KR200240016Y1 - Structure of reclamation type's for dection soil - Google Patents

Structure of reclamation type's for dection soil Download PDF

Info

Publication number
KR200240016Y1
KR200240016Y1 KR2020010011615U KR20010011615U KR200240016Y1 KR 200240016 Y1 KR200240016 Y1 KR 200240016Y1 KR 2020010011615 U KR2020010011615 U KR 2020010011615U KR 20010011615 U KR20010011615 U KR 20010011615U KR 200240016 Y1 KR200240016 Y1 KR 200240016Y1
Authority
KR
South Korea
Prior art keywords
joint
civil
steel
fastening
steel plate
Prior art date
Application number
KR2020010011615U
Other languages
Korean (ko)
Inventor
한택수
Original Assignee
주식회사 한국종합기술개발공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 한국종합기술개발공사 filed Critical 주식회사 한국종합기술개발공사
Priority to KR2020010011615U priority Critical patent/KR200240016Y1/en
Application granted granted Critical
Publication of KR200240016Y1 publication Critical patent/KR200240016Y1/en

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

본 고안은 토목구조물의 교각기초에 사용되는 매립형 흙막이구조에 관한 것으로서, 지하수 노출이 많은 지역이나 작업장이 협소한 공간이나 지장물이 많아 시공이 어려운 여건에서도 경제적이고 안정한 시공을 위한 흙막이 구조를 제공하는 것이 목적이다.The present invention relates to a landfill structure used for piling foundations of civil engineering structures, and provides an earthquake structure for economical and stable construction even in difficult conditions due to many spaces or obstacles where the groundwater is exposed and the workplace is narrow. The purpose is.

토목구조물의 교각기초공사의 흙막이구조에 있어서, 'ㄱ'형상의 토목구조 흙막이틀인 4개의 단편들이 개개의 접합부위의 중앙에 조인트 고무링(60)이 삽입되고, 상기 접합부위의 내측에는 내측체결강판(70)이 장착되고, 외측에는 외측체결강판(80)이 장착되어 체결볼트(90)로 결합되며, 상기 접합된 흙막이틀의 내측에는 지지력을 주기위해 상단 강재버팀대(110)와 하단 강재버팀대(120)가 장착되는 구조로 되어 있는 것을 특징으로 한다.In the masonry structure of pier foundation work of civil engineering structure, four pieces of 'a' shaped civil structure masonry are inserted into the joint rubber ring 60 at the center of each joint, and the inner side of the joint. The fastening steel plate 70 is mounted, the outer fastening steel plate 80 is mounted on the outside is coupled to the fastening bolt 90, the upper steel brace 110 and the lower steel to give a supporting force to the inside of the bonded earthenware Characterized in that the structure is mounted on the brace 120.

상기 기술한 고안으로 인해 가시설 자재와 말뚝박기 작업시에 소음에 의한 민원발생의 문제점을 해결할 수 있게 되었고, 지하수의 노출지역이나 협소한 공간에서도 시공이 가능한 효과가 있다.Due to the above-described design, it is possible to solve the problem of civil complaints caused by noise during pile materials and pile work, and there is an effect that construction can be performed even in an exposed area of a groundwater or a narrow space.

Description

교각기초 매립형 콘크리트 흙막이구조{Structure of reclamation type's for dection soil}Structural of reclamation type's for dection soil}

본 고안은 토목구조물의 교각기초에 사용되는 매립형 흙막이구조에 관한 것으로서, 더욱 상세하게는 교각기초공사시 거푸집의 설치와 철거작업이 필요없이 흙막이 콘크리트와 본체구조물이 합성으로 일체의 구조로 되는 것을 특징으로 한다.The present invention relates to a buried mudstone structure used for the foundation of a civil engineering structure, and more specifically, the mud concrete and the main body structure are synthesized integrally without the need for installing and removing the formwork during the foundation work. It is done.

일반적으로 종래에는 지하수의 유입이 있는 구역의 공사경우나 하천내지 해상구간의 공사에는 Sheet pile을 주로 사용하여 시공하였으며, 일반토양이나 도심에서의 공사에는 H-pile 말뚝박기후 토류판을 설치하는 공법을 사용하여 온 것이 현실이다. 상기 시공방법은 가도축도를 설치하고 H-pile 말뚝박기후 수평방향의 지지력을 보강키위해 띠장을 거치한후 토류판을 설치하고 터파기를 한후 물푸기와 암바닥따기를 시행하고 저면콘크리트를 타설한뒤 철근거푸집을 조립하고 콘크리트를 타설한후 콘크리트를 양생하고 거푸집을 해체한 뒤 이어서 토류판을 제거한 뒤 H-pile을 제거하고 끝으로 되메우기를 하는 방법으로 시공하는 것이 일반적인 공사현장의 상황이다.In general, sheet piles are mainly used for the construction of areas with inflow of groundwater or between rivers and offshore sections, and the construction of H-pile piles after installation of soil piles is used for construction work in general soil or urban areas. It is a reality. The construction method is to install the road shaft, install the H-pile pile, and then mount the belt to reinforce the supporting force in the horizontal direction, install the earth plate, dig the hole, drain the water and rock the ground, and place the bottom concrete It is a general construction site to assemble formwork and pour concrete, cure concrete, dismantle formwork, remove earth plate, remove H-pile and fill it to the end.

그러나 상기와 같은 방법은 터파기 작업시 토사의 유실로 토류판 설치의 어려움이 있으며, 또한 지하수등의 유입이 과다한 구역에서는 효율적인 공사의 진행이 어려웠을 뿐만 아니라 공사구간이 협소한 지역이나 지장물이 많은 지역에서의 공사에 많은 문제점이 있었다.However, in the above method, it is difficult to install the earthen board due to the loss of earth and sand during the digging work, and it is difficult to proceed with efficient construction in areas with excessive inflow of groundwater. There were many problems with construction in the area.

본 고안은 상기 기술한 문제점을 해결하기 위하여, 토목구조물의 교각기초에 사용되는 매립형 흙막이구조에 관한 것으로서, 상기 기술한 문제점을 해결하기 위하여, 지하수 노출이 많은 지역이나 작업장이 협소한 공간이나 지장물이 많아 시공이 어려운 여건에서도 경제적이고 안전한 시공을 위한 흙막이 구조를 제공하는 것이 목적이다.The present invention relates to a buried mudstone structure used for piling foundations of civil engineering structures to solve the above-described problems, in order to solve the above-mentioned problems, spaces or obstacles where the groundwater is exposed to a narrow area or workplace. The purpose is to provide an earth block structure for economical and safe construction even in difficult conditions.

상기 기술한 목적을 달성하기 위하여, 토목구조물의 교각기초공사의 흙막이구조에 있어서, 'ㄱ'형상의 토목구조 흙막이틀인 4개의 단편들이 개개의 접합부위의 중앙에 조인트 고무링이 삽입되고, 상기 접합부위의 내측에는 내측체결강판이 장착되고, 외측에는 외측체결강판이 장착되어 체결볼트로 결합되며, 상기 접합된 흙막이틀의 내측에는 지지력을 주기위해 상단 강재버팀대와 하단 강재버팀대가 장착되는 구조로 되어 있는 것을 특징으로 하는 교각기초 매립형 콘크리트 흙막이구조를 제공한다.In order to achieve the above object, in the masonry structure of piers foundation work of civil engineering structures, four pieces of 'a' shaped civil structure masonry are inserted into the joint rubber ring in the center of each joint, An inner fastening steel plate is mounted on the inner side of the joining portion, and an outer fastening steel plate is mounted on the outer side to be coupled with the fastening bolts, and the upper steel brace and the lower steel brace are mounted on the inner side of the joined earthen board to provide support. It provides a bridge foundation buried concrete mudstone structure, characterized in that.

도 1은 기존의 흙막이구조의 단면을 개략적으로 나타낸 도면.1 is a view schematically showing a cross section of a conventional retaining structure.

도 2는 본 고안인 교각기초 매립형 흙막이구조를 개략적으로 나타낸 도면.Figure 2 is a view schematically showing a bridge foundation buried mud structure of the present invention.

도 3은 본 고안인 교각기초 매립형 흙막이구조의 분해상세도.Figure 3 is an exploded detailed view of the pier foundation landfill structure of the present invention.

도 4는 본 고안인 교각기초 매립형 흙막이구조의 철근조립도면.Figure 4 is a reinforcement assembly drawing of the pier foundation landfill structure of the present invention.

도 5는 본 고안인 교각기초 매립형 흙막이구조의 하단부에 장착되는 강재 Shoe의 상세도.Figure 5 is a detailed view of the steel Shoe mounted to the lower end of the pier foundation landfill structure of the present invention.

도 6은 본 고안인 교각기초 매립형 흙막이구조의 강재 Shoe의 철근용접도면.Figure 6 is a steel reinforcing drawing of the steel Shoe of the pier foundation landfill structure of the present invention.

도 7은 본 고안인 교각기초 매립형 흙막이구조의 조립평면도.Figure 7 is an assembly plan view of the pier foundation buried soil structure of the present invention.

도 8은 본 고안인 교각기초 매립형 흙막이구조의 조립단면도.8 is an assembled cross-sectional view of the piling foundation landfill structure of the present invention.

도 9는 본 고안인 교각기초 매립형 흙막이구조를 이용하여 시공하는 순서를 개략적으로 나타낸 도면.9 is a view schematically showing the construction process using the pier foundation buried soil structure of the present invention.

< 도면의 주요부분에 대한 부호의 간단한 설명 ><Brief description of symbols for the main parts of the drawings>

10 : 강재 Shoe 11 : 고무링 홈10: steel Shoe 11: rubber ring groove

20 : 강재 Shoe 앵커철근 용접 30 : 철근조립20: Steel Shoe anchor reinforcing bar welding 30: Reinforcing bar assembly

40 : 거푸집조립 50 : PC콘크리트 흙막이틀40: form assembly 50: PC concrete trowel

60 : 조인트 고무링 70 : 체결강판 내측60: joint rubber ring 70: fastening steel sheet inside

80 : 체결강판 외측 90 : 체결볼트80: outside the fastening steel 90: fastening bolt

110 : 상단 강재버팀대 120 : 하단 강재버팀대110: upper steel brace 120: lower steel brace

본 고안은 토목구조물의 교각기초에 사용되는 매립형 흙막이구조에 관한 것으로서, 더욱 상세하게는 교각기초공사시 거푸집의 설치와 철거작업이 필요없이 흙막이 콘크리트와 본체구조물이 합성으로 일체의 구조로 되는 것을 특징으로 한다.The present invention relates to a buried mudstone structure used for the foundation of a civil engineering structure, and more specifically, the mud concrete and the main body structure are synthesized integrally without the need for installing and removing the formwork during the foundation work. It is done.

이하 첨부된 도면을 참조하여 본 고안의 구성과 일 실시예를 구체적으로 설명하면 다음과 같다.Hereinafter, a configuration and an embodiment of the present invention will be described in detail with reference to the accompanying drawings.

본 고안인 매립형 흙막이구조의 시공개념도는 도 2에서 도시하고 있으며, 본 고안인 교각기초 매립형 흙막이구조의 분해상세도를 도시한 도 3에서 알 수 있듯이, PC콘크리트 흙막이틀(50)의 최하단에 강재 Shoe(10)가 설치된 'ㄱ'형상의 4개의 단편들의 결합으로 구성되는 구조로 상기 단편들은 양끝단에 형성된 고무링홈(11)에 조인트고무링(60)이 삽입되고, 이어서 내측체결강판(70) 및 외측체결강판(80)이 삽입되어 체결볼트(90)로 상기 4개의 단편들이 결합되는 구조로 되어 있다.The construction conceptual diagram of the landfill soil structure of the present invention is shown in Figure 2, as can be seen in Figure 3 showing an exploded detail of the piling foundation landfill structure of the present invention, the steel material at the bottom of the PC concrete soil structure (50) Shoe (10) is a structure consisting of a combination of the four pieces of the 'b' shape is installed in the joint rubber ring 60 is inserted into the rubber ring groove 11 formed at both ends, and then the inner fastening steel plate 70 ) And the outer fastening steel plate 80 is inserted into the fastening bolt 90 is configured to combine the four pieces.

그리고 상기 PC콘크리트 흙막이틀(50)의 철근조립을 나타낸 도 4에서 알 수 있듯이, 최하단에 강재 Shoe(10)가 설치되고 상기 강재 Shoe(10)의 상단에 철근을 조립(30)하고 이어서 콘크리트 타설을 위한 거푸집조립(40)을 한후 PC콘크리트 흙막이틀의 콘크리트를 타설하는 순서로 제작된다.And as can be seen in Figure 4 showing the reinforcing the reinforcement of the PC concrete retainer 50, the steel Shoe (10) is installed at the bottom and the steel reinforcement (30) on the top of the steel Shoe (10) and then poured concrete After assembling the formwork for 40 is produced in the order of placing the concrete of the concrete concrete grater.

상기 기술한 강재 Shoe(10)의 상세도와, 강재 Shoe(10)의 철근용접은 도 5와 도 6에서 알 수 있으며, 본 고안인 교각기초 매립형 콘크리트 흙막이의 전체적인 구조는 도 7의 평면도에서 알 수 있듯이, 4개의 단편들이 접합부위의 중앙에 조인트 고무링(60)이 삽입되고, 상기 접합부위의 내측에는 내측체결강판(70)이 장착되고, 외측에는 외측체결강판(80)이 장착되어 체결볼트(90)로 결합되며, 상기 접합부위의 내측에는 지지력을 주기위해 상단 강재버팀대(110)와 하단 강재버팀대(120)가 장착되는 구조로 되어 있으며, 또한 상기 교각기초 매립형 콘크리트 흙막이의 A-A단면도는 도 8에 도시된 바와 같다.Details of the steel Shoe (10) described above, the steel welding of the steel Shoe (10) can be seen in Figures 5 and 6, the overall structure of the pier foundation buried concrete mudstone of the present invention can be seen in the plan view of FIG. As shown, the four pieces of the joint rubber ring 60 is inserted in the center of the joint portion, the inner fastening steel plate 70 is mounted on the inner side of the joint portion, the outer fastening steel plate 80 is mounted on the outer fastening bolt It is coupled to (90), the inner side of the joint portion has a structure in which the upper steel brace 110 and the lower steel brace 120 is mounted to give a supporting force, and also AA cross-sectional view of the pier foundation embedded concrete mud As shown in 8.

그리고 본 고안인 교각기초 매립형 콘크리트 흙막이구조를 이용한 시공의 순서는 도 9에 도시된 바와같이, 본 고안인 교각기초 매립형 흙막이구조를 완성한뒤, 개구부를 이용하여 크람샬로 굴착침하 시키며 깊이는 설계도면에 의거하여 암바닥까지 침하시킨다. 이어서 내부 암바닥을 청소하고 기초바닥 고름콘크리트를 타설한후 양생하고 하부가로빔(120)을 철거한후 기초철근조립 및 콘크리트타설후 상부가로빔(110)을 철거한고 되메우는 것으로 공사를 완료한다.And the construction sequence using the pier foundation buried concrete mud structure of the present invention is as shown in Figure 9, after completing the pier foundation buried mud structure of the present invention, using the opening to excavate and settle down to the crammals and the depth of the design drawing Settle down to the rock floor accordingly. Subsequently, after cleaning the inner rock floor and placing the foundation floor pus concrete, curing and dismantling the lower horizontal beam 120, after completing the foundation reinforcement and concrete laying, the upper horizontal beam 110 is removed and refilled. .

상기 기술한 바와같이, 본 고안은 제작이 간단하고 거푸집과 철거작업이 필요없으며, 가시설 자재와 말뚝박기 작업시에 소음에 의한 민원발생의 문제점을 해결할 수 있게 되었고, 우기 또는 지하수의 노출지역이나 협소한 공간에서도 시공이 가능한 효과가 있다.As described above, the present invention is simple to manufacture and does not require formwork and demolition work, and it is possible to solve the problem of civil complaints caused by noise during the work of pile materials and pile work, and exposed areas or narrow areas of rainy or groundwater. There is an effect that can be installed in one space.

Claims (1)

토목구조물의 교각기초공사의 흙막이구조에 있어서, 'ㄱ'형상의 토목구조 흙막이틀인 4개의 단편들이 개개의 접합부위의 중앙에 조인트 고무링(60)이 삽입되고, 상기 접합부위의 내측에는 내측체결강판(70)이 장착되고, 외측에는 외측체결강판(80)이 장착되어 체결볼트(90)로 결합되며, 상기 접합부위의 내측에는 지지력을 주기위해 상단 강재버팀대(110)와 하단 강재버팀대(120)가 장착되는 구조로 되어 있는 것을 특징으로 하는 교각기초 매립형 콘크리트 흙막이구조.In the masonry structure of pier foundation work of civil engineering structure, four pieces of 'a' shaped civil structure masonry are inserted into the joint rubber ring 60 at the center of each joint, and the inner side of the joint. The fastening steel plate 70 is mounted, the outer fastening steel plate 80 is mounted on the outside is coupled to the fastening bolt 90, the inner side of the joining portion of the upper steel brace 110 and the lower steel brace ( The bridge foundation buried concrete mudstone structure, characterized in that 120 is mounted.
KR2020010011615U 2001-04-23 2001-04-23 Structure of reclamation type's for dection soil KR200240016Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020010011615U KR200240016Y1 (en) 2001-04-23 2001-04-23 Structure of reclamation type's for dection soil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020010011615U KR200240016Y1 (en) 2001-04-23 2001-04-23 Structure of reclamation type's for dection soil

Publications (1)

Publication Number Publication Date
KR200240016Y1 true KR200240016Y1 (en) 2001-10-12

Family

ID=73081441

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020010011615U KR200240016Y1 (en) 2001-04-23 2001-04-23 Structure of reclamation type's for dection soil

Country Status (1)

Country Link
KR (1) KR200240016Y1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200255698Y1 (en) * 2001-08-31 2001-12-13 주식회사 홍익기술단 Hexagon concrete body for a pier construction
KR20020089687A (en) * 2001-05-23 2002-11-30 주식회사유신코퍼레이션 The method for carrying out synthetic precast concreted wall of bridge

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020089687A (en) * 2001-05-23 2002-11-30 주식회사유신코퍼레이션 The method for carrying out synthetic precast concreted wall of bridge
KR200255698Y1 (en) * 2001-08-31 2001-12-13 주식회사 홍익기술단 Hexagon concrete body for a pier construction

Similar Documents

Publication Publication Date Title
US20110142550A1 (en) Method for constructing a chair-type, self-supported earth retaining wall
KR101274974B1 (en) Earth retaining wall and construction method thereof
KR20130081971A (en) Precast concrete wall and method for constructing underground permanent wall using the precast concrete wall
KR100722665B1 (en) Steel guide wall for construction of underground diaphragm wall and construction method of underground diaphragm wall using the same
KR100862977B1 (en) Precast concrete file and method for constructing thereof
KR102173079B1 (en) Composite phc pile for soil retaining wall
KR200240016Y1 (en) Structure of reclamation type&#39;s for dection soil
JP2001329545A (en) Bridge pier foundation construction method and floor slab for bridge pier
KR100257083B1 (en) Dry method or rubber gasket apparatus of a pier of a bridge
KR200224758Y1 (en) Structure of caisson soil protection four concret caisson
KR100493516B1 (en) Micro pile and assembly foundation reinforcement structure member and its method for pier
KR102195496B1 (en) Pile for earth self-retaining wall using cast in place concrete pile with double I beam
KR100647488B1 (en) Caisson for Pier Construction and Construction Method of Underwater Structure
KR100327547B1 (en) Composite retaining wall construction method
KR100429283B1 (en) Construction Method using Precast Concrete for Diaphragm Wall
KR100722198B1 (en) Strut system of temporary retaining wall and subgrade external wall construction method utilizing the same
KR200428941Y1 (en) Strut system of temporary retaining wall
KR100592397B1 (en) storey spacing support ssoldier pile soil retaining wall
KR200225641Y1 (en) Structure of caisson soil protection four concrete caisson of bridge
KR100637899B1 (en) Pier foundation temporarily structure and method for constructing it
KR200291370Y1 (en) Concrete caisson structure for earth and sand guard of pier&#39;s basis
KR100525355B1 (en) Caisson for constructing pier
KR200373276Y1 (en) Steel pipe pile of support structure
KR101256311B1 (en) Structual deepening method
KR200373275Y1 (en) Steel pipe pile of support structure

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
FPAY Annual fee payment

Payment date: 20090715

Year of fee payment: 9

LAPS Lapse due to unpaid annual fee