KR100554761B1 - Watertproof structure of protection wall for building foundation work - Google Patents

Watertproof structure of protection wall for building foundation work Download PDF

Info

Publication number
KR100554761B1
KR100554761B1 KR1020050111960A KR20050111960A KR100554761B1 KR 100554761 B1 KR100554761 B1 KR 100554761B1 KR 1020050111960 A KR1020050111960 A KR 1020050111960A KR 20050111960 A KR20050111960 A KR 20050111960A KR 100554761 B1 KR100554761 B1 KR 100554761B1
Authority
KR
South Korea
Prior art keywords
earth
wall
earth plate
plate
installation groove
Prior art date
Application number
KR1020050111960A
Other languages
Korean (ko)
Inventor
남궁찬
Original Assignee
(주)부림종합건축사사무소
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)부림종합건축사사무소 filed Critical (주)부림종합건축사사무소
Priority to KR1020050111960A priority Critical patent/KR100554761B1/en
Application granted granted Critical
Publication of KR100554761B1 publication Critical patent/KR100554761B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2220/00Temporary installations or constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

본 발명은 건축 기초공사용 토류벽의 차수구조에 관한 것으로서, 종래의 토류벽은 지하수의 누수가 쉽게 되면서 지반의 침하와 함께 토류판이 쉽게 파손되고 그에 따른 토사의 유출로 인하여 토류벽 전체가 붕괴될 수 있는 문제점이 있었다.The present invention relates to the order structure of the earth wall of the building foundation construction, the conventional earth wall is a problem that the ground plate is easily broken with ground subsidence and the earth plate is easily damaged due to the sediment of the ground while the groundwater leaks easily and the entire earth wall collapses due to the outflow of the soil. there was.

따라서 본 발명은 내면에 중간벽(111)이 형성되면서 제1설치홈(112)과 제2설치홈(113)이 형성되는 H형 강말뚝(110)과; 상기 제1설치홈(112)에 끼워져 설치되며, 일측은 제1토류판(120)의 상면에 덮혀져 고정부재(123)에 의해 고정되고, 타측은 제1토류판(120)의 내측면에 덮혀지면서 그 연장된 끝단에는 덮개부(122)가 형성된 방수커버(121)와; 상기 제2설치홈(113)에 끼워져 설치되는 제2토류판(130)과; 상기의 제2토류판(130)의 내면에 설치되는 방수시트(140)를 구성하므로서, 지하수가 토류벽(100)을 통해 누수되지 못하게 됨에 따라 지하수의 누수로 인해 토류판이 파손되거나 토사의 유출 및 토류벽이 붕괴되는 것을 사전에 예방할 수 있는 것이며, 아울러 높은 수위의 지하수도 차단할 수 있어 토류벽(100)의 활용도가 더욱 향상될 수 있는 것이다.Accordingly, the present invention provides an H-shaped steel pile 110 in which an intermediate wall 111 is formed on an inner surface thereof, and a first installation groove 112 and a second installation groove 113 are formed; The first installation groove 112 is fitted to be installed, one side is covered with the upper surface of the first earth plate 120 is fixed by the fixing member 123, the other side is covered with the inner surface of the first earth plate 120 The extended end of the waterproof cover 121 is formed with a cover portion 122; A second earth plate 130 inserted into and installed in the second installation groove 113; By constructing the waterproof sheet 140 installed on the inner surface of the second earth plate 130, the groundwater is prevented from leaking through the earth wall 100, the earth plate is damaged due to the leakage of groundwater or the outflow and earth wall of the earth It is possible to prevent the collapse in advance, and can also block the groundwater at a high level, so that the utilization of the earth wall 100 can be further improved.

건축, 기초공사, 토류판, 토류벽, H형 강말뚝, 방수, 지하수, 붕괴, 토사 Construction, foundation work, earth plate, earth wall, H type steel pile, waterproof, groundwater, collapse, earth and sand

Description

건축 기초공사용 토류벽의 차수구조{Watertproof structure of protection wall for building foundation work}Watertproof structure of protection wall for building foundation work

도 1 은 본 발명에 따른 종래의 토류벽을 예시한 요부 사시도.1 is a perspective view illustrating main parts of a conventional earth wall according to the present invention;

도 2 는 본 발명에 따른 토류벽의 구성을 예시한 요부 분리 사시도.Figure 2 is an exploded perspective view showing the main portion of the structure of the earth wall according to the present invention.

도 3 은 본 발명에 따른 토류벽의 요부 평면도.3 is a plan view of main parts of an earth wall according to the present invention;

도 4 는 본 발명에 따른 토류벽의 요부 측단면도.Figure 4 is a side cross-sectional view of the main portion of the earth wall in accordance with the present invention.

도면의 주요 부분에 대한 부호의 설명Explanation of symbols for the main parts of the drawings

100 : 토류벽 110 : H형 강말뚝100: earth wall 110: H-type steel pile

111 : 중간벽 112 : 제1설치홈111: intermediate wall 112: first installation groove

113 : 제2설치홈 120 : 제1토류판113: second installation groove 120: first earth plate

121 : 방수커버 122 : 덮개부121: waterproof cover 122: cover

123 : 고정부재 130 : 제2토류판123: fixing member 130: second earth plate

140 : 방수시트 140: waterproof sheet

본 발명은 건축 기초공사에 사용되는 토류벽에 관한 것으로서, 더욱 상세히는 상기 토류벽의 차수효과를 극대화시켜 토류벽을 통해 지하수가 누수되는 현상을 방지함에 따라 토류벽을 통한 지하수의 누수로 인하여 토류벽 내면의 토사가 침하되면서 수압과 토압에 의해 토류벽의 일부분이 파손되거나 또는 토류벽 전체가 붕괴될 수 있는 문제점을 효과적으로 해결할 수 있도록 한 건축 기초공사용 토류벽의 차수구조에 관한 것이다.The present invention relates to an earth wall used for building foundation work, and more particularly, to prevent the phenomenon of groundwater leakage through the earth wall by maximizing the ordering effect of the earth wall, so that the soil inside the earth wall due to the leakage of ground water through the earth wall It relates to the order structure of the earth wall of the building foundation public works to effectively solve the problem that the part of the earth wall is damaged or the entire earth wall collapses by the hydraulic pressure and the earth pressure while sinking.

건축의 기초공사에 이용되는 흙막이(land-side protection wall)는 지하공사를 할 때 굴토벽면으로부터 붕괴되는 토사 및 물의 유입을 방지하기 위해 설치되는 가설구조물로서 이러한 흙막이의 대표적인 공법으로는 토류판공법과, CPI공법과, SCW공법이 있다.The land-side protection wall used for the basic construction of the building is a temporary structure that is installed to prevent the inflow of soil and water that collapses from the pit soil wall during underground construction. There are CPI method and SCW method.

즉, 상기 토류판공법은 다수개의 토류판과 H형 강말뚝을 이용하는 공법으로 지하의 굴착할 곳에 H형 강말뚝을 약 1.8M 간격으로 박고 굴착을 해가면서 상기 H형 강말뚝의 사이에 나무판재인 토류판을 넣어 배면의 토사를 막고, 상기 H형 강말뚝의 지탱을 위한 버팀띠장을 설치한 다음 상기 버팀띠장과 H형 강말뚝에 가로 및 세로로 버팀대를 설치하는 공법이다.That is, the earth plate method is a method using a plurality of earth plate and H-type steel piles in the ground to be excavated H-type steel piles at about 1.8M intervals in the excavation of the underground plate plate between the H-shaped steel piles To prevent the earth and sand of the back, and to install the brace for the support of the H-type steel pile is a method of installing the brace in the horizontal and vertical brace on the brace and H-type steel pile.

그리고 CPI공법은 오우거(AUGER)로 땅에 구멍을 뚫은 다음 그 구멍에 철근망이나 H형 강말뚝을 넣고 레미콘이나 시멘트페이스트와 벤토나이트를 섞은 시멘트풀을 넣어 연속된 콘크리트 기둥을 만들어 나가는 공법으로 굴착할 곳 사방을 콘크리트벽으로 만든 다음 붕괴를 막기위하여 콘크리트벼을 지탱할 가로 및 세로의 버팀보를 설치한 상태에서 굴착을 하는 방법이다.The CPI method is a method of drilling a hole in the ground with an auger, and then inserting a reinforcing bar or H type steel pile into the hole and adding cement concrete mixed with ready-mixed concrete, cement paste and bentonite to make a continuous concrete column. It is a method of excavating with concrete walls on both sides and installing horizontal and vertical braces to support concrete rice to prevent collapse.

또한 SCW공법은 축을 세개 가진 오우거로 지하 연속벽을 만들어 나가는 것으로 공사방법은 상기 CPI와 거의 동일하다.In addition, the SCW method is to create an underground continuous wall with three ogre, the construction method is almost the same as the CPI.

한편, 도 1 과 같은 기초공사용 흙막이의 토류판공법에 있어서, H형 강말뚝(11)과 토류판(12)으로 이루어진 토류벽(10)의 경우 지하수의 차단효과가 약하기 때문에 토류벽(10) 배면의 지하수 수위가 높은 경우에는 전혀 사용할 수가 없으며, 수위가 높지 않더라도 토류벽(10) 배면의 지하수가 토류벽(10)을 통해 누수될 경우 토류벽(10)의 배면에 위치한 토사가 침하되면서 지하수의 수압과 상기 토사의 압력에 의하여 토류판(12)의 일부분이 파손될 수 있는 것이며, 그러한 경우 빠져나오는 토사의 압력 등에 의해 토류벽(10) 전체가 붕괴될 수도 있는 문제점이 있었다.On the other hand, in the soil plate method of the earthwork mudstone for the basic construction as shown in Figure 1, in the case of the earth wall 10 consisting of the H-type steel pile 11 and the earth plate 12, because the groundwater blocking effect is weak, the groundwater level on the back surface of the earth wall 10 Is not available at all, and even if the water level is not high, if the groundwater on the back surface of the earth wall 10 leaks through the earth wall 10, the sediment located on the back surface of the earth wall 10 is settled and the pressure of the groundwater and the pressure of the earth and sand As a result, a part of the earth plate 12 may be damaged, and in such a case, the entire earth wall 10 may be collapsed due to the pressure of the earth discharged.

따라서 본 발명의 목적은 상기와 같은 문제점을 해결하기 위한 것으로서, 건축의 기초공사에 사용되는 토류벽의 차수구조를 개선하여 토류벽 배면의 지하수가 토류벽을 통해 누수되는 것을 방지함에 따라 토류벽을 이용한 기초공사를 보다 안전하면서 용이하게 할 수 있도록 한 기초 공사용 토류벽의 차수구조를 제공하는데 있다.Accordingly, an object of the present invention is to solve the problems as described above, by improving the order structure of the earth wall used in the foundation work of the building to prevent the groundwater on the back of the earth wall leak through the earth wall, It is to provide the order structure of the earth wall for the foundation construction to make it safer and easier.

이와 같은 본 발명의 목적은 소정의 간격으로 설치되는 다수개의 H형 강말뚝과 그 사이에 설치되는 다수개의 토류판 등으로 구성되는 토류벽을 구성함에 있어서,In the object of the present invention as described above, in constructing a earth wall composed of a plurality of H-type steel piles installed at predetermined intervals and a plurality of earth plate installed therebetween,

대향된 양쪽 내면에 중간벽이 형성되면서 상기 중간벽에 의해 제1설치홈과 제2설치홈이 형성된 H형 강말뚝과; 상기 제1설치홈에 끼워져 설치되며, 상부는 제1토류판의 상면에 덮혀져 고정부재에 의해 고정되고, 하부는 제1토류판의 내측면에 덮혀지면서 그 연장된 끝단에는 덮개부가 형성된 방수커버와; 상기 제2설치홈에 끼워져 설치되는 제2토류판과; 상기 제2토류판의 내면에 부착되면서 제2설치홈에 함께 설치되는 방수시트를 구성하므로서 달성되는 것이다.An H-type steel pile formed with first and second installation grooves formed by the intermediate wall while the intermediate walls are formed on opposite inner surfaces; A watertight cover which is inserted into the first installation groove, the upper part of which is covered by an upper surface of the first earth plate, and is fixed by a fixing member, the lower part of which is covered by an inner surface of the first earth plate and whose cover is formed at an extended end thereof; A second earth plate inserted into and installed in the second installation groove; Attached to the inner surface of the second earth plate is achieved by configuring a waterproof sheet that is installed together in the second installation groove.

이러한 본 발명은 H형 강말뚝의 내면에 제1설치홈과 제2설치홈을 형성하고, 상기 상기 제1설치홈과 제2설치홈에 제2토류판과, 방수시트와, 방수커버가 설치된 제1토류판을 설치하여 토류벽을 구성함에 따라 토류벽 내면의 지하수가 토류벽 외부로 누수되는 것이 방지될 수 있어 지하수의 누수로 인한 토류판의 파손 및 토류벽의 붕괴를 사전에 예방할 수 있는 것이며, 높은 수위의 지하수도 차단할 수 있어 토류벽의 활용도가 더욱 향상될 수 있으므로 상기 목적을 달성할 수 있는 것이다.The present invention forms a first installation groove and a second installation groove on the inner surface of the H-type steel pile, the second earth plate, the waterproof sheet and the waterproof cover is installed in the first and second installation grooves 1 By installing the earth plate, it is possible to prevent the groundwater inside the earth wall from leaking to the outside of the earth wall by installing the earth plate, which can prevent the damage of the earth plate and the collapse of the earth wall in advance due to the leakage of the ground water. It can be blocked to achieve the above object because the utilization of the earth wall can be further improved.

이하, 본 발명의 특징을 효과적으로 달성할 수 있는 바람직한 실시 예로서 그 기술구성 및 작용효과를 첨부된 도면에 의하여 상세히 설명하면 다음과 같다.Hereinafter, with reference to the accompanying drawings, the technical configuration and operational effects as a preferred embodiment that can effectively achieve the features of the present invention will be described.

즉, 도 2 는 본 발명에 따른 토류벽의 구성을 예시한 요부 분리 사시도이고, 도 3 은 본 발명에 따른 토류벽의 구성을 예시한 요부 평면도이며, 도 4 는 본 발명에 따른 토류벽의 구성을 예시한 요부 측단면도이다.That is, FIG. 2 is a perspective view of the main part separation illustrating the structure of the earth wall according to the present invention, FIG. 3 is a plan view of the main part illustrating the structure of the earth wall according to the present invention, and FIG. 4 illustrates the configuration of the earth wall according to the present invention. It is a sectional side view of the main part.

이에 예시한 바와 같이 본 발명은 일정한 간격으로 설치되는 다수개의 H형 강말뚝과, 상기 H형 강말뚝의 사이에 설치되는 다수개의 토류판 및 버팀띠장과 비 팀대 등으로 구성되는 토류벽을 구성함에 있어서,As exemplified in the present invention, in the construction of a soil wall including a plurality of H-type steel piles installed at regular intervals, and a plurality of earth-plates and braces and non-teamings installed between the H-type steel piles,

대향된 양쪽 내면에 일정한 높이의 중간벽(111)이 형성되면서 상기 중간벽(111)에 의해 제1설치홈(112)과 제2설치홈(113)이 구분되어 형성된 H형 강말뚝(110)과;H-shaped steel pile 110 formed by separating the first installation groove 112 and the second installation groove 113 by the intermediate wall 111 is formed on both opposite inner surface with a constant height is formed. and;

상기 제1설치홈(112)에 끼워져 설치되며, 상부는 제1토류판(120)의 상면에 덮혀져 고정부재(123)에 의해 고정되고, 하부는 제1토류판(120)의 내측면에 덮혀지면서 그 연장된 끝단에는 덮개부(122)가 형성된 방수커버(121)와;It is fitted into the first installation groove 112, the upper portion is covered by the upper surface of the first earth plate 120 is fixed by the fixing member 123, the lower portion is covered on the inner surface of the first earth plate 120 The extended end of the waterproof cover 121 is formed with a cover portion 122;

상기 제2설치홈(113)에 끼워져 제2토류벽(100)과;A second earth wall 100 inserted into the second installation groove 113;

상기 제2토류벽(100)의 내면에 부착되면서 제2설치홈(113)에 함께 설치되는 방수시트(140)로서 토류벽(100)을 구성한 것이 특징이다.The earth wall 100 is configured as a waterproof sheet 140 which is attached to the inner surface of the second earth wall 100 and installed together in the second installation groove 113.

도면중 미설명 부호(110a)는 다른 H형 강말뚝이며, (112a)는 상기 다른 H형 강말뚝의 다른 제1설치홈이고, (113a)는 상기 다른 H형 강말뚝의 다른 제2설치홈이며, (120a)는 다른 제1토류판이고, (121a)는 다른 방수커버이다.In the figure, reference numeral 110a is another H-shaped steel pile, 112a is another first installation groove of the other H-type steel pile, and 113a is another second installation groove of the other H-type steel pile. (120a) is another first earth plate, (121a) is another waterproof cover.

이러한 본 발명은 건축의 기초공사에 사용되는 흙막이중 H형 강말뚝과 토류판 등을 이용하여 토류벽을 만들어 사용함에 있어서, 토류벽(100)의 차수성을 더욱 향상시켜 토류벽(100) 안쪽의 지하수가 토류벽(100)을 통해 굴착공사가 진행중인 곳으로 누수되는 현상을 방지할 수 있도록 함에 따라 토류벽(100)을 통한 지하수의 누수로 인하여 토류벽(100)의 일부 또는 전체가 파손되는 것을 효과적으로 방지토록 한 것이다.In the present invention, the earth wall using the H-type steel pile and earth plate, etc., used in the foundation construction of the building, the earth wall in the earth wall 100 by further improving the water-repellency of the earth wall 100 Through the (100) to prevent the leakage of the excavation work in progress, it is to effectively prevent a part or all of the earth wall 100 is damaged due to the leakage of groundwater through the earth wall (100).

즉, 도 2 는 본 발명에 따른 토류벽의 구성을 예시한 것으로서, 본 발명에 따른 토류벽(100)은 H형 강말뚝(110)과, 방수커버(121)가 설치된 제1토류판(120)과, 방수시트(140)와, 제2토류판(130)으로 구성된 것이다.That is, Figure 2 illustrates the configuration of the earth wall according to the present invention, the earth wall 100 according to the present invention is the H-type steel pile 110, the first earth plate 120 is provided with a waterproof cover 121, It is composed of a waterproof sheet 140, the second earth plate (130).

여기서 상기 H형 강말뚝(110)은 서로 대향된 양쪽 내면의 중앙부위에 일정한 높이로 돌출되는 중간벽(111)을 각각 형성하여 토사가 지지되는쪽의 제1설치홈(112)과, 굴착공사가 진행되는쪽의 제2설치홈(113)으로 구분되도록 한것이다.Wherein the H-shaped steel pile 110 is formed in each of the middle wall 111 protruding at a constant height in the central portion of both inner surfaces facing each other, the first installation groove 112 of the side where the soil is supported and excavation work It is to be divided into the second installation groove 113 of the going.

그리고 상기 제1토류판(120)에는 방수커버(121)가 설치되는 것인데, 상기 방수커버는 제1토류판(120)의 상면과 내측면을 가려줄 수 있도록 "Г" 형태로 구성된 것이며, 이때 상기 방수커버(121)의 상부와 제1토류판(120)의 상면을 고정시키는 방법은 여러가지 방법이 있을 수 있지만 여기서는 못과 같은 고정부재(123)를 이용하여 서로 고정되도록 한 것이며, 상기 고정부재(123)는 못으로 한정할 필요없이 다양한 체결수단을 이용할 수도 있는 것이다.In addition, the first earth plate 120 is provided with a waterproof cover 121, wherein the waterproof cover is configured in the form of "Г" to cover the upper and inner surfaces of the first earth plate 120, wherein the waterproof The top of the cover 121 and the upper surface of the first earth plate 120 may be fixed in various ways, but here it is to be fixed to each other using a fixing member 123 such as a nail, the fixing member 123 It is also possible to use a variety of fastening means without having to limit to a nail.

또한 상기 방수커버(121)의 하부 끝단은 제1토류판(120)의 하단보다 더욱 길게 연장시킨 상태에서 바깥쪽으로 어느정도 구부려 덮개부(122)가 형성되도록 한 것인데, 이는 H형 강말뚝(110)의 제1설치홈(112)에 방수커버(121)가 고정되어 있는 다수개의 제1토류판(120)이 아래부터 위까지 순차적으로 겹쳐져 설치됨에 따라 방수커버(121)가 설치된 제1토류판(120)의 저면과 다른 제1토류판(120a)에 설치된 다른 방수커버(121a)의 상부가 서로 접면되면서 그 접면부에 틈새가 발생하게 되므로 방수효과를 높이기 위하여 덮개부(122)가 상기 접면부의 틈새를 가려줄 수 있도록 한것이며, 상기 덮개부(122)가 연장된 상태에서 바깥쪽으로 구부러진 이유는 덮개부(122)가 다른 방수커버(121a)의 상측 일부분을 정확히 감싸도록 하기 위한 것이 다.In addition, the lower end of the waterproof cover 121 is bent outward to some extent in a state extending longer than the lower end of the first earth plate 120 to form a cover portion 122, which is of the H-type steel pile 110 As the plurality of first earth plates 120 having the waterproof cover 121 fixed to the first installation grooves 112 are sequentially stacked from the bottom to the top, the first earth plate 120 having the waterproof cover 121 is installed. Since the upper part of the bottom surface and the other waterproof cover 121a installed on the other first earth plate 120a are in contact with each other, a gap is generated in the contact surface, so that the cover part 122 covers the gap of the contact part to increase the waterproof effect. The reason why the cover part 122 is bent outward in the extended state is to ensure that the cover part 122 accurately covers an upper portion of the other waterproof cover 121a.

그리고 H형 강말뚝(110)의 제2설치홈(113)에는 다수개의 제2토류판(130)이 아래부터 위까지 순차적으로 겹쳐지면서 설치되는 것이며, 이때 상기 제2설치홈(113)에는 방수시트(140)가 함께 설치되는데 상기 방수시트(140)는 제2토류판(130)의 안쪽면에 부착등의 방식으로 위치되도록 한 것이다.And the second installation grooves 113 of the H-type steel pile 110 is a plurality of second earth plate 130 is installed while overlapping sequentially from the bottom to the top, wherein the second installation grooves 113 is a waterproof sheet 140 is installed together with the waterproof sheet 140 is to be positioned in such a manner as to attach to the inner surface of the second earth plate (130).

이와 같은 H형 강말뚝(110)에 방수커버(121)가 설치된 제1토류판(120)과, 방수시트(140)와, 제2토류판(130)이 설치되는 상태를 도 3 과 도 4 를 통해 살펴보면 다음과 같다.3 and 4 show a state in which the first earth plate 120, the waterproof sheet 140, and the second earth plate 130 are installed on the H-shaped steel stake 110. Looking at it as follows.

우선, 다수개의 H형 강말뚝(110)이 일정한 간격을 두고 설치됨에 따라 도면에서와 같이 H형 강말뚝(110)과 다른 H형 강말뚝(110a)이 일정한 간격을 유지하게 되는 것이며, 그러한 상태에서 H형 강말뚝(110)의 제1설치홈(112)과 다른 H형 강말뚝(110a) 다른 제1설치홈(112a)에 방수커버(121)가 설치된 다수개의 제1토류판(120)이 아래부터 위까지 순차적으로 끼워져 설치되는 것이다.First, as the plurality of H-type steel piles 110 are installed at regular intervals, as shown in the drawing, H-shaped steel piles 110 and other H-type steel piles 110a maintain a constant interval, and in such a state In the first installation groove 112 and the other H-shaped steel pile 110a of the H-shaped steel pile 110, a plurality of first earth plate 120 is provided with a waterproof cover 121 in the other first installation groove (112a) It is installed by inserting it sequentially from the bottom up.

그리고 H형 강말뚝(110)의 제2설치홈(113)과 다른 H형 강말뚝(110a)의 다른 제2설치홈(113a)에는 다수개의 제2토류판(130)이 상기 제1토류판(120)과 같이 아래부터 위까지 순차적으로 끼워져 설치되는 것이며, 이때 상기 제2토류판의 내면에는 방수시트(140)를 부착 또는 접면시키는 방법으로 방수시트(140)와 상기 제2토류판(130)이 H형 강말뚝(110)의 제2설치홈(113)과 다른 H형 강말뚝(110a)의 다른 제2설치홈(113a)에 함께 설치되도록 함에 따라 상기 방수시트(140)에 의해 제2토류판(130)간의 연결부위 틈새가 차단될 수 있도록 한 것이다.In addition, a plurality of second earth plates 130 are disposed in the second installation grooves 113 of the H-shaped steel pile 110 and the other second installation grooves 113a of the H-shaped steel pile 110a. ) Is installed in order from the bottom to the top, such that the waterproof sheet 140 and the second earth plate 130 is H-type by attaching or contacting the waterproof sheet 140 to the inner surface of the second earth plate. Second earth plate 130 by the waterproof sheet 140 to be installed together with the second installation groove 113 of the river pile 110 and the other second installation groove 113a of the other H-shaped steel pile (110a). The gap between the joints is blocked.

이상과 같이 본 발명의 바람직한 실시 예를 설명하였으나 본 발명은 다양한 변화와 변경 및 균등물을 사용할 수가 있으며, 상기 실시 예를 적절히 변형하여 동일하게 응용할 수 있음이 명확하다. 따라서 상기 기재 내용은 하기 특허청구범위의 한계에 의해 정해지는 본 발명의 범위를 한정하는 것은 아니다.As described above, the preferred embodiment of the present invention has been described, but the present invention may use various changes, modifications, and equivalents. Therefore, the above description does not limit the scope of the invention defined by the limitations of the following claims.

이상에서 상술한 바와 같이 본 발명은 다수개의 H형 강말뚝과, 방수커버가 설치된 제1토류판과, 방수시트와, 제2토류판에 의해 토류벽이 구성됨에 따라 상기 토류벽의 안쪽 지하수가 토류벽을 통해 굴착공사가 진행되고 있는 바깥쪽으로 누수되는 현상을 방지할 수 있어 종래와 같이 토류벽을 통해 지하수가 누수되면서 토류판이 파손됨에 따라 토사가 새거나 토류벽 전체가 붕괴되는 사고를 미연에 방지할 수 있는 것이며, 아울러 본 발명에 의한 토류벽을 이용하여 높의 수위의 지하수도 차단할 수 있으므로 토류벽의 활용도가 높아져 기초공사의 효율성과 경제성을 더욱 향상시킬 수 있는 것이다.As described above, according to the present invention, a ground wall is formed by a plurality of H-type steel piles, a first earth plate provided with a waterproof cover, a water resistant sheet, and a second earth plate, and the groundwater inside the earth wall is excavated through the earth wall. It is possible to prevent the leakage of water to the outside where the construction is in progress. As a result, the ground plate leaks as the groundwater leaks through the earth wall, which prevents earth leakage or the entire earth wall collapse. The earth wall according to the invention can be used to block the groundwater at a high level, so that the utilization of the earth wall can be increased, thereby improving the efficiency and economic efficiency of the foundation work.

Claims (4)

일정한 간격으로 설치되는 다수개의 H형 강말뚝과, 상기 H형 강말뚝의 사이에 설치되는 다수개의 토류판 등으로 이루어지는 토류벽을 구성함에 있어서,In constructing a earth wall consisting of a plurality of H-type steel piles installed at regular intervals, and a plurality of earth plate installed between the H-shaped steel piles, 대향된 양쪽 내면에 일정한 높이의 중간벽(111)이 형성되면서 상기 중간벽(111)에 의해 제1설치홈(112)과 제2설치홈(113)이 구분되어 형성되는 H형 강말뚝(110);The H-shaped steel pile 110 in which the first and second installation grooves 112 and 113 are separated by the intermediate wall 111, and the intermediate wall 111 having a constant height is formed on opposite inner surfaces. ); 상기 제1설치홈(112)에 끼워져 설치되며, 상부는 제1토류판(120)의 상면에 덮혀져 고정되고, 하부는 제1토류판(120)의 내측면에 덮혀지는 방수커버(121);A watertight cover 121 inserted and installed in the first installation groove 112, an upper portion of which is covered and fixed to an upper surface of the first earth plate 120, and a lower portion of the waterproof cover 121 that is covered on an inner surface of the first earth plate 120; 상기 제2설치홈(113)에 끼워져 설치되는 제2토류판(130);A second earth plate 130 inserted into the second installation groove 113 and installed; 을 포함하여 이루어진 것을 특징으로 하는 건축 기초공사용 토류벽의 차수구조.The order structure of the earth wall of the building foundation public, characterized in that consisting of. 제 1 항에 있어서,The method of claim 1, 상기 방수커버(121)의 상부와 제1토류판(120)의 상면이 다수개의 고정부재(123)에 의해 고정된 것을 특징으로 하는 건축 기초공사용 토류벽의 차수구조.The upper structure of the waterproof cover 121 and the upper surface of the first earth plate 120 is fixed by a plurality of fixing members 123, the order structure of the earth wall for building foundation public works. 제 1 항 또는 제 2 항에 있어서,The method according to claim 1 or 2, 상기 방수커버(121)의 하부 끝단에 연장된 덮개부(122)를 형성하여 상기 방수커버(121)의 제1토류판(120) 저면과 그 아래쪽에 위치하는 방수커버(121) 상부와 의 연결부위 틈새가 상기 덮개부(122)에 의해 차단될 수 있도록 한 것을 특징으로 하는 건축 기초공사용 토류벽 차수구조.A cover portion 122 is formed at the lower end of the waterproof cover 121 to form a connection portion between the bottom surface of the first earth plate 120 of the waterproof cover 121 and the upper portion of the waterproof cover 121 located below the waterproof cover 121. Earth wall structure of the foundation for public works, characterized in that the gap can be blocked by the cover 122. 제 1 항 또는 제 2 항에 있어서,The method according to claim 1 or 2, 상기 제2토류판(130)의 내면에 방수시트(140)를 설치하여 제2토류판(130)과 방수시트(140)가 H형 강말뚝(110)의 제2설치홈(113)에 함께 설치되도록 한 것을 특징으로 하는 건축 기초공사용 토류벽 차수구조.Install the waterproof sheet 140 on the inner surface of the second earth plate 130 so that the second earth plate 130 and the waterproof sheet 140 are installed together in the second installation groove 113 of the H-type steel pile 110. Earth wall order structure for building foundation work, characterized in that the one.
KR1020050111960A 2005-11-22 2005-11-22 Watertproof structure of protection wall for building foundation work KR100554761B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050111960A KR100554761B1 (en) 2005-11-22 2005-11-22 Watertproof structure of protection wall for building foundation work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050111960A KR100554761B1 (en) 2005-11-22 2005-11-22 Watertproof structure of protection wall for building foundation work

Publications (1)

Publication Number Publication Date
KR100554761B1 true KR100554761B1 (en) 2006-02-24

Family

ID=37179161

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050111960A KR100554761B1 (en) 2005-11-22 2005-11-22 Watertproof structure of protection wall for building foundation work

Country Status (1)

Country Link
KR (1) KR100554761B1 (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100599245B1 (en) * 2006-04-05 2006-07-13 (주)원건축사사무소 Apartment house foundation work drainage member structure
KR100923728B1 (en) * 2009-03-13 2009-10-27 (주)예원엔지니어링 종합건축사사무소 Drainage disposal equipment for institution to construction base sheet pile
CN105113513A (en) * 2015-08-12 2015-12-02 南昌航空大学 Anti-seepage foundation pit supporting structure and construction method
CN105544465A (en) * 2016-01-29 2016-05-04 俞向阳 Bank protecting wall
CN105672253A (en) * 2016-04-01 2016-06-15 俞向阳 Hollow concrete pile and ecological environment-friendly bank protective wall adopting pile
KR101640795B1 (en) * 2015-09-18 2016-07-19 주식회사 세기엔지니어링 Furlable earth retaining structure for provisional facilities and construction method thereof
KR20180065584A (en) * 2016-12-08 2018-06-18 홍익대학교 산학협력단 Diaphragm wall with double reinforcement cage and its construction method
KR200487881Y1 (en) * 2018-06-15 2018-11-16 이강호 Earth Retaining Structure
KR102018567B1 (en) * 2018-12-26 2019-11-14 류현미 Self-supporting retaining wall structure and its construction method
KR102108816B1 (en) * 2019-07-19 2020-05-12 주식회사 스틸토건 Enhanced soil arresting structure
KR20200001283U (en) * 2020-06-10 2020-06-17 김대운 Earth retaining wall
CN111519632A (en) * 2020-04-28 2020-08-11 中一达建设集团有限公司 Foundation pit supporting structure
KR102153542B1 (en) * 2019-08-28 2020-09-09 김종필 Enhanced soil arresting structure

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100599245B1 (en) * 2006-04-05 2006-07-13 (주)원건축사사무소 Apartment house foundation work drainage member structure
KR100923728B1 (en) * 2009-03-13 2009-10-27 (주)예원엔지니어링 종합건축사사무소 Drainage disposal equipment for institution to construction base sheet pile
CN105113513A (en) * 2015-08-12 2015-12-02 南昌航空大学 Anti-seepage foundation pit supporting structure and construction method
KR101640795B1 (en) * 2015-09-18 2016-07-19 주식회사 세기엔지니어링 Furlable earth retaining structure for provisional facilities and construction method thereof
WO2017048056A1 (en) * 2015-09-18 2017-03-23 주식회사 세기엔지니어링 Water barrier-type earth blocking structure for temporary facility and method of constructing same
CN108291377A (en) * 2015-09-18 2018-07-17 世纪工程有限公司 Temporary facility water-proof type soil-baffling structure body and its construction method
CN105544465B (en) * 2016-01-29 2018-04-10 俞向阳 A kind of bunding protecting wall
CN105544465A (en) * 2016-01-29 2016-05-04 俞向阳 Bank protecting wall
CN105672253A (en) * 2016-04-01 2016-06-15 俞向阳 Hollow concrete pile and ecological environment-friendly bank protective wall adopting pile
CN105672253B (en) * 2016-04-01 2018-02-23 俞向阳 Hollow concrete-pile and the ecological environment-friendly type bunding protecting wall using this
KR20180065584A (en) * 2016-12-08 2018-06-18 홍익대학교 산학협력단 Diaphragm wall with double reinforcement cage and its construction method
KR101886260B1 (en) * 2016-12-08 2018-09-06 홍익대학교 산학협력단 Diaphragm wall with double reinforcement cage and its construction method
KR200487881Y1 (en) * 2018-06-15 2018-11-16 이강호 Earth Retaining Structure
KR102018567B1 (en) * 2018-12-26 2019-11-14 류현미 Self-supporting retaining wall structure and its construction method
KR102108816B1 (en) * 2019-07-19 2020-05-12 주식회사 스틸토건 Enhanced soil arresting structure
KR102153542B1 (en) * 2019-08-28 2020-09-09 김종필 Enhanced soil arresting structure
CN111519632A (en) * 2020-04-28 2020-08-11 中一达建设集团有限公司 Foundation pit supporting structure
KR20200001283U (en) * 2020-06-10 2020-06-17 김대운 Earth retaining wall
KR200492803Y1 (en) * 2020-06-10 2020-12-14 김대운 Earth retaining wall

Similar Documents

Publication Publication Date Title
KR100554761B1 (en) Watertproof structure of protection wall for building foundation work
KR100857772B1 (en) Construction structure of open caisson cofferdam using assembling sheet pile and it's method
KR100722665B1 (en) Steel guide wall for construction of underground diaphragm wall and construction method of underground diaphragm wall using the same
KR100485742B1 (en) Water-storage tank
KR102011321B1 (en) Construction method of foundation using rectangular pipe and its foundation
KR100886445B1 (en) Soil tank type land-side protection wall
KR100659599B1 (en) Apartment house foundation work drainage member structure
CN110359476B (en) Construction method of construction platform for mounting steel sheet pile cofferdam inner support and bored pile steel casing
JP4942230B1 (en) Submersible method and equipment for submerged method
US20060179730A1 (en) Wall structural member and method for constructing a wall structure
KR100854338B1 (en) Construction structure of open caisson cofferdam using holding type sheet pile
KR100583939B1 (en) Concrete basic structure of building
JP2002371556A (en) Heave preventing construction method for excavated bottom face using temporary cutoff wall
KR100503871B1 (en) Device for strengthening retaining board
KR20080025219A (en) Underground outer wall construction method using deck-plate and deck-plate for constructing underground outer wall
KR101385090B1 (en) Foundation Structure and the method of wall and cut off wall
JP4440799B2 (en) Ground excavation method
CN114250744B (en) Ecological combined river slope retaining wall revetment
KR102337545B1 (en) Underground retaining wall using concrete pile and soil retaining plate
KR19990042532A (en) Bridge construction of wells and drywall equipment
KR100647488B1 (en) Caisson for Pier Construction and Construction Method of Underwater Structure
KR100659728B1 (en) Earth of building land-side protection wall structure
KR100637899B1 (en) Pier foundation temporarily structure and method for constructing it
KR200224758Y1 (en) Structure of caisson soil protection four concret caisson
KR200240016Y1 (en) Structure of reclamation type's for dection soil

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
A302 Request for accelerated examination
N231 Notification of change of applicant
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20110316

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee