Method of main-rope stretching construction of elevator

Info

Publication number
JPS63262385A
JPS63262385A JP9537787A JP9537787A JPS63262385A JP S63262385 A JPS63262385 A JP S63262385A JP 9537787 A JP9537787 A JP 9537787A JP 9537787 A JP9537787 A JP 9537787A JP S63262385 A JPS63262385 A JP S63262385A
Authority
JP
Japan
Prior art keywords
rope
main rope
temporary
lifting
hoistway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP9537787A
Other languages
Japanese (ja)
Other versions
JPH0470235B2 (en
Inventor
大迫 昭一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Elevator Engineering and Service Co Ltd
Original Assignee
Hitachi Elevator Engineering and Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Elevator Engineering and Service Co Ltd filed Critical Hitachi Elevator Engineering and Service Co Ltd
Priority to JP9537787A priority Critical patent/JPS63262385A/en
Publication of JPS63262385A publication Critical patent/JPS63262385A/en
Publication of JPH0470235B2 publication Critical patent/JPH0470235B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 く−条上の利用分野〉      ・ 本発明はエレベータの主ロープ掛け工法、特にエレベー
タの据付時における足場なし据付工法に最適なエレベー
タの主ロープ掛け工法に関するものである。
[Detailed Description of the Invention] Application Fields> - The present invention relates to an elevator main rope hanging method, and particularly to an elevator main rope hanging method that is optimal for an installation method without scaffolding during elevator installation.

く従来の技術〉 エレベータの据付に際しては、昇降路内において一端に
つり合い重りを連結した主ロープを゛、昇降路下端部の
機械室に配設された巻上機のシーブに巻回Q1主ロープ
の他端を昇降路下端部に配されたかご側に送り込んで、
主ロープとかごとを連結する主ロー1′掛け作業が必要
である。
Prior Art> When installing an elevator, a main rope with a counterweight connected to one end in the hoistway is wound around a sheave of a hoist installed in a machine room at the lower end of the hoistway. Insert the other end into the car side located at the lower end of the hoistway,
It is necessary to attach the main rope 1' to connect the main rope and the car.

この主ロープ掛け作業を行なう場合に、昇降路内に足場
t−組むことなしにかごに対し℃主ロープを連結する工
法として従来用いられている主ロープ掛け工法は、第2
図に示すようなものであった。
When carrying out this main rope hanging work, the main rope hanging method, which is conventionally used as a method for connecting the main rope to the car without setting up scaffolding in the hoistway, is the second method.
It was as shown in the figure.

この従来の主ロープ掛け工法では、昇降路1の上端部の
機械室5に配設される巻上様のシーブ6に主ロープ7が
巻回される。この主ロープ7の一端には、昇降路1の下
端部において、つり合い重り4が連結されている。
In this conventional main rope hanging construction method, the main rope 7 is wound around a hoist-like sheave 6 disposed in the machine room 5 at the upper end of the hoistway 1. A counterweight 4 is connected to one end of the main rope 7 at the lower end of the hoistway 1.

一方、前述のつり合い重り4には吊り上げロープ11の
一端が連結され、吊り上げロープ11は昇降路1内を上
方に延長され、機械室5に設けられているそらせ車15
に巻回されて、昇降路1内を下方に延長される。
On the other hand, one end of a lifting rope 11 is connected to the above-mentioned counterweight 4, and the lifting rope 11 is extended upward in the hoistway 1.
and is extended downward within the hoistway 1.

このようにし【昇降路1内を下方に延長された吊り上げ
ロープ11は、昇降路1内に設けられているそらせ車1
6に巻回されて昇降路1外に導出される。昇降路1外に
導出され次吊り上げロープ11の他端側はウィンチ10
に巻き付けられる。
In this way, [the lifting rope 11 extended downward in the hoistway 1 is connected to the diversion wheel 1 provided in the hoistway 1.]
6 and led out of the hoistway 1. The other end of the lifting rope 11 that is led out of the hoistway 1 is a winch 10.
wrapped around.

このウィンチ10は、昇降路1の下端部に配されるかと
2の上部に組立てられる作業床3とほぼ同一高さに据付
けられている。
This winch 10 is installed at approximately the same height as a work floor 3 assembled on the upper part of the shaft 2 arranged at the lower end of the hoistway 1.

また、巻上機のシーブ6に巻回された前述せる主ロープ
7の他端には、主ロープ7をかと2に連結させるための
重り8が取り付けられている。
A weight 8 for connecting the main rope 7 to the heel 2 is attached to the other end of the main rope 7 wound around the sheave 6 of the hoist.

前述の設定現場において、ウィンチ10の操作を行なう
作業者12をウィンチ10のそばに配置させ、主ロープ
7の送り込みを行なう作業者13を機械室5内に配置さ
せる。
At the aforementioned setting site, a worker 12 who operates the winch 10 is placed near the winch 10, and a worker 13 who feeds the main rope 7 is placed inside the machine room 5.

作業者12がウィンチ10を操作して吊り上げ冒−プの
他端側を巻き取ると、主ロープ7の一端側、つり合い重
り4及び吊り上げロープ11の一端側で構成される吊り
上げ糸が、昇降路1内を上方に移動する。この移動によ
って巻上様のシーブ6に巻回されている主ローグアが九
るむので、機械室5内の作業員13は、前述せる吊り上
げ糸の移動距離に対応して主ロープ7を、かご2に対し
て送り込む。
When the operator 12 operates the winch 10 to wind up the other end of the lifting rope, the lifting line, which is made up of one end of the main rope 7, the counterweight 4, and one end of the lifting rope 11, Move upward within 1. As a result of this movement, the main rope wound around the hoisting sheave 6 becomes nine, so the worker 13 in the machine room 5 moves the main rope 7 to the car according to the moving distance of the hoisting line mentioned above. Send for 2.

このようにして、作業員12によるウィンチ10の操作
と、機械室5内の作業員13による主ロープ7の送り込
み操作とのタイミングを合せることにより、主ロープ7
の他端を昇降路1内で他部分に衝突させたり、他部分に
絡ませ九りすることなしにかと2に近付けて、最終的に
は主ロープ7をかと2と連結させることが出来る。
In this way, by synchronizing the operation of the winch 10 by the worker 12 and the feeding operation of the main rope 7 by the worker 13 in the machine room 5, the main rope 7
The main rope 7 can be finally connected to the heel 2 by bringing the other end close to the heel 2 without colliding with other parts in the hoistway 1 or getting entangled with other parts.

〈発明が解決しようとする問題点〉 前述せる従来の主ロープ掛け工法では、昇降路1の下端
部の近くでウィンチ10を操作する作業者12と、機械
室5内で主ロープ7の送り込みをする作業者13との2
名の作業者が必要であって、人件費が嵩む。
<Problems to be Solved by the Invention> In the conventional main rope hanging method described above, the worker 12 operates the winch 10 near the lower end of the hoistway 1, and the worker 12 operates the winch 10 near the lower end of the hoistway 1, and the main rope 7 is fed inside the machine room 5. 2 with worker 13
This requires several workers, which increases labor costs.

また、作業者12によるウィンチ100巻付は作業と、
機械室5内における作業者13による主ロープ7の送り
込み作業をタイミングを取って同時に行なう必要があり
、作業も複雑で熟練を要する。さらに、作業者13は狭
い機械室5内で身を屈めて作業をしなくて&害ならず、
しかも機械室5が昇降路1の上端部にあるために作業の
危険性が太きい。
In addition, attaching 100 windings to the winch by worker 12 is considered work.
It is necessary for the operator 13 to feed the main rope 7 into the machine room 5 at the same time, and the operation is complicated and requires skill. Furthermore, the worker 13 does not have to bend over while working in the narrow machine room 5 and is not harmed.
Moreover, since the machine room 5 is located at the upper end of the hoistway 1, the work is highly dangerous.

本発明は前述せるようなエレベータの主ロープ掛け工法
の現状に鑑みてなされたものであり、その目的は1名の
作業者で安全且つ容易にかごに対して主ロープを連結さ
せることが出来るエレベータの主ロープ掛け工法を提供
することにある。
The present invention was made in view of the current state of the method of hanging the main rope of an elevator as described above, and its purpose is to provide an elevator in which the main rope can be safely and easily connected to the car by one worker. The main purpose is to provide a rope hanging method.

く問題点を解決する几めの手段〉 前述せる問題点を解決するために、本発明では昇降路上
端部の機械室に配設される巻上様のシーブに主ロープを
巻回し、該主ロープの一端に前記昇降路下端部において
つり合い嵐りを連結し、該クリ合い重りに吊り上げロー
プの一端を連結し、該吊り上げロープの他端側をウィン
チで巻き取ることにより、前記主ロープの一端側、前記
つり合い重り及び前記吊り上げロープの一端側で構成さ
れる吊り上げ系を吊り上げ移動させ、該吊り上げ移動の
距離に対応して前記主ロープの他端を前記昇降路下端部
に配されたかごに対して送り込んで前記かごに連結する
、据付時におけるエレベータの主ロープ掛け工法におい
て、前記昇降路内において前記かごの上方に仮設プーリ
を配設し、前記主ロープの他端に仮設ロープの一端を連
結し、該仮設ロープの他端を前記仮設プーリを巻回経由
して前記吊り上げ系に連結させ、前記ウィンチの巻き取
りによる前記吊り上げ系の吊り上げ移動の距離に対応し
て、前記仮設プーリを介して前記仮設ロープが移動する
ことにより、前記主ロープの他端を前記かごに接近させ
て連結するような構成をとっている。
In order to solve the above-mentioned problems, in the present invention, the main rope is wound around a hoist-like sheave installed in the machine room at the end of the hoistway. One end of the main rope is connected to one end of the rope by a counterweight at the lower end of the hoistway, one end of the lifting rope is connected to the chestnut weight, and the other end of the lifting rope is wound with a winch. the lifting system consisting of the counterweight and one end of the lifting rope is lifted and moved, and the other end of the main rope is attached to the car disposed at the lower end of the hoistway in accordance with the distance of the lifting movement; In the elevator main rope hanging method during installation, in which a temporary pulley is arranged above the car in the hoistway, and one end of the temporary rope is connected to the other end of the main rope. and connect the other end of the temporary rope to the lifting system via winding the temporary pulley, and connecting the other end of the temporary rope to the lifting system via the temporary pulley in accordance with the lifting distance of the lifting system due to winding of the winch. By moving the temporary rope, the other end of the main rope approaches and connects to the car.

く作用〉 本発明では、ウィンチを作業者が操作することによって
、吊り上げロープが巻き取られて吊り上げ糸が昇降路を
上方に移動する。セして、この吊り上げ系の上方への移
動に対応して、仮設プーリを介して仮設ロープが主ロー
プとの連結側で引き下げられる。
Effects> In the present invention, when a worker operates a winch, the lifting rope is wound up and the lifting line moves upward along the hoistway. Then, in response to the upward movement of the lifting system, the temporary rope is pulled down on the side connected to the main rope via the temporary pulley.

このよ、うにして、ウィンチの巻き取り距離に対応して
巻上様のシーブに巻回されている主ロープが、自動的に
引き下げられるので1名の作業者に、よって安全且つ容
易に据付時におけるエレベータの主ロープ掛け作業を行
なうことが出来る。
In this way, the main rope wound around the sheave of the hoist is automatically lowered in accordance with the winding distance of the winch, allowing for safe and easy installation by one worker. It is possible to carry out the work of hanging the main rope of the elevator at the same time.

〈実施例〉 以下に本発明の実施例を第1図を用いて、詳細に説明す
る。
<Example> Hereinafter, an example of the present invention will be described in detail using FIG. 1.

ここで第1図は本発明の実施例の構成を示す側面説明図
であり、第2図と同一部分には同一符号が付されている
Here, FIG. 1 is an explanatory side view showing the configuration of an embodiment of the present invention, and the same parts as in FIG. 2 are given the same reference numerals.

第1図に示すように、本発明の実施例では第2図に示す
従来のエレベータの主ロープ掛け工法に対して、かご2
の上部に組立てられる作業床3に仮設プーリ14を固定
配設し、この仮設プーリ14に仮設ロープ17を巻回さ
せる。
As shown in FIG. 1, the embodiment of the present invention differs from the conventional elevator main rope hanging method shown in FIG.
A temporary pulley 14 is fixedly arranged on the work floor 3 which is assembled on the upper part of the work floor 3, and a temporary rope 17 is wound around the temporary pulley 14.

このようにして、仮設プーリ14に巻回させた仮設ロー
プ17の一端は、主ロープ7の重り8が取り付けられて
いる他端に連結される。また、仮設ロープ17の他端は
、主ロープ7のつり合い重り4が取り付けられている一
端に連結される。
In this way, one end of the temporary rope 17 wound around the temporary pulley 14 is connected to the other end of the main rope 7 to which the weight 8 is attached. Further, the other end of the temporary rope 17 is connected to one end of the main rope 7 to which the counterweight 4 is attached.

このよりな設定状態において、本発明の実施例では、ウ
ィンチ10を操作する1名の作業者12のみで、エレベ
ータの主ロープ掛け作業が行なわれる。
In this more set state, in the embodiment of the present invention, only one worker 12 operating the winch 10 performs the main rope hanging work of the elevator.

即ち、作業者12がウィンチ101に操作して吊り上げ
ロープ11の他端側を巻き取ると、吊り上げロープ11
の1端はつり合い重り4を昇降路1内を上方に引き上げ
移動させる。
That is, when the operator 12 operates the winch 101 to wind up the other end of the lifting rope 11, the lifting rope 11
One end moves the counterweight 4 upwardly in the hoistway 1.

第1図で実線で示す位置から二点鎖線で示す位置につり
合い重り4が上昇すると、仮設ロープ17も実線で示す
位置から二点鎖線で示す位置に上方に引き上げられる。
When the counterweight 4 rises from the position shown by the solid line to the position shown by the two-dot chain line in FIG. 1, the temporary rope 17 is also pulled upward from the position shown by the solid line to the position shown by the two-dot chain line.

また、この引き上げ移動によって、主ロープ7の他端は
引き下げられてlす8は実線で示す位置から、二点鎖線
で示す位置に移動する。
Further, due to this lifting movement, the other end of the main rope 7 is pulled down, and the lance 8 moves from the position shown by the solid line to the position shown by the two-dot chain line.

この場合、作業床3上における仮設プーリ14の取り付
は位置、つり合いlす4に対するムリ8の′x蓋比を選
定することにより、ウィンチ10の巻取り操作で主ロー
プ7は円滑に降下して、かご2の所定位置に到達する。
In this case, the position of the temporary pulley 14 on the work floor 3 is selected, and the main rope 7 can be lowered smoothly by the winding operation of the winch 10 by selecting the position of the temporary pulley 14 and the ratio of the overload 8 to the balance 14. and reaches the predetermined position of car 2.

この状態で、作業者12はウィンチ10のロック状態と
し、作業床3上において王ローグアとかと2との連結作
条を行なうことが出来る。
In this state, the worker 12 can lock the winch 10 and connect the rotor to the heel 2 on the work floor 3.

このようにし℃、本発明の実施例においては、危険な機
械室5円に作業者全配置することなしに、1名の作業者
12によって安全且つ容易に、エレベータの据付時にお
ける主ロープ7とかと2との連結作業を行なうことが出
来る。
In this way, in the embodiment of the present invention, one worker 12 can safely and easily install the main rope 7 during elevator installation, without having to place all the workers in a dangerous machine room. and 2 can be connected.

実施例においては、仮設ロープの他端を主ロープのつり
合い重りが取り付けられている一端に連結しt構成のも
のを説明したが1本発明の構成は実施例のものに限定さ
れるものでなく、仮設ロープの他端がりり合い重り、吊
り上げロープの一端側及び主ロープの一端側よりなる吊
り上げ系に連結された各種の構成をとることが出来る。
In the embodiment, the other end of the temporary rope is connected to one end of the main rope to which the counterweight is attached, and a T configuration is described. However, the structure of the present invention is not limited to the embodiment. Various configurations can be adopted in which the other end of the temporary rope is connected to a lifting system consisting of a tie weight, one end of the lifting rope, and one end of the main rope.

従って例えば、仮設ロープの他端をつり合い重りに連結
した構成のもの、或は仮設ロープの他端を吊り上げロー
プの一端側に連結した構成のものとすることが出来る。
Therefore, for example, the other end of the temporary rope may be connected to a counterweight, or the other end of the temporary rope may be connected to one end of the lifting rope.

〈発明の効果〉 以上詳細に説明したように、本発明によると1名の作業
者による簡単で安全な作業により、工事費用を大幅に削
減して据付時における主ロープとかごの連結作業を行な
わせることが可能な、エレベータの主ロープ掛け工法を
提供することが出来る。
<Effects of the Invention> As explained in detail above, according to the present invention, the work of connecting the main rope and the car during installation can be performed easily and safely by one worker, greatly reducing construction costs. It is possible to provide a construction method for hanging the main rope of an elevator.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明の実施例の構成を示す側面説明図、第2
図は従来のエレベータの主ロープ掛け工法の構成を示す
側面説明図である。 1・・・・・・昇降路、2・・曲かご、3・・曲作業床
、4・・・・・・つり合い夏り、5・・・・・・機械室
、6・・・・・・シーブ、7・・・・・・主ロープ、8
・・・・・・重り、10・・曲ウィンチ、11・・・・
・・吊り上げロープ、12.13・・・・・・作業者、
14・・・・・・仮設グーIJ、15.16・・曲そら
せ車、17・・・・・・仮設ロープ。 第1図 第2図
FIG. 1 is a side explanatory view showing the configuration of an embodiment of the present invention, and FIG.
The figure is an explanatory side view showing the configuration of a conventional elevator main rope hanging method. 1... Hoistway, 2... Bent cage, 3... Bent work floor, 4... Balance summer, 5... Machine room, 6...・Sheave, 7...Main rope, 8
・・・・・・Weight, 10...Curved winch, 11...
...lifting rope, 12.13... worker,
14...temporary goo IJ, 15.16...bending vehicle, 17...temporary rope. Figure 1 Figure 2

Claims (1)

【特許請求の範囲】[Claims] 昇降路上端部の機械室に配設される巻上機のシーブに主
ロープを巻回し、該主ロープの一端に前記昇降路下端部
においてつり合い重りを連結し、該つり合い重りに吊り
上げロープの一端を連結し、該吊り上げロープの他端側
をウインチで巻き取ることにより、前記主ロープの一端
側、前記つり合い重り及び前記吊り上げロープの一端側
で構成される吊り上げ系を吊り上げ移動させ、該吊り上
げ移動の距離に対応して前記主ロープの他端を前記昇降
路下端部に配されたかごに対して送り込んで前記かごに
連結する、据付時におけるエレベータの主ロープ掛け工
法において、前記昇降路内において前記かごの上方に仮
設プーリを配設し、前記主ロープの他端に仮設ロープの
一端を連結し、該仮設ロープの他端を前記仮設プーリを
巻回経由して前記吊り上げ系に連結させ、前記ウインチ
の巻き取りによる前記吊り上げ系の吊り上げ移動の距離
に対応して、前記仮設プーリを介して前記仮設ロープが
移動することにより、前記主ロープの他端を前記かごに
接近させて連結することを特徴とするエレベータの主ロ
ープ掛け工法。
A main rope is wound around a sheave of a hoist installed in a machine room at the end of the hoistway, a counterweight is connected to one end of the main rope at the lower end of the hoistway, and one end of the lifting rope is connected to the counterweight. and winding the other end of the lifting rope with a winch, the lifting system consisting of one end of the main rope, the counterweight, and one end of the lifting rope is lifted and moved. In the elevator main rope hanging method during installation, in which the other end of the main rope is fed into a car arranged at the lower end of the hoistway and connected to the car according to a distance of disposing a temporary pulley above the car, connecting one end of the temporary rope to the other end of the main rope, and connecting the other end of the temporary rope to the lifting system via winding around the temporary pulley; The other end of the main rope is brought close to and connected to the car by moving the temporary rope via the temporary pulley in accordance with the lifting distance of the lifting system due to winding of the winch. The main rope hanging method for elevators is characterized by:
JP9537787A 1987-04-20 1987-04-20 Method of main-rope stretching construction of elevator Granted JPS63262385A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9537787A JPS63262385A (en) 1987-04-20 1987-04-20 Method of main-rope stretching construction of elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9537787A JPS63262385A (en) 1987-04-20 1987-04-20 Method of main-rope stretching construction of elevator

Publications (2)

Publication Number Publication Date
JPS63262385A true JPS63262385A (en) 1988-10-28
JPH0470235B2 JPH0470235B2 (en) 1992-11-10

Family

ID=14135951

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9537787A Granted JPS63262385A (en) 1987-04-20 1987-04-20 Method of main-rope stretching construction of elevator

Country Status (1)

Country Link
JP (1) JPS63262385A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003063753A (en) * 2001-08-23 2003-03-05 Mitsubishi Electric Corp Method for roping elevator main rope
JP2003201074A (en) * 2001-10-26 2003-07-15 Hitachi Building Systems Co Ltd Confinement rescue method for elevator and its device
JP2006001739A (en) * 2004-05-20 2006-01-05 Fujitec Co Ltd Installation method of rise-up elevator

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003063753A (en) * 2001-08-23 2003-03-05 Mitsubishi Electric Corp Method for roping elevator main rope
JP2003201074A (en) * 2001-10-26 2003-07-15 Hitachi Building Systems Co Ltd Confinement rescue method for elevator and its device
JP2006001739A (en) * 2004-05-20 2006-01-05 Fujitec Co Ltd Installation method of rise-up elevator

Also Published As

Publication number Publication date
JPH0470235B2 (en) 1992-11-10

Similar Documents

Publication Publication Date Title
US8028393B2 (en) Elevator arrangement
JPH07100582B2 (en) Elevator work platform and elevator installation method
JPS63262385A (en) Method of main-rope stretching construction of elevator
JPH09151053A (en) Fixing device for car of elevator
JP6504589B2 (en) Elevator equipment
JPS5935822B2 (en) Construction elevator installation method
JP3209931B2 (en) Elevator car fixing device
CN212503693U (en) Tower crane is attached to ann and is torn open hoisting accessory
CN213060100U (en) Working hanging basket of tower crane
CN212769312U (en) One-stop elevator along with floor
JP2654412B2 (en) How to reset the emergency stop device
JPH0733355A (en) Installation method for elevator
JP2549726Y2 (en) Construction lift
JPH0672663A (en) Construction method for linking main rope of elevator
JP3464395B2 (en) Elevator main cable replacement method
JP2549171B2 (en) Elevator installation method
JPH06156931A (en) Main rope passing method for elevator
JP2939064B2 (en) Elevator installation template
JP2862063B2 (en) How to extend the lift of a construction elevator
JPS5918309B2 (en) Installation method of mobile mechanical room elevator
JPH0432478A (en) Installation method for elevator
JPS5934633B2 (en) Construction elevator installation method
JPH02300081A (en) Installation work method for elevator
JPH0859132A (en) Lifting of load
JPH06255943A (en) Device and method for installing guide rail