KR100372313B1 - Process for Constructing Containg Wall with Blocks - Google Patents

Process for Constructing Containg Wall with Blocks Download PDF

Info

Publication number
KR100372313B1
KR100372313B1 KR10-2000-0049559A KR20000049559A KR100372313B1 KR 100372313 B1 KR100372313 B1 KR 100372313B1 KR 20000049559 A KR20000049559 A KR 20000049559A KR 100372313 B1 KR100372313 B1 KR 100372313B1
Authority
KR
South Korea
Prior art keywords
block
retaining wall
acupressure
plate
constructing
Prior art date
Application number
KR10-2000-0049559A
Other languages
Korean (ko)
Other versions
KR20020016298A (en
Inventor
성낙영
Original Assignee
주식회사 팸택
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 팸택 filed Critical 주식회사 팸택
Priority to KR10-2000-0049559A priority Critical patent/KR100372313B1/en
Publication of KR20020016298A publication Critical patent/KR20020016298A/en
Application granted granted Critical
Publication of KR100372313B1 publication Critical patent/KR100372313B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0266Retaining or protecting walls characterised by constructional features made up of preformed elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0233Retaining or protecting walls comprising retention means in the backfill the retention means being anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0051Including fibers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Retaining Walls (AREA)

Abstract

본발명은 절취면을 지압판들로서 안정화시키고 뒷채움되는 토사는 별도의 마감블록들로서 지탱하고 마감되도록 시공하여서, 지압판의 설치작업 여건을 개선시켜서 시공성 및 안정성을 획기적으로 향상시켜 주며, 시공조건에 맞추어서 뒷채움된 토사를 다짐장비로서 확실하게 기계다짐할 수 있도록 하여서 우수한 시공품질을 유지할 수 있도록 하는 블록조적식 옹벽의 시공방법에 관한 것이다.The present invention stabilizes the cutting surface as acupressure plates and constructs the backfilled soil to be supported and finished as separate finishing blocks, thereby improving the workability of the acupressure plate and dramatically improving workability and stability. The present invention relates to a method for constructing a block retaining retaining wall for maintaining a good construction quality by enabling the machine to be compactly machined as soil compaction equipment.

본발명의 기술구성상의 특징은; 옹벽(100)을 구축하기 위한 해당위치의 상부로부터 최하부 바닥까지 소정의 높이로 나누어 절토한 후에 들어난 절취면(1)에 대하여 지중에 관입된 앵커볼트(20) 및 조임너트(30)로서 지압판(10)을 등간격마다 고정 설치하여서 압축하는 작업을 반복하되, 유연하게 펼치거나 접을 수 있도록 만들어진 블록지지체(40)들을 상기 지압판(10)들로서 고정시키면서 둘둘 말아서 설치하고, 상기 지압판(10)들이 설치된 절취면으로부터 뒷채움 공간을 감안하여서 일정한 거리만큼 떨어진 최하부 바닥에 기초받침(50)을 수평하게 설치하며, 상기 기초받침(50)의 상면에 소정의 높이로 마감블록(60)들을 쌓아서 뒷채움한 후에 그 마감블록(60)들 사이에 블록지지체(40)들의 자유단을 끼워서 지지되도록 적층시키는 작업을 반복하여서 시공한 것이다.Features of the technical construction of the present invention; Acupressure plate as anchor bolt 20 and tightening nut 30 penetrated into the ground with respect to the cut-out surface 1 which came in after cutting by dividing by a predetermined height from the top to the bottom of the corresponding position for constructing the retaining wall 100. (10) is fixed to install at regular intervals to repeat the operation, but the block supporters 40 made to be flexible to expand or fold, while fixed as the acupressure plate (10) to be rolled up and installed, the acupressure plate (10) The base support 50 is horizontally installed on the bottom of the bottom by a predetermined distance in consideration of the backfill space from the installed cutting surface, and after filling the finishing blocks 60 by stacking the finishing blocks 60 at a predetermined height on the upper surface of the base support 50. The construction is repeated by stacking the free ends of the block supporters 40 between the finishing blocks 60 to be supported.

Description

블록조적식 옹벽의 시공방법{Process for Constructing Containg Wall with Blocks}Process for Constructing Containg Wall with Blocks}

본발명은 산간지역의 비탈면에 옹벽을 구축하기 위한 것으로, 특히 절취면을 지압판으로 압축하여서 안정화시키고 별도의 마감블록을 적층시켜서 시공하는 블록조적식 옹벽의 시공방법에 관한 것이다.The present invention is to build a retaining wall on the slope of a mountainous area, and more particularly, to a method of constructing a block-type retaining wall that is constructed by compressing the cut surface with a pressure plate and stacking a separate finishing block.

산간지역의 비탈면을 보호하기 위한 옹벽은 주로 현장타설 콘크리트방법으로 구축하여 왔으나, 이 현장타설 콘크리트 옹벽공법은 거푸집을 설치하고 해체하는 데 과도한 작업인원이 소요되어서 경제적인 시공을 저해하게 될 뿐만 아니라, 거푸집 내에 타설된 콘크리트 옹벽이 완전히 경화 양생되기까지 거푸집을 존치시키게 되므로 공사기간이 연장되는 등의 문제점을 수반하게 되었다.Retaining walls to protect slopes in mountain areas have been mainly constructed by cast-in-place concrete method, but this cast-in-place concrete retaining wall method requires excessive working personnel to install and dismantle formwork, and impedes economic construction. As the concrete retaining wall placed in the formwork retains the formwork until it is completely cured and cured, it is accompanied by problems such as an extended construction period.

상기한 현장타설 콘크리트 옹벽공법의 문제점을 해소하고자 지압판을 이용한 옹벽공법이 개발되어서 공사현장에서 폭넓게 활용되고 있다. 이 지압판을 이용한 옹벽공법은 절토된 비탈면에 소정의 위치마다 앵커구멍들을 굴착한 후에 그 앵커구멍들의 내부에 앵커볼트들을 삽입하여 양생시키는 앵커볼트 매립공정과, 앵커볼트의 자유단부에 지압판을 끼워맞추고 체결너트를 채워서 고정시키는 지압판의 설치공정과, 상기 지압판과 절취사면 사이의 틈새에 토사를 채워넣고 다짐하는 토사뒷채움공정을 하부로부터 상부로 순차적으로 수행하여서 옹벽시공을 완료하게 되었다.In order to solve the problems of the cast-in-place concrete retaining wall method, a retaining wall method using acupressure plate has been developed and widely used in construction sites. In the retaining wall method using the pressure plate, an anchor bolt embedding process is carried out by excavating anchor holes at predetermined positions on a cut slope, and then inserting anchor bolts into the anchor holes to cure them. The retaining wall construction was completed by sequentially performing the installation process of the acupressure plate to fill and fasten the fastening nut, and the earth and sand backfill process to fill and fix the soil in the gap between the pressure plate and the cutting slope from the bottom to the top.

이와 같은 지압판을 이용한 옹벽공법에 의하면, 절취사면에 수평하게 천공된 앵커구멍을 통하여 긴장되게 설치되는 앵커볼트로서 고정된 지압판이 뒷채움된 토사와 함께 절취사면 전체를 압축하도록 시공되므로, 절취사면을 보호하여서 붕괴됨을 방지하여 줄 뿐만 아니라, 거푸집을 조립하고 해체하는 데 소요되는 불필요한 작업량 및 작업시간을 감축시켜서 경제적으로 시공할 수 있도록 하여 주는 등의 장점을 가지는 것이 사실이다.According to the retaining wall method using the acupressure plate, as the anchor bolt is tensioned to be installed through the anchor hole drilled horizontally on the cut slope, the fixed pressure plate is constructed to compress the entire cut slope together with the backfilled soil, thereby protecting the cut slope. It is true that it not only prevents collapse, but also reduces the amount of work and time required for assembling and dismantling formwork, thereby enabling economical construction.

그러나, 이와 같이 지압판을 이용한 옹벽공법은 지압판들 및 앵커볼트들로서 뒷채움된 토사와 함께 절취사면 전체를 압축하고 마감하여 주도록 시공하게 되므로 다음과 같은 결과를 초래하게 되었다.However, the retaining wall method using acupressure plate was constructed to compress and finish the entire cut surface along with the earth filled with acupressure plates and anchor bolts, resulting in the following results.

즉, 뒷채움된 토사와 함께 절취사면을 압축하여서 마감하여 주기 위해서는 가급적 압축면적이 넓은 지압판들을 틈새없이 밀착되도록 설치하여야 하는 시공조건을 만족시켜야 하기 때문에, 비교적 부피가 크고 중량인 지압판을 사용하게 될 뿐만 아니라 중량의 지압판을 일일이 장비로 운반하고 설치하게 되어서 시공성이 저하되는 문제점이 있었으며, 지압판들을 장비로 운반하여서 서로 밀착되도록 설치하는 과정에서 안전사고의 위험성이 상존하게 되고, 지압판들을 서로 부딪혀서 파손시키게 되는 등의 문제점이 있었다.In other words, in order to finish the cut slope together with the backfilled soil, it is necessary to satisfy the construction conditions in which the pressure plates with a large compressed area should be closely adhered to each other without gaps. Therefore, a relatively large and heavy pressure plate is used. However, there was a problem in that the workability is degraded by carrying and installing the acupressure plate of the weight to the equipment one by one, and the risk of safety accidents exist in the process of installing the acupressure plates to be in close contact with each other. There was a problem.

더욱이, 서로 밀착되게 설치된 지압판을 고정시켜 주는 앵커볼트들은 절취사면과 지압판 사이의 뒷채움 공간에 촘촘히 노출되어서 다짐장비의 반입 및 이동을 방해하기 때문에, 작업자가 뒷채움 공간에 채워진 토사를 다짐장비로서 기계다짐하는 데 커다란 어려움을 겪게 될 뿐만 아니라, 이로 인하여 다짐작업을 확실하게 실시하지 못하고 대충하여서 부실시공을 야기시키는 등의 심각한 문제점이 있었다.Furthermore, the anchor bolts that hold the pressure plates installed in close contact with each other are closely exposed to the backfill space between the cutting slope and the pressure plate, which hinders the carry-in and movement of compaction equipment. Not only do they have great difficulty in doing this, but because of this, there was a serious problem such as failing to reliably carry out the compacting work and causing rough construction.

본발명은 절취면을 지압판들로서 안정화시키고 뒷채움되는 토사는 별도의 마감블록들로서 지탱하고 마감되도록 시공하여서, 첫째 지압판의 설치작업 여건을 개선시켜서 시공성 및 안정성을 획기적으로 향상시켜 주며, 둘째 시공조건에 맞추어서 뒷채움된 토사를 다짐장비로서 확실하게 기계다짐할 수 있도록 하여서 우수한 시공품질을 유지할 수 있도록 하는 블록조적식 옹벽의 시공방법을 제공하는 데 그 목적이 있다.The present invention stabilizes the cutting surface as acupressure plates and constructs the backfilled soil to be supported and finished as separate finishing blocks. First, it improves the installation work conditions of the acupressure plate and dramatically improves the workability and stability. The purpose of the present invention is to provide a method for constructing a retaining wall for block masonry to ensure that the backfilled soil is compactly machined as compaction equipment to maintain excellent construction quality.

도1은 본발명 블록조적식 옹벽의 시공예를 나타낸 것임Figure 1 shows the construction of the block retaining wall of the present invention

도2a, 도2b, 도2c는 본발명 블록조적식 옹벽 시공에 따른 단계별 작업공정을 순서대로 나타낸 것임Figure 2a, Figure 2b, Figure 2c is a step-by-step work process according to the construction of the retaining wall construction of the present invention in order

도3은 본발명 블록조적식 옹벽의 시공예를 나타낸 요부발췌 사시도Figure 3 is a perspective view showing the excerpts showing the construction example of the block-mounted retaining wall of the present invention

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

1: 절취면 10: 지압판 11: 평판부1: cutting surface 10: pressure plate 11: plate

12: 연결판부 13: 조립구멍 20: 앵커볼트12: connecting plate portion 13: assembly hole 20: anchor bolt

30: 조임너트 40: 블록지지체 41: 섬유사30: tightening nut 40: block support 41: fiber yarn

42: 줄눈 50: 기초받침 60: 마감블록42: joint 50: foundation 60: finishing block

61: 요입홈 62: 결합홈부 C: 채움재61: concave groove 62: coupling groove C: filling material

본발명의 블록조적식 옹벽의 시공방법은Block construction retaining wall construction method of the present invention

옹벽(100)을 구축하기 위한 해당위치의 상부로부터 최하부 바닥까지 소정의 높이로 나누어 절토한 후에 들어난 절취면(1)에 대하여 지중에 관입된 앵커볼트(20) 및 조임너트(30)로서 지압판(10)을 등간격마다 고정 설치하여서 압축하는 작업을 반복하되, 유연하게 펼치거나 접을 수 있도록 만들어진 블록지지체(40)들을 상기 지압판(10)들로서 고정시키면서 둘둘 말아서 설치하고, 상기 지압판(10)들이 설치된 절취면으로부터 뒷채움 공간을 감안하여서 일정한 거리만큼 떨어진 최하부 바닥에 기초받침(50)을 수평하게 설치하며, 상기 기초받침(50)의 상면에 소정의 높이로 마감블록(60)들을 쌓아서 뒷채움한 후에 그 마감블록(60)들 사이에 블록지지체(40)들의 자유단을 끼워서 지지되도록 적층시키는 작업을 반복하여서 시공함을 기술구성상의 특징으로 한다.Acupressure plate as anchor bolt 20 and tightening nut 30 penetrated into the ground with respect to the cut-out surface 1 which came in after cutting by dividing by a predetermined height from the top to the bottom of the corresponding position for constructing the retaining wall 100. (10) is fixed to install at regular intervals to repeat the operation, but the block supporters 40 made to be flexible to expand or fold, while fixed as the acupressure plate (10) to be rolled up and installed, the acupressure plate (10) The base support 50 is horizontally installed on the bottom of the bottom by a predetermined distance in consideration of the backfill space from the installed cutting surface, and after filling the finishing blocks 60 by stacking the finishing blocks 60 at a predetermined height on the upper surface of the base support 50. The construction is repeated by laminating the free end of the block supporting members 40 between the finishing blocks 60 so as to be supported.

다시말해서, 본발명은 도1의 도시와 같이 비탈면을 절토하여서 불안정하게 들어난 절취면은 등간격마다 설치되는 지압판(10)들로서 압축하여서 안정화시키고, 그 절취면의 전방에 지압판(10)들로서 고정된 각각의 블록지지체(40)에 의하여 지지되도록 적층된 마감블록(60)들로서 뒷채움 공간에 채워진 토사를 지탱하고 마감하여 주도록 시공하게 되는 것이다.In other words, the present invention cuts the inclined surface unstable by cutting the slope as shown in Fig. 1 is stabilized by compressing as the pressure plate (10) installed at equal intervals, and fixed as the pressure plate (10) in front of the cutting surface Finished blocks 60 are laminated to be supported by each block support 40 is to be constructed to support and finish the soil filled in the back-filling space.

따라서, 본발명의 블록조적식 옹벽의 시공방법에 의하면, 부피와 중량이 상대적으로 작은 지압판(10)들을 등간격마다 설치하여서 불안전한 절취면을 안정화시킬 수 있기 때문에, 지압판(10)을 운반하고 설치하는 작업을 상대적으로 용이하게 수행할 수 있을 뿐만 아니라, 지압판(10)의 설치과정에서 안전사고의 위험성을 줄여주면서도 지압판(10)들이 서로 부딪혀서 파손됨을 방지하여 주는 장점을 가지게 되는 것이다.Therefore, according to the construction method of the block-mounted retaining wall of the present invention, since the pressure plate 10 having a relatively small volume and weight can be installed at equal intervals, the unsafe cutting surface can be stabilized, thereby carrying the pressure plate 10. Not only can the installation work be performed relatively easily, but it also has the advantage of preventing the acupressure plate 10 from colliding with each other while reducing the risk of a safety accident during the installation of the acupressure plate 10.

또, 절취면의 전방에 별도의 마감블록(60)들을 블록지지체(40)들로서 지지되도록 적층시키면서 뒷채움 공간에 채워진 토사를 앵커볼트에 의하여 방해받지 않고 다짐장비를 사용하여서 기계다짐할 수 있기 때문에, 뒷채움시에 다짐작업을 효과적으로 확실하게 수행하여서 부실시공을 미연에 방지하여 주는 등의 장점을 가지게 되는 것이다.In addition, because the sediment filled in the backfill space can be machined by using the compacting equipment without being disturbed by the anchor bolt while stacking the separate finishing blocks 60 to be supported as the block supports 40 in front of the cutting surface, It will have the advantage of preventing compaction work by performing the compaction work effectively and reliably at the time of back filling.

이하, 첨부도면에 도시되는 구체적인 실시예를 통하여 본발명의 기술내용을 상세히 설명하면 다음과 같다.Hereinafter, the technical details of the present invention through the specific embodiments shown in the accompanying drawings in detail as follows.

도2a는 예정된 작업위치에 상부로부터 최하부 바닥까지 앵커볼트(20) 및 조임너트(30)로서 지압판(10)을 설치하면서 그 지압판들로서 블록지지체(40)들을 고정시켜서 설치하는 작업공정을 나타내고 있다.FIG. 2A shows a working process of fixing the block supporting bodies 40 as the pressure plate while installing the pressure plate 10 as the anchor bolt 20 and the tightening nut 30 from the top to the bottom bottom in the predetermined working position.

본발명의 실시예에서 상기 지압판(10)들은 절취면(1)에 대하여 일정간격을 두고 상하방향으로 교대로 엇갈리게 배열되도록 설치하고, 상기 블록지지체(40)들의 중간부를 서로 이웃하는 지압판(10)에 고정시켜서 상하로 수평하게 펼치거나 말아접을 수 있도록 설치하여서 된 것으로 예시하고 있다. 이는, 상기 지압판(10)들 및 블록지지체(40)들의 설치 수량을 최소한으로 감축시킬 수 있도록 하는 동시에, 상기 지압판(10)은 절취면(1)을 상기 블록지지체(40)는 마감블록(60)을 견실하게 지탱하여 주는 역할을 충실히 수행할 수 있도록 하는 데 도움이 된다.In the embodiment of the present invention, the pressure plate 10 is installed to be alternately arranged alternately in the vertical direction at a predetermined interval with respect to the cutting surface (1), the pressure plate 10 adjacent to the middle of the block support 40 It is exemplified by being installed in such a way that it is fixed to the top and bottom horizontally or rolled up. This can reduce the installation quantity of the acupressure plate 10 and the block support 40 to a minimum, while the acupressure plate 10 is the cutting surface 1 and the block support 40 is the finishing block 60 It helps us to faithfully fulfill our role of sustaining).

여기에서, 상기 블록지지체(40)의 양단부는 서로 이웃하는 지압판(10)들을 고정하여 주는 앵커볼트(20)에 끼워져서 임의로 이탈됨을 방지하여 주도록 설치함이 바람직하다.Here, it is preferable that both ends of the block support 40 are fitted to the anchor bolt 20 for fixing the pressure plate 10 adjacent to each other so as to prevent it from being detached arbitrarily.

상기 지압판(10)들은 절취면(1)을 뚫어서 천공한 굴착공(2)내에 그라우트액(3)으로서 고정시킨 앵커볼트(20)의 자유단에 끼워맞추고, 그 지압판(10)을 관통한 앵커볼트(20)의 자유단에 체결되는 조임너트(30)를 조여서 절취면(1)에 대하여 확실하게 압축력이 발휘되도록 설치한다. 이와 같이 설치되는 지압판(10)들은 절토한 후에 들어난 일부분의 절취면(1)을 압축하여서 안정화시킨 후에, 그 하부에 다시 절토하여서 들어난 일부분의 절취면(1)을 압축하여서 안정화시키는 작업을 반복하여서, 절취면(1) 전체를 바닥면에 대하여 수직에 가깝게 유지되도록 시공할 수 있기 때문에, 옹벽(100) 설치시에 소요되는 점유공간을 최소화하여 주는 부수적인 이점을 기대할 수 있게 된다.The acupressure plate 10 is fitted to the free end of the anchor bolt 20 fixed as grout liquid 3 in the drilling hole 2 drilled through the cutting surface (1), the anchor penetrating the acupressure plate 10 Tighten the tightening nut 30 fastened to the free end of the bolt 20 so that the compression force can be reliably exerted on the cutting surface 1. The acupressure plate 10 installed as described above is stabilized by compressing and stabilizing a part of the cutting surface 1 which has been cut after cutting, and then compressing and stabilizing a part of the cutting surface 1 which has been cut by cutting the lower part again. Repeatedly, because the entire cutting surface (1) can be constructed so as to be maintained close to the vertical to the floor surface, it can be expected an additional advantage of minimizing the occupied space required when installing the retaining wall (100).

그리고, 상기 지압판(10)들과 굴토된 절취면(1) 사이의 틈새를 채움재(C)로 메꾸어 주도록 함이 바람직하다. 그 이유는, 상기 지압판(10)들을 절취면(1)에 대하여 틈새없이 밀착시켜서 균일한 압축력으로서 더욱 효과적으로 안정화시켜 주도록 하기 위함이다. 이때, 상기 채움재(C)로는 토사를 사용할 수도 있으며 필요에 따라서 시멘트몰탈이 사용될 수도 있음을 밝혀 둔다.Then, it is preferable to fill the gap between the acupressure plate 10 and the excavated cutting surface 1 with the filling material (C). The reason for this is to keep the pressure plate 10 in close contact with the cutting surface 1 without any gap so as to more effectively stabilize it with a uniform compressive force. At this time, as the filling material (C) it may be used for the earth and sand it is revealed that the cement mortar may be used if necessary.

또한, 상기 지압판(10)들은 도3의 도시와 같이 일정간격을 두고 서로 마주하는 한쌍의 평판부(11)의 중간에 조립구멍(13)이 뚫어진 연결판부(12)가 일체로 연이어져서, 그 평판부(11)들 사이의 연결판부(12)를 기준으로 양측에 빈공간들이 확보되도록 형성하여서 된 것으로 예시하고 있다. 이러한 지압판(10)들은 그 자체의 무게를 최대한 경량화하여 주어서 운반 및 설치작업을 용이하게 수행하는 데 도움이 된다.In addition, the acupressure plate 10 is connected to the connecting plate portion 12 in which the assembly hole 13 is drilled in the middle of the pair of flat plate portions 11 facing each other at a predetermined interval as shown in FIG. It is illustrated that the empty spaces are formed on both sides with respect to the connection plate part 12 between the flat plate parts 11. These acupressure plate 10 is to give the weight of the weight itself as much as possible to facilitate the carrying and installation work.

상기 블록지지체(40)들은 절취면(1)에 설치되는 지압판(10)들로서 고정되도록 설치하여서, 이후에 절취면(1)의 전방에 적층되는 마감블록(60)들을 견실하게 지지하여 주는 역할을 수행한다.The block supports 40 are installed to be fixed as the acupressure plates 10 installed on the cutting surface 1, and thus serve to firmly support the finishing blocks 60 stacked in front of the cutting surface 1. Perform.

그리고, 상기 블록지지체(40)들은 도3의 도시와 같이 섬유사(41)를 종횡으로 직조하여 일정한 크기의 줄눈(42)들을 가지는 망체형으로서 유연하게 펼치거나 접을 수 있도록 만들어지도록 함이 중요하다. 그 이유는, 상기 블록지지체(40)를 설치할 때에 일단 지압판(10)에 말아서 고정시켜 두었다가 뒷채움작업 후에 수평하게 펼쳐서 적층되는 마감블록(60)을 지지하여 줄 수 있도록 하여서, 뒷채움작업시에 일단 채워진 토사를 다짐장비로서 기계다짐하는 데 지장이 없도록 하고, 뒷채움된 토사내에 일체성있게 매립되도록 하기 위함이다.In addition, it is important that the block supports 40 are made of a mesh type having joints 42 having a predetermined size by weaving the fiber yarn 41 vertically and horizontally as shown in FIG. . The reason is that, when the block support 40 is installed, it is rolled and fixed to the pressure plate 10 once, and then supported to finish the finishing block 60 which is horizontally laid and stacked after the back filling operation, so that it is filled once during the back filling operation. This is to prevent the soil from being compacted as a compaction equipment and to be integrally embedded in the filled soil.

도2b는 절취면(1) 전방의 최하부 바닥에 기초받침(50)을 설치하는 작업공정을 나타고 있다.FIG. 2B shows the working process of installing the foundation base 50 on the bottom bottom in front of the cutting surface 1.

본발명의 실시예에서 상기 기초받침(50)은 뒷채움 공간을 감안하여 절취면으로부터 일정한 거리만큼 떨어진 최하부 바닥을 터파기한 후에, 잡석을 채우고 다짐하여서 설치한 것으로 예시하고 있다. 이는, 터파기하여서 들어난 최하부 바닥에 잡석을 채우고 다짐하여서 후속되는 마감블록(60)의 적층작업을 지체함이 없이 곧바로 수행할 수 있는 이점을 가지게 되는 것이다.In the embodiment of the present invention, the base support 50 is exemplified by filling the rubble and compacted after breaking the bottom of the bottom away from the cutting surface by a certain distance in consideration of the backfill space. This has the advantage that it is possible to immediately carry out the laminating work of the finishing block 60 by filling and compacting the rubble at the bottom of the bottom, and without delay.

여기에서, 상기 기초받침(50)은 필요에 따라서 터파기하여서 들어난 최하부 바닥에 미경화콘크리트를 타설하고 경화 양생시켜서 설치할 수도 있음을 밝혀 둔다.Here, it is to be noted that the foundation support 50 may be installed by curing and curing curing the uncured concrete at the bottom of the bottom, which is broken through as necessary.

도2c는 최하부 바닥에 설치된 기초받침(50)의 상면에 하부로부터 상부까지 마감블록(60)들을 적층시키면서 뒷채움하는 작업공정을 나타내고 있다.Figure 2c shows a working process of backfilling by stacking the finishing blocks 60 from the bottom to the top on the upper surface of the base support 50 installed on the bottom bottom.

본발명의 실시예에서 상기 마감블록(60)들은 기초받침(50)의 상면에 일정한 높이만큼 나누어서 마감블록(60)들을 길이쌓기하고, 확보된 뒷채움 공간에 토사를 채우고 다짐하는 뒷채움작업을 수행하며, 상기 지압판(10)들을 통하여 말아진 상태로 고정되어 있는 블록지지체(40)를 펼쳐서 마감블록(60)의 상부에 배치시킨 후에, 그 블록지지체(40)들이 사이에 끼워지도록 다시 마감블록(60)을 쌓아서 뒷채움하는 작업을 반복하여서 적층한 것으로 예시하고 있다.In the embodiment of the present invention, the finishing blocks 60 are divided by a predetermined height on the upper surface of the base support 50 to stack the length of the finishing blocks 60, and performs the back filling operation to fill and compact the soil in the secured back filling space After unfolding and placing the block support 40 fixed in the rolled state through the acupressure plate 10 on the top of the finishing block 60, the block support 40 is again closed so that the block supports 40 are sandwiched therebetween. ) Is repeated by stacking the backfilling process.

그리고, 상기 마감블록(60)들은 도3의 도시와 같이 전체적으로 직사각형으로서 상부면에는 요입홈(61)을 그 하부면에는 결합돌부(62)를 각각 형성하여서, 상기 마감블록(60)들을 상하로 끼워맞춰서 견고하게 조립되도록 함이 바람직하다.The finishing blocks 60 are generally rectangular as shown in FIG. 3, and each of the finishing blocks 60 is formed in the upper surface thereof with recessed grooves 61 in the upper surface thereof, and coupling protrusions 62 in the lower surface thereof. It is desirable to fit and securely assemble.

또한, 상기 마감블록(60)들이 적층된 뒷채움 공간에는 그 마감블록의 배면에 가까이에 일정한 두께로서 잡석을 채우고 그 잡석으로부터 다시 배수토를 채워서 빗물이나 침출수 등을 원할하게 배수시킬 수 있도록 함이 바람직하다.In addition, in the backfill space in which the finishing blocks 60 are stacked, it is preferable to fill the rubble with a constant thickness close to the rear surface of the finishing block and to drain the reclaimed soil from the rubble so that rainwater or leachate can be smoothly drained. Do.

이상에서 살펴 본 바와 같이, 본발명은 절취면을 지압판들로서 안정화시키고 뒷채움되는 토사는 별도의 마감블록들로서 지탱하고 마감되도록 시공하여서, 부피와 중량이 상대적으로 작은 지압판들을 등간격마다 설치하여 불안정한 절취면을 안정화시켜 주므로 시공능률이 향상되며, 뒷채움작업시 다짐장비로서 확실하게 기계다짐할 수 있도록 하여서 부실시공을 방지하여 주는 등의 효과를 가지게 되는 것이다.As described above, the present invention stabilizes the cutting surface as acupressure plate and constructs the backfilled soil to be supported and finished as separate finishing blocks, and installs acupressure plates having relatively small volume and weight at equal intervals. Since it stabilizes the construction efficiency, the construction efficiency is improved, and it is possible to reliably make the machine compact as a compaction equipment during the backfilling operation, thereby preventing the secondary construction work.

Claims (6)

옹벽(100)을 구축하기 위한 해당위치의 상부로부터 최하부 바닥까지 소정의 높이로 나누어 절토한 후에 들어난 절취면(1)에 대하여 지중에 관입된 앵커볼트(20) 및 조임너트(30)로서 지압판(10)을 등간격마다 고정 설치하여서 압축하는 작업을 반복하되, 유연하게 펼치거나 접을 수 있도록 만들어진 블록지지체(40)들을 상기 지압판(10)들로서 고정시키면서 둘둘 말아서 설치하고, 상기 지압판(10)들이 설치된 절취면으로부터 뒷채움 공간을 감안하여서 일정한 거리만큼 떨어진 최하부 바닥에 기초받침(50)을 수평하게 설치하며, 상기 기초받침(50)의 상면에 소정의 높이로 마감블록(60)들을 쌓아서 뒷채움한 후에 그 마감블록(60)들 사이에 블록지지체(40)들의 자유단을 끼워서 지지되도록 적층시키는 작업을 반복하여서 시공함을 특징으로 하는 블록조적식 옹벽의 시공방법.Acupressure plate as anchor bolt 20 and tightening nut 30 penetrated into the ground with respect to the cut-out surface 1 which came in after cutting by dividing by a predetermined height from the top to the bottom of the corresponding position for constructing the retaining wall 100. (10) is fixed to install at regular intervals to repeat the operation, but the block supporters 40 made to be flexible to expand or fold, while fixed as the acupressure plate (10) to be rolled up and installed, the acupressure plate (10) The base support 50 is horizontally installed on the bottom of the bottom by a predetermined distance in consideration of the backfill space from the installed cutting surface, and after filling the finishing blocks 60 by stacking the finishing blocks 60 at a predetermined height on the upper surface of the base support 50. Of the block-shaped retaining wall, characterized in that the construction by repeating the laminating operation to sandwich the free end of the block supports 40 between the finishing blocks 60 Construction method. 제1항에 있어서, 상기 지압판(10)들은 절취면(1)에 대하여 일정간격을 두고 상하방향으로 교대로 엇갈리게 배열되도록 설치하고, 상기 블록지지체(40)들의 중간부를 서로 이웃하는 지압판(10)에 고정시켜서 상하로 수평하게 펼치거나 말아접을 수 있도록 설치하여서 됨을 특징으로 하는 블록조적식 옹벽의 시공방법.The pressure plate (10) of claim 1, wherein the pressure plate (10) is installed such that the pressure plate (10) is alternately arranged alternately in a vertical direction with a predetermined interval with respect to the cutting surface (1). The method of constructing a block retaining wall, characterized in that the installation to be fixed to the horizontal expansion or roll up and down to be folded. 제1항 또는 제2항에 있어서, 상기 지압판(10)들과 굴토된 절취면(1) 사이의 틈를 채움재(C)로 메꾸어 주도록 함을 특징으로 하는 블록조적식 옹벽의 시공방법.The method according to claim 1 or 2, wherein the gap between the bearing plate (10) and the excavated cutting surface (1) is filled with a filler (C). 제1항 또는 제2항에 있어서, 상기 지압판(10)들은 일정간격을 두고 서로 마주하는 한쌍의 평판부(11)의 중간에 조립구멍(13)이 뚫어진 연결판부(12)가 일체로 연이어져서, 그 평판부(11)들 사이의 연결판부(12)를 기준으로 양측에 빈공간들이 확보되도록 만들어짐을 특징으로 하는 블록조적식 옹벽의 시공방법.According to claim 1 or 2, wherein the pressure plate (10) is connected to the connecting plate portion 12 in which the assembling hole 13 is drilled in the middle of the pair of flat plate portion 11 facing each other at a predetermined interval, , The construction method of the block-type retaining wall, characterized in that the empty spaces are made to be secured on both sides based on the connecting plate portion 12 between the flat plate portion (11). 제1항 또는 제2항에 있어서, 블록지지체(40)들은 섬유사(41)를 종횡으로 직조하여 일정한 크기의 줄눈(42)들을 가지는 망체형으로서 유연하게 펼치거나 접을 수 있도록 만들어짐을 특징으로 하는 블록조적식 옹벽의 시공방법.The method of claim 1 or claim 2, characterized in that the block support 40 is a mesh type having joints 42 of a constant size by weaving the fiber yarn 41 longitudinally and horizontally, characterized in that it is made to be flexible to expand or fold. Construction method of block retaining wall. 제1항에 있어서, 상기 마감블록(60)들은 전체적으로 직사각형으로서 상부면에는 요입홈(61)을 그 하부면에는 결합돌부(62)를 각각 형성하여서, 상기 마감블록(60)들을 상하로 끼워맞춰서 견고하게 조립되도록 함을 특징으로 하는 블록조적식 옹벽의 시공방법.According to claim 1, wherein the closing block 60 is formed as a generally rectangular concave groove 61 on the upper surface and the engaging protrusion 62 on the lower surface, respectively, by fitting the closing block 60 up and down A method of constructing a block retaining wall, characterized in that to be firmly assembled.
KR10-2000-0049559A 2000-08-25 2000-08-25 Process for Constructing Containg Wall with Blocks KR100372313B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2000-0049559A KR100372313B1 (en) 2000-08-25 2000-08-25 Process for Constructing Containg Wall with Blocks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2000-0049559A KR100372313B1 (en) 2000-08-25 2000-08-25 Process for Constructing Containg Wall with Blocks

Publications (2)

Publication Number Publication Date
KR20020016298A KR20020016298A (en) 2002-03-04
KR100372313B1 true KR100372313B1 (en) 2003-02-19

Family

ID=19685157

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2000-0049559A KR100372313B1 (en) 2000-08-25 2000-08-25 Process for Constructing Containg Wall with Blocks

Country Status (1)

Country Link
KR (1) KR100372313B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101015619B1 (en) 2008-02-29 2011-02-17 장해영 adjustable anchor device, retaining wall and method for constructing a retaining wall with reinforcement soil
KR101032408B1 (en) 2010-12-10 2011-05-03 지반이엔씨 주식회사 Method of reinforced earth retaining wall for cutting face through reinforcing execution and concrete block
KR101465149B1 (en) * 2012-12-17 2014-11-25 한국철도기술연구원 Anchored retaining wall of gravity block type, and constructing method for the same

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20180089440A (en) 2015-12-28 2018-08-08 주식회사 젬백스앤카엘 Melanin inhibiting functional peptide and composition comprising same

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101015619B1 (en) 2008-02-29 2011-02-17 장해영 adjustable anchor device, retaining wall and method for constructing a retaining wall with reinforcement soil
KR101032408B1 (en) 2010-12-10 2011-05-03 지반이엔씨 주식회사 Method of reinforced earth retaining wall for cutting face through reinforcing execution and concrete block
KR101465149B1 (en) * 2012-12-17 2014-11-25 한국철도기술연구원 Anchored retaining wall of gravity block type, and constructing method for the same

Also Published As

Publication number Publication date
KR20020016298A (en) 2002-03-04

Similar Documents

Publication Publication Date Title
CA2306130C (en) Reinforced retaining wall
KR101640795B1 (en) Furlable earth retaining structure for provisional facilities and construction method thereof
KR100633796B1 (en) Connecting structure of mid supporting beam for temporary soil sheathing work
WO2000020695A1 (en) Concrete masonry unit for reinforced retaining wall
KR20190083466A (en) Retaining wall and construction method thereof
KR101211469B1 (en) Retaining wall structure having prefabricated block and method for constructing retaining wall using the same
KR100372313B1 (en) Process for Constructing Containg Wall with Blocks
KR101902791B1 (en) Under ground structure construction method using composite steel pile and under ground structure therewith
KR100313721B1 (en) Method for designing synthetic underground retaining wall by temporary soil protection structure and working process of underground retaining wall of structure
KR20000003270A (en) Tunnel construction method at area of thin soil surface
JP2007308882A (en) Lightweight embankment structure
KR20120106037A (en) Reformed sheet plate and the method of installation of the same
KR20080025219A (en) Underground outer wall construction method using deck-plate and deck-plate for constructing underground outer wall
KR100935317B1 (en) Assembly retaining wall system with ground reinforcement and its construction method
KR102482690B1 (en) Bridge foundation construction method using formwork integrated PC panels
JP5280150B2 (en) Yamadome retaining wall and method of forming Yamadome retaining wall
KR101696282B1 (en) Precast wall using soil interception pile, underground structure having Precast wall and Method for connecting precast wall
JPH01146020A (en) Foundation structure by banking and its construction
KR200223113Y1 (en) A structure preventing for bulging of retaining wall
KR102019902B1 (en) Underground Retaining Wall Removal Structure and its Removal Method using Modula Circle Struts
KR100858712B1 (en) Corner connecting apparatus of temporary soil sheathing work
KR100327547B1 (en) Composite retaining wall construction method
KR100744972B1 (en) Earth of building land-side protection wall structure
JP2010168808A (en) Protective wall and protective wall formation method
KR20010028793A (en) Precast Retaining Wall Using High Strength Micro Pile

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130130

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20140129

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20150203

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20160128

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20161229

Year of fee payment: 15

FPAY Annual fee payment

Payment date: 20180202

Year of fee payment: 16

FPAY Annual fee payment

Payment date: 20190131

Year of fee payment: 17

FPAY Annual fee payment

Payment date: 20200120