JPS6121869A - Car assembly line - Google Patents

Car assembly line

Info

Publication number
JPS6121869A
JPS6121869A JP59142848A JP14284884A JPS6121869A JP S6121869 A JPS6121869 A JP S6121869A JP 59142848 A JP59142848 A JP 59142848A JP 14284884 A JP14284884 A JP 14284884A JP S6121869 A JPS6121869 A JP S6121869A
Authority
JP
Japan
Prior art keywords
line
assembly process
assembly
work
conveyor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP59142848A
Other languages
Japanese (ja)
Other versions
JPH0683938B2 (en
Inventor
Toshinobu Takeya
竹谷 利信
Masaru Kuramori
蔵盛 賢
Toshiharu Sakamoto
俊治 坂本
Hiroshi Fujii
博司 藤井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mazda Motor Corp
Original Assignee
Mazda Motor Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mazda Motor Corp filed Critical Mazda Motor Corp
Priority to JP59142848A priority Critical patent/JPH0683938B2/en
Priority to US06/752,558 priority patent/US4683651A/en
Publication of JPS6121869A publication Critical patent/JPS6121869A/en
Publication of JPH0683938B2 publication Critical patent/JPH0683938B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B62LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
    • B62DMOTOR VEHICLES; TRAILERS
    • B62D65/00Designing, manufacturing, e.g. assembling, facilitating disassembly, or structurally modifying motor vehicles or trailers, not otherwise provided for
    • B62D65/02Joining sub-units or components to, or positioning sub-units or components with respect to, body shell or other sub-units or components
    • B62D65/18Transportation, conveyor or haulage systems specially adapted for motor vehicle or trailer assembly lines

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Automobile Manufacture Line, Endless Track Vehicle, Trailer (AREA)
  • Automatic Assembly (AREA)

Abstract

PURPOSE:To adapt the captioned assembly line to the progress in automation technology and automatize each process by stages in order by enabling switchover between a tact feed and a continuous feed for the first half of said assembly line in which an automatic assembly process is mixed with a man-power assembly process, and adopting said continuous feed for its last half. CONSTITUTION:A main line 1 consists of an automatic assembly line 2 for the first half, a man-power assembly line 3 for the last half, and an automatized operation line 4 for the final part. The automatic assembly line 2 is formed by an electric-car type conveyor 5 for which switchover between the continuous feed and the tact feed of a car body is enabled, and a receiving part A is provided at its crossing part with the passage of a carrying-in conveyor 6 from a painting line. The man-power assembly line 3 is formed by a trolley type conveyor 7 which continuously feeds the car body, and a relay part B is provided at its crossing part with the electric-car type conveyor 5. On the automatized operation line 4, operations of pouring in various liquids and testing operations are carried out.

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は車両の組立ライン、特にロボット等による自動
組立工程と人間による人手組立工程とが混在する車両の
組立ラインに関する。
DETAILED DESCRIPTION OF THE INVENTION (Field of Industrial Application) The present invention relates to a vehicle assembly line, and particularly to a vehicle assembly line in which an automatic assembly process using a robot or the like and a manual assembly process using humans coexist.

(従  来  技  術) 近年、車両の製造工場においてはロボット等の採用によ
る自動化が推進されているが、これは主として車体の溶
接ラインや塗装ラインを中心とするものであって、車両
の製造全般に対して大きな割合を占める組立ラインにつ
いては、作業内容が複雑なこともあって未だ十分に自動
化されていないのが実情である。しかし、ロボットの性
能の向上等の自動化技術の進歩に伴って、組立ラインに
おいても特定の工程については既に自動化され、また今
後も次第に自動化される工程が増加する傾向にある。
(Conventional technology) In recent years, automation has been promoted in vehicle manufacturing plants through the adoption of robots, etc., but this is mainly focused on welding lines and painting lines for vehicle bodies, and is not applicable to overall vehicle manufacturing. The reality is that assembly lines, which account for a large proportion of the total, have not yet been fully automated, partly because the work involved is complex. However, with advances in automation technology such as improvements in the performance of robots, certain processes on assembly lines have already been automated, and there is a tendency for more and more processes to be automated in the future.

然るに、このような組立ラインにおける自動化は、従来
の人間作業を前提として設計されたラインにおける個々
の工程をポイント的に自動化するものであるから、ロボ
ット等の改良があっても、人間とロボットの能力や特性
の相違から直ちに人間作業をロボットに置換できない場
合が多い。つまり、人間作業を前提とする組立ラインは
、ワークが作業中に不意に移動することによる危険を避
けるためにワークを一定速度で移動させる連続送り方式
のコンベアによって構成されているが、ロボットによる
場合はワークとの相対位置関係が一定していることが必
要で、移動しているワークに対する作業には適さないの
である。また、人間作業によればワークのコンベアに対
するセット位置や該ワークへの部品の取付位置等に誤差
があっても支障なく次の作業を行うことができるが、ロ
ボット作業によると、このような位置の誤差がある場合
に部品同志の干渉を生じることになる。このような理由
により、従来の人間作業そ前提とする組立ラインをポイ
ント的に自動化することには限度があり、そのため自動
化技術の進歩があっても、これを直ちに既存のラインに
適用することができないのである。
However, since automation on assembly lines like this involves automating individual processes on a line that was previously designed with human work in mind, even with improvements to robots, the interaction between humans and robots will be reduced. In many cases, it is not possible to immediately replace human work with robots due to differences in abilities and characteristics. In other words, assembly lines that require human work are comprised of continuous conveyors that move workpieces at a constant speed to avoid dangers caused by unexpected movement of workpieces during work, but when robots are used, requires a constant relative positional relationship with the workpiece, and is not suitable for work on moving workpieces. Furthermore, according to human work, even if there is an error in the set position of the workpiece on the conveyor or the attachment position of parts to the workpiece, the next work can be carried out without any problem, but according to robot work, such position If there is an error, interference between parts will occur. For these reasons, there is a limit to the point-by-point automation of assembly lines that rely on traditional human work, and even if automation technology advances, it may not be possible to immediately apply it to existing lines. It cannot be done.

これに対しては、ロボット等による自動化が可能となっ
た工程がある程痘の数に達した時点でライン構成を変更
すればよいが、このように自動化の進行段階に応じてそ
の都度ライン構成を変更覆ることは費用の点で極めて困
難である。
To deal with this, the line configuration can be changed when the number of smallpox reaches a certain level in a process that can be automated by robots, etc.; It is extremely difficult to override changes in terms of cost.

ところで、特開昭53−8884号公報或いは特開昭5
3’−8883号公報によれば、従来の一本の連続した
ラインの不合理性を解消して作業性や生産性を向上させ
るための新たなラインシステムが提案されている。前者
は、自動車の組立ラインにおいてボデーの賊装ラインに
対して分岐、合流するドアの繕装ラインを設けたことを
特徴とするものであり、また、後者はワークを所定ピッ
チで間欠的に移送するダクト送り方式のコンベアを用い
たラインにおいて、作業設備の稼動率向上のため、作業
要素を適切にグループ分けして各グループの作業要素を
遂行する複数の作業領域を設けたことを特徴とするもの
である。つまり、これらは組立ラインないし生産ライン
をシステムとして改良したものであるが、自動化技術の
進歩に対応できるライン構成を提案するものではない。
By the way, Japanese Unexamined Patent Publication No. 53-8884 or Japanese Unexamined Patent Publication No. 5
According to Japanese Patent Publication No. 3'-8883, a new line system is proposed to eliminate the unreasonableness of the conventional single continuous line and improve workability and productivity. The former is characterized by the installation of a door repair line that branches off and merges with the body repair line in the automobile assembly line, and the latter is characterized by an intermittently transferring workpiece at a predetermined pitch. The line uses a duct-feeding conveyor, and is characterized by having multiple work areas where work elements are appropriately grouped and each group's work elements are carried out, in order to improve the operating efficiency of work equipment. It is something. In other words, although these are improvements to the assembly line or production line as a system, they do not propose a line configuration that can respond to advances in automation technology.

(発  明  の  目  的) 本発明は、車両の組立ラインを自動化する場合における
上記のような問題に対処するもので、組立ラインの個々
の工程には、その作業内容に応じて、既に自動化されて
いるもの、技術の進歩による将来の自動化が予測される
もの、及び将来においても自動化が困難と判断されるも
のが存在することに着目し、これらのうちの将来の自動
化が予測されるものについては、当面は人間作業による
と共に、自動化が可能となった時点でライン設備の変更
を要することなく、直ちに自動作業に切替え得るように
する。これにより、自動化技術の進歩に合せて、多大の
設備投資を要することなく、順次段階的に各工程を自動
化できるようにすることを目的とする。
(Object of the Invention) The present invention addresses the above-mentioned problems when automating a vehicle assembly line. Focusing on the fact that there are things that are currently being automated, things that are predicted to be automated in the future due to technological advances, and things that are judged to be difficult to automate in the future, For the time being, the work will be done by humans, and once automation becomes possible, the work will be able to be switched to automatic work immediately without requiring any changes to the line equipment. The purpose of this is to enable each process to be automated in a step-by-step manner in accordance with advances in automation technology without requiring large capital investments.

また、本発明においては、既に自動化された工程及び自
動化が予定される工程と、将来においても人間作業によ
らざるを得ない工程とを適切に配置することにより、自
動作業と人間作業の両者を夫々の特性に応じて最も効率
良く行い得るようにすることを目的とする。
In addition, in the present invention, by appropriately arranging processes that have already been automated, processes that are scheduled to be automated, and processes that will have to be performed by humans in the future, both automated and human operations can be achieved. The aim is to do so in the most efficient manner according to the characteristics of each.

〈発  明  の  構  成〉 本発明に係る車両の組立ラインは、上記目的達成のため
次のように構成したことを特徴とする。
<Configuration of the Invention> In order to achieve the above object, the vehicle assembly line according to the present invention is characterized by being configured as follows.

即ち、多数のロボット等による自動組立工程と多数の人
間による人手組立工程とが混在する車両の組立ラインに
おいて、メインラインの前半部をダクト送りと連続送り
の切替自在な電車型コンベアで、構成Jると共に、後半
部を連続送りされるトロリー型もしくはパワーアンドフ
リー型コンベアで構成し、更にメインラインの最終部を
ダクト送りされるコンベアで構成する。
In other words, in a vehicle assembly line where an automatic assembly process using many robots, etc. and a manual assembly process using many people coexist, the first half of the main line is equipped with a train-type conveyor that can freely switch between duct feeding and continuous feeding, and the configuration J At the same time, the latter half is constructed with a continuously fed trolley-type or power-and-free type conveyor, and the final section of the main line is constructed with a duct-fed conveyor.

そして、上記メインライン前半部には、既に自動化され
ているロボット等による自動組立工程と、将来の自動化
が予定されているが、当面は人間作業による自動化予定
の人手組立工程とを集中、連続的に配置する。その場合
に、該前半部における電車型コンベアの送り方式を、自
動組立工程においてはダクト送りどし、且つ自動化予定
の人手組立工程においては連続送りとり−る。
In the first half of the main line, the automatic assembly process using robots, etc., which has already been automated, and the manual assembly process, which is scheduled to be automated in the future, will be concentrated and continuous. Place it in In this case, the feeding method of the electric train type conveyor in the first half is duct feeding in the automatic assembly process, and continuous feeding in the manual assembly process scheduled to be automated.

また、メインラインの後半部には、将来においても人手
によらざるを得ない人手組立工程を配置すると共に、メ
インラインの@終部には、組立順序上の制限から人手組
立工程後に行わざるを得ない自動化作業工程を配置する
In addition, in the latter half of the main line, we will place a manual assembly process that will have to be done manually in the future, and at the end of the main line, due to restrictions in the assembly order, it will have to be done after the manual assembly process. Place automated work processes that cannot be achieved.

このような構成によれば、コンベアの送り方式が人手組
立工程においては全て連続送りとされ、また自動組立工
程及び自動化作業工程においては全てダクト送りとされ
て、いずれの工程においても人間及びロボットの特性に
応じた送り形式とされる。そして、特にメインライン前
半部においては、連続送りとダクト送りとの切替が自在
な電車型コンベアが用いられているので、人手組立工程
の自動化が可能となった時点で、送り方式を連続送りか
らダクト送りに切替えることにより、ライン構成を変更
することなく直ちに人間作業をロボット等による自動作
業に置換することが可能となる。
According to this configuration, the conveyor feeding method is continuous feeding in all manual assembly processes, and duct feeding in all automatic assembly processes and automated work processes, so that there is no need for humans or robots in any process. The feeding format is determined according to the characteristics. Especially in the first half of the main line, a train-type conveyor that can freely switch between continuous feed and duct feed is used, so when it becomes possible to automate the manual assembly process, the feed method can be changed from continuous feed to duct feed. By switching to duct feeding, it becomes possible to immediately replace human work with automatic work by robots, etc., without changing the line configuration.

また、この自動組立工程及び自動化予定の人手組立工程
が配置された自動組立ラインがメインラインの前半部に
、将来においても人間作業によらざるを得ない人手組立
ラインがメインラインの後半部に夫々配置されているこ
とにより、自動組立ラインにおいては部品干渉がなく、
また人手組立ラインにおいては自動組立ラインでの部品
の粗(=1げに位置ずれ等があってもこれを許容しなが
ら情況に応じて作業を行うことができ、このようにして
両作業系の特徴を生かしながら順次、円滑に部品の組付
は作業を行うことが可能となる。
In addition, the automatic assembly line where this automatic assembly process and the manual assembly process scheduled for automation are located will be located in the first half of the main line, and the manual assembly line that will have to be operated by humans in the future will be located in the second half of the main line. Due to this arrangement, there is no interference between parts on the automatic assembly line.
In addition, on a manual assembly line, even if there are rough parts (= misalignment, etc.) on an automatic assembly line, it is possible to work according to the situation while tolerating this, and in this way, the characteristics of both work systems are This makes it possible to assemble parts smoothly and sequentially while taking advantage of this.

(実  施  例) 以下、本発明の実施例を図面に基づいて説明する。(Example) Embodiments of the present invention will be described below based on the drawings.

第1図は車両組立ラインの全体概略構成を示すもので、
そのメインライン1は、前半部の自動ライン2と、後半
部の人手組立ライン3と、最終部の自動化作業ライン4
とで構成されている。上記自動組立ライン2は、循環経
路を有し、車体(ワーク)の連続送りとダクト送りとの
切換が可能とされた電車型コンベア5で構成されている
と共に、塗装ライン(図示せず)からの搬入コンベア6
の経路との交差部が車体受取り部Aとされている。
Figure 1 shows the overall schematic configuration of the vehicle assembly line.
The main line 1 consists of an automatic line 2 in the first half, a manual assembly line 3 in the latter half, and an automated work line 4 in the final part.
It is made up of. The automatic assembly line 2 is composed of an electric train type conveyor 5 that has a circulation path and is capable of switching between continuous feeding of car bodies (workpieces) and duct feeding. Loading conveyor 6
The intersection with the route is designated as the vehicle body receiving section A.

また、メインライン後半部の人手組立ライン3は、同じ
く循環経路を有して車体を連続送りするトロリー型又は
パワーアンドフリー型コンベア7によって構成され、上
記電車型コンベア5の経路との交差部が自動組立ライン
2から該人手組立ライン3への中継部Bとされている。
In addition, the manual assembly line 3 in the latter half of the main line is composed of a trolley-type or power-and-free type conveyor 7 that also has a circulation route and continuously conveys car bodies, and the intersection with the route of the train-type conveyor 5 is It serves as a relay section B from the automatic assembly line 2 to the manual assembly line 3.

更に、メインライン最終部の自動化作業ライン4は、人
手組立ライン3との間の中継部Cからラインオフ部りに
至るラインであって、車体をダクト送りする電車型コン
ベア8によって構成されている。
Furthermore, the automated work line 4 at the end of the main line is a line from the relay section C with the manual assembly line 3 to the line-off section, and is composed of a train-type conveyor 8 that transports the car bodies through a duct. .

そして、これらのライン2.3.4に沿って多数の工程
が配置されているのであるが、次にこれらの工程の配置
例を第2図によって説明する。
A large number of processes are arranged along these lines 2.3.4. Next, an example of the arrangement of these processes will be explained with reference to FIG.

先ず、塗装ラインからの搬入コンベア6から車体を受取
る自動組立ライン2の始端部には、塗装ラインにおいて
車体と共に塗装されたドアを該車体から自動的に取外す
ドア取外し工程11が配置されている。そして、ドアを
取外された車体が該自動組立ライン2を構成する電車型
コンベア5によって、ブレーキパイプ組付工程′12、
排気パイプ組付工程13、フロントアクスル組付工程1
4、すVアクスル組付工程15、タイA7組付工程16
、ガソリンタンク組付工程17、バッテリー組付工程1
8、フロントグリル組付工程19、バンパー組付工程2
0、インスツルメントパネル組付工程21、シート組付
工程22、テールランプ組付工Pi! 23、成形天井
組付工程24、及びウィンドガラス組付工程25に順次
移送されるようになっている。その場合に、上記各相伺
工稈12〜25には夫々サプライン12a〜25aが合
流され、各組付工程12〜25で組付けるべき部品が供
給されるようになっている。つまり、ブレーキパイプ組
付工程12にはブレーキパイプサブ組立工程12bから
ブレーキパイプASSV(アッセンブリー)が供給され
、排気パイプ組付工程13には排気パイプサブ組立工程
13bから排気パイプA ssyが供給され、フロント
アクスル組付工程14にはフロントアクスルサブ組立工
程141)からエンジン、ステアリング、フロントサス
ペンション等を含むフロントアクスルA ssyが供給
され、リャアクスル組付■程15にはリヤアクスルサブ
組立工程15bからリヤサスペンションを含むリヤアク
スルA ssyが供給され、タイヤ組付工程16にはタ
イヤサブ組立工程16bからタイヤAs5y(スペアタ
イヤを含む)が供給され、ガソリンタンク組付工程17
にはガソリンタンクサブ組立T稈17bからガソリンタ
ンクA ssyが供給され、バッテリー組付工程18に
はバッテリーラック18bからバッテリーが供給され、
フロントグリル組付工程19にはフロントグリルサブ組
立工程19bからフロントグリルA SSVが供給され
、バンパー組付工程2oにはバンパーサブ組立工程20
bからバンパーA ssyが供給さ机、インスッルメン
トパネル組付工程21にはインスツルメントパネルサブ
組立工程211)からインスツルメントパネル△SSy
が供給され、シート組付工程22にはシー1〜ザブ組立
工程22bからシー]・A SSVが供給され、テール
ランプ組付工程23にはテールランプサブ組立工程23
bからテールランプA ssyが供給され、成形天井組
付工程24には成形天井ラック24bから成形天井が供
給され、更にウィンドガラス組付工程25にはプライマ
ー及びウレタン塗布工程25bからこれらが塗布された
ウィンドガラスが供給されるようになっている。
First, at the starting end of the automatic assembly line 2 that receives vehicle bodies from the conveyor 6 carried in from the painting line, a door removal process 11 is arranged to automatically remove the door that was painted along with the vehicle body in the painting line from the vehicle body. Then, the car body from which the door has been removed is transferred to the brake pipe assembly process '12 by the electric train type conveyor 5 that constitutes the automatic assembly line 2.
Exhaust pipe assembly process 13, front axle assembly process 1
4. V axle assembly process 15, tie A7 assembly process 16
, Gas tank assembly process 17, Battery assembly process 1
8. Front grill assembly process 19, bumper assembly process 2
0, Instrument panel assembly process 21, seat assembly process 22, tail lamp assembly work Pi! 23, a molded ceiling assembly process 24, and a window glass assembly process 25. In that case, supply lines 12a to 25a are joined to each of the mutual culms 12 to 25, respectively, and parts to be assembled in each of the assembly processes 12 to 25 are supplied. That is, the brake pipe ASSV (assembly) is supplied to the brake pipe assembly process 12 from the brake pipe sub-assembly process 12b, and the exhaust pipe ASSV (assembly) is supplied from the exhaust pipe sub-assembly process 13b to the exhaust pipe assembly process 13. In the axle assembly process 14, the front axle assembly including the engine, steering, front suspension, etc. is supplied from the front axle subassembly process 141), and in the rear axle assembly process 15, the rear suspension is supplied from the rear axle subassembly process 15b. The rear axle Assy is supplied, the tire As5y (including the spare tire) is supplied from the tire sub-assembly process 16b to the tire assembly process 16, and the gas tank assembly process 17
The gasoline tank A ssy is supplied from the gasoline tank sub-assembly T culm 17b, and the battery is supplied from the battery rack 18b to the battery assembly process 18.
The front grill A SSV is supplied to the front grill assembly process 19 from the front grill sub-assembly process 19b, and the bumper sub-assembly process 20 is supplied to the bumper assembly process 2o.
The bumper A ssy is supplied from b, and the instrument panel △SSy is supplied from the instrument panel sub-assembly process 211) to the instrument panel assembly process 21.
is supplied to the seat assembly process 22, the seat assembly process 22 is supplied with the sea]・A SSV from the seat 1 to sub assembly process 22b, and the tail lamp assembly process 23 is supplied with the tail lamp sub assembly process 23.
A tail lamp A ssy is supplied from b, a molded ceiling is supplied from a molded ceiling rack 24b to a molded ceiling assembly process 24, and a window coated with primer and urethane is applied from a primer and urethane coating process 25b to a window glass assembly process 25. Glass is now available.

然して、これらの各組付工程12〜25の中には、既に
自動化が可能となっている工程と将来の自動化が予定さ
れている工程とが含まれており、前者の工程においては
ロボット等の自動化機械が設置されて自動組付が行われ
、また後者の工程においては人間が配置されて人手によ
る組付が行われるようになっている。そして、これら各
工程12〜25に車体を移送する上記の電車型コンベア
5は、自動組付工程にd)いては車体をタクl〜送りし
、自動化予定の人手組付工程においては車体を連続送り
するようになっている。
However, each of these assembly processes 12 to 25 includes processes that can already be automated and processes that are scheduled to be automated in the future, and the former process requires the use of robots, etc. Automated machines are installed to perform automatic assembly, and in the latter process, humans are assigned to perform manual assembly. The above-mentioned train-type conveyor 5, which transfers the car bodies to each of these processes 12 to 25, transports the car bodies by taxi in the automatic assembly process (d), and continuously transports the car bodies in the manual assembly process scheduled to be automated. It is set to be sent.

ここで、この電車型コンベア5としては、第3図に示す
ようなレール51にハンガ52を垂下させたキャリア5
3を移動可能に懸架してなるオーバーヘッドタイプの電
車型コンベア5′又は第4図に示ずようなレール54上
に台車55を移動可能に載置したフロア−タイプの電車
型コンベア5″が使用されるが、上記キャリア53及び
台車55は個々に駆動装置と制御装置とを有し、一定時
間の停止と一定距離の移動とを間欠的に行うダクト走行
と、一定速度での連続走行とが可能とされている。尚、
上記各組付工程12〜25のうち、工程12〜17につ
いては車体下廻り部品の組付工程であるからオーバーヘ
ッドタイプの電車型コンベア5′が適し、また工程18
〜25については車体の内、外装関係の部品の組付工程
であるからフロア−タイプの電車型コンベア5″が適し
ている。
Here, as this electric train type conveyor 5, a carrier 5 with hangers 52 hanging down from a rail 51 as shown in FIG.
3 is movably suspended, or a floor-type train-type conveyor 5'' in which a trolley 55 is movably mounted on a rail 54 as shown in FIG. 4 is used. However, the carrier 53 and the trolley 55 each have a drive device and a control device, and are capable of running in a duct intermittently, stopping for a certain period of time and moving a certain distance, and continuously running at a constant speed. It is considered possible.
Among the above assembly steps 12 to 25, steps 12 to 17 are the steps for assembling parts under the vehicle body, so an overhead electric train type conveyor 5' is suitable, and step 18
25 is an assembly process for parts related to the interior and exterior of the vehicle body, so a floor-type electric train conveyor 5'' is suitable.

以上のような構成の自動組立ライン2に続いて、メイン
ライン1の後半部には人手組立ライン3が設けられてい
る。この人手組立ライン3については個々の工程の詳細
は省略するが、前部に1〜2ステーシヨンの予備作業ゾ
ーン31が設(プられ、該ゾーン31に続いて多数のス
テーションでなる人間作業ゾーン32が設けられている
。予備作業ゾーン31は、上記自動組立ライン2にお【
′jる各自動組付工程に配置されたロボッ1−等の故障
により当該組付作業が行われず、或いは組付はミスがあ
った時に、その作業を人手により補完するゾーンであり
、また人間作業ゾーン32は上記自動組立ライン2にお
ける各組付工程12〜25で組付けられた部品に加えて
更に他の部品を人手により組付りるゾーンであって、こ
の32には多数の人間が配置されている。そして、この
人手組立ライン3を構成して上記予備作業ゾーン31及
び人間作業ゾーン32に車体を供給するコンベア7は、
第5.6図に概略構成を示すような!・ロリー型又はパ
ワーアンドフリー型コンベアどされている。
Following the automatic assembly line 2 configured as described above, a manual assembly line 3 is provided in the latter half of the main line 1. Regarding this manual assembly line 3, details of individual processes are omitted, but a preliminary work zone 31 with one or two stations is provided at the front, and a human work zone 32 consisting of a large number of stations is provided following the zone 31. The preliminary work zone 31 is located on the automatic assembly line 2.
When the assembly work is not performed due to a failure of the robot 1- etc. placed in each automatic assembly process, or when an assembly mistake is made, this is a zone where the work is supplemented by humans. The work zone 32 is a zone where, in addition to the parts assembled in each assembly process 12 to 25 on the automatic assembly line 2, other parts are manually assembled. It is located. The conveyor 7 that constitutes this manual assembly line 3 and supplies vehicle bodies to the preliminary work zone 31 and the human work zone 32 is
The schematic configuration is shown in Figure 5.6!・It is a roller type or power and free type conveyor.

これらのコンベアのうら、トロリー型コンベア7′は、
第5図に示すように、レール71にハンガ72を移動可
能に懸架すると共に、該レール71に沿って駆動チェー
ン73を配設し、且つこのチェーン73と各ハンガ72
とを直接連結した構成で、該チェーン73の走行により
各ハンが72を連続送りするようになっている。また、
第6図に示すように、パワーアンドフリー型コンベア7
″はレール74に懸架したハンガ75と駆動チェーン7
6との間に係月凭1m77を介設したもので、この係脱
機構77を係合した時にハンガ75が駆動チェーン76
の走行によって連続送りされるようになっている。
Behind these conveyors, the trolley type conveyor 7' is
As shown in FIG. 5, a hanger 72 is movably suspended on a rail 71, and a drive chain 73 is disposed along the rail 71.
The chain 73 is directly connected to each other so that each hand 72 is continuously fed by the running of the chain 73. Also,
As shown in Figure 6, power and free type conveyor 7
'' is a hanger 75 suspended on a rail 74 and a drive chain 7
6, and when this locking/disengaging mechanism 77 is engaged, the hanger 75 is connected to the drive chain 76.
It is designed to be continuously fed by running.

更に、この人手組立ライン3に続く自動化作業ライン4
には、各種の自動作業工程41〜44が配置されている
。即ち、該ライン4には始端部側から、ブレーキ液、ウ
オッシャ−液、不凍液、パワーステアリング用オイル等
を所定箇所に注入する液体注入工程41、上記自動組立
ライン2の始端部におけるドア取外し工程11で車体か
ら取外したドアを再び車体に取付けるドア取付は工程4
2、ホイールアライメントの測定及び調整、ヘッドライ
トエイミングの測定及び調整、ブレーキ制動力の測定、
サイドスリップの測定、電装品のチェック等を行うテス
ト工程43、及び水もれテスト工程44が配置されてい
る。これらの工程41゜〜44は車体に全ての部品が組
付けられた後に行われるものであるから、メインライン
1の最終部に設けられているのであるが、いずれも既に
自動化されているものである。そして、この自動化作業
ライン4を構成して上記各自動作業工程41へ・44に
車体を移送するコンベア8としては電車型コンベア、特
に第4図に示す如きフロア−タイプの電車型コンベア8
′が用いられ、車体を上記各工程41〜44にダクト送
りするようになっている。尚、上記自動組立ライン2に
おけるドア取外し工程11と自動化作業ライン4におけ
るドア取付は工程42との間にはドアサブ組立工稈61
を配置したサプライン62が設けられ、車体から取外さ
れたドアがサブ組立された−[でドア取付は工程42に
供給されるようになっている。
Furthermore, an automated work line 4 following this manual assembly line 3
, various automatic work processes 41 to 44 are arranged. That is, the line 4 includes a liquid injection step 41 in which brake fluid, washer fluid, antifreeze, power steering oil, etc. are injected into predetermined locations from the starting end side, and a door removal step 11 at the starting end of the automatic assembly line 2. Door installation is step 4, where the door that was removed from the car body is reattached to the car body.
2. Measuring and adjusting wheel alignment, measuring and adjusting headlight aiming, measuring braking force,
A test process 43 for measuring side slip, checking electrical components, etc., and a water leak test process 44 are arranged. These steps 41 to 44 are performed after all parts are assembled to the car body, so they are installed at the end of the main line 1, but all of them are already automated. be. The conveyor 8 that constitutes this automated work line 4 and transports the car bodies to each of the automatic work processes 41 and 44 is an electric train type conveyor, particularly a floor type electric train type conveyor 8 as shown in FIG.
' is used to send the car body through a duct to each of the above-mentioned processes 41 to 44. Note that there is a door sub-assembly process 61 between the door removal process 11 in the automatic assembly line 2 and the door installation process 42 in the automated work line 4.
A supply line 62 is provided in which the door removed from the vehicle body is sub-assembled, and the door installation is supplied to step 42.

次に、上記実施例の作用を説明する。Next, the operation of the above embodiment will be explained.

先ず、図示しない塗装ラインでドアと共に塗装された車
体は、車両組立ラインにおけるメインライン1の前半部
を構成する自動組立ライン2に受は渡され、該ライン2
の始端部に設けられたドア取外し工程11においてドア
が自動的に取外される。そして、該自動組立ライン2に
沿って配置された各組付工程12〜25に順次移送され
、これらの組付工程12〜25においてサプライン12
8〜25aから夫々供給される部品が順次組付けられる
First, the vehicle body, which has been painted together with the doors on a painting line (not shown), is transferred to an automatic assembly line 2 that constitutes the first half of the main line 1 in the vehicle assembly line.
The door is automatically removed in a door removal step 11 provided at the starting end of the door. Then, it is sequentially transferred to each assembly process 12 to 25 arranged along the automatic assembly line 2, and in these assembly processes 12 to 25, the supply line 12
The parts supplied from 8 to 25a are sequentially assembled.

然して、上記各組付工程12〜25のうち、あるものは
既に自動化された工程であり、他のものは自動化が予定
されているが、当面は人手により行われる工程であり、
従って該自動組立ライン2にはロボットと人間とが併存
している状態にある。
However, among the above-mentioned assembly processes 12 to 25, some are already automated processes, and others are scheduled to be automated, but for the time being they will be performed manually.
Therefore, robots and humans coexist on the automatic assembly line 2.

しかし、この自動組立ライン2を構成するコンベア5は
ダクト送りと連続送りの切替自在な電車型コンベアであ
って、上記各組付工程12〜25のうちの自動組付工程
においては車体をダクト送りし、また人手組付工程にお
いては車体を連続送りするようになっているから、いず
れの工程においても人間及びロボットの夫々の特性に応
じて良好に、また特に人手組付工程においては安全に組
付は作業が行われることになる。
However, the conveyor 5 constituting this automatic assembly line 2 is a train-type conveyor that can freely switch between duct feeding and continuous feeding, and in the automatic assembly process among the above-mentioned assembly processes 12 to 25, the car body is conveyed by duct feeding. In addition, since the car body is continuously fed during the manual assembly process, it is possible to assemble the car body satisfactorily in accordance with the characteristics of humans and robots in all processes, and particularly safely in the manual assembly process. Further work will be carried out.

そして、2ト記人手組付工程は自動化技術の進歩に応じ
て順次自動化されるのであるが、その場合、当該工程に
配置されている人間をロボットに置換すると共に、電車
型コンベア5の送り方式を連続送りからダクト送りに切
替えるだけで、ライン構成を変更することなく自動化が
実現されることになる。
The two-step manual assembly process will be gradually automated as automation technology advances, but in that case, the humans assigned to the process will be replaced by robots, and the feeding method of the train-type conveyor 5 will be By simply switching from continuous feeding to duct feeding, automation can be achieved without changing the line configuration.

また、この自動組立ライン2はメインライン1の前半部
に設けられていることにより、自動組立工程におけるロ
ボットによる組付は作業時に部品干渉が生じることがな
い。つまり、メインライン1の後半部においては、多数
の部品が先付けされた状態の車体に対して更に部品が積
み重ねられるように組付けられるのであるが、特にその
先付は部品が人手作業によるものである時は取付位置の
ずれが多いので、メインライン後半部の組付けを自動化
した場合には先付は部品との干渉が生じ易いのである。
Further, since the automatic assembly line 2 is provided in the first half of the main line 1, there will be no interference between parts during assembly by robots in the automatic assembly process. In other words, in the latter half of Main Line 1, many parts are assembled onto the car body, which has already been pre-assembled, in such a way that further parts are stacked on top of each other. Sometimes there is a lot of misalignment in the installation position, so if the assembly of the latter half of the main line is automated, the front attachment is likely to interfere with the parts.

然るに上記のように自動組立ライン2がメインライン1
の前半部に設けられていると、先付は部品が殆どない状
態の車体に対して部品が組付けられるから、自動組付け
によっても上記のような部品干渉が生じないのである。
However, as mentioned above, automatic assembly line 2 is main line 1.
If the front part is installed in the front half of the front part, the parts will be assembled to the vehicle body in a state where there are almost no parts, so the interference of parts as described above will not occur even during automatic assembly.

次に、上記のようにして自動組立ライン2の各組付工程
12〜25において各種の部品が自動的に又は人手によ
り組付けられた車体は、メインライン1の後半部の人手
組立ライン3に受は渡され、該ライン3における予備作
業ゾーン31及び人間作業ゾーン32に供給される。そ
して、予備作業ゾーン31においては、上記自動組立ラ
イン2における自動組付工程においてロボットの故障等
により部品の組付けが行われず、又は組付はミスがあっ
た時にその補完作業が人手により行われる。
Next, the vehicle body on which various parts have been automatically or manually assembled in each assembly process 12 to 25 of the automatic assembly line 2 as described above is transferred to the manual assembly line 3 in the latter half of the main line 1. The receiver is passed and supplied to the pre-work zone 31 and the human work zone 32 in the line 3. In the preliminary work zone 31, when parts are not assembled due to a robot failure or an assembly error occurs during the automatic assembly process in the automatic assembly line 2, supplementary work is performed manually. .

また、人間作業ゾーン32においては、上記自動組立ラ
イン2の各工程12〜25で組付けられた部品以外の部
品が紺付けられる。その場合に、このゾーン32で組付
けられる部品は先付は部品に積み重ねて組付けられるも
のが多いが、人間によって組付けが行われるので、先付
は部品の位置ずれ等があってもこれを許容しながら情況
に応じて良好に粗付けが行われる。また、この人間作業
ゾーン32及び上記予備作業ゾーン31に車体を移送す
るコンベア7はトロリー型又はパワーアンドフリー型コ
ンベアであって、車体を一定速度で連続送りするから、
これらのゾーン31.32における人間による作業が安
全に行われることになる。
Further, in the human work zone 32, parts other than those assembled in each process 12 to 25 of the automatic assembly line 2 are assembled. In that case, the parts to be assembled in this zone 32 are often assembled by stacking them on top of each other, but since the assembling is done by humans, the parts are assembled in the first part even if the parts are misaligned. Roughing can be performed satisfactorily depending on the situation while allowing for. Furthermore, the conveyor 7 that transfers the car bodies to the human work zone 32 and the preliminary work zone 31 is a trolley type or power-and-free type conveyor, and the car bodies are continuously conveyed at a constant speed.
Work by humans in these zones 31, 32 will be performed safely.

そして、以上のようにして自動組立ライン2及び人手組
立ライン3において所定の部品を組付けられた車体は更
に自動化作業ライン4に受は渡され、該ライン4におけ
る各工程41〜44において、各種液体の注入作業、上
記自動組立ライン2のドア取外し工程11で車体から取
外されてサプライン62におけるドアサブ組立工程62
でサブ組立されたドアの取付は作業、及び各種のテスト
作業が行われる。これにより車両の組立が完了し、該自
動化作業ライン4の終端部から完成車がオフラインされ
ることになる。ここで、この自動化作業ライン4の各工
程41〜44は既に自動化されたものであるが、該ライ
ン4を構成するコンベア8は車体をタフ1送りするコン
ベア(この実施例ではフロア−タイプの電車型コンベア
8′ 〉とされているから、上記各工程41〜44にお
ける自動化作業が良好に行われることになる。
The vehicle bodies on which predetermined parts have been assembled in the automatic assembly line 2 and manual assembly line 3 in the manner described above are further transferred to the automated work line 4, where various processes 41 to 44 are carried out on the automated work line 4. During the liquid injection work, the door is removed from the vehicle body in the door removal process 11 of the automatic assembly line 2, and the door sub-assembly process 62 is carried out in the supply line 62.
The sub-assembled door will be installed and various test work will be carried out. This completes the assembly of the vehicle, and the completed vehicle is taken offline from the end of the automated work line 4. Here, each process 41 to 44 of this automated work line 4 has already been automated, but the conveyor 8 constituting this line 4 is a conveyor for transporting car bodies (in this embodiment, a floor-type electric car). Since the mold conveyor 8' is used, the automation work in each of the above steps 41 to 44 can be performed satisfactorily.

(発  明  の  効  果) 以上のように本発明は、多数のロボット等による自動組
立工程と、多数の人間組立工程とが混在する車両の組立
ラインにおいて、既に自動化されている自動組立工程と
将来における自動化が予定されている人手組立工程とを
ダクト送りと連続送りの切替自在な電車型コンベアで構
成されるメインラインの前半部に集中配置すると共に、
将来においても人手によらざるを得ない人手組立工程を
連続送りされるトロリー型もしくはパワーアンドフリー
型コンベアで構成されるメインラインの後半部に集中配
置し、更に人手組立工程後にならざるを得ない自動化作
業工程をダクト送りされるコンベアによって構成される
メインラインの最終部に配置するようにしたから、コン
ベアの送り方式が自動化されている工程については全て
ダクト送りとされ、また人手による工程については全て
連続送りとされると共に、自動化され或いは自動化予定
の工程の後に人手組立工程が配置されるので、ロボット
及び人間による作業を夫々の特性に応じて良好且つ安全
に行うことができるようになる。
(Effects of the Invention) As described above, the present invention can be applied to a vehicle assembly line in which an automatic assembly process using a large number of robots, etc. and an assembly process involving a large number of people coexist. The manual assembly process, which is scheduled to be automated in
Even in the future, manual assembly processes that must be done manually will be concentrated in the latter half of the main line, which consists of continuous trolley-type or power-and-free type conveyors, and will have to be carried out after the manual assembly process. Since the automated work process is placed at the end of the main line consisting of a conveyor that is fed by a duct, all processes where the conveyor feeding method is automated are considered to be duct feeding, and processes that are carried out manually are All of the processes are continuous feed, and the manual assembly process is placed after the automated or scheduled automation process, so robots and humans can work efficiently and safely according to their respective characteristics.

特に、本発明によれば、メインラインの前半部に配置さ
れている自動化予定の人手組立工程が自動化技術の進歩
により自動化が可能となった時に、ライン設備を変更す
ることなく、当該コンベアの送り方式を連続送りからダ
クト送りに切替えるだけで直ちに自動化されることにな
り、これにより膨大な設備投資を要することなく、自動
化を順次、段階的に進めて行くことが可能となる。
In particular, according to the present invention, when it becomes possible to automate the manual assembly process scheduled for automation located in the first half of the main line due to advances in automation technology, the conveyor can be moved without changing the line equipment. Simply switching the method from continuous feeding to duct feeding will result in immediate automation, making it possible to proceed with automation step by step without requiring huge capital investment.

【図面の簡単な説明】[Brief explanation of the drawing]

図面は本発明の実施例を示すもので、第1図はラインの
全体構成を示す概略平面図、第2図は該ラインにお(プ
る各工程の配置図、第3図はメインライン前半部に使用
されるオーバーヘッドタイプの電車型コンベアを示す概
略側面図、第4図はメインライン前半部及び最終部で使
用されるフロア−タイプの電車型、コンベアを示す概略
側面図、第5図はメインラインの後半部に使用されるト
ロリー型コンベアの概略側面図、第6図は同じくメイン
ラインの後半部に使用されるパワーアンドフリ−型コン
ベアの概略側面図である。 1・・・メインライン、2・・・前半部(自動組立ライ
ン)、3・・・後半部(人手組立ライン)、4・・・最
終部(自動化作業ラインL5,5’。 5″・・・電車型コンベア、7′・・・トロリー型コン
ベア、7″・・・パワーアンドフリー型コンベア、8.
8′・・・コンベア(電車型コンベア)、12〜25・
・・自動組立工程、自動化予定の人手組立工程、32・
・・人手組立工程(人間作業ゾーン)、41〜44・・
・自動化作業工程。
The drawings show an embodiment of the present invention, and Fig. 1 is a schematic plan view showing the overall configuration of the line, Fig. 2 is a layout of each process connected to the line, and Fig. 3 is the first half of the main line. Fig. 4 is a schematic side view showing an overhead type electric train type conveyor used in the main line first half and final section; A schematic side view of a trolley-type conveyor used in the latter half of the main line, and FIG. 6 is a schematic side view of a power-and-free type conveyor also used in the latter half of the main line. 1... Main line , 2... First half (automatic assembly line), 3... Second half (manual assembly line), 4... Final part (automated work line L5, 5'. 5''... Train type conveyor, 7 '...Trolley type conveyor, 7''...Power and free type conveyor, 8.
8'... Conveyor (train type conveyor), 12-25.
・・Automatic assembly process, manual assembly process scheduled for automation, 32・
...Manual assembly process (human work zone), 41-44...
・Automated work process.

Claims (1)

【特許請求の範囲】[Claims] (1)多数のロボット等による自動組立工程と、多数の
人間による人手組立工程とが混在する車両の組立ライン
であって、メインラインの前半部をダクト送りと連続送
りの切替自在な電車型コンベアで構成して、該部にロボ
ット等による自動組立工程と自動化予定の人手組立工程
とを集中連続的に配置すると共に、メインラインの後半
部を連続送りされるトロリー型もしくはパワーアンドフ
リー型コンベアで構成して、該部に人手組立工程を集中
連続的に配置し、更にメインライン最終部をダクト送り
されるコンベアで構成して、該部に組立順序上の制限か
ら人手組立工程後に行わざるを得ない自動化作業工程を
配置したことを特徴とする車両の組立ライン。
(1) A vehicle assembly line in which an automatic assembly process using many robots, etc. and a manual assembly process using many people coexist, and the first half of the main line is a train-type conveyor that can be switched between duct feeding and continuous feeding. The automated assembly process using robots, etc. and the manual assembly process scheduled for automation will be concentrated and continuous in this section, and the latter part of the main line will be continuously fed by a trolley-type or power-and-free type conveyor. In addition, the last part of the main line is constructed with a duct-fed conveyor, so that due to restrictions in the assembly order, the manual assembly process has to be carried out after the manual assembly process. A vehicle assembly line characterized by the arrangement of unique automated work processes.
JP59142848A 1984-07-09 1984-07-09 Vehicle assembly line Expired - Lifetime JPH0683938B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP59142848A JPH0683938B2 (en) 1984-07-09 1984-07-09 Vehicle assembly line
US06/752,558 US4683651A (en) 1984-07-09 1985-07-08 Vehicle assembly line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP59142848A JPH0683938B2 (en) 1984-07-09 1984-07-09 Vehicle assembly line

Publications (2)

Publication Number Publication Date
JPS6121869A true JPS6121869A (en) 1986-01-30
JPH0683938B2 JPH0683938B2 (en) 1994-10-26

Family

ID=15325018

Family Applications (1)

Application Number Title Priority Date Filing Date
JP59142848A Expired - Lifetime JPH0683938B2 (en) 1984-07-09 1984-07-09 Vehicle assembly line

Country Status (1)

Country Link
JP (1) JPH0683938B2 (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63258312A (en) * 1987-04-17 1988-10-25 Kanto Auto Works Ltd Assembling line for automobile
JPH0236033A (en) * 1988-07-21 1990-02-06 Honda Motor Co Ltd Assembling line for vehicle
US4937929A (en) * 1986-09-25 1990-07-03 Honda Giken Kogyo Kabushiki Kaisha Method and apparatus for transporting vehicle bodies, and vehicle assembling system
EP0737543A2 (en) * 1995-04-15 1996-10-16 Adam Opel Ag Machining and/or assembling center
JPH08290789A (en) * 1995-04-20 1996-11-05 Mc Micro Compact Car Ag Assembly plant for continuous assembly of industrial product,especially vehicle,which is optimized in viewpoints of material supply and cost
JP2009214264A (en) * 2008-03-12 2009-09-24 Honda Motor Co Ltd Operation automation method
JP2009220231A (en) * 2008-03-17 2009-10-01 Honda Motor Co Ltd Work system
JP2010191753A (en) * 2009-02-19 2010-09-02 Honda Motor Co Ltd Production line
US8483862B2 (en) 2008-03-12 2013-07-09 Honda Motor Co., Ltd. Working system and work-automating method
WO2013111646A1 (en) * 2012-01-27 2013-08-01 本田技研工業株式会社 Wheel assembly line layout method and wheel assembly line
CN114261464A (en) * 2022-01-25 2022-04-01 法睿兰达科技(武汉)有限公司 AGV-based conveying system and flexible factory with same

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4595885B2 (en) * 2006-05-24 2010-12-08 日産自動車株式会社 Workpiece transfer device and workpiece transfer system

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4937929A (en) * 1986-09-25 1990-07-03 Honda Giken Kogyo Kabushiki Kaisha Method and apparatus for transporting vehicle bodies, and vehicle assembling system
JPS63258312A (en) * 1987-04-17 1988-10-25 Kanto Auto Works Ltd Assembling line for automobile
JPH0236033A (en) * 1988-07-21 1990-02-06 Honda Motor Co Ltd Assembling line for vehicle
JPH0659586B2 (en) * 1988-07-21 1994-08-10 本田技研工業株式会社 Vehicle assembly line
EP0737543A3 (en) * 1995-04-15 1997-10-29 Opel Adam Ag Machining and/or assembling center
EP0737543A2 (en) * 1995-04-15 1996-10-16 Adam Opel Ag Machining and/or assembling center
JP3184762B2 (en) * 1995-04-20 2001-07-09 マイクロ コンパクト カー アクチエンゲゼルシヤフト Assembly plant for continuous assembly of industrial products, especially vehicles, optimized in terms of material supply and costs
US6070320A (en) * 1995-04-20 2000-06-06 Micro Compact Car Ag Cost effective and logically optimized assembly plant for series production of industrial products, especially vehicles
JPH08290789A (en) * 1995-04-20 1996-11-05 Mc Micro Compact Car Ag Assembly plant for continuous assembly of industrial product,especially vehicle,which is optimized in viewpoints of material supply and cost
JP2009214264A (en) * 2008-03-12 2009-09-24 Honda Motor Co Ltd Operation automation method
US8483862B2 (en) 2008-03-12 2013-07-09 Honda Motor Co., Ltd. Working system and work-automating method
JP2009220231A (en) * 2008-03-17 2009-10-01 Honda Motor Co Ltd Work system
JP2010191753A (en) * 2009-02-19 2010-09-02 Honda Motor Co Ltd Production line
WO2013111646A1 (en) * 2012-01-27 2013-08-01 本田技研工業株式会社 Wheel assembly line layout method and wheel assembly line
CN114261464A (en) * 2022-01-25 2022-04-01 法睿兰达科技(武汉)有限公司 AGV-based conveying system and flexible factory with same
CN114261464B (en) * 2022-01-25 2023-10-03 法睿兰达科技(武汉)有限公司 AGV-based conveying system and flexible factory with same

Also Published As

Publication number Publication date
JPH0683938B2 (en) 1994-10-26

Similar Documents

Publication Publication Date Title
US4683651A (en) Vehicle assembly line
EP2100804B1 (en) Robotic high density welding body shop
US11364962B2 (en) Method and production facility for producing vehicles, and surface treatment system for treating the surface of vehicle bodies
JPS6121869A (en) Car assembly line
JP4262605B2 (en) Assembly plant for assembling industrial products
CN210149454U (en) Whole car assembly line
JPH10156547A (en) Equipment for spot welding of structure comprising metallic element, particularly automobile body or its assembly
CA2659143A1 (en) Robotic high density welding body shop
JPS62110581A (en) Car body assembly method
KR20010007286A (en) Vehicle body assembly and processing line
CN212738372U (en) New forms of energy commercial car assembly workshop circuit structure
JP2001100841A (en) Automated guided vehicle system
JP6534175B2 (en) Assembly line
CN112026960A (en) New forms of energy commercial car assembly workshop circuit layout
CN217170859U (en) Vehicle final assembly production line
JP2871357B2 (en) Train control method for article assembly line
US20090321218A1 (en) Vehicle Assembling Line System
JPS6121871A (en) Car assembly line
JPH0236033A (en) Assembling line for vehicle
JPS6121870A (en) Car assembly line
JPH0370689A (en) Assembly line for automobile body
JP4872566B2 (en) Paint surface treatment line transport system
JPS62110582A (en) Car body assembly method
JPH0253536A (en) Assembly method for vehicle
JP3004366B2 (en) Work assembling method and apparatus used for carrying out the method