JPS63277804A - Turbine control device for steam generating plant - Google Patents

Turbine control device for steam generating plant

Info

Publication number
JPS63277804A
JPS63277804A JP62063894A JP6389487A JPS63277804A JP S63277804 A JPS63277804 A JP S63277804A JP 62063894 A JP62063894 A JP 62063894A JP 6389487 A JP6389487 A JP 6389487A JP S63277804 A JPS63277804 A JP S63277804A
Authority
JP
Japan
Prior art keywords
signal
flow rate
turbine
load
request signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP62063894A
Other languages
Japanese (ja)
Other versions
JPH0754084B2 (en
Inventor
Fumio Mizuki
文夫 水木
Toichi Shida
志田 統一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP62063894A priority Critical patent/JPH0754084B2/en
Publication of JPS63277804A publication Critical patent/JPS63277804A/en
Publication of JPH0754084B2 publication Critical patent/JPH0754084B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin

Landscapes

  • Control Of Turbines (AREA)

Abstract

PURPOSE:To improve resistance to systematic disturbance of the titled plant by setting the limit value of the derivative of a request signal of a flow rate in an add-subtract valve which is sent to a computing unit of a bypass valve control signal in order to maintain this request signal at a certain level during a certain time after the reset of a power load unbalanced relay. CONSTITUTION:The load setting signal 14 is added 57 to the signal from a speed adjuster 11. This added signal 13 is inputted to a prior circuit of the low value 26 and compared with signals 31, 5 from a speed load limiter 30 and a pressure adjuster 4 and the lower signal is outputted as a request signal 27 for flow rate in the add-subtract valve. Request signal for flow rate of a bypass valve 7 is computed by subtracting the request signal 27 for flow rate of the add-subtract valve from a total flow rate signal of main steam 5. In this time, the derivative of the subtract signal is limited by a derivative limiter 32. During a certain time after the reset of a power load unbalance relay 23, a speed load setting signal 31 is maintained at zero and the request signal 27 for flow rate of the add-subtract valve is also maintained at zero and only the bypass valve is throttled.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、蒸気発生プラントのタービン制御装置に係り
、沸騰水型原子力発電プラントに適用するのに好適な蒸
気発生プラントの制御装置に関するものである。
[Detailed Description of the Invention] [Field of Industrial Application] The present invention relates to a turbine control device for a steam generation plant, and more particularly, to a control device for a steam generation plant suitable for application to a boiling water nuclear power plant. be.

〔従来の技術〕[Conventional technology]

沸騰水型原子力発電プラント(以下、単に+3WRプラ
ン1−という)におけるタービン制御装置は、検出され
た蒸気の圧力信号に応じて原子炉圧力を制御する圧力調
整機能と、検出されたタービン速度信号及び負荷設定値
に応じてタービン出力を制御する速度/負荷瀾整機能と
を有し・ており、この両者の機能によって得られる信号
に基づいて主蒸気加減弁及びタービンバスパス弁との協
調制御を実行する。また、電力系統に異常が生じた場合
A turbine control device in a boiling water nuclear power plant (hereinafter simply referred to as +3WR Plan 1-) has a pressure adjustment function that controls reactor pressure according to a detected steam pressure signal, a detected turbine speed signal, and It has a speed/load adjustment function that controls the turbine output according to the load setting value, and performs cooperative control with the main steam control valve and the turbine bus pass valve based on the signals obtained from both functions. do. Also, if an abnormality occurs in the power system.

パワーロードアンバランスリレーが動作し、主蒸気加減
弁が急閉され、タービンバイパス弁ノ開閉操作にて原子
炉圧力が制御される。このような制御は、特開昭56−
145397号公報に示されている。
The power load unbalance relay operates, the main steam control valve is suddenly closed, and the reactor pressure is controlled by opening and closing the turbine bypass valve. Such control is described in Japanese Unexamined Patent Application Publication No. 1986-
It is shown in Japanese Patent No. 145397.

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

前述の公開公報は、電力系統の異常時(例えば落゛ル↑
等による負荷遮断時)にパワーロードアンバランスリレ
ーの動作により主蒸気加減弁の急閉操作及びタービンバ
イパス弁の急開操作を行うものである。しかし実際には
、タービンとしては高圧タービン及び低圧タービンが連
結され、高圧タービンから吐出された蒸気がインターセ
プト弁を介して低圧タービンに供給される。主蒸気加減
弁はBWRプラントの原子炉圧力容器にて発生した蒸気
を高圧タービンに導く主蒸気配管に設置されている。前
述の公開公報は、電力系統の異常時においてインターセ
プト弁の開閉操作と対応した主蒸気加減弁及びタービン
バイパス弁の開閉操作については考慮されていない。
The above-mentioned public bulletin states that when there is an abnormality in the electric power system (for example, a downfall↑
When the load is cut off due to the above reasons), the power load unbalance relay operates to quickly close the main steam control valve and quickly open the turbine bypass valve. However, in reality, a high-pressure turbine and a low-pressure turbine are connected as a turbine, and steam discharged from the high-pressure turbine is supplied to the low-pressure turbine via an intercept valve. The main steam control valve is installed in the main steam piping that guides the steam generated in the reactor pressure vessel of the BWR plant to the high pressure turbine. The above-mentioned publication does not take into consideration the opening/closing operations of the main steam control valve and the turbine bypass valve, which correspond to the opening/closing operations of the intercept valve in the event of an abnormality in the power system.

しかしながら、インターセプト弁の開閉及びパワーロー
ドアンバランスリレーの動作と主蒸気加減弁及びタービ
ンバイパス弁の開閉とを対応させて検討することによっ
て、新たな課題があることを発明者等は見出した。以下
にBWRプラントにおけるその検討内容を説明する。
However, by examining the correspondence between the opening and closing of the intercept valve and the operation of the power load unbalance relay, and the opening and closing of the main steam control valve and the turbine bypass valve, the inventors discovered that there was a new problem. The details of the study in the BWR plant will be explained below.

パワーロートアンバランスリレーは、低圧タービンに連
結される発電機にて発生する電流の測定信号(発電機電
流信号)及び低圧タービンに連結された高圧タービンか
ら吐出されて低圧タービンに供給される蒸気圧力(以下
、中間蒸気圧力という)の測定信号(中間蒸気圧力信号
)とを入力しており、これらの発電機電流信号と中間蒸
気圧力信号との差が所定値(例えば40%)以下になる
と作動してリセットされる。パワロードアンバランスリ
レーの作動により主蒸気加減弁の作動油圧が急速に低下
して主蒸気加減弁が急閉すると同時に、負荷設定器の負
荷設定信号を零にする。
The power rotor unbalance relay measures the current measurement signal (generator current signal) generated by the generator connected to the low-pressure turbine and the steam pressure discharged from the high-pressure turbine connected to the low-pressure turbine and supplied to the low-pressure turbine. (hereinafter referred to as "intermediate steam pressure"), and the generator is activated when the difference between the generator current signal and the intermediate steam pressure signal becomes less than a predetermined value (for example, 40%). will be reset. Due to the operation of the power load unbalance relay, the working oil pressure of the main steam control valve rapidly decreases, and the main steam control valve suddenly closes, and at the same time, the load setting signal of the load setting device is set to zero.

圧力調節器は、BWRプラントの原子炉圧力容器内で発
生した蒸気の圧力信号と圧力設定信号と偏差信号を入力
して全主蒸気流量信号を出力する。
The pressure regulator inputs a pressure signal of steam generated in the reactor pressure vessel of the BWR plant, a pressure setting signal, and a deviation signal, and outputs a total main steam flow rate signal.

速度調節器は、測定されたタービン回転速度信号とター
ビン回転速度設定信号との偏差信号を入力してタービン
回転速度制御信号を出力する。低値優先回路は、全主蒸
気流量信号と速度/負荷制御信号とのうちでレベルの低
い信号を選択して主蒸気加減弁流量要求信号を出力する
。主蒸気加減弁は、主蒸気加減弁流量要求信号に基づい
て開度が制御される。なお、速度/負荷制御信号は、タ
ービン回転速度制御信号と負荷設定信号に基づいて得ら
れる。
The speed regulator inputs a deviation signal between the measured turbine rotation speed signal and the turbine rotation speed setting signal and outputs a turbine rotation speed control signal. The low value priority circuit selects a signal with a low level from among the total main steam flow rate signal and the speed/load control signal and outputs a main steam control valve flow rate request signal. The opening degree of the main steam control valve is controlled based on the main steam control valve flow rate request signal. Note that the speed/load control signal is obtained based on the turbine rotation speed control signal and the load setting signal.

またタービンバイパス弁は、金主蒸気流量信号と主蒸気
加減弁流量要求信号との偏差であるタービンバイパス弁
流量要求信号に基づいて開度が制御される。
Further, the opening degree of the turbine bypass valve is controlled based on the turbine bypass valve flow rate request signal, which is the deviation between the main steam flow rate signal and the main steam control valve flow rate request signal.

高圧タービンから低圧タービンに導かれる蒸気流延を制
御するインターセプト弁は、インターセプト弁流量要求
信号により制御される。この流量要求信号は、速度調節
器に入力される偏差信号を入力するインターセプト弁速
度調定器の出力信号である制御信号を負荷設定器からの
負荷設定信号に基づいて補正することにより得られる。
An intercept valve that controls steam flow directed from a high pressure turbine to a low pressure turbine is controlled by an intercept valve flow rate request signal. This flow rate request signal is obtained by correcting the control signal, which is the output signal of the intercept valve speed regulator, which inputs the deviation signal input to the speed regulator, based on the load setting signal from the load setting device.

パワーロードアンバランスリレーが作動せずインターセ
プ1−弁が急閉する程度の部分負荷遮断が電力系統に生
じた場合におけるBWRプラントの応答を第5図を用い
て説明する。
The response of the BWR plant when a partial load cutoff occurs in the power system to the extent that the power load unbalance relay does not operate and the intercept 1 valve suddenly closes will be described using FIG. 5.

このような部分負荷遮断が電力系統に生じると、タービ
ン回転速度信号が上昇し、速度/負荷制御信号が低下す
る。タービンの回転速度が約0.25Hz上昇した時点
で速度/負荷制御信号が全主蒸気流量信号以下となり、
低値優先回路は速度/負荷制御信号を選択し主蒸気流量
要求信号として出力する第5図(A)破線)。従って、
主蒸気加減弁の開度は速度/・′負荷制御43号の減少
に伴って絞られ、主蒸気加減弁流量は第5図(A)実線
のように低下する。またバイパス弁流量要求信号は正の
値となり、タービンバイパス弁が開き、タービンバイパ
ス弁流址は第5図(A)の一点鎖線のように上昇する。
When such a partial load shedding occurs in a power system, the turbine rotational speed signal increases and the speed/load control signal decreases. When the rotational speed of the turbine increases by about 0.25 Hz, the speed/load control signal becomes less than the total main steam flow rate signal,
The low value priority circuit selects the speed/load control signal and outputs it as the main steam flow rate request signal (broken line in FIG. 5(A)). Therefore,
The opening degree of the main steam control valve is throttled as the speed/·' load control number 43 decreases, and the flow rate of the main steam control valve decreases as shown by the solid line in FIG. 5(A). Further, the bypass valve flow rate request signal becomes a positive value, the turbine bypass valve opens, and the turbine bypass valve flow rate rises as shown by the dashed line in FIG. 5(A).

ただし、タービン回転速度数の上昇率が大きい場合、高
圧タービンから低圧タービンへ流れ込む主蒸気流量を先
行的に遮断すべく、インターセプト弁が急閉する(第5
図(A)の二点鎖線)。
However, when the rate of increase in the turbine rotational speed is large, the intercept valve closes suddenly (fifth
(Two-dot chain line in figure (A)).

第5図に示した様な事象では、タービンの回転速度上昇
による主蒸気加減弁流量要求信号の減少(第7図(A)
の破線)に対し主蒸気加減弁閉動作がやや遅れ(第7図
(A)の実線)、またタービンバイパス弁は、主蒸気加
減弁流量要求信号に伴うバイパス弁流量要求信号と実際
の弁開度の偏差が5%以上かつ原子炉出力15%以上で
急開するというインタロツタによって急開する。このた
め、主蒸気加減弁流量(第7図(A)の実線)とタービ
ンバイパス弁流量(第5図(A)の一点鎖線)との間の
ミスマツチにより主蒸気流量は増大しく第5図(C)の
実線)、主蒸気流量大のスクラム設定値を越えてスクラ
ムに敗る可能性がある。
In the event shown in Figure 5, the main steam control valve flow rate request signal decreases due to an increase in the rotational speed of the turbine (Figure 7 (A)).
(broken line), the main steam regulator valve closing operation is slightly delayed (solid line in Figure 7 (A)), and the turbine bypass valve has a slight delay between the bypass valve flow rate request signal accompanying the main steam regulator flow rate request signal and the actual valve opening. It opens suddenly due to an interrotation that occurs when the temperature deviation is 5% or more and the reactor output is 15% or more. Therefore, the main steam flow rate increases due to the mismatch between the main steam control valve flow rate (solid line in Figure 7 (A)) and the turbine bypass valve flow rate (dotted chain line in Figure 5 (A)). C) solid line), there is a possibility that the main steam flow rate will exceed the scram set value and lose the scram.

またタービン回転速度が急上昇するためインターセプト
弁は急閉し、それによりタービン回転速度は低下する。
Furthermore, since the turbine rotational speed increases rapidly, the intercept valve closes rapidly, thereby decreasing the turbine rotational speed.

またタービン回転速度が低下する過程においては、主蒸
気加減弁が開く(第5図(A ’)の実線)。ただし主
蒸気加減弁の動作特性から、主蒸気加減弁流量要求信号
が開方向に変っても主蒸気加減弁閉動作が継続しており
(第5図(A))。
Further, in the process of decreasing the turbine rotational speed, the main steam control valve opens (solid line in FIG. 5 (A')). However, due to the operating characteristics of the main steam control valve, even if the main steam control valve flow rate request signal changes to the opening direction, the main steam control valve continues to close (FIG. 5(A)).

主蒸気加減弁の開動作は更に遅れる。この時、併せてタ
ービンバイパス弁の閉動作が行われる(第5図(A)の
一点鎖線)が、タービンバイパス弁流量要求信号は主蒸
気加減弁の応答によらず主蒸気加減弁流量要求信号の変
化にのみ従うため主蒸気加減弁の開動作が行われないに
もかかオ〕らず。
The opening operation of the main steam control valve is further delayed. At this time, the turbine bypass valve is also closed (dotted chain line in Fig. 5(A)), but the turbine bypass valve flow rate request signal is independent of the response of the main steam control valve, and the main steam control valve flow rate request signal is This is despite the fact that the opening operation of the main steam control valve is not performed because it follows only the change in .

タービンバイパス弁が閉じられる。その結果、原子炉圧
力が上昇しく第5図(B)、この圧力変動に最も敏感な
中性子束が変動しく第5図(C)の破線)、中性子束高
スクラム設定値に達する可能性がある。
The turbine bypass valve is closed. As a result, the reactor pressure increases (Figure 5 (B)), and the neutron flux, which is most sensitive to this pressure fluctuation, fluctuates (dashed line in Figure 5 (C)), potentially reaching the neutron flux high scram set value. .

次に第6図によ′す、パワーロードアンバランスリレー
が作動する程度の部分負荷遮断が電力系統に発生した場
合のBWRプラント応答について説明する。
Next, a description will be given of the BWR plant response when a partial load shedding occurs in the power system to the extent that the power load unbalance relay is activated, as shown in FIG. 6.

電力系統で落雷等の事故が発生し、負荷が欠落すると、
これに伴い電力系統の周波数が上昇する。
If an accident such as a lightning strike occurs in the power system and the load is lost,
As a result, the frequency of the power system will increase.

この電力系統周波数の上昇すなわちタービン回転速度の
上昇を抑制すべく、原子炉出力に比べ、電力系統負荷が
40%以上かつ40%/10ミリ秒以内となった場合に
パワーロードアンバランスリレーが作動し、主蒸気加減
弁の駆動油圧を急減させることにより主蒸気加減弁が急
閉される(第6図(A)の実m>。また同時に、パワー
ロードアンバランスリレーの作動により負荷設定器の負
荷設定信号は零となり、速度/負荷制御信号は負(制御
上は零)となる。従って速度/負荷制御信号が優先して
低値優先回路を通過し、主蒸気加減弁流量要求信号も零
となる。これに伴い全主蒸気流量信号がそのままタービ
ンバイパス弁流量要求信号となり、タービンバイパス弁
が開する(第6図(A)の一点鎖、Ijl)。
In order to suppress this increase in power system frequency, that is, the increase in turbine rotation speed, a power load imbalance relay is activated when the power system load is 40% or more and less than 40%/10 milliseconds compared to the reactor output. Then, by rapidly reducing the drive oil pressure of the main steam regulating valve, the main steam regulating valve is suddenly closed (actual m in Fig. 6 (A)).At the same time, the power load unbalance relay is activated to close the main steam regulating valve. The load setting signal becomes zero, and the speed/load control signal becomes negative (zero in terms of control).Therefore, the speed/load control signal takes priority and passes through the low value priority circuit, and the main steam regulator flow rate request signal also becomes zero. Accordingly, the total main steam flow rate signal directly becomes the turbine bypass valve flow rate request signal, and the turbine bypass valve opens (dotted chain, Ijl in FIG. 6(A)).

一方、パワーロードアンバランスリレー作動により負荷
設定が零になり、尚かつタービン速度が上昇すると、イ
ンターセプト弁は閉方向に制御される。ただし本事象の
様な急激な負荷変動の場合。
On the other hand, when the load setting becomes zero due to the operation of the power load unbalance relay and the turbine speed increases, the intercept valve is controlled in the closing direction. However, in the case of sudden load changes like this event.

インターセプト弁は急閉される。The intercept valve is suddenly closed.

一連の動作により、電力系統周波数の上昇は抑制される
Through a series of operations, the increase in power system frequency is suppressed.

その後、タービン回転速度が低下する過程において、イ
ンターセプト弁は、その開度偏差が5%以下になると急
閉リセットの働きにより徐々に開く(第6図(A)の二
点鎖線)。この時主蒸気加減弁はまだ全閉した状態にあ
るので、中間蒸気圧力信号が低下し0発電機電流信号と
の偏差が40%以下となるとパワーロードアンバランス
リレーは自動的にリセットされる。パワーロードアンバ
ランスリレーのリセットにより、4弁ある主蒸気加減弁
急閉作動電磁弁はそれぞれ1,2,3.4秒後にリセッ
トされる。また負荷設定はリセット後、ある値(例えば
20%)に再設定され、タービン速度8がl OO,8
%以下に低下すると、主蒸気加減弁は再び開く(第6図
(A)の実線)。
Thereafter, in the process of decreasing the turbine rotational speed, the intercept valve gradually opens due to the action of the quick-close reset when the opening degree deviation becomes 5% or less (double-dashed line in FIG. 6(A)). At this time, the main steam control valve is still fully closed, so when the intermediate steam pressure signal decreases and the deviation from the 0 generator current signal becomes 40% or less, the power load unbalance relay is automatically reset. By resetting the power load unbalance relay, the four main steam control valve quick-closing solenoid valves are reset after 1, 2, and 3.4 seconds, respectively. Also, after the load setting is reset, it is reset to a certain value (for example, 20%), and the turbine speed 8 is set to 1 OO, 8
%, the main steam control valve opens again (solid line in FIG. 6(A)).

以上の様な動作において、パワーロードアンバランスリ
レーがリセットする前にタービン回転速度が100%を
下回ると、主蒸気加減弁は急閉リセットされる前である
ためタービンバイパス弁だけが閉される(第6図(A)
の一点鎖線)ことにより、主蒸気加減弁流量とタービン
バイパス弁流量にミスマツチが生じ、主蒸気加減弁の開
動作とタービンバイパス弁の閉動作の特性差から原子炉
圧力は上昇する(第6図(B)の実線)とともに。
In the above operation, if the turbine rotation speed falls below 100% before the power load imbalance relay is reset, only the turbine bypass valve is closed because the main steam control valve has not yet been reset to sudden closing ( Figure 6 (A)
As a result, a mismatch occurs between the main steam control valve flow rate and the turbine bypass valve flow rate, and the reactor pressure increases due to the difference in characteristics between the main steam control valve opening operation and the turbine bypass valve closing operation (Fig. 6). (B) with solid line).

原子炉水位は低下しく第6図(B)の破線)、スクラム
する可能性がある。
The reactor water level is decreasing (dashed line in Figure 6 (B)) and there is a possibility of a scram.

また、主蒸気加減弁及びインターセプト弁のリセットに
時間がかかり、これらの弁の開開始時間が遅くなる。
Furthermore, it takes time to reset the main steam control valve and the intercept valve, which delays the opening time of these valves.

本発明の目的は、電力系統外乱によるタービン速度変動
が生じて、加減動作する場合にも、不要なプラント停止
を回避しながら蒸気発生プラントの運転を継続可能な蒸
気発生プラントのタービン制御装置を提供することにあ
る。
An object of the present invention is to provide a turbine control device for a steam generation plant that can continue operating the steam generation plant while avoiding unnecessary plant stoppages even when turbine speed fluctuations occur due to power system disturbances and the operation is increased or decreased. It's about doing.

〔問題点を解決するための手段〕[Means for solving problems]

上記目的は、先ず、加減弁開閉特性とバイパス弁の開閉
特性の違いから生ずる主蒸気流量のミスマツチ及び原子
炉圧力変動、原子炉水位変動を抑えるためには、実際の
加減弁開閉特性に合う様に、バイパス弁流量要求信号演
算の基礎とされる加減弁流量要求信号をそのまま減算す
ることをやめて、変化率を制限した加減弁流量減算信号
としてバイパス弁流量要求信号演算部に供給すること、
かつ上記変化率制限は、パワーロードアンバランスリレ
ー作動もしくはタービントリップが発生した時には作動
しない切換手段を設けることにより達成される。
The above objectives are: First, in order to suppress mismatches in main steam flow rate, reactor pressure fluctuations, and reactor water level fluctuations caused by differences in the opening/closing characteristics of the regulator valve and the bypass valve, it is necessary to The control valve flow rate request signal, which is the basis of bypass valve flow rate request signal calculation, is no longer subtracted as it is, and is supplied to the bypass valve flow rate request signal calculation unit as a control valve flow rate subtraction signal with a limited rate of change;
The rate of change limit described above is achieved by providing a switching means that does not operate when the power load unbalance relay operates or when a turbine trip occurs.

次に、パワーロードアンバランスリレーが作動し、加減
弁は急閉する様な場合、パワーロードがリセットする前
に加減弁流量要求信号が正値となり、バイパス弁のみ絞
られ原子炉圧力が変動する点に対しては、パワーロード
アンバランスリレーがリセットし、ある一定時間の間、
加減弁流量要求信号をある定められた値に保持する負荷
制限手段を設けることにより達成される。
Next, when the power load unbalance relay is activated and the regulator valve suddenly closes, the regulator valve flow rate request signal becomes a positive value before the power load is reset, and only the bypass valve is throttled, causing the reactor pressure to fluctuate. For a point, the power load unbalance relay resets and remains on for a certain period of time.
This is achieved by providing a load limiting means that maintains the regulating valve flow rate request signal at a certain predetermined value.

〔作用〕[Effect]

前記の切換手段を有する変化率制限は、パワーロードア
ンバランスリレーが作動しない程度の系統変動、もしく
はパワーロードアンバランスリレーリセット後は、全主
蒸気流量信号から減算してバイパス弁流量要求信号を作
る加減弁流量要求信号の増減両方向に変化率制限がかか
るため、バイパス弁の急開は避けられ、パワーロードア
ンバランスリレーリセット後のバイパス弁の開閉動作も
実際の加減弁開閉動作に合う様に制御されるため、主蒸
気流量大による主蒸気隔離弁閉スクラム、圧力高、中性
子束高、及び水位低スクラムを回避することができる。
The rate of change limit having the above-mentioned switching means generates a bypass valve flow rate request signal by subtracting it from the total main steam flow rate signal when there is a system fluctuation to the extent that the power load unbalance relay does not operate, or after the power load unbalance relay is reset. Since the rate of change of the regulator valve flow rate request signal is limited in both directions, sudden opening of the bypass valve is avoided, and the bypass valve opening/closing operation after resetting the power load imbalance relay is controlled to match the actual opening/closing operation of the regulator valve. Therefore, it is possible to avoid main steam isolation valve closing scrams due to large main steam flow rates, high pressure, high neutron flux, and low water level scrams.

また負荷制限手段を設けることにより、パワーロードア
ンバランスリレーが作動し、加減弁が急閉した場合、リ
レーがリセットし、かつ一定時間経過する間は、加減弁
流量要求信号は、ある定められた値となるため、加減弁
流量とバイパス弁流量とのミスマツチによる原子炉圧力
高スクラムを回避することが可能となる。
In addition, by providing a load limiting means, when the power load unbalance relay is activated and the regulator valve suddenly closes, the regulator resets and the regulator valve flow rate request signal remains at a certain level for a certain period of time. Therefore, it is possible to avoid a reactor pressure high scram caused by a mismatch between the regulator valve flow rate and the bypass valve flow rate.

〔実施例〕〔Example〕

第1図及び第2図に基づいて、BWRプラントに適用し
た本発明の好適な一実施例である蒸気発生プラントのタ
ービン制御装置を説明する。
A turbine control device for a steam generation plant, which is a preferred embodiment of the present invention applied to a BWR plant, will be explained based on FIGS. 1 and 2.

まずBWRプラントの概要を第2図により説明する。蒸
気発生器である原子炉圧力容器40にて発生した蒸気は
、主蒸気管45を経て高圧タービン41に送られ、さら
にクロスアラウンド管47を経て低圧タービン42に導
かれる。低圧タービン42から排気された蒸気は、復水
器43にて凝縮されて水になる。この凝縮水は1図示さ
れていないが給水配管を通って原子炉圧力容器1に戻さ
れる。主蒸気管45には蒸気加減弁46が、クロスアラ
ウンド管47にはインターセプト弁48がそれぞれ設け
られている。蒸気加減弁46より上流側で主蒸気器45
から分岐されたバイパス配管49は、復水器43に接続
されている。タービンバイパス弁5oが、バイパス配管
49に設けられる。高圧タービン41の回転軸と低圧タ
ービン42の回転軸は、連結されている。また発電機4
4が、低圧タービン42の回転軸に切離し可能に連結さ
れている。圧力計51.52、タービン速度検出器53
及び電流計54の出力信号がタービン制御装置13に入
力される6 タービン制御装置13の詳細構成を第1図に示す。この
タービン制御装置13の動作を以下に詳細に説明する。
First, an overview of the BWR plant will be explained with reference to FIG. Steam generated in a reactor pressure vessel 40, which is a steam generator, is sent to a high-pressure turbine 41 through a main steam pipe 45, and further led to a low-pressure turbine 42 through a cross-around pipe 47. Steam exhausted from the low pressure turbine 42 is condensed into water in a condenser 43. This condensed water is returned to the reactor pressure vessel 1 through a water supply pipe (not shown). The main steam pipe 45 is provided with a steam control valve 46, and the cross-around pipe 47 is provided with an intercept valve 48, respectively. The main steamer 45 is located upstream from the steam control valve 46.
A bypass pipe 49 branched from the condenser 43 is connected to the condenser 43 . A turbine bypass valve 5o is provided in the bypass pipe 49. The rotating shaft of the high-pressure turbine 41 and the rotating shaft of the low-pressure turbine 42 are connected. Also generator 4
4 is detachably connected to the rotating shaft of the low pressure turbine 42. Pressure gauge 51, 52, turbine speed detector 53
The output signal of the ammeter 54 is input to the turbine control device 13.The detailed configuration of the turbine control device 13 is shown in FIG. The operation of this turbine control device 13 will be explained in detail below.

圧力計51及び52が主蒸気管45及びクロスアラウン
ド管にそれぞれ設置される。圧力計51は原子炉圧力容
器1に取付けてもよい。53はタービンの回転速度を検
出するタービン速度検出器であり、54は電流計である
Pressure gauges 51 and 52 are installed in the main steam pipe 45 and the cross-around pipe, respectively. The pressure gauge 51 may be attached to the reactor pressure vessel 1. 53 is a turbine speed detector that detects the rotational speed of the turbine, and 54 is an ammeter.

13はタービン制御装置で圧力計51は1M子炉圧力容
器40から吐出される蒸気圧を測定する。
Reference numeral 13 denotes a turbine control device, and a pressure gauge 51 measures the steam pressure discharged from the 1M child reactor pressure vessel 40.

この圧力計51にて測定された圧力信号1と予め設定さ
れた圧力設定値2との偏差が加算器55にて求められる
。この偏差信号は、フィルター回路3を経゛C5圧力調
定器4に入力される。圧力調定器4は、その偏差信号に
より全主蒸気流量信号5を作成する。一方、タービン速
度検出器53にて測定されたタービン速度信号8とター
ビン速度設定値9との偏差が加算器56にと求められる
。得られた偏差信号10は、速度調定器11に入力され
る。速度調定器11は、入力した偏差信号に応じたター
ビン速度制御信号12を出力する。速度制御信号12は
、負荷設定器15の出力信号である負荷設定値14を加
算器57で付加され、速度/負荷制御信号13となる。
An adder 55 calculates the deviation between the pressure signal 1 measured by the pressure gauge 51 and a preset pressure value 2. This deviation signal is input to the C5 pressure regulator 4 via the filter circuit 3. The pressure regulator 4 generates a total main steam flow rate signal 5 from the deviation signal. On the other hand, the difference between the turbine speed signal 8 measured by the turbine speed detector 53 and the turbine speed setting value 9 is determined by the adder 56. The obtained deviation signal 10 is input to the speed regulator 11. The speed regulator 11 outputs a turbine speed control signal 12 according to the input deviation signal. The speed control signal 12 is added with a load setting value 14, which is an output signal of the load setting device 15, by an adder 57, and becomes a speed/load control signal 13.

金主蒸気流量信号5及び速度/負荷制御信号13は、低
値優先回路26に入力される。低値優先回路26は、そ
れらの信号のうち低値を選択し、選択した信号を加減弁
流量要求信号27として出力する。蒸気加減弁46の開
度は、加減弁流量要求信号27によって制御される。
Gold main steam flow signal 5 and speed/load control signal 13 are input to low value priority circuit 26 . The low value priority circuit 26 selects the low value among these signals and outputs the selected signal as the regulating valve flow rate request signal 27. The opening degree of the steam control valve 46 is controlled by the control valve flow rate request signal 27.

パワーロードアンバランスリレー23は、圧力計52の
出力である中間蒸気圧力信号24及び電流計54の出力
である発電機電流信号25を入力し、それらの信号の差
が所定値以上になった時に作動42号22を出力する。
The power load unbalance relay 23 inputs an intermediate steam pressure signal 24 which is the output of the pressure gauge 52 and a generator current signal 25 which is the output of the ammeter 54, and when the difference between these signals exceeds a predetermined value, Operation 42 outputs No. 22.

圧力計52は、クロスアラウンド管47内の蒸気圧力を
測定してこの測定値を中間蒸気圧力信号24として出力
する。電流計54は1発電機44で発生した電流を測定
し。
The pressure gauge 52 measures the steam pressure within the cross-around pipe 47 and outputs this measured value as an intermediate steam pressure signal 24. The ammeter 54 measures the current generated by the generator 44.

この測定値を発電機電流信号25として出力する。This measured value is output as a generator current signal 25.

前述の作動信号22は、負荷設定器15.瞬時動作時限
復帰回路28及び変化率制限切換器34にそれぞれ入力
される。
The aforementioned actuation signal 22 is transmitted to the load setter 15. The signal is inputted to the instantaneous operation time limit recovery circuit 28 and the rate-of-change limit switch 34, respectively.

タービンバイパス弁5oは、加算器58から出力された
バイパス弁流量要求信号7に基づいて開度が制御される
。加算器58は、全主蒸気流量信号5から蒸気加減弁流
量減算43号33及びチャタリング防止用のバイアス信
号6を引いてバイパス弁流量要求信号7を求める。蒸気
加減弁流量減算信号33は変化率制限器32から出力さ
れるが、この変化率制限器32の機能については、後述
する。
The opening degree of the turbine bypass valve 5o is controlled based on the bypass valve flow rate request signal 7 output from the adder 58. The adder 58 subtracts the steam control valve flow rate subtraction number 43 and the chattering prevention bias signal 6 from the total main steam flow rate signal 5 to obtain the bypass valve flow rate request signal 7. The steam control valve flow rate subtraction signal 33 is output from the rate of change limiter 32, and the function of this rate of change limiter 32 will be described later.

B W Rプラントでは、炉心内のボイド(蒸気泡)量
により原子炉出力を調整しているので、中性子束は圧力
変化に対し敏感に反応する。従って、通常運転時は圧力
信号1による全主蒸気流量信号5にて蒸気加減弁46が
優先的に制御される。タービン速度の比較的小さな変動
に対応して蒸気加減弁46が動作しないように、負荷設
定器15の負荷設定値14を全主蒸気流量信号よりも1
0%高くなるように設定しである。このため、速度制御
信号12が一10%以内(一般的に速度調定率は100
%制御信号75%速度変化であり、5011zの場合、
0 、25 Hz  に相当する)となるタービン速度
上昇に対しては、蒸気加減弁46は応答しない、蒸気加
減弁46は、全主蒸気流量信号5によって制御され、圧
力制御が優先的に行われる。
In a BWR plant, the reactor output is adjusted by the amount of voids (steam bubbles) in the reactor core, so the neutron flux responds sensitively to pressure changes. Therefore, during normal operation, the steam control valve 46 is preferentially controlled by the total main steam flow rate signal 5 based on the pressure signal 1. In order to prevent the steam control valve 46 from operating in response to relatively small fluctuations in turbine speed, the load setting value 14 of the load setting device 15 is set to 1 higher than the total main steam flow rate signal.
It is set to be 0% higher. Therefore, the speed control signal 12 is within 10% (generally the speed adjustment rate is 100%).
% control signal 75% speed change, for 5011z,
0,25 Hz), the steam regulator 46 does not respond to the increase in turbine speed, which corresponds to 0.0 Hz, 25 Hz.The steam regulator 46 is controlled by the total main steam flow signal 5, and pressure control is performed preferentially. .

一方、速度/負荷制御信号13が10%以上減少する様
なタービン速度上昇(すなわち0.25Hz以上の周波
数上昇)に対しては、速度/負荷制御信号13が金主蒸
気流量信号5よりも小さくなる。
On the other hand, for a turbine speed increase where the speed/load control signal 13 decreases by 10% or more (that is, a frequency increase of 0.25 Hz or more), the speed/load control signal 13 becomes smaller than the main steam flow rate signal 5. Become.

このため蒸気加減弁46は、速度/負荷制御信号13に
て制御され絞られる。
Therefore, the steam control valve 46 is controlled by the speed/load control signal 13 and throttled.

この蒸気加減弁4Gの絞り動作により余剰となった蒸気
は、バイパス弁流量要求信号7にてタービンバイパス弁
50が開くことにより復水器43に直接排気される。こ
の様に、蒸気加減弁46とタービンバイパス弁50とを
協澗動作させることによって、原子炉圧力をほとんど変
化させることなく、BWRプラント運転を安定に継続で
きることになる。
The surplus steam resulting from the throttling operation of the steam control valve 4G is directly exhausted to the condenser 43 by opening the turbine bypass valve 50 in response to the bypass valve flow rate request signal 7. In this way, by operating the steam control valve 46 and the turbine bypass valve 50 in a coordinated manner, the BWR plant operation can be stably continued without substantially changing the reactor pressure.

また、高圧タービン41から低圧タービン42に導かれ
る蒸気流量を制御するインターセプト弁48の開度制御
は、以下のようにして行なわれる。
Further, the opening degree of the intercept valve 48 that controls the flow rate of steam guided from the high pressure turbine 41 to the low pressure turbine 42 is performed as follows.

加算器56から出力された偏差信号10がインターセプ
ト弁速度調定器17に入力される。インターセプト弁速
度調定器Y7は、偏差信号10に対応する制御信号18
を出力する。加算器59は、制御信号18.負荷設定値
14にインターセプト弁調定ゲイン16を乗じて得られ
る制御信号19゜及びインターセプト弁の開バイアス信
号20を加算し、インターセプト弁流量要求信号21を
出力する。インターセプト弁48は、インターセプト弁
流量要求信号21に基づいて開閉を制御される。
The deviation signal 10 output from the adder 56 is input to the intercept valve speed regulator 17. The intercept valve speed regulator Y7 receives a control signal 18 corresponding to the deviation signal 10.
Output. Adder 59 receives control signal 18 . A control signal 19° obtained by multiplying the load setting value 14 by an intercept valve adjustment gain 16 and an intercept valve opening bias signal 20 are added, and an intercept valve flow rate request signal 21 is output. The opening and closing of the intercept valve 48 is controlled based on the intercept valve flow rate request signal 21.

ただし、通常運転時は、開バイアス信号20が100%
に設定されていることと、調定ゲイン16を乗じた制御
信号が大きな正の値となる様に設定されているため、イ
ンターセプト弁48は常に全開となっており、タービン
へ送られる蒸気流量は蒸気加減弁46によって制御され
る。
However, during normal operation, the open bias signal 20 is 100%.
, and the control signal multiplied by the adjustment gain 16 is set to be a large positive value, so the intercept valve 48 is always fully open, and the steam flow rate sent to the turbine is It is controlled by a steam control valve 46.

次に、タービン制御表@13を構成されている瞬時動作
時限復帰回路28.速度/負荷信号切換回路29及び速
度負荷制限器30について説明する。瞬時動作時限復帰
回路28は、パワーロードアンバランスリレー23が作
動した時に出力される作動信号28により瞬時に速度/
負荷信号切換回路29を切換え、パワーロードアンバラ
ンスリレー23がリセットされて作動信号28が出力さ
れなくなった時にそれから所定時間後に速度/負荷信号
切換回路29を元の状態に切換える。速度/負荷制限器
30は、速度/負荷信号切換回路29が作動信号22に
より切換えられた時(パワーロードアンバランスリレー
23が作動した時)に0%の設定値を速度/負荷設定信
号31として低値優先回路26に出力し、速度/負荷信
号切換回路29が元の状態に切換えられた時(パワーロ
ードアンバランスリレー23がリセットされた後に所定
時間経過した時)に110%の設定値を速度/負荷設定
信号31として低値優先回路26に出力する。
Next, the instantaneous operation time-limited return circuit 28. which is configured with the turbine control table @13. The speed/load signal switching circuit 29 and speed load limiter 30 will be explained. The instantaneous operation time limit recovery circuit 28 instantly adjusts the speed/speed by the activation signal 28 output when the power load unbalance relay 23 is activated.
The load signal switching circuit 29 is switched, and when the power load unbalance relay 23 is reset and the operating signal 28 is no longer output, the speed/load signal switching circuit 29 is switched to the original state after a predetermined time. The speed/load limiter 30 sets the 0% setting value as the speed/load setting signal 31 when the speed/load signal switching circuit 29 is switched by the activation signal 22 (when the power load unbalance relay 23 is activated). It outputs to the low value priority circuit 26, and when the speed/load signal switching circuit 29 is switched to its original state (when a predetermined period of time has elapsed after the power load imbalance relay 23 was reset), the set value of 110% is set. It is output to the low value priority circuit 26 as a speed/load setting signal 31.

変化率制限器切換回路34は、蒸気加減弁流量要求信号
27を入力する変化率制限器32の出力信号を制御する
ものである。すなわち、変化率制限器切換回路34は、
作動信号22またはタービントリップ発生信号35を入
力していない場合には蒸気加減弁流量要求信号27の変
化率を制限した蒸気加減弁流量減算信号33として変化
率制限器32から出力させ、作動信号22またはタービ
ントリップ発生信号35を入力した場合には蒸気加減弁
流量要求信号27を変化率制限せずにそのままh気加減
弁流斌減算信号33として変化率制限器32から出力さ
せるように、変化率制限器32を制御する。BWRプラ
ントの通常運転時においては、変化率制限器32は、常
に前述の変化率制限機能を働かせている。
The rate of change limiter switching circuit 34 controls the output signal of the rate of change limiter 32 to which the steam control valve flow rate request signal 27 is input. That is, the rate of change limiter switching circuit 34 is
If the operating signal 22 or the turbine trip generation signal 35 is not input, the rate of change limiter 32 outputs the steam regulating valve flow rate subtraction signal 33 that limits the rate of change of the steam regulating valve flow rate request signal 27, and the operating signal 22 Alternatively, when the turbine trip occurrence signal 35 is input, the change rate limiter 32 outputs the steam control valve flow rate request signal 27 as it is as the h steam control valve flow subtraction signal 33 without limiting the change rate. Controls the limiter 32. During normal operation of the BWR plant, the rate-of-change limiter 32 always operates the rate-of-change limiting function described above.

以上の様にして構成した本実施例の具体的な作用につい
て説明する。
The specific operation of this embodiment configured as described above will be explained.

最初に、パワーロードアンバランスリレー23が作動せ
ず、しかもインターセプト弁48が急閉する程度の負荷
遮断が生じた場合、すなねち負荷遮断量が20%〜40
%程度である負荷遮断が生じた場合におけるBWRのプ
ラント応答について説明する。′このような負荷遮断に
おいては、変化率制限器32から変化率制限をかけら九
た蒸気加減弁流量減算信号33が出力される。ここでは
、パワーロードアンバランスリレー23が作動しないの
で、速度/負荷制限器30からは11.0%の設定値1
10%に設定が速度/負荷設定信号31が出力されてい
る。また、変化率制限切換534は、入力信号がないか
ら動作しないので、変化率制限器32は変化率を制限し
た蒸気加減弁流量減算信号33を出力し続ける。
First, when the power load unbalance relay 23 does not operate and a load shedding occurs to the extent that the intercept valve 48 suddenly closes, the amount of load shedding is 20% to 40%.
A description will be given of the BWR plant response when a load shedding of approximately 50% occurs. 'In such a load cutoff, the rate of change limiter 32 outputs a steam control valve flow rate subtraction signal 33 which is subjected to the rate of change limit. Here, since the power load unbalance relay 23 does not operate, the speed/load limiter 30 outputs the set value 1 of 11.0%.
A speed/load setting signal 31 set to 10% is output. Further, since the rate of change limit switch 534 does not operate because there is no input signal, the rate of change limiter 32 continues to output the steam control valve flow rate subtraction signal 33 with the rate of change limited.

この時のBWRプラント応答を第3図に示す。Figure 3 shows the BWR plant response at this time.

負荷遮断に基づくタービン速度の上昇により速度/負荷
制御信号12が低下し、速度/負荷制御信号12が全主
蒸気流量信号5を下回る。この時点から、蒸気加減弁4
6は、低値優先回路26にて選択された速度/負荷制御
信号12により制御されて絞られる。実際の蒸気加減弁
46の開閉速度とタービンバイパス弁50の開閉速度は
かなりの差があるが、全主蒸気流量信号5から減算する
蒸気加減弁流量要求信号27に変化率制限器32にて変
化率制限をかけているので、タービンバイパス弁50が
急開することもなく蒸気加減弁急閉とタービンバイパス
弁流量とのミスマツチが小さくなり(第3図(A)) 
、主蒸気流量及び中性子束の変動が小さくなる(第3図
(C))。このため。
The increase in turbine speed due to load shedding causes the speed/load control signal 12 to decrease, causing the speed/load control signal 12 to be below the total main steam flow signal 5. From this point on, steam control valve 4
6 is controlled and throttled by the speed/load control signal 12 selected by the low value priority circuit 26. Although there is a considerable difference between the actual opening/closing speed of the steam regulating valve 46 and the opening/closing speed of the turbine bypass valve 50, the change rate limiter 32 changes the steam regulating valve flow rate request signal 27 subtracted from the total main steam flow rate signal 5. Since the rate is limited, the turbine bypass valve 50 does not open suddenly, and the mismatch between the sudden closing of the steam control valve and the turbine bypass valve flow rate is reduced (Fig. 3 (A)).
, fluctuations in the main steam flow rate and neutron flux become smaller (Fig. 3(C)). For this reason.

不要な、主蒸気流量大による主蒸気隔離弁閉スクラム、
及び中性子束高スクラムを回避することができる。
Unnecessary main steam isolation valve closing scram due to large main steam flow rate,
and high neutron flux scrams can be avoided.

パワーロードアンバランスリレー23が作動スると、急
速作動電磁弁が励磁されて蒸気加減弁46の油圧を急速
に低下させることにより蒸気加減弁46を急閉する。ま
た同時に、作動信号22により負荷設定器15の負荷設
定値14は零となり、速度/負荷制御信号13は負(制
御上は′8)となる。このため、速度/負荷制御46号
13が、低値優先回路26を通過する。
When the power load unbalance relay 23 is activated, the quick-acting solenoid valve is energized to rapidly reduce the oil pressure of the steam regulating valve 46, thereby rapidly closing the steam regulating valve 46. At the same time, the load setting value 14 of the load setting device 15 becomes zero due to the actuation signal 22, and the speed/load control signal 13 becomes negative ('8 in terms of control). Therefore, the speed/load control 46 number 13 passes through the low value priority circuit 26.

また、パワーロードアンバランスリレー23から出力さ
れた作動信号22により変化率制限器切換器34が作動
し、変化率制限器32は変化率を制限する機能を停止す
る。従って、低値優先回路2Gから出力された蒸気加減
弁流量要求信号27である速度/負荷制御信号(零)1
3がそのまま加算器58に入力される。速度/負荷制御
信号13のそのままの値で全主蒸気流量信号5を補正す
ることによって得られるバイパス弁流量制御信号7(バ
イパス弁全開信号)によりタービンバイパス弁50は急
開する(弁開度と制御信号との偏差が5%以上となるた
め)。
Further, the operating signal 22 output from the power load unbalance relay 23 causes the rate of change limiter switch 34 to operate, and the rate of change limiter 32 stops the function of limiting the rate of change. Therefore, the speed/load control signal (zero) 1 which is the steam control valve flow rate request signal 27 output from the low value priority circuit 2G
3 is input to the adder 58 as is. The turbine bypass valve 50 is suddenly opened by the bypass valve flow control signal 7 (bypass valve full open signal) obtained by correcting the total main steam flow rate signal 5 with the unchanged value of the speed/load control signal 13 (the valve opening degree and (because the deviation from the control signal is 5% or more).

その後1選択制御棒挿入等による原子炉出力低下及び他
プラントの運転の影響により、タービン速度は低下して
設定値9を下回る。ここで5パワーロードアンバランス
リレー23がリセットされる前にタービン速度が設定値
9を下回ると、速度/負荷制御信号13は正から負とな
る。一方、全主蒸気流量信号5は、蒸気加減弁急閉、タ
ービンバイパス弁急開時の弁特性の差による主蒸気流量
ミスマツチによる圧力上昇のため、最大値が110%と
なっている。従って従来装置では、速度/負荷制御信号
13がそのまま蒸気加減弁流量制御信号27となり蒸気
加減弁を開く方向に、及びタービンバイパス弁を閉じる
方向に制御しようとするが、蒸気加減弁急閉リセット前
であるため、タービンバイパス弁50のみ絞られる結果
となり、圧力高スクラムに敗る可能性がある。しかし本
実施例によれば、パワーロードアンバランスリレー23
の作動信号22により瞬時動作時限復帰回路28が作動
し、切換回路29によって、速度/負荷制限器30から
出力される速度負荷設定信号31が零となる。このため
パワーロードアンバランスリレー23がリセットされて
、かつ蒸気加減弁急閉リセットが開始される1秒後まで
の期間。
After that, the turbine speed decreases to below the set value 9 due to the reduction in reactor output due to the insertion of one selected control rod and the influence of the operation of other plants. If the turbine speed falls below the set point 9 before the 5 power load unbalance relay 23 is reset, the speed/load control signal 13 goes from positive to negative. On the other hand, the total main steam flow rate signal 5 has a maximum value of 110% due to a pressure increase due to a mismatch in the main steam flow rate due to the difference in valve characteristics between the sudden closing of the steam control valve and the sudden opening of the turbine bypass valve. Therefore, in the conventional device, the speed/load control signal 13 directly becomes the steam regulator flow rate control signal 27 to control the steam regulator in the direction of opening and the turbine bypass valve in the direction of closing. Therefore, only the turbine bypass valve 50 is throttled, and there is a possibility that a high pressure scram occurs. However, according to this embodiment, the power load unbalance relay 23
The activation signal 22 activates the instantaneous operation time limit recovery circuit 28, and the switching circuit 29 causes the speed load setting signal 31 output from the speed/load limiter 30 to become zero. For this reason, the power load unbalance relay 23 is reset and the period is until 1 second after the steam control valve quick closing reset is started.

瞬時動作時限復帰回路28により速度/負荷制限器30
の速度負荷設定信号31が零に保持されるので、蒸気加
減弁流量要求信号27も零に保持され、タービンバイパ
ス弁50のみが絞られ、圧力高スクラムに到ることはな
い。
The speed/load limiter 30 is activated by the instantaneous operation time limit recovery circuit 28.
Since the speed load setting signal 31 is held at zero, the steam control valve flow rate request signal 27 is also held at zero, and only the turbine bypass valve 50 is throttled, preventing a high pressure scram.

また、パワーロードアンバランスリレー23のリセット
により、再び変化率制限器32が作動して制限動作を開
始するため、パワーロードアンバランスリレー23のリ
セット後における蒸気加減弁46の開動作とタービンバ
イパス弁50の閉動作の差が小さくなり、両者のミスマ
ツチによる圧力高スクラム、及び水位低スクラムは回避
される。
Furthermore, by resetting the power load unbalance relay 23, the rate of change limiter 32 operates again and starts the limiting operation, so the opening operation of the steam control valve 46 and the turbine bypass valve after resetting the power load unbalance relay 23 are also performed. The difference between the closing operations of the valves 50 and 50 is reduced, and high pressure scrams and low water level scrams due to mismatch between the two are avoided.

以上の様に、本実施例によれば、系統外乱による。いか
なる負荷遮断が生じた場合も、不要なスクラムを避けな
がら、原子カプラントを安定に継続運転できる。
As described above, according to this embodiment, the disturbance is due to system disturbance. Even if any load shedding occurs, the atomic coupler can continue to operate stably while avoiding unnecessary scrams.

すなわち、本実施例によれば、パワーロードアンバラン
スリレーが作動する様な、もしくはタービントリップ以
外の系統外乱によりタービン速度変動が生じ、蒸気加減
弁及びタービンバイパス弁が開閉動作する場合、開閉速
度の遅い蒸気加減弁に合わせて蒸気加減弁流量要求信号
に変化率制限を行うので、タービンバイパス弁流量と蒸
気加減弁流量の和と全蒸気流量要求信号との偏差が小さ
くなる。従って原子炉圧力変動を抑えることができ、不
要なスクラムを回避することができる。
That is, according to this embodiment, when a turbine speed fluctuation occurs due to a power load unbalance relay operating or a system disturbance other than a turbine trip, and the steam control valve and the turbine bypass valve open/close, the opening/closing speed changes. Since the rate of change of the steam regulator flow rate request signal is limited in accordance with the slow steam regulator valve, the deviation between the sum of the turbine bypass valve flow rate and the steam regulator flow rate and the total steam flow rate request signal is reduced. Therefore, reactor pressure fluctuations can be suppressed and unnecessary scrams can be avoided.

また、パワーロードアンバランスリレー23が作動する
様な負荷遮断が生じた場合も、速度/負荷制限機能、変
化率制限切換機能、及び系統負荷制限により不要なスク
ラムを回避することが可能である。
Further, even if a load shedding such as activation of the power load unbalance relay 23 occurs, unnecessary scrams can be avoided by the speed/load limiting function, rate of change limit switching function, and system load limiting.

本実施例は、他の蒸気発生プラントである加圧木型原子
炉プラント及び火力プラント等にも適用できる。BWR
プラントの原子炉圧力容器は、加圧木型原子炉プラン1
〜においては蒸気発生器であり、火力プラントではボイ
ラとなる。
This embodiment can also be applied to other steam generation plants such as a pressurized wooden nuclear reactor plant and a thermal power plant. BWR
The reactor pressure vessel of the plant is a pressurized wooden reactor plan 1.
In ~, it is a steam generator, and in a thermal power plant, it is a boiler.

〔発明の効果〕〔Effect of the invention〕

以−Lのように本発明は、いかなる系統外乱が生じても
、蒸気発生プラン1−を安定に継続運転をすることがで
きるので、蒸気発生プラントの系統外乱耐力を大幅に向
上させ、稼動率を上げることができるという効果がある
As shown in (L) above, the present invention allows the steam generation plan 1- to continue to operate stably even if any system disturbance occurs, thereby significantly improving the system disturbance resistance of the steam generation plant and increasing the operating rate. It has the effect of increasing the

【図面の簡単な説明】[Brief explanation of drawings]

第1図は第2図のタービン制御装置の詳細も5成図、第
2図はBWRプラントに適用した本発明の好適な一実施
例である蒸気発生プラントのタービン制御装置の構成図
、第3図は第1図及び第2図の実施例においてパワーロ
ードアンバランスリレーが作動しない程度の系統外乱が
生じた場合のBWRのプラント応答を示す特性図、第4
図は第1図及び第2図に示す実施例においてパワーロー
トアンバランスリレーが作動した場合のBWRプラント
応答を示す特性図、第5図は第3図と同じ条件における
従来のBWRブラン1−のタービン制御装置の特性図、
第6図は第4図と同じ2条件における従来のB W R
プラントのタービン制御装置の特性図である。 4・・・圧力調定器、11・・・速度調定器、1:3・
・・タービン制御装置、15・・・負荷設定器、17・
・・インターセプト弁速度調定器、23・・・パワーロ
ードアンバランスリレー、26・・・低値優先回路、2
8・・・瞬時動作時限復帰回路、29・・・速度/負荷
信号切換回路、30・・・速度負荷制限器、32・・・
変化率制限器、34・・・変化率制限器切°換回路、4
0・・・原子炉圧力容器、41・・・高圧タービン、4
2・・・低圧タービン、46・・・蒸気加減弁、48・
・・インターセプト弁、50・・・タービンバイパス弁
、51.52・・・圧力計、53・・・タービン速度検
出器、54・・・電流計。
1 is a detailed diagram of the turbine control device shown in FIG. 2; FIG. 2 is a configuration diagram of a turbine control device for a steam generation plant which is a preferred embodiment of the present invention applied to a BWR plant; Figure 4 is a characteristic diagram showing the BWR plant response when a system disturbance occurs to the extent that the power load imbalance relay does not operate in the embodiments of Figures 1 and 2.
The figure is a characteristic diagram showing the BWR plant response when the power rotor unbalance relay is activated in the embodiment shown in Figs. Characteristic diagram of turbine control device,
Figure 6 shows conventional BW R under the same two conditions as Figure 4.
It is a characteristic diagram of the turbine control device of a plant. 4...Pressure regulator, 11...Speed regulator, 1:3.
...Turbine control device, 15...Load setting device, 17.
...Intercept valve speed regulator, 23...Power load unbalance relay, 26...Low value priority circuit, 2
8... Instantaneous operation time limit recovery circuit, 29... Speed/load signal switching circuit, 30... Speed load limiter, 32...
Rate of change limiter, 34... Rate of change limiter switching circuit, 4
0... Nuclear reactor pressure vessel, 41... High pressure turbine, 4
2...Low pressure turbine, 46...Steam control valve, 48...
...Intercept valve, 50...Turbine bypass valve, 51.52...Pressure gauge, 53...Turbine speed detector, 54...Ammeter.

Claims (1)

【特許請求の範囲】 1、蒸気発生プラントの全主蒸気流量信号と速度/負荷
要求信号とを比較し低値を選択する手段と、選択された
信号を加減弁流量要求信号として加減弁開度を制御する
手段と、全主蒸気流量信号から加減弁流量要求信号を減
算しバイパス弁流量要求信号としてバイパス弁開度を制
御する手段とを含む蒸気発生プラントのタービン制御装
置において、全蒸気流量信号から減算すべき加減弁流量
要求信号の変化率に制限を加え、加減弁流量減算信号と
して前記バイパス弁流量要求信号演算手段に出力する変
化率制限と、タービン負荷が急減しパワーロードアンバ
ランスリレーが作動した場合、リレー作動後の一定時間
、低値優先ゲートの出力信号である加減弁流量要求信号
を強制的にある定められた値とする負荷制限器を設けた
ことを特徴とする蒸気発生プラントのタービン制御装置
。 2、特許請求の範囲第1項の記載において、パワーロー
ドアンバランスリレーもしくはタービントリップ時には
変化率制限を切換え、現状の制御回路とする切換装置を
設けたことを特徴とするタービン蒸気発生プラントのタ
ービン制御装置。 3、特許請求の範囲第1項の記載において、パワーロー
ドアンバランスリレーリセット後一定時間が経過すると
負荷制限器の動作を解除させる手段を設けたことを特徴
とする蒸気発生プラントのタービン制御装置。
[Claims] 1. Means for comparing the total main steam flow rate signal of the steam generation plant with the speed/load request signal and selecting the lower value, and adjusting the valve opening by using the selected signal as the control valve flow rate request signal. and means for subtracting a regulating valve flow rate request signal from the total main steam flow rate signal to control the bypass valve opening degree as a bypass valve flow rate request signal. A restriction is placed on the rate of change of the regulator valve flow rate request signal to be subtracted from the control valve flow rate, and a rate of change limit is outputted as a regulator valve flow rate subtraction signal to the bypass valve flow rate request signal calculation means, and a power load imbalance relay is activated when the turbine load suddenly decreases. A steam generation plant characterized by being provided with a load limiter that, when activated, forces a regulating valve flow rate request signal, which is an output signal of a low value priority gate, to a certain predetermined value for a certain period of time after the relay is activated. turbine control device. 2. A turbine for a turbine steam generation plant as set forth in claim 1, characterized in that it is provided with a power load unbalance relay or a switching device that switches the rate of change limit at the time of a turbine trip and uses the current control circuit. Control device. 3. The turbine control device for a steam generation plant as set forth in claim 1, further comprising means for canceling the operation of the load limiter when a certain period of time has elapsed after the power load imbalance relay was reset.
JP62063894A 1987-03-20 1987-03-20 Turbine controller for steam generation plant Expired - Lifetime JPH0754084B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP62063894A JPH0754084B2 (en) 1987-03-20 1987-03-20 Turbine controller for steam generation plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP62063894A JPH0754084B2 (en) 1987-03-20 1987-03-20 Turbine controller for steam generation plant

Publications (2)

Publication Number Publication Date
JPS63277804A true JPS63277804A (en) 1988-11-15
JPH0754084B2 JPH0754084B2 (en) 1995-06-07

Family

ID=13242462

Family Applications (1)

Application Number Title Priority Date Filing Date
JP62063894A Expired - Lifetime JPH0754084B2 (en) 1987-03-20 1987-03-20 Turbine controller for steam generation plant

Country Status (1)

Country Link
JP (1) JPH0754084B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6429604A (en) * 1987-07-23 1989-01-31 Hitachi Ltd Turbine controller
JP2009191715A (en) * 2008-02-14 2009-08-27 Toshiba Corp Turbine control valve control device

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62139908A (en) * 1985-12-12 1987-06-23 Hitachi Ltd Turbine controller

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62139908A (en) * 1985-12-12 1987-06-23 Hitachi Ltd Turbine controller

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6429604A (en) * 1987-07-23 1989-01-31 Hitachi Ltd Turbine controller
JP2009191715A (en) * 2008-02-14 2009-08-27 Toshiba Corp Turbine control valve control device

Also Published As

Publication number Publication date
JPH0754084B2 (en) 1995-06-07

Similar Documents

Publication Publication Date Title
JPH06201891A (en) Device and method of controlling nuclear reactor
JPS63277804A (en) Turbine control device for steam generating plant
JP7369732B2 (en) Output control device and output control method for nuclear power plant
JP2564351B2 (en) Output control device for reactor plant
JPS63314302A (en) Turbine controller for nuclear power station
JPS6158903A (en) Turbine controller for nuclear reactor
JP2863581B2 (en) Turbine steam control valve controller
JP3026049B2 (en) Turbine control device
JPH04134102A (en) Turbine controller
JPS63285205A (en) Load setting device for turbine control device
JPH0429921B2 (en)
JPS60129694A (en) Controller for pressure of nuclear power plant
JPS62131903A (en) Speed control device for steam turbine
JPH0577841B2 (en)
JPH01216005A (en) Turbine control device
JPS62139908A (en) Turbine controller
JPS6390605A (en) Control device for steam generating plant
JPH01110813A (en) Turbine controller
JPS63117298A (en) Turbine controller
JPH0441798B2 (en)
JPH0245601A (en) Turbine control device
JPS62195404A (en) Turbine control device
JPH04113298A (en) Controlling of nuclear reactor pressure
JPH0241720B2 (en)
JPS6275003A (en) Steam turbine speed control device

Legal Events

Date Code Title Description
EXPY Cancellation because of completion of term