JPS6136462A - Apparatus for building iron wire beam - Google Patents

Apparatus for building iron wire beam

Info

Publication number
JPS6136462A
JPS6136462A JP15816184A JP15816184A JPS6136462A JP S6136462 A JPS6136462 A JP S6136462A JP 15816184 A JP15816184 A JP 15816184A JP 15816184 A JP15816184 A JP 15816184A JP S6136462 A JPS6136462 A JP S6136462A
Authority
JP
Japan
Prior art keywords
crane
column
beams
hydraulic cylinder
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP15816184A
Other languages
Japanese (ja)
Other versions
JPH0421029B2 (en
Inventor
岩永 志昭
出口 種臣
純一郎 前田
哲二 吉田
信博 奥山
忍 山崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Original Assignee
Shimizu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd filed Critical Shimizu Construction Co Ltd
Priority to JP15816184A priority Critical patent/JPS6136462A/en
Publication of JPS6136462A publication Critical patent/JPS6136462A/en
Publication of JPH0421029B2 publication Critical patent/JPH0421029B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 〔産業上の利用分野] この発明は、柱の間に梁を組み付ける際に用いられる鉄
骨梁の建方alF1.:Wする。
DETAILED DESCRIPTION OF THE INVENTION [Industrial Field of Application] This invention relates to a steel beam erection method alF1. used when assembling a beam between columns. :W.

[従来の技術] 従来、柱間への鉄骨梁の組み付は作業は、クレーンによ
って梁を吊り下げ始めた時点から、その梁を柱間に組み
付は終るまでの間、終始クレーンを必要としていた。つ
まり、従来は、まずクレーンによって梁を吊り下げてか
ら、クレーンを操作して梁を柱間の組み付は箇所に位置
させ、そしてクレーンによって梁を吊った状態に保持し
たまま、その梁を柱間に組み付けている。実際には、鳶
職人が梁を柱間に仮組みした時点でクレーンが外される
ものの、その仮組み作業を行なっている間、例えば2本
の大東を同時に吊り下げてそれらを仮組みする時開は、
クレーンが梁の組み付は専用として常にその行動が拘束
されていた。
[Conventional technology] Conventionally, the work of assembling steel beams between columns required a crane from start to finish, from the time the beam began to be suspended by a crane until the beam was assembled between the columns. there was. In other words, in the past, the beam was first suspended by a crane, then the crane was operated to position the beam between the columns, and the beam was then held suspended by the crane while the beam was placed between the columns. It is installed in between. In reality, the crane is removed when the crane craftsman temporarily assembles the beams between the pillars, but during the temporary assembly work, for example, when two Daitos are suspended at the same time and they are temporarily assembled. The opening is
Cranes were only used for assembling beams, and their actions were always restricted.

[発明が解決しようどする問題点] 上記従来の鉄骨梁の建方工法にあっては、梁の組み付は
作業中は常にクレーンが拘束されるため、そのクレーン
の稼働率が低く、工期の短mおよびコストダウンを図る
上での大きな問題となっていた。しかも、梁はクレーン
のアーム先端から不安定に吊り下げられるため、特に、
高所の柱の仕口に乗った鳶職人が、クレーンにより運ば
れてきた梁を案内して柱間の組み付は箇所におさめる梁
の取り込み作業がきわめて危険な作業となり、その改善
が望まれていた。なお、クレーンから水平1桿と梁を平
行に吊り下げ、そしてその水平1桿を柱に沿わせて昇降
させることによって、その下側に吊り下がる梁を柱間に
取り付ける方法も考えられてはいるが、しかしこの方法
にあっても終始クレーンを拘束するためそのクレーンの
稼働率が低く、またクレーン使用のため充分な安定性を
確保することが難しく梁を定位置にセットすることが容
易ではなかった。
[Problems to be solved by the invention] In the above-mentioned conventional method of constructing steel beams, the crane is always restrained during the work of assembling the beams, so the operating rate of the crane is low and the construction period is shortened. This has been a big problem in trying to shorten m and reduce costs. Moreover, since the beam is hung precariously from the tip of the crane's arm,
A craftsman riding on a pillar at a high place guides the beams brought in by a crane and assembles them between the pillars.The work of bringing in the beams is extremely dangerous, and improvements are desired. was. In addition, a method has also been considered in which a horizontal rod and a beam are suspended parallel to each other from a crane, and the horizontal rod is raised and lowered along the pillars, and the beams suspended below are attached between the columns. However, even with this method, the crane's operating rate is low because the crane is restrained from beginning to end, and it is difficult to ensure sufficient stability due to the use of the crane, making it difficult to set the beam in a fixed position. Ta.

この発明は、このような問題を解決するものである。This invention solves these problems.

[問題点を解決するための手段] この発明による鉄骨梁の建方装置は、鉄骨の梁を組み付
ける柱の柱頭間に架け渡される長さの本体を有し、この
本体の両端に、上方から柱頭に合致してこの柱頭をり、
ランプするクランプ機構をそれぞれ設け、これらのクラ
ンプ機構の下側に、これらのクランプ機構によってクラ
ンプされる柱頭の一側面に当接する突き当てローラを!
!備し、かつ本体の上部に、クレーンに連結される連結
手段を設けると共に、本体の中間部に、梁を吊り下げて
その梁を昇降させる昇降機構を備えたことを特徴とする
[Means for Solving the Problems] A steel beam erecting device according to the present invention has a main body that is long enough to span between the capitals of columns on which steel beams are assembled, and a Match the capital of the column and remove this capital.
A clamping mechanism is provided for each ramp, and an abutting roller is provided below each of these clamping mechanisms to abut one side of the column capital to be clamped by these clamping mechanisms!
! The apparatus is characterized in that a connecting means connected to a crane is provided on the upper part of the main body, and an elevating mechanism for suspending a beam and raising and lowering the beam is provided in the middle part of the main body.

[実施例] 以下、この発明による鉄骨梁の建方装置を図面に基づい
て説明する。
[Example] Hereinafter, a steel beam erecting device according to the present invention will be explained based on the drawings.

第1図は、使用状況における本発明の建方1it1の概
略構成を表わす。この建方1!11は、梁2が組み付け
られる柱3の柱頭間に架け渡される長さを有し、その両
端には柱頭をクランプするクランプ機構1aが設けられ
、中間部には、ワイヤ4によって梁3を吊り下げてその
梁3を昇降させる昇降機構1bが設けられている。また
、上部には、クレーン(図示せず)に連結される連結手
段1Cが設けられている。クランプ機構18は、柱頭を
外側爪5、内側風6、および左右のガイド7.8によっ
てクランプする構造とされ、かつこのクランプ機構18
が建方装置1の長手方向に沿ってスライド調整されるよ
うになっている。そして、これらのクランプ機構1aと
昇降機構1bは無線によって遠隔操作されるようになっ
ている。
FIG. 1 shows a schematic configuration of the construction 1it1 of the present invention in a usage situation. This construction method 1!11 has a length spanning between the capitals of the columns 3 to which the beam 2 is assembled, and a clamp mechanism 1a for clamping the column capitals is provided at both ends, and a wire 4 is provided in the middle part. An elevating mechanism 1b that suspends the beam 3 and raises and lowers the beam 3 is provided. Moreover, a connecting means 1C connected to a crane (not shown) is provided at the upper part. The clamping mechanism 18 has a structure in which the column head is clamped by an outer claw 5, an inner wind 6, and left and right guides 7.8, and this clamping mechanism 18
is adapted to be slid and adjusted along the longitudinal direction of the erection device 1. The clamp mechanism 1a and the lifting mechanism 1b are remotely controlled by radio.

第2図、第3図、および第4図はクランプ機構1aと昇
降機構1bの詳細を表わす。
2, 3, and 4 show details of the clamp mechanism 1a and the lifting mechanism 1b.

クランプ機構18は、建方装置1の本体21の端部に取
付けられた第1の筒状体22と、この筒状体22の内側
に備えられた第2、第3の筒状体23.24との3重の
嵌め合い構造部を基部として構成されている。第2、第
3の筒状体23.24は、それぞれ本体21の長手方向
に沿ってスライド自在に備えられている。そして、本体
21と第2の筒状体23との間に、往復動型の第1の油
圧シリンダ25が配備され、また第2の筒状体23と第
3の筒状体24左の間に、往復動型の第2の油圧シリン
ダ26が配備されている。これら両油圧シリンダ25.
26は、無線によって遠隔制御される本体21上の油圧
ユニット27に接続されている。したがって、この油圧
ユニット27の制御によって第1の油圧シリンダ25が
伸縮動作すると、本体21に対して第2、第3の筒状体
23.24が一体的にスライドし、また第2の油圧シリ
ンダ26が伸縮動作すると、第2の筒状体23に対して
第3の筒状体24がスライドする。
The clamp mechanism 18 includes a first cylindrical body 22 attached to an end of a main body 21 of the erection device 1, and second and third cylindrical bodies 23 provided inside this cylindrical body 22. It is constructed using a triple fitting structure with 24 as the base. The second and third cylindrical bodies 23 and 24 are provided so as to be slidable along the longitudinal direction of the main body 21, respectively. A reciprocating type first hydraulic cylinder 25 is provided between the main body 21 and the second cylindrical body 23, and between the second cylindrical body 23 and the third cylindrical body 24 on the left side. A reciprocating second hydraulic cylinder 26 is disposed at. Both hydraulic cylinders 25.
26 is connected to a hydraulic unit 27 on the main body 21 which is remotely controlled by radio. Therefore, when the first hydraulic cylinder 25 expands and contracts under the control of this hydraulic unit 27, the second and third cylindrical bodies 23 and 24 slide integrally with respect to the main body 21, and the second hydraulic cylinder When 26 expands and contracts, the third cylindrical body 24 slides with respect to the second cylindrical body 23.

第2の筒状体23の下部には前出した外側爪5が設けら
れ、第3の筒状体24の下部には前出した外側爪5と左
右のガイド7.8が設けられている。左右のガイド7.
8は、第3の筒l状体24の下部の保持ブロック28に
左右のガイドローラ29.30を保持して、これらガイ
ドローラ29.30の相互の間隔を調整できる構造とな
っている。
The lower part of the second cylindrical body 23 is provided with an external claw 5 that extends forward, and the lower part of the third cylindrical body 24 is provided with an external claw 5 that extends forward and left and right guides 7.8. . Left and right guides7.
8 has a structure in which left and right guide rollers 29.30 are held by a holding block 28 at the lower part of the third cylindrical l-shaped body 24, and the mutual spacing between these guide rollers 29.30 can be adjusted.

すなわち、左右のガイドローラ29.30は、それぞれ
左右のクランク3L 32に、それらの回転中心のシャ
フト33.34から偏心して設けられ、それら両シャフ
ト33.34は保持ブロック28の左右の定位置に保持
され、そして、左右のクランク31.32はリンクによ
って第3の油圧シリンダ35に連結されている。左のク
ランク31はリンク36によって油圧シリンダ35に連
結され、右のクランク32は、このクランク32と共に
平行リンクを構成するリンク37とクランク38を介し
てからリンク39によって油圧シリンダ35に連結され
ている。油圧シリンダ35は保持ブロック28に保持さ
れ、そして前出した油圧ユニット27に接続されていて
、この油圧ユニット27の制御によって油圧シリンダ3
5が伸縮動作すると、左右のガイドローラ29.3oが
共に同程度ずつ互いに近接および離間変位する。
That is, the left and right guide rollers 29 and 30 are provided on the left and right cranks 3L 32, respectively, eccentrically from the shafts 33 and 34 that are the center of rotation thereof, and both shafts 33 and 34 are placed in fixed positions on the left and right sides of the holding block 28. The left and right cranks 31, 32 are connected to a third hydraulic cylinder 35 by a link. The left crank 31 is connected to the hydraulic cylinder 35 by a link 36, and the right crank 32 is connected to the hydraulic cylinder 35 by a link 39 via a link 37 and a crank 38, which together with the crank 32 form a parallel link. . The hydraulic cylinder 35 is held by the holding block 28 and connected to the previously mentioned hydraulic unit 27, and the hydraulic cylinder 3 is controlled by the hydraulic unit 27.
5 expands and contracts, the left and right guide rollers 29.3o move toward and away from each other to the same extent.

ところで、前較の平行リンクを構成するクラン1  ゛ り38は、その旬報中心のシャフト4oがら偏心した位
置に突き出てロー541を回転自在に欝えている。この
突き当てローラ41は、右のガイドローラ30の真下に
位置して、そのガイドローラ30と同様に変位する。
By the way, the crank 1 lever 38 constituting the parallel link in the previous comparison protrudes at an eccentric position from the shaft 4o at the center of the newsletter and rotatably supports the row 541. This abutment roller 41 is located directly below the right guide roller 30 and is displaced in the same manner as the guide roller 30.

また、昇降機構1bは、第1の筒状体22の上部に配備
した対のドラム42.431にワイヤ4を複数回巻き付
け、そして一方のドラム42を固定側とし、かつ他方の
ドラム43は、第4の油圧シリンダ44によって変位さ
れる可動側としている。この油圧シリンダ44は、前出
した油圧ユニット27に接続されていて、この油圧ユニ
ット27の1lJtllによって油圧シリンダ44が伸
縮動作すると、可動側のドラム43が固定側のドラム4
2に近接、離間移動し、その移動量に応じてワイヤ4の
下端が昇降する。
In addition, the elevating mechanism 1b has the wire 4 wound multiple times around a pair of drums 42 and 431 arranged on the upper part of the first cylindrical body 22, and one drum 42 is fixed, and the other drum 43 is The movable side is displaced by a fourth hydraulic cylinder 44. This hydraulic cylinder 44 is connected to the previously mentioned hydraulic unit 27, and when the hydraulic cylinder 44 expands and contracts due to 1lJtll of this hydraulic unit 27, the movable drum 43 moves to the fixed drum 4.
2, and the lower end of the wire 4 moves up and down according to the amount of movement.

このようなりランプ機構1aと昇降機構1bは、本体1
の両側のそれぞれにおいて対称的に装備されている。
In this way, the lamp mechanism 1a and the lifting mechanism 1b are connected to the main body 1.
are equipped symmetrically on each side of the

また、連結手段1Cは、本例では、梁2が組み付けられ
る位置の階と、その階の下の作業階との間の距離に略等
しい長さを有する吊りワイヤ10とされている。
Furthermore, in this example, the connecting means 1C is a hanging wire 10 having a length approximately equal to the distance between the floor where the beam 2 is assembled and the working floor below that floor.

次に、上記のように構成された建方装置1の作用を、第
5図及至第11図に表わす梁2の組み付は手順にしたが
って説明する。本例では、2本の@2を同時に吊り上げ
て作業を行なう。
Next, the operation of the erection apparatus 1 constructed as described above will be explained in accordance with the procedure for assembling the beam 2 shown in FIGS. 5 to 11. In this example, the work is carried out by lifting two @2 at the same time.

まず、第5図に表わすように、建方装W1の吊りワイヤ
10にクレーン(図示せず)の吊りフック9を掛けて、
建方装W11を水平に吊り下げ、更にその建方装M1の
ワイヤ4に、所定の間隔をおいて2本の梁2を水平に吊
り下げる。第1図には、吊りビーム11を介して建方装
@1の吊りワイヤ10を吊りフック9に掛けた場合を表
わす。
First, as shown in FIG. 5, the hanging hook 9 of a crane (not shown) is hung on the hanging wire 10 of the construction equipment W1.
The construction fixture W11 is suspended horizontally, and two beams 2 are suspended horizontally from the wire 4 of the construction fixture M1 at a predetermined interval. FIG. 1 shows a case in which a hanging wire 10 of construction equipment@1 is hung on a hanging hook 9 via a hanging beam 11.

それから、第6図に表わすように、クレーンを操作して
建方装M1と2本の梁2を移動させ、建方装M1を柱3
の柱頭間に位置させる。そして、建方装置1から垂れ下
がる金錫ローフ12を利用して鳶職人が建方装置1を誘
導しつつ、その建方装置1のクランプ゛機構1aを上方
から柱頭に合致させる。その際、突き当てローラ41が
利用される。すなわち、クランプ機構18の外側型5と
、内側型6と、左右のガイド7.8のガイドローラ29
.30が柱頭の上方に位置し、かつ突き当てローラ41
が柱頭の下方に位Ifするように建方装[1を吊り下げ
てから、その建方装置f1を水平に移動させて突き当て
ローラ41を柱頭の一側面に突き当てる。このとき、突
き当てローラ41が右のガイドローラ309真下に位置
していることにより、柱頭は、必然的に外側型5と、内
側型6と、左右のガイドローラ29.30の間のクラン
プ箇所の真下に位置する。したがって、この状態から、
柱頭の一側面に突き当てローラ41を接触させつつ建方
装置1を下降させることにより、柱頭はクランプ機構1
aのクランプ箇所に速やかに位置決めされる。
Then, as shown in FIG.
placed between the stigmas of Then, a craftsman guides the construction device 1 using the gold-tin loaf 12 hanging from the construction device 1, and aligns the clamp mechanism 1a of the construction device 1 with the capital of the column from above. At this time, the abutting roller 41 is used. That is, the outer mold 5 of the clamp mechanism 18, the inner mold 6, and the guide rollers 29 of the left and right guides 7.8.
.. 30 is located above the column head, and the abutment roller 41
After suspending the erection device f1 so that it is positioned below the column capital, the erection device f1 is moved horizontally to abut the abutting roller 41 against one side of the column capital. At this time, since the abutment roller 41 is located directly below the right guide roller 309, the column head is necessarily clamped at the clamping point between the outer mold 5, the inner mold 6, and the left and right guide rollers 29, 30. located directly below. Therefore, from this state,
By lowering the erection device 1 while bringing the abutting roller 41 into contact with one side of the column capital, the column capital is attached to the clamping mechanism 1.
It is quickly positioned at the clamp location a.

この位置決めに当っては、左右のがイドローラ29.3
0の間隔を柱3の幅に合わせて予め調整しておく。例え
ば、第3図に表わすように対象となる柱3の幅J+ 、
J2 、J3に若干のクリアランス分を加えた間隔に調
整する。この調整は第3の油圧シリンダ35を作動させ
ることにより行なわれ、また突き当てローラ41は右の
ガイドローラ30と共に変位して常にそのガイドローラ
30の真下に位置する。そして、このように間隔が調整
されたガイドローラ29.30の間に柱頭が入り込むと
き、建方装置1は突き当てローラ41のガイド作用によ
り柱3に沿って下降する。そして、ガイドローラ29.
30の間に柱頭が入り込んだとき、建方装置11は柱頭
間に確かに位置決めされる。その際、柱頭はガイドロー
ラ29.30のガイド作用によって、それらの闇にスム
ーズに入り込む。ところで、柱頭の一側面に対する建方
装置1の位置決めは、初期の時点からの突き当てローラ
41によるガイドと、建方装[1を下降させた時点から
の右のガイドローラ30によるガイドとの21所のガイ
ドによって行なわれるため、建方装[1の位置決めを柱
頭の一側面を基準として安定性をもって行なうとができ
る。その際、初期の時点での建方装置1F1の安定性を
増すためには、複数の突き当てロー541を上下に備え
て、それら複数の突き当てローラ41が柱頭の一側面に
同時に当たるようにすることが有利となる。
For this positioning, the left and right idle rollers 29.3
The interval of 0 is adjusted in advance according to the width of the pillar 3. For example, as shown in FIG. 3, the width J+ of the target pillar 3,
Adjust the spacing to J2 and J3 plus some clearance. This adjustment is performed by operating the third hydraulic cylinder 35, and the abutting roller 41 is displaced together with the right guide roller 30 and is always positioned directly below the guide roller 30. When the column head enters between the guide rollers 29 and 30 whose spacing is adjusted in this manner, the erection device 1 descends along the column 3 by the guiding action of the abutment roller 41. And guide roller 29.
When the capitals of the columns are inserted between the columns 30, the erection device 11 is reliably positioned between the capitals. In this case, the capitals smoothly enter their darkness by the guiding action of the guide rollers 29,30. By the way, the positioning of the erecting device 1 with respect to one side of the column head is achieved by two steps: the guidance by the abutment roller 41 from the initial point in time, and the guidance by the right guide roller 30 from the time when the erecting device 1 is lowered. Since this is done by a guide in place, the positioning of the construction can be done with stability using one side of the column capital as a reference. At this time, in order to increase the stability of the erection device 1F1 at the initial stage, a plurality of abutment rows 541 are provided above and below so that the abutment rollers 41 hit one side of the column head at the same time. It is advantageous to do so.

こうした位置決め終了債、第7図に表わすようにクラン
プ機構18の外側用5と内側型6によって柱頭をグリッ
プさせる。建方装M1の長手方向に関する内側型6の変
位は、無線操縦による第1の油圧シリンダ25の伸縮動
弁によって行ない、この内側型6に対す、る外側用5の
変位を無りt操縦による第2の油圧シリンダ26の伸縮
動作によって行なう。このようなグリップ動作により、
建方amiは柱頭間に架け渡された状態に固定される。
After completing this positioning, the column head is gripped by the outer mold 5 and the inner mold 6 of the clamp mechanism 18, as shown in FIG. The displacement of the inner mold 6 in the longitudinal direction of the construction equipment M1 is performed by the telescopic valve of the first hydraulic cylinder 25 by radio control, and the displacement of the outer mold 5 with respect to this inner mold 6 is performed by the control. This is done by the expansion and contraction movement of the second hydraulic cylinder 26. Due to this gripping action,
The construction ami is fixed in a state where it spans between the pillar capitals.

それから、クレーンの吊りフック9を安全な作業姿勢で
作業できる作業階まで下げて、その吊りフック9から建
方装W11の吊りワイヤ10を外す。
Then, the hanging hook 9 of the crane is lowered to a working floor where work can be done in a safe working posture, and the hanging wire 10 of the construction equipment W11 is removed from the hanging hook 9.

この時点から、梁2を吊り下げ保持するクレーンの役目
が建方装W11に完全に移り代わる。したがって、クレ
ーンはこの作業場所から解放され、次に呼び出されるま
での闇は、何の拘束を受けることなく他の場所で柱や梁
の建方作業等を行なうことができる。
From this point on, the role of the crane for suspending and holding the beam 2 is completely transferred to the construction equipment W11. Therefore, the crane is released from this work place, and until the next call is called, the crane can perform work such as erecting columns and beams at another place without any restrictions.

つづいて、第8図に表わすように、@2を組み付ける2
つの階の内の下側の階の仕口に作業員が上がり、無線に
よって昇R機構1bを遠隔操作して、組み付けるべき下
側の梁2を対応する仕口間にまで上昇させておさめる。
Next, as shown in Figure 8, assemble @2.
A worker goes up to the joint on the lower floor of the two floors, remotely controls the raising R mechanism 1b by radio, and raises the lower beam 2 to be assembled to the space between the corresponding joints.

そのとき、仕口間の間隔が梁2の長さよりも大きかった
り、小さかったりした場合には、無線操縦によって両端
のクランプ機構1構1aをそれぞれ建方装置711の長
手方向にスライドさせ、柱頭間の間隔を調整して仕口間
の間隔を梁2の長さに合わせる。クランプ機構18のス
ライドは、第1の油圧シリンダ25の伸縮動作によって
行なう。その際、両端のクランプ機構18における第1
の油圧シリンダ25を同時に伸縮させて、両クランプ機
構1aを互いに近接する方向、および互いに離間する方
向に同程度ずつ同時に変位させることにより、柱頭間に
て建方装置1と吊っている梁2の芯を合わせたまま柱頭
間の間隔を!IIIすることができる。ちなみに、従来
は、111人がジノ、ジヤツキ等によって仕口間の間隔
調整を行なっており、高所でのその調整作業はきわめて
危険であった。
At that time, if the distance between the joints is larger or smaller than the length of the beam 2, the clamp mechanism 1 structure 1a at both ends is slid in the longitudinal direction of the erection device 711 using radio control, and the space between the column heads is Adjust the interval between the joints to match the length of the beam 2. The clamp mechanism 18 is slid by the expansion and contraction movement of the first hydraulic cylinder 25. At that time, the first clamp mechanism 18 at both ends
By simultaneously expanding and contracting the hydraulic cylinders 25 of the two clamp mechanisms 1a and simultaneously displacing both clamp mechanisms 1a to the same extent in the direction toward each other and in the direction away from each other, the erection device 1 and the suspended beam 2 are moved between the column heads. Adjust the spacing between the capitals while keeping the cores aligned! III. Incidentally, in the past, 111 people had to adjust the spacing between the joints using tools such as jino, jacks, etc., and the adjustment work at high places was extremely dangerous.

また、仕口間に対する梁2の水平方向の位II調整が必
要な場合、その位WW4整は、両端のクランプ機構18
における第1の油圧シリンダ25の伸縮動作量を変えて
、柱−における建方装[1を水平に変位させることによ
り行なう。なお、組み付けるべき下側の梁2と共に上昇
される上側の梁2は、下側の梁2が対応、する仕口間に
おさめられたときには対応する上側の仕口間の若干下方
に位窮する。こうした位gt圓係となるように、上下の
梁2の吊りの間隔を予め設定しておく。なお、図中13
は無線操縦機を示す。
In addition, if it is necessary to adjust the horizontal position of the beam 2 with respect to the gap between the joints, the WW4 adjustment can be made by adjusting the clamp mechanism 18 at both ends.
This is done by changing the amount of expansion and contraction of the first hydraulic cylinder 25 in the column and horizontally displacing the erection system [1] in the column. Note that the upper beam 2 that is raised together with the lower beam 2 to be assembled is placed slightly below the corresponding upper joint when the lower beam 2 is placed between the corresponding upper joints. . The spacing between the upper and lower beams 2 is set in advance so that the gt circle relation is achieved. In addition, 13 in the figure
indicates a radio control aircraft.

このようにして下側の梁2を仕口間におさめた後は、第
9図に表わすようにその梁2を仕口間に仮組みする。そ
して、この梁2の仮組み後にその梁2の吊りロープを外
す。
After the lower beam 2 is placed between the joints in this manner, the beam 2 is temporarily assembled between the joints as shown in FIG. After the beam 2 is temporarily assembled, the suspension rope of the beam 2 is removed.

つづいて、第10図に表わすように作業員が上の階の仕
口に上がり、そして、上述した下側の梁2の組み付けの
場合と同様に、クランプ機構1aと昇降開溝1bを無線
により操作して、上側の梁2を対応する仕口間におさめ
る。それから、その梁2を仮組みし、吊りローブを外す
Next, as shown in Fig. 10, the worker goes up to the doorway on the upper floor, and as in the case of assembling the lower beam 2 described above, connects the clamp mechanism 1a and the elevating opening groove 1b by wireless. Operate to fit the upper beam 2 between the corresponding joints. Then, temporarily assemble the beam 2 and remove the hanging robe.

その債第11図に表わすように再びクレーンを呼んでそ
の吊りフック9に、建方8W11の吊りワイヤ10を掛
け、そして、柱頭に対してクランプ機構18のグリップ
を無線操縦により解除させる。
As shown in FIG. 11, the crane is called again, and the hanging wire 10 of construction 8W11 is hung on the hanging hook 9, and the grip of the clamp mechanism 18 on the column head is released by radio control.

つまり、外側用5は外方へ、内側型6は内方へ戻す。そ
れから、クレーンを操作して建方a*iを吊り上げ、そ
れを柱頭間から外す。そして、再び、建方装置1を第5
図に表わしたような梁2の置き場に移動させて、その建
方amiの下方に、次に組み付けるべきIR2を吊り下
げる。
That is, the outer mold 5 is returned to the outside, and the inner mold 6 is returned to the inside. Then, operate the crane to lift the construction a*i and remove it from between the column heads. Then, once again, the erection device 1 is
Move the beam 2 to the location shown in the figure, and hang the IR 2 to be assembled next below the beam ami.

以降、同様の作業を繰り返して、梁2を順次組み付ける
Thereafter, similar operations are repeated to assemble the beams 2 in sequence.

このように、この発明の建方装[1によると、第7図の
状態から第1図の状態まで間の作業中において、クレー
ンはその作業場所から解放される。
As described above, according to the construction method [1 of the present invention], the crane is released from its work place during the work from the state shown in FIG. 7 to the state shown in FIG.

したがって、この解放時間中に、クレーンが例えば関連
した他の梁や柱などの建方作業を行なうことにより、工
期の短縮を図ることが可能となる。
Therefore, during this release time, the crane can perform the erection work of other related beams, columns, etc., thereby making it possible to shorten the construction period.

[発明の効果] 以上説明したように、この発明による鉄骨梁の建方装置
は、クレーンによって梁と共に吊り上げられて柱頭間に
架け渡された時から、クレーンに代えて梁を吊り下げ保
持してその梁を昇降させる構成であるから、クレーンに
代わって梁を吊り下げ保持した時から、クレーンの拘束
を解いてそのクレーンに他の作業を行なわぜることがで
き゛る。
[Effects of the Invention] As explained above, the steel beam erection device according to the present invention suspends and holds the beam in place of the crane from the time the beam is lifted together with the crane and placed between the column heads. Since the structure allows the beam to be raised and lowered, once the beam is suspended and held in place of the crane, the crane can be unrestrained and the crane can perform other tasks.

したがって、クレーンの稼鋤率を上げ、工期の短縮およ
びコストダウンを図ることが可能となる。
Therefore, it is possible to increase the operating rate of the crane, shorten the construction period, and reduce costs.

しかも、柱頭間に架【プ渡されて安定した状態を基にし
て、芯を合わせたまま梁の吊り下げ位置を微調整するた
め、梁を柱頭の組みイリは箇所におさめる取り込み作業
を安定した状態で危険なく容易に行なうことができる。
Moreover, based on the stable condition of the beams being suspended between the column capitals, fine adjustments are made to the suspension position of the beams while keeping their centers aligned, making it possible to stabilize the work of placing the beams in place at the column capitals. This can be done easily and without danger.

更に、クレーンに吊り下げられて不安定な状態にある建
方装置自体を柱頭間に架け渡す際、クランプ機構の下側
に位Uする突き当てローラを柱頭部の一側面に横方から
突き当てて、建方装置自体を柱頭間の真上に静止させて
から、建方装置自体を下げてそのクランプ機構によって
柱頭をクランプする構成であるから、建方装置自体を柱
wi間に簡易に位置決めして架け渡すことができ、高所
におけるその作業をきわめて安全に行なうことができる
Furthermore, when the erection equipment itself, which is suspended by a crane and is in an unstable state, is to be bridged between the column heads, a butting roller located below the clamping mechanism is butted from the side against one side of the column head. The structure is such that the erection device itself is stopped directly above the column heads, and then the erection device itself is lowered and its clamp mechanism clamps the column heads, so the erection device itself can be easily positioned between the columns wi. The work can be carried out at high places extremely safely.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図はこの発明の建方装置の使用状況を表わす顕略斜
視図、第2図はその建方装置の一端部の拡大断面図、第
3図は第2図の■−■線に沿う断面図、第4図は第3図
に表わしたがイドローラ部の要部の斜視図、第5図及至
第11図はこの発明の建方装置による梁の組み付は作業
手順の説明図である。 1・・・・・・建方装置、1a・・・・・・クランプ機
構、1b・・・・・・昇降機構、1C・・・・・・連結
部、2・・・・・・梁、3・・・・・・柱、21・・・
・・・本体、
Fig. 1 is a schematic perspective view showing the use of the erection device of the present invention, Fig. 2 is an enlarged sectional view of one end of the erection device, and Fig. 3 is taken along the line ■-■ in Fig. 2. The cross-sectional view and FIG. 4 are shown in FIG. 3, but the perspective views of the main parts of the idle roller section, and FIGS. 5 to 11 are explanatory diagrams of the work procedure for assembling a beam using the erection device of the present invention. . 1... Erecting equipment, 1a... Clamp mechanism, 1b... Lifting mechanism, 1C... Connecting section, 2... Beam, 3... Pillar, 21...
...Body,

Claims (1)

【特許請求の範囲】[Claims] 鉄骨の梁を組み付ける柱の柱頭間に架け渡される長さの
本体を有し、この本体の両端に、上方から柱頭に合致し
てこの柱頭をクランプするクランプ機構をそれぞれ設け
、これらのクランプ機構の下側に、これらのクランプ機
構によってクランプされる柱頭の一側面に当接する突き
当てローラを装備し、かつ本体の上部に、クレーンに連
結される連結部を設けると共に、本体の中間部に、梁を
吊り下げてその梁を昇降させる昇降機構を備えたことを
特徴とする鉄骨梁の建方装置。
It has a main body long enough to be spanned between the capitals of columns on which steel beams are assembled, and clamp mechanisms are provided at both ends of the main body to match and clamp the column capitals from above. The lower side is equipped with an abutment roller that comes into contact with one side of the column head to be clamped by these clamp mechanisms, and the upper part of the main body is provided with a connecting part to be connected to the crane. A steel beam erecting device characterized by being equipped with an elevating mechanism that suspends a steel beam and raises and lowers the beam.
JP15816184A 1984-07-28 1984-07-28 Apparatus for building iron wire beam Granted JPS6136462A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15816184A JPS6136462A (en) 1984-07-28 1984-07-28 Apparatus for building iron wire beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15816184A JPS6136462A (en) 1984-07-28 1984-07-28 Apparatus for building iron wire beam

Publications (2)

Publication Number Publication Date
JPS6136462A true JPS6136462A (en) 1986-02-21
JPH0421029B2 JPH0421029B2 (en) 1992-04-08

Family

ID=15665600

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15816184A Granted JPS6136462A (en) 1984-07-28 1984-07-28 Apparatus for building iron wire beam

Country Status (1)

Country Link
JP (1) JPS6136462A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07145671A (en) * 1993-11-24 1995-06-06 Kajima Corp Column adjusting device for installation of beam
JP2014201932A (en) * 2013-04-03 2014-10-27 清水建設株式会社 Member holding device for cutting demolition and method of demolishing building using the same

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58115667U (en) * 1982-02-01 1983-08-06 大成建設株式会社 Beam attachment device

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58115667U (en) * 1982-02-01 1983-08-06 大成建設株式会社 Beam attachment device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07145671A (en) * 1993-11-24 1995-06-06 Kajima Corp Column adjusting device for installation of beam
JP2014201932A (en) * 2013-04-03 2014-10-27 清水建設株式会社 Member holding device for cutting demolition and method of demolishing building using the same

Also Published As

Publication number Publication date
JPH0421029B2 (en) 1992-04-08

Similar Documents

Publication Publication Date Title
US5417018A (en) Construction apparatus for building and constructing method therewith
US5881504A (en) Temporary frame system for construction
JP2001226913A (en) Device and method for erecting bridge
JPH06298495A (en) Vehicle for operation at high place
JPS6136462A (en) Apparatus for building iron wire beam
JP2775201B2 (en) Lifting member positioning and mounting device for high lift crane
JPS6136461A (en) Apparatus for building iron wire beam
JP5356091B2 (en) Crane girder exchanging method and crane girder exchanging apparatus
JP3034960B2 (en) Equipment installed in hoistway
JP3841242B2 (en) Elevator parking elevating work table and construction method using it
JP2761518B2 (en) Construction method of building
JPS6136460A (en) Building of iron wire beam
JPH0325573B2 (en)
KR100403920B1 (en) Welding system for steel box
JPH035565A (en) Moving scaffold robot
JP7246035B2 (en) mobile scaffolding
CN218320410U (en) Lifting and jacking integrated self-climbing crane
JPH0776489B2 (en) Steel erection device and steel erection system
JPS63196491A (en) Portal type cargo gear
JPH09125578A (en) Fitting device and fitting method for floor member
JP3021199B2 (en) Construction method of chimney inner cylinder and pull jack up device for the construction
JPH0522487U (en) Scissors type work machine
JP3786385B2 (en) Elevating work table and assembly method of parking equipment using it
JP3035099B2 (en) Elevator main cable replacement method
JP2542846Y2 (en) Multi-stage telescopic excavator drive