JPS5829917A JP12615181A JP12615181A JPS5829917A JP S5829917 A JPS5829917 A JP S5829917A JP 12615181 A JP12615181 A JP 12615181A JP 12615181 A JP12615181 A JP 12615181A JP S5829917 A JPS5829917 A JP S5829917A
Authority
JP
Japan
Prior art keywords
reinforcing bar
bar cage
expanded
cage
reinforcing rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP12615181A
Other languages
Japanese (ja)
Inventor
Shoji Yoshida
章二 吉田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokiwa Sangyo Co ltd
Original Assignee
Tokiwa Sangyo Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokiwa Sangyo Co ltd filed Critical Tokiwa Sangyo Co ltd
Priority to JP12615181A priority Critical patent/JPS5829917A/en
Publication of JPS5829917A publication Critical patent/JPS5829917A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/44Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

PURPOSE:To enable reinforcing of an expanding bottom part of a pile, by a method wherein one reinforcing rod cage, a spreading in an umbrella rib, is attached to a lower part of the other reinforcing rod cage which is located in a pit, and the one reinforcing rod cage is spread in an expanding bottom part. CONSTITUTION:A second moving reinforcing rod cage 3 is attached to a lower part of a first reinforcing rod cage 2 so that they are partially overlapped with each other. A reinforcing rod cage assembly is lowered in a pit with an expanding bottom, a lower hook ring 9 of the second reinforcing rod cage 3 is brought into contact with a bottom surface 4 of the pit with expanding bottom. If the reinforcing rod cage assembly is further lowered, the lower hook ring 9 is set to an inactive state, whereby upper and lower hook rings 8 and 9 function as a fulcrum, and pivots 6 act as a bending point. As a result, upper and lower longitudinal members 5 and 7 start to spread outwardly, and if the lower end of the longitudinal member of the first reinforcing rod cage 2 makes contact with the bottom surface 4, the upper and lower longitudinal members 5 and 7 stop spreading. Concrete is then placed into the pit with expanding bottom.

Description

【発明の詳細な説明】 本発明は、拡底杭の拡底部の配筋方法に関し、さらに詳
しく言えば、拡底杭の底部の内壁の輪郭に沿って多数の
補強用の鉄筋を配設するようにした新規なる方法に関す
る。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for arranging reinforcement at the expanded bottom of an expanded bottom pile, and more specifically, a method for arranging a large number of reinforcing reinforcing bars along the contour of the inner wall at the bottom of an expanded bottom pile. Regarding a new method.

ビル等の建築物を建設する地盤を強化するため、拡底杭
を所定の深さに掘削し、この拡底杭に長い円筒状の鉄筋
籠を沈め、コンクリートを流し込んで、固化させること
は公知のことである。第1図は、おおむねこのような状
態を図解した拡底杭の底部まわりの部分断面図である。
It is well known that in order to strengthen the ground on which structures such as buildings are constructed, expanded-bottomed piles are excavated to a predetermined depth, long cylindrical reinforcing bars are sunk into the expanded-bottomed piles, and concrete is poured and solidified. It is. FIG. 1 is a partial cross-sectional view around the bottom of the expanded-bottomed pile, illustrating generally such a state.

この図より判るように、従来の拡底杭の場合、拡底sl
の側壁の近傍に多数の補強用の鉄筋を配設することはで
きなかつ九。したがって・、従来の拡底杭は拡底部局壁
まわりに鉄筋がはいっていない以上、拡底部lの強度、
とくにその周壁部の強度はコンクリートにより与えられ
るだけのものであるので、満足すべきものではなかった
As can be seen from this figure, in the case of conventional expanded-bottom piles, the expanded-bottom sl
(9) It is not allowed to install a large number of reinforcing bars near the side walls of the building. Therefore, since conventional expanded bottom piles do not have reinforcing bars around the local walls of the expanded bottom part, the strength of the expanded bottom part l,
In particular, the strength of the surrounding wall portion was not satisfactory because it was only provided by the concrete.

本発明は、上述のごとき拡底杭の拡底部局壁まわりの強
度について指摘されて−る上述の欠点を解消することを
目的とするもので、従来の細長9円筒状の鉄筋籠の下端
に部分的にオーバーラツプした状態に外開き可能な第2
のムエ動鉄筋籠を取シ付け、第1鉄筋籠と第2の可動鉄
筋篭より成る鉄筋籠アッセンブリを拡底杭に徐々に沈め
、第2の可動鉄筋篭の下端が拡底杭の底面に当接したあ
と、第1の鉄筋籠の縦部材の下端が底面に当接するまで
鉄筋籠アッセンブリをさらに沈め、第2の可動鉄筋篭の
各縦部材が外向きに広がり、もって拡底部のアンダーカ
ット部分に多数の補強鉄筋を配設するようにしたことを
特徴とする方法を提供しようとするものである。
The present invention aims to solve the above-mentioned drawbacks pointed out regarding the strength around the local wall of the expanded bottom part of the expanded bottom pile as described above. The second part can be opened outward in an overlapping state.
The rebar cage assembly consisting of the first rebar cage and the second movable rebar cage is gradually sunk into the expanded bottom pile, and the lower end of the second movable rebar cage comes into contact with the bottom of the expanded bottom pile. After that, the rebar cage assembly is further sunk until the lower end of the vertical member of the first rebar cage abuts the bottom surface, and each vertical member of the second movable rebar cage expands outward, causing the undercut portion of the expanded bottom portion to It is an object of the present invention to provide a method characterized by arranging a large number of reinforcing bars.

以下、本発明に係る方法を実施する工程を図解した添付
図面を参照しながら本発明の詳細な説明する。
The invention will now be described in detail with reference to the accompanying drawings, which illustrate the steps for carrying out the method according to the invention.

第1図は、第1の鉄筋籠2と8g2の鉄筋籠3より成る
鉄筋籠アッセンブリを拡底杭に沈め、第2の鉄°筋籠3
の下部体th IJングが拡底部1の底面4に当接した
状態を示す拡底杭の部分断面図である。第1の鉄筋籠2
は、上述のように従来から使用されている細長い円筒状
のものであるから、その構成を改ためて詳細に説明する
ことは省略する。
FIG. 1 shows a reinforcing bar cage assembly consisting of a first reinforcing bar cage 2 and a reinforcing bar cage 3 of 8g2 being sunk in an expanded bottom pile, and a second reinforcing bar cage 3
FIG. 3 is a partial sectional view of the expanded bottom pile showing a state in which the lower body th IJ is in contact with the bottom surface 4 of the expanded bottom portion 1; First reinforcing cage 2
As mentioned above, since it is an elongated cylindrical shape that has been used conventionally, a detailed explanation of its structure will be omitted.

しかして、本発明方法を実施するうえで必要なもつとも
重要な構成要素は第2の鉄筋籠3であって、理解の便を
はかるため第2図を参照しながらその構成を説明する。
Therefore, the most important component required to carry out the method of the present invention is the second reinforcing bar cage 3, and for ease of understanding, its structure will be explained with reference to FIG. 2.

第2の鉄筋籠3は、第1の鉄筋籠2の縦筋と同数の上部
縦部材5と、該上部縦部材5の下端に枢軸6を介して枢
着された下部縦部材7と、前記上部縦部材5の上端を第
1の鉄筋籠2の各縦部材の間で枢動可能に係止する下部
体+h ’Jング8と、前記下部縦部材7の下端を集約
的に枢動可能に係止する下部係止り/グ9とから構成さ
れている。
The second reinforcing bar cage 3 includes an upper vertical member 5 of the same number as the longitudinal bars of the first reinforcing bar cage 2, a lower vertical member 7 pivotally attached to the lower end of the upper vertical member 5 via a pivot 6, and A lower body +h'Jing 8 that pivotally locks the upper end of the upper vertical member 5 between each vertical member of the first reinforcing bar cage 2, and the lower end of the lower vertical member 7 can pivot collectively. 9.

@2図より判るように、上部係止り/グ8は。@ As you can see from Figure 2, the upper lock/g8 is.

拡底s1がが広がりはじめる領域に位置き°めされてお
り、また第2図に示すように、上部縦部材5と下部縦部
材7が外に向かって広がったとき、両縦部材を枢動可能
に接続する枢軸6が拡底部1の最大内径の領域に位置す
るよう上部縦部材5と下部縦部材7それぞれの長さが設
定されている。さらに、両縦部材5と7が51g2図に
示すように外に向かって広がったとき、上部縦部材5が
拡底部1の上部内壁の近傍でこれに#1ぼ平行に延在す
るよう両縦部材5と7それぞれの相対的な長さが設定さ
れている。なお、10と11は、上下両縦部材が外に向
かって広がったとき、それぞれ対をなす上下両縦部材が
等間隔をあけて拡底部1の中で広がっている状態を保持
するため、水平に延設させて固着させたチェーンである
The enlarged bottom s1 is positioned in the area where the bottom expands, and as shown in FIG. The respective lengths of the upper vertical member 5 and the lower vertical member 7 are set so that the pivot shaft 6 connected to the enlarged bottom portion 1 is located in the region of the maximum inner diameter of the enlarged bottom portion 1. Furthermore, when both vertical members 5 and 7 are expanded outward as shown in Figure 51g2, both vertical members 5 and 7 are arranged so that the upper vertical member 5 extends approximately #1 parallel to the upper inner wall of the enlarged bottom portion 1. The relative lengths of members 5 and 7 are set. Note that 10 and 11 are horizontal in order to maintain the state in which the pair of upper and lower vertical members are spread out in the enlarged bottom part 1 at equal intervals when the upper and lower vertical members are spread outward. This is a chain that is extended and fixed.

上述のように構成された第2の鉄筋籠3を第1の鉄筋籠
2の下部Kiり下げるように取9付け良状態を示したも
のが第1図である。上下両縦部材5と7はすぼまって垂
れ下がっているので、チェーンlOと11も隣接し友上
部縦部材の間でV字状に垂れ下がっている。
FIG. 1 shows a state in which the second reinforcing bar cage 3 configured as described above is properly installed by lowering the lower part Ki of the first reinforcing bar cage 2. Since both the upper and lower vertical members 5 and 7 are constricted and hang down, the chains 10 and 11 are also adjacent and hang down in a V-shape between the upper vertical members.

第1の鉄筋籠2と第2の可動鉄筋能3より成る鉄筋籠ア
ッセンブリを使用して本発明に係る方法を実施する工程
を説明すると次の通りである。
The steps of implementing the method according to the present invention using a reinforcing bar cage assembly consisting of a first reinforcing bar cage 2 and a second movable reinforcing bar cage 3 are as follows.

まず、第1図に示すように、上述のように構成された第
2の可動鉄筋能3を第1の鉄筋籠2の下部に部分的にオ
ーバーラッグした状態に取シ付ける。次に、鉄筋籠アッ
センブリを拡底杭の中に徐々に沈め、第2の鉄筋籠3の
下部係止リング9を拡底杭の底面4に当接させる(第1
図参照)。さらに鉄筋能アツセ/プリを沈めると、下部
係止リング9が動かないから、上下の係止リング7と8
が支点として機能するとともに、枢軸6が折曲点として
機能することにより上下両縦部材5と7は外に向かって
広がりはじめ、第1の鉄筋籠2の縦部材の下端が拡底杭
の底II4に当接したとき、上下両綾部材5と7の広が
9が停止する(82図参照10このとき、上部縦部材5
はそれぞれ、第2図に示すように、拡底部lの上部内壁
にはぼ平行に延在している。
First, as shown in FIG. 1, the second movable reinforcing bar 3 constructed as described above is attached to the lower part of the first reinforcing bar cage 2 in a partially overlapping state. Next, the reinforcing bar cage assembly is gradually lowered into the expanded bottom pile, and the lower locking ring 9 of the second reinforcing bar cage 3 is brought into contact with the bottom surface 4 of the expanded bottom pile (the first
(see figure). If the reinforcing bar assembly/pre is further sunk, the lower locking ring 9 will not move, so the upper and lower locking rings 7 and 8
functions as a fulcrum, and the pivot 6 functions as a bending point, so that both the upper and lower vertical members 5 and 7 begin to expand outward, and the lower end of the vertical member of the first reinforcing bar cage 2 reaches the bottom II 4 of the expanded bottom pile. When the upper and lower twill members 5 and 7 come into contact with the
As shown in FIG. 2, each extends substantially parallel to the upper inner wall of the enlarged bottom portion l.

必要に応じて適当な検知手段(図示せず)を用いて上下
両縦部材5と7が第2図に示されている状態に広がった
ことを確認したあと、拡底杭にコンクリートを流し込む
After confirming that both the upper and lower vertical members 5 and 7 have expanded to the state shown in FIG. 2 using an appropriate detection means (not shown) if necessary, concrete is poured into the expanded pile.

第1図より判るように、第2の鉄筋籠の下部係止リング
9が拡底杭の底面4に当接しためと、上下両縦部材5と
7が容易に外向きに広がることができるようにするため
、下S係とリング9は第1の鉄筋籠2の径よりかなり小
径に寸法ぎめされていることが好ましい。
As can be seen from FIG. 1, the lower locking ring 9 of the second reinforcing bar cage is in contact with the bottom surface 4 of the expanded bottom pile, and both the upper and lower vertical members 5 and 7 can easily expand outward. Therefore, it is preferable that the lower S member and the ring 9 are dimensioned to have a considerably smaller diameter than the diameter of the first reinforcing bar cage 2.

上述のごとき本発明に係る方法によれば、多数の補足的
な鉄筋を拡底杭の内壁の近傍でこれに平行に等間隔をあ
けて配設することができるので、この部分に流□し込ま
れたコンクリートの強度を大幅に高めることができる。
According to the method according to the present invention as described above, a large number of supplementary reinforcing bars can be placed in the vicinity of the inner wall of the expanded pile at equal intervals in parallel thereto. can significantly increase the strength of concrete.

本発明の他の実施態様として、図示を省略したが、下部
縦部材7と該下部縦部材7を枢動可能に係止する下部係
止リング9をJI1図に示されて−る配置とは逆向きに
第1の鉄筋籠の内部に収容しておくことも可能である。
As another embodiment of the present invention, although not shown, the lower longitudinal member 7 and the lower locking ring 9 that pivotally locks the lower longitudinal member 7 are arranged as shown in Figure JI1. It is also possible to accommodate it inside the first reinforcing bar cage in the opposite direction.

すなわち、下部縦部材7を枢軸6を回動点して上部縦部
材5の内側に重ね合わせるとともに、下部係止リング9
をおおむね上部チェーン10の付近の近傍で鉄筋籠アッ
センブリの内部に収容しておく。
That is, the lower vertical member 7 is superimposed on the inside of the upper vertical member 5 with the pivot point 6 as the pivot point, and the lower locking ring 9
is housed within the rebar cage assembly approximately in the vicinity of the upper chain 10.

この実施態様に係る鉄筋籠アッセンブリを使用する場合
、これを拡底杭の中に徐々に降ろし、第1の鉄筋籠の縦
部材の下端が拡底部の底面に当接したとき、第1の鉄筋
籠の内部スペースを通つそ下向きに延在させ適当な操作
手段(図示せず)を介して下部係止リング9を押し下げ
ると、互に重なり合った状態にある上下両縦部材5と7
を外に向かって押し広ろげる、拡底部の内壁の近傍に配
設することができる。この実施例によれば、第2の鉄筋
籠3がすべて第1の鉄筋籠2の下端内部に収容されてi
るので、工場からポーリング現場まで輸送する間や荷積
み。
When using the reinforcing bar cage assembly according to this embodiment, it is gradually lowered into the expanded bottom pile, and when the lower end of the vertical member of the first reinforcing bar cage comes into contact with the bottom surface of the expanded bottom part, the first reinforcing bar cage When the lower locking ring 9 is pushed down via suitable operating means (not shown), both the upper and lower longitudinal members 5 and 7, which are in an overlapping position, are released.
It can be arranged near the inner wall of the enlarged bottom part, which pushes and spreads outward. According to this embodiment, all the second reinforcing bar cages 3 are housed inside the lower end of the first reinforcing bar cage 2.
During transportation and loading from the factory to the polling site.

荷卸ろしするさめ損傷をうけることがない。There is no risk of shark damage during unloading.

上述のように、本発明に係る方法によれば、従来の方法
と異なり、第2の鉄筋籠の複数の縦部材を拡底部の内壁
に8って等間隔に正確に配設させることができるので、
コンクリート・パイルの拡底部の強度を大幅に高めるこ
とができる。
As described above, according to the method according to the present invention, unlike the conventional method, the plurality of vertical members of the second reinforcing bar cage can be precisely arranged at equal intervals of 8 on the inner wall of the expanded bottom part. So,
The strength of the expanded bottom part of concrete piles can be significantly increased.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は、本発明に係る拡底坑底部の配筋方法の第1段
階を図解した拡底坑底部まわりの縦断面図。第2図は、
第2の鉄筋籠の縦部材がすべて半径方向に広がった状態
にある本発明方法の第2段階を図解し九拡底杭底部まわ
りの縦断面図。 l・・・・・・拡底部、   2・・・・・・第1の鉄
筋籠、3・・・・・・第2の鉄筋籠、4・・・・・・拡
底部の底面、5・・・・・・上部縦部材、 6・・・・
・・枢軸、7・・・・・・下部縦部材、 8・・・・・
・上部係止リング、9・・・・・・下部係止リング、1
O1ll・・・・・・チェーン。 第1図 第2図
FIG. 1 is a longitudinal cross-sectional view of the area around the bottom of an expanded shaft, illustrating the first step of the method for arranging reinforcement at the bottom of the expanded shaft according to the present invention. Figure 2 shows
FIG. 6 is a vertical cross-sectional view around the bottom of the nine-expanded pile, illustrating the second stage of the method of the invention, in which all the longitudinal members of the second reinforcing bar cage are in a radially expanded state; l... Expanded bottom part, 2... First reinforcing bar cage, 3... Second reinforcing bar cage, 4... Bottom surface of the expanded bottom part, 5. ...Top vertical member, 6...
...Pivot, 7...Lower vertical member, 8...
・Upper locking ring, 9...Lower locking ring, 1
O1ll...Chain. Figure 1 Figure 2

Claims (3)

【特許請求の範囲】[Claims] (1)第1の鉄筋籠の下部に傘骨状に開拡しうる第2の
鉄筋籠を取付け、第1の鉄筋籠を航中に配設するととも
に、第2の鉄筋籠を拡底部において開拡することを特徴
とする拡底杭の拡底部の配筋方法。
(1) Attach a second reinforcing bar cage that can be expanded and expanded like an umbrella at the bottom of the first reinforcing bar cage, place the first reinforcing bar cage in the air, and place the second reinforcing bar cage in the expanded bottom part. A reinforcement arrangement method for the expanded bottom portion of an expanded bottom pile that is characterized by expanding.
(2)上記第2の鉄筋籠が、複数の上部縦部材と該上部
縦部材の下端に枢軸を介して枢止された下部縦部材と前
記上部縦部材の上端を枢動可能に係止する上部係止リン
グと、前記下部縦部材の下端を枢動可能に係止する下部
係止リングとより構成されており、あらかじめ掘削して
おφた拡底杭の中に第1の鉄筋籠と!42の鉄筋籠から
なる前記鉄筋籠アッセンブリを徐々に沈め、第1の鉄筋
籠の下部にオーバー2ツグした状態で取り付けられてい
る第2の鉄筋籠の下部係止リングが拡底部の底面に当接
したあと、第1の鉄筋籠の縦部材の下端が底面に当接す
るまで鉄筋籠アッセンブリをさらに沈め、もって前記枢
軸を折曲点として第2の鉄筋籠の上部縦部材と下部縦部
材を外に向かって張り広ろげ、上下両縦部材を拡底部の
内壁の近傍に配設することを特徴とする特許請求の範囲
第1項記載の方法。
(2) The second reinforcing bar cage pivotally locks a plurality of upper vertical members, a lower vertical member which is pivotally fixed to the lower end of the upper vertical members via a pivot, and an upper end of the upper vertical member. It is composed of an upper locking ring and a lower locking ring that pivotally locks the lower end of the lower vertical member, and the first reinforcing bar cage is placed inside the expanded bottom pile that has been excavated in advance! The reinforcing bar cage assembly consisting of 42 reinforcing bar cages is gradually sunk until the lower locking ring of the second reinforcing bar cage, which is attached to the lower part of the first reinforcing bar cage in an over 2-hook state, comes into contact with the bottom surface of the expanded bottom part. After making contact, the rebar cage assembly is further sunk until the lower end of the vertical member of the first rebar cage contacts the bottom surface, and then the upper and lower vertical members of the second rebar cage are removed using the pivot as a bending point. 2. The method according to claim 1, further comprising arranging both the upper and lower vertical members in the vicinity of the inner wall of the expanded bottom portion.
(3)前記枢軸を折曲点として下部縦部材を鉄筋籠アッ
センブリの内側に折りたたみ、下部係止リングを第1の
鉄筋籠の内部に収容した状態で第2の鉄筋籠を第1の鉄
筋籠の下部に取り付けることに゛より#1成された鉄筋
−アンセンブリを拡底杭の中に徐々に沈め、第1の鉄筋
籠の縦部材の下端が拡底部の底面に当接したあと、適当
な押し下げ手段を操作することにより下部係止リングを
押し下げ、もって第2の鉄筋籠の上下両縦部材を前記枢
軸を接合点として外に向かって張り広げて、拡底部の内
壁の近傍に配設することを特徴とする特許蛸求の範囲の
第1項または第2項記載の方法。
(3) Fold the lower vertical member inside the reinforcing bar cage assembly using the pivot as a bending point, and with the lower locking ring housed inside the first reinforcing bar cage, insert the second reinforcing bar cage into the first reinforcing bar cage. Gradually sink the #1 reinforcing bar assembly into the expanded bottom pile, and after the lower end of the vertical member of the first reinforcing bar cage comes into contact with the bottom of the expanded bottom section, By operating the push-down means, the lower locking ring is pushed down, whereby both the upper and lower vertical members of the second reinforcing bar cage are expanded outward using the pivot as a joint point, and are disposed near the inner wall of the expanded bottom portion. 2. The method according to claim 1 or 2, characterized in that:
JP12615181A 1981-08-12 1981-08-12 Reinforcing rod arranging method for expanding bottom part of pit with expanding bottom Pending JPS5829917A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12615181A JPS5829917A (en) 1981-08-12 1981-08-12 Reinforcing rod arranging method for expanding bottom part of pit with expanding bottom

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12615181A JPS5829917A (en) 1981-08-12 1981-08-12 Reinforcing rod arranging method for expanding bottom part of pit with expanding bottom

Publications (1)

Publication Number Publication Date
JPS5829917A true JPS5829917A (en) 1983-02-22

Family

ID=14927936

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12615181A Pending JPS5829917A (en) 1981-08-12 1981-08-12 Reinforcing rod arranging method for expanding bottom part of pit with expanding bottom

Country Status (1)

Country Link
JP (1) JPS5829917A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4685834A (en) * 1986-07-02 1987-08-11 Sunohio Company Splay bottom fluted metal piles
US4767241A (en) * 1985-11-13 1988-08-30 Wells Gordon T Method for simultaneous forming of concrete footings and piers
JPS6431132U (en) * 1987-08-18 1989-02-27
JPH045308A (en) * 1990-04-23 1992-01-09 Kajima Corp Reinforcing steel cage
JP2006257856A (en) * 2005-02-21 2006-09-28 Kiso Koji Kk Saitougumi Prefabricated reinforcing rod and construction method of pile using the same
JP2010048019A (en) * 2008-08-22 2010-03-04 Kiso Koji Kk Saitogumi Erection bar
US8485493B2 (en) 2006-09-21 2013-07-16 Soundfootings, Llc Concrete column forming assembly
CN105178324A (en) * 2015-09-25 2015-12-23 广州市市政工程设计研究总院 Construction device for umbrella tray type special-shaped pile
CN107882022A (en) * 2017-12-12 2018-04-06 中国建筑第八工程局有限公司 Reducing reinforcement cage structure and pedestal pile constructing process for club-footed pile
CN114086540A (en) * 2021-11-30 2022-02-25 中铁七局集团有限公司 Steel reinforcement cage convenient to get into stake hole and can carry out centering adjustment

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5224334U (en) * 1975-08-12 1977-02-21

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5224334U (en) * 1975-08-12 1977-02-21

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4767241A (en) * 1985-11-13 1988-08-30 Wells Gordon T Method for simultaneous forming of concrete footings and piers
US4685834A (en) * 1986-07-02 1987-08-11 Sunohio Company Splay bottom fluted metal piles
JPS6431132U (en) * 1987-08-18 1989-02-27
JPH0529239Y2 (en) * 1987-08-18 1993-07-27
JPH045308A (en) * 1990-04-23 1992-01-09 Kajima Corp Reinforcing steel cage
JPH0718154B2 (en) * 1990-04-23 1995-03-01 鹿島建設株式会社 Rebar basket
JP2006257856A (en) * 2005-02-21 2006-09-28 Kiso Koji Kk Saitougumi Prefabricated reinforcing rod and construction method of pile using the same
US8485493B2 (en) 2006-09-21 2013-07-16 Soundfootings, Llc Concrete column forming assembly
JP2010048019A (en) * 2008-08-22 2010-03-04 Kiso Koji Kk Saitogumi Erection bar
CN105178324A (en) * 2015-09-25 2015-12-23 广州市市政工程设计研究总院 Construction device for umbrella tray type special-shaped pile
CN107882022A (en) * 2017-12-12 2018-04-06 中国建筑第八工程局有限公司 Reducing reinforcement cage structure and pedestal pile constructing process for club-footed pile
CN114086540A (en) * 2021-11-30 2022-02-25 中铁七局集团有限公司 Steel reinforcement cage convenient to get into stake hole and can carry out centering adjustment

Similar Documents

Publication Publication Date Title
JPS5829917A (en) Reinforcing rod arranging method for expanding bottom part of pit with expanding bottom
JP2007023579A (en) Construction method of underground structure skeleton
KR102017731B1 (en) Reaction bed for pressing in reinforcing pile and pressing in method of reinforcing pile using the same
JP6539718B1 (en) Construction method of underground structure
KR102361505B1 (en) Installation and construction method of non-excavated underground structures using PC steel wire
JPH026106Y2 (en)
JP3125153B2 (en) Shaft structure and construction method
JP6827294B2 (en) Segment wall and tunnel lining
JP6677564B2 (en) Reinforced basket and connection method of reinforced basket
JP2002155695A (en) Method for executing shield-tunnel connecting section
JP2536701B2 (en) Earth retaining method for deep excavation
JP3031505B2 (en) Underground structure construction method
JP2676041B2 (en) How to install structural elements consisting of formwork and segments
JPH062331A (en) Construction method of cast-in-place reinforced concrete under-reamed pile and reinforced cage used therefor
JPH0748799Y2 (en) Structure of tubular wall for lining of drilling hole
JPH0343520A (en) Method of setting bottom die frame in reverse winding process
JP3074282B2 (en) Rebar assembly
JPH04297615A (en) Construction of caisson bottom slab
JPS61186623A (en) Method of building foundation of building
JPH06101226A (en) Constructing method for cast-in-place reinforced concrete bottom widening pile and reinforced cage used therefor
JP2552783Y2 (en) Telescopic support
JPH0587096U (en) Shield construction segment with hollow cross section for filling
JPS58768B2 (en) pile support device
KR20230159027A (en) Construction method of phc pile for retaining wall
JPH04319114A (en) Construction of continuous underground wall