR 100593786B1
Authority
KR
South Korea
Prior art keywords
blind
tunnel
road
pipe
drainage
Prior art date
Application number
KR1020050091970A
Other languages
Korean (ko)
Inventor
윤상길
Original Assignee
주식회사 바우 컨설탄트
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 바우 컨설탄트 filed Critical 주식회사 바우 컨설탄트
Priority to KR1020050091970A priority Critical patent/KR100593786B1/en
Application granted granted Critical
Publication of KR100593786B1 publication Critical patent/KR100593786B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

본 발명은 터널 배수구조에 관한 것으로서, 터널의 내부에는 굴착 암반에서 발생하는 용출수와 바닥부분에서 침투하는 침투수를 터널 외부로 배출하기 위한 맹암거가 설치되어 있으나 미세토석분말이 상기 맹암거의 내부에서 퇴적되면 수압이 상승하고 지하수가 누출되며 이를 예방하고 막힌 부분을 용이하게 찾아낼 수 있도록 한 것으로서, 터널의 내부 양측 벽체에 인접하여 도로와 단턱지게 상부로 돌출되며, 상기 양측 벽체와의 경계에는 소정 폭이 함몰되는 제1 배수홈이 형성되며, 내부는 공동구가 설치되는 보행자통로와; 상기 보행자통로와 도로와의 사이에 상기 도로와 같은 높이에 뚜껑이 형성되며, 상기 보행자통로의 경계에는 소정 폭이 함몰되는 제2 배수홈을 형성하되 상기 제1 배수홈과는 일정간격으로 연결되도록 하는 연결관을 형성하며, 상기 뚜껑의 하부로 소정깊이 함몰되어 종 방향으로 물이 흐르도록 하는 배수관로와; 상기 양측 배수관로의 내측에 인접하여 각각 형성하며 골재층의 내부에 설치되는 유공관으로 구성되는 맹암거와; 상기 맹암거를 상호 연결하는 맹암거 연결로와, 상기 양측 맹암거의 상부를 관통하며 그 일측 끝단은 상기 배수관로와 관통 연결되며 타측은 맹암거 연결로와 연결되는 맹암거 연결 유공관으로 구성되는 연결로로 구성됨을 특징으로 하는 터널배수구조에 관한 것이다.The present invention relates to a tunnel drainage structure, and inside the tunnel is installed a blind pit for discharging the effluent from the excavated rock and the infiltration water penetrating from the bottom portion to the outside of the tunnel, but the fine earth powder When it is deposited inside, the water pressure rises, the groundwater leaks, prevents it, and makes it easy to find the blockage, and it protrudes upwardly along the road adjacent to both inner walls of the tunnel, and the boundary between the two walls. A first drain groove having a predetermined width recessed therein, the interior having a pedestrian passage through which the cavity is installed; A lid is formed at the same height as the road between the pedestrian passage and the road, and a second drain groove having a predetermined width is formed at the boundary of the pedestrian passage, but is connected to the first drain groove at a predetermined interval. A drainage pipe channel formed in the lower portion of the lid to allow the water to flow in the longitudinal direction; Blind culverts each formed adjacent to the inside of the both side drainage passages and composed of perforated pipes installed inside the aggregate layer; And a connecting passage consisting of a blind-arm connecting pipe connected to the blind-arm connecting passage, and one end of which penetrates the upper portion of the both-sided crypt and penetrates the drainage pipe and the other side is connected to the blind-arm connecting passage. It relates to a tunnel drainage structure characterized in that.

맹암거, 터널  Blind culvert, tunnel

Description

터널 배수구조{The construction of waterway for tunnel}The construction of waterway for tunnel

도 1은 본 발명의 일 실시 예에 따른 터널의 횡단면도1 is a cross-sectional view of a tunnel according to an embodiment of the present invention.

도 2는 본 발명의 일 실시 예에 따른 부분 확대 단면도2 is a partially enlarged cross-sectional view according to an embodiment of the present invention.

<도면 중 주요 부분에 대한 부호의 설명><Explanation of symbols for main parts of the drawings>

1 : 도로1: road

2 : 벽체2: wall

21 : 시공이음부21: Construction joint

3 : 보행자통로3: Pedestrian passage

31 : 제1 배수홈 32 : 공동구31: first drain groove 32: cavity ball

4 : 배수관로4: drainage pipe

41 : 뚜껑 42 : 제2 배수홈41: lid 42: second drain groove

43 : 연결관43 connector

5 : 맹암거5: blind tiger

51 : 골재 52 : 유공관51: aggregate 52: merit pipe

6 : 연결로6: with connection

61 : 맹암거 연결로 62 : 맹암거 연결 유공관61: Maenggam gangro 62: Maenggam gang connection pipe

7 : 측방향 배수관7: lateral drain pipe

8 : 횡방향 배수관8: transverse drainage pipe

본 발명은 터널 배수구조에 관한 것으로서, 좀더 상세하게 설명하면 암반에서의 용출수와 지하에서 침투되는 침투수 등에 포함된 미세 분말의 퇴적에 의하여 맹암거가 막히거나 수압이 상승할 경우에도 용출수 및 침투수가 도로로 누출되는 것을 방지하고 퇴적구간을 용이하게 찾아낼 수 있도록 한 터널 배수구조에 관한 것이다.The present invention relates to a tunnel drainage structure, which will be described in more detail in the case of leachate and blockage due to the deposition of fine powder contained in the effluent water in the rock and the infiltration water penetrated underground. It relates to a tunnel drainage structure that prevents infiltration water from leaking into the road and makes it easier to find sediment sections.

주로 교통로의 역할을 하기 위하여 건설되는 터널은 암반에서 나오는 용출수나 또는 지하수 그리고 비가 온 뒤에 흘러내리는 각종 토사가 유입되는 것을 방지하기 위한 배수구조를 가지도록 하고 있다.The tunnel, which is mainly constructed to serve as a traffic route, has a drainage structure to prevent the inflow of effluent or groundwater from the rock and various soils flowing down after rain.

이러한 배수구조는 먼저 터널의 골격을 이루는 구조물은 기본적으로 내부로 물이 유입되지 않도록 처리되어 있기에 도로에서 흘러내리는 물을 흐르도록 하는 배수관로와 지하에서 지표로 나오는 물이 도로로 누출되지 않고 흐르도록 하는 맹암거로 크게 구분된다.This drainage structure is first constructed so that the structure that forms the skeleton of the tunnel is basically treated to prevent water from flowing into the interior, so that the water flowing down from the road flows and the water from the basement does not leak to the road. It is largely classified as blind.

이때 상기 배수관로의 경우 일반 도로변에서 볼 수 있는 하수관로와 유사한 외부에 뚜껑이 형성된 구조를 가지고 있어 내부에 침전물이 발생할 경우 용이하게 이를 제거하는 보수작업을 진행할 수 있다.In this case, the drainage pipe has a structure in which a lid is formed on the outside similar to the sewer pipe, which can be seen in the general roadside, and when a sediment is generated therein, a repair operation can be easily performed.

또한 맹암거의 경우 도로 포장면 하부에 위치하여 일정 규격의 유공관의 주위에 골재가 둘러싸이도록 하여 내부의 지하수는 침전물을 최소화하는 골재를 통하여 상기 유공관으로 흘러들어 일정방향으로 흐르도록 하되 침전물이 매우 적은 암반구간을 제외한 구간에는 상기 골재의 부위에는 부직포로 둘러싸이도록 하여 침전물이 흘러드는 것을 방지하도록 하였다.In addition, in the case of blind tiger, the aggregate is surrounded around the perforated pipe of a certain size by placing it under the pavement of the road. In the section except the rock section, the aggregate was surrounded by a nonwoven fabric to prevent sediment from flowing.

때문에 산의 암반을 굴착하여 형성하는 터널의 경우 부직포를 사용하지 않은 맹암거가 대부분이나 이에 지층에서 유출되는 미세한 토석분말이 조금씩 퇴적하면서 물의 흐름을 방해하여 수압이 상승하거나 지표로 누출되는 일이 발생한다.Therefore, in the tunnels formed by excavating rock in the mountains, most of the non-woven fabrics are used, but the fine soil powder flowing out from the layers gradually accumulates little by little, and the water flow increases or leaks to the surface. do.

이러한 경우 지하의 수압이 상승하게 되면 도로의 하부를 구성하는 기반부를 침식하여 도로의 함몰 등의 손상을 가져오는 최악의 경우까지 발생하게 되므로 신속한 보수공사가 요구된다.In this case, if the water pressure in the underground rises, the worst case that causes damage such as sinking of the road by eroding the base constituting the lower part of the road is required.

하지만 이러한 보수공사를 위하여 문제가 되는 막힌 구간을 찾아내어 포장을 걷어내고 보수를 하여야하나 이러한 문제구간을 찾아내는 작업이 용이하지 않은 문제점이 있다.However, for such repair work, finding a clogged section that is a problem and removing the pavement and repairing it is not easy to find such a problem section.

본 발명은 상기와 같은 문제점을 해결하기 위하여 개발된 것으로서, 그 목적은 맹암거 구간에 부분적인 침식으로 수압이 상승하거나 막히는 경우 물이 우회할 수 있는 배수구조를 제공하는데 있다.The present invention was developed to solve the above problems, and its object is to provide a drainage structure that can bypass the water when the water pressure rises or is blocked by partial erosion in the blind area.

또한 맹암거 내의 수압발생 또는 막힌 구간을 용이하게 찾아낼 수 있는 터널 배수구조를 제공하는데 있다.In addition, it is to provide a tunnel drainage structure that can easily find the hydraulic pressure generation or blocked section in the blind culvert.

상기와 같은 목적을 달성하기 위하여 본 발명은 터널의 내부 양측 벽체에 인접하여 도로와 단턱지게 상부로 돌출되며, 상기 양측 벽체와의 경계에는 소정 폭이 함몰되는 제1 배수홈이 형성되며, 내부는 공동구가 설치되는 보행자통로와; 상기 보행자통로와 도로와의 사이에 상기 도로와 같은 높이에 뚜껑이 형성되며, 상기 보행자통로의 경계에는 소정 폭이 함몰되는 제2 배수홈을 형성하되 상기 제1 배수홈과는 일정간격으로 연결되도록 하는 연결관을 형성하며, 상기 뚜껑의 하부로 소정깊이 함몰되어 종 방향으로 물이 흐르도록 하는 배수관로와; 상기 양측 배수관로의 내측에 인접하여 각각 형성하며 골재층의 내부에 설치되는 유공관으로 구성되는 맹암거와; 상기 맹암거를 상호 연결하는 맹암거 연결로와, 상기 양측 맹암거의 상부를 관통하며 그 일측 끝단은 상기 배수관로와 관통 연결되며 타측은 맹암거 연결로와 연결되는 맹암거 연결 유공관으로 구성되는 연결로로 구성됨을 특징으로 하는 터널배수구조에 관한 것이다.In order to achieve the above object, the present invention protrudes upward from the road adjacent to both inner walls of the tunnel, and a first drainage groove having a predetermined width is formed at the boundary between the two walls. A pedestrian passage where the common ward is installed; A lid is formed at the same height as the road between the pedestrian passage and the road, and a second drain groove having a predetermined width is formed at the boundary of the pedestrian passage, but is connected to the first drain groove at a predetermined interval. A drainage pipe channel formed in the lower portion of the lid to allow the water to flow in the longitudinal direction; Blind culverts each formed adjacent to the inside of the both side drainage passages and composed of perforated pipes installed inside the aggregate layer; And a connecting passage consisting of a blind-arm connecting pipe connected to the blind-arm connecting passage, and one end of which penetrates the upper portion of the both-sided crypt and penetrates the drainage pipe and the other side is connected to the blind-arm connecting passage. It relates to a tunnel drainage structure characterized in that.

이에 본 발명의 구성을 첨부된 도면에 의하여 당업자가 용이하게 이해하고 재현할 수 있도록 상세하게 설명하면 다음과 같다.Accordingly, the configuration of the present invention will be described in detail with reference to the accompanying drawings so that those skilled in the art can easily understand and reproduce.

도 1은 본 발명의 일 실시 예에 따른 터널의 횡단면도이며, 도 2는 본 발명의 일 실시 예에 따른 부분 확대 단면도로서, 터널의 내부 양측 벽체에 인접하여 도로(1)와 단턱지게 상부로 돌출되며, 상기 양측 벽체(2)와의 경계에는 소정 폭이 함몰되는 제1 배수홈(31)이 형성되며, 내부는 공동구(32)가 설치되는 보행자통로(3)와;1 is a cross-sectional view of a tunnel according to an embodiment of the present invention, Figure 2 is a partial enlarged cross-sectional view according to an embodiment of the present invention, protrudes upwardly stepped with the road (1) adjacent to both inner walls of the tunnel A first drainage groove 31 in which a predetermined width is recessed is formed at a boundary between the two side walls 2, and an inside thereof includes a pedestrian passage 3 in which a cavity 32 is installed;

상기 보행자통로(3)와 도로(1)와의 사이에 상기 도로(1)와 같은 높이에 뚜껑(41)이 형성되며, 상기 보행자통로(3)의 경계에는 소정 폭이 함몰되는 제2 배수홈(42)을 형성하되 상기 제1 배수홈(31)과는 일정간격으로 연결되도록 하는 연결관(43)을 형성하며, 상기 뚜껑의 하부로 소정깊이 함몰되어 종 방향으로 물이 흐르도록 하는 배수관로(4)와;A second drain groove having a lid 41 formed at the same height as the road 1 between the pedestrian path 3 and the road 1 and having a predetermined width recessed at the boundary of the pedestrian path 3 ( 42 to form a connection pipe 43 to be connected to the first drain groove 31 at a predetermined interval, and the drain pipe passage to allow water to flow in the longitudinal direction is recessed a predetermined depth to the lower portion of the lid ( 4) and;

상기 양측 배수관로(4)의 내측에 인접하여 각각 형성하며 골재층(51)의 내부에 설치되는 유공관(52)으로 구성되는 맹암거(5)와;A blind ulcer (5) formed adjacent to the inner side of each of the drain pipe passages (4) and composed of a perforated pipe (52) installed inside the aggregate layer (51);

상기 맹암거(5)를 상호 연결하는 맹암거 연결로(61)와, 상기 양측 맹암거(5)의 상부를 관통하며 그 일측 끝단은 상기 배수관로(4)와 관통 연결되며 타측은 맹암거 연결로(61)와 연결되는 맹암거 연결 유공관(62)으로 구성되는 연결로(6)로 구성되는 터널 배수구조를 나타내었다.The blind logger connection path 61 interconnecting the blind loggers 5 and the upper ends of the two blind loggers 5, one end of which is connected to the drainage pipe 4 and the other is connected to the blind loggers. The tunnel drainage structure composed of a connecting passage 6 composed of a blind ulcer connecting hole 62 connected to the furnace 61 is illustrated.

이러한 구성은 도로의 하부에서 침투하는 침투수는 바닥면에서 침투되는 지하수로 이러한 지하수의 경우 물이 차오르면서 발생하여 각종 미세토사가 발생하는 경우가 자주 발생하며 이에 의하여 물의 흐름이 막힐 경우가 발생한다.In this configuration, the infiltration water penetrating from the lower part of the road is groundwater penetrating from the bottom surface, and in the case of such groundwater, it occurs as the water rises and various microsoils frequently occur, thereby causing the flow of water to be blocked. do.

이때 일정 수위이상 물이 차오르면 상기 맹암거 연결 유공관(62)에 의하여 배수관로(4)로 물을 유도하도록 하여 물의 막힘 현상을 방지하게 되며 이 경우 일정 구간마다 설치되어 있는 상기 연결로(6)를 체크하면 용이하게 수압발생 또는 막 힌 부분을 용이하게 찾아낼 수 있게 되어 보수공사가 용이하게 된다.At this time, when the water rises above a certain level, water is induced into the drainage pipe 4 by the blind gang connecting pipe 62 to prevent water clogging. In this case, the connection path 6 is installed at a predetermined interval. If you check it, you can easily find the hydraulic pressure or clogged parts to facilitate the repair work.

또한 종래와 같이 물이 막혀 수압이 상승하게 되면 도로로 물이 누출되거나 기잔부를 침식하는 최악의 경우를 최대한 방지할 수 있게 됨을 전술한 내용으로 익히 알 수 있을 것이다.In addition, it will be understood from the foregoing that when the water is blocked due to the water clogging as in the related art, the worst case of water leakage or erosion of the road can be prevented as much as possible.

이때 상기 맹암거 연결로(61)은 도로(1)의 중앙에서 양측 방향으로 소정각도 경사지게 형성되도록 하여 일정 수압 이상이 발생하였을 때 반대측으로 물을 보내도록 구성함이 바람직할 것이다.At this time, the blind hook connection path 61 may be configured to be formed to be inclined at a predetermined angle in both directions from the center of the road (1) to send water to the opposite side when a predetermined hydraulic pressure abnormality occurs.

또한 본 발명에서는 상기 벽체(2)의 시공이음부(21)에 인접하여 측방향 배수관(7)이 형성되며, 상기 측방향 배수관(7)은 일정간격으로 횡방향 배수관(8)에 의하여 상기 배수관로(4)와 연결되는 실시 예를 추가로 제시하였다.In the present invention, the lateral drain pipe 7 is formed adjacent to the construction joint 21 of the wall (2), the lateral drain pipe (7) is the drain pipe by the lateral drain pipe (8) at regular intervals An embodiment connected with the furnace 4 is further presented.

이러한 배수구조는 지하에서 지표로 상승하는 것보다 주로 암반에서 나오는 용출수가 상기 측방향 배수관(7)에 모여 일정 간격의 횡방향 배수관(8)에 의하여 배수관로(4)로 흐르도록 한 것이다.This drainage structure is such that the effluent from the rock flows into the drainage pipe 4 by the horizontal drainage pipes 8 at regular intervals rather than rising from the rock to the ground.

상술한 바와 같이 본 발명은 맹암거의 내부에 퇴적되는 미세토사에 의하여 수압이 상승하거나 막힐 경우 배수관로나 타측 맹암거로 물을 보내어 도로면으로 물이 넘치거나 또는 기반부를 침식하는 것을 연장 또는 방지할 수 있는 효과가 있다.As described above, the present invention is to extend or prevent water overflow or erosion of the road surface by sending water to the drainage pipe or the other blind culvert when the water pressure rises or is blocked by the fine soil deposited inside the blind culvert. It can be effective.

또한 보수가 요구되는 맹암거 구간을 맹암거 연결 유공관의 상태를 확인하여 용이하게 파악할 수 있게 되어 신속하고 적절한 보수공사가 가능한 효과가 있다.In addition, it is possible to easily grasp the blind area, which needs repair, by checking the status of the blind hole connecting pipe, so that a quick and proper repair work is possible.

Claims (2)

터널의 내부 양측 벽체에 인접하여 도로(1)와 단턱지게 상부로 돌출되며, 상기 양측 벽체(2)와의 경계에는 소정 폭이 함몰되는 제1 배수홈(31)이 형성되며, 내부는 공동구(32)가 설치되는 보행자통로(3)와;The first drainage groove 31 protrudes upward from the road 1 adjacent to both inner walls of the tunnel, and has a predetermined width recessed at the boundary between the two walls 2, and the inside of the cavity 32. Pedestrian passage (3) is installed; 상기 보행자통로(3)와 도로(1)와의 사이에 상기 도로(1)와 같은 높이에 뚜껑(41)이 형성되며, 상기 보행자통로(3)의 경계에는 소정 폭이 함몰되는 제2 배수홈(42)을 형성하되 상기 제1 배수홈(31)과는 일정간격으로 연결되도록 하는 연결관(43)을 형성하며, 상기 뚜껑의 하부로 소정깊이 함몰되어 종 방향으로 물이 흐르도록 하는 배수관로(4)와;A second drain groove having a lid 41 formed at the same height as the road 1 between the pedestrian path 3 and the road 1 and having a predetermined width recessed at the boundary of the pedestrian path 3 ( 42 to form a connection pipe 43 to be connected to the first drain groove 31 at a predetermined interval, and the drain pipe passage to allow water to flow in the longitudinal direction is recessed a predetermined depth to the lower portion of the lid ( 4) and; 상기 양측 배수관로(4)의 내측에 인접하여 각각 형성하며 골재층(51)의 내부에 설치되는 유공관(52)으로 구성되는 맹암거(5)와;A blind ulcer (5) formed adjacent to the inner side of each of the drain pipe passages (4) and composed of a perforated pipe (52) installed inside the aggregate layer (51); 상기 맹암거(5)를 상호 연결하는 맹암거 연결로(61)와, 상기 양측 맹암거(5)의 상부를 관통하며 그 일측 끝단은 상기 배수관로(4)와 관통 연결되며 타측은 맹암거 연결로(61)와 연결되는 맹암거 연결 유공관(62)으로 구성되는 연결로(6)로 구성되고,The blind logger connection path 61 interconnecting the blind loggers 5 and the upper ends of the two blind loggers 5, one end of which is connected to the drainage pipe 4 and the other is connected to the blind loggers. Consists of a connection furnace 6 consisting of a blind ulcer connecting hole (62) connected to the furnace 61, 상기 벽체(2)의 시공이음부(21)에 인접하여 측방향 배수관(7)이 형성되며, 상기 측방향 배수관(7)은 일정간격으로 횡방향 배수관(8)에 의하여 상기 배수관로(4)와 연결됨을 특징으로 하는 터널 배수구조.A lateral drainage pipe 7 is formed adjacent to the construction joint 21 of the wall 2, and the lateral drainage pipe 7 is the drainage pipe 4 by a transverse drainage pipe 8 at a predetermined interval. Tunnel drainage structure, characterized in that connected with. 삭제delete
KR1020050091970A 2005-09-30 2005-09-30 The construction of waterway for tunnel KR100593786B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050091970A KR100593786B1 (en) 2005-09-30 2005-09-30 The construction of waterway for tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050091970A KR100593786B1 (en) 2005-09-30 2005-09-30 The construction of waterway for tunnel

Publications (1)

Publication Number Publication Date
KR100593786B1 true KR100593786B1 (en) 2006-06-28

Family

ID=37183243

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050091970A KR100593786B1 (en) 2005-09-30 2005-09-30 The construction of waterway for tunnel

Country Status (1)

Country Link
KR (1) KR100593786B1 (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100986157B1 (en) * 2010-04-08 2010-10-07 주식회사 도화종합기술공사 Tunnel with drain bracing and supporting channel
KR101024787B1 (en) 2008-11-14 2011-03-24 (주)동명기술공단종합건축사사무소 Tunnel abutment precast block structure and drainage structure of new concept and method constructing abutment used by them
KR101385563B1 (en) * 2012-04-10 2014-04-15 한국도로공사 Drainage structure in tunnel and method constructing thereof
CN104879164A (en) * 2015-03-12 2015-09-02 西南交通大学 Tunnel annular drain structure
CN105422139A (en) * 2015-12-14 2016-03-23 黄高飞 Tunnel ditch cable trough trolley
CN105604606A (en) * 2016-01-22 2016-05-25 山东大学 Integral construction method for air bag of tunnel sewer ditch
CN106523028A (en) * 2017-01-05 2017-03-22 中铁工程设计咨询集团有限公司 Tunnel center drainage pipe and laying method thereof
CN109751080A (en) * 2019-01-15 2019-05-14 西南交通大学 The supporting construction and construction method with guarded drainage function suitable for water rich strata
CN111472838A (en) * 2020-03-16 2020-07-31 中铁西南科学研究院有限公司 Cooperative drainage system and drainage method for ditches in railway single-track tunnel
CN111924994A (en) * 2020-08-31 2020-11-13 中交路桥建设有限公司 Treatment system and method for blocking prevention of tunnel drainage pipeline
CN113756864A (en) * 2020-06-01 2021-12-07 中国铁道科学研究院集团有限公司铁道建筑研究所 Railway tunnel basement disease anchoring, grouting and draining integrated treatment method

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101024787B1 (en) 2008-11-14 2011-03-24 (주)동명기술공단종합건축사사무소 Tunnel abutment precast block structure and drainage structure of new concept and method constructing abutment used by them
KR100986157B1 (en) * 2010-04-08 2010-10-07 주식회사 도화종합기술공사 Tunnel with drain bracing and supporting channel
KR101385563B1 (en) * 2012-04-10 2014-04-15 한국도로공사 Drainage structure in tunnel and method constructing thereof
CN104879164A (en) * 2015-03-12 2015-09-02 西南交通大学 Tunnel annular drain structure
CN105422139A (en) * 2015-12-14 2016-03-23 黄高飞 Tunnel ditch cable trough trolley
CN105604606A (en) * 2016-01-22 2016-05-25 山东大学 Integral construction method for air bag of tunnel sewer ditch
CN106523028A (en) * 2017-01-05 2017-03-22 中铁工程设计咨询集团有限公司 Tunnel center drainage pipe and laying method thereof
CN109751080A (en) * 2019-01-15 2019-05-14 西南交通大学 The supporting construction and construction method with guarded drainage function suitable for water rich strata
CN111472838A (en) * 2020-03-16 2020-07-31 中铁西南科学研究院有限公司 Cooperative drainage system and drainage method for ditches in railway single-track tunnel
CN113756864A (en) * 2020-06-01 2021-12-07 中国铁道科学研究院集团有限公司铁道建筑研究所 Railway tunnel basement disease anchoring, grouting and draining integrated treatment method
CN111924994A (en) * 2020-08-31 2020-11-13 中交路桥建设有限公司 Treatment system and method for blocking prevention of tunnel drainage pipeline
CN111924994B (en) * 2020-08-31 2023-11-28 中交路桥建设有限公司 Treatment system and method for preventing tunnel drainage pipeline from being blocked

Similar Documents

Publication Publication Date Title
KR100593786B1 (en) The construction of waterway for tunnel
JP5982027B1 (en) Water leakage countermeasures for tunnels constructed by the Natom method
KR20130114904A (en) Drainage structure in tunnel and method constructing thereof
JP2009179945A (en) Well conduit for road and its construction method
Crawford et al. Sinkhole collapse and ground water contamination problems resulting from storm water drainage wells on karst terrain
JP4074313B2 (en) Structure of steel sheet pile for water flow and water retaining wall, and its construction method.
CN215057564U (en) Visual and maintainable type anti-clogging drainage system for highway tunnel
CN114718175A (en) Landslide drainage system and construction method thereof
KR100455841B1 (en) Culvert drainage water pipe reinforced with slope safety in civil engineering and road construction
KR102120402B1 (en) System and Method for Remediation of Polluted Ground Water
JP7042198B2 (en) Embankment structure, embankment structure construction method and embankment structure repair method
JP7073163B2 (en) Embankment structure
JP2004278287A (en) Permeable steel pipe earth-retaining type retaining wall structure
JP2011032703A (en) Subterranean rainwater infiltration facility
CN221167881U (en) Foundation pit hydrophobic structure suitable for under rich water stratum condition
CN113833524B (en) Double-hole box culvert for treating karst area tunnel water burst and construction method thereof
CN112922670B (en) Visual and maintainable type anti-clogging drainage system for highway tunnel
CN109630192A (en) A kind of precipitation method suitable for the construction of half diagenesis bored tunnel
KR200187240Y1 (en) Double waterway using permeation pipe
TWI547621B (en) Water retention and permeability structure for base and water collection and storage system thereof
EP2281950A1 (en) System for treating underground fluids
JP2019100104A (en) Ground surface draining equipment and method of installing the same
JP4800119B2 (en) Anti-floating structure for underground objects
Mrvik Experience with drainage and ground stabilisation by siphon drains in slovakia
KR102362469B1 (en) Rainwater penetration and storage type shoulder structure for impermeable pavement road and construction method thereof

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E601 Decision to refuse application
J201 Request for trial against refusal decision
AMND Amendment
B701 Decision to grant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130617

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20140610

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20160620

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20170620

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20180619

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20190619

Year of fee payment: 14