KR100446543B1 - Process for enlarging tunnels - Google Patents

Process for enlarging tunnels Download PDF

Info

Publication number
KR100446543B1
KR100446543B1 KR10-2001-0073326A KR20010073326A KR100446543B1 KR 100446543 B1 KR100446543 B1 KR 100446543B1 KR 20010073326 A KR20010073326 A KR 20010073326A KR 100446543 B1 KR100446543 B1 KR 100446543B1
Authority
KR
South Korea
Prior art keywords
tunnel
existing
existing tunnel
excavation device
pair
Prior art date
Application number
KR10-2001-0073326A
Other languages
Korean (ko)
Other versions
KR20020001688A (en
Inventor
김상록
Original Assignee
구영숙
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 구영숙 filed Critical 구영숙
Priority to KR10-2001-0073326A priority Critical patent/KR100446543B1/en
Publication of KR20020001688A publication Critical patent/KR20020001688A/en
Application granted granted Critical
Publication of KR100446543B1 publication Critical patent/KR100446543B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/01Methods or apparatus for enlarging or restoring the cross-section of tunnels, e.g. by restoring the floor to its original level
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D19/00Provisional protective covers for working space
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions
    • E21F13/006Equipment transport systems

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

기존 터널에 차량이 계속적으로 통행하게하면서 그 기존터널위에 확장 터널을 굴착시공하는 시공방법에 관한 것으로서, 기존 터널 외표면보다 더 큰 내부 면적을 갖는 터널굴착장치로서 양측에 장착된 캐터필러에 의해 장비를 이동하면서 그 장비 내부는 공간으로 비어있는 기존의 굴착장치를 이용하여 기존 터널위를 감싸면서 이동시켜 주열식연속벽공법, 지중연속벽공법, 지반보강공법과 같은 통상의 공법에 의해 확장예정 터널의 윤곽을 따라 보강공사를 한 후, 확장 터널 예정위치를 굴착하여 확장 터널공사를 완성한 다음, 상기 터널굴착장치의 캐터필러와 같은 캐터필러가 양측에 장착되고 내부는 비어있는 굴착장치와 같은 장비에서 상부에는 거기에 장착된 굴착기와 지지대등을 제거한 대신 반구형 지붕으로 덮은 것으로 구성되고 기존 터널 내부 면적보다 외표면이 적은 방호장비를 캐터필러에의해 기존 터널내로 이동시켜 기존 터널을 철거하면서 철거장비내로는 차량의 운행을 계속할 수 있게 하므로서, 기존 터널이 있는 곳에서도 차량 통제없이 확장 및 철거공사를 할 수 있게 하는데 특징이 있는 것이다.A construction method for excavating an expansion tunnel on an existing tunnel while allowing a vehicle to continue to pass through the existing tunnel. The equipment is installed by caterpillars mounted on both sides as a tunnel excavation device having a larger internal area than the existing tunnel outer surface. While moving, the inside of the equipment is moved to the space by wrapping it over the existing tunnel using the existing excavation device, and then expanding the tunnel by the usual construction methods such as the continuous column wall method, the underground continuous wall method, and the ground reinforcement method. After the reinforcement work is completed along the contour, the expansion tunnel construction is completed by excavating the predetermined position of the expansion tunnel, and then the caterpillar, such as the caterpillar of the tunnel excavator, is mounted on both sides, and the upper part of the equipment, such as the excavator, which is empty inside Instead of removing the excavators and supports mounted on the roof, they are covered with a hemispherical roof. Caterpillar moves the protective equipment with less outer surface into the existing tunnel to dismantle the existing tunnel while continuing the operation of the vehicle within the demolition equipment. It is characteristic to make it possible.

Description

터널 확장 시공방법{Process for enlarging tunnels}Tunnel extension construction method {Process for enlarging tunnels}

본 발명은 기존 터널장소에 기존 터널보다 확장된 확장터널을 시공하는 방법에 관한 것으로서, 특히 기존 터널내에서 차량 운행의 통제를 하지 않고 정상운행상태에서도 터널 확장공사를 할 수 있는 터널 확장시공방법에 관한 것이다.The present invention relates to a method for constructing an extended tunnel than an existing tunnel at an existing tunnel. In particular, the present invention relates to a tunnel extension construction method that can perform tunnel expansion work in a normal operation state without controlling vehicle operation in an existing tunnel. It is about.

일반적으로 기존 터널을 확장하려면 터널을 폐쇄하여 차량운행을 차단해야하므로 차라리 기존 터널장소에서는 차량 운행이 되도록 둔채로 다른 장소를 확보하여 새로운 터널을 시공할 수 밖에 없었다.In general, in order to expand the existing tunnel, it is necessary to close the tunnel to block the operation of the vehicle, so it was inevitable to construct a new tunnel by securing another place while allowing the vehicle to operate in the existing tunnel place.

따라서 새로운 터널공사를 위해 새로운 장소를 물색하여 확보해야하므로 주택 또는 도로 부지 보상 및 확보를 위한 막대한 예산과 장비 및 인력이 필요하게되고 장소 물색도 어려운 단점이 있었다.Therefore, new tunnel construction must be searched for and secured. Therefore, a huge budget, equipment, and manpower for housing and road site compensation and securing are required.

본 발명은 상기한 바와같은 새로운 터널시공이나 터널 확장공사에 있어서의 어려움을 해결하여 기존의 터널위치에서 터널내로의 차량 통행을 제한하지 않고 정상 운행하도록하면서 확장코저하는 터널을 기존 터널위에서 시공하는 터널 확장시공방법에 관한 것으로서 이를 첨부된 도면을 참조하면서 상세히 설명하면 다음과 같다.The present invention solves the difficulties in the new tunnel construction or tunnel expansion as described above to construct a tunnel over the existing tunnel to expand the normal operation without restricting the vehicle traffic into the tunnel from the existing tunnel location Regarding the tunnel extension construction method, it will be described in detail with reference to the accompanying drawings.

도 1 은 기존 터널과 확장 예정 터널 및 굴착장치 배치 정면도.1 is a front view of the existing tunnel and the expansion tunnel and the excavator arrangement.

도 2 는 터널 확장후 기존 터널 제거를 위한 방호장비 설치 확대 정면도.Figure 2 is an enlarged front view of the installation of protective equipment for removing the existing tunnel after the tunnel expansion.

도 3 은 완성된 확장 터널 정면도.3 is a completed elevation tunnel front view.

도 4 는 확장터널 굴착장치 사시도.4 is a perspective view of the expansion tunnel excavator;

도 5 는 기존 터널 철거시 터널내부에 설치하는 방호장비의 확대 사시도.Figure 5 is an enlarged perspective view of the protective equipment installed in the tunnel when the existing tunnel demolition.

*도면 중 주요부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *

1 : 기존 터널 2 : 지반보강 콘크리트층1: existing tunnel 2: ground reinforced concrete layer

4 : 터널굴착장치4: tunnel drilling equipment

5 : 확장 터널5: extension tunnel

8 : 반구형 지붕 9 : 방호장비8: hemispherical roof 9: protection equipment

12 : 기존 터널 외표면 13 : 기존 터널 내부12: Existing tunnel outer surface 13: Existing tunnel inside

101,101a : 지지대 본체 102,102a : 양측 하단부103,103a : 캐터필러 105,105a : 내부공간106,106a : 돔형 보조 지지대 107,107a : 연결봉108 : 붐 이송겸 지지대 109 : 천공롯드110 : 홈형 랙 111 : 피니온112 : 브라켓 113 : 붐114 : 유압장치 116 : 신축 실린더101,101a: Support body 102,102a: Both lower ends 103,103a: Caterpillar 105,105a: Internal space 106,106a: Dome-shaped auxiliary support 107,107a: Connecting rod 108: Boom transfer and support 109: Perforated rod 110: Groove rack 111: Pinion 112: Bracket 113 : Boom 114: Hydraulic system 116: Expansion cylinder

기존 터널(1)위에 확장하고져하는 확장 예정 터널(5)부위를 주열식 연속벽공법, 판넬식연속벽공법, 기타 보강공법 중 어느한가지의 기존의 지반보강 공법에 의해 지반보강 콘크리트층(2)을 형성한 다음, 중앙에 내부공간(105)을 갖는 터널형 지지대 본체(101)와, 그 양측 하단부(102)에 장착되어 그것을 이동하는 한쌍의 캐터필러(103)와, 상기 지지대 본체(101)의 상단 전후에 장착된 한쌍의 돔형 보조 지지대(106) 및 그 보조지지대와 다수개의 연결봉(107)에 의해 연결된 전후 한쌍의 천공롯드(109) 장착용 붐(113) 이송겸 지지대(108)와, 상기 양 붐 이송겸 지지대(108)의 측면에 형성된 홈형 랙(110)에 맞물려 좌우 이동하는 피니온(111)이 내장되고 천공롯드 장착용 붐(113)하단에서 유압에 의해 상하 신축되는 신축 실린더(116)에 연결된 브라켓(112)과, 그 브라켓(112)을 이동시키는 유압장치(114)로 구성되어 등록번호 제10-0402336호로 선출원, 등록된, 도4에 도시된 상세사시도와 같은, 기존의 터널굴착장치(4)를 이용하되, 상기 중앙의 내부공간(105)이 기존 터널(1)의 외표면(12)넓이보다 더 넓은 터널굴착장치(4)를 이용하여 그 터널굴착장치(4)의 내부공간(105)내에 기존 터널(1)이 감싸이도록 굴착장치를 캐터필러(103)에의해 이동시키면서 상기 기존의 터널굴착장치(4)를 이용한 굴착방법으로 확장 예정터널(5)을 굴착한 후, 도5에 도시된 상세사시도와 같이, 내부공간(105a)을 갖는 지지대 본체(101a)와, 그 양측 하단부(102a)에 장착되어 그것을 이동하는 한쌍의 캐터필러(103a)와, 상기 지지대 본체(101a)의 상단 전후에 장착된 한쌍의 돔형 보조지지대(106a) 및 그 보조지지대에 연결된 다수개의 연결봉(107a)이 상기 기존의 터널굴착장치(4)와 동일하고, 상기 다수개의 연결봉(107a)에 기존 터널(1)의 내부(13)보다 작은 외표면을 갖는 반구형 지붕(8)이 장착된 것으로 구성된 차량 및 인원 보호용 방호장비(9)를 기존 터널(1)내에 위치시켜 터널 철거물이 터널바닥으로 낙하하지 않도록 보호한 다음 기존 터널(1)을 통상의 철거방법으로 철거하는 것으로 구성되는 확장터널 시공방법이다.The site to be expanded on the existing tunnel (1) is to be reinforced by the existing ground reinforcement method of any one of the main column continuous wall method, panel continuous wall method, and other reinforcement methods. And a tunnel-shaped support body 101 having an inner space 105 at the center thereof, a pair of caterpillars 103 mounted on both side lower ends 102 and moving thereon, and the support body 101 of the support body 101. A pair of domed auxiliary supports 106 mounted before and after the top and a pair of perforated rods 109 for transporting and supporting 108 for mounting the perforated rod 109 connected by the auxiliary supports and the plurality of connecting rods 107, and both The expansion cylinder 116 is vertically stretched up and down by hydraulic pressure at the lower end of the perforated rod mounting boom 113 is built in the pinion 111 which is engaged with the groove-type rack 110 formed on the side of the boom feed and support 108. Connected bracket 112 and the bracket 112 is moved It is composed of a hydraulic device 114 to be registered using the existing tunnel excavation device 4, such as a detailed perspective view shown in Figure 4, the first application, registered in the registration number 10-0402336, but the central internal space 105 Excavator is used to cover the existing tunnel 1 in the inner space 105 of the tunnel excavator 4 by using the tunnel excavator 4 that is wider than the outer surface 12 of the existing tunnel 1. After excavating the expansion scheduled tunnel (5) by the excavation method using the existing tunnel drilling device (4) while moving by the caterpillar 103, as shown in the detailed perspective view shown in Figure 5, the inner space 105a A support body (101a) having a pair, a pair of caterpillars (103a) mounted on both side lower ends (102a) and moving it, a pair of domed auxiliary supports (106a) mounted before and after an upper end of the support body (101a), and the A plurality of connecting rods (107a) connected to the auxiliary support and the existing tunnel drilling device (4) The vehicle and personnel protection equipment 9 consisting of a plurality of connecting rods (107a) is equipped with a hemispherical roof (8) having an outer surface smaller than the interior (13) of the existing tunnel (1) to the existing tunnel (1) It is located inside the tunnel to protect the tunnel demolition from falling to the tunnel floor, and then the existing tunnel (1) is an extension tunnel construction method consisting of dismantling by the normal demolition method.

미설명부호 104는 높이조절잭이고 115는 장치기판이다.상기 터널천공장치(4)는 상기한 기존의 선등록된 터널천공장치와 동일하지만 장치의 내부공간(105)이 기존 터널(1)의 외표면(12)넓이보다 더 넓어서 기존 터널(1)을 외부에서 감싸면서 터널내로 캐터필러(103)에 의해 이동시켜 굴착작업을 할 수 있고 그 굴착작업을 하는 동안 장치를 이동할 필요없이 장치의 중앙에 확보된 공간(105)을 통하여 터널내로 차량과 인원의 출입이 항상 가능하므로 굴착작업을 중단없이 계속할 수 있고 천공롯드(109)는 붐(113) 하단에서 유압에 의해서 상하 신축되는 신축 실린더(116)에 연결된 브라켓(112)에 내장된 피니언(111)이 홈형 랙(110)과 맞물려서 유압장치(114)에 의해 이송겸 지지대(108)위를 선회하므로 어떤 위치에서도 천공롯드의 이송이 가능하며 높이조절도 실린더(116)에의해 자유자재로 할 수가 있어서 굴착작업이 용이한 장점이 있다.Reference numeral 104 is a height adjustment jack and 115 is a device substrate. The tunnel drilling device 4 is the same as the existing pre-registered tunnel drilling device described above, but the internal space 105 of the device is the same as that of the existing tunnel 1. It is wider than the outer surface 12 so that the existing tunnel 1 can be wrapped outside and moved by the caterpillar 103 into the tunnel for excavation work, and the center of the device can be moved without having to move the device during the excavation work. Through the secured space 105, the entry and exit of vehicles and personnel is always possible, so the excavation work can be continued without interruption, and the drilling rod 109 is stretched up and down by hydraulic pressure at the bottom of the boom 113. The expansion cylinder 116 The pinion 111 built in the bracket 112 connected to the grooved rack 110 is engaged with the pivoting unit 108 by the hydraulic device 114 so that the feed rod can be transported at any position and the height can be adjusted. On cylinder 116 There is an advantage that the excavation work can be easily made freely.

본 발명에서 사용된 지반보강 공법으로는 주열식 연속벽공법(도1 및 2참조)을 사용하였다.또한 확장터널의 굴착작업이 끝나면, 기존 터널(1)의 내부크기보다 외경이 작은 반구형 지붕(8)을 가진, 도5에 도시된 바와같은, 방호장비(9)를 캐터필러(103a)로 이동시켜 기존 터널(1)내부에 설치하여 반구형의 외표면 지붕(8)에의해 철거시 낙하되는 철거폐기물이 터널내 바닥중앙으로 낙하되지 못하도록하므로써 방호장비(9)내로는 사람과 차량이 철거작업중에도 출입할 수 있게 되는 것이다.이에 철거방법은 기존 이용되는 철거방법에 의해 철거하게 된다.As the ground reinforcement method used in the present invention, a column-heated continuous wall method (see FIGS. 1 and 2) was used. After the excavation work of the expansion tunnel, a hemispherical roof having a smaller outer diameter than the inner size of the existing tunnel 1 5, the demolition of the protective equipment (9), as shown in Figure 5, moved to the caterpillar (103a) and installed in the existing tunnel (1) to be dropped during demolition by the hemispherical outer surface roof (8) By preventing waste from falling down to the center of the floor in the tunnel, people and vehicles can enter and exit the protective equipment 9 during the demolition work. The demolition method is demolished by the existing demolition method.

이상과 같이 구성되는 본 발명 확장터널시공방법으로 터널을 확장하게되면 기존 터널내로 차량 통행이 가능하게 현상태로 둔채 그 기존 터널(1)을 감싸는 터널굴착장치(4)로 확장 예정터널을 굴착시공할 수 있는 장점이 있고 따라서 다른 지역에 터널공사를 별도로 하기위해 부지 확보를 할 필요가 없고 별도 용지, 주택, 도로등의 보상이나 시설이 필요없으므로 막대한 예산을 절감할 수 있고 인건비, 장비 및 시공 시간의 절감으로 시공비가 현저하게 절감되는 효과도 있게 된다.When the tunnel is expanded by the present invention, the tunnel construction method as described above can be used to excavate the tunnel to be extended to the tunnel excavation device (4) surrounding the existing tunnel (1) while leaving the vehicle in an existing state to enable traffic. There is an advantage in that it is not necessary to secure the site to separate the tunnel construction in other areas, and there is no need for compensation or facilities such as site, house, road, etc., which can save enormous budget and reduce labor cost, equipment and construction time. In addition, construction costs are significantly reduced.

뿐만 아니라 확장터널 공사가 완료된 후에 기존 터널의 철거도 기존 터널의 크기보다 작은 철거용 방호장비(9)를 기존 터널(1)내에 위치시켜 철거하게되면 터널내로 차량 통행이 유지되면서 철거를 할 수 있고 먼지나 소음이 적게되어 철거작업이 가능하고 단시간에 효과적으로 철거할 수 있는 장점도 있는 것이다.In addition, after the completion of the extension tunnel construction, the demolition of the existing tunnel is also carried out by placing the demolition protective equipment (9) smaller than the size of the existing tunnel in the existing tunnel (1). Less dust and noise is possible to remove the work and there is an advantage that can be effectively removed in a short time.

Claims (1)

기존 터널(1)위에 확장하고져하는 확장 예정 터널(5)부위를 주열식 연속벽공법, 판넬식연속벽공법, 기타 보강공법 중 어느한가지의 기존의 지반보강 공법에 의해 지반보강 콘크리트층(2)을 형성한 다음, 중앙에 내부공간(105)을 갖는 터널형 지지대 본체(101)와, 그 양측 하단부(102)에 장착되어 그것을 이동하는 한쌍의 캐터필러(103)와, 상기 지지대 본체(101)의 상단 전후에 장착된 한쌍의 돔형 보조 지지대(106) 및 그 보조지지대와 다수개의 연결봉(107)에 의해 연결된 전후 한쌍의 천공롯드(109) 장착용 붐(113) 이송겸 지지대(108)와, 상기 양 붐 이송겸 지지대(108)의 측면에 형성된 홈형 랙(110)에 맞물려 좌우 이동하는 피니온(111)이 내장되고 천공롯드 장착용 붐(113)하단에서 유압에 의해 상하 신축되는 신축 실린더(116)에 연결된 브라켓(112)과, 그 브라켓(112)을 이동시키는 유압장치(114)로 구성된 기존의 터널굴착장치(4)를 이용하되, 상기 중앙의 내부공간(105)이 기존 터널(1)의 외표면(12)넓이보다 더 넓은 굴착장치(4)를 이용하여 그 터널굴착장치(4)의 내부공간(105)에 기존 터널(1)이 감싸이도록 굴착장치를 캐터필러(103)에의해 이동시키면서 상기 기존의 터널굴착장치(4)를 이용한 굴착방법으로 확장 예정터널(5)을 굴착한 후, 내부공간(105a)을 갖는 지지대 본체(101a)와, 그 양측 하단부(102a)에 장착되어 그것을 이동하는 한쌍의 캐터필러(103a)와, 상기 지지대 본체(101a)의 상단 전후에 장착된 한쌍의 돔형 보조지지대(106a) 및 그 보조지지대에 연결된 다수개의 연결봉(107a)이 상기 기존의 터널굴착장치(4)와 동일하고, 상기 다수개의 연결봉(107a)에 기존 터널(1)의 내부(13)보다 작은 외표면을 갖는 반구형 지붕(8)으로 구성된 차량 및 인원 보호용 방호장비(9)를 기존 터널(1)내에 위치시켜 터널 철거물이 터널바닥으로 낙하되지 않도록 보호한 다음 기존 터널(1)을 통상의 철거방법으로 철거하는 것으로 구성됨을 특징으로하는 터널 확장 시공방법.The site to be expanded on the existing tunnel (1) is to be reinforced by the existing ground reinforcement method of any one of the main column continuous wall method, panel continuous wall method, and other reinforcement methods. And a tunnel-shaped support body 101 having an inner space 105 at the center thereof, a pair of caterpillars 103 mounted on both side lower ends 102 and moving thereon, and the support body 101 of the support body 101. A pair of domed auxiliary supports 106 mounted before and after the top and a pair of perforated rods 109 for transporting and supporting 108 for mounting the perforated rod 109 connected by the auxiliary supports and the plurality of connecting rods 107, and both The expansion cylinder 116 is vertically stretched up and down by hydraulic pressure at the lower end of the perforated rod mounting boom 113 is built in the pinion 111 which is engaged with the groove-type rack 110 formed on the side of the boom feed and support 108. Connected bracket 112 and the bracket 112 is moved Existing tunnel excavation device (4) consisting of a hydraulic device 114 to use, but the inner space 105 of the center of the excavation device (4) wider than the width of the outer surface 12 of the existing tunnel (1) By expanding the excavation device by the caterpillar 103 so that the existing tunnel 1 is wrapped in the inner space 105 of the tunnel excavation device 4 by using the existing tunnel excavation device 4 After excavating the predetermined tunnel 5, a support body 101a having an internal space 105a, a pair of caterpillars 103a mounted at both lower ends 102a and moving it, and the support body 101a. A pair of dome-shaped auxiliary supports 106a mounted at the front and rear of the upper and the plurality of connecting rods 107a connected to the auxiliary supports are the same as the existing tunnel excavation device 4, and the existing tunnels to the plurality of connecting rods 107a. A car consisting of a hemispherical roof 8 having an outer surface smaller than the interior 13 of (1) And a protective equipment (9) for personnel protection in the existing tunnel (1) to protect the tunnel demolition from falling to the tunnel floor, and then to the existing tunnel (1) by demolishing the tunnel Expansion construction method.
KR10-2001-0073326A 2001-11-23 2001-11-23 Process for enlarging tunnels KR100446543B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2001-0073326A KR100446543B1 (en) 2001-11-23 2001-11-23 Process for enlarging tunnels

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2001-0073326A KR100446543B1 (en) 2001-11-23 2001-11-23 Process for enlarging tunnels

Publications (2)

Publication Number Publication Date
KR20020001688A KR20020001688A (en) 2002-01-09
KR100446543B1 true KR100446543B1 (en) 2004-09-01

Family

ID=19716242

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2001-0073326A KR100446543B1 (en) 2001-11-23 2001-11-23 Process for enlarging tunnels

Country Status (1)

Country Link
KR (1) KR100446543B1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100439605B1 (en) * 2001-11-23 2004-07-12 구영숙 Auto cleaner for domes of tunnels
KR102213469B1 (en) * 2019-03-19 2021-02-09 한국철도기술연구원 Apparatus for extension work of tunnel and method for expansion work of tunnel using the same

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01187285A (en) * 1988-01-20 1989-07-26 Mitsui Eng & Shipbuild Co Ltd Width-widening excavation work for tunnel
JPH01315586A (en) * 1988-03-24 1989-12-20 Ing Giovanni Rodio & C Impresa Costruzioni Speciali Spa Method and device for expanding diameter of tunnel
JPH0510100A (en) * 1991-02-05 1993-01-19 Taisei Corp Transporation device of tunnel repairing panel
JPH10252376A (en) * 1997-03-10 1998-09-22 Taisei Corp Hot line tunnel widening device and widening method
JPH11229789A (en) * 1998-02-16 1999-08-24 Taisei Corp Tunnel repairing and widening device
JPH11229751A (en) * 1998-02-17 1999-08-24 Taisei Corp Widening device for existing tunnel
JP2000257368A (en) * 1999-03-11 2000-09-19 Taisei Corp Widening construction method for existing tunnel
KR20010090040A (en) * 2001-08-22 2001-10-18 김상록 Installation for drilling Tunnel

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01187285A (en) * 1988-01-20 1989-07-26 Mitsui Eng & Shipbuild Co Ltd Width-widening excavation work for tunnel
JPH01315586A (en) * 1988-03-24 1989-12-20 Ing Giovanni Rodio & C Impresa Costruzioni Speciali Spa Method and device for expanding diameter of tunnel
JPH0510100A (en) * 1991-02-05 1993-01-19 Taisei Corp Transporation device of tunnel repairing panel
JPH10252376A (en) * 1997-03-10 1998-09-22 Taisei Corp Hot line tunnel widening device and widening method
JPH11229789A (en) * 1998-02-16 1999-08-24 Taisei Corp Tunnel repairing and widening device
JPH11229751A (en) * 1998-02-17 1999-08-24 Taisei Corp Widening device for existing tunnel
JP2000257368A (en) * 1999-03-11 2000-09-19 Taisei Corp Widening construction method for existing tunnel
KR20010090040A (en) * 2001-08-22 2001-10-18 김상록 Installation for drilling Tunnel

Also Published As

Publication number Publication date
KR20020001688A (en) 2002-01-09

Similar Documents

Publication Publication Date Title
CN110593881A (en) Method for realizing large-section underground space excavation by using small-section combined jacking pipe
CN108425678A (en) Construction method of large-section subway crossover tunnel
JPH01315586A (en) Method and device for expanding diameter of tunnel
JP3586864B2 (en) Underground structure construction method and elevated traffic path
KR100446543B1 (en) Process for enlarging tunnels
JP4144702B2 (en) How to build an enlarged tunnel
JP3864377B2 (en) Existing tunnel widening method
JP3107458U (en) Work floor for shaft construction and its mounting device
JP3996818B2 (en) Work truck for tunnel widening work
CN211178169U (en) Protection device for small-size tunnel blasting construction in city
JPH0483089A (en) Lifting gear of rod body for erecting sand guard frame and engineering method of erecting and removing sand guard frame in adit work using lifting gear
JP2656892B2 (en) Underground structure construction method and continuous underground wall construction method
JPH11229751A (en) Widening device for existing tunnel
JP3996597B2 (en) Open shield machine and open shield method using it
JP3348052B2 (en) Open shield machine
KR100402236B1 (en) Installation for drilling Tunnel
JP2003269073A (en) Extension method of existing tunnel making use of mobile working platform
US5199817A (en) Process of providing an elongate underground cavity
JP2967508B2 (en) Scaffolding equipment for wall work
KR20000074753A (en) Shield tunneling apparatus and method
CN116378677B (en) Tunnel construction method and tunnel structure of full-span filling karst cave section
KR100777777B1 (en) Earthwork temporary ramp using mainsteel structure
JP2001123798A (en) Work method in tunnel
JP2668109B2 (en) Construction method for underground structures
CN209760296U (en) rail transit does not have post station system of building

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20070823

Year of fee payment: 4

LAPS Lapse due to unpaid annual fee