JPS645134B2 - - Google Patents

Info

Publication number
JPS645134B2
JPS645134B2 JP8839182A JP8839182A JPS645134B2 JP S645134 B2 JPS645134 B2 JP S645134B2 JP 8839182 A JP8839182 A JP 8839182A JP 8839182 A JP8839182 A JP 8839182A JP S645134 B2 JPS645134 B2 JP S645134B2
Authority
JP
Japan
Prior art keywords
column
steel frame
reinforcing bars
steel
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP8839182A
Other languages
Japanese (ja)
Other versions
JPS58204246A (en
Inventor
Shigeru Nikai
Takeshi Kojima
Kenzo Mizuhara
Noboru Fujii
Keiji Himi
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP8839182A priority Critical patent/JPS58204246A/en
Publication of JPS58204246A publication Critical patent/JPS58204246A/en
Publication of JPS645134B2 publication Critical patent/JPS645134B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【発明の詳細な説明】 この発明は鉄骨鉄筋コンクリート構造物の施工
法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method of constructing a steel reinforced concrete structure.

従来鉄筋コンクリート構造あるいは鉄骨構造で
は地上で所要の大きさに先組みしたものを現場で
組立てることは屡々実施されている。しかし鉄
骨、鉄筋コンクリート構造物の場合鉄骨は先組み
しても鉄筋は建込んだ鉄骨周縁に現場配筋してお
り、省力化、工期短縮等から改善が要望された。
Conventionally, reinforced concrete or steel structures are often pre-assembled to the required size on the ground and then assembled on site. However, in the case of steel frames and reinforced concrete structures, even if the steel frames are pre-assembled, the reinforcing bars are placed on-site around the erected steel frames, and improvements have been requested to save labor and shorten the construction period.

この発明は鉄骨と鉄筋とを可能な限りプレハブ
化して前記要望に対処すべくしたもので、以下そ
の詳細を図示した実施例によつて説明する。図に
おいてH形鋼等からなる柱鉄骨1の周囲には主鉄
筋2およびフープ筋3を籠状をなすように先組み
してある。その際鉄骨1を支持材とし、鉄骨1の
周辺に保持杆4を井桁状に組み、この保持杆4に
主鉄筋2を結束して取付けプレハブ化したユニツ
トを構成する。
This invention is intended to meet the above demand by prefabricating steel frames and reinforcing bars as much as possible, and details thereof will be explained below with reference to illustrated embodiments. In the figure, main reinforcing bars 2 and hoop reinforcing bars 3 are preassembled in a cage shape around a column steel frame 1 made of H-shaped steel or the like. At this time, the steel frame 1 is used as a support, retaining rods 4 are assembled around the steel frame 1 in a cross-shaped configuration, and the main reinforcing bars 2 are tied and attached to the retaining rods 4 to form a prefabricated unit.

以上のようにしてプレハブ化した柱鉄骨鉄筋の
ユニツトを吊上げ、先ず鉄骨1,1相互を連結板
5を添わせハイテンシヨンボルト締めして連結自
立させた後、主鉄筋2相互をガス圧接あるいはス
クイズジヨイント等により接合する。
The unit of column steel reinforcing bars prefabricated as described above is lifted up, and the steel frames 1 and 1 are first attached to each other with the connecting plate 5 and tightened with high tension bolts to make the connection independent, and then the main reinforcing bars 2 are welded together by gas pressure or squeezed. Join using joints, etc.

次いで柱型枠6を組立て一方向梁型枠7を組立
て、かつ梁床型枠8を組立てる。
Next, the column formwork 6 is assembled, the one-way beam formwork 7 is assembled, and the beam floor formwork 8 is assembled.

次いで柱コンクリートを打設し、プレハブ化し
た梁鉄筋9を配筋し、かつ床鉄筋を配筋して梁、
床コンクリートを打設する。
Next, column concrete is poured, prefabricated beam reinforcing bars 9 are placed, and floor reinforcing bars are placed to complete the beam.
Place concrete floor.

第4図は他の実施例を示したもので柱鉄骨1と
一方の梁鉄骨10を一体的に結合しておき、柱鉄
骨1を支持材とし主鉄筋2を取付、かつフープ筋
を籠状をなすように先組みしておくとともに梁鉄
骨10にも梁主鉄筋12およびスターラツプ13
を籠状をなすように、先組しておき柱梁鉄骨と鉄
筋のプレハブ化したユニツトを構成する。次にこ
のプレハブ化したユニツトを吊上げる。この場合
他方向の梁は鉄筋コンクリート構造,鉄骨鉄筋コ
ンクリート構造の何れでもよい。また一方向梁鉄
骨は梁型枠,床型枠の支保工として利用できる。
Figure 4 shows another embodiment in which the column steel frame 1 and one beam steel frame 10 are integrally connected, the column steel frame 1 is used as a support, the main reinforcing bars 2 are attached, and the hoop bars are shaped like cages. The beam main reinforcing bars 12 and stirrups 13 are attached to the beam steel frame 10 as well.
The columns are pre-assembled to form a cage-like structure, and a prefabricated unit of column, beam, and steel frames and reinforcing bars is constructed. Next, this prefabricated unit is lifted up. In this case, the beam in the other direction may have either a reinforced concrete structure or a steel reinforced concrete structure. Additionally, the one-way beam steel frame can be used as support for beam formwork and floor formwork.

第5図は梁鉄骨10を二方向とも柱鉄骨1と一
体的に結合したものであり、柱鉄骨および梁鉄骨
を支持材として柱主鉄筋2と梁主鉄筋12を井桁
状に取付け、第4図と同様に各柱,梁の鉄筋も籠
状をなすようにして先組みして柱梁鉄骨と鉄筋と
のプレハブ化したユニントを構成し、これを吊上
げる。
Figure 5 shows a beam steel frame 10 integrally connected to a column steel frame 1 in both directions, with the column main reinforcing bars 2 and beam main reinforcing bars 12 attached in a cross-shaped manner using the column steel frame and beam steel frame as supporting materials. As shown in the figure, the reinforcing bars of each column and beam are pre-assembled in a cage-like manner to form a prefabricated unit of column and beam steel frames and reinforcing bars, which is then lifted up.

なお、第2,第3の実施例では柱,梁,床コン
クリートを同時に打設するがその他の施工手順は
最初の実施例と略同様である。またこれら実施例
ではパネルゾーン部の配筋が簡略化され、あるい
は現場作業がなくなり、より施工が容易である。
In the second and third embodiments, columns, beams, and floor concrete are cast at the same time, but other construction procedures are substantially the same as in the first embodiment. Furthermore, in these embodiments, the reinforcement arrangement in the panel zone portion is simplified or on-site work is eliminated, making construction easier.

この発明は以上の構成よりなり、鉄骨鉄筋コン
クリート構造の施工に際して鉄骨と鉄筋が先組み
され、可能な限りプレハブ化されているので現場
での省力化が著しく、また鉄骨を自立させてから
鉄筋を連結するので施工が安全であり、またプレ
ハブ化によつて精度が向上し、工期が短縮し,作
業能率が向上する。
This invention has the above structure, and when constructing a steel reinforced concrete structure, the steel frames and reinforcing bars are pre-assembled and prefabricated as much as possible, resulting in significant labor savings on site.Also, the steel frames are allowed to stand on their own before being connected to the reinforcing bars. This makes construction safer, and prefabrication improves accuracy, shortens construction time, and improves work efficiency.

【図面の簡単な説明】[Brief explanation of drawings]

第1図、第2図は鉄骨、鉄筋の平面図と立面
図、第3図、第4図、第5図は施工状態の概要を
示した斜視図、第6図は鉄骨、鉄筋の斜視図であ
る。 1……鉄骨、2……主鉄筋、3……フープ筋、
4……保持杆、5……連結板、6……柱型枠、7
……梁型枠、8……梁床型枠、9……梁鉄筋、1
0……梁鉄骨、12……梁主鉄筋、13……スタ
ーラツプ。
Figures 1 and 2 are plan and elevation views of the steel frame and reinforcing bars, Figures 3, 4, and 5 are perspective views showing an overview of the construction status, and Figure 6 is a perspective view of the steel frames and reinforcing bars. It is a diagram. 1... Steel frame, 2... Main reinforcing bar, 3... Hoop bar,
4... Holding rod, 5... Connecting plate, 6... Column formwork, 7
... Beam formwork, 8 ... Beam floor formwork, 9 ... Beam reinforcement, 1
0...beam steel frame, 12...beam main reinforcing bar, 13...starrup.

Claims (1)

【特許請求の範囲】 1 柱鉄骨と柱鉄筋とを、鉄骨を支持材として、
鉄骨の周辺に保持杆を井桁状に組み、その周囲に
鉄筋を籠状をなすように先組みし柱鉄骨鉄筋のプ
レハブ化したユニツトを構成し、次いでこのプレ
ハブ化した柱鉄骨鉄筋のユニツトを吊上げ、鉄骨
相互に連結板を添わせボルト締めして連結自立さ
せ、次いで柱型枠6を組立て一方向梁型枠7を組
立て、かつ梁床型枠8を組立てて柱コンクリート
を打設し、次いでプレハブ化した梁鉄筋9を配筋
してあることを特徴とする鉄骨、鉄筋コンクリー
ト構造物の施工法。 2 柱鉄骨と少なくとも一方向の梁鉄骨とを一体
とし、それら鉄骨と鉄筋とを、鉄骨を支持材とし
て、柱鉄筋と梁鉄筋とを取付け、その周囲に鉄筋
を籠状をなすように先組みして柱梁鉄骨と鉄筋と
のプレハブ化したユニツトを構成し、次いでこの
プレハブ化した柱梁鉄骨と鉄筋のユニツトを吊上
げ、鉄骨相互に連結板を添わせ、ボルト締めして
連結自立させた後、鉄筋を接続することを特徴と
する鉄骨、鉄筋コンクリート構造物の施工法。
[Claims] 1. A column steel frame and a column reinforcing bar, with the steel frame as a supporting material,
Prefabricated column steel reinforcement units are constructed by assembling retaining rods around the steel frame in a cross-shaped cross-shaped structure, and pre-assembling reinforcing bars around them in a cage-like manner, and then lifting this prefabricated column steel reinforcement unit. , attach connecting plates to the steel frames and tighten bolts to make the connection self-supporting, then assemble the column formwork 6, assemble the one-way beam formwork 7, assemble the beam floor formwork 8, and pour the column concrete. A method of constructing a steel frame or reinforced concrete structure, characterized in that prefabricated beam reinforcing bars 9 are arranged. 2 The column steel frame and the beam steel frame in at least one direction are integrated, the steel frame is used as a supporting material, the column reinforcing bar and the beam reinforcing bar are attached, and the reinforcing bars are pre-assembled around them in a cage-like manner. After that, a prefabricated unit of column and beam steel frames and reinforcing bars is constructed, and then this prefabricated unit of column and beam steel frames and reinforcing bars is hoisted up, connecting plates are attached to each steel frame, and bolts are tightened to make the connection independent. , a construction method for steel frame and reinforced concrete structures characterized by connecting reinforcing bars.
JP8839182A 1982-05-25 1982-05-25 Construction of reinforced concrete structure Granted JPS58204246A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8839182A JPS58204246A (en) 1982-05-25 1982-05-25 Construction of reinforced concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8839182A JPS58204246A (en) 1982-05-25 1982-05-25 Construction of reinforced concrete structure

Publications (2)

Publication Number Publication Date
JPS58204246A JPS58204246A (en) 1983-11-28
JPS645134B2 true JPS645134B2 (en) 1989-01-27

Family

ID=13941492

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8839182A Granted JPS58204246A (en) 1982-05-25 1982-05-25 Construction of reinforced concrete structure

Country Status (1)

Country Link
JP (1) JPS58204246A (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61158537A (en) * 1984-12-28 1986-07-18 東急建設株式会社 Building of iron skeletal
JPS62260931A (en) * 1986-05-07 1987-11-13 鹿島建設株式会社 Construction of reinforced concrete body

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS512206B2 (en) * 1972-05-18 1976-01-23
JPS5238331A (en) * 1975-09-23 1977-03-24 Nippon Beet Sugar Mfg Attitude control device for farm machinery

Also Published As

Publication number Publication date
JPS58204246A (en) 1983-11-28

Similar Documents

Publication Publication Date Title
JPS645134B2 (en)
JP2000160687A (en) Construction method for composite structure and precast concrete column
JP2620118B2 (en) Net formwork method for walls and floors
JP2000073448A (en) Connection method and structure for precast concrete beam and column
JPH01214641A (en) Construction of steel-pipe precast concrete pole
JPS603844Y2 (en) reinforced concrete structure
JPH01203537A (en) Src precast beam and junction structure of column and beam
JPH0749681B2 (en) Steel frame / reinforced concrete composite construction method
JPH0412348B2 (en)
JPS62178634A (en) Framework construction method of structure
JPH06158863A (en) Method for constructing concrete frame
JPH0366878A (en) Construction method for precast column and beam and precast anti-seismic wall
JP2000265548A (en) Structure of joining part of column and beam and construction method for frame
JPH0546561Y2 (en)
JPH0410954B2 (en)
JPH044091Y2 (en)
JP2554535B2 (en) Steel beam / reinforced concrete column composite construction method
JPS6321773B2 (en)
JPS6141857Y2 (en)
JPH02236328A (en) Construction method for super-highrice building
JP2723011B2 (en) Construction method of steel frame reinforced concrete structure
JPH0448136B2 (en)
JP2651506B2 (en) How to apply underground beams
JPH06306951A (en) Frame for multistoried building
JPH0460183B2 (en)