JPS6361476B2 - - Google Patents

Info

Publication number
JPS6361476B2
JPS6361476B2 JP59161270A JP16127084A JPS6361476B2 JP S6361476 B2 JPS6361476 B2 JP S6361476B2 JP 59161270 A JP59161270 A JP 59161270A JP 16127084 A JP16127084 A JP 16127084A JP S6361476 B2 JPS6361476 B2 JP S6361476B2
Authority
JP
Japan
Prior art keywords
cylindrical structure
cutting edge
wall
ground
protection wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP59161270A
Other languages
Japanese (ja)
Other versions
JPS6140994A (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP16127084A priority Critical patent/JPS6140994A/en
Publication of JPS6140994A publication Critical patent/JPS6140994A/en
Publication of JPS6361476B2 publication Critical patent/JPS6361476B2/ja
Granted legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は筒体構造物を地中に埋設する方法に関
し、さらに詳しくは、現存する鉄道、道路等の建
造物の直下にプレカストコンクリート筒体等の筒
体構造物を掘進することにより立体交差を完成さ
せる方法に関するものである。
[Detailed Description of the Invention] [Field of Industrial Application] The present invention relates to a method of burying a cylindrical structure underground, and more specifically, to a method of burying a cylindrical structure underground, and more specifically, a method of burying a cylindrical structure underground, and more specifically, a method of burying a cylindrical structure underground, and more specifically, a method of burying a cylindrical structure underground. The present invention relates to a method for completing a grade separation by excavating a cylindrical structure such as a body.

〔従来の技術〕[Conventional technology]

このような方法に関する従来技術としていわゆ
るパイプルーフ工法が存する。従来のパイプルー
フ工法は第3図に示すように筒体構造物1の埋設
予定位置の上方および左右外方地盤中に、全長に
わたつてパイプ群を門型に予め圧入して地盤崩壊
防止用の擁護壁2を形成し、次いで、この擁護壁
2の内面に沿つて筒体構造物1を掘進する工法で
ある。
A so-called pipe roof construction method exists as a prior art related to such a method. As shown in Figure 3, in the conventional pipe roof construction method, a group of pipes is press-fitted in advance into the ground above and to the left and right of the planned burial position of the cylindrical structure 1 in a gate shape over the entire length to prevent ground collapse. In this construction method, a protection wall 2 is formed, and then a cylindrical structure 1 is excavated along the inner surface of this protection wall 2.

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

従来のパイプルーフ工法では、第3図に示すよ
うに、パイプ群から成る地盤崩壊防止用擁護壁2
の屋根部分2−1を筒体構造物1の上外方地盤中
に設置することとなるため、筒体構造物1と地表
5との間にパイプ群2−1が介在するためのいわ
ゆる土被りが必要となり、それだけ筒体構造物1
の埋設位置を下げなければならない。そのため、
長いアプローチが必要となり、掘削や土留も深
く、長くならざるを得ない。これは、当然に作業
量も増大させることとなる。
In the conventional pipe roof construction method, as shown in Figure 3, a protection wall 2 for preventing ground collapse consisting of a group of pipes is constructed.
Since the roof portion 2-1 will be installed in the ground above and outside the cylindrical structure 1, the pipe group 2-1 will be interposed between the cylindrical structure 1 and the ground surface 5. Covering is necessary, and the cylindrical structure 1
The burial position must be lowered. Therefore,
A long approach will be required, and the excavation and earth retention will have to be deep and long. This naturally increases the amount of work.

また、パイプ群から成る地盤崩壊防止用の擁護
壁2は地下立体交差完成後も地中に埋設されたま
ま残るため、パイプ上部の凹凸箇所に水溜りが生
じ、噴泥やさび水の原因となることも多い。これ
は、筒体構造物1およびその上層部道床、舗装等
の保守上の不利を招くものである。
In addition, because the protection wall 2, which is made up of a group of pipes and is used to prevent ground collapse, remains buried in the ground even after the underground overpass is completed, water pools can form on the uneven parts of the upper part of the pipes, which can cause mud and rust water. It often happens. This causes disadvantages in terms of maintenance of the cylindrical structure 1 and its upper trackbed, pavement, and the like.

さらに、地盤崩壊防止用擁護壁2のパイプ群は
回収されないから資源の無駄となり、これらの問
題点とともに経済的にもマイナスである。
Furthermore, since the pipes of the ground collapse prevention wall 2 are not recovered, it is a waste of resources, and in addition to these problems, it is also economically disadvantageous.

〔問題点を解決するための手段〕[Means for solving problems]

本発明は以上のような問題点を解決するもので
あり、その要旨とするところは、前端部に刃口4
を有する筒体構造物1を地中に埋設するためのパ
イプルーフ工法において、筒体構造物1が掘進さ
れる前方地盤中にパイプ等を門型に圧入して予め
形成される地盤崩壊防止用の擁護壁2を、前記筒
体構造物1の掘進に伴つて地盤中から前記刃口4
内に露出してくるように位置決め構築し、掘進に
伴つて露出してくる擁護壁2の内側面は前記刃口
4位置に固定した支保工3により支え、かつ、支
保工3による支え位置より筒体側に延出する擁護
壁2の余長部分を適宜切除することを特徴とする
筒体構造物の地中埋設方法にある。
The present invention solves the above-mentioned problems, and its gist is that a blade opening 4 is provided at the front end.
In the pipe roof construction method for burying a cylindrical structure 1 underground, a pipe or the like is press-fitted in a gate shape into the ground in front of which the cylindrical structure 1 is excavated to prevent ground collapse. As the cylindrical structure 1 is excavated, the protective wall 2 is removed from the ground through the cutting edge 4.
The inner surface of the protection wall 2, which is exposed as the excavation progresses, is supported by the support 3 fixed at the position of the cutting edge 4, and from the support position by the support 3. This method of burying a cylindrical structure underground is characterized by appropriately cutting off the extra length of the protecting wall 2 extending toward the cylindrical side.

本発明方法においては擁護壁2が筒体構造物1
前端部の刃口4内に露出してくるが、この擁護壁
2と刃口4との距離は擁護壁2と刃口4の接触に
よる変形防止、擁護壁2・刃口4間の土砂量、作
業の便宜等に鑑みるとほぼ30cm〜60cmが好まし
い。
In the method of the present invention, the protective wall 2 is attached to the cylindrical structure 1.
It is exposed inside the cutting edge 4 at the front end, but the distance between the protecting wall 2 and the cutting edge 4 is determined to prevent deformation due to contact between the protecting wall 2 and the cutting edge 4, and to prevent the amount of dirt between the protecting wall 2 and the cutting edge 4. , approximately 30 cm to 60 cm is preferable in view of work convenience and the like.

また、本発明において露出してくる擁護壁2を
指示する支保工3は地盤崩壊防止の点から刃口4
位置にあることが好ましい。もつとも支保工3は
単数である必要はなく、例えば長尺方向に複数設
け、複数位置で擁護壁2を受けて支持するように
しても良い。また、支保工3は刃口4に固定して
も筒体構造物1本体に固定しても良い。
In addition, in the present invention, the shoring 3 that directs the exposed protection wall 2 is provided with a cutting edge 4 from the viewpoint of preventing ground collapse.
preferably in position. Of course, the shoring 3 does not have to be singular, and for example, a plurality of shorings 3 may be provided in the longitudinal direction so as to receive and support the protection wall 2 at a plurality of positions. Further, the support 3 may be fixed to the cutting edge 4 or to the main body of the cylindrical structure 1.

また、本発明方法において、地盤崩壊防止用擁
護壁2を形成するパイプ等の形成材には、鋼管の
他、H型鋼等を使用することも可能である。
Furthermore, in the method of the present invention, as the material for forming the pipes and the like that form the ground collapse prevention wall 2, it is also possible to use H-shaped steel or the like in addition to steel pipes.

〔作用〕[Effect]

本発明方法においては、パイプ等で形成される
地盤崩壊防止用擁護壁2が、埋設すべき筒体構造
物1の掘進に伴つて筒体構造物の前端部刃口4内
に露出してくるように位置決め構築されているた
め、擁護壁2が地中に残存することもなく、ま
た、筒体構造物埋設に際しての条件が同じであれ
ば、従来のパイプルーフ工法に比べて筒体構造物
1埋設の深さをはかるかに浅くすることができ
る。
In the method of the present invention, as the cylindrical structure 1 to be buried is excavated, the ground collapse prevention wall 2 formed of a pipe or the like is exposed inside the cutting edge 4 at the front end of the cylindrical structure. Because the protective wall 2 is positioned in such a way that it does not remain underground, and if the conditions for burying the cylindrical structure are the same, it is easier to bury the cylindrical structure than with the conventional pipe roof construction method. 1. The depth of burial can be made much shallower.

また、露出してくる擁護壁2は筒体構造物1の
前端部刃口4位置に固定された支保工3により内
側面で支えられているため、門型擁護壁2が同擁
護壁2内の地盤掘削に伴つて内側に変形するのを
防ぐことが出来る。これにより、機械掘削も可能
となる。
In addition, since the exposed protecting wall 2 is supported on the inner surface by the support 3 fixed at the cutting edge 4 position at the front end of the cylindrical structure 1, the gate-shaped protecting wall 2 is inside the protecting wall 2. This can prevent inward deformation due to ground excavation. This also allows mechanical excavation.

さらに、本発明方法では擁護壁2は筒体構造物
1の前端部刃口4内に地盤から露出してくるた
め、前記擁護壁2の進路に筒体構造物外周壁がぶ
つかる不都合が起こる場合がある。このような場
合には必要に応じて擁護壁2を構成するパイプ等
を切除してやれば良い。
Furthermore, in the method of the present invention, since the protecting wall 2 is exposed from the ground within the cutting edge 4 at the front end of the cylindrical structure 1, there may be an inconvenience that the outer circumferential wall of the cylindrical structure collides with the path of the protecting wall 2. There is. In such a case, the pipes and the like constituting the protection wall 2 may be removed as necessary.

〔実施例〕〔Example〕

本発明実施例を以下図面に基いて説明する。第
1図aは本発明の実施例を示す正面図、第1図b
は本発明の実施例を示す一部を断面にした斜視
図、第2図,第4図乃至第7図は本発明の実施例
を示す側面図である。第4図に示すように、ま
ず、立体交差予定箇所を狭んでA及びBの立坑を
掘り下げながら鋼製パイプをA又はBのいずれか
片側から順次圧入し、立坑をほぼ貫通して第1図
a,bのように端面門型に設置し、擁護壁2を形
成する。この場合、擁護壁2はAまたはBの支保
工を設置する側の立坑土留より外側に第1図a,
b、第2図及び第5図のように門型擁護壁2の内
側に支保工3が組立てのできるように余長を出し
ておくことが好ましい。
Embodiments of the present invention will be described below based on the drawings. Figure 1a is a front view showing an embodiment of the present invention, Figure 1b
1 is a partially sectional perspective view showing an embodiment of the present invention, and FIGS. 2, 4 to 7 are side views showing embodiments of the present invention. As shown in Fig. 4, first, while narrowing the planned grade-separated intersection and digging down the shafts A and B, steel pipes are sequentially press-fitted from either side of A or B, almost penetrating the shafts as shown in Fig. 1. It is installed in an end face gate shape as shown in a and b to form a protection wall 2. In this case, the retaining wall 2 is located outside the shaft retaining area on the side where shoring A or B is installed, as shown in Figure 1 a.
It is preferable to leave an extra length so that the shoring 3 can be assembled inside the gate-shaped protection wall 2 as shown in FIGS. 2 and 5.

次に鋼製刃口4を擁護壁2を包むように外側に
設置する。刃口4の出来上がり長さは、掘進速
度、刃口の強度等を勘案すると、厚さ19〜22mm程
度の鋼板を使用した場合で約2mが好ましい。
Next, a steel blade 4 is installed outside so as to surround the protective wall 2. The finished length of the cutting edge 4 is preferably about 2 m when a steel plate with a thickness of about 19 to 22 mm is used, taking into account the digging speed, the strength of the cutting edge, etc.

次に、この刃口下床の上に門型擁護壁2を支持
する支保工3を組立てる。支保工3の底部と刃口
4の下床はボルト又は溶接で定結しておく。支保
工3は刃口4位置に固定されていれば足り、例え
ば筒体構造物1の内壁に固結しても良い。
Next, a shoring 3 supporting the gate-shaped protection wall 2 is assembled on the bottom floor of the cutting edge. The bottom of the shoring 3 and the lower floor of the cutting edge 4 are fixed with bolts or welding. It is sufficient that the support 3 is fixed at the position of the cutting edge 4, and may be fixed to the inner wall of the cylindrical structure 1, for example.

プレカストコンクリート筒体の分割相対けん引
又は推進の場合は第5図のようにA,B両側の立
坑内に鋼製刃口4及び支保工3を同じように組立
てるが、片側けん引又は推進の場合は第2図のよ
うに支保工3で支持する側の反対側の反力壁9の
中に門型擁護壁2を埋込み支持させておけば良
い。
In the case of divided relative towing or propulsion of a precast concrete cylinder, the steel cutting edge 4 and shoring 3 are assembled in the same way in the shafts on both sides A and B as shown in Figure 5, but in the case of one-sided towing or propulsion. As shown in FIG. 2, the gate-shaped protection wall 2 may be embedded and supported in the reaction wall 9 on the opposite side to the side supported by the shoring 3.

さらに、鋼製刃口4を結合させてプレカストコ
ンクリート筒体1を製作する。この時支保工補強
材6をプレカストコンクリート筒体に上・下両端
を埋込み定着させ、コンクリートの硬化をまつて
これと支保工3を水平材及び斜材で継ぎ一体化さ
せる。
Furthermore, the steel cutting edge 4 is combined to produce the precast concrete cylinder 1. At this time, the shoring reinforcing material 6 is embedded and fixed at both upper and lower ends in the precast concrete cylinder, and after the concrete has hardened, the shoring reinforcing material 6 and the shoring 3 are joined and integrated using horizontal members and diagonal members.

次にプレカストコンクリート筒体の掘進のため
にけん引又は推進のジヤツキ7、けん引ケーブル
8等を取付け、刃口及びプレカストコンクリート
筒体の上端部に軌道又は道路舗装等が横移動しな
いようにフリクシヨンカツターを設け、立坑の土
留を切断し、上記ジヤツキ7によつて、第5図の
ように土の中へ刃口を貫入させる。
Next, in order to excavate the precast concrete cylinder, attach a traction or propulsion jack 7, a traction cable 8, etc., and flick the track or road pavement etc. to the cutting edge and the upper end of the precast concrete cylinder to prevent it from moving laterally. A shaft cutter is provided to cut the earth retention of the shaft, and the cutter is penetrated into the soil by the above-mentioned jack 7 as shown in FIG.

その後、門型擁護壁2内側の立坑土留をてつ去
し、門型擁護壁2内の土砂の掘削を開始する。土
砂の掘削は刃口下床板前端から 約45゜+φ/2(φ=土の内部摩擦角)の範囲で止 め、再びジヤツキによつて刃口及びプレカストコ
ンクリート筒体1を前進させる。
Thereafter, the shaft earth retention inside the gate-shaped protection wall 2 is removed, and excavation of the earth and sand inside the gate-shaped protection wall 2 is started. The earth and sand excavation is stopped within a range of approximately 45° + φ/2 (φ = internal friction angle of the soil) from the front end of the floor plate below the cutting edge, and the cutting edge and precast concrete cylinder 1 are moved forward again by jacking.

これを繰返すことによりプレカストコンクリー
ト筒体1を所定の位置に前進させ、さらに分割相
対の場合は対向筒体を同様に前進させ、第7図の
ように左右の刃口をドツキングさせ、この刃口を
外型枠として刃口部にコンクリートを打設して立
体交差を完成させる。
By repeating this, the precast concrete cylindrical body 1 is advanced to a predetermined position, and in the case of a divided relative, the opposing cylinder is similarly advanced, and the left and right blade openings are dotted as shown in Fig. 7. Using the opening as the outer formwork, concrete is poured at the cutting edge to complete the grade crossing.

〔発明の効果〕〔Effect of the invention〕

本発明の方法によれば、パイプ等により形成さ
れる擁護壁2が、筒体構造物1の掘進に伴つて筒
体構造物前端部の刃口4内に露出し、適宜切除さ
れるため、工事完成時には擁護壁2が地盤中に残
存することはなく、水溜り等による噴泥やさび水
の流出の心配がない。したがつて、埋設された筒
体構造物1およびその上層部道床あるいは舗装等
への悪影響がなく、これらの保守上も有利であ
る。
According to the method of the present invention, the protecting wall 2 formed of a pipe or the like is exposed within the cutting edge 4 at the front end of the cylindrical structure 1 as the cylindrical structure 1 excavates, and is cut off as appropriate. When the construction is completed, the protection wall 2 will not remain in the ground, and there is no need to worry about mud or rust water flowing out due to puddles, etc. Therefore, there is no adverse effect on the buried cylindrical structure 1 and its upper roadbed or pavement, which is advantageous in terms of maintenance thereof.

更に、従来のパイプルーフ工法によれば、筒体
構造物1と路盤表面の中間に地盤崩壊防止用擁護
壁2のループ部分2−1が介在するので、それだ
け筒体構造物1を深いところに埋設しなければな
らないが、本発明の方法によれば擁護壁2を筒体
構造物前端部刃口4の内側に露出してくるように
設置しているので、極めて浅い土被りでの施工が
可能であり、加えて、土被りが浅くなつた分だけ
筒体構造物の施工基準高を高くすることが可能
で、その分筒体構造物前後の取付けアプローチが
短くなり、これにより根掘り及び左右の土留の高
さが低くなるため、工事量がそれだけ少なくて済
み、極めて経済的なものともなる。
Furthermore, according to the conventional pipe roof construction method, since the loop portion 2-1 of the protection wall 2 for preventing ground collapse is interposed between the cylindrical structure 1 and the roadbed surface, the cylindrical structure 1 can be moved to a deeper location. However, according to the method of the present invention, the protective wall 2 is installed so as to be exposed inside the cutting edge 4 at the front end of the cylindrical structure, so construction can be carried out with extremely shallow earth cover. In addition, the construction standard height of the cylindrical structure can be increased by the shallower earth cover, which shortens the installation approach before and after the cylindrical structure, which reduces the need for root digging and Since the height of the left and right retaining earthworks is lower, the amount of construction work is reduced, making it extremely economical.

更に、支保工3で露出してくる門型擁護壁2を
内側面で支持し、又反対側も同様に支持されるか
又は反力壁9の中に埋込まれて堅固に支持されて
いるので、筒体構造物1前方の土砂を従来の場合
よりはるかに広範囲に掘削することができるた
め、機械による掘削が可能となり、これにより作
業の能率が増加し、工期の短縮、工事費の低廉化
も図ることができる。
Furthermore, the gate-shaped protection wall 2 exposed by the shoring 3 is supported on the inner side, and the opposite side is supported in the same way or embedded in the reaction wall 9 and firmly supported. Therefore, the earth and sand in front of the cylindrical structure 1 can be excavated over a much wider area than in the conventional case, making it possible to excavate by machine, which increases work efficiency, shortens the construction period, and lowers construction costs. It is also possible to achieve

【図面の簡単な説明】[Brief explanation of drawings]

第1図a,b、第2図は本発明の実施例を示す
図であり、第1図aは筒体構造物1、刃口4、パ
イプ群から成る擁護壁2および支保工3の位置関
係を示す正面図、第1図bは同一部を断面にした
斜視図、第2図は同側面図である。第3図は従来
のパイプルーフ工法におけるパイプ群から成る擁
護壁2と筒体構造物1との関係を示す正面図であ
る。第4図は筒体構造物の埋設予定地盤にパイプ
群により地盤崩壊防止用擁護壁2を形成した状態
を示す側面図である。第5図は筒体構造物の分割
相互けん引方式の場合における本発明の実施例を
示す側面図である。第6図および第7図は本発明
を実施して筒体構造物を埋設した状態を示す図で
あり、第6図は片側けん引方式の場合で第2図に
示した実施例によつた場合の図、第7図は分割相
対けん引または推進による場合であり、第5図に
示した実施例によつた場合の完成状態図である。 1……筒体構造物、2……擁護壁、3……支保
工、4……刃口、5……地表、6……支保工補強
材、7……けん引ジヤツキ、8……けん引ケーブ
ル、9……反力壁、A,B……立坑。
1a, b, and 2 are diagrams showing an embodiment of the present invention, and FIG. 1a shows the positions of the cylindrical structure 1, the cutting edge 4, the retaining wall 2 consisting of the pipe group, and the shoring 3. FIG. 1B is a front view showing the relationship, FIG. 1B is a perspective view with the same part cut away, and FIG. 2 is a side view of the same. FIG. 3 is a front view showing the relationship between the cylindrical structure 1 and the protective wall 2 made up of a group of pipes in the conventional pipe roof construction method. FIG. 4 is a side view showing a state in which a protection wall 2 for preventing ground collapse is formed by a group of pipes in the ground where a cylindrical structure is to be buried. FIG. 5 is a side view showing an embodiment of the present invention in the case of a mutually divided cylindrical structure towing system. 6 and 7 are diagrams showing a state in which the cylindrical structure is buried by implementing the present invention, and FIG. 6 shows a case of a one-sided traction system, and a case according to the embodiment shown in FIG. 2. 7 and 7 show the case of split relative traction or propulsion, and are diagrams of the completed state when the embodiment shown in FIG. 5 is used. DESCRIPTION OF SYMBOLS 1... Cylindrical structure, 2... Protective wall, 3... Shoring, 4... Cut edge, 5... Ground surface, 6... Shoring reinforcement material, 7... Traction jack, 8... Traction cable , 9... Reaction wall, A, B... Shaft.

Claims (1)

【特許請求の範囲】[Claims] 1 前端部に刃口4を有する筒体構造物1を地中
に埋設するためのパイプルーフ工法において、筒
体構造物1が掘進される前方地盤中にパイプ等を
門型に圧入して予め形成される地盤崩壊防止用の
擁護壁2を、前記筒体構造物1の掘進に伴つて地
盤中から前記刃口4内に露出してくるように位置
決め構築し、掘進に伴つて露出してくる擁護壁2
の内側面は前記刃口4位置に固定した支保工3に
より支え、かつ、支保工3による支え位置より筒
体側に延出する擁護壁2の余長部分を適宜切除す
ることを特徴とする筒体構造物の地中埋設方法。
1 In the pipe roof construction method for burying a cylindrical structure 1 having a cutting edge 4 at the front end underground, a pipe or the like is press-fitted in a gate shape into the ground in front of which the cylindrical structure 1 is to be excavated. The protection wall 2 for preventing ground collapse to be formed is positioned and constructed so that it is exposed from the ground into the cutting edge 4 as the cylindrical structure 1 excavates, and is exposed as the cylindrical structure 1 excavates. Kuru protection wall 2
The inner surface of the cylinder is supported by a support 3 fixed at the position of the blade opening 4, and the extra length of the protection wall 2 extending toward the cylinder from the position supported by the support 3 is appropriately cut off. Method of burying body structures underground.
JP16127084A 1984-07-31 1984-07-31 Underground burying method of cylindrical body structure Granted JPS6140994A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16127084A JPS6140994A (en) 1984-07-31 1984-07-31 Underground burying method of cylindrical body structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16127084A JPS6140994A (en) 1984-07-31 1984-07-31 Underground burying method of cylindrical body structure

Publications (2)

Publication Number Publication Date
JPS6140994A JPS6140994A (en) 1986-02-27
JPS6361476B2 true JPS6361476B2 (en) 1988-11-29

Family

ID=15731910

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16127084A Granted JPS6140994A (en) 1984-07-31 1984-07-31 Underground burying method of cylindrical body structure

Country Status (1)

Country Link
JP (1) JPS6140994A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4599303B2 (en) * 2006-01-20 2010-12-15 株式会社ピーエス三菱 Underpass construction method

Also Published As

Publication number Publication date
JPS6140994A (en) 1986-02-27

Similar Documents

Publication Publication Date Title
KR100289256B1 (en) Tunnel construction method in shallow toffee area
CN107044135A (en) A kind of tunnel portal excavates the construction method built
KR100986312B1 (en) Apparatus for guiding the driving force of steel pipe loop structure
KR20070079675A (en) Method for construction of tunnel
JP2594863B2 (en) Underground tunnel widening method and branching / merging section construction method
JP4303512B2 (en) Construction method of large section tunnel
JPS6361476B2 (en)
JPH0415878B2 (en)
JP3091859B2 (en) Piling method for shafts with openings at the top
JP3135495B2 (en) Construction method of avalanche and rock fall protection fence and avalanche and rock fall protection fence
JPS622116B2 (en)
JP2554507B2 (en) Underground space construction method
JP6276300B2 (en) Open shield method
JP2874906B2 (en) Shaft construction method
KR102610909B1 (en) Method and structure of steel pipe propulsion using anchor installation inside steel pipe to prevent sinking
JP3012896B2 (en) Reverse cutting method combined with advance cutting
JP5167578B2 (en) Construction method for underground structures
JP7002950B2 (en) Connection structure and connection method between straight pipe roof and reaching tunnel
JP2565452B2 (en) Construction method of self-supporting retaining wall
JP4344733B2 (en) Seismic reinforcement structure for existing pile foundation structures
JP3249636B2 (en) Foundation structure and construction method
JPH0122410B2 (en)
JP2769778B2 (en) Road construction method in mountains and hills
JP2732007B2 (en) How to build underground structures
JP3065228B2 (en) How to build a building foundation

Legal Events

Date Code Title Description
EXPY Cancellation because of completion of term