JPH11324557A - Construction method of shaft - Google Patents

Construction method of shaft

Info

Publication number
JPH11324557A
JPH11324557A JP13567698A JP13567698A JPH11324557A JP H11324557 A JPH11324557 A JP H11324557A JP 13567698 A JP13567698 A JP 13567698A JP 13567698 A JP13567698 A JP 13567698A JP H11324557 A JPH11324557 A JP H11324557A
Authority
JP
Japan
Prior art keywords
liner plate
shaft
hole
beams
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP13567698A
Other languages
Japanese (ja)
Inventor
Kenji Matsuda
賢二 松田
Takeo Fukui
健雄 福井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP13567698A priority Critical patent/JPH11324557A/en
Publication of JPH11324557A publication Critical patent/JPH11324557A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

PROBLEM TO BE SOLVED: To execute a work smoothly and safely and maintain stable condition by arranging a liner plate on the circumferential wall of a hole while forming a shaft, and repeatedly providing vertical beams on the inside and cross beams on the inside of the vertical beams. SOLUTION: A liner plate 12 is provided on the full circumference of the circumferential wall of a hole 11 drilled in the ground. The liner plate 12 is used a corrugated steel plate under the condition of vertically contnuing the wavy recessed and projecting parts. Vertical beams 13 are provided inside the liner plate at fixed intervals. Next cross beams 18 are constituted by combining together a plurality of H-steel into a (square) shape in plane view so as to continue along the full circumference of the hole 11 inside the vertical beams 13. Angle brace machines are provided on the four corner of the cross beam 18. Further an angle brace 21 is driven in between the cross beam 18 and the vertical beam 13, so as to push the vertical beams 13 on the outer circumferential side. Next the hole 11 is drilled down to a specified depth, the liner late 12, vertical beams 13, and the cross beams 18 are similarly provided on the under part, they are connected with the upper parts through joint plates or H-steel, and the shaft 10 is constructed in order downward.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、各種推進工法やシ
ールド工法を行うときの発進あるいは到達用の立坑の構
築方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a shaft for starting or reaching when performing various propulsion methods or shield methods.

【0002】[0002]

【従来の技術】一般に、下水道管渠やケーブル管等の敷
設を、推進工法やシールド工法等で行う場合、発進ある
いは到達地点に立坑を構築しているのは周知の通りであ
る。
2. Description of the Related Art It is well known that, when laying sewer sewers and cable pipes by a propulsion method, a shield method, or the like, a shaft is constructed at a starting point or an arrival point.

【0003】このとき、図5に示すように、立坑1に
は、周囲地山Gの崩壊等を防止するため、その周壁に沿
ってライナー2を設置している。図6に示すように、ラ
イナー2は、立坑1の周方向に連続するH鋼等からなる
横梁3と、例えば波形鋼板等からなるライナープレート
4とが、上下方向に交互に複数段にわたって配設された
構成からなっている。図7に示すように、各段のライナ
ープレート4は、その上端部と下端部とが、横梁3の両
側のフランジ3a,3a間に入り込み、ウェブ3bにボ
ルト5等で接合されている。
At this time, as shown in FIG. 5, a liner 2 is provided along the peripheral wall of the shaft 1 in order to prevent the surrounding ground G from collapsing. As shown in FIG. 6, the liner 2 is composed of a cross beam 3 made of H steel or the like continuous in the circumferential direction of the shaft 1 and a liner plate 4 made of, for example, corrugated steel plates, which are alternately arranged in a plurality of stages in the vertical direction. It consists of the configuration. As shown in FIG. 7, the upper end and the lower end of the liner plate 4 in each step enter between the flanges 3 a on both sides of the cross beam 3 and are joined to the web 3 b by bolts 5 or the like.

【0004】このような立坑1を構築するには、地山を
掘り下げて立坑1を形成しつつ、所定寸法掘り下げるご
とに立坑1の上部から横梁3、ライナープレート4を順
次交互に設置していくことによって、立坑1の周壁に沿
ってライナー2を設置するようにしている。
[0004] In order to construct such a shaft 1, the shaft 1 is formed by digging the ground, and the cross beam 3 and the liner plate 4 are sequentially and alternately installed from the upper portion of the shaft 1 every time when the shaft 1 is dug by a predetermined size. Thus, the liner 2 is installed along the peripheral wall of the shaft 1.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、上述し
たような従来の立坑の構築方法には、以下のような問題
が存在する。まず、施工に際して、ライナープレート4
を設置するときには、その上方に既に設置されている横
梁3の下側にライナープレート4を挿入する必要があ
る。しかも、ライナープレート4の上端部を上方の横梁
3に接合するには、ライナープレート4を持ち上げて横
梁3のウェブ3bに押し付けた状態でボルト5の締め付
け等を行わなければならない。このように、ライナープ
レート4の設置作業は困難であり、作業効率も悪く、ま
たライナープレート4は重量物であることから作業安全
性にも向上の余地があった。
However, the conventional shaft construction method as described above has the following problems. First, at the time of construction, the liner plate 4
Is required to insert the liner plate 4 below the cross beam 3 already installed above. Moreover, in order to join the upper end of the liner plate 4 to the upper cross beam 3, the bolts 5 must be tightened while the liner plate 4 is lifted and pressed against the web 3b of the cross beam 3. As described above, the installation work of the liner plate 4 is difficult, the work efficiency is poor, and since the liner plate 4 is heavy, there is room for improvement in work safety.

【0006】また、ライナー2と周囲地山との間にグラ
ウト材7等を充填した場合、グラウト材7が横梁3のフ
ランジ3a,3a間にまで入り込むため、立坑1の撤去
埋め戻しの際に、ライナープレート4の取り外しが人力
では不可能となる。このため、これら横梁3及びライナ
ープレート4は転用が効かず、埋め殺しあるいはスクラ
ップとするしかなく、コスト及び産業廃棄物処理の観点
から改善の余地があった。
When the grout 7 is filled between the liner 2 and the surrounding ground, the grout 7 penetrates into the space between the flanges 3 a of the cross beam 3. In addition, the removal of the liner plate 4 cannot be performed manually. For this reason, these cross beams 3 and liner plates 4 cannot be diverted and must be buried or scrapped, and there is room for improvement from the viewpoint of cost and industrial waste disposal.

【0007】さらに、立坑1の周壁に、推進工法やシー
ルド工法による発進あるいは到達のための開口部を形成
する場合、開口部の径によっては横梁3を一部撤去しな
ければならず、この部分が構造的に大きな弱点となると
いう問題がある。
Further, when an opening for starting or reaching by the propulsion method or the shield method is formed in the peripheral wall of the shaft 1, a part of the cross beam 3 must be removed depending on the diameter of the opening. However, there is a problem that it is a major weak point structurally.

【0008】本発明は、以上のような点を考慮してなさ
れたもので、立坑の構築を円滑かつ安全に行い、また開
口部を形成する場合にも構造的に安定した状態を維持す
ることのできる立坑の構築方法を提供することを課題と
する。
SUMMARY OF THE INVENTION The present invention has been made in view of the above points, and aims to smoothly and safely construct a shaft and to maintain a structurally stable state even when an opening is formed. It is an object of the present invention to provide a method of constructing a shaft that can be performed.

【0009】[0009]

【課題を解決するための手段】請求項1に係る発明は、
立坑を構築するため、地山を掘り下げて孔を形成しつ
つ、前記孔の周壁に沿ってライナープレートを配置する
とともに、該ライナープレートの内側には上下方向に延
在する縦梁を設置し、さらにその内側には、前記孔の周
方向に沿って延在する横梁を設置していくことを特徴と
している。
The invention according to claim 1 is
To construct a shaft, while digging down the ground to form a hole, placing a liner plate along the peripheral wall of the hole, and installing a vertical beam extending vertically inside the liner plate, Further, a transverse beam extending along the circumferential direction of the hole is provided inside the hole.

【0010】このようにしてライナープレートの内側に
縦梁及び横梁を設けるようにしたので、ライナープレー
トの設置に手間が掛かることもない。
Since the vertical beams and the horizontal beams are provided inside the liner plate in this way, the installation of the liner plate is not troublesome.

【0011】請求項2に係る発明は、請求項1記載の立
坑の構築方法であって、前記ライナープレートと前記縦
梁と横梁の設置を、前記孔を前記縦梁の長さに対応した
深さ掘削するごとに行うことを特徴としている。
According to a second aspect of the present invention, in the method for constructing a shaft according to the first aspect, the installation of the liner plate, the vertical beam, and the horizontal beam is performed by setting the hole to a depth corresponding to the length of the vertical beam. It is characterized in that it is performed every time excavation is performed.

【0012】このように、孔を縦梁の長さ分掘削するご
とに、ライナープレートと縦梁の設置を行うことによっ
て、立坑の施工をシステマティックに行うことができ
る。
As described above, by installing the liner plate and the vertical beam every time a hole is excavated by the length of the vertical beam, the construction of the shaft can be systematically performed.

【0013】[0013]

【発明の実施の形態】以下、本発明に係る立坑の構築方
法の実施の形態の一例を、図1ないし図4を参照して説
明する。ここでは、例えば、平面視矩形の立坑を構築す
る場合の例を用いて説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of a method for constructing a shaft according to the present invention will be described below with reference to FIGS. Here, for example, a description will be given using an example of a case where a vertical shaft in a plan view is constructed.

【0014】図1(a)に示すように、例えば平面視矩
形の立坑10を構築するには、まず、地面を所定深さ、
例えば2mだけ掘り下げる。そして、図1および図2に
示すように、掘り下げて形成した孔11の周壁の全周
に、ライナープレート12を設置する。このとき、ライ
ナープレート12には、例えば断面視波形の鋼板を用
い、これを波状の凹凸が上下方向に連続する状態で設置
する。さらに、ライナープレート12の内側には、上下
方向に延在する縦梁13を、孔11の周方向において所
定間隔ごとに設置する。
As shown in FIG. 1A, for example, in order to construct a vertical shaft 10 having a rectangular shape in a plan view, first, the ground must have a predetermined depth,
For example, dig down 2m. Then, as shown in FIGS. 1 and 2, a liner plate 12 is provided on the entire periphery of the peripheral wall of the hole 11 formed by dug-down. At this time, as the liner plate 12, for example, a steel plate having a corrugated cross section is used, and the liner plate 12 is installed in a state where the wavy irregularities are continuous in the vertical direction. Further, inside the liner plate 12, vertical beams 13 extending in the vertical direction are provided at predetermined intervals in the circumferential direction of the hole 11.

【0015】このとき、図1(a)に示したように、各
縦梁13には、例えば1mの長さを有したH鋼14を用
い、これを上下に2本連結する。図3に示すように、H
鋼14を上下に連結するには、上下の縦梁H鋼14,1
4のフランジ14a,14aどうしを、板状のカバープ
レート15及びボルト16を介して接続するようにす
る。このとき、孔11の内方側に位置するカバープレー
ト15には、孔11の内方に向けて延出する例えば断面
視コ字状のブラケット17が一体に設けられている。
At this time, as shown in FIG. 1A, for each vertical beam 13, an H steel 14 having a length of, for example, 1 m is used, and two of them are connected vertically. As shown in FIG.
To connect the steel 14 vertically, the upper and lower vertical beams H steel 14,1
The four flanges 14a, 14a are connected via a plate-shaped cover plate 15 and bolts 16. At this time, the cover plate 15 located on the inner side of the hole 11 is integrally provided with, for example, a U-shaped bracket 17 extending inward of the hole 11.

【0016】図2に示したように、縦梁13を設置した
後、さらにその内側に横梁18を設置する。この横梁1
8は、孔11の全周に沿って連続するよう平面視ロ字状
に組まれるもので、複数本のH鋼19を組み合わせるこ
とによって構成されている。ここで、横梁18の四隅に
は、火打ち材20が設けられている。
As shown in FIG. 2, after the vertical beams 13 are installed, the horizontal beams 18 are further installed inside them. This cross beam 1
8 is assembled in a rectangular shape in a plan view so as to be continuous along the entire circumference of the hole 11, and is configured by combining a plurality of H steels 19. Here, fired materials 20 are provided at the four corners of the cross beam 18.

【0017】さらに、図1(a)に示したように、この
ようにして設置した横梁18と、その外周側の縦梁13
との間には、キャンバー材21を打ち込み、各縦梁13
を外周側に押し付るようにする。
Further, as shown in FIG. 1A, the horizontal beam 18 installed in this manner and the vertical beam 13 on the outer peripheral side thereof are provided.
Between the vertical beams 13
To the outer peripheral side.

【0018】次いで、図1(b)に示したように、孔1
1をさらに所定深さ、例えば1m掘り下げる。そして、
前記と同様にして、孔11の掘り下げた部分の内周面
に、新たなライナープレート12を、既に設置したライ
ナープレート12の下方に設置する。そして、互いに上
下に位置するライナープレート12どうしは、その上下
端部に形成された図示しないジョイントプレート等をボ
ルト等の連結手段で連結する。
Next, as shown in FIG.
1 is further dug down to a predetermined depth, for example, 1 m. And
In the same manner as described above, a new liner plate 12 is placed below the liner plate 12 already installed on the inner peripheral surface of the dug portion of the hole 11. The liner plates 12 located above and below each other are connected to joint plates (not shown) formed at the upper and lower ends thereof by connecting means such as bolts.

【0019】さらに、新たに設置したライナープレート
12の内側には、前記と同様にして新たなH鋼14を、
既に設置した縦梁13の下端部のH鋼14に継ぎ足す。
このときにも、互いに上下に位置するH鋼14,14ど
うしの連結には、カバープレート15及びボルト16を
用いる。
Further, a new H steel 14 is provided inside the newly installed liner plate 12 in the same manner as described above.
It is added to the H steel 14 at the lower end of the longitudinal beam 13 already installed.
Also at this time, the cover plates 15 and the bolts 16 are used to connect the H steels 14, 14 located above and below each other.

【0020】そして、このようにして下方に延長した縦
梁13の内側に、前記と同様に、横梁18をカバープレ
ート15のブラケット17上に設置し、横梁18と各縦
梁13との間にキャンバー材21を打ち込む。
A transverse beam 18 is set on the bracket 17 of the cover plate 15 in the same manner as described above inside the longitudinal beam 13 extending downward in this manner, and between the transverse beam 18 and each longitudinal beam 13. The camber material 21 is driven.

【0021】この後は、孔11を1m掘り下げる毎に、
上記と同様にライナープレート12の設置,縦梁13の
延長,横梁18の設置を順次繰り返して行っていき、図
4に示すような所定深さの立坑10を構築する。
Thereafter, every time the hole 11 is dug down by 1 m,
The installation of the liner plate 12, the extension of the vertical beam 13, and the installation of the horizontal beam 18 are sequentially repeated in the same manner as described above, thereby constructing the shaft 10 having a predetermined depth as shown in FIG.

【0022】上述した立坑10の構築方法では、地面を
掘り下げて孔11を形成しつつ、孔11の内周壁に沿っ
てライナープレート12を設置し、その内側に縦梁13
を設置し、さらにその内側に横梁18を設置していく構
成とした。これにより、施工時にはライナープレート1
2の設置作業、縦梁13の設置作業、横梁18の設置作
業と、孔11内の外周側から内周側に順次作業を行えば
良く、施工を効率良く、かつ安全に行うことができる。
また、ライナープレート12の外周側にグラウト材等を
充填した場合にも縦梁13・横梁18等にはグラウト材
は一切付着しないため、これら縦梁13・横梁18を容
易に解体撤去することができ、その結果、資材の転用化
を促進し、資源の有効利用及びコスト低減を図ることが
できる。
In the above-described method of constructing the shaft 10, the liner plate 12 is installed along the inner peripheral wall of the hole 11 while the hole 11 is formed by digging down the ground, and the vertical beam 13 is provided inside the liner plate 12.
, And the cross beam 18 is further installed inside. As a result, the liner plate 1
2, the installation of the vertical beams 13, the installation of the cross beams 18, and the operation from the outer peripheral side to the inner peripheral side in the hole 11, so that the construction can be performed efficiently and safely.
Further, even when grout material or the like is filled on the outer peripheral side of the liner plate 12, no grout material adheres to the vertical beams 13 and the horizontal beams 18 and the like, so that the vertical beams 13 and the horizontal beams 18 can be easily dismantled and removed. As a result, the conversion of materials can be promoted, and the effective use of resources and cost reduction can be achieved.

【0023】さらに、横梁18に加えて縦梁13を設け
ることによって、これら縦梁13と横梁18とからなる
ライナープレート12の補強材は、孔11の内側から見
れば略格子状に組まれた構成となっており、従来の図5
に示したライナープレート3と横梁4とを交互に設けて
いた構成に比較して、非常に高い剛性を有したものとな
る。したがって、立坑10の内周壁に推進工法やシール
ド工法の発進・到達のための開口部30を形成する場合
に、縦梁13あるいは横梁18の一部を取り外したとし
ても、剛性の低下を最小限に押さえることができる。加
えて、従来の図5に示した技術では、波形のライナープ
レート3自体は上下方向にたわみやすいために剛性を確
保するには横梁4の間隔を狭める必要があったが、上記
のように縦梁13と横梁18とを組み合わせることによ
って、横梁18の上下間隔を広げることができ、これに
よっても効率化を図ることができる。
Further, by providing the vertical beam 13 in addition to the horizontal beam 18, the reinforcing material of the liner plate 12 including the vertical beam 13 and the horizontal beam 18 is assembled in a substantially lattice shape when viewed from the inside of the hole 11. It is configured as shown in FIG.
Has a very high rigidity as compared with the configuration in which the liner plates 3 and the cross beams 4 are alternately provided. Therefore, when forming the opening 30 for starting and reaching the propulsion method or the shield method on the inner peripheral wall of the shaft 10, even if a part of the vertical beam 13 or the horizontal beam 18 is removed, a decrease in rigidity is minimized. Can be held down. In addition, in the conventional technique shown in FIG. 5, the corrugated liner plate 3 itself is liable to bend in the vertical direction, so that it is necessary to reduce the interval between the cross beams 4 in order to secure rigidity. By combining the beams 13 and the cross beams 18, the vertical spacing of the cross beams 18 can be increased, and thereby the efficiency can be improved.

【0024】加えて、孔11を、縦梁13の長さに対応
させて1m掘り下げる毎に、ライナープレート12,縦
梁13,横梁19を設置するようにした。これにより、
孔11の掘り下げと、ライナープレート12,縦梁1
3,横梁19の設置とを交互に行うことによって、立坑
10の施工をシステマティックに行うことができ、これ
によっても施工の効率化が図られる。
In addition, every time the hole 11 is dug down by 1 m corresponding to the length of the vertical beam 13, the liner plate 12, the vertical beam 13, and the horizontal beam 19 are provided. This allows
Drilling of hole 11, liner plate 12, longitudinal beam 1
3, by alternately installing the cross beam 19, the construction of the shaft 10 can be performed systematically, and thereby the construction efficiency can be improved.

【0025】また、縦梁13には水平方向に延出するブ
ラケット17を設けておき、横梁18を設置するときに
は横梁18をブラケット17上に設置する構成とした。
これにより、横梁18を設置するに際しては、既に設置
されている縦梁13のブラケット17上に載置すればよ
く、横梁18の設置を容易に行うことが可能となる。し
かもブラケット17は、縦梁13を構成するH鋼14,
14の接続用のカバープレート15に一体に形成するよ
うにしたので、ブラケット17を現場で別途取り付ける
必要もなく、施工を効率良く行うことができる。
The vertical beam 13 is provided with a bracket 17 extending in the horizontal direction, and the horizontal beam 18 is installed on the bracket 17 when the horizontal beam 18 is installed.
Thereby, when installing the cross beam 18, it is sufficient to mount it on the bracket 17 of the already installed vertical beam 13, and the cross beam 18 can be easily installed. Moreover, the bracket 17 is made of H steel 14, which constitutes the vertical beam 13,
Since it is formed integrally with the cover plate 15 for connection of 14, the bracket 17 does not need to be separately attached on site, and the construction can be performed efficiently.

【0026】さらに、横梁18は、縦梁13を構成する
H鋼14,14の接続部に設けるようにした。このH鋼
14,14の接続部は、縦梁13の構造的な弱点となっ
ているが、ここに横梁18を配することによって、縦梁
13の補強に対して有効な補強効果を図ることができ、
これによって周囲地山の土留機能を一層高めることがで
きる。
Further, the horizontal beam 18 is provided at a connection portion between the H steels 14, 14 constituting the vertical beam 13. The connecting portions of the H steels 14, 14 are structural weaknesses of the vertical beams 13, but by arranging the horizontal beams 18 there, an effective reinforcing effect for reinforcing the vertical beams 13 is to be achieved. Can be
Thereby, the soil retaining function of the surrounding ground can be further enhanced.

【0027】なお、上記実施の形態において、用いるラ
イナープレート12,縦梁13,横梁18及びその他の
部材の形状や材質については、所要の機能を発揮するこ
とができるのであれば、適宜他の構成を採用することが
可能である。
In the above embodiment, the shape and material of the liner plate 12, the vertical beam 13, the horizontal beam 18, and other members to be used are appropriately changed as long as required functions can be exhibited. Can be adopted.

【0028】もちろん、立坑10の深さや径、あるいは
周囲地山の状態等によって、縦梁13の間隔やサイズ等
を変更しても何ら支障はない。また、立坑10の形状に
ついては、上記実施の形態で挙げた矩形のものに限ら
ず、小判型、円形等他の形状であって良い。
Of course, there is no problem even if the interval and the size of the vertical beams 13 are changed depending on the depth and diameter of the shaft 10 or the state of the surrounding ground. The shape of the shaft 10 is not limited to the rectangular shape described in the above embodiment, but may be other shapes such as an oval shape and a circle.

【0029】加えて、その施工工程についても、上記実
施の形態に対して本願発明の主旨を逸脱しない範囲内で
変更を加えても良い。
In addition, the construction process may be modified from the above embodiment without departing from the gist of the present invention.

【0030】これ以外にも、本発明の主旨を逸脱しない
範囲内であれば、いかなる構成を採用しても良く、また
上記したような構成を適宜選択的に組み合わせたものと
しても良いのは言うまでもない。
Other than this, any configuration may be adopted as long as it does not depart from the gist of the present invention, and it is needless to say that the above-described configurations may be appropriately selectively combined. No.

【0031】[0031]

【発明の効果】以上説明したように、請求項1に係る立
坑の構築方法によれば、地山を掘り下げて孔を形成しつ
つ、孔の周壁に沿ってライナープレートを配置するとと
もに、ライナープレートの内側には縦梁を設置し、さら
にその内側には横梁を設置していく構成となっている。
このようにしてライナープレートの内側に縦梁及び横梁
を設けるようにしたので、施工時にはライナープレート
の設置作業、縦梁の設置作業、横梁の設置作業と、孔内
の外周側から内周側に順次作業を行えば良く、施工を効
率良く、かつ安全に行うことができる。また、ライナー
プレートの外周側にグラウト材等を充填した場合にも縦
梁・横梁を容易に解体撤去できるので、資材の転用化を
促進し、資源の有効利用及びコスト低減を図ることがで
きる。さらに、横梁に加えて縦梁を設けることによっ
て、これら縦梁と横梁とからなるライナープレートの補
強材の剛性が高められる。したがって、立坑の周壁に推
進工法やシールド工法の発進・到達のための開口部を形
成する場合にも、剛性の低下を最小限に押さえることが
できる。加えて、横梁のみの場合に比較して横梁の上下
間隔を広げることができ、これによっても作業の効率化
を図ることができる。
As described above, according to the method for constructing a shaft according to the first aspect, the liner plate is arranged along the peripheral wall of the hole while the hole is formed by digging down the ground and the liner plate is formed. A vertical beam is installed inside the, and a horizontal beam is installed inside the vertical beam.
Since the vertical beam and the horizontal beam were provided inside the liner plate in this way, at the time of construction, the liner plate installation work, vertical beam installation work, horizontal beam installation work, and from the outer side to the inner side in the hole The work can be performed sequentially, and the construction can be performed efficiently and safely. In addition, when the grout material or the like is filled on the outer peripheral side of the liner plate, the vertical beams and the horizontal beams can be easily dismantled and removed, so that the conversion of materials can be promoted, and the resources can be effectively used and costs can be reduced. Further, by providing the vertical beams in addition to the horizontal beams, the rigidity of the reinforcing material of the liner plate including the vertical beams and the horizontal beams is increased. Therefore, even when an opening for starting and reaching the propulsion method or the shield method is formed in the peripheral wall of the shaft, a decrease in rigidity can be suppressed to a minimum. In addition, the vertical spacing of the cross beams can be increased as compared with the case where only the cross beams are used, so that work efficiency can be improved.

【0032】請求項2に係る立坑の構築方法によれば、
ライナープレートと縦梁と横梁の設置を、孔を縦梁の長
さに対応した深さ掘削するごとに行う構成となってい
る。これにより、立坑の施工をシステマティックに行う
ことができ、これによっても施工の効率化が図られる。
According to the method for constructing a shaft according to claim 2,
The liner plate, vertical beam and horizontal beam are installed every time the hole is excavated to a depth corresponding to the length of the vertical beam. Thereby, the construction of the shaft can be performed systematically, and thereby the efficiency of the construction can be improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明に係る立坑の構築方法の一例を示す立
断面図である。
FIG. 1 is a vertical sectional view showing an example of a method for constructing a shaft according to the present invention.

【図2】 前記立坑の平面図である。FIG. 2 is a plan view of the shaft.

【図3】 同立坑を構成するライナープレート、縦梁、
横梁の設置構造を示す側断面図および立断面図である。
Fig. 3 Liner plate, vertical beam,
It is the side sectional view and standing sectional view which show the installation structure of a cross beam.

【図4】 同立坑が完成した状態を示す立断面図であ
る。
FIG. 4 is a sectional elevational view showing a state where the shaft is completed.

【図5】 従来の立坑を示す平断面図および立断面図で
ある。
FIG. 5 is a plan sectional view and a vertical sectional view showing a conventional shaft.

【図6】 前記立坑の構造を示す斜視断面図である。FIG. 6 is a perspective sectional view showing the structure of the shaft.

【図7】 同立坑のライナープレートと横梁の設置構造
を示す立断面図である。
FIG. 7 is an elevational sectional view showing an installation structure of a liner plate and a cross beam of the same shaft.

【符号の説明】[Explanation of symbols]

10 立坑 11 孔 12 ライナープレート 13 縦梁 18 横梁 10 vertical shaft 11 hole 12 liner plate 13 vertical beam 18 horizontal beam

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 立坑を構築するため、地山を掘り下げて
孔を形成しつつ、前記孔の周壁に沿ってライナープレー
トを配置するとともに、該ライナープレートの内側には
上下方向に延在する縦梁を設置し、さらにその内側に
は、前記孔の周方向に沿って延在する横梁を設置してい
くことを特徴とする立坑の構築方法。
In order to construct a shaft, a liner plate is disposed along a peripheral wall of the hole while digging a ground to form a hole, and a vertically extending vertical line is provided inside the liner plate. A method of constructing a shaft, comprising: installing a beam; and further, inside the beam, a cross beam extending along a circumferential direction of the hole.
【請求項2】 請求項1記載の立坑の構築方法であっ
て、前記ライナープレートと前記縦梁と横梁の設置を、
前記孔を前記縦梁の長さに対応した深さ掘削するごとに
行うことを特徴とする立坑の構築方法。
2. The method for constructing a shaft according to claim 1, wherein the liner plate, the vertical beam, and the horizontal beam are installed.
A method for constructing a shaft, wherein the hole is drilled every time excavation is performed at a depth corresponding to the length of the longitudinal beam.
JP13567698A 1998-05-18 1998-05-18 Construction method of shaft Withdrawn JPH11324557A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13567698A JPH11324557A (en) 1998-05-18 1998-05-18 Construction method of shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13567698A JPH11324557A (en) 1998-05-18 1998-05-18 Construction method of shaft

Publications (1)

Publication Number Publication Date
JPH11324557A true JPH11324557A (en) 1999-11-26

Family

ID=15157332

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13567698A Withdrawn JPH11324557A (en) 1998-05-18 1998-05-18 Construction method of shaft

Country Status (1)

Country Link
JP (1) JPH11324557A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018017042A (en) * 2016-07-28 2018-02-01 Jfe建材株式会社 Underground structure, and construction method for the same
JP2020023818A (en) * 2018-08-07 2020-02-13 鹿島建設株式会社 Rectangular pit and its construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018017042A (en) * 2016-07-28 2018-02-01 Jfe建材株式会社 Underground structure, and construction method for the same
JP2020023818A (en) * 2018-08-07 2020-02-13 鹿島建設株式会社 Rectangular pit and its construction method

Similar Documents

Publication Publication Date Title
JP3011169B2 (en) Shield tunnel and lining method
JPH11324557A (en) Construction method of shaft
KR101545713B1 (en) Composite type cutoff wall of steel temporary facility and construction method of the same
JPS6137692Y2 (en)
JP2017145571A (en) Half precast member, body lining wall and construction method for the same
JP2004225386A (en) Built-up steel shell and tunnel enlarged part lining work
JPH11193685A (en) Segment piece
JP2003003781A (en) Reinforcing ring and mounting structure of joint plate
JP2741387B2 (en) Construction manhole construction method
KR100959946B1 (en) Constructing method of loop structure by tension force and loop structure constructed by this
JP4288316B2 (en) Tunnel widening method
KR102162460B1 (en) Height extension assembly for pile in temporary soil shearing system and Method for constructing and dismantling of temporary soil shearing system
JPH10331569A (en) Steel segment piece with joint box opened to its outer surface and method for constructing sunk body using the same
JP2633435B2 (en) Liner plate assembly
JP3725005B2 (en) Flat panel and its construction method
JP7153603B2 (en) Construction method of underground structure
JP6019689B2 (en) Tunnel widening method
JP2013221241A (en) Tunnel widening method and tunnel widening structure
JP3646698B2 (en) Construction method for underground structures
KR20100117826A (en) Construction method of earth retaining wall
JPS5840608B2 (en) Earth retaining method for ditch side walls
JPS6136625Y2 (en)
KR101829245B1 (en) Composite file structure
JP5769103B2 (en) Basement installation structure
JP2002070470A (en) Connecting method for reinforcing ring and liner plate, and connecting structure of rectangular liner plate

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20050802