JPWO2019187438A1 - Sheet pile construction method, sheet pile construction equipment and holder - Google Patents
Sheet pile construction method, sheet pile construction equipment and holder Download PDFInfo
- Publication number
- JPWO2019187438A1 JPWO2019187438A1 JP2020509663A JP2020509663A JPWO2019187438A1 JP WO2019187438 A1 JPWO2019187438 A1 JP WO2019187438A1 JP 2020509663 A JP2020509663 A JP 2020509663A JP 2020509663 A JP2020509663 A JP 2020509663A JP WO2019187438 A1 JPWO2019187438 A1 JP WO2019187438A1
- Authority
- JP
- Japan
- Prior art keywords
- sheet pile
- holder
- hole
- excavation
- pile construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
騒音及び振動の発生は可及的に低減し得、また水が不要であり、更に、硬い地盤であっても確実に矢板を施工することができる矢板施工方法及び矢板施工装置並びに保持具を提供する。本矢板施工装置にあっては、移動手段12を設けてなる車両1によって柱状のリーダ2が略鉛直方向に支持されており、アースオーガ3のオーガ本体31がリーダ2に昇降可能に支持されている。オーガ本体31には、鋼矢板SPの一端部を固着させる油圧チャック6をスクリュー32の相隣る位置に支持する支持体4が垂設してあり、一方、スクリュー32の先端近傍には、油圧チャック6に固着された鋼矢板SPの一側縁を保持する保持具7が遊嵌してある。そして、矢板施工装置は、スクリュー32にて地盤を所要深さまで掘削して空穴Hを形成するのと並行して、当該空穴Hに隣接して形成された前の空穴H内に、油圧チャック6に固着された鋼矢板Hを挿入させるようになっている。Provided are a sheet pile construction method, a sheet pile construction device, and a holder that can reduce the generation of noise and vibration as much as possible, do not require water, and can reliably construct a sheet pile even on hard ground. To do. In this sheet pile construction device, the columnar leader 2 is supported in the substantially vertical direction by the vehicle 1 provided with the moving means 12, and the auger body 31 of the earth auger 3 is supported by the leader 2 so as to be able to move up and down. There is. A support 4 for supporting a hydraulic chuck 6 for fixing one end of the steel sheet pile SP at a position adjacent to the screw 32 is vertically provided on the auger main body 31, while the hydraulic pressure is provided near the tip of the screw 32. A holder 7 for holding one side edge of the steel sheet pile SP fixed to the chuck 6 is loosely fitted. Then, the sheet pile construction device excavates the ground to a required depth with the screw 32 to form the hole H, and in parallel, in the previous hole H formed adjacent to the hole H, The steel sheet pile H fixed to the hydraulic chuck 6 is inserted.
Description
本発明は、施工対象領域中に複数の矢板を埋設する施工を行う方法、及びこの矢板施工方法の実施に使用する矢板施工装置、並びに該矢板施工装置に取付けられ、施工対象の矢板を保持する保持具に関する。 The present invention is a method of burying a plurality of sheet piles in a construction target area, a sheet pile construction device used for carrying out the sheet pile construction method, and a sheet pile construction device attached to the sheet pile construction device to hold the sheet piles to be constructed. Regarding the holder.
土留め又は止水等を行うために、帯状鋼材を横断面形状がハット形又はU字形等に成形してなる複数の矢板を交互に向きを異ならせて施工対象の地中に埋設する施工工事が行われている。矢板を地中に埋設するには、振動機の上下振動を利用するバイブロハンマ工法、土中へ高圧力水を噴射するジェット工法、及び油圧によって矢板を地中に圧入させる油圧圧入工法等が開発されている。しかし、前者の工法にあっては、騒音が激しい上に周囲に振動が伝わるという問題があり、また中者の工法にあっては、川というように大量の水を供給し得る水源が必要であるという問題があり、更に後者の工法にあっては、前記両工法の問題は回避し得るものの、油圧機の限界により、比較的硬い地盤には矢板を圧入することが困難であった。 Construction work in which multiple sheet piles formed by forming a strip-shaped steel material into a hat-shaped or U-shaped cross section are alternately oriented in different directions and buried in the ground to be constructed in order to retain soil or stop water. Is being done. To bury the sheet pile in the ground, a vibro hammer method that uses the vertical vibration of the vibrator, a jet method that injects high-pressure water into the soil, and a hydraulic press-fit method that press-fits the sheet pile into the ground by flood control have been developed. ing. However, the former method has the problem that it is noisy and vibration is transmitted to the surroundings, and the middle method requires a water source that can supply a large amount of water, such as a river. In addition, in the latter construction method, although the problems of both construction methods can be avoided, it is difficult to press-fit the sheet pile into the relatively hard ground due to the limitation of the hydraulic machine.
ところで、住宅又はビルといった建物が比較的密集した都市部といった施工対象領域において矢板を施工する場合にあっては、騒音及び振動の発生は可及的に低減する必要があるのに加え、大量の水を供給し得る水源が無い場合も多く、更に、地盤の硬さが油圧機の限界を超えることも比較的多い。従って、そのような施工対象領域では、上述したいずれの工法も適用することができない。そのため、後述する特許文献1には次のような装置が開示されている。
By the way, when the sheet pile is constructed in the construction target area such as an urban area where buildings such as houses or buildings are relatively dense, it is necessary to reduce the generation of noise and vibration as much as possible, and in addition, a large amount of noise and vibration are generated. In many cases, there is no water source that can supply water, and the hardness of the ground often exceeds the limit of the hydraulic machine. Therefore, none of the above-mentioned construction methods can be applied to such a construction target area. Therefore, the following devices are disclosed in
図28及び図29は特許文献1に開示された矢板施工装置の使用様態を示す側面図であり、図中、SPはハット形の鋼矢板である。鋼矢板SPは、平面視が直線分状のウェブ部Wの両端からそれぞれフランジ部F,Fが互いに線対称となるテーパ状に延設されており、両フランジ部F,Fの先端にはアーム部A,Aが前記ウェブ部Wと並行な姿勢で延設されている。両アーム部A,Aの先端には爪状のセクションS,Sそれぞれが設けてあり、該セクションS,Sに他の鋼矢板SPのセクションS,Sを結合させて両鋼矢板SP,SPを連結させるようになしてある。
28 and 29 are side views showing a usage mode of the sheet pile construction device disclosed in
図28に示したように、複数の鋼矢板SP,SP,…が前述した如く相互連結されて一列に施工対象領域中に埋設してあり、相隣る4枚の鋼矢板SP,SP,SP,SP上に矢板施工装置のサドル100が配置されている。サドル100は直線上に所定の間隔で配された4対のクランプ101,101,101,101を具備しており、各クランプ101,101,101,101によって相隣る4枚の鋼矢板SP,SP,SP,SPを挟持している。またサドル100にはマスト102を介して、アースオーガ110及び圧入機120が各クランプ101,101,101,101と同一線上に支持されており、アースオーガ110のスクリュー111が収納された筒体115の外周面から所定寸法を隔てて配されたチャック(図示せず)によって、鋼矢板SPが圧入機120に固定されている。
As shown in FIG. 28, a plurality of steel sheet piles SP, SP, ... Are interconnected as described above and buried in a row in the construction target area, and four adjacent steel sheet piles SP, SP, SP. , The
かかる矢板施工装置にて鋼矢板SPを埋設するには、アースオーガ110のスクリュー111を回動させつつ該スクリュー111を適宜距離だけ降下させて施工対象領域の地盤を掘削した後、図29に示した如く、スクリュー111を引き抜きつつ圧入機120を作動させて、鋼矢板SPを圧入させる操作を繰り返し、鋼矢板SPを所要の深さまで埋設させる。このように、施工対象の鋼矢板SPの近傍をアースオーガ110のスクリュー111によって予め掘削した後、当該鋼矢板SPを土中へ圧入させるため、予め掘削しない場合に比べて相対的に小さな力で鋼矢板SPを圧入させることができる。また、かかる矢板施工装置は、水を要さず、騒音及び振動の発生を可及的に低減し得る。
In order to bury the steel sheet pile SP with such a sheet pile construction device, the
しかしながら、このような従来の矢板施工装置にあっては、施工対象領域の地盤中に圧入する鋼矢板SPの圧入方向には当該地盤の土石が残留しているため、鋼矢板SPから圧入機120に印加される抵抗が依然高い。このため、鋼矢板SPの圧入作業の効率が低く、また鋼矢板SPの圧入作業に過大なエネルギを要するため施工コストが嵩むという問題があった。更に、残留土石の状態によっては、圧入機の能力を超えてしまう虞もあった。
However, in such a conventional sheet pile construction device, since the earth and stone of the ground remains in the press-fitting direction of the steel sheet pile SP to be press-fitted into the ground in the construction target area, the press-
本発明は斯かる事情に鑑みてなされたものであって、騒音及び振動の発生は可及的に低減し得、また水が不要であり、更に、硬い地盤であっても確実に矢板を施工することができる矢板施工方法、及び該矢板施工方法の実施に適用する矢板施工装置、並びに該矢板施工装置に取付けられ、施工対象の矢板を保持する保持具を提供する。 The present invention has been made in view of such circumstances, the generation of noise and vibration can be reduced as much as possible, water is not required, and the sheet pile is surely constructed even on hard ground. Provided are a sheet pile construction method that can be used, a sheet pile construction device that is applied to the implementation of the sheet pile construction method, and a holder that is attached to the sheet pile construction device and holds the sheet pile to be constructed.
(1)本発明に係る矢板施工方法は、施工対象領域の地盤中に帯状の複数の矢板を施工する方法であって、前記地盤を所要深さまで掘削して、前記矢板の幅寸法以上の直径を有する空穴を形成する工程と、前記空穴に隣接させて、前記矢板の幅寸法以上の直径を有する次の空穴を形成するのと並行して、前記空穴内に矢板を挿入させる工程とを実施することを特徴とする。 (1) The sheet pile construction method according to the present invention is a method of constructing a plurality of strip-shaped sheet piles in the ground of a construction target area, in which the ground is excavated to a required depth and the diameter is equal to or larger than the width dimension of the sheet pile. And a step of inserting the sheet pile into the hole in parallel with forming the next hole having a diameter equal to or larger than the width dimension of the sheet pile adjacent to the hole. It is characterized by carrying out.
本発明の矢板施工方法にあっては、施工対象領域の地盤中に帯状の複数の矢板を施工する場合、施工対象領域の地盤を所要深さまで掘削して、矢板の幅寸法以上の直径を有する空穴を形成する。次に、この空穴に隣接させて、矢板の幅寸法以上の直径を有する次の空穴を形成するのと並行して、既に形成した前記空穴内に矢板を挿入させる。このように、矢板の幅寸法以上の直径を有する空穴内に矢板を挿入させるため、当該空穴の周囲の地盤からの抵抗といった特段の支障を被ることなく、当該空穴の深部へ確実に進入させることができる。従って、騒音及び振動の発生は可及的に低減し得、また水が不要であり、更に、硬い地盤であっても確実に矢板を施工することができる。また、矢板を空穴内へ進入させる作業を可及的に小さなエネルギで実施することができ、従って施工コストが廉価である。なお、本明細書中、矢板には、板材をU形又はハット形等に成形したもの以外に、管材の外周面に接手(セクション)を設けてなる管矢板も含まれる。 In the sheet pile construction method of the present invention, when a plurality of strip-shaped sheet piles are constructed in the ground of the construction target area, the ground of the construction target area is excavated to a required depth and has a diameter equal to or larger than the width dimension of the sheet pile. Form a hole. Next, in parallel with forming the next hole having a diameter equal to or larger than the width dimension of the sheet pile adjacent to this hole, the sheet pile is inserted into the already formed hole. In this way, since the sheet pile is inserted into the hole having a diameter equal to or larger than the width of the sheet pile, it surely enters the deep part of the hole without suffering any particular trouble such as resistance from the ground around the hole. Can be made to. Therefore, the generation of noise and vibration can be reduced as much as possible, water is not required, and the sheet pile can be reliably constructed even on hard ground. In addition, the work of inserting the sheet pile into the hole can be carried out with as little energy as possible, and therefore the construction cost is low. In addition to the sheet pile formed into a U shape or a hat shape, the sheet pile includes a pipe sheet pile having a joint (section) on the outer peripheral surface of the pipe material.
(2)本発明に係る矢板施工方法は、更に、次の空穴を形成するのと並行して、当該次の空穴に隣接して形成された前の空穴内に矢板を挿入させる工程を所要回数実施することを特徴とする。 (2) The sheet pile construction method according to the present invention further comprises a step of inserting a sheet pile into a previous hole formed adjacent to the next hole in parallel with forming the next hole. It is characterized by carrying out the required number of times.
本発明の矢板施工方法にあっては、地盤を掘削することによって、次の空穴を形成するのと並行して、当該次の空穴に隣接して形成された前の空穴内に矢板を挿入させる工程を所要回数実施するため、前同様、複数の矢板を地盤中に施工するに際して、騒音及び振動の発生は可及的に低減し得、また水が不要であり、更に、硬い地盤であっても確実に矢板を施工することができる。 In the sheet pile construction method of the present invention, the sheet pile is formed in the previous hole formed adjacent to the next hole in parallel with the formation of the next hole by excavating the ground. Since the process of inserting is carried out the required number of times, the generation of noise and vibration can be reduced as much as possible when constructing multiple sheet piles in the ground as before, water is not required, and the ground is hard. Even if there is, the sheet pile can be surely constructed.
(3)本発明に係る矢板施工方法は、前記矢板を略鉛直方向の姿勢に保持した状態で空穴内へ挿入させることを特徴とする。 (3) The sheet pile construction method according to the present invention is characterized in that the sheet pile is inserted into a hole while being held in a substantially vertical posture.
本発明の矢板施工方法にあっては、例えば、矢板を略鉛直方向の姿勢に保持する保持具を用いて、当該矢板を略鉛直方向の姿勢に保持した状態で空穴内へ挿入させるため、矢板は空穴の周面等に引っかからず、矢板を空穴内へ進入させる作業を円滑に実施することができる。 In the sheet pile construction method of the present invention, for example, a holder for holding the sheet pile in a substantially vertical posture is used to insert the sheet pile into the hole while holding the sheet pile in a substantially vertical posture. Can smoothly carry out the work of inserting the sheet pile into the hole without getting caught in the peripheral surface of the hole.
(4)本発明に係る矢板施工方法は、柱状のリーダに進退可能に固定された掘削手段の回転駆動機に連結させた掘削用柱状体にて前記地盤を掘削して次の空穴を形成するのと並行して、前記回転駆動機及び掘削用柱状体に支持された矢板を前記空穴内に挿入するに際して、前記リーダに支持され、前記掘削用柱状体の揺動による矢板の揺動を止める振れ止め具を用いることを特徴とする。 (4) In the sheet pile construction method according to the present invention, the ground is excavated with a columnar body for excavation connected to a rotary drive of excavation means fixed to a columnar leader so as to be able to advance and retreat, and the next hole is formed. In parallel with this, when the sheet pile supported by the rotary drive machine and the excavation columnar body is inserted into the hole, the sheet pile supported by the leader and the excavation columnar body is swung to cause the sheet pile to swing. It is characterized by using a steady rest device.
本発明の矢板施工方法にあっては、柱状のリーダに進退可能に固定されたアースオーガといった掘削手段の回転駆動機に連結させたスクリューといった掘削用柱状体にて前記地盤を掘削して次の空穴を形成するのと並行して、前記回転駆動機及び掘削用柱状体に支持された矢板を既に形成された空穴内に挿入するに際して、掘削用柱状体の揺動による矢板の揺動を止める振れ止め具を用いる。掘削用柱状体によって施工対象領域の地盤を掘削して次の空穴を形成して行く間、例えば当該地盤中の石等が掘削用柱状体に噛み込んで当該掘削用柱状体が揺動するため、掘削用柱状体に支持された矢板も揺動する虞があるが、例えば矢板の一側部を平面視がC字状の揺れ止め具内に挿入することによって、振れが発生した矢板の一側部が振れ止め具に当接して、矢板の振れが低減及び停止される。ここで、振れ止め具はリーダに支持されており、掘削用柱状体の揺動に影響されない。これによって、既に形成した空穴内へ矢板を挿入する作業に対して、施工対象領域の地盤の掘削作業が悪影響を与えることを可及的に回避することができる。 In the sheet pile construction method of the present invention, the ground is excavated with a columnar body for excavation such as a screw connected to a rotary drive of excavation means such as an earth auger fixed to a columnar leader so as to be able to advance and retreat. In parallel with the formation of the hole, when the sheet pile supported by the rotary drive and the excavation columnar body is inserted into the already formed hole, the sheet pile is shaken by the swinging of the excavation columnar body. Use a steady rest to stop. While excavating the ground in the construction target area with the excavation column to form the next hole, for example, stones in the ground bite into the excavation column and the excavation column swings. Therefore, the sheet pile supported by the columnar body for excavation may also swing. For example, by inserting one side of the sheet pile into the anti-sway tool having a C-shaped plan view, the sheet pile in which the swing occurs. One side abuts on the steady rest to reduce and stop the runout of the sheet pile. Here, the steady rest is supported by the leader and is not affected by the swing of the columnar body for excavation. As a result, it is possible to prevent the excavation work of the ground in the construction target area from having an adverse effect on the work of inserting the sheet pile into the already formed hole.
(5)本発明に係る矢板施工装置は、移動手段を設けてなる車両と、該車両によって略鉛直方向に支持される柱状のリーダと、リーダに昇降可能に支持される回転駆動機に掘削用柱状体を垂設してなる掘削手段とを備え、施工対象領域の地盤中に帯状の矢板を施工する矢板施工装置において、矢板の一端部を固着させる固着手段と、前記回転駆動機に垂設され、固着手段を前記掘削用柱状体の相隣る位置に支持する支持手段と、前記掘削用柱状体の先端近傍に遊嵌され、前記固着手段に固着された矢板の一側縁を保持する保持具と、を備え、前記掘削用柱状体にて前記地盤を所要深さまで掘削して空穴を形成するのと並行して、当該空穴に隣接して形成された前の空穴内に、前記固着手段に固着された矢板を挿入させるようになしてあることを特徴とする。 (5) The sheet pile construction device according to the present invention is used for excavation in a vehicle provided with a means of transportation, a columnar leader supported by the vehicle in a substantially vertical direction, and a rotary drive machine supported by the leader so as to be able to move up and down. In a sheet pile construction device provided with an excavation means formed by vertically suspending a columnar body and constructing a strip-shaped sheet pile in the ground of a construction target area, a fixing means for fixing one end of the sheet pile and vertically installed on the rotary drive machine. The support means for supporting the fixing means at a position adjacent to the excavation columnar body and one side edge of the sheet pile which is loosely fitted near the tip of the excavation columnar body and fixed to the fixing means are held. A holder is provided, and in parallel with excavating the ground to a required depth with the excavation columnar body to form a hole, in the previous hole formed adjacent to the hole, It is characterized in that the sheet pile fixed to the fixing means is inserted.
本発明の矢板施工装置にあっては、移動手段を設けてなる車両と、該車両によって略鉛直方向に支持される柱状のリーダと、リーダに昇降可能に支持される回転駆動機に、スクリュー、ダウンザホールドリル又はダウンザホールハンマといった掘削用柱状体を垂設してなる掘削手段と、矢板の一端部を固着させる固着手段とを備え、施工対象領域の地盤中に帯状又は管状の矢板を後述する如く施工する。なお、本明細書中、矢板には、板材をU形又はハット形等に成形したもの以外に、管材の外周面に接手(セクション)を設けてなる管矢板も含まれる。 In the sheet pile construction device of the present invention, a vehicle provided with a means of transportation, a columnar leader supported by the vehicle in a substantially vertical direction, a rotary drive machine supported by the leader so as to be able to move up and down, and a screw. It is equipped with an excavation means such as a down-the-hole drill or a down-the-hole hammer in which a columnar body for excavation is vertically installed and a fixing means for fixing one end of a sheet pile, and a strip-shaped or tubular sheet pile is constructed in the ground of the construction target area as described later. To do. In addition to the sheet pile formed into a U shape or a hat shape, the sheet pile includes a pipe sheet pile having a joint (section) on the outer peripheral surface of the pipe material.
固着手段としては、油圧又は電動によって矢板の一端を挟持するチャックを用いることができるが、これに限らず、例えばフックによって矢板の一端を垂下するように構成することもできる。また、チャック又はフック等を例えば油圧シリンダ又は電動シリンダのロッドに取り付けて進退可能に構成することもできる。 As the fixing means, a chuck that sandwiches one end of the sheet pile by hydraulic or electric means can be used, but the present invention is not limited to this, and for example, one end of the sheet pile may be hung down by a hook. Further, a chuck, a hook, or the like can be attached to a rod of, for example, a hydraulic cylinder or an electric cylinder so as to be able to move forward and backward.
かかる固着手段によって矢板の一端部を固着させるようになっており、これによって矢板が垂下される。この固着手段は、オーガ本体といった回転駆動機に垂設された支持手段によって、掘削用柱状体の相隣る位置に支持されるようになっている。一方、矢板の一側縁は、掘削用柱状体の先端近傍に遊嵌された保持具によって保持されており、これによって、矢板は略鉛直方向の姿勢に保持される。 One end of the sheet pile is fixed by such fixing means, whereby the sheet pile is hung down. This fixing means is supported at a position adjacent to the excavation columnar body by a support means vertically installed on a rotary drive such as an auger body. On the other hand, one side edge of the sheet pile is held by a holder loosely fitted near the tip of the columnar body for excavation, whereby the sheet pile is held in a substantially vertical posture.
かかる矢板施工装置では、掘削手段にて施工対象領域の地盤を所要深さまで掘削して空穴を形成するのと並行して、当該空穴に隣接して形成された前の空穴内に、回転駆動機に取り付けられた固着手段に固着された矢板を挿入させる。このように、土壌を掘削して形成した空穴内に矢板を挿入させるため、騒音及び振動の発生は可及的に低減し得、また水が不要であり、更に、硬い地盤であっても確実に矢板を施工することができる。一方、次の空穴を形成するのと並行して、当該空穴に隣接して形成された前の空穴内に、前記固着手段に固着された矢板を挿入させるため、施工対象領域に複数の矢板を効率的に施工することができる。 In such a sheet pile construction device, in parallel with excavating the ground in the construction target area to a required depth by excavation means to form a hole, the sheet pile construction device rotates in the previous hole formed adjacent to the hole. The sheet pile fixed to the fixing means attached to the drive is inserted. In this way, since the sheet pile is inserted into the hole formed by excavating the soil, the generation of noise and vibration can be reduced as much as possible, water is not required, and even if the ground is hard, it is reliable. Sheet piles can be installed on the floor. On the other hand, in parallel with forming the next hole, a plurality of sheet piles fixed to the fixing means are inserted into the previous hole formed adjacent to the hole, so that a plurality of sheet piles are inserted in the construction target area. The sheet pile can be constructed efficiently.
(6)本発明に係る矢板施工装置は、前記掘削用柱状体のヘッドの直径は前記矢板の幅寸法以上の寸法になしてあることを特徴とする。 (6) The sheet pile construction device according to the present invention is characterized in that the diameter of the head of the columnar body for excavation is larger than the width dimension of the sheet pile.
本発明の矢板施工装置にあっては、前記掘削用柱状体のヘッドの直径は矢板の幅寸法以上の寸法になしてあるため、空穴の直径は矢板の幅寸法以上であり、これによって当該空穴内に矢板を挿入させる際に、当該空穴の周囲の地盤からの抵抗といった特段の支障を被ることなく、空穴の深部へ矢板を進入させることができる。 In the sheet pile construction device of the present invention, since the diameter of the head of the columnar body for excavation is equal to or larger than the width dimension of the sheet pile, the diameter of the hole is equal to or larger than the width dimension of the sheet pile. When the sheet pile is inserted into the hole, the sheet pile can be inserted deep into the hole without suffering any particular trouble such as resistance from the ground around the hole.
(7)本発明に係る矢板施工装置は、前記保持具は、前記掘削用柱状体を構成するロッドに遊嵌させた筒状の保持具本体と、該保持具本体のロッドの軸長方向へのずれを防止するストッパと、矢板の側縁に設けられた爪部に係合させる係合部と、該係合部と保持具本体との間に架設した連結部とを具備することを特徴とする。 (7) In the sheet pile construction device according to the present invention, the holder is a tubular holder main body loosely fitted to a rod constituting the excavation columnar body, and the holder main body in the axial length direction of the rod. It is characterized by including a stopper for preventing slippage, an engaging portion for engaging with a claw portion provided on the side edge of the sheet pile, and a connecting portion erected between the engaging portion and the holder main body. And.
本発明の矢板施工装置にあっては、前述した保持具は、掘削用柱状体を構成するロッドに遊嵌させた筒状の保持具本体と、該保持具本体のロッドの軸長方向へのずれを防止するストッパと、矢板の側縁に設けられた爪部に係合させる係合部と、該係合部と保持具本体との間に架設した連結部とを具備して構成してあり、保持具本体が掘削用柱状体を構成するロッドの周りに回動自在であるため、掘削用柱状体が回転した場合であっても、保持具を構成する係合部及びこの係合部に係合させた矢板に掘削用柱状体の回転は伝わらず、矢板は略鉛直方向の姿勢を保って、空穴内に挿入される。 In the sheet pile construction device of the present invention, the above-mentioned holder is a tubular holder body loosely fitted to a rod constituting a columnar body for excavation, and the holder body in the axial length direction of the rod. It is configured to include a stopper for preventing slippage, an engaging portion for engaging with a claw portion provided on the side edge of the sheet pile, and a connecting portion erected between the engaging portion and the holder main body. Since the holder body is rotatable around the rod forming the drilling column, the engaging portion constituting the holder and the engaging portion thereof even when the drilling column is rotated. The rotation of the columnar body for excavation is not transmitted to the sheet pile engaged with the sheet pile, and the sheet pile is inserted into the hole while maintaining a substantially vertical posture.
(8)本発明に係る矢板施工装置は、更に、前記連結部の係合部の近傍の位置に、係合部に係合した爪部が係合部から抜出することを防止する抜止め部が突設してあることを特徴とする。 (8) The sheet pile construction device according to the present invention further prevents the claw portion engaged with the engaging portion from being pulled out from the engaging portion at a position near the engaging portion of the connecting portion. The feature is that the part is projected.
本発明の矢板施工装置にあっては、前述した保持具を構成する連結部の係合部の近傍の位置に、係合部に係合した爪部が係合部から抜出することを防止する抜止め部が突設してある。空穴内に矢板を挿入させる際に、例えば当該矢板が空穴の周面に接触したときに、矢板が前後左右に揺動する場合があるが、かかる場合であっても、係合部を支持する連結部に抜止め部が突設してあるため、揺動した矢板が抜止め部に当接して、係合部から矢板が脱離することが防止される。 In the sheet pile construction apparatus of the present invention, it is possible to prevent the claw portion engaged with the engaging portion from being pulled out from the engaging portion at a position near the engaging portion of the connecting portion constituting the holder described above. There is a protruding retaining part. When inserting the sheet pile into the hole, for example, when the sheet pile comes into contact with the peripheral surface of the hole, the sheet pile may swing back and forth and left and right, but even in such a case, the engaging portion is supported. Since the retaining portion is projected from the connecting portion, the swinging sheet pile is prevented from coming into contact with the retaining portion and being detached from the engaging portion.
(9)本発明に係る矢板施工装置は、前記係合部は、前記連結部が連結する帯板状の本体と、該本体から延設され、前記矢板の爪部に遊嵌される遊嵌部とを具備することを特徴とする。 (9) In the sheet pile construction device according to the present invention, the engaging portion is a strip-shaped main body to which the connecting portion is connected and a loose fitting that extends from the main body and is loosely fitted to the claw portion of the sheet pile. It is characterized by having a part.
本発明の矢板施工装置にあっては、前述した係合部は、前記連結部が連結する帯板状の本体を具備しており、該本体から遊嵌部が延設してある。そして、係合部は遊嵌部を矢板の爪部に遊嵌させて、当該爪部と係合する。これによって、係合部は矢板の爪部と容易確実に係合することができる。 In the sheet pile construction apparatus of the present invention, the above-mentioned engaging portion includes a strip-shaped main body to which the connecting portion is connected, and a free fitting portion extends from the main body. Then, the engaging portion loosely fits the loose fitting portion into the claw portion of the sheet pile and engages with the claw portion. Thereby, the engaging portion can be easily and surely engaged with the claw portion of the sheet pile.
(10)本発明に係る矢板施工装置は、前記遊嵌部は、前記ロッドと平行に配され、前記爪部に抜き差し自在なレール状にしてあることを特徴とする。 (10) The sheet pile construction device according to the present invention is characterized in that the play-fitting portion is arranged in parallel with the rod and has a rail shape that can be inserted and removed from the claw portion.
本発明の矢板施工装置にあっては、前述した遊嵌部は、前記ロッドと平行に配され、前記爪部に抜き差し自在なレール状にしてあるため、空穴内へ矢板を挿入させた後に、掘削用柱状体及び保持具等を引き上げる際に、保持具の遊嵌部が矢板の爪部上を摺動することができ、従って掘削用柱状体及び保持具等の引き上げ作業を円滑に実施することができる。 In the sheet pile construction device of the present invention, the play-fitting portion described above is arranged in parallel with the rod and has a rail shape that can be inserted and removed from the claw portion. Therefore, after the sheet pile is inserted into the hole, the sheet pile is inserted into the hole. When pulling up the excavation columnar body and the holding tool, the loose fitting part of the holding tool can slide on the claw part of the sheet pile, and therefore the lifting work of the excavating columnar body and the holding tool, etc. is smoothly performed. be able to.
(11)本発明に係る矢板施工装置は、対をなす連結部が前記ロッド回りに軸対称の位置にそれぞれ配設してあり、それら両連結部によってそれぞれ支持された両係合部の本体から前記遊嵌部が、互いに鏡像になるように延設してあり、両連結部にそれぞれ前記抜止め部が、当該連結部が支持する係合部の遊嵌部に対向するように設けてあることを特徴とする。 (11) In the sheet pile construction apparatus according to the present invention, paired connecting portions are arranged at axially symmetric positions around the rod, and from the main body of both engaging portions supported by both connecting portions. The loose fitting portions are extended so as to form a mirror image of each other, and the retaining portions are provided on both connecting portions so as to face the loose fitting portions of the engaging portions supported by the connecting portions. It is characterized by that.
本発明の矢板施工装置にあっては、前述した対をなす連結部が前記ロッド回りに軸対称の位置にそれぞれ配設してあり、それら両連結部によってそれぞれ支持された両係合部の本体から前記遊嵌部が、互いに鏡像になるように延設してある。連結部はロッドに遊嵌させた保持具本体に固定してあるので、連結部及び保持具本体ロッド回りに回動させることによって、異なる姿勢の遊嵌部に容易に変更することが可能である。これによって、異なる姿勢の爪部であっても対応する姿勢の遊嵌部になして、当該遊嵌部にて当該爪部を係合させることができる。 In the sheet pile construction apparatus of the present invention, the paired connecting portions described above are arranged at axially symmetric positions around the rod, and the main body of both engaging portions supported by both connecting portions. The loose fitting portions are extended so as to form a mirror image of each other. Since the connecting portion is fixed to the holder body loosely fitted to the rod, it is possible to easily change to the loose fitting portion having a different posture by rotating the connecting portion and the holder main body rod. .. As a result, even if the claws have different postures, the claws can be made into loose fitting portions having the corresponding postures, and the claws can be engaged with the loose fitting portions.
このとき、いずれの遊嵌部にも対応して抜止め部がそれぞれ突設してあるため、矢板が前後左右に揺動した場合であっても、当該矢板が対応する抜止め部に当接して、係合部から矢板が脱離することが防止される。 At this time, since the retaining portions are projected so as to correspond to any of the loose fitting portions, even if the sheet pile swings back and forth and left and right, the sheet pile comes into contact with the corresponding retaining portion. Therefore, the sheet pile is prevented from being disengaged from the engaging portion.
(12)本発明に係る矢板施工装置は、前記連結部はロッド回りの一方向へ延設してあり、該連結部によって支持された係合部の本体の両側から前記遊嵌部がそれぞれ延設してあり、当該連結部に前記抜止め部が、両遊嵌部に対向するようにそれぞれ設けてあることを特徴とする。 (12) In the sheet pile construction device according to the present invention, the connecting portion extends in one direction around the rod, and the loose fitting portion extends from both sides of the main body of the engaging portion supported by the connecting portion. It is characterized in that the retaining portion is provided at the connecting portion so as to face both loose fitting portions.
本発明の矢板施工装置にあっては、前述した連結部はロッド回りの一方向へ延設してあり、該連結部によって支持された係合部の本体の両側から前記遊嵌部がそれぞれ延設してあり、当該連結部に前記抜止め部が、両遊嵌部に対向するようにそれぞれ設けてある。これによって、矢板の爪部が異なる姿勢であっても、連結部を回動させることなく、両遊嵌部の内の対応する姿勢の遊嵌部に爪部を遊嵌させることができ、従って、当該矢板の爪部を係合部に確実に係合させることができる。 In the sheet pile construction apparatus of the present invention, the above-mentioned connecting portion extends in one direction around the rod, and the loose fitting portion extends from both sides of the main body of the engaging portion supported by the connecting portion. The retaining portion is provided at the connecting portion so as to face both loose fitting portions. As a result, even if the claws of the sheet piles have different postures, the claws can be loosely fitted to the loose fitting portions of the corresponding postures in both loose fitting portions without rotating the connecting portion. , The claw portion of the sheet pile can be securely engaged with the engaging portion.
(13)本発明に係る矢板施工装置は、前記支持手段は、前記掘削用柱状体を囲繞する筒状の支持本体と、該支持本体を前記回転駆動機に垂設するための垂設部とを具備し、前記支持本体は周方向の複数位置でそれぞれ前記固着手段を支持し得るようになしてあることを特徴とする。 (13) In the sheet pile construction device according to the present invention, the support means includes a tubular support body surrounding the excavation columnar body and a hanging portion for suspending the support body on the rotary drive machine. The support main body is characterized in that it can support the fixing means at a plurality of positions in the circumferential direction.
本発明の矢板施工装置にあっては、前述した支持手段は、掘削用柱状体を囲繞する筒状の支持本体を具備しており、この支持本体は垂設部によって、リーダに支持された回転駆動機に垂設されるようになっている。この支持本体は、周方向の複数位置でそれぞれ前述した固着手段を支持し得るようになっており、これによって、矢板を鉛直な軸周りの適宜の回動姿勢で固着手段に固着させることができる。 In the sheet pile construction apparatus of the present invention, the above-mentioned support means includes a tubular support main body surrounding a columnar body for excavation, and this support main body is rotated by being supported by a leader by an hanging portion. It is designed to be hung on the drive machine. The support main body can support the above-mentioned fixing means at a plurality of positions in the circumferential direction, whereby the sheet pile can be fixed to the fixing means in an appropriate rotational posture around the vertical axis. ..
(14)本発明に係る矢板施工装置は、更に、前記リーダに支持され、前記固着手段に固着された矢板の揺動を止めるための振れ止め具を備えることを特徴とする。 (14) The sheet pile construction device according to the present invention is further provided with a steady rest tool for stopping the swing of the sheet pile supported by the leader and fixed to the fixing means.
本発明の矢板施工装置にあっては、更に、リーダに支持され、前記固着手段に固着された矢板の揺動を止めるための振れ止め具を備えている。スクリューといった掘削用柱状体によって施工対象領域の地盤を掘削して次の空穴を形成して行く間、例えば当該地盤中の石等が掘削用柱状体に噛み込んで当該掘削用柱状体が揺動するため、掘削用柱状体に支持された矢板も揺動する虞があるが、例えば矢板の一側部を揺れ止め具内に挿入することによって、振れが発生した矢板の一側部が振れ止め具に当接して、矢板の振れが低減及び停止される。ここで、振れ止め具はリーダに支持されており、掘削用柱状体の揺動に影響されない。これによって、既に形成した空穴内へ矢板を挿入する作業に対して、施工対象領域の地盤の掘削作業が悪影響を与えることを可及的に回避することができる。 The sheet pile construction device of the present invention further includes a steady rest tool for stopping the swing of the sheet pile supported by the leader and fixed to the fixing means. While excavating the ground in the construction target area with an excavation column such as a screw to form the next hole, for example, stones in the ground bite into the excavation column and the excavation column shakes. Since it moves, the sheet pile supported by the excavation columnar body may also swing, but for example, by inserting one side part of the sheet pile into the anti-sway tool, one side part of the sheet pile where the runout occurred swings. The runout of the sheet pile is reduced and stopped by contacting the stopper. Here, the steady rest is supported by the leader and is not affected by the swing of the columnar body for excavation. As a result, it is possible to prevent the excavation work of the ground in the construction target area from having an adverse effect on the work of inserting the sheet pile into the already formed hole.
(15)本発明に係る矢板施工装置は、前記振れ止め具は、躯体を貫通する貫通孔と、躯体の周面に設けられ、前記貫通孔に連通する開口部とを具備し、該開口部は躯体の縦方向の全領域に亘って開設してあることを特徴とする。 (15) In the sheet pile construction device according to the present invention, the steady rest tool includes a through hole penetrating the skeleton and an opening provided on the peripheral surface of the skeleton and communicating with the through hole. Is characterized in that it is opened over the entire vertical area of the skeleton.
本発明の矢板施工装置にあっては、前述した振れ止め具は、躯体を貫通する貫通孔と、躯体の周面に設けられ、前記貫通孔に連通する開口部とを具備し、該開口部は躯体の縦方向の全領域に亘って開設してある。矢板の一側部を振れ止め具の開口部から貫通孔内に挿入させることによって、振れが発生した矢板の一側部を躯体の開口部に臨む端縁に当接させて、矢板の振れを低減及び停止させることができる。なお、固着手段に固着させた矢板の回動姿勢に応じて、躯体の周方向の相異なる位置に開口部を開設した複数の振れ止め具を用意しておくとよい。 In the sheet pile construction apparatus of the present invention, the above-mentioned steady rest tool includes a through hole penetrating the skeleton and an opening provided on the peripheral surface of the skeleton and communicating with the through hole. Is open over the entire vertical area of the skeleton. By inserting one side of the sheet pile into the through hole through the opening of the steady rest, the one side of the sheet pile where the runout has occurred is brought into contact with the edge facing the opening of the skeleton to prevent the sheet pile from swinging. It can be reduced and stopped. It is preferable to prepare a plurality of steady rests having openings at different positions in the circumferential direction of the skeleton according to the rotational posture of the sheet pile fixed to the fixing means.
(16)本発明に係る矢板施工装置は、前記固着手段を進退させる進退機を更に備え、該進退機は前記支持手段に支持されていることを特徴とする。 (16) The sheet pile construction device according to the present invention is further provided with an advancing / retreating machine for advancing / retreating the fixing means, and the advancing / retreating machine is supported by the supporting means.
本発明の矢板施工装置にあっては、油圧ピストンというように、固着手段を進退させる進退機を更に備えている。この進退機は前述した支持手段に支持されており、回転駆動機の昇降動作に伴って、支持手段、進退機及び進退機に取り付けられた固着手段が昇降するようになっている。これによって、掘削用柱状体による次の空穴の形成と、既に形成された前の空穴内への矢板の挿入とが並行して実施される。一方、固着手段に固着された矢板は、当該固着手段とともに進退機によって進退されるため、前述した保持具、振れ止め具への矢板の取り付け作業を比較的容易に実施することができる。 The sheet pile construction device of the present invention further includes an advancing / retreating machine for advancing / retreating the fixing means, such as a hydraulic piston. This advancing / retreating machine is supported by the above-mentioned supporting means, and the supporting means, the advancing / retreating machine, and the fixing means attached to the advancing / retreating machine move up and down as the rotary drive machine moves up and down. As a result, the formation of the next hole by the drilling column and the insertion of the sheet pile into the already formed previous hole are performed in parallel. On the other hand, since the sheet pile fixed to the fixing means is advanced and retreated together with the fixing means by the advancing / retreating machine, the above-mentioned work of attaching the sheet pile to the holder and the steady rest can be carried out relatively easily.
(17)本発明に係る矢板施工装置は、前記掘削用柱状体の周囲は筒状体にて囲繞してあることを特徴とする。 (17) The sheet pile construction device according to the present invention is characterized in that the circumference of the excavation columnar body is surrounded by a tubular body.
本発明の矢板施工装置にあっては、前述した掘削用柱状体の周囲は筒状体にて囲繞してあるため、掘削用柱状体にて掘削搬送された土石等が矢板施工装置の周囲へ散乱することが防止される。 In the sheet pile construction device of the present invention, since the circumference of the above-mentioned excavation columnar body is surrounded by a tubular body, earth and stones excavated and transported by the excavation columnar body move to the periphery of the sheet pile construction device. Scattering is prevented.
(18)本発明に係る矢板施工装置は、前記筒状体の周面には複数の開口が、筒状体の長手方向へ互いに距離を隔て開設してあることを特徴とする。 (18) The sheet pile construction device according to the present invention is characterized in that a plurality of openings are opened on the peripheral surface of the tubular body at a distance from each other in the longitudinal direction of the tubular body.
本発明の矢板施工装置にあっては、筒状体の周面には複数の開口が、筒状体の長手方向へ互いに距離を隔て開設してあるため、掘削用柱状体にて掘削搬送された土石等を矢板施工装置の周囲の所定位置に排出させることができる。これによって、矢板の施工作業を円滑に実施することができ、また排出された土石等の後処理も円滑に行うことができる。 In the sheet pile construction apparatus of the present invention, since a plurality of openings are opened on the peripheral surface of the tubular body at a distance from each other in the longitudinal direction of the tubular body, the sheet pile construction apparatus is excavated and transported by the columnar body for excavation. It is possible to discharge the earth and stones and the like to a predetermined position around the sheet pile construction device. As a result, the construction work of the sheet pile can be smoothly carried out, and the post-treatment of the discharged earth and stone can be smoothly carried out.
(19)本発明に係る保持具は、移動手段を設けてなる車両と、該車両によって略鉛直方向に支持される柱状のリーダと、リーダに昇降可能に支持される回転駆動機に掘削用柱状体を垂設してなる掘削手段と、矢板の一端部を固着させる固着手段と、前記回転駆動機に垂設され、固着手段を前記掘削用柱状体の相隣る位置に支持する支持手段とを備え、施工対象領域の地盤中に帯状の矢板を施工する矢板施工装置の前記掘削用柱状体の先端近傍に遊嵌され、前記固着手段に固着された矢板の一側縁を保持する保持具であって、前記掘削用柱状体を構成するロッドに遊嵌させた筒状の保持具本体と、該保持具本体のロッドの軸長方向へのずれを防止するストッパと、矢板の側縁に設けられた爪部に係合させる係合部と、該係合部と保持具本体との間に架設した連結部とを具備し、更に、前記連結部の係合部の近傍の位置に、係合部に係合した爪部が係合部から抜出することを防止する抜止め部が突設してあることを特徴とする。 (19) The holder according to the present invention includes a vehicle provided with a means of transportation, a columnar leader supported by the vehicle in a substantially vertical direction, and a columnar excavation column on a rotary drive machine supported by the leader so as to be able to move up and down. An excavation means for vertically suspending a body, a fixing means for fixing one end of a sheet pile, and a support means which is vertically installed on the rotary drive machine and supports the fixing means at a position adjacent to the excavation columnar body. A holder that holds one side edge of the sheet pile that is loosely fitted near the tip of the excavating columnar body of the sheet pile construction device that constructs a strip-shaped sheet pile in the ground of the construction target area and is fixed to the fixing means. The tubular holder body loosely fitted to the rod constituting the excavation columnar body, the stopper for preventing the rod of the holder body from shifting in the axial length direction, and the side edge of the sheet pile. An engaging portion to be engaged with the provided claw portion and a connecting portion erected between the engaging portion and the holder main body are provided, and further, at a position in the vicinity of the engaging portion of the connecting portion. It is characterized in that a retaining portion is provided so as to prevent the claw portion engaged with the engaging portion from being pulled out from the engaging portion.
本発明の保持具にあっては、移動手段を設けてなる車両と、該車両によって略鉛直方向に支持される柱状のリーダと、リーダに昇降可能に支持される回転駆動機に掘削用柱状体を垂設してなる掘削手段と、矢板の一端部を固着させる固着手段と、前記回転駆動機に垂設され、固着手段を前記掘削用柱状体の相隣る位置に支持する支持手段とを備え、施工対象領域の地盤中に帯状の矢板を施工する矢板施工装置の前記掘削用柱状体の先端近傍に遊嵌され、前記固着手段に固着された矢板の一側縁を保持する保持具であって、前記掘削用柱状体を構成するロッドに遊嵌させた筒状の保持具本体と、該保持具本体のロッドの軸長方向へのずれを防止するストッパと、矢板の側縁に設けられた爪部に係合させる係合部と、該係合部と保持具本体との間に架設した連結部とを具備し、更に、前記連結部の係合部の近傍の位置に、係合部に係合した爪部が係合部から抜出することを防止する抜止め部が突設してある。 In the holder of the present invention, a vehicle provided with a means of transportation, a columnar leader supported by the vehicle in a substantially vertical direction, and a columnar body for excavation on a rotary drive machine supported by the leader so as to be able to move up and down. An excavation means that is vertically installed, a fixing means that fixes one end of a sheet pile, and a support means that is vertically installed on the rotary drive machine and supports the fixing means at positions adjacent to the excavation columnar body. A holder that is loosely fitted near the tip of the excavating columnar body of the sheet pile construction device that constructs a strip-shaped sheet pile in the ground of the construction target area and holds one side edge of the sheet pile fixed to the fixing means. A tubular holder body loosely fitted to the rod constituting the excavation columnar body, a stopper for preventing the rod of the holder body from shifting in the axial length direction, and a side edge of the sheet pile are provided. An engaging portion to be engaged with the engaged portion and a connecting portion erected between the engaging portion and the holder main body are provided, and further, the engaging portion is engaged at a position in the vicinity of the engaging portion of the connecting portion. A retaining portion is provided to prevent the claw portion engaged with the joint portion from being pulled out from the engaging portion.
このような保持具を備える矢板施工装置では、前述したように、掘削手段にて施工対象領域の地盤を所要深さまで掘削して空穴を形成するのと並行して、当該空穴に隣接して形成された前の空穴内に、回転駆動機に取り付けられた固着手段に固着された矢板を挿入させる。このように、土壌を掘削して形成した空穴内に矢板を挿入させるため、騒音及び振動の発生は可及的に低減し得、また水が不要であり、更に、硬い地盤であっても確実に矢板を施工することができる。一方、次の空穴を形成するのと並行して、当該空穴に隣接して形成された前の空穴内に、前記固着手段に固着された矢板を挿入させるため、施工対象領域に複数の矢板を効率的に施工することができる。 In the sheet pile construction device provided with such a holder, as described above, in parallel with excavating the ground of the construction target area to the required depth by the excavation means to form a hole, the sheet pile construction device is adjacent to the hole. The sheet pile fixed to the fixing means attached to the rotary drive machine is inserted into the front hole formed in the above. In this way, since the sheet pile is inserted into the hole formed by excavating the soil, the generation of noise and vibration can be reduced as much as possible, water is not required, and even if the ground is hard, it is reliable. Sheet piles can be installed on the floor. On the other hand, in parallel with forming the next hole, a plurality of sheet piles fixed to the fixing means are inserted into the previous hole formed adjacent to the hole, so that a plurality of sheet piles are inserted in the construction target area. The sheet pile can be constructed efficiently.
このとき、保持具は、掘削用柱状体を構成するロッドに遊嵌させた筒状の保持具本体と、該保持具本体のロッドの軸長方向へのずれを防止するストッパと、矢板の側縁に設けられた爪部に係合させる係合部と、該係合部と保持具本体との間に架設した連結部とを具備するため、空穴内に挿入される矢板を略鉛直な姿勢で保持することができ、これによって、空穴内への矢板の挿入操作を円滑に実施することができる。 At this time, the holders are a tubular holder body loosely fitted to a rod constituting a columnar body for excavation, a stopper for preventing the rod of the holder body from shifting in the axial length direction, and a sheet pile side. Since the engaging portion to be engaged with the claw portion provided on the edge and the connecting portion erected between the engaging portion and the holder main body are provided, the sheet pile inserted into the hole is placed in a substantially vertical posture. This allows the sheet pile to be smoothly inserted into the hole.
一方、空穴内に矢板を挿入させる際に、例えば当該矢板が空穴の周面に接触したときに、矢板が前後左右に揺動する場合があるが、かかる場合であっても、係合部を支持する連結部に抜止め部が突設してあるため、揺動した矢板が抜止め部に当接して、係合部から矢板が脱離することが防止される。 On the other hand, when inserting the sheet pile into the hole, for example, when the sheet pile comes into contact with the peripheral surface of the hole, the sheet pile may swing back and forth and left and right. Since the retaining portion is projected from the connecting portion that supports the, the swinging sheet pile is prevented from coming into contact with the retaining portion and being detached from the engaging portion.
(20)本発明に係る保持具は、前記係合部は、前記連結部が連結する帯板状の本体と、該本体から延設され、前記矢板の爪部に遊嵌される遊嵌部とを具備することを特徴とする。 (20) In the holder according to the present invention, the engaging portion is a strip-shaped main body to which the connecting portion is connected, and a free fitting portion that extends from the main body and is loosely fitted to the claw portion of the sheet pile. It is characterized by having.
本発明の保持具にあっては、前述した係合部は、前記連結部が連結する帯板状の本体と、該本体から延設され、前記矢板の爪部に遊嵌される遊嵌部とを具備する。これによって、係合部は矢板の爪部と容易確実に係合することができる。 In the holder of the present invention, the above-mentioned engaging portion includes a strip-shaped main body to which the connecting portion is connected and a loose fitting portion extending from the main body and loosely fitted to the claw portion of the sheet pile. And. Thereby, the engaging portion can be easily and surely engaged with the claw portion of the sheet pile.
(21)本発明に係る保持具は、前記遊嵌部は、前記ロッドと平行に配され、前記爪部に抜き差し自在なレール状にしてあることを特徴とする。 (21) The holder according to the present invention is characterized in that the loose fitting portion is arranged in parallel with the rod and has a rail shape that can be inserted and removed from the claw portion.
本発明の保持具にあっては、前述した遊嵌部は、前記ロッドと平行に配され、前記爪部に抜き差し自在なレール状にしてあるため、空穴内へ矢板を挿入させた後に、掘削用柱状体及び保持具等を引き上げる際に、保持具の遊嵌部が矢板の爪部上を摺動することができ、従って掘削用柱状体及び保持具等の引き上げ作業を円滑に実施することができる。 In the holder of the present invention, the above-mentioned loose fitting portion is arranged in parallel with the rod and has a rail shape that can be inserted and removed from the claw portion. Therefore, after inserting the sheet pile into the hole, excavation is performed. When pulling up the columnar body and holder, the loose fitting part of the holder can slide on the claws of the sheet pile, so the work of pulling up the columnar body and holder for excavation should be carried out smoothly. Can be done.
(22)本発明に係る保持具は、対をなす連結部が前記ロッド回りに軸対称の位置にそれぞれ配設してあり、それら両連結部によってそれぞれ支持された両係合部の本体から前記遊嵌部が、互いに鏡像になるように延設してあり、両連結部にそれぞれ前記抜止め部が、当該連結部が支持する係合部の遊嵌部に対向するように設けてあることを特徴とする。 (22) In the holder according to the present invention, paired connecting portions are arranged around the rod at axially symmetric positions, and the main body of both engaging portions supported by both connecting portions is described. The loose fitting portions are extended so as to form a mirror image of each other, and the retaining portions are provided on both connecting portions so as to face the loose fitting portions of the engaging portions supported by the connecting portions. It is characterized by.
本発明の保持具にあっては、対をなす連結部が前記ロッド回りに軸対称の位置にそれぞれ配設してあり、それら両連結部によってそれぞれ支持された両係合部の本体から前記遊嵌部が、互いに鏡像になるように延設してあり、両連結部にそれぞれ前記抜止め部が、当該連結部が支持する係合部の遊嵌部に対向するように設けてある。連結部はロッドに遊嵌させた保持具本体に固定してあるので、連結部及び保持具本体ロッド回りに回動させることによって、異なる姿勢の遊嵌部に容易に変更することが可能である。これによって、異なる姿勢の爪部であっても対応する姿勢の遊嵌部になして、当該遊嵌部にて当該爪部を係合させることができる。 In the holder of the present invention, paired connecting portions are arranged around the rod at axially symmetric positions, and the play is provided from the main body of both engaging portions supported by both connecting portions. The fitting portions are extended so as to form a mirror image of each other, and the retaining portions are provided on both connecting portions so as to face the loose fitting portions of the engaging portions supported by the connecting portions. Since the connecting portion is fixed to the holder body loosely fitted to the rod, it is possible to easily change to the loose fitting portion having a different posture by rotating the connecting portion and the holder main body rod. .. As a result, even if the claws have different postures, they can be made into loose fitting portions having the corresponding postures, and the claws can be engaged with the loose fitting portions.
このとき、いずれの遊嵌部にも対応して抜止め部がそれぞれ突設してあるため、矢板が前後左右に揺動した場合であっても、当該矢板が対応する抜止め部に当接して、係合部から矢板が脱離することが防止される。 At this time, since the retaining portions are projected so as to correspond to any of the loose fitting portions, even if the sheet pile swings back and forth and left and right, the sheet pile comes into contact with the corresponding retaining portion. Therefore, the sheet pile is prevented from being disengaged from the engaging portion.
(23)本発明に係る保持具は、前記連結部はロッド回りの一方向へ延設してあり、該連結部によって支持された係合部の本体の両側から前記遊嵌部がそれぞれ延設してあり、当該連結部に前記抜止め部が、両遊嵌部に対向するようにそれぞれ設けてあることを特徴とする。 (23) In the holder according to the present invention, the connecting portion extends in one direction around the rod, and the loose fitting portion extends from both sides of the main body of the engaging portion supported by the connecting portion. The connecting portion is provided with the retaining portion so as to face both loose fitting portions.
本発明の保持具にあっては、前述した連結部はロッド回りの一方向へ延設してあり、該連結部によって支持された係合部の本体の両側から前記遊嵌部がそれぞれ延設してあり、当該連結部に前記抜止め部が、両遊嵌部に対向するようにそれぞれ設けてある。これによって、矢板の爪部が異なる姿勢であっても、連結部を回動させることなく、両遊嵌部の内の対応する姿勢の遊嵌部に爪部を遊嵌させることができ、従って、当該矢板の爪部を係合部に確実に係合させることができる。 In the holder of the present invention, the above-mentioned connecting portion extends in one direction around the rod, and the loose fitting portion extends from both sides of the main body of the engaging portion supported by the connecting portion. The connecting portion is provided with the retaining portion so as to face both loose fitting portions. As a result, even if the claws of the sheet piles have different postures, the claws can be loosely fitted to the loose fitting portions of the corresponding postures in both loose fitting portions without rotating the connecting portion. , The claw portion of the sheet pile can be securely engaged with the engaging portion.
本発明に係る矢板施工方法及び矢板施工装置、並びに該矢板施工装置に取付けられ、施工対象の矢板を保持する保持具を図面に基づいて詳述する。
なお、本実施の形態で説明する矢板施工方法及び矢板施工装置、並びに保持具は、本発明の趣旨を説明する一例であり、本発明はその趣旨を逸脱しない範囲での変形や改造を含むことはいうまでもない。The sheet pile construction method and the sheet pile construction device according to the present invention, and the holder attached to the sheet pile construction device and holding the sheet pile to be constructed will be described in detail with reference to the drawings.
The sheet pile construction method, sheet pile construction device, and holder described in the present embodiment are examples for explaining the gist of the present invention, and the present invention includes deformation and modification within a range not deviating from the gist. Needless to say.
(発明を実施するための第1の形態)
図1及び図2は本発明に係る矢板施工装置の適用様態を示す正面図及び側面図であり、図中、1はクローラといった移動手段12と、該移動手段12上に回動可能に担持され、運転操作部及び動力部等を有する車両本体11とを具備する車両である。本車両本体11にあっては、車両本体11を構成する台座に柱状のリーダ2を支持する支持部14が突設してあり、該支持部14によって略鉛直方向に立設されるリーダ2の下端近傍の部分が支持されている。前記台座には車両1の両側へそれぞれ突出させた突出部15,15が設けてあり、リーダ2の長手方向の中途部分と両突出部15,15との間には、油圧にて伸縮可能なステー14,14が架設してある。(First mode for carrying out the invention)
1 and 2 are a front view and a side view showing an application mode of the sheet pile construction apparatus according to the present invention, in which 1 is rotatably supported on a moving means 12 such as a crawler and the moving
なお、図1及び図2にあっては、三点支持式の施工装置を用いた場合について示したが、本発明はこれに限らず、例えばラフタークレーンにリーダを垂下させるラフター式施工装置、又は油圧ショベルを適用した施工装置等、他の施工装置を用いることができる。 Although FIGS. 1 and 2 show the case where a three-point support type construction device is used, the present invention is not limited to this, for example, a rough ter type construction device for hanging a leader on a rough terrain crane, or Other construction equipment such as a construction equipment to which a hydraulic excavator is applied can be used.
リーダ2の外周面には、リーダ2の中心軸と平行に配置し少なくとも一対のガイドレール21,21がリーダ2の長手方向の略全域に亘って設けてあり、ガイドレール21,21にはアースオーガ(掘削手段)3のオーガ本体(回転駆動機)31が図示しないガイドギブを介してリーダ2の長手方向へ摺動自在に取り付けてある。オーガ本体31はリーダ2の頂部から垂下された複数のワイヤ25によって吊下されており、車両本体11に配設されたドラムにてワイヤ25を巻き上げ・巻き戻すことによってオーガ本体31を昇降させるようになっている。オーガ本体31には、長尺のロッドの外周面に螺旋状の羽根を設けてなるスクリュー(掘削用柱状体)32の基端が連結固定してあり、オーガ本体31の駆動力によってスクリュー32は回転駆動されるようになっている。スクリュー32の先端にはスクリューヘッド34が交換可能に取り付けてあり、施工対象領域の地盤に応じたスクリューヘッド34が取り付けられるようになっている。
On the outer peripheral surface of the
そして、車両1を施工対象領域の適宜位置に移動させた後、アースオーガ3のオーガ本体31を駆動させてスクリュー322を回転させながら、ドラムをしてワイヤ25を巻き戻すことによってオーガ本体31を降下させてスクリューヘッド34を地盤中へ進入させ、これによって施工対象領域の地盤を掘削するようになっている。
Then, after moving the
ところで、本発明に係る矢板施工装置にあっては、オーガ本体31の近傍であってオーガ本体31の高さ位置より少し低い位置には油圧シリンダ(進退機)5が当該油圧シリンダ5のピストンロッド51を地面側に向けた姿勢で配置してあり、該油圧シリンダ5は支持体(支持手段)4を介してリーダ2に昇降可能に支持されている。リーダ2の頂部には鋼矢板SPを吊り上げるための吊り上げ機9が配設してあり、該吊り上げ機9から引き出した吊上ワイヤ91によって鋼矢板SPを吊り上げるようになっている。一方、前述した油圧シリンダ5のピストンロッド51の先端には油圧チャック(固着手段)6が配設してあり、吊り上げ機9によって吊り上げられた鋼矢板SPの一端を油圧チャック6に固着させるようになっている。
By the way, in the sheet pile construction device according to the present invention, the hydraulic cylinder (advancing / retreating machine) 5 is located near the auger
また、前述したスクリュー32のロッド33であってスクリューヘッド34の近傍に、鋼矢板SPのセクションを摺動可能に保持する保持具7が遊嵌してあり、油圧シリンダ5に垂下された鋼矢板SPはそのセクションが保持具7に保持されることによって略鉛直方向の姿勢を保たれるようになしてある。なお、本矢板施工装置は、鋼矢板SPとしては爪としてのセクションがその両側に設けてあるものであれば、ハット形、U形又は直線形等、適宜の形状に適用することが出来る。
Further, a
更に、リーダ2に配設されたガイドレール21,21の下端近傍であって前記保持具7の高さより少し高い位置には、平面視がC字状の振れ止め具8が着脱可能に固定してあり、油圧シリンダ5に垂下された鋼矢板SPの一側部を振れ止め具8内に挿入させるようになっている。スクリュー32によって施工対象領域の地盤を前述した如く掘削して行く際に、スクリューヘッド34に石等が噛み込んでスクリュー32が揺動する場合があるが、前述したように保持具7はスクリュー32のロッド33に支持されているため、スクリュー32の揺動に伴って保持具7及び該保持具7に保持された鋼矢板SPも揺動するが、リーダ2に支持された振れ止め具8内に鋼矢板SPの一側部を挿入させることによって、当該鋼矢板SPの揺動を抑制及び停止させることができる。
Further, a
図3は図1及び図2に示した矢板施工装置の支持体4の部分を示す部分正面図であり、図4は図3に示した支持体4のIV−IV線による断面図である。なお、両図中、図1及び図2に示した部分に対応する部分には同じ番号が付してある。
FIG. 3 is a partial front view showing a portion of the
図3及び図4に示したように、支持体4は、スクリュー32の基端部のロッド33を囲繞する短寸筒状の支持本体41を具備しており、支持本体41の周面には支持本体41の中心軸の軸長方向へ所定間隔を隔てて開設した複数(図3にあっては3つ)の固定用孔43,43,43、43,43,43、…が支持本体41の周方向へ適宜の間隔で設けてある。
As shown in FIGS. 3 and 4, the
ところで、図1及び図2に示した油圧シリンダ5には図示しないブラケットが突設してあり、該ブラケットにも複数の固定用孔が開設してある。そして、支持本体41に開設した複数列の固定用孔43,43,43、43,43,43、…の内、適宜の列の固定用孔43,43,43と油圧シリンダ5のブラケットの固定用孔とを位置合わせさせた後、ボルト及びナットを用いて、油圧シリンダ5を支持本体41に、当該支持本体41の周方向の適宜の位置に取り付けるようになっている。これによって、支持本体41の周方向の適宜位置に油圧シリンダ5を取り付けることができる。
By the way, a bracket (not shown) is projected from the
一方、支持本体41のリーダ2(図1参照)に対向する部分には、一対の半円筒状の外嵌部41a,41aが支持本体41の中心軸と直交する方向へ所定距離を隔て、互いに対向する姿勢で突設してあり、支持体4は、両外嵌部41a,41aをリーダ2(図1参照)に配設されたガイドレール21,21に外嵌させることによって、ガイドレール21,21の長手方向へ昇降自在に案内されるようになっている。
On the other hand, a pair of semi-cylindrical outer
支持本体41の端縁には一対の垂下用ブラケット(垂下部)42,42が立設してあり、両垂下用ブラケット42,42の先端部はアースオーガ3のガイドギブに連結固定させるようになっている。これによって、支持体4及び該支持体4に支持された油圧シリンダ5は、オーガ本体31の昇降動作に伴ってガイドレール21,21上を昇降するため、図1に示した油圧シリンダ5に垂下された鋼矢板SPもオーガ本体31の昇降動作に伴って昇降する。
A pair of hanging brackets (hanging brackets) 42, 42 are erected on the edge of the support
なお、本実施の形態では、支持本体41に油圧シリンダ5を取り付けるように構成した場合について示したが、本発明はこれに限らず、前述したオーガ本体31に油圧シリンダ5を取り付けるように構成してもよい。この場合、オーガ本体31に油圧シリンダ5を取り付けるためのブラケット及び/又はボルト・ナット等の取り付け具によって油圧シリンダ5を支持する支持手段が構成される。
In the present embodiment, the case where the
次に、矢板施工装置の保持具7について詳述する。図1及び図2に示した如く、保持具7はスクリュー32のロッド33であってスクリューヘッド34の近傍に取り付けてある。
Next, the
図5は図1に示した矢板施工装置の保持具7の部分の部分正面図であり、図6は図5に示した矢板施工装置の保持具の部分の平面図である。なお、両図中、図1及び図2に示した部分に対応する部分には同じ番号が付してある。また、図5及び図6にあっては単純化のために、図1及び図2に示したスクリュー32の羽根を省略してある。
FIG. 5 is a partial front view of the portion of the
図5及び図6に示したように、スクリュー32のロッド33の周面には、保持具7を構成する短寸筒状の取付具71,71がロッド33の長手方向へ適宜距離を隔てて外嵌固定してあり、取付具71,71の両端縁にはそれぞれ、環状のカラー部(ストッパ)72,72、72,72が立設してある。取付具71,71の対をなすカラー部72,72、72,72の間の部分は、カラー部72,72、72,72の高さ寸法より低い取付具本体になしてあり、両取付具本体にはそれぞれ、取付具本体の外径より少し大きい内径を有する筒体の外周面に矩形の固定片76,76、76,76を筒体の周方向へ180度位置を異ならせて突設してなる保持具本体75,75が遊嵌してある。
As shown in FIGS. 5 and 6, short
なお、かかる保持具本体75,75は、例えば図5に示したように、オーム形に成形してなる一対の帯板を中央部が筒状になるように対向配置し、その両端部をボルト及びナットにて固着させて構成することができる。
In the
保持具本体75,75の固定片76,76、76,76には短寸帯板状の連結部77,77、77,77の一端が、前記ロッド33の中心軸と直交する姿勢で連結固定してあり、ロッド33の軸長方向に対向する連結部77,77、77,77の間にはそれぞれ、細帯板材を平面視がレ字状に成形してなり、鋼矢板SPの側縁に設けられたセクション(図1参照)を係合させる係合部78,78が架設してある。
One ends of the short strip-shaped connecting
かかる保持具7にあっては、当該保持具7を構成する一方の係合部78に、油圧チャック(図1参照)にその一端部を固着させた鋼矢板SPの両側縁に設けられたセクションの内の一方を係合させる。これによって、鋼矢板SPの一端側は油圧チャックによって固着され、当該鋼矢板SPの他端側は保持具7によって保持されるため、鋼矢板SPの姿勢は鉛直方向に保持される。
In such a
一方、本矢板施工装置にあっては後述するように、鋼矢板SPを保持具7に保持させた後にスクリュー32を回転させつつ、当該スクリュー32と共に鋼矢板SPを降下させるようになっているが、前述した如く鋼矢板SPの他端側は保持具7によって保持されるため、鋼矢板SPは鉛直方向の姿勢が保持された状態で降下される。ところで、鋼矢板SPのセクションを係合させた係合部78は、前述したようにロッド33に固定させたストッパ72,72の間の取付具本体に遊嵌した支持本体41に鉛直方向の姿勢が保持されよって支持されているため、スクリュー32及びロッド33の回転は保持具本体75及び係合部78には伝わらず、従って、スクリュー32及びロッド33が回転した場合であっても、鋼矢板SPの姿勢に影響が及ぼされずに、鋼矢板SPは鉛直方向の姿勢に保持される。
On the other hand, in this sheet pile construction device, as will be described later, after the steel sheet pile SP is held by the
なお、図5及び図6に示した保持具7にあっては、取付具71の両端縁にカラー部72,72を突設した取付具71をロッド33に外嵌固定した場合について説明したが、本発明はこれに限らず、カラー部72,72に相当する2対の環状のストッパをロッド33の周面に適宜の距離を隔てて外嵌固定してもよい。なお、取付具71の両端縁にカラー部72,72を突設した取付具71を用いた場合、ロッド33の摩耗を防止し、またロッド33に疵が発生することを防止することができるため好適である。
In the
図7は他の保持具7aの部分を示す部分正面図であり、図8は図7に示した他の保持具の部分の平面図である。なお、両図中、図5及び図6に示した部分に対応する部分には同じ番号を付してその説明を省略する。また、図7及び図8にあっても単純化のために、図1及び図2に示したスクリュー32の羽根を省略してある。
FIG. 7 is a partial front view showing a portion of the
前同様、保持具本体75,75の固定片76,76、76,76には短寸帯板状の連結部77,77、77,77の一端が、前記ロッド33の中心軸と直交する姿勢で連結固定してあり、ロッド33の軸長方向に対向する連結部77,77、77,77の間にはそれぞれ、鋼矢板SPの側縁に設けられたセクションSEを係合させる係合部78a,78aが架設してある。
As before, the fixing
この係合部78aは、帯板材を平面視が略レ字形に成形して、連結部77,77に支持される細帯状の本体178aと、鋼矢板SPのセクションSEに遊嵌させる細帯状の遊嵌部178bを設けてなり、遊嵌部178bはロッド33と平行をなすレール状に成形してある。また、各連結部77,77、77,77の係合部78a,78aの近傍の位置には、係合部78aに係合されたセクションSEが当該係合部78aから抜け出ることを防止するブロック状の抜止め部79,79、79,79が、対応する遊嵌部178b,178bに対向するように突設してある。
The engaging
ここで、図7及び図8に示した抜止め部79は四角柱状に成形してあるが、本発明はこれに限らず、丙断面が半円形状、扇形状、三角形状等、種々の形状であってよい。また、抜止め部79は連結部77に複数設けてもよい。
Here, the retaining
本矢板施工装置を用いて後述する如く鋼矢板SPを埋設する施工を行う際に、土壌からの抵抗によって鋼矢板SPが前後左右に揺動する、所謂暴れることがあるが、かかる場合であっても、係合部78aにそのセクションSEが係合された鋼矢板SPが抜止め部79に当接するため、遊嵌部178bからセクションSEが抜出することが防止される。
When burying the steel sheet pile SP using this sheet pile construction device as described later, the steel sheet pile SP may swing back and forth and left and right due to resistance from the soil, so-called rampage. However, since the steel sheet pile SP in which the section SE is engaged with the engaging
ところで、図7及び図8に示したように、連結部77,77、77,77はロッド33から、それぞれ異なる方向へ延設して両手になしてあるが、連結部77,77、77,77に支持された係合部78a,78aの遊嵌部178b,178bは、互いに鏡像の姿勢になるように対応する各本体178a,178aからそれぞれ延設してある。
By the way, as shown in FIGS. 7 and 8, the connecting
連結部77,77、77,77は前述したように、取付具71,71の取付具本体に遊嵌させた保持具本体75,75に固定してあるので、保持具本体75,75及び連結部77,77、77,77をロッド33回りに回動させることによって、異なる姿勢の遊嵌部178b,178bに容易に変更することが可能である。これによって、異なる姿勢のセクションSEであっても対応する姿勢の遊嵌部178bになして、当該遊嵌部178bにて当該セクションSEを係合させることができる。
As described above, the connecting
図9及び図10は更に他の保持具の例を示す部分正面図及び部分平面図であり、片手に対応する様態になしてある。なお、図9及び図10にあっても、図7及び図8と同様、単純化のために、図1及び図2に示したスクリュー32の羽根を省略してある。すなわち、図9及び図10に示した如く、保持具7bは、ロッド33から一方向へ延出させて片手になした連結部77,77の間に係合部78bの本体178aが架設してある。この本体178aのロッド33に対して外側の縁部は、平面視が略T字形に成形して、本体178aの両面に遊嵌部178b,178bがそれぞれ延設してある。これら両遊嵌部178b,178bと本体178aとがなす角の角度は鋭角になしてあり、両遊嵌部178b,178bそれぞれを、鋼矢板SPのセクションSE内に遊嵌し得るようになっている。
9 and 10 are a partial front view and a partial plan view showing an example of another holder, and are arranged so as to correspond to one hand. Also in FIGS. 9 and 10, the blades of the
連結部77,77の両側面であって前述した遊嵌部178b,178bの近傍の位置には、前同様の抜止め部79,79が対応する遊嵌部178b,178bに対向するように突設してあり、この抜止め部79,79によって対応する遊嵌部178b,178bが遊嵌されたセクションSEが係合部78bから抜出することが防止される。
On both side surfaces of the connecting
このような保持具7bにあっては、異なる姿勢のセクションSEであっても、連結部77,77を回動させることなく、両遊嵌部178b,178bの内の対応する姿勢の遊嵌部178bによって、当該セクションSEを確実に係合させることができる。
In such a
図11及び図12は更に他の保持具の例を示す部分正面図及び部分平面図である。なお、図11及び図12にあっても単純化のために、図1及び図2に示したスクリュー32の羽根を省略してある。
11 and 12 are a partial front view and a partial plan view showing an example of still another holder. Note that the blades of the
保持具本体75,75の固定片76,76、76,76には短寸帯板状の連結部77,77、77,77の一端が、前記ロッド33の中心軸と直交する姿勢で連結固定してあり、ロッド33の軸長方向に対向する連結部77,77、77,77の間にはそれぞれ、細帯板材を平面視がレ字状に成形するとともにその端部に返しを設けてなり、鋼矢板SPの側縁に設けられたフック状のセクションを係合させる係合部78c,78cが架設してある。
One ends of the short strip-shaped connecting
かかる保持具7cにあっては、当該保持具7cを構成する一方の係合部78cに、油圧チャック(図1参照)にその一端部を固着させた鋼矢板SPの両側縁に設けられたセクションの内の一方を係合させる。これによって、鋼矢板SPの一端側は油圧チャックによって固着され、当該鋼矢板SPの他端側は保持具7によって保持されるため、鋼矢板SPの姿勢は鉛直方向に保持される。
In such a
なお、保持具7cとしては例えば、図13に示した如く、片手になした連結部77,77の間に、その先端部を平面視が面対称レ字状、即ち矢符形状に成形するとともに両端にそれぞれ返しを設けた係合部78c,78cを架設した構成でもよい。
As the
なお、本形態では、抜止め部79,79を設けた例として保持具7aを説明したが、本発明はこれに限らず、保持具7,7b,7cにも抜止め部79,79を設けも良いことは言うまでもない。
In this embodiment, the
ここで、鋼矢板SPにはフック状以外にも、図14(a)〜(c)に示した如く、種々の形状のセクションが設けられており、保持具本体75の係合部はセクションの形状に応じた形状の遊嵌部を設けておく。例えば、図14(a)(c)に示した如く、鋼矢板SPに平面視がT字状のセクションが設けられている場合、保持具本体75の係合部には、一対の山形材を適宜距離隔てて配してなる形状の遊嵌部78d、又はその一部が削除された環状の遊嵌部78fを形成しておき、逆に、鋼矢板SPに一対の山形材を適宜距離隔てて配してなる形状又はその一部が削除された環状のセクションが設けられている場合、保持具本体75の係合部にはT字状の遊嵌部78eを形成しておく。また、図14(b)に示した如く、鋼矢板SPにその一部が削除された環状のセクションが設けられている場合、保持具本体75の係合部もその一部が削除された環状の遊嵌部78f又はT字状の遊嵌部78eを形成しておく。
Here, in addition to the hook shape, the steel sheet pile SP is provided with sections having various shapes as shown in FIGS. 14 (a) to 14 (c), and the engaging portion of the
このように、係合部にはセクションの形状に応じた形状の遊嵌部78a〜fを設けるが、いずれの形状であっても、遊嵌部78a〜fは鋼矢板SPのセクション対して抜き差し自在なレール状になしてある。これによって、後述する如く空穴内へ鋼矢板SPを遊嵌させた後に、オーガ本体31、スクリュー32及び該スクリュー32に取り付けられた保持具7等を引き上げる際に、保持具7の遊嵌部78bが鋼矢板SPのセクション上を摺動することができ、当該引き上げ作業を円滑に実施することができる。
In this way, the engaging portions are provided with the loose
次に、矢板施工装置の振れ止め具8について説明する。
図15は図1に示した振れ止め具8の斜視図である。なお、図中、図1及び図2に示した部分に対応する部分には同じ番号が付してある。Next, the
FIG. 15 is a perspective view of the
図15に示したように、振れ止め具8は矩形のブロック状の躯体の略中央部に、縦方向の貫通孔82を開設してなる振れ止め本体81を具備しており、貫通孔の内径は前述したスクリューヘッド34(図1参照)の外径より大きくしてある。振れ止め本体81の周面には、前記貫通孔82に連通する帯状の開口部83が、振れ止め本体81の縦方向の全長に亘って設けてあり、該開口部83内に油圧シリンダ5に垂下された鋼矢板SP(図1参照)の一側部を挿入するようになっている。
As shown in FIG. 15, the
施工対象領域の地盤中に複数の鋼矢板SP,SP,…を埋設する場合、各鋼矢板SP,SP,…別に鉛直軸周りに向きを異ならせる場合がある。そのため、例えば、図15(a)に示したように、振れ止め本体81の一側面に開口部83を設けた振れ止め具8、図15(b)に示したように、振れ止め本体81の正面に開口部83を設けた振れ止め具8、更に、図15(c)に示したように、振れ止め本体81の他側面に開口部83を設けた振れ止め具8、を予め用意しておき、適宜の振れ止め具8を選択して、リーダ2のガイドレール21,21(図1参照)に固定しておく。
When a plurality of steel sheet piles SP, SP, ... Are buried in the ground of the construction target area, the orientation of each steel sheet pile SP, SP, ... May be different around the vertical axis. Therefore, for example, as shown in FIG. 15 (a), the
一方、振れ止め本体81の背面には、一対の半円筒状の第2外嵌部81a,81aが振れ止め本体81の中心軸と直交する方向へ所定距離を隔て、互いに対向する姿勢で突設してあり、両第2外嵌部81a,81aをガイドレール21,21(図1参照)に外嵌させ、例えば当該ガイドレール21,21に固着させた落下防止具(図示せず)を第2外嵌部81a,81aの下端に配設することによって、振れ止め具8をガイドレール21,21に固定する。
On the other hand, on the back surface of the
このような振れ止め具8にあっては、前述したようにガイドレール21,21を介してリーダ2(いずれも図1参照)に支持されているため、油圧シリンダ5に垂下された鋼矢板SPに振れが発生した場合であっても、当該振れは振れ止め具8に影響を及ぼさない一方、鋼矢板SPの一側部が振れ止め本体81の開口部83内に挿入されているため、振れが発生した鋼矢板SPの一側部が振れ止め本体81の開口部83に臨む当接面83a,83aに当接して、鋼矢板SPの振れを低減及び停止することができる。
Since the
次に、このような矢板施工装置を用いて矢板を施工する方法について説明する。
図16は図1に示した矢板施工装置を用いて矢板を施工する手順を説明する説明図である。なお、図中、図1及び図2に示した部分に対応する部分には同じ番号が付してある。Next, a method of constructing a sheet pile using such a sheet pile construction device will be described.
FIG. 16 is an explanatory diagram illustrating a procedure for constructing a sheet pile using the sheet pile construction apparatus shown in FIG. In the figure, the parts corresponding to the parts shown in FIGS. 1 and 2 are numbered the same.
図16(a)に示したように、移動手段12によって車両本体11及びリーダ2を施工対象領域の所定位置に位置させた後、アースオーガ3のオーガ本体31を駆動させてスクリュー32を回転させつつ、オーガ本体31をリーダ2のガイドレール21,21に沿って降下させ、スクリュー32によって当該位置の地盤を、鋼矢板SPの長さに応じた所定深さまで掘削することによって当初の空穴Hを形成する。その後、オーガ本体31及びスクリュー32を引き上げ、オーガ本体31の駆動を停止する。
As shown in FIG. 16A, after the
このとき、油圧シリンダ5は支持本体41の周面であって、次工程で施工する鋼矢板SPの向きに応じた位置に予め固定しておくが、当該油圧シリンダ5には鋼矢板SPを垂下させない。なお、前述したスクリュー32には、鋼矢板SPの幅寸法以上の適宜の外径を有するスクリューヘッド34が取り付けてある。
At this time, the
次に、移動手段12及び/又は車両本体11等によってリーダ2を前記空穴Hの隣接する位置に位置させる。また、吊り上げ機9をして鋼矢板SPを吊下げさせて、当該鋼矢板SPの上端部を油圧チャック6によって固着する一方、油圧シリンダ5のシリンダロッド51を伸縮させながら、鋼矢板SPの下端近傍の一側部を振れ止め具8の開口部83(図7参照)内に挿入させるとともに、鋼矢板SPの一側部に設けられたセクションを保持具7の係合部78に係合させる。これによって、鋼矢板SPを鉛直方向の姿勢に保持する。
Next, the
なお、このとき、鋼矢板SPのセクション内にワイヤ又は粘土質土壌等を装填しておいてもよい。保持具7の係合部78とそこに係合された鋼矢板SPのセクションとの間に小石等が侵入した場合、係合部78から鋼矢板SPが抜けなくなる虞があるが、鋼矢板SPのセクション内に充填されたワイヤ又は粘土質土壌等によって小石等が侵入を防止することができ、これによって前述した如き支障の発生が回避される。
At this time, a wire, clay soil, or the like may be loaded in the section of the steel sheet pile SP. If pebbles or the like intrude between the engaging
この状態で、図8(b)に示したように、再びアースオーガ3のオーガ本体31を駆動させてスクリュー32を回転させつつ、オーガ本体31をリーダ2のガイドレール21,21に沿って降下させ、スクリュー32によって前の空穴Hに隣接する位置の地盤を所定深さまで掘削することによって次の空穴Hを形成するとともに、油圧チャック6に固着させた鋼矢板SPを前の空穴H内へ進入させて行く。
In this state, as shown in FIG. 8B, the
前述した如く、空穴Hの直径は鋼矢板SPの幅寸法以上になしてあるため、空穴H内の鋼矢板SPは、空穴Hの周囲の地盤からの抵抗といった特段の支障を被ることなく、当該空穴Hの深部へ進入させることができる。また、スクリュー32の降下とともに、オーガ本体31に連結させた油圧シリンダ5、及びスクリュー32のロッド33に遊嵌させた保持具7も降下するため、油圧チャック6と保持具7とによって略鉛直姿勢に保持された鋼矢板SPにあっては、当該鋼矢板SPを空穴H内へ進入させて行く間も略鉛直姿勢に保持され続ける。従って、鋼矢板SPを空穴H内へ進入させる作業を円滑に実施することができる。
As described above, since the diameter of the hole H is larger than the width dimension of the steel sheet pile SP, the steel sheet pile SP in the hole H suffers from a special hindrance such as resistance from the ground around the hole H. It is possible to enter the deep part of the hole H without any problem. Further, as the
ところで、スクリュー32によって施工対象領域の地盤を掘削して次の空穴Hを形成して行く間、例えば当該地盤中の石等がスクリューヘッド34に噛み込んでスクリュー32が揺動し、スクリュー32のロッド33に遊嵌させた保持具7に支持された鋼矢板SPも揺動する虞があるが、前述した如く、鋼矢板SPの一側部がリーダ2のガイドレール21,21に固定した揺れ止め具8の開口部83(図15参照)内に挿入してあるため、振れが発生した鋼矢板SPの一側部が振れ止め本体81の開口部83に臨む当接面81a,81a(図15参照)に当接して、鋼矢板SPの振れが低減及び停止される。
By the way, while excavating the ground in the construction target area with the
ここで、前の空穴Hに隣接させて次の空穴Hを開設するので、スクリュー32には周囲の地盤から前の空穴Hへ向かう土圧が印加され、印加される土圧の程度によっては、鉛直方向へスクリュー32を進入させることが難しい場合がある。かかる場合にあっては、例えばステー14,14によってリーダ2の傾きを調整することによって、鉛直方向へスクリュー32を進入させることができる。一方、施工対象領域の地盤の性質によっては、スクリューヘッド34から例えばセメント系の薬剤を吐出させながら空穴Hを形成するようにしてもよい。これによって、ヒービング又はボイリング等、掘削底面の破壊現象の発生を回避することができる。
Here, since the next hole H is opened adjacent to the previous hole H, the earth pressure from the surrounding ground toward the previous hole H is applied to the
そして、このような前の空穴Hに隣接させて次の空穴Hを形成する作業と、前の空穴Hへ鋼矢板SPを挿入させる作業とを並行して実施する施工操作を繰り返すことによって、図16(c)に示したように、複数の空穴H,H,…内にそれぞれ鋼矢板SP,SP,…を挿入させる。このとき、相隣る鋼矢板SP,SPは自身のセクションを相互に係合させることによって、互いに固着させてある。更に、適宜のタイミング毎に、鋼矢板SP,SP,…を挿入させた空穴H,H,…を埋め戻すことによって、施工対象領域の地盤中に複数の鋼矢板SP,SP,…を埋設する。 Then, the work of forming the next hole H adjacent to the previous hole H and the work of inserting the steel sheet pile SP into the previous hole H are repeated in parallel. As shown in FIG. 16 (c), the steel sheet piles SP, SP, ... Are inserted into the plurality of holes H, H, ..., Respectively. At this time, the adjacent steel sheet piles SP and SP are fixed to each other by engaging their sections with each other. Further, by backfilling the holes H, H, ... In which the steel sheet piles SP, SP, ... Are inserted at appropriate timings, a plurality of steel sheet piles SP, SP, ... Are buried in the ground of the construction target area. To do.
なお、本実施の形態では、鋼矢板SPを油圧チャック6に固着させるための吊り上げ機9をリーダ2の頂部に配設した矢板施工装置を用いた場合について説明したが、本発明はこれに限らず、吊り上げ機9が配設されていない矢板施工装置及び該矢板施工装置に相伴させるクレーンを用い、この相伴クレーンによって吊り上げた鋼矢板を矢板施工装置の油圧チャック6に固着させるようにしてもよい。また、本実施の形態では、U形又はハット形等に成形した鋼矢板SPを用いた場合について説明したが、管材の外周面に接手(セクション)を設けてなる管矢板を適用してもよい。
In the present embodiment, the case where the sheet pile construction device in which the
一方、本実施の形態では、スクリュー2の周囲にケーシングを設けていない場合を示したが、本発明はこれに限らず例えば、図17に示したように、スクリュー2の周囲を筒状のケーシング(筒状体)28で囲繞するように構成してもよい。
On the other hand, in the present embodiment, the case where the casing is not provided around the
この場合、ケーシング28は、前述した平面視がC字状の振れ止め具8の内径より小さい外径になしておき、支持本体41の下端から垂下させたケーシング28を前記振れ止め具8内に挿通させる。そして、スクリュー2の支持本体41の下端位置から保持具7の上端位置に亘る領域を、ケーシング28で囲繞するように構成するとよい。なお、ケーシング28の周面であってケーシング28の中心軸上に複数の開口29,29,…を、ケーシング28の長手方向へ互いに適宜の距離を隔てて設けておく。
In this case, the
このようなケーシング28によってスクリュー2の周囲を囲繞することによって、スクリュー2にて掘削搬送された土石等をケーシング28の所定の位置から排出させることができるため、矢板の施工中、矢板施工装置の周囲への土石等の散乱が防止され、矢板の施工作業を円滑に実施することができ、また排出された土石等の後処理も円滑に行うことができる。
By surrounding the circumference of the
(発明を実施するための第2の形態)
図18及び図19は本発明に係る更に他の矢板施工装置を示す正面図及び側面図であり、図中、1はクローラといった移動手段12と、該移動手段12上に回動可能に担持され、運転操作部及び動力部等を有する車両本体11とを具備する車両である。本車両本体11にあっては、車両本体11を構成する台座に柱状のリーダ2を支持する支持部15が突設してあり、該支持部15によって略鉛直方向に立設されるリーダ2の下端近傍の部分が支持されている。また、前述した台座の車両本体11近傍には油圧にて伸縮可能なステー14の基部が設けてあり、該ステー14の先端部はリーダ2の長さ方向の中途位置に連結してある。(Second mode for carrying out the invention)
18 and 19 are front and side views showing still another sheet pile construction apparatus according to the present invention, in which 1 is rotatably supported on a moving means 12 such as a crawler and the moving
リーダ2の外周面には、リーダ2の中心軸と平行に配置し少なくとも一対のガイドレール21,21がリーダ2の長手方向の略全域に亘って設けてあり、ガイドレール21,21にはアースオーガ(掘削手段)3のオーガ本体(回転駆動機)31が後述するガイドギブ35を介してリーダ2の長手方向へ摺動自在に取り付けてある。オーガ本体31のリーダ2に対向する部分には図示しないピニオンが配設してある一方、リーダ2の外周面であって、オーガ本体31のリーダ2の長手方向へ昇降する領域に対向する部分には前記ピニオンに噛合するラック23が配設してある。そして、オーガ本体31は、内蔵する駆動機によってピニオンを正逆回転させることによって、該ピニオンが噛合したラック23に倣ってリーダ2の長手方向へ昇降し得るようになっている。
On the outer peripheral surface of the
なお、本発明に係る矢板施工装置はかかる構成に限らず、例えばラフタークレーンにリーダを垂下させるラフター式施工装置等、リーダ2が中心軸回りに回動し得ない他の構成の矢板施工装置にも適用することができる。一方、リーダ2が中心軸回りに回動し得るように構成された矢板施工装置に適用してもよい。
The sheet pile construction device according to the present invention is not limited to such a configuration, and may be used for sheet pile construction devices having other configurations in which the
前述したオーガ本体31には、長尺のロッド33の外周面に螺旋状の羽根を設けてなるスクリュー32の基端が連結固定してあり、オーガ本体31の駆動力によってスクリュー32は回転駆動されるようになっている。スクリュー(掘削用柱状体)32の先端にはスクリューヘッド34が交換可能に取り付けてあり、施工対象領域の地盤に応じたスクリューヘッド34が取り付けられるようになっている。
The
そして、車両1を施工対象領域の適宜位置に移動させた後、アースオーガ3のオーガ本体31を駆動させてスクリュー32を回転させながら、内蔵する駆動機をしてピニオンを正回転させることによってオーガ本体31を降下させてスクリューヘッド34を地盤中へ進入させ、これによって施工対象領域の地盤を掘削するようになっている。
Then, after moving the
ところで、本発明に係る矢板施工装置にあっては、オーガ本体31の周面に油圧シリンダ(進退機)5が、当該油圧シリンダ5のピストンロッド51を地面側に向けた姿勢で配置してあり、該油圧シリンダ5は後述する取付構造140を介してオーガ本体31の外周面に、当該オーガ本体31の周方向へ回動可能に取り付けられている。
By the way, in the sheet pile construction device according to the present invention, a hydraulic cylinder (advancing / retreating machine) 5 is arranged on the peripheral surface of the auger
一方、リーダ2の頂部には鋼矢板SPを吊り上げるための吊り上げ機9が配設してあり、該吊り上げ機9から引き出した吊上ワイヤ91によって鋼矢板SPを吊り上げるようになっている。また、前述した油圧シリンダ5のピストンロッド51の先端には油圧チャック(固着手段)6が配設してあり、吊り上げ機9によって吊り上げられた鋼矢板SPの一端を油圧チャック6に固着させるようになっている。
On the other hand, a lifting
前述したように、油圧シリンダ5は、リーダ2の長手方向へ昇降するオーガ本体31に取り付けられているため、油圧シリンダ5に垂下された鋼矢板SPもオーガ本体31の昇降動作に伴って昇降する。
As described above, since the
ところで、前述したスクリュー32のロッド33であってスクリューヘッド34の近傍に、鋼矢板SPの側縁に設けられたセクションを摺動可能に保持する保持具7が遊嵌してあり、油圧シリンダ5に垂下された鋼矢板SPはそのセクションが保持具7に保持されることによって略鉛直方向の姿勢を保たれるようになしてある。なお、本矢板施工装置は、鋼矢板SPとしては爪としてのセクションがその両側縁に設けてあるものであれば、ハット形、U形又は直線形、或は管形等、適宜の形状に適用することが出来る。
By the way, in the
更に、リーダ2に配設されたガイドレール21,21の下端近傍であって前記保持具7の高さより少し高い位置には、図15に示した如き平面視がC字状の振れ止め具8が着脱可能に固定してあり、油圧シリンダ5に垂下された鋼矢板SPの一側部を振れ止め具8内に挿入させるようになっている。スクリュー32によって施工対象領域の地盤を前述した如く掘削して行く際に、スクリューヘッド34に石等が噛み込んでスクリュー32が揺動する場合があるが、前述したように保持具7はスクリュー32のロッド33に支持されているため、スクリュー32の揺動に伴って保持具7及び該保持具7に保持された鋼矢板SPも揺動するが、リーダ2に支持された振れ止め具8内に鋼矢板SPの一側部を挿入させることによって、当該鋼矢板SPの揺動を抑制及び停止させることができる。
Further, at a position near the lower ends of the guide rails 21 and 21 arranged on the
図20〜図23は、図18に示した矢板施工装置の部分斜視図、部分正面図、部分側面図、一部省略部分底面図であり、これらの図面を用いて、前述した油圧シリンダ5をオーガ本体31に取り付けるための取付構造を詳述する。なお、これら図20〜図23中、図18及び図19に示した部分に対応する部分には同じ番号が付してある。
20 to 23 are a partial perspective view, a partial front view, a partial side view, and a partially omitted partial bottom view of the sheet pile construction apparatus shown in FIG. The mounting structure for mounting on the
図20乃至図23に示したように、油圧シリンダ5を構成する筒状のシリンダチューブ50のオーガ本体31に対向する部分には、油圧シリンダ5を支持する板状の基体141が配置してあり、該基体141の正面にシリンダチューブ50がボルト等によって固定してある。基体141の裏面側には縦方向へ距離を隔てて配された少なくとも2対の脚部が横方向へ距離を隔てて突設してあり、各脚部の先端にはそれぞれスライダ145,145、145,145が固定してある。これら脚部と対応するスライダ145,145、145,145によって後述するレール147,147に嵌合する嵌合部が構成されている。ここで、前述した基体141はブロック状であってもよい。
As shown in FIGS. 20 to 23, a plate-shaped
一方、オーガ本体31の外周面であって、前記対をなすスライダ145,145、145,145に対向する位置には、該スライダ145,145、145,145を内嵌させるレール(案内部)147,147が設けてあり、両レール147,147に内嵌されたスライダ145,145、145,145はレール147,147内をその長手方向へ前進後退し得るようになっている。両レール147,147は、オーガ本体31のリーダ2に対向しない領域に、オーガ本体31に設けられた一方のガイドギブ35近傍から他方のガイドギブ35近傍に亘って延設してあり、これによって基体141及び該基体141に固定された油圧シリンダ5はオーガ本体31の中心軸回りに270°程度回動し得るようになっている。なお、レール(案内部)147,147はオーガ本体31の周面に突設された様態であってもよく、またオーガ本体31の周面に凹設された様態であってもよい。これら基体141、各脚部及びスライダ145,145、145,145を具備する嵌合部、並びにレール147,147等によって取付構造140が構成されている。
On the other hand, on the outer peripheral surface of the auger
図24は、図20に示した取付構造140のスライダ145付近の縦断面図である。なお、図24中、図20に示した部分に対応する部分には同じ番号が付してある。
FIG. 24 is a vertical cross-sectional view of the mounting
図24に示した如く、レール147はその断面形状が例えばC字状をなしており、かかるレール147内に、頭部が円形又は矩形のスライダ145が嵌入してある。これによって、レール147からスライダ145が脱離することが防止される。ここで、スライダ145はレール147内をその長手方向へ摺動し得るように構成してもよく、また、1又は複数のベアリングを設けて、レール147内を回転移動し得るように構成してもよい。
As shown in FIG. 24, the
ところで、オーガ本体31の底部には、オーガ本体31の外径と同程度の直径を有する外歯のギア148が、オーガ本体31の中心軸と同心円上に固着してあり、該ギア148には基体141及び基体141に固定された油圧シリンダ5の回動を禁止するためのストッパ143が着脱可能に噛合している。ストッパ143は保持部42に設けられた嵌合凹部142aに進退可能に内嵌してあり、該保持部142は基体141の下端近傍に固定して、該基体141によって支持されている。これらギア148,保持部142及びストッパ143等も取付構造140を構成しており、またギア148及びストッパ143等によって禁止手段が構成されている。
By the way, on the bottom of the auger
図25は図20に示したストッパ143及びギア148の模式的部分斜視図であり、図25(a)はストッパ143を作動させた状態を、一方、図25(b)はストッパ143を解除した状態をそれぞれ示している。
25 is a schematic partial perspective view of the
図25(a)(b)に示したように、ストッパ143はヘッド部143aに脚部143cの一端を連結したハンマー形をなしており、ヘッド部143aには前述したギア148に噛合する凹凸が形成された噛合部143bが設けてある。保持部142は前述した基体141(図4参照)からギア148の下面側へ延設されており、保持部142のギア148の外周部近傍の位置に、ヘッド部143aを嵌入させるための嵌合凹部142aが設けてある。この嵌合凹部142a内にストッパ143が、脚部143cの他端が保持部142の嵌合凹部142aの底部の部分を貫通する様態で挿入してある。脚部143cの嵌合凹部142a内の部分にはバネ部材146が外嵌してあり、ヘッド部143aにはバネ部材146(付勢手段)によって嵌合凹部142aから突出する方向へ付勢されるようになっている。なお、付勢手段としてはバネ以外にもゴムといった弾性体による弾性力又は空気圧といった圧力を印加し得る部材を適用することができる。
As shown in FIGS. 25 (a) and 25 (b), the
このようなストッパ143にあっては、図25(a)に示したように、ストッパ143に外力が作用されない場合、バネ部材146からの付勢によって、ストッパ143のヘッド部143aが保持部142の嵌合凹部142aから突出して、前記ギア148に噛合する複数の凹凸を設けてなる噛合部143bがギア148に噛合するため、保持部142及び該保持部142を支持する基体141(図21照)がオーガ本体31の中心軸回りに回動することが禁止される。
In such a
一方、図25(b)に示したように、ストッパ143を構成する脚部143cの他端側に引力が作用されると、バネ部材146の付勢に抗して、ストッパ143のヘッド部143aが保持部142の嵌合凹部142a内へ後退して噛合部143bがギア148から脱離するためストッパ143が解除される。この状態で、保持部142,該保持部142を支持する基体141及び該基体 に固定された油圧シリンダ5(共に図21参照)に外力を印加して、それらをオーガ本体31(図20参照)の中心軸回りに回動させることができる。
On the other hand, as shown in FIG. 25B, when an attractive force is applied to the other end side of the
そして、保持部142並びに該保持部142を支持する基体141及び該基体141に固定された油圧シリンダ5をオーガ本体31の中心軸回りに所要角度だけ回動させると、ストッパ143の脚部143cの他端側に作用させた引力を除去する。これによって、図25(a)に示したように、バネ部材146からの付勢によってストッパ143のヘッド部143aが保持部142の嵌合凹部142aから再び突出して噛合部143bがギア148に噛合し、保持部142及び該保持部142を支持する基体141(図21参照)がオーガ本体31(図20参照)の中心軸回りに回動することが禁止される。
Then, when the holding
なお、本実施をするための形態では、オーガ本体31に外歯のギア148を固定した場合について示したが、本発明はこれに限らず、オーガ本体31に内歯のギアを固定しておいてもよい。この場合、前述した保持部142は内歯のギアの内部まで延設しておき、該保持部142の嵌合凹部142a内にストッパ143を、ヘッド部143aの噛合部143bが当該ギアの内歯に噛合し得るように挿入しておく。
In the embodiment for carrying out the present invention, the case where the
一方、本形態に係る矢板施工装置には図18に示したように、発明を実施するための第1の形態で説明した保持具7が設けてあり、該保持具7の前述した作用によって、スクリュー及びロッド33が回転した場合であっても、鋼矢板SPの姿勢に影響が及ぼされずに、鋼矢板SPは鉛直方向の姿勢に保持される。
On the other hand, as shown in FIG. 18, the sheet pile construction device according to the present embodiment is provided with the
なお、矢板施工装置には、保持具7に替えて、前述した保持具7a,7b,7cを設けてもよいことは言うまでもない。このとき、抜止め部79,79が設けられた保持具7a以外に、保持具7,7b,7cにも抜止め部79,79を設けることができる。抜止め部79,79が設けてある保持具にあっては、当該抜止め部79,79によって、対応する遊嵌部78b,78bが遊嵌されたセクションSEが係合部78から抜出することが防止される。
Needless to say, the sheet pile construction device may be provided with the above-mentioned
同様に、本矢板施工装置には図18に示したように、発明を実施するための第1の形態で説明した振れ止め具8が設けてある。前述した如く、振れ止め具8は、ガイドレール21,21を介してリーダ2に支持されているため、油圧シリンダ5に垂下された鋼矢板SPに振れが発生した場合であっても、当該振れは振れ止め具8に影響を及ぼさない一方、鋼矢板SPの一側部が振れ止め本体81の開口部83内に挿入されているため、振れが発生した鋼矢板SPの一側部が振れ止め本体81の開口部83に臨む当接面83a,83a(図15参照)に当接して、鋼矢板SPの振れを低減及び停止することができる。
Similarly, as shown in FIG. 18, the sheet pile construction device is provided with the
次に、このような矢板施工装置を用いて矢板を施工する方法について説明する。
図26及び図27は、図18に示した矢板施工装置を用いて矢板を施工する手順を説明する説明図である。なお、両図中、図28及び図29に示した部分に対応する部分には同じ番号が付してある。Next, a method of constructing a sheet pile using such a sheet pile construction device will be described.
26 and 27 are explanatory views illustrating a procedure for constructing a sheet pile using the sheet pile construction apparatus shown in FIG. In both figures, the parts corresponding to the parts shown in FIGS. 28 and 29 are numbered the same.
図26(a)に示したように、移動手段12によって車両本体11及びリーダ2を施工対象領域の所定位置に位置させた後、アースオーガ3のオーガ本体31を駆動させてスクリュー32を回転させつつ、オーガ本体31をリーダ2のガイドレール21,21に沿って降下させ、スクリュー32によって当該位置の地盤を、鋼矢板SPの長さに応じた所定深さまで掘削することによって当初の空穴Hを形成する。その後、オーガ本体31及びスクリュー32を引き上げ、オーガ本体31の駆動を停止する。
As shown in FIG. 26A, after the
このとき、油圧シリンダ5はオーガ本体31の周面であって、次工程で施工する鋼矢板SPの向きに応じた位置に予め固定しておくが、当該油圧シリンダ5には鋼矢板SPを垂下させない。なお、前述したスクリュー32には、鋼矢板SPの幅寸法以上の適宜の外径を有するスクリューヘッド34が取り付けてある。
At this time, the
次に、移動手段12及び/又は車両本体11等によってリーダ2を前記空穴Hの隣接する位置に位置させる。また、吊り上げ機9をして鋼矢板SPを吊下げさせて、当該鋼矢板SPの上端部を油圧チャック6によって固着する一方、油圧シリンダ5のシリンダロッド51を伸縮させながら、鋼矢板SPの下端近傍の一側部を振れ止め具8の開口部83(図15参照)内に挿入させるとともに、鋼矢板SPの一側部に設けられたセクションを保持具7の係合部78に係合させる。これによって、鋼矢板SPを鉛直方向の姿勢に保持する。
Next, the
なお、このとき、鋼矢板SPのセクション内にワイヤ又は粘土質土壌等を装填しておいてもよい。保持具7の係合部78とそこに係合された鋼矢板SPのセクションとの間に小石等が侵入した場合、係合部78から鋼矢板SPが抜けなくなる虞があるが、鋼矢板SPのセクション内に充填されたワイヤ又は粘土質土壌等によって小石等が侵入を防止することができ、これによって前述した如き支障の発生が回避される。
At this time, a wire, clay soil, or the like may be loaded in the section of the steel sheet pile SP. If pebbles or the like intrude between the engaging
この状態で、図26(b)に示したように、再びアースオーガ3のオーガ本体31を駆動させてスクリュー32を回転させつつ、オーガ本体31をリーダ2のガイドレール21,21に沿って降下させ、スクリュー32によって前の空穴Hに隣接する位置の地盤を所定深さまで掘削することによって次の空穴Hを形成するとともに、油圧チャック6に固着させた鋼矢板SPを前の空穴H内へ進入させて行く。
In this state, as shown in FIG. 26B, the
前述した如く、空穴Hの直径は鋼矢板SPの幅寸法以上になしてあるため、空穴H内の鋼矢板SPは、空穴Hの周囲の地盤からの抵抗といった特段の支障を被ることなく、当該空穴Hの深部へ進入させることができる。また、スクリュー32の降下とともに、オーガ本体31に取り付けた油圧シリンダ5、及びスクリュー32のロッド33に遊嵌させた保持具7も降下するため、油圧チャック6と保持具7とによって略鉛直姿勢に保持された鋼矢板SPにあっては、当該鋼矢板SPを空穴H内へ進入させて行く間も略鉛直姿勢に保持され続ける。従って、鋼矢板SPを空穴H内へ進入させる作業を円滑に実施することができる。
As described above, since the diameter of the hole H is larger than the width dimension of the steel sheet pile SP, the steel sheet pile SP in the hole H suffers from a special hindrance such as resistance from the ground around the hole H. It is possible to enter the deep part of the hole H without any problem. Further, as the
ところで、スクリュー32によって施工対象領域の地盤を掘削して次の空穴Hを形成して行く間、例えば当該地盤中の石等がスクリューヘッド34に噛み込んでスクリュー32が揺動し、スクリュー32のロッド33に遊嵌させた保持具7に支持された鋼矢板SPも揺動する虞があるが、前述した如く、鋼矢板SPの一側部がリーダ2のガイドレール21,21に固定した揺れ止め具8の開口部83(図14参照)内に挿入してあるため、振れが発生した鋼矢板SPの一側部が振れ止め本体81の開口部83に臨む当接面81a,81a(図25参照)に当接して、鋼矢板SPの振れが低減及び停止される。
By the way, while excavating the ground in the construction target area with the
ここで、前の空穴Hに隣接させて次の空穴Hを開設するので、スクリュー32には周囲の地盤から前の空穴Hへ向かう土圧が印加され、印加される土圧の程度によっては、鉛直方向へスクリュー32を進入させることが難しい場合がある。かかる場合にあっては、例えばステー14によってリーダ2の傾きを調整することによって、鉛直方向へスクリュー32を進入させることができる。一方、施工対象領域の地盤の性質によっては、スクリューヘッド34から例えばセメント系の薬剤を吐出させながら空穴Hを形成するようにしてもよい。これによって、ヒービング又はボイリング等、掘削底面の破壊現象の発生を回避することができる。
Here, since the next hole H is opened adjacent to the previous hole H, the earth pressure from the surrounding ground toward the previous hole H is applied to the
そして、このような前の空穴Hに隣接させて次の空穴Hを形成する作業と、前の空穴Hへ鋼矢板SPを挿入させる作業とを並行して実施する施工操作を繰り返すことによって、図27(c)に示したように、複数の空穴H,H,…内にそれぞれ鋼矢板SP,SP,…を挿入させる。このとき、相隣る鋼矢板SP,SPは自身のセクションを相互に係合させることによって、互いに固着させてある。更に、適宜のタイミング毎に、鋼矢板SP,SP,…を挿入させた空穴H,H,…を埋め戻すことによって、施工対象領域の地盤中に複数の鋼矢板SP,SP,…を埋設する。 Then, the work of forming the next hole H adjacent to the previous hole H and the work of inserting the steel sheet pile SP into the previous hole H are repeated in parallel. As shown in FIG. 27 (c), the steel sheet piles SP, SP, ... Are inserted into the plurality of holes H, H, ..., Respectively. At this time, the adjacent steel sheet piles SP and SP are fixed to each other by engaging their sections with each other. Further, by backfilling the holes H, H, ... In which the steel sheet piles SP, SP, ... Are inserted at appropriate timings, a plurality of steel sheet piles SP, SP, ... Are buried in the ground of the construction target area. To do.
ここで、係合部78の遊嵌部78bはスクリュー32のロッド33と平行に配され、鋼矢板SPのセクションに対して抜き差し自在なレール状になしてあるため、空穴Hへ挿入させた鋼矢板SPをそこに残して、オーガ本体31、スクリュー32及び保持具7を引き上げる際に、保持具7の遊嵌部78bが鋼矢板SPのセクション上を摺動し、オーガ本体31、スクリュー32及び保持具7の引き上げ作業を円滑に実施することができる。
Here, since the loose
一方、図27(d)に示したように、オーガ本体31の周面に取り付けた基体41及び油圧シリンダ5を矢板施工装置の正面の位置に配置するとともに、同じ正面に開口部83が位置した揺れ止め具8(図26(b)参照)をリーダ2のガイドレール21,21に固定しておく。
On the other hand, as shown in FIG. 27 (d), the
ここで、基体41及び油圧シリンダ5を矢板施工装置の正面の位置に配置するには、図25(b)に示した如く、ストッパ43を構成する脚部43cの他端側に引力を作用させて、バネ部材46の付勢に抗して、ストッパ43のヘッド部43aが保持部42の嵌合凹部42a内へ後退させてストッパ43を解除させる。この状態で、保持部42並びに該保持部42を支持する基体41及び該基体41に固定された油圧シリンダ5(共に図20照)に外力を印加して、それらを矢板施工装置の正面の位置まで回動させる。そして、図25(a)に示した如く、脚部43cの他端側に作用させた引力を除去して、バネ部材46からの付勢によってストッパ43のヘッド部43aが保持部42の嵌合凹部42aから再び突出させて噛合部43bをギア48に噛合させ、基体41及び油圧シリンダ5がオーガ本体31の中心軸回りに回動することを禁止しておく。
Here, in order to arrange the
そして、図26(a)と同様に、油圧シリンダ5には鋼矢板SPを垂下させない状態で、アースオーガ3のオーガ本体31を駆動させてスクリュー32を回転させつつ、オーガ本体31をリーダ2のガイドレール21,21に沿って降下させ、スクリュー32によって当該位置の地盤を、鋼矢板SPの長さに応じた所定深さまで掘削することによって当初の空穴Hを形成しておき、移動手段12及び/又は車両本体11等によってリーダ2を前記空穴Hの隣接する位置に位置させる。また、吊り上げ機9をして鋼矢板SPを吊下げさせて、当該鋼矢板SPの上端部を油圧チャック6によって固着する一方、油圧シリンダ5のシリンダロッド51を伸縮させながら、鋼矢板SPの下端近傍の一側部を振れ止め具8の開口部83内に挿入させるとともに、保持具7の向きを調整しつつ鋼矢板SPの一側部に設けられたセクションを保持具7の係合部78に係合させる。
Then, as in FIG. 26A, the
次に、移動手段12及び/又は車両本体11等によってリーダ2を前記空穴Hの隣接する位置に位置させる。また、吊り上げ機9をして鋼矢板SPを吊下げさせて、当該鋼矢板SPの上端部を油圧チャック6によって固着する一方、油圧シリンダ5のシリンダロッド51を伸縮させながら、鋼矢板SPの下端近傍の一側部を振れ止め具8の開口部83内に挿入させるとともに、鋼矢板SPの一側部に設けられたセクションを保持具7の係合部78に係合させて、鋼矢板SPを鉛直方向の姿勢に保持する。
Next, the
この状態で、図27(d)に示したように、再びアースオーガ3のオーガ本体31を駆動させてスクリュー32を回転させつつ、オーガ本体31をリーダ2のガイドレール21,21に沿って降下させ、スクリュー32によって前の空穴Hに隣接する位置の地盤を所定深さまで掘削することによって次の空穴Hを形成するとともに、油圧チャック6に固着させた鋼矢板SPを前の空穴H内へ進入させて行く。
In this state, as shown in FIG. 27 (d), the
図27(c)と図27(d)とから明らかなように、本発明に係る矢板施工装置にあっては、車両本体11の向きを変更することなく、オーガ本体31の周面に取り付けた基体41及び油圧シリンダ5を、オーガ本体31の周面方向へ回動させることによって、鋼矢板SPの向きを種々変更することができるため、鋼矢板SPの施工効率が高い。
As is clear from FIGS. 27 (c) and 27 (d), in the sheet pile construction device according to the present invention, the sheet pile construction device according to the present invention was attached to the peripheral surface of the auger
なお、本実施の形態では、鋼矢板SPを油圧チャック6に固着させるための吊り上げ機9をリーダ2の頂部に配設した矢板施工装置を用いた場合について説明したが、本発明はこれに限らず、吊り上げ機9が配設されていない矢板施工装置及び該矢板施工装置に相伴させるクレーンを用い、この相伴クレーンによって吊り上げた鋼矢板を矢板施工装置の油圧チャック6に固着させるようにしてもよい。また、本実施の形態では、U形又はハット形等に成形した鋼矢板SPを用いた場合について説明したが、管材の外周面に接手(セクション)を設けてなる鋼管矢板を適用してもよい。
In the present embodiment, the case where the sheet pile construction device in which the
なお、本発明に係る矢板施工装置はかかる構成に限らず、例えば三点支持式の施工装置、又はラフタークレーンにリーダを垂下させるラフター式施工装置等、他の施工装置を用いることができる。このとき、図17に示した如きケーシング28を配設してもよいことは言うまでもない。
The sheet pile construction device according to the present invention is not limited to such a configuration, and other construction devices such as a three-point support type construction device or a rough ter type construction device in which a leader is hung on a rough ter crane can be used. At this time, it goes without saying that the
なお、図1及び図18に示した矢板施工装置にあっては平面視において左回りになしたスクリュー32を用いた場合についてしめしたが、本発明に係る矢板施工装置はこれに限らず、左回り又は右回りいずれのスクリューも適用し得ることは言うまでもない。
In the sheet pile construction device shown in FIGS. 1 and 18, the case where the
1 車両
2 リーダ
3 アースオーガ(掘削手段)
4 支持体(支持手段)
5 油圧シリンダ(進退機)
6 油圧チャック(固着手段)
7 保持具
8 振れ止め具
21 ガイドレール
28 ケーシング(筒状体)
31 オーガ本体(回転駆動機)
32 スクリュー(掘削用柱状体)
33 ロッド
34 スクリューヘッド
78 係合部
140 取付構造
141 基体
142 保持部
143 ストッパ
145 スライダ
146 バネ部材
147 レール
148 ギア
178b 遊嵌部
SP 鋼矢板
H 空穴
1
4 Support (support means)
5 Hydraulic cylinder (advance / retreat machine)
6 Hydraulic chuck (fixing means)
7
31 auger body (rotary drive)
32 screw (columnar body for excavation)
33
Claims (23)
前記地盤を所要深さまで掘削して、前記矢板の幅寸法以上の直径を有する空穴を形成する工程と、
前記空穴に隣接させて、前記矢板の幅寸法以上の直径を有する次の空穴を形成するのと並行して、前記空穴内に矢板を挿入させる工程と
を実施することを特徴とする矢板施工方法。It is a method of constructing multiple strip-shaped sheet piles in the ground of the construction target area.
A step of excavating the ground to a required depth to form a hole having a diameter equal to or larger than the width dimension of the sheet pile.
A sheet pile is characterized in that a step of inserting a sheet pile into the hole is performed in parallel with forming the next hole having a diameter equal to or larger than the width dimension of the sheet pile adjacent to the hole. Construction method.
前記リーダに支持され、前記掘削用柱状体の揺動による矢板の揺動を止める振れ止め具を用いる請求項1から3のいずれかに記載の矢板施工方法。In parallel with excavating the ground with a columnar body for excavation connected to a rotary drive machine of excavation means fixed to a columnar leader so as to be able to advance and retreat, the rotary drive machine and the next hole are formed. When inserting the sheet pile supported by the excavation column into the hole,
The sheet pile construction method according to any one of claims 1 to 3, wherein a steady rest tool that is supported by the leader and stops the swing of the sheet pile due to the swing of the columnar body for excavation is used.
矢板の一端部を固着させる固着手段と、
前記回転駆動機に垂設され、固着手段を前記掘削用柱状体の相隣る位置に支持する支持手段と、
前記掘削用柱状体の先端近傍に遊嵌され、前記固着手段に固着された矢板の一側縁を保持する保持具と、
を備え、
前記掘削用柱状体にて前記地盤を所要深さまで掘削して空穴を形成するのと並行して、当該空穴に隣接して形成された前の空穴内に、前記固着手段に固着された矢板を挿入させるようになしてあることを特徴とする矢板施工装置。A vehicle provided with a means of transportation, a columnar leader supported by the vehicle in a substantially vertical direction, and an excavation means formed by vertically mounting an excavation columnar body on a rotary drive machine supported by the leader so as to be able to move up and down. In preparation, in the sheet pile construction equipment that constructs a strip-shaped sheet pile in the ground of the construction target area
A fixing means for fixing one end of the sheet pile,
A support means that is vertically installed on the rotary drive machine and supports the fixing means at positions adjacent to the drilling columnar body.
A holder that is loosely fitted near the tip of the excavation columnar body and holds one side edge of the sheet pile fixed to the fixing means.
With
In parallel with excavating the ground to a required depth with the excavation columnar body to form a hole, the hole was fixed to the fixing means in the previous hole formed adjacent to the hole. A sheet pile construction device characterized in that a sheet pile is inserted.
前記支持本体は周方向の複数位置でそれぞれ前記固着手段を支持し得るようになしてある請求項5から12のいずれかに記載の矢板施工装置。The support means includes a tubular support body that surrounds the excavation columnar body, and a vertical portion for vertically suspending the support body on the rotary drive machine.
The sheet pile construction device according to any one of claims 5 to 12, wherein the support main body can support the fixing means at a plurality of positions in the circumferential direction.
前記掘削用柱状体を構成するロッドに遊嵌させた筒状の保持具本体と、該保持具本体のロッドの軸長方向へのずれを防止するストッパと、矢板の側縁に設けられた爪部に係合させる係合部と、該係合部と保持具本体との間に架設した連結部とを具備し、
更に、前記連結部の係合部の近傍の位置に、係合部に係合した爪部が係合部から抜出することを防止する抜止め部が突設してある
ことを特徴とする保持具。A vehicle provided with a moving means, a columnar leader supported by the vehicle in a substantially vertical direction, and an excavating means obtained by vertically mounting a columnar body for excavation on a rotary drive machine supported by the leader so as to be able to move up and down. It is provided with a fixing means for fixing one end of the sheet pile and a supporting means which is vertically installed on the rotary drive machine and supports the fixing means at a position adjacent to the excavation columnar body, and has a strip shape in the ground of the construction target area. A holder that is loosely fitted near the tip of the excavating columnar body of the sheet pile construction device for constructing the sheet pile and holds one side edge of the sheet pile fixed to the fixing means.
A tubular holder body loosely fitted to a rod constituting the excavation columnar body, a stopper for preventing the rod of the holder body from shifting in the axial length direction, and a claw provided on the side edge of the sheet pile. It is provided with an engaging portion to be engaged with the portion and a connecting portion erected between the engaging portion and the holder main body.
Further, it is characterized in that a retaining portion for preventing the claw portion engaged with the engaging portion from being pulled out from the engaging portion is provided at a position near the engaging portion of the connecting portion. Holder.
The connecting portion extends in one direction around the rod, and the loose fitting portion extends from both sides of the main body of the engaging portion supported by the connecting portion. The holder according to claim 20 or 21, wherein the portions are provided so as to face both loose fitting portions.
Applications Claiming Priority (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2018060581 | 2018-03-27 | ||
JP2018060581 | 2018-03-27 | ||
JP2018190812 | 2018-10-09 | ||
JP2018190812 | 2018-10-09 | ||
PCT/JP2018/047837 WO2019187438A1 (en) | 2018-03-27 | 2018-12-26 | Sheet pile construction method, sheet pile construction device, and holding tool |
Publications (1)
Publication Number | Publication Date |
---|---|
JPWO2019187438A1 true JPWO2019187438A1 (en) | 2021-03-18 |
Family
ID=68058036
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2020509663A Pending JPWO2019187438A1 (en) | 2018-03-27 | 2018-12-26 | Sheet pile construction method, sheet pile construction equipment and holder |
Country Status (2)
Country | Link |
---|---|
JP (1) | JPWO2019187438A1 (en) |
WO (1) | WO2019187438A1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115233674B (en) * | 2021-04-22 | 2023-09-19 | 东台市巨力机械制造有限公司 | Column telescopic crawler pile driver |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS4922709A (en) * | 1972-06-24 | 1974-02-28 | ||
JPS5174410A (en) * | 1974-12-25 | 1976-06-28 | Honshu Shikoku Renkakukyo | KOYAITATATEKOMIHOHOOYOBI KOYAITATATEKOMYOKUTSUSAKUSOCHI |
JPS5418109A (en) * | 1977-07-08 | 1979-02-09 | Yuzuru Taniguchi | Method of pressing sheet pile into earth and machine of pressing in sheet pile |
JPS54108408A (en) * | 1978-02-15 | 1979-08-25 | Hitachi Construction Machinery | Method of steel pipe sheet pile building construction |
JPS55142835A (en) * | 1979-04-24 | 1980-11-07 | Toshio Enoki | Earth retaining method |
JPS61250229A (en) * | 1985-04-30 | 1986-11-07 | Mitsuo Sugaya | Method and apparatus for penetration of steel sheet pile |
JPS626019A (en) * | 1985-07-01 | 1987-01-13 | Kazuo Murazaki | Driving work of u-shaped sheet pile |
JPH11117299A (en) * | 1997-10-08 | 1999-04-27 | Nakatomi Kurimoto | Casing bracing device for foundation work machine |
JP3447273B2 (en) * | 2001-02-19 | 2003-09-16 | 日本車輌製造株式会社 | Elevating steady rest device |
JP2004162528A (en) * | 2004-03-15 | 2004-06-10 | Fumio Hoshi | Continuous lap drilling method by auger drilling machine, and auger drilling machine |
GB2529253A (en) * | 2014-08-15 | 2016-02-17 | Peter Michael Hickson | Pneumatic or hydraulically operated linear driver |
-
2018
- 2018-12-26 WO PCT/JP2018/047837 patent/WO2019187438A1/en active Application Filing
- 2018-12-26 JP JP2020509663A patent/JPWO2019187438A1/en active Pending
Also Published As
Publication number | Publication date |
---|---|
WO2019187438A1 (en) | 2019-10-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101669249B1 (en) | Slime disposal device and method of construction for large caliber Basic file construction | |
JP4792123B1 (en) | Underwater working machine and underwater working method | |
JPWO2019187438A1 (en) | Sheet pile construction method, sheet pile construction equipment and holder | |
JP2008255603A (en) | Driving method of inner excavation pile under low and narrow restriction | |
JP3230213U (en) | Drilling device for rockfall prevention fence support | |
JP2020037808A (en) | Method of constructing vertical shaft | |
JP2010031544A (en) | Hole wall protecting method of cast in place pile | |
JP2007138552A (en) | Pile removing device and pile removing method | |
JP3978469B2 (en) | Expansion drilling equipment and pile bottom expansion method | |
JP5946055B2 (en) | Drilling machine mounting bracket and drilling system | |
JP2005220573A (en) | Pile driving method | |
JP2019196611A (en) | Attachment structure and sheet pile construction device | |
JP3165997B2 (en) | Casting method and equipment for sheet piles | |
JP2021055429A (en) | Removal device of existing pile | |
JP2943845B2 (en) | Drilling equipment | |
JP2006336241A (en) | Pile construction method and pile construction system | |
JP3907538B2 (en) | Pile construction method and pile head extension and rotation device used therefor | |
JP2729940B2 (en) | Drilling rig | |
JP2008032182A (en) | Pipe installation method | |
JP7057582B1 (en) | Underground construction method for large pipes and bottomed buried pipes | |
JP6403300B1 (en) | How to embed sheet pile | |
JPH11229740A (en) | Subsoil excavation method and device | |
JP2007262677A (en) | Self-propelling apparatus of full slewing machine | |
JP6596952B2 (en) | Eyebreaking device | |
JP2017133249A (en) | Shaft excavation device and shaft excavation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A80 | Written request to apply exceptions to lack of novelty of invention |
Free format text: JAPANESE INTERMEDIATE CODE: A80 Effective date: 20191108 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20201216 |
|
AA64 | Notification of invalidation of claim of internal priority (with term) |
Free format text: JAPANESE INTERMEDIATE CODE: A241764 Effective date: 20201216 |