JPS6327625A - Foundation construction work for underwater structure - Google Patents

Foundation construction work for underwater structure

Info

Publication number
JPS6327625A
JPS6327625A JP61170791A JP17079186A JPS6327625A JP S6327625 A JPS6327625 A JP S6327625A JP 61170791 A JP61170791 A JP 61170791A JP 17079186 A JP17079186 A JP 17079186A JP S6327625 A JPS6327625 A JP S6327625A
Authority
JP
Japan
Prior art keywords
underwater structure
sheet material
gap
sheet
underwater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP61170791A
Other languages
Japanese (ja)
Other versions
JPH0613773B2 (en
Inventor
Kenji Wada
憲治 和田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP61170791A priority Critical patent/JPH0613773B2/en
Publication of JPS6327625A publication Critical patent/JPS6327625A/en
Publication of JPH0613773B2 publication Critical patent/JPH0613773B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

PURPOSE:To prevent the leakage of grout by a method in which a sheet is attached in a skirt form to the lower part of an underwater structure, the structure is landed on the bottom, and grout is injected into the section surrounded by the sheet. CONSTITUTION:A sheet 4 having fine bandlike holes is attached in a skirt form to the lower part of an underwater structure 2, and weights 6, e.g., chain, etc., are attached to the lower end of the sheet 4. An underwater structure 2 is landed on a temporary support block on the bottom 1 under water, and a grout 5, e.g., cement mortar, etc., is injected into the space between the structure 2 and the bottom 1. Since the lower periphery of the structure 2 is surrounded by the sheet 4, the leakage of the grout 5 can be prevented.

Description

【発明の詳細な説明】 〈産業上の利用分野〉 本発明は水中構造物の基礎施工方法に関するものである
DETAILED DESCRIPTION OF THE INVENTION <Industrial Application Field> The present invention relates to a method for constructing the foundation of an underwater structure.

〈従来の技術〉 沈埋函やケーソン等の水中構造物を水底に据え付ける場
合、水底の凹凸と水中構造物の底面との間に発生する間
隙を放置すると水中構造物の安定性が悪くなるから、こ
の間隙を解消する必要がある。
<Prior art> When installing an underwater structure such as a submerged box or a caisson on the bottom of the water, the stability of the underwater structure will deteriorate if a gap is left between the unevenness of the bottom and the bottom of the underwater structure. This gap needs to be resolved.

一般には、水底と水中構造物との間に、モルタルやセメ
ントミルク等の注入材を注入して間隙を解消している。
Generally, an injection material such as mortar or cement milk is injected between the underwater bottom and the underwater structure to eliminate the gap.

ところで、注入材の注入に際して、水中構造物の周囲が
開放された状態で注入材を注入すると、せっか(注入し
たi主人材が水中構造物の側方に漏出してしまう。
By the way, if the injection material is injected with the area around the underwater structure open, the injected material will leak out to the side of the underwater structure.

そこで注入材の漏出を規制する方法として次のような対
策が講じられている。
Therefore, the following measures have been taken to control the leakage of the injection material.

(a)水中構造物の周囲に土のうを留み上げて遮蔽する
方法。
(a) A method of shielding by piling up sandbags around underwater structures.

(b)水中構造物の周囲に捨石や土砂等を埋戻して遮蔽
する方法。
(b) Method of shielding by backfilling rubble, earth, etc. around underwater structures.

(c)モルタル注入袋を用いる方法。(c) Method using a mortar injection bag.

く本発明が解決しようとする問題点〉 上記した各間隙の解消技術の場合、いずれら水中構造物
を沈設してから間隙を遮蔽するまでに相当の時間と手数
がかかり、そのうえ遮蔽した後にモルタル等を注入して
水中構造物を安定させるまでにはさらに日数を要し、施
工期間が長期化する傾向がある。
Problems to be Solved by the Present Invention In the case of the above-mentioned techniques for eliminating the gaps, it takes a considerable amount of time and effort to cover the gaps after submerging the underwater structure, and in addition, mortar It takes an additional number of days to stabilize the underwater structure by injecting water, etc., which tends to prolong the construction period.

く本発明の目的〉 本発明はこのような問題点に鑑みなされたもので、間隙
の遮蔽に要する時間と手数を低減でき、さらに工期の短
縮化が可能な水中構造物の基礎施工方法を提供すること
を目的とする。
OBJECTS OF THE INVENTION The present invention has been made in view of these problems, and provides a method for constructing foundations for underwater structures that can reduce the time and labor required for shielding gaps, and further shorten the construction period. The purpose is to

く本発明の構成〉 以下、図面を参照しながら本発明の一実施例について説
明する。
Configuration of the Present Invention> An embodiment of the present invention will be described below with reference to the drawings.

くイ〉間隙の遮蔽方法 第1図に示すように、本発明では水底1と水中構造物2
の水面との間に発生する間隙3を遮蔽する方法として、
水中構造物2の下部に帯状のシート材4をスカート状に
取り付けることにより、水中構造物2を着底させたとき
にシート材4で間隙3を遮蔽する。
Kui〉Gap shielding method As shown in Fig. 1, in the present invention, an underwater structure 2 is
As a method of shielding the gap 3 that occurs between the water surface and the water surface,
By attaching a band-shaped sheet material 4 like a skirt to the lower part of the underwater structure 2, the gap 3 is covered by the sheet material 4 when the underwater structure 2 is brought to the bottom.

そして、シート材4で遮蔽した間隙3内にモルタル等の
注入材5を注入して基礎工を行う方法を採用した。
Then, a method was adopted in which foundation work was performed by injecting a pouring material 5 such as mortar into the gap 3 covered by the sheet material 4.

く口〉シート材 シート材4は可撓性を有し、かつ、モルタル等の注入材
の透過を規制し、水のみの透過を許容する寸法の多数の
微孔を開設しであるシートであり、例えば織布や網体、
樹脂製のシートを使用できる。
Sheet material Sheet material 4 is a sheet that is flexible and has a large number of micropores sized to restrict the permeation of a pouring material such as mortar and allow the permeation of only water. , such as woven fabrics and nets,
Resin sheets can be used.

シート材4の上端を水中構造物2の側壁下部、あるいは
底面に取り付けるには、接着、ボルト止め、あるいはカ
ーテンレール方式等の公知の方法で固定する。
In order to attach the upper end of the sheet material 4 to the lower side wall or bottom surface of the underwater structure 2, it is fixed by a known method such as gluing, bolting, or a curtain rail method.

また、シート材4の下端には、比較的重たい鎖等の重り
6を取り付ける。
Further, a relatively heavy weight 6 such as a chain is attached to the lower end of the sheet material 4.

また、シート材4の裾幅は、発生予定の間隙3の高さの
2倍から3倍程度の長さとする。
Further, the width of the hem of the sheet material 4 is approximately two to three times the height of the gap 3 that is expected to occur.

次に水中構造物の据え付は方法について説明する。Next, we will explain how to install underwater structures.

く1〉水中構造物の着底 沈埋函等の水中構造物2の側壁下部あるいは底面には、
前記したようにシート材4の一端を固定してスカート状
に取り付けておく。
1> Attachment of underwater structure to the bottom The bottom of the side wall or bottom of the underwater structure 2, such as a submerged box, is
As described above, one end of the sheet material 4 is fixed and attached in the form of a skirt.

シート材4はあらかじめ犠装ヤードで取り付けてお(。Sheet material 4 is installed in advance at the sacrificial yard (.

次に水中構造物2を静かに吊り降ろす。Next, the underwater structure 2 is gently lowered.

シート材4を取り付けた水中構造物2を吊り降ろす際、
シート材4が着底したとき邪魔にならないようにシート
材4の下端にロープを接続しておく等して捲り上げてお
(。
When suspending the underwater structure 2 with the sheet material 4 attached,
When the sheet material 4 reaches the bottom, connect a rope to the bottom end of the sheet material 4 so that it does not get in the way and roll it up (.

水中構造物2を仮支承ブロック7に着底させ、水中構造
物2に配備したジヤツキ8の操作によって所定の据え付
は高さを調整する。
The underwater structure 2 is placed on the temporary support block 7, and the height of the underwater structure 2 is adjusted to a predetermined height by operating a jack 8 provided on the underwater structure 2.

その結果、水中構造物2と水底1との間に間隙3が形成
される。
As a result, a gap 3 is formed between the underwater structure 2 and the underwater bottom 1.

く2〉シート材による遮蔽(第3図) 水中構造物2を着底したら、それまで捲り上げていたシ
ート材4を垂れ落とす。
2> Shielding with sheet material (Figure 3) When the underwater structure 2 reaches the bottom, the sheet material 4 that had been rolled up until then is dropped.

シート材4の下端には重り6が取り付けであるから、速
やかに下端が着底して水中構造物2と水底1との間に形
成された間隙3を外部から遮蔽する。
Since the weight 6 is attached to the lower end of the sheet material 4, the lower end quickly lands on the bottom and shields the gap 3 formed between the underwater structure 2 and the underwater bottom 1 from the outside.

く3〉注入材の注入(第1.3図) 次に水中構造物2の内部側からシート材4で遮蔽した間
隙3内にモルタル等の注入材5を注入する。
3> Injection of injection material (Fig. 1.3) Next, injection material 5 such as mortar is injected into the gap 3 covered by the sheet material 4 from the inside of the underwater structure 2.

間隙3内に注入された注入材5は、水中構造物2と水底
lと間に形成された間隙3内に浸透してい(。
The injection material 5 injected into the gap 3 permeates into the gap 3 formed between the underwater structure 2 and the water bottom l (.

間隙3内に注入材5が注入されると、間隙3内に存在す
る水は注入材5と置換されてシート材4を透過してシー
ト材4の外部に排水される。
When the injection material 5 is injected into the gap 3, the water present in the gap 3 is replaced by the injection material 5, passes through the sheet material 4, and is drained to the outside of the sheet material 4.

注入された注入材5がシート材4に達すると、注入材5
は水底1に横たわるシート材4の上面に堆積してシート
材4の下端を水底1に押しつける。
When the injected injection material 5 reaches the sheet material 4, the injection material 5
is deposited on the upper surface of the sheet material 4 lying on the water bottom 1 and presses the lower end of the sheet material 4 against the water bottom 1.

シート材4は注入材5の重量で下端を水底1に押さえつ
けられたことになり、またシート材4の上端は水中構造
物2に固定しであるから間隙3を包囲するような袋体が
形成されたことになる。
The lower end of the sheet material 4 is pressed against the water bottom 1 by the weight of the injection material 5, and since the upper end of the sheet material 4 is fixed to the underwater structure 2, a bag body that surrounds the gap 3 is formed. It means that it was done.

注入材5の注入が続けられるとシート材4に張力が発生
するが、注入材5の注入量が増えるに従って、シート材
4の下端と水底1との間に発生する摩擦抵抗が大きくな
るのでシート材4の下端が注入材5の中から抜は出るこ
とはない。
As injection of the injection material 5 continues, tension is generated in the sheet material 4, but as the injection amount of the injection material 5 increases, the frictional resistance generated between the lower end of the sheet material 4 and the water bottom 1 increases. The lower end of the material 4 will not come out of the injection material 5.

以上の結果、注入材5の漏出が規制された状態で間隙3
内の全域に注入材5が注入される。
As a result of the above, the leakage of the injection material 5 is regulated in the gap 3.
The injection material 5 is injected into the entire area inside.

く本発明の効果〉 本発明は以上説明したようになるから次のような効果を
得ることができる。
Effects of the Present Invention> Since the present invention is as described above, the following effects can be obtained.

(イ)水底と水中構造物との間に発生する間隙をシート
材で確実に遮蔽できるから、間隙内に注入する注入材を
シート材の外部に漏出させることを規制できる。
(a) Since the gap generated between the water bottom and the underwater structure can be reliably covered by the sheet material, leakage of the injection material injected into the gap to the outside of the sheet material can be regulated.

その結果、注入材の注入量を最小に抑えることができ経
済的である。
As a result, the amount of injection material can be minimized, which is economical.

(ロ)水中構造物の沈設後、早期に水中構造物をモルタ
ル基礎上へジヤツキダウンできる。
(b) After submerging the underwater structure, the underwater structure can be jacked down onto the mortar foundation at an early stage.

(ハ)間隙の遮蔽手段としてシート材で遮蔽する方法を
採用したことにより、従来の方法に比べて遮蔽に要する
労力や時間を著しく軽減でき、しかも工期を大幅に短縮
できる。
(c) By adopting a method of shielding the gap with a sheet material, the labor and time required for shielding can be significantly reduced compared to conventional methods, and the construction period can also be significantly shortened.

(ニ)注入材の注入状態はシート材に触れることにより
容易に確認することができる。
(d) The injection state of the injection material can be easily confirmed by touching the sheet material.

(ホ)モルタルコアを採取して、品質の確認が容易に行
える。
(e) The quality can be easily checked by collecting mortar cores.

(へ)透水性を有するシート材を使用したことにより、
間隙内に存在する水をスムーズに排水でき、しかも注入
材の透過を規制するから、注入材の注入作業を効率良く
行える。
(f) By using a sheet material with water permeability,
The water present in the gap can be drained smoothly, and the permeation of the injection material is restricted, so the injection work of the injection material can be carried out efficiently.

【図面の簡単な説明】[Brief explanation of drawings]

第1図:本発明に係る一実施例の説明図第2図:水中構
造物を着底させてシート材で間隙を遮蔽したときの説明
Figure 1: An explanatory diagram of one embodiment of the present invention Figure 2: An explanatory diagram when an underwater structure is placed on the bottom and the gap is covered with a sheet material

Claims (1)

【特許請求の範囲】 沈設した水中構造物と水底との間に発生する間隙内にモ
ルタル等の注入材を注入して、水中構造物と水底間の間
隙を処理するに際して、 水中構造物の下部にシート材をスカート状に取り付け、 前記水中構造物を着底させ、 水底と水中構造物との間に発生した間隙と外部とをシー
ト材で遮蔽し、 シート材で遮蔽した間隙内に、 シート材で注入材の漏出を規制して注入材を注入するこ
とを特徴とする、 水中構造物の基礎施工方法
[Claims] When treating the gap between the submerged underwater structure and the water bottom by injecting an injection material such as mortar into the gap that occurs between the submerged underwater structure and the water bottom, the lower part of the underwater structure A sheet material is attached in the form of a skirt to the underwater structure, the underwater structure is placed on the bottom, and the gap generated between the underwater structure and the underwater structure is shielded from the outside with the sheet material. A method for constructing a foundation for an underwater structure, characterized by injecting the injection material while restricting leakage of the injection material using a material.
JP61170791A 1986-07-22 1986-07-22 Basic construction method for underwater structures Expired - Fee Related JPH0613773B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP61170791A JPH0613773B2 (en) 1986-07-22 1986-07-22 Basic construction method for underwater structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP61170791A JPH0613773B2 (en) 1986-07-22 1986-07-22 Basic construction method for underwater structures

Publications (2)

Publication Number Publication Date
JPS6327625A true JPS6327625A (en) 1988-02-05
JPH0613773B2 JPH0613773B2 (en) 1994-02-23

Family

ID=15911424

Family Applications (1)

Application Number Title Priority Date Filing Date
JP61170791A Expired - Fee Related JPH0613773B2 (en) 1986-07-22 1986-07-22 Basic construction method for underwater structures

Country Status (1)

Country Link
JP (1) JPH0613773B2 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008075245A (en) * 2006-09-19 2008-04-03 Japan Bridge Engineering Center Construction method for pedestal concrete
DE102007019276A1 (en) 2007-04-16 2008-11-13 Heinze, Peter, Dr.-Ing. Method for construction of tunnels by prefabricated concrete tunnel sections employed in crossing of rivers, involves fixing guide rails with axle supported rolling elements e.g. roller or ball in tunnel shoring for loading tunnel section
EP2597206A1 (en) * 2011-11-22 2013-05-29 Ceteal Foundation and method of manufacture
WO2014202948A1 (en) * 2013-06-20 2014-12-24 Linell Renewables Limited Gravity base for a marine structure
JP2017503101A (en) * 2014-01-15 2017-01-26 シービージェイ(香港) オーシャン エンジニアリング リミテッドCbj(Hong Kong) Ocean Engineering Limited Water structure fixing roll and its construction method
WO2017045030A1 (en) * 2015-09-18 2017-03-23 Worleyparsons Services Pty Ltd Method and apparatus for deploying tide driven power generators
KR20200041196A (en) * 2018-10-11 2020-04-21 정민시 Foundation Module for using Kinetic Energy of Fluid and the Construction Methods thereof

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008075245A (en) * 2006-09-19 2008-04-03 Japan Bridge Engineering Center Construction method for pedestal concrete
JP4699320B2 (en) * 2006-09-19 2011-06-08 財団法人 海洋架橋・橋梁調査会 Construction method of pedestal concrete
DE102007019276A1 (en) 2007-04-16 2008-11-13 Heinze, Peter, Dr.-Ing. Method for construction of tunnels by prefabricated concrete tunnel sections employed in crossing of rivers, involves fixing guide rails with axle supported rolling elements e.g. roller or ball in tunnel shoring for loading tunnel section
EP2597206A1 (en) * 2011-11-22 2013-05-29 Ceteal Foundation and method of manufacture
WO2013076133A3 (en) * 2011-11-22 2013-11-21 Ceteal Foundation and method of manufacture
WO2014202948A1 (en) * 2013-06-20 2014-12-24 Linell Renewables Limited Gravity base for a marine structure
JP2017503101A (en) * 2014-01-15 2017-01-26 シービージェイ(香港) オーシャン エンジニアリング リミテッドCbj(Hong Kong) Ocean Engineering Limited Water structure fixing roll and its construction method
WO2017045030A1 (en) * 2015-09-18 2017-03-23 Worleyparsons Services Pty Ltd Method and apparatus for deploying tide driven power generators
KR20200041196A (en) * 2018-10-11 2020-04-21 정민시 Foundation Module for using Kinetic Energy of Fluid and the Construction Methods thereof

Also Published As

Publication number Publication date
JPH0613773B2 (en) 1994-02-23

Similar Documents

Publication Publication Date Title
US3247672A (en) Underwater well head encasement structure
US5961253A (en) Pile head dresser, pile head dressing method, and, placement of cast-in-place concrete piles
JP2020041315A (en) Scour preventing construction around pile-shaped body, and construction method of scour preventing construction around pile-shaped body
JPS6327625A (en) Foundation construction work for underwater structure
JP4044719B2 (en) Method and apparatus for extending waterproof sheet or gap suppressing material to tunnel
CN207553086U (en) Pile In Karst Area protective device
RU179112U1 (en) GEOBOX
JPH0454011B2 (en)
JPH07247535A (en) Rock-fill dam construction tent device and construction method of rock-fill dam
JP2506050B2 (en) Construction method of asphalt mastic layer
JPH059948A (en) Reverse placing method of concrete
JPS6367328A (en) Construction of high-floor type tank foundation
JPH0291311A (en) Concrete placing method for steel sheet-pile shade
JPS607094B2 (en) Rubble foundation mound formation method
JPH05140955A (en) Preventive method for flow of ground
JP2557952B2 (en) Gravel filling method in reinforced concrete basket of cast-in-place concrete pile and filling jig directly used for its implementation
JP2001098532A (en) Flood gate skeleton, towing method therefor and instalation method
JP3637506B2 (en) Concrete underwater structure construction method
JPS56115426A (en) Construction of vibration-proof foundation of building
JPS639679Y2 (en)
JPS62129418A (en) Constructing method for underwater structure
JPS62248715A (en) Installation work for caisson
JPS621914A (en) Scouring preventing work for caisson foundation
JPH0132335B2 (en)
SU1084357A1 (en) Method of construction counter-filtration diaphragm of flexible webs and soil filler

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees