JPH11131465A JP23583098A JP23583098A JPH11131465A JP H11131465 A JPH11131465 A JP H11131465A JP 23583098 A JP23583098 A JP 23583098A JP 23583098 A JP23583098 A JP 23583098A JP H11131465 A JPH11131465 A JP H11131465A
Authority
JP
Japan
Prior art keywords
ground
water
sand
drainage
vacuum pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP23583098A
Other languages
Japanese (ja)
Other versions
JP4058550B2 (en
Inventor
Kazuyoshi Nakakuma
和義 中熊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maruyama Kogyo Co Ltd
Original Assignee
Maruyama Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maruyama Kogyo Co Ltd filed Critical Maruyama Kogyo Co Ltd
Priority to JP23583098A priority Critical patent/JP4058550B2/en
Publication of JPH11131465A publication Critical patent/JPH11131465A/en
Application granted granted Critical
Publication of JP4058550B2 publication Critical patent/JP4058550B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Biological Depolymerization Polymers (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an improvement method of poor subsoil in which the water and air contained in the ground can be efficiently and surely discharged. SOLUTION: A vertical drain material 11 is driven into a poor ground A while leaving an upper end part 11a, and a water passing material 13 connected to a vacuum pump 16 is horizontally arranged so as to make contact with the upper end part 11a. The upper surface is covered with a sand layer 21, an airtight sheet 18 is put thereon, a negative pressure is formed by the vacuum pump to discharge water, earth and sand 22 is laid in the recessed part formed thereby, and a drain material 24 is driven to the earth and sand layer through the airtight sheet 18 to discharge the water and air in the earth and sand through it.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、例えば湖沼周囲の
埋立造成区域などの軟弱地盤に多量に含まれる水と空気
とを排出することで、硬質地盤へと改良する軟弱地盤の
改良工法に関する。詳細には軟弱地盤に含まれる水と空
気とを効率よく、しかも確実に排出することができる軟
弱地盤の改良工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for improving a soft ground by discharging a large amount of water and air contained in a soft ground such as a land reclamation area around a lake or the like, thereby improving the soft ground. More particularly, the present invention relates to a method for improving soft ground, which can efficiently and surely discharge water and air contained in soft ground.

【0002】[0002]

【従来の技術及び発明が解決しようとする課題】従来、
軟弱軟弱地盤の改良工法としては、サンドドレーン工法
やペーパードレーン工法が代表的なものとして挙げられ
るバーチカルドレーン工法がある。サンドドレーン工法
は、軟弱地盤中に適当な間隔で鉛直方向に数多くのサン
ドパイル(人工的に設けた砂柱)を設置し、このサンド
パイルを通して地盤中の水を抜き取って地盤の圧密と強
度増加を促進し、硬質地盤へと改良する方法である。
2. Description of the Related Art
As a method of improving soft and soft ground, there is a vertical drain construction method which is typically exemplified by a sand drain construction method and a paper drain construction method. In the sand drain method, a number of sand piles (artificial sand columns) are installed vertically at appropriate intervals in soft ground, and water in the ground is extracted through these sand piles to increase the consolidation and strength of the ground. This is a method of promoting the formation of a hard ground.

【0003】一方、ペーパードレン工法は、軟弱な地盤
の圧密を促進するためのものであり、厚さ3mm、幅1
00mm程度の帯状原紙の中に縦方向に連続した通水孔
を設けたカードボードをマンドレルによって適当な間隔
に打ち込み設置し、このカードボードを通して地盤中の
水を抜き取るようにしたものである。
On the other hand, the paper drain method is for promoting the compaction of soft ground, and has a thickness of 3 mm and a width of 1 mm.
A cardboard provided with water holes continuous in the vertical direction in a band-shaped base paper of about 00 mm is driven at a suitable interval by a mandrel, and the water in the ground is drained through the cardboard.

【0004】ところが、これらサンドドレーン工法やペ
ーパードレーン工法などのバーチカルドレーン工法にあ
っては、処理を開始した当初はよいが、水の抜き取りが
進行するにつれて、地盤中に水の通路となるべき間隙が
なくなり、遂には排水されないという不具合が生じてい
た。
[0004] However, in the vertical drain method such as the sand drain method and the paper drain method, it is good at the beginning of the treatment, but as the drainage proceeds, a gap that becomes a water passage in the ground is formed. Had disappeared, and finally there was a problem that it was not drained.

【0005】そこで、排水効率をさらに高める目的で提
案されたのが図16に示す改良工法である。この方法
は、プラスチックドレーンを打設した後、カードボード
1の上端部1aにこれと接触するように水平状に真空ポ
ンプ3に連結した有孔管2を配置し、これらカードボー
ド1及び有孔管2を砂層4で覆うようにしたものであ
り、真空ポンプ3に連結した有孔管2を通して地盤A上
面を負圧とすることで、地盤A中における間隙水圧との
差を大きくし、地盤A中の水をカードボード1及び有孔
管2を介して排水するようにしたものである。
To improve drainage efficiency, an improved method shown in FIG. 16 has been proposed. In this method, after a plastic drain is cast, a perforated pipe 2 connected to a vacuum pump 3 is horizontally disposed at the upper end 1a of the card board 1 so as to come into contact with the plastic drain, and the card board 1 and the perforated pipe are arranged. The pipe 2 is covered with a sand layer 4, and the upper surface of the ground A is made to have a negative pressure through the perforated pipe 2 connected to the vacuum pump 3, thereby increasing the difference from the pore water pressure in the ground A. The water in A is drained through the card board 1 and the perforated pipe 2.

【0006】しかしながら、真空ポンプ3に連結した有
孔管2は砂層4で覆われているだけであり、地盤A上面
に十分な負圧環境を創り出すことができない。また有孔
管2の孔5が砂や地盤A内からの土砂などで目詰まりを
生じることもあり、地盤Aの深部まで圧力差による水の
吸い出し効果が得られないなどの不具合があり、十分な
排水ができないことがあった。
However, the perforated pipe 2 connected to the vacuum pump 3 is merely covered with the sand layer 4, and a sufficient negative pressure environment cannot be created on the upper surface of the ground A. In addition, the hole 5 of the perforated pipe 2 may be clogged with sand or earth and sand from inside the ground A, and there is a problem that a water suction effect cannot be obtained due to a pressure difference to a deep portion of the ground A. Drainage was not always possible.

【0007】また、図面に示した改良工法の場合には、
地盤A上面に負圧環境を創り出すために強力な吸引力で
吸引しなければならず、しかも地盤A中の排水が完了す
るまでの間中吸引しつづけることから、真空ポンプ3を
作動させるために消費される電力、軽油も多く、地盤上
面に負圧環境を創り出すために要する費用は莫大なもの
となっていた。
In the case of the improved construction method shown in the drawings,
In order to create a negative pressure environment on the upper surface of the ground A, it is necessary to suction with a strong suction force, and since the suction in the ground A is continued until the drainage is completed, the vacuum pump 3 is operated. The amount of power and light oil consumed is large, and the cost required to create a negative pressure environment on the ground surface has been enormous.

【0008】本発明は、このような事情に鑑みなされた
ものであり、地盤中に含まれる水と空気とを効率よく、
しかも確実に排出することができる軟弱地盤の改良工法
を提供することを目的とするものである。
[0008] The present invention has been made in view of such circumstances, and efficiently removes water and air contained in the ground.
Moreover, it is an object of the present invention to provide an improved method for soft ground that can be reliably discharged.

【0009】また、例えば湖沼周囲の埋立造成区域など
の軟弱地盤にあっては、地盤中に多量の水と空気とが含
まれており、このような地盤改良には、上述の費用や労
力だけではなく、3ヶ月から半年、場合によっては1年
といった長期に渡る施工期間を必要としていた。
[0009] In the case of soft ground such as a landfill area around a lake, a large amount of water and air is contained in the ground, and such ground improvement requires only the cost and labor described above. Instead, it required a long construction period of three months to six months, and in some cases one year.

【0010】また、埋立造成時には、埋立造成区域の周
囲を浚渫することから、その際に生じる浚渫泥の処理に
は、別に設けた浚渫泥用の処理プールに運び入れて処理
しなければならず、その手間だけでも大変な労力と時間
と費用とを必要としていた。
[0010] In addition, since the area around the landfill area is dredged during landfilling, the dredging mud generated at that time must be carried to a separate treatment pool for dredging mud. However, even that time alone required a great deal of labor, time and money.

【0011】本発明の他の目的は、例えば湖沼州の埋立
造成区域などの軟弱地盤を硬質地盤へと改良するととも
に、その際に生じる浚渫泥、(あるいは別の工事や浚渫
作業などに伴って生じた浚渫泥であってもよい)も確実
に処理することができる軟弱地盤の改良工法を提供する
ことである。
Another object of the present invention is to improve a soft ground such as a land reclamation area in a lake state into a hard ground, and to generate dredging mud (or other work or dredging work) at that time. It is an object of the present invention to provide an improved method for soft ground that can reliably treat the generated dredging mud.

【0012】[0012]

【課題を解決するための手段】上記目的を達成するた
め、請求項1記載の発明は、以下のa)〜h)の工程を
有することを特徴とする軟弱地盤の改良工法をその要旨
とした。 a) 鉛直ト゛レーン材を上端部を残して地盤中に所定の
間隔をおいて打設することにより、地盤中に鉛直排水壁
を造成する工程、 b) 前記鉛直ト゛レーン材上端部と接触するように水平
状に真空ポンプに連結した通水材を配置する工程、 c) 前記鉛直ト゛レーン材上端部及び通水材を砂層で覆
う工程、 d) 前記地盤上を前記鉛直ト゛レーン材上端部、通水材
及び砂層とともに気密シートで覆う工程、 e) 前記真空ポンプを作動させて地盤上面に負圧の状
態を造り出す工程、 f) 前記地盤の圧密沈下後の凹部内に土砂を撒き出す
工程、 g) 前記土砂層に前記気密シートを貫通して前記砂層
に至る深さまで鉛直ト゛レーン材を打設する工程、 h) 前記真空ポンプを作動させて前記地盤上面に負圧
の状態を造り出し、前記土砂層中に打設した鉛直ト゛レー
ン材を介して土砂層中の水及び空気を排出させる工程。
In order to achieve the above-mentioned object, the gist of the present invention is to provide a method for improving soft ground characterized by having the following steps a) to h). . a) forming a vertical drainage wall in the ground by placing a vertical train material in the ground at a predetermined interval while leaving the upper end thereof; b) contacting the vertical train material with the upper end of the vertical train material. Arranging the water-permeable material connected to the vacuum pump horizontally; c) covering the upper end of the vertical train material and the water-permeable material with a sand layer; d) upper end of the vertical train material on the ground, the water-permeable material. E) a step of operating the vacuum pump to create a negative pressure state on the ground surface, f) a step of dispersing earth and sand in a concave portion of the ground after consolidation settlement, and g) the above. A step of driving a vertical train material through the airtight sheet to a depth reaching the sand layer in the soil layer, h) operating the vacuum pump to create a negative pressure state on the ground surface, and Casting Step of discharging the water and air of sediment layer was via a vertical Doreen material.

【0013】請求項2記載の発明は、e)、f)、g)
の工程を繰り返すことを特徴とする軟弱地盤の改良工法
をその要旨とした。
The invention according to claim 2 provides e), f) and g).
The main idea is to improve the soft ground by repeating the above steps.

【0014】請求項3記載の発明は、気密シート上に撒
き出す土砂が浚渫泥であることを特徴とする軟弱地盤の
改良工法をその要旨とする。
The gist of the invention according to claim 3 is an improved method for soft ground characterized in that the earth and sand scattered on the airtight sheet is dredge mud.

【0015】請求項4記載の発明は、各工程に使用され
る鉛直ト゛レーン材、通水材及び気密シートのいずれか又
は全てが、生分解性成形材料よりなることを特徴とする
軟弱地盤の改良工法をその要旨とした。
According to a fourth aspect of the present invention, there is provided an improved soft ground characterized in that any or all of the vertical train material, the water-permeable material and the airtight sheet used in each step are made of a biodegradable molding material. The construction method was the gist.

【0016】請求項5記載の発明は、生分解性成形材料
が天然高分子を主体とすることを特徴とする軟弱地盤の
改良工法をその要旨とした。
The gist of the invention according to claim 5 is a method of improving soft ground, characterized in that the biodegradable molding material is mainly composed of a natural polymer.

【0017】請求項6記載の発明は、真空ポンプを間欠
的に作動させることで、地盤上面に常圧及び負圧の状態
を交互に造り出す工程をさらに含むことを特徴とする軟
弱地盤の改良工法をその要旨とした。
According to a sixth aspect of the present invention, there is provided a method of improving soft ground, further comprising the step of intermittently operating a vacuum pump to alternately create a normal pressure state and a negative pressure state on the ground surface. Was the gist.

【0018】請求項7記載の発明は、地盤上面が負圧の
状態から常圧の状態へと移行するときに、地盤上面に空
気を送り込むことを特徴とする軟弱地盤の改良工法をそ
の要旨とした。
According to a seventh aspect of the present invention, there is provided an improved method of soft ground characterized by blowing air into the upper surface of the ground when the upper surface of the ground shifts from a negative pressure state to a normal pressure state. did.

【0019】請求項8記載の発明は、鉛直ト゛レーン材を
振動させるようにしたことを特徴とする軟弱地盤の改良
工法をその要旨とした。
The gist of the invention described in claim 8 is a method of improving soft ground characterized by vibrating a vertical train material.

【0020】請求項9記載の発明は、以下のa)〜f)
の工程を有することを特徴とする軟弱地盤の改良工法を
その要旨とした。 a) 圧密沈下後の地盤の凹部底面に、真空ポンプと連
結し、排水ポンプを備える真空タンクと、同真空タンク
と接続した第1の排水材とを設置すると共に、この第1
の排水材と接するように、所定の間隔をおいて第1の水
平ト゛レーン材を敷設する工程、 b) 前記地盤の凹部内に土砂を撒き出す工程、 c) 前記真空ポンプを作動させて、真空タンク、第1
の排水材、第1の水平ト゛レーン材を介して土砂層に含ま
れる水分及び空気を除去し、土砂層を固化させる工程、 d) 前記固化した土砂上面に、第2の排水材を設置
し、この第2の排水材に接するように、所定の間隔をお
いて第2の水平ト゛レーン材を敷設すると共に、前記第2
の排水材と前記第1の排水材とを可撓管を介して接続す
る工程、 e) 前記凹部内に再度土砂を撒き出す工程、 f) 前記真空ポンプを作動させて、真空タンク、第
1、第2の排水材、第1、第2の水平ト゛レーン材、可撓
管を介して土砂層に含まれる水分及び空気を除去し、土
砂層を固化させる工程。
[0020] The invention according to claim 9 provides the following a) to f).
The purpose of the present invention is to provide a method for improving soft ground characterized by having the following steps. a) A vacuum tank connected to a vacuum pump and provided with a drainage pump and a first drainage material connected to the vacuum tank are installed on the bottom of the concave portion of the ground after consolidation settlement, and the first drainage material is connected to the vacuum tank.
Laying a first horizontal train material at a predetermined interval so as to be in contact with the drainage material of (b), b) spouting earth and sand into the concave portion of the ground, c) operating the vacuum pump to vacuum Tank, first
Removing the water and air contained in the sediment layer through the first drainage material and the first horizontal train material to solidify the sediment layer; d) installing a second drainage material on the solidified soil and sand upper surface; A second horizontal train member is laid at a predetermined interval so as to be in contact with the second drainage member, and
Connecting the drainage material and the first drainage material through a flexible pipe, e) re-spreading the earth and sand into the concave portion, f) operating the vacuum pump to form a vacuum tank, Removing the moisture and air contained in the sediment layer through the second drainage material, the first and second horizontal train materials, and the flexible pipe, and solidifying the sediment layer.

【0021】請求項10記載の発明は、a)の工程にお
ける地盤を圧密沈下させて地盤に凹部を造成する工法
が、以下のア)〜オ)の工程からなることを特徴とする
軟弱地盤の改良工法をその要旨とした。 ア) 鉛直ト゛レーン材を上端部を残して地盤中に所定の
間隔をおいて打設することにより、地盤中に鉛直排水壁
を造成する工程、 イ) 前記鉛直ト゛レーン材上端部と接触するように水平
状に真空ポンプに連結した通水材を配置する工程、 ウ) 前記鉛直ト゛レーン材上端部及び通水材を砂層で覆
う工程、 エ) 前記地盤上を前記鉛直ト゛レーン材上端部、通水材
及び砂層とともに気密シートで覆う工程、 オ) 前記真空ポンプを作動させて地盤上面に負圧の状
態を造り出す工程。
According to a tenth aspect of the present invention, in the soft ground, the method of forming a concave portion in the ground by consolidating the ground in the step a) comprises the following steps a) to e). The improved method was the gist. A) a step of forming a vertical drainage wall in the ground by placing a vertical train material in the ground at a predetermined interval while leaving the upper end thereof, a) making contact with the upper end of the vertical train material. Arranging the water-permeable material connected to the vacuum pump horizontally; c) covering the upper end of the vertical train material and the water-permeable material with a sand layer; d) upper end of the vertical train material on the ground, the water-permeable material. And a step of covering with an airtight sheet together with the sand layer. E) a step of operating the vacuum pump to create a negative pressure state on the ground surface.

【0022】請求項11記載の発明は、d)、e)、
f)の工程を繰り返すことを特徴とする軟弱地盤の改良
工法をその要旨とした。
The invention according to claim 11 provides d), e),
The gist of the present invention is a method for improving soft ground characterized by repeating step f).

【0023】請求項12記載の発明は、圧密沈下後の地
盤の凹部内に撒き出す土砂が浚渫泥であることを特徴と
する軟弱地盤の改良工法をその要旨とした。
The gist of the invention according to claim 12 is to provide an improved method of soft ground characterized in that the earth and sand scattered into the concave portion of the ground after consolidation settlement is dredge mud.

【0024】請求項13記載の発明は、各工程に使用さ
れる第1、第2の水平ト゛レーン材、第1、第2の排水材
及び可撓管のいずれか又は全てが、生分解性成形材料よ
りなることを特徴とする軟弱地盤の改良工法をその要旨
とした。
According to a thirteenth aspect of the present invention, any or all of the first and second horizontal train members, the first and second drainage members, and the flexible pipe used in each step are formed by biodegradable molding. The gist is an improvement method for soft ground characterized by being made of a material.

【0025】請求項14記載の発明は、生分解性成形材
料が天然高分子を主体とすることを特徴とする軟弱地盤
の改良工法をその要旨とした。
The gist of the invention of claim 14 is a method of improving soft ground, characterized in that the biodegradable molding material is mainly composed of a natural polymer.

【0026】[0026]

【発明の実施の形態】BEST MODE FOR CARRYING OUT THE INVENTION

(作用)請求項1〜8記載の軟弱地盤の改良工法にあっ
ては、地盤上面が、鉛直ト゛レーン材上端部及び通水材と
ともに気密シートで覆われるとともに、通水材に連結さ
れた真空ポンプが作動して真空引きされることから、地
盤上面は負圧の状態となり、地盤中における間隙水圧と
の間には差が生じるようになる。
(Operation) In the method for improving soft ground according to claims 1 to 8, the upper surface of the ground is covered with an airtight sheet together with the upper end of the vertical train material and the water-permeable material, and the vacuum pump is connected to the water-permeable material. Is operated to be evacuated, so that the upper surface of the ground is in a negative pressure state, and a difference is generated between the pressure and the pore water pressure in the ground.

【0027】そしてこの圧力差によって、鉛直ト゛レーン
材を上端部を残して地盤中に所定の間隔をおいて打設す
ることにより、地盤中に造成された鉛直排水壁を通して
地盤中の水と空気が地盤表面へと吸い出されるようにな
っている。地盤表面の水と空気は、鉛直ト゛レーン材上端
部と接触するように水平状に配された通水材を通って真
空タンクへと排出されるようになっている。
[0027] By this pressure difference, the vertical train material is driven into the ground at predetermined intervals while leaving the upper end portion, so that water and air in the ground pass through the vertical drainage wall formed in the ground. It is designed to be sucked out to the ground surface. Water and air on the ground surface are discharged to the vacuum tank through a water-permeable material arranged horizontally so as to contact the upper end of the vertical train material.

【0028】地盤中の水と空気が地盤表面へと吸い出さ
れると、地盤は水と空気が吸い出された分だけ圧密沈下
し、凹部が形成されることになる。この後、圧密沈下後
の凹部に土砂を撒き出す。これにより、地盤上には土砂
による圧密載荷重が加わり、地盤の圧密脱水はさらに進
行し、圧密沈下が促進することになる。
When the water and air in the ground are sucked out to the surface of the ground, the ground consolidates and sinks by the amount of water and air sucked out, and a concave portion is formed. Thereafter, the earth and sand is scattered into the recess after the consolidation settlement. As a result, a consolidation load due to earth and sand is applied to the ground, and consolidation dewatering of the ground further proceeds, and consolidation settlement is promoted.

【0029】また凹部内に撒き出された土砂層中の水及
び空気は、この土砂層に、前記気密シートを貫通して前
記砂層に至る深さまで鉛直ト゛レーン材を打設し、前記真
空ポンプを作動させて前記地盤上面に負圧の状態を造り
出すことで、前記鉛直ト゛レーン材を介して排出されるよ
うになっている。
The water and the air in the sediment layer spouted into the recess are used to drive a vertical train material into the sediment layer so as to penetrate the airtight sheet and reach the sand layer. By actuating to create a negative pressure state on the ground surface, the ground is discharged through the vertical train material.

【0030】そして上述の気密シート上への土砂の撒き
出し、土砂層への鉛直ト゛レーン材の打設、及び地盤上面
における負圧状態の造出といった操作を繰り返すことに
より、地盤及び土砂層は土砂層による圧密載荷重と負圧
力とによって圧密脱水が効果的に進行し、硬化地盤へと
改良されるようになっている。
By repeating the above-described operations of dispersing the earth and sand on the airtight sheet, placing the vertical train material on the earth and sand layer, and creating a negative pressure state on the upper surface of the ground, the soil and the earth and sand layer are formed. The consolidation dehydration proceeds effectively by the consolidation load and the negative pressure by the layer, and is improved to a hardened ground.

【0031】また、土砂層が浚渫泥によるものの場合に
は、上記圧密載荷重と負圧力とによる圧密脱水で、地盤
改良と同時に浚渫泥の処理も行うことができるようにな
っている。
When the soil layer is made of dredged mud, the consolidation dewatering by the above-mentioned consolidation load and negative pressure enables the dredged mud to be treated simultaneously with the ground improvement.

【0032】請求項9〜15記載の軟弱地盤の改良工法
にあっては、圧密沈下後の地盤の凹部底面に、真空ポン
プと連結し、排水ポンプを備えた真空タンクと、同真空
タンクと接続した第1の排水材とが設置され、この第1
の排水材と接するように、所定の間隔をおいて第1の水
平ト゛レーン材が敷設され、当該凹部内に土砂が撒き出さ
れ、前記真空ポンプが作動して真空引きされることか
ら、真空タンク、第1の排水材及び第1の水平ト゛レーン
材を介して土砂層中の水及び空気が排出され、土砂層は
固化するようになる。また同時に、凹部内に撒き出され
た土砂層による圧密載荷重によって地盤の圧密脱水が効
果的に進行し、硬化地盤へと改良されるようになってい
る。
In the method for improving soft ground according to the ninth to fifteenth aspects, a vacuum tank connected to a vacuum pump and connected to a vacuum pump is provided on the bottom surface of the concave portion of the ground after consolidation settlement, and the vacuum tank is connected to the vacuum tank. The first drainage material was installed, and this first drainage material was installed.
The first horizontal train material is laid at a predetermined interval so as to be in contact with the drainage material, and the earth and sand is scattered in the concave portion, and the vacuum pump is operated to be evacuated. Then, water and air in the sediment layer are discharged through the first drainage material and the first horizontal train material, and the sediment layer solidifies. At the same time, the consolidation dewatering of the ground proceeds effectively by the consolidation load of the earth and sand layer scattered in the concave portion, and the ground is improved to a hardened ground.

【0033】土砂層の固化と軟弱地盤の硬化により圧密
沈下がさらに進行した凹部内(固化した土砂層の上面)
に、第2の排水材が設置され、この第2の排水材に接す
るように、所定の間隔をおいて第2の水平ト゛レーン材が
敷設され、前記第2の排水材と前記第1の排水材とが可
撓管を介して接続され、この凹部内に再度土砂が撒き出
され、前記真空ポンプが作動して真空引きされることか
ら、真空タンク、第1、第2の排水材及び第1、第2の
水平ト゛レーン材、可撓管を介して新たに撒き出された土
砂層中の水及び空気が排出され、土砂層は固化するよう
になる。また同時に、さきに撒き出された土砂層からの
水及び空気の排出も行われ、さらに凹部内に再度撒き出
された土砂層による圧密載荷重によって地盤の圧密脱水
が効果的に進行し、さらなる硬化地盤へと改良されるよ
うになっている。
[0033] In a concave portion where consolidation settlement further progresses due to solidification of the soil layer and hardening of the soft ground (the upper surface of the solidified soil layer).
A second drain material is installed, and second horizontal train members are laid at predetermined intervals so as to be in contact with the second drain material, and the second drain material and the first drain material are laid. The material is connected via a flexible tube, the earth and sand is again scattered into the concave portion, and the vacuum pump is operated to be evacuated, so that the vacuum tank, the first and second drainage materials and the 1. The water and air in the newly spouted sediment layer are discharged through the second horizontal train material and the flexible tube, and the sediment layer solidifies. At the same time, water and air are discharged from the sediment layer that has been scattered earlier, and the consolidation load of the soil layer that has been scattered again in the concave portion effectively consolidates and dewaters the ground. It has been improved to hardened ground.

【0034】尚、軟弱地盤の含水量(軟弱さ)によって
は、上記固化した土砂上面に、第3、第4、第5・・・
の排水材の設置、第3、第4、第5の水平ト゛レーン材の
敷設、凹部内への土砂の撒き出し、真空ポンプによる土
砂層中の水分及び空気の除去といった操作を繰り返すこ
とで、より効果的でかつ確実な地盤の改良がなされるよ
うになる。
Depending on the water content (softness) of the soft ground, the third, fourth, fifth,...
By repeating the operation of installing drainage material, laying the third, fourth, and fifth horizontal train materials, dispersing earth and sand in the recess, and removing water and air in the earth and sand layer by the vacuum pump, Effective and reliable ground improvement will be achieved.

【0035】また、土砂層が浚渫泥によるものの場合に
は、上記圧密載荷重と負圧力とによる圧密脱水で、地盤
改良と同時に浚渫泥の処理も行うことができるようにな
っている。
When the soil layer is made of dredged mud, the consolidation dewatering by the above-mentioned consolidation load and negative pressure enables the dredged mud to be treated simultaneously with the ground improvement.

【0036】尚、上記請求項9〜14記載の工法におい
ては、真空タンクとして排水ポンプを備えたものを採用
している。これは、圧密による地盤の沈下が大きくて
も、凹部内に設置した真空タンク(排水ポンプ)の稼働
により真空度ロスが軽減できるようにするためである。
すなわち、図13〜図15に示すように、圧密による地
盤Aの沈下に伴って真空タンク32も沈下することにな
る。真空タンク32の沈下に伴い、本来負圧発生手段で
ある真空ポンプ40は、沈下した深さ(高さ)分だけ、
地盤間隙水を揚水しなければならなくなる。そして、そ
の揚水に真空ポンプ40の負圧力が利用され、その結果
として真空ポンプ40による負圧能力も低下することに
なるのである。このような不具合が発生することがない
よう、本発明では、排水ポンプを備えた真空タンク32
を採用し、これにより真空タンク32内の間隙水が、常
時、排水ポンプの稼働によって排水されて、真空ポンプ
40の真空度ロスを軽減しているのである。
In the construction method according to the ninth to fourteenth aspects, a vacuum tank equipped with a drainage pump is employed. This is because even if the settlement of the ground due to consolidation is large, the loss of the degree of vacuum can be reduced by operating the vacuum tank (drain pump) installed in the concave portion.
That is, as shown in FIGS. 13 to 15, the vacuum tank 32 also sinks with the settlement of the ground A due to the consolidation. With the sinking of the vacuum tank 32, the vacuum pump 40, which is originally a negative pressure generating means, moves by the sinking depth (height).
The ground pore water must be pumped. Then, the negative pressure of the vacuum pump 40 is used for the pumping, and as a result, the negative pressure capability of the vacuum pump 40 is also reduced. In order to prevent such a problem from occurring, the present invention provides a vacuum tank 32 having a drain pump.
Thus, the interstitial water in the vacuum tank 32 is constantly drained by the operation of the drain pump to reduce the loss of vacuum degree of the vacuum pump 40.

【0037】以下、本発明の軟弱地盤の改良工法(以下
単に改良工法という)を図面に示した一実施例に従って
詳細に説明する。尚、図1〜図15に示す実施例は、湖
沼周囲の軟弱地盤の改良例を図示したものであり、同改
良例では、地盤上に撒き出す土砂として湖沼からの浚渫
泥を用いることで、軟弱地盤の改良と同時に湖沼からの
浚渫泥の処理も行っている。
Hereinafter, the method for improving soft ground of the present invention (hereinafter simply referred to as “improvement method”) will be described in detail with reference to an embodiment shown in the drawings. The embodiment shown in FIGS. 1 to 15 illustrates an improved example of soft ground around a lake, and in the improved example, dredging mud from a lake is used as soil to be scattered on the ground. At the same time as improving the soft ground, we are also treating dredged mud from lakes and marshes.

【0038】図1〜図11には、請求項1〜8記載の発
明の改良工法の実施例を示した。請求項1記載の改良工
法は、以下のa)〜h)の工程を有することを特徴とす
るものである。図1に示すように、a)の工程、すなわ
ち地盤中に鉛直排水壁を造成する工程は、鉛直ト゛レーン
材11を上端部11aを残して地盤A中に所定の間隔を
おいて打設することからなる。鉛直ト゛レーン材11とし
ては、従来より使用されているドレーン材を用いること
ができる。その中でもプラスチックドレーン材は、図1
に示すように、マンドレル12に内挿した状態で地盤A
中に貫入し、プラスチックドレーン材11を地盤Aに残
したままマンドレル12を引き上げることで打設するこ
とができ、打設作業の容易さ、目詰まりが生じ難く、確
実な透水材としての機能をもつことから好ましく、本実
施例ではこのドレーン材を採用している。
FIGS. 1 to 11 show an embodiment of the improved method according to the first to eighth aspects of the present invention. The improved method according to the first aspect is characterized by including the following steps a) to h). As shown in FIG. 1, in the step a), that is, in the step of forming a vertical drainage wall in the ground, the vertical train material 11 is cast into the ground A at a predetermined interval while leaving the upper end portion 11a. Consists of A conventionally used drain material can be used as the vertical drain material 11. Among them, plastic drain material is shown in Fig. 1.
As shown in FIG.
The mandrel 12 can be poured by penetrating into the ground and pulling up the mandrel 12 while leaving the plastic drain material 11 on the ground A, so that the driving work is easy, the clogging hardly occurs, and the function as a reliable water permeable material is achieved. In this embodiment, this drain material is employed.

【0039】この鉛直ト゛レーン材11を地盤A中に所定
の間隔をおいて打設することで、地盤A中には所定の間
隔をおいて鉛直状の排水壁が造成されることになり、各
排水壁間の地盤中に含まれる水及び空気は、図1中矢印
で示すように鉛直ト゛レーン材11よりなる排水壁を通し
て地盤A上面へと吸い上げられ、地盤A上面に残されて
いるドレーン材上端部11aより排出される。
By placing the vertical train material 11 in the ground A at predetermined intervals, vertical drainage walls are formed in the ground A at predetermined intervals. Water and air contained in the ground between the drainage walls are sucked up to the upper surface of the ground A through the drainage wall composed of the vertical train material 11 as shown by arrows in FIG. It is discharged from the unit 11a.

【0040】次に、b)の工程、すなわち、真空ポンプ
に連結した通水材を配置する。図2に示すように、ドレ
ーン材上端部11aは地盤Aの上面に突出している。こ
の突出部分に通水材13を接触するように平行状に配置
するのである。通水材13としては、水及び空気が該通
水材13の長手方向へと移動できる通路としての機能を
持つものならば何でもよいが、地盤A側からの水及び空
気が該通水材13内部へ侵入する口、例えば孔、スリッ
トなどが、地盤A中の砂や土砂などによって閉塞してし
まい、水及び空気の通水材内部への侵入が困難となった
り、同じく地盤中の砂や土砂などによって通路が閉塞し
て水及び空気が該通水材の長手方向へ移動できなかった
りすることが少ない構造のものが好ましい。
Next, step b), that is, a water-permeable material connected to a vacuum pump is arranged. As shown in FIG. 2, the drain material upper end 11 a protrudes from the upper surface of the ground A. The water-permeable material 13 is arranged in parallel so as to come into contact with the projecting portion. As the water passage material 13, any material having a function as a passage through which water and air can move in the longitudinal direction of the water passage material 13 may be used. The openings, such as holes and slits, that enter the interior are blocked by sand, earth and sand, etc. in the ground A, making it difficult for water and air to enter the water-permeable material. It is preferable to use a structure in which water and air are less likely to move in the longitudinal direction of the water-permeable material due to the passage being blocked by soil and the like.

【0041】具体的には図3に示すように、プラスチッ
クネット14とその表面に積層した繊維シート15とか
らなるものが好ましい例として挙げられる。この通水材
13において水及び空気は、プラスチックネット14の
表面に積層した繊維シート15側から侵入し、プラスチ
ックネット14と繊維シート15との隙間、及び繊維シ
ート15の構成繊維相互間を通して移動するようにな
る。
More specifically, as shown in FIG. 3, a preferred example is one comprising a plastic net 14 and a fiber sheet 15 laminated on the surface thereof. In the water-permeable material 13, water and air enter from the side of the fiber sheet 15 laminated on the surface of the plastic net 14 and move through the gap between the plastic net 14 and the fiber sheet 15 and between the constituent fibers of the fiber sheet 15. Become like

【0042】この通水材13の一端側には真空ポンプ1
6が連結されている。図2に示すように、真空ポンプ1
6は通水材13の一端側に直接連結されず、真空タンク
17を介している。つまり真空ポンプ16からの負圧が
排水ポンプ(図示しない)を備える真空タンク17を介
して通水材13へと伝達されるようになっている。そし
てこの作用により水及び空気が通水材13へと入り込
み、同通水材13内を移動して真空タンク17へと排出
され、排水ポンプ(図示しない)によってタンク17外
へ排出されるようになっているのである。
A vacuum pump 1 is provided at one end of the water passage material 13.
6 are connected. As shown in FIG.
Numeral 6 is not directly connected to one end of the water-passing material 13 but via a vacuum tank 17. That is, the negative pressure from the vacuum pump 16 is transmitted to the water passage material 13 via the vacuum tank 17 having a drain pump (not shown). By this action, water and air enter the water passage material 13, move inside the water passage material 13, are discharged to the vacuum tank 17, and are discharged to the outside of the tank 17 by a drain pump (not shown). It is becoming.

【0043】次いで、c)、d)の工程を行う。つまり
図4に示すように、鉛直ト゛レーン材11の上端部11a
及び通水材13を砂層21で覆い、地盤A上を前記鉛直
ト゛レーン材11の上端部11a、通水材13及び砂層2
1とともに気密シート18で覆うのである。ここで気密
シート18は、空気が透過できない素材であるならば、
合成樹脂シート、繊維基材表面に合成樹脂フィルムをラ
ミネートしたものなど何でもよい。
Next, steps c) and d) are performed. That is, as shown in FIG. 4, the upper end portion 11a of the vertical train
And the water-permeable material 13 is covered with a sand layer 21, and the upper end 11 a of the vertical train material 11, the water-permeable material 13 and the sand layer 2 are covered on the ground A.
1 together with the airtight sheet 18. Here, if the airtight sheet 18 is made of a material through which air cannot pass,
Any material may be used, such as a synthetic resin sheet or a laminate of a synthetic resin film on the surface of a fiber substrate.

【0044】次いで、e)の工程、すなわち気密シート
18で地盤A上を覆った状態で真空ポンプ16を作動さ
せるのである。真空ポンプ16が作動すると、真空ポン
プ16からの負圧が排水ポンプを備える真空タンク17
を介して通水材13へと伝達され、地盤A上面は負圧状
態となり、地盤A中における間隙水圧との間には差が生
じるようになる。
Then, the vacuum pump 16 is operated in the step e), that is, while the ground A is covered with the airtight sheet 18. When the vacuum pump 16 is operated, the negative pressure from the vacuum pump 16 is applied to a vacuum tank 17 having a drain pump.
And the upper surface of the ground A is in a negative pressure state, and a difference is generated between the upper surface of the ground A and the pore water pressure in the ground A.

【0045】そしてこの圧力差によって、地盤A中に造
成された鉛直排水壁を通して地盤A中の水と空気が、図
4中矢印で示したように、地盤A表面へと吸い出され、
地盤表面の水と空気は、鉛直ト゛レーン材上端部11aと
接触するように水平状に配された通水材13を通って真
空タンク17へと排出されるようになる。
Then, due to this pressure difference, water and air in the ground A are sucked out to the surface of the ground A as shown by arrows in FIG.
The water and air on the ground surface are discharged to the vacuum tank 17 through the water-passing material 13 arranged horizontally so as to contact the upper end portion 11a of the vertical train material.

【0046】真空ポンプ16は勿論連続して作動させて
もよいが、間欠的に作動させることもできる。図5に示
すように、地盤A表面が負圧の状態となり、その圧力差
によって地盤A中の水と空気が地盤A表面へと吸い出さ
れると、地盤、特に鉛直ト゛レーン材11の周りは、地盤
Aを構成する粒子間隙が狭くなり、水と空気が通り難く
なる。この結果、地盤A中に残存する水と空気は、圧力
差によっても十分に吸い出されなくなる。
The vacuum pump 16 may be operated continuously, but may be operated intermittently. As shown in FIG. 5, when the surface of the ground A is in a negative pressure state, and the water and the air in the ground A are sucked out to the surface of the ground A due to the pressure difference, the ground, especially around the vertical train material 11, The gap between the particles constituting the ground A becomes narrow, and it becomes difficult for water and air to pass through. As a result, the water and air remaining in the ground A cannot be sufficiently sucked even by the pressure difference.

【0047】真空ポンプを間欠的に作動させることで、
地盤A上面は常圧及び負圧の状態が交互に造り出される
ことになる。負圧の状態から常圧の状態へと変わるとき
には、空気が一気に入り込むことになる。このため、地
盤Aにはその圧力差によって空気が一気に入り込むこと
になり、このときの衝撃力が地盤Aに作用して地盤Aを
揺り動かし、この結果図6に示すように地盤A、特に鉛
直ト゛レーン材11周りの地盤Aを構成する粒子間隙は広
がり、水と空気は通り易くなる。
By operating the vacuum pump intermittently,
On the upper surface of the ground A, a state of normal pressure and a state of negative pressure are alternately created. When the state changes from a negative pressure state to a normal pressure state, the air becomes completely entrapped. Due to this pressure difference, the air is forced into the ground A, and the impact force at this time acts on the ground A to shake the ground A. As a result, as shown in FIG. The gap between the particles constituting the ground A around the material 11 is widened, and the water and the air pass easily.

【0048】そこで、再び真空ポンプ16を作動させる
ことで、地盤A表面が常圧の状態から負圧の状態へと変
わることで、その圧力差によって地盤A中の水と空気が
吸い出されるようになる。このように真空ポンプを間欠
的に作動させることで、地盤中の水と空気はより効率的
に吸い出されることになる。
Then, by operating the vacuum pump 16 again, the surface of the ground A changes from a normal pressure state to a negative pressure state, so that the water and the air in the ground A are sucked out by the pressure difference. become. By intermittently operating the vacuum pump in this manner, water and air in the ground are more efficiently sucked.

【0049】また真空ポンプを間欠的に作動させること
で、地盤A上面に常圧及び負圧の状態を交互に造り出す
場合、負圧の状態から常圧の状態へと変わるときに、圧
力差によって空気が一気に入り込むだけではなく、さら
に積極的に空気を送り込むようにすることもできる。こ
の場合には、地盤に作用する衝撃力もより大きくなり、
地盤、特に鉛直ト゛レーン材11周りの地盤Aを構成する
粒子間隙はより大きく広がり、水と空気はより通り易く
なる。
When the vacuum pump is operated intermittently to alternately create a normal pressure state and a negative pressure state on the upper surface of the ground A, when the state changes from the negative pressure state to the normal pressure state, a pressure difference is generated. Not only can air be loved, but air can be sent more actively. In this case, the impact force acting on the ground becomes larger,
The space between the particles constituting the ground, particularly the ground A around the vertical train material 11, is larger and the water and the air are easier to pass through.

【0050】この結果、より効果的に地盤中の水と空気
の吸い出しができると共に、地盤上面をより速く常圧の
状態へと戻すことができる。
As a result, water and air in the ground can be sucked out more effectively, and the upper surface of the ground can be returned to a normal pressure state more quickly.

【0051】また、地盤Aを揺り動かす別の方法として
は、鉛直ト゛レーン材11自体を振動させる方法がある。
この場合も地盤A、特に鉛直ト゛レーン材11周りの地盤
を構成する粒子間隙は広がり、水と空気は通り易くな
る。尚、鉛直ト゛レーン材を振動させる方法と前述の真空
ポンプを間欠的に作動させる方法を併用したならば、よ
り効果的に地盤A中の水及び空気の吸い出しを行うこと
ができる。
As another method of shaking the ground A, there is a method of vibrating the vertical train material 11 itself.
Also in this case, the gap between the particles constituting the ground A, particularly the ground around the vertical train material 11, is widened, and water and air can easily pass through. If the method of vibrating the vertical train material and the method of intermittently operating the above-described vacuum pump are used together, the water and air in the ground A can be more effectively sucked out.

【0052】上述の如く地盤A中の水と空気が地盤A表
面へと吸い出されることで、地盤Aは、図7に示すよう
に水と空気が吸い出された分だけ圧密沈下し、ここに凹
部30が造り出されることになる。
As described above, the water and the air in the ground A are sucked out to the surface of the ground A, so that the ground A consolidates and sinks by an amount corresponding to the sucked water and air as shown in FIG. The concave portion 30 is created in the first step.

【0053】この後、F)の工程を行う。すなわち図8
に示すように、前記軟弱地盤Aの圧密沈下により造られ
た凹部30内に土砂22を撒き出す。これにより、地盤
A上には土砂22よりなる層によって圧密載荷重が加わ
り、さらに地盤Aの圧密脱水が行われるようになる。
尚、土砂22を撒き出す場合、土砂22が周囲に広がら
ないように、改良区域を取り囲むように壁を設けておい
てもよい。
Thereafter, the step F) is performed. That is, FIG.
As shown in FIG. 5, earth and sand 22 are scattered in a recess 30 formed by consolidation settlement of the soft ground A. As a result, a consolidation load is applied on the ground A by the layer of the earth and sand 22, and the consolidation dewatering of the ground A is performed.
When the earth and sand 22 are scattered, a wall may be provided so as to surround the improvement area so that the earth and sand 22 do not spread around.

【0054】次に、g)の工程、すなわち図9に示す如
く、前記土砂22よりなる層中に前記気密シート18を
貫通して前記砂層21に至る深さまで鉛直ト゛レーン材2
4を打設するのである。この場合、鉛直ト゛レーン材24
の打設は、前述の鉛直ト゛レーン材18の打設と同じ要領
で行う。そして、h)の工程、つまり前記真空ポンプ1
6を作動させるのである。これにより真空ポンプ16か
らの負圧が真空タンク17を介して通水材13へと伝達
され、地盤A上面は負圧状態となる。地盤A上面の負圧
力は、砂層21中の前記通水材13に上端部11aが接
触する地盤A中の鉛直ト゛レーン材18とともに、砂層2
1中に打ち込まれた鉛直ト゛レーン材24にも伝わり、こ
れら鉛直ト゛レーン材18、24を介して、地盤A及び土
砂22よりなる層中の水及び空気が排出されるようにな
る。
Next, in the step g), as shown in FIG. 9, the vertical train material 2 penetrates through the hermetic sheet 18 into the sand layer 21 to a depth reaching the sand layer 21 in the layer made of the earth and sand 22.
4 is cast. In this case, the vertical train material 24
Is carried out in the same manner as the above-described placement of the vertical train 18. And step h), that is, the vacuum pump 1
6 is activated. As a result, the negative pressure from the vacuum pump 16 is transmitted to the water passage material 13 via the vacuum tank 17, and the upper surface of the ground A is in a negative pressure state. The negative pressure on the upper surface of the ground A is caused by the vertical train material 18 in the ground A where the upper end 11a contacts the water-permeable material 13 in the sand layer 21 and the sand layer 2
The water and the air in the layer consisting of the ground A and the earth and sand 22 are discharged through the vertical train members 18 and 24 which are also transmitted to the vertical train members 24 driven into the inside.

【0055】尚、図9に示す態様では、土砂22よりな
る層の上面に砂層21を覆う気密シート18と同じ気密
シート25で覆われており、これにより真空ポンプ16
からの負圧力が確実に土砂22よりなる層中に伝わり、
より効果的な脱水が行えるようになっている。
In the embodiment shown in FIG. 9, the upper surface of the layer composed of the earth and sand 22 is covered with the same air-tight sheet 25 as the air-tight sheet 18 covering the sand layer 21.
The negative pressure from is surely transmitted to the layer consisting of earth and sand 22,
More effective dehydration can be performed.

【0056】次いで図10に示すように、図8及び図9
に示す土砂22の撒き出し、鉛直ト゛レーン材24の砂層
21への打設、及び真空ポンプ16からの負圧力による
排水によって地盤A及び土砂22よりなる層の圧密沈下
が生じた後、再度上述の気密シート25上への土砂の撒
き出し、土砂層への鉛直ト゛レーン材の打設、及び地盤上
面における負圧状態の造出といった操作を繰り返すので
ある。これにより、地盤及び土砂層は土砂による圧密載
荷重と負圧力とによって圧密脱水が効果的に進行し、硬
化地盤へと改良されるようになる。
Next, as shown in FIG. 10, FIGS.
After the soil A and the soil composed of the soil A and the layer made of the soil 22 are caused by the dispersal of the earth and sand 22, the placement of the vertical train material 24 into the sand layer 21, and the drainage by the negative pressure from the vacuum pump 16, as described above. Operations such as dispersal of earth and sand on the airtight sheet 25, placement of a vertical train material on the earth and sand layer, and creation of a negative pressure state on the ground surface are repeated. Thereby, the consolidation dewatering of the ground and the earth and sand layer is effectively progressed by the consolidation load and the negative pressure due to the earth and sand, and the soil and the soil are improved to the hardened ground.

【0057】尚、各工程に使用される鉛直ト゛レーン材、
通水材及び気密シートのいずれか又は全てを生分解性成
形材料により構成することもできる。生分解性成形材料
とは土中又は水中に存在する微生物や水分などにより容
易に分解してしまう材料をいう。この生分解性成形材料
によって構成された鉛直ト゛レーン材、通水材及び気密シ
ートを用いて、上述の方法に従い改良工法を施工した場
合、鉛直ト゛レーン材、通水材及び気密シートを構成する
生分解性成形材料が、地盤内の土中又は水中に存在する
微生物や水分などにより容易に分解してしまうため、こ
れらの部材を撤去する必要がなく、軟弱地盤の改良に要
する費用と手間とを大幅に削減することができる。
The vertical train material used in each step,
Any or all of the water-permeable material and the airtight sheet may be made of a biodegradable molding material. The biodegradable molding material refers to a material which is easily decomposed by microorganisms or water existing in soil or water. When a vertical train material, a water-permeable material, and an airtight sheet are constructed using the biodegradable molding material and the improved construction method is applied in accordance with the above-described method, the biodegradation forming the vertical train material, the water-permeable material, and the airtight sheet Since the flexible molding material is easily decomposed by microorganisms and water present in the soil or water in the ground, there is no need to remove these members, greatly reducing the cost and labor required for improving the soft ground. Can be reduced.

【0058】また生分解性成形材料としては、芋類、米
麦類、コーン類などの澱粉質、澱粉に酢酸ビニルなどの
ビニルモノマーを共重合させた澱粉質誘導体、パルプ、
セルロースなどの植物繊維又は植物粉末、天然ゴム、ア
ラビアゴムなどの植物性高分子、ガゼイン、ゼラチン、
グルテンなどの動物性タンパク質といった天然高分子を
主体とするものが好ましい。というのは、これら天然高
分子を主体とするものにあっては、施工後に地盤内で分
解しても環境に悪影響を与えることがないからである。
Examples of the biodegradable molding material include starches such as potatoes, rice and wheat, corns, starchy derivatives obtained by copolymerizing starch with a vinyl monomer such as vinyl acetate, pulp, and the like.
Plant fibers or plant powders such as cellulose, natural rubber, vegetable polymers such as gum arabic, casein, gelatin,
Those mainly composed of natural polymers such as animal proteins such as gluten are preferred. This is because, in the case of these natural polymer-based materials, even if they are decomposed in the ground after construction, they do not adversely affect the environment.

【0059】尚、本発明の軟弱地盤の改良工法を施工し
た後(地盤を十分に減圧した後)、必要に応じて前記砂
層にセメント粉末またはセメントミルクを、地盤の減圧
様態を利用して注入すれば、砂層の液状化を防止するこ
とができる。
After the soft ground improvement method of the present invention is applied (after the ground is sufficiently depressurized), if necessary, cement powder or cement milk is injected into the sand layer by utilizing the depressurized state of the ground. Then, liquefaction of the sand layer can be prevented.

【0060】尚、本発明の軟弱地盤の改良工法を、埋立
造成区域などの軟弱地盤に適用する場合、埋立造成時に
は、埋立造成区域の周囲を浚渫することから、その際に
生じる浚渫泥を気密シート上に撒き出す土砂とすればよ
い。これにより、軟弱地盤の改良と浚渫泥の処理とが同
時に行えるようになる。また、河川や港湾などの浚渫工
事の際に生じた浚渫泥を、本発明の地盤改良工法を適用
するときに、気密シート上に投入される圧密載荷重(土
砂)として用いることもできる。
When the method for improving soft ground of the present invention is applied to soft ground such as a landfill area, the land around the landfill area is dredged during landfill, and the dredging mud generated at that time is hermetically sealed. It may be earth and sand to be scattered on the sheet. Thereby, improvement of soft ground and treatment of dredging mud can be performed simultaneously. In addition, when applying the ground improvement method of the present invention, dredging mud generated at the time of dredging work of a river or a harbor can be used as a consolidation load (sediment) loaded on an airtight sheet.

【0061】尚、上に示したものは単なる説明例にすぎ
ず、例えば鉛直ト゛レーン材11の上端部11aと通水材
13との位置が施工時にズレてしまわないように、これ
らに固定手段を設けたりするなど、特許請求の範囲に記
載された範囲で自由に変更することができる。
The above is merely an illustrative example. For example, a fixing means is provided on the vertical train 11 so that the upper end 11a of the vertical train 11 and the water-permeable material 13 do not shift during construction. For example, it can be freely changed within the scope described in the claims.

【0062】次に、請求項9〜15記載の発明の改良工
法を説明する。この発明の実施例を図12〜図15に示
した。この改良工法は、以下のa)〜f)の工程を有す
ることを特徴とするものである。まず最初に、a)の工
程について説明する。a)の工程では、図12及び図1
3に示すように、圧密沈下後の地盤Aの凹部30底面
に、真空ポンプ40と連結した真空タンク32(水中ポ
ンプ内蔵、以下同様)と、この真空タンク32と接続し
た第1の排水材33aとを設置すると共に、この第1の
排水材33aと接するように、所定の間隔をおいて第1
の水平ト゛レーン材34aを敷設する。尚、この例におい
て、真空タンク32は、図12に示すように凹部30底
面のほぼ中央に設置した。これは、通常、中央部が最も
沈下量が大きくなるからである。
Next, an improved method according to the present invention will be described. Embodiments of the present invention are shown in FIGS. This improved method has the following steps a) to f). First, the step a) will be described. In the step a), FIG. 12 and FIG.
As shown in FIG. 3, a vacuum tank 32 (built-in submersible pump, the same applies hereinafter) connected to a vacuum pump 40 and a first drainage material 33a connected to the vacuum tank 32 are provided on the bottom surface of the concave portion 30 of the ground A after consolidation settlement. And the first drainage member 33a is contacted with the first drainage member 33a at a predetermined interval.
Is laid. In this example, the vacuum tank 32 was installed substantially at the center of the bottom surface of the recess 30 as shown in FIG. This is because the sinking amount is usually largest in the central part.

【0063】尚、ここで軟弱地盤を圧密沈下させて、地
盤に凹部を造成する方法は、地盤中に鉛直ト゛レーン材を
打設し、この地盤上に土砂などの加重を載加して地盤中
の水を圧密脱水する方法や真空圧密脱水による方法な
ど、まったく任意である。本実施例では、前述の図1〜
図7に示す工法を用いた。又、本例では、図1〜図7に
示す工法で用いた真空ポンプ16を、そのまま本工法の
真空ポンプ40として利用した。尚、地盤の沈下量、即
ち凹部30の深さとしては、1m以上が好ましい。
Here, a method of forming a concave portion in the ground by consolidating the soft ground to form a depression in the ground is performed by placing a vertical train material in the ground and placing a load such as earth and sand on the ground. Any method such as a method of consolidating and dewatering the water or a method of vacuum consolidation dehydration is possible. In the present embodiment, FIGS.
The method shown in FIG. 7 was used. In this example, the vacuum pump 16 used in the method shown in FIGS. 1 to 7 was used as it is as the vacuum pump 40 of the present method. Note that the amount of subsidence of the ground, that is, the depth of the concave portion 30 is preferably 1 m or more.

【0064】この例において、真空タンク32と真空ポ
ンプ40とは、耐圧ホース41を介して連結されてい
る。また第1の排水材33aには、多数の孔(図示しな
い)を有する管体であり、その周面には不織布などの繊
維シートが張り付けられて孔及び管の目詰まりを防止し
ているものを用いた。図12及び図13の例では、凹部
30底部の長さ方向に間隔をおいて3本の第1の排水材
33aを配置したが、凹部の大きさや深さに応じて、複
数本縦方向に並設したり、縦横格子状に配したり、ある
いは上部及び下部に平行して配置したりすることもでき
る。
In this example, the vacuum tank 32 and the vacuum pump 40 are connected via a pressure-resistant hose 41. The first drainage member 33a is a tubular body having a large number of holes (not shown), and a fibrous sheet such as a nonwoven fabric is adhered to a peripheral surface thereof to prevent the holes and the tubes from being clogged. Was used. In the examples of FIGS. 12 and 13, the three first drainage members 33a are arranged at intervals in the length direction of the bottom of the concave portion 30. However, depending on the size and depth of the concave portion, a plurality of first drainage members 33a are arranged in the vertical direction. They may be arranged side by side, arranged in a vertical and horizontal lattice, or arranged in parallel at the top and bottom.

【0065】また凹部30の底部には、前記第1の排水
材33aに接触するように、第1の水平ドレーン材34
aを所定の間隔、好ましくは0.7〜1.0mの間隔を
置いて敷設する。この第1の水平ドレーン材34aは、
幅が10〜30cmの帯状をなしており、プラスチック
ネットとその両表面に積層した繊維シートとからなり、
後述する土砂層内の水分及び空気が、プラスチックネッ
トと繊維シートとの間隙、繊維シートを構成する繊維間
隙を通して侵入し、かつ移動するようにしたもの(尚、
繊維シートには、不織布、織物、編物、紙などを用いる
ことができる。)、あるいは同じく樹脂ネットを用い、
このプラスチックネットの一方面側のみに繊維シートを
積層一体化したものなどを適用することができる。尚、
第1の水平ドレーン材34a相互の間隔は、土質定数に
従って適宜変更する。
The first horizontal drain member 34 is provided at the bottom of the recess 30 so as to contact the first drain member 33a.
a is laid at a predetermined interval, preferably 0.7 to 1.0 m. This first horizontal drain material 34a is
It is in the form of a belt with a width of 10 to 30 cm, and consists of a plastic net and a fiber sheet laminated on both surfaces thereof,
Moisture and air in the earth and sand layer to be described later enter and move through the gap between the plastic net and the fiber sheet and the fiber gap constituting the fiber sheet (in addition,
Nonwoven fabric, woven fabric, knitted fabric, paper, and the like can be used for the fiber sheet. ) Or, similarly, using a resin net,
A plastic net in which a fiber sheet is laminated and integrated only on one side of the plastic net can be used. still,
The distance between the first horizontal drain members 34a is appropriately changed according to the soil constant.

【0066】図12及び図13に示すように、第1の水
平ドレーン材34aは、縦横に0.7〜1.0mの間隔
で格子状に配列して、各交差点を止め金(図示しない)
で止めて固定した網目状として用いることもできる。
As shown in FIGS. 12 and 13, the first horizontal drain members 34a are arranged in a grid pattern at intervals of 0.7 to 1.0 m vertically and horizontally, and clasps (not shown) are provided at each intersection.
It can also be used as a mesh that is fixed by stopping at

【0067】尚、水平ドレーン材34aは、凹部30底
部にのみ配されているだけでも良いが、凹部30の底部
及びその周辺部分にも敷設して、同水平ドレーン材34
aで凹部30(撒き出される土砂層35)の全体を取り
囲むようにすることもできる。この場合、凹部30内に
撒き出される土砂層35が、底部のみならず、その周辺
部からも水分及び空気の吸い出しが行われることにな
り、より効率的な水分及び空気の除去ができる。
The horizontal drain member 34a may be disposed only at the bottom of the concave portion 30. However, the horizontal drain member 34a is also laid at the bottom of the concave portion 30 and its peripheral portion.
It is also possible to surround the entire concave portion 30 (the spouted soil layer 35) with a. In this case, the earth and sand layer 35 scattered in the concave portion 30 sucks moisture and air not only from the bottom but also from the periphery thereof, so that moisture and air can be more efficiently removed.

【0068】この第1の水平ドレーン材34aと前記第
1の排水材33aとは、例えば排水材33a上に第1の
水平ドレーン材34aを直接接続する態様を採ることが
できる。この場合、第1の排水材33aと第1の水平ド
レーン材34aは、単に積層状態としておいても良い
が、止め金(図示しない)などで相互を固定しておいて
も良い。また、第1の水平ドレーン材34aを敷設して
おき、この上に排水材33aを配置し、この上に砂の層
13を設けるという態様も採ることもできる。
The first horizontal drain member 34a and the first drainage member 33a can take a form in which the first horizontal drain member 34a is directly connected to the drainage member 33a, for example. In this case, the first drainage member 33a and the first horizontal drain member 34a may be simply laminated, but may be fixed to each other by a stopper (not shown) or the like. Further, a mode in which the first horizontal drain member 34a is laid, the drainage member 33a is disposed thereon, and the sand layer 13 is provided thereon may be employed.

【0069】次に、前記凹部30内に土砂35を撒き出
す。土砂35の撒き出しにより、地盤A上には土砂35
による圧密載荷重が加わり、さらに地盤Aの圧密脱水が
行われるようになる。この土砂35の撒き出し量、換言
すれば土砂35よりなる層の厚さは任意である。土砂層
の厚さが薄ければ、処理は速いものの、1回の処理量は
少なくなり、土砂層の厚さが厚ければ、処理は遅くなる
ので、必要な処理量を考慮して適宜決定すると良い。具
体的には1〜2mの厚さが好ましい。
Next, earth and sand 35 are scattered in the recess 30. By discharging the soil 35, the soil 35
And the consolidation load is applied, and consolidation dewatering of the ground A is further performed. The spreading amount of the earth and sand 35, in other words, the thickness of the layer made of the earth and sand 35 is arbitrary. If the thickness of the earth and sand layer is thin, the processing is fast, but the amount of one processing is small, and if the thickness of the earth and sand layer is thick, the processing is slow. Good. Specifically, a thickness of 1 to 2 m is preferable.

【0070】次に、前記土砂層上面を気密シート36で
覆う。気密シートとしては、空気が透過できない素材で
あるならば、合成樹脂シート、繊維シート表面に合成樹
脂フィルムをラミネートしたものなど何でも良い。この
気密シート36で、土砂層上面を覆うことで、凹部30
内は気密状態となり、より効率的な排水がなされるよう
になる。
Next, the upper surface of the earth and sand layer is covered with an airtight sheet 36. The airtight sheet may be any material such as a synthetic resin sheet or a fiber sheet laminated with a synthetic resin film on the surface, as long as it is a material through which air cannot pass. By covering the upper surface of the earth and sand layer with this airtight sheet 36, the recess 30
The inside is airtight, and more efficient drainage is performed.

【0071】この後、e)の工程、すなわち真空ポンプ
40を作動させる。これにより、真空ポンプ40からの
負圧が真空タンク32を介して第1の排水材33aに伝
わり、この第1の排水材33aに接続する第1の水平ド
レーン材34aを通して土砂層内の水分及び空気が、図
13中矢印で示すように、第1の水平ドレーン材34a
へと吸い出され、第1の排水材33a、真空タンク3
2、耐圧ホース41を介して排水され、土砂層が固化す
るようになっている。
Thereafter, the step e), that is, the vacuum pump 40 is operated. Thereby, the negative pressure from the vacuum pump 40 is transmitted to the first drainage member 33a via the vacuum tank 32, and the moisture and the water in the sediment layer are passed through the first horizontal drain member 34a connected to the first drainage member 33a. As shown by an arrow in FIG. 13, air flows through the first horizontal drain material 34a.
To the first drainage material 33a, the vacuum tank 3
2. The water is drained through the pressure hose 41 so that the earth and sand layer is solidified.

【0072】次に、i)の工程、すなわち図14に示す
ように、前記固化した土砂35よりなる層上面に、第2
の排水材33bを設置し、この第2の排水材33bに接
するように、所定の間隔をおいて第2の水平ト゛レーン材
34bを敷設する。また、可撓管37を介して前記第1
の排水材33aと第2の排水材33bとを接続する。
Next, in the step i), ie, as shown in FIG. 14, a second layer
Is disposed, and a second horizontal train member 34b is laid at a predetermined interval so as to be in contact with the second drainage member 33b. Also, the first tube is connected via a flexible tube 37.
Drain material 33a and the second drain material 33b.

【0073】この後、j)、k)の工程、つまり前記凹
部内(固化した土砂35の層の上面)に再度土砂42を
撒き出し、土砂42からなる層の上面を気密シート43
で覆い、真空ポンプ40を作動させるのである。これに
より、真空ポンプ40からの負圧が、真空タンク32、
第1、第2の排水材33a、33b、第1、第2の水平
ト゛レーン材34a、34b、可撓管37を介して土砂3
5、42からなる層に伝わり、図14中矢印に示すよう
に、土砂層中の水分と空気が、第1、第2の水平ドレー
ン材34a、34bへと吸い出され、第1、第2の排水
材33a、真空タンク3、耐圧ホース41を介して排水
され、土砂35、42からなる層が固化するようになっ
ている。勿論この場合も、固化した土砂35の層の上面
への土砂42の撒き出しにより、地盤Aには、土砂35
の荷重に加え、土砂42の荷重が加わることになり、こ
の荷重の載加により、地盤Aの圧密脱水も進行すること
になる。
Thereafter, the steps j) and k), that is, the earth and sand 42 are again scattered into the recess (the upper surface of the layer of the solidified earth and sand 35), and the upper surface of the layer made of the earth and sand 42 is sealed with the airtight sheet 43.
Then, the vacuum pump 40 is operated. As a result, the negative pressure from the vacuum pump 40 is
The first and second drainage members 33a and 33b, the first and second horizontal train members 34a and 34b, and the sediment 3
The moisture and air in the sediment layer are sucked out into the first and second horizontal drain members 34a and 34b as shown by arrows in FIG. Is drained through the drainage material 33a, the vacuum tank 3, and the pressure-resistant hose 41, and the layer composed of the earth and sand 35, 42 is solidified. Of course, also in this case, the soil A is scattered on the ground A by spreading the soil 42 on the upper surface of the layer of the solidified soil 35.
In addition to the load, the load of the earth and sand 42 is added, and the consolidation and dewatering of the ground A also proceeds by the application of this load.

【0074】次いで、図15に示すように、上記i)、
j)、k)の工程を繰り返すのである。これにより、地
盤Aは、繰り返し載加される土砂による圧密載荷重によ
って圧密脱水が効果的に進行し、硬化地盤へと改良され
るようになる。同時に地盤A上の土砂層も、土砂による
圧密載荷重と負圧力とによって圧密脱水が効果的に進行
し、盛土材などに再生利用ができるまでに固化処理がな
されるようになる。
Next, as shown in FIG.
The steps j) and k) are repeated. Thereby, the consolidation dewatering of the ground A is effectively advanced by the consolidation load due to the repeatedly applied earth and sand, and the ground A is improved to the hardened ground. At the same time, the consolidation load and the negative pressure due to the consolidation of the soil and sand layer on the ground A are effectively dewatered by consolidation, and the solidification process is performed before the material can be recycled into the embankment material.

【0075】また、図15に示すように、固化した土砂
をそのまま盛土材として用い、軟弱地盤A上に堤防を造
成することができる。
As shown in FIG. 15, the embankment can be formed on the soft ground A using the solidified earth and sand as the embankment material as it is.

【0076】尚、前記c)〜f)の工程を繰り返す毎
に、地盤Aの凹部30底面に設置した真空タンク32
は、図13〜図15に示すように、地盤Aと共に沈下す
ることになる。真空タンク32の沈下に伴い、真空ポン
プ40による負圧能力も低下していくことになる。とい
うのは真空ポンプ40は本来負圧発生手段であるが、沈
下した深さ(高さ)分だけ、地盤間隙水を揚水しなけれ
ばならなくなり、その揚水に真空ポンプ40の負圧力が
利用され、その結果として真空ポンプ40による負圧能
力も低下することになるからである。このような不具合
の発生を解消するため、本例では、水中ポンプ(図示し
ない)を内蔵した真空タンク32を設置している。これ
により真空タンク32内の間隙水は、常時、水中ポンプ
の稼働によって排水されるので、真空ポンプ40による
真空度ロスを軽減することができる。尚、水中ポンプが
故障したときに対処すべく、真空タンク内の底部に耐圧
ホースを設置して地上(外側)まで配管しておくとよ
い。また本例では、タンク内に水中ポンプを設置した真
空タンクを採用したが、地盤間隙水を排水するための排
水ポンプを備えるものならば何でも良く、例えばタンク
外部に排水ポンプを付設した真空タンク、あるいは地上
に設置した排水ポンプと連結させた真空タンクなども用
いることができる。
Each time the steps c) to f) are repeated, the vacuum tank 32 installed on the bottom surface of the concave portion 30 of the ground A
Will sink together with the ground A, as shown in FIGS. As the vacuum tank 32 sinks, the negative pressure capability of the vacuum pump 40 also decreases. This is because the vacuum pump 40 is originally a negative pressure generating means, but it is necessary to pump the ground pore water by the depth (height) of the sink, and the negative pressure of the vacuum pump 40 is used for the pumping. As a result, the negative pressure capability of the vacuum pump 40 also decreases. In order to eliminate such a problem, in this example, a vacuum tank 32 having a built-in submersible pump (not shown) is installed. Thereby, the pore water in the vacuum tank 32 is constantly drained by the operation of the submersible pump, so that the loss of the degree of vacuum caused by the vacuum pump 40 can be reduced. In order to cope with a failure of the submersible pump, it is preferable to install a pressure-resistant hose at the bottom of the vacuum tank and pipe it to the ground (outside). In addition, in this example, a vacuum tank having a submersible pump installed in the tank was adopted, but any device having a drain pump for draining ground pore water may be used.For example, a vacuum tank having a drain pump attached outside the tank, Alternatively, a vacuum tank connected to a drain pump installed on the ground can be used.

【0077】尚、各工程に使用される第1、第2の水平
ドレーン材、第1、第2の排水材、可撓管、及び気密シ
ートのいずれか又は全てを生分解性成形材料により構成
することもできる。生分解性成形材料とは土中又は水中
に存在する微生物や水分などにより容易に分解してしま
う材料をいう。この生分解性成形材料によって構成され
た第1、第2の水平ドレーン材、第1、第2の排水材、
可撓管、及び気密シートを用いて、上述の方法に従い改
良工法を施工した場合、第1、第2の水平ドレーン材、
第1、第2の排水材、可撓管、及び気密シートを構成す
る生分解性成形材料が、地盤、土砂内の土中又は水中に
存在する微生物や水分などにより容易に分解してしまう
ため、これらの部材を撤去する必要がなく、軟弱地盤の
改良に要する費用と手間とを大幅に削減することができ
る。
It is to be noted that any or all of the first and second horizontal drain materials, first and second drainage materials, flexible pipes, and airtight sheets used in each step are made of a biodegradable molding material. You can also. The biodegradable molding material refers to a material which is easily decomposed by microorganisms or water existing in soil or water. A first and a second horizontal drain material, a first and a second drainage material constituted by the biodegradable molding material,
When a flexible pipe and an airtight sheet are used to perform an improved construction method according to the above-described method, the first and second horizontal drain members are provided.
Since the biodegradable molding materials constituting the first and second drainage materials, the flexible pipe, and the airtight sheet are easily decomposed by microorganisms and water present in the ground, in soil in soil or in water, or the like. It is not necessary to remove these members, and the cost and labor required for improving the soft ground can be significantly reduced.

【0078】また生分解性成形材料としては、芋類、米
麦類、コーン類などの澱粉質、澱粉に酢酸ビニルなどの
ビニルモノマーを共重合させた澱粉質誘導体、パルプ、
セルロースなどの植物繊維又は植物粉末、天然ゴム、ア
ラビアゴムなどの植物性高分子、ガゼイン、ゼラチン、
グルテンなどの動物性タンパク質といった天然高分子を
主体とするものが好ましい。というのは、これら天然高
分子を主体とするものにあっては、施工後に地盤内で分
解しても環境に悪影響を与えることがないからである。
Examples of the biodegradable molding material include starches such as potatoes, rice and wheat, corns, starchy derivatives obtained by copolymerizing starch with a vinyl monomer such as vinyl acetate, pulp, and the like.
Plant fibers or plant powders such as cellulose, natural rubber, vegetable polymers such as gum arabic, casein, gelatin,
Those mainly composed of natural polymers such as animal proteins such as gluten are preferred. This is because, in the case of these natural polymer-based materials, even if they are decomposed in the ground after construction, they do not adversely affect the environment.

【0079】尚、請求項9〜15記載の改良工法を、埋
立造成区域などの軟弱地盤に適用する場合、埋立造成時
には、埋立造成区域の周囲を浚渫することから、その際
に生じる浚渫泥を凹部内に撒き出す土砂とすればよい。
これにより、軟弱地盤の改良と浚渫泥の処理とが同時に
行えるようになる。また、河川や港湾などの浚渫工事の
際に生じた浚渫泥を、この改良工法を適用するときに、
凹部内に撒き出す土砂として用いることもできる。
When the improved method according to claims 9 to 15 is applied to soft ground such as a landfill area, the surrounding area of the landfill area is dredged at the time of landfill. What is necessary is just to make the earth and sand scattered in a recessed part.
Thereby, improvement of soft ground and treatment of dredging mud can be performed simultaneously. Also, when applying this improved construction method, dredging mud generated during dredging work on rivers and ports,
It can also be used as earth and sand scattered in the recess.

【0080】[0080]

【発明の効果】請求項1〜8記載の軟弱地盤の改良工法
にあっては、a)〜h)の工程を有することから、土砂
層による圧密載荷重と負圧力とによって地盤及び土砂層
の圧密脱水が効果的に進行し、より効率的な軟弱地盤の
硬化地盤への改良がなされる。
According to the method for improving soft ground described in claims 1 to 8, since the method includes the steps a) to h), the soil and the soil layer are compacted by the consolidation load of the soil layer and the negative pressure. The consolidation dewatering effectively proceeds, and a more efficient improvement of the soft ground to the hardened ground is performed.

【0081】また、上記工法においてe)f)g)の工
程を繰り返すことで、土砂層による圧密載荷重と負圧力
とによる軟弱地盤及び土砂層の圧密脱水はさらに進行
し、より確かな硬化地盤への改良がなされるようにな
る。
Further, by repeating the steps e), f) and g) in the above construction method, the consolidation dewatering of the soft ground and the sediment layer due to the consolidation load and the negative pressure by the sediment layer further progresses, and a more reliable hardened ground Will be improved.

【0082】また、土砂層が浚渫泥によるものの場合に
は、上記圧密載荷重と負圧力とによる圧密脱水で、地盤
改良と同時に浚渫泥の処理も行うことができる。
When the soil layer is made of dredged mud, the consolidation dewatering by the consolidation load and the negative pressure enables the dredged mud to be treated simultaneously with the ground improvement.

【0083】また、前記各工程に使用される鉛直ト゛レー
ン材、通水材及び気密シートのいずれか又は全てに、生
分解性成形材料(特に好ましくは天然高分子)を用いた
ならば、これらの部材が地盤内で容易に分解してしまう
ので、これらの部材を撤去する必要がなく、軟弱地盤の
改良に要する費用と手間とを大幅に削減することができ
る。
Further, if a biodegradable molding material (particularly preferably a natural polymer) is used for any or all of the vertical train material, the water-permeable material and the airtight sheet used in each of the above steps, Since the members are easily disassembled in the ground, there is no need to remove these members, and the cost and labor required for improving the soft ground can be significantly reduced.

【0084】また、上記工法において、真空ポンプを間
欠的に作動させることもでき、この場合、地盤上面は、
負圧の状態と常圧の状態とが交互に造り出されることに
なる。負圧の状態から常圧の状態に変わるとき、その圧
力差によって地盤中に空気が一気に入り込むことにな
り、その衝撃力によって脱水により閉塞状態となってい
た地盤を構成する粒子間隔が広がり、地盤中の水及び空
気の排出経路が確保され、より効率的な水及び空気の排
出がなされるようになる。
In the above method, the vacuum pump can be operated intermittently. In this case,
A state of negative pressure and a state of normal pressure are created alternately. When changing from a negative pressure state to a normal pressure state, the pressure difference causes air to enter the ground, and the impact force expands the space between particles that have been closed due to dehydration, and the ground A drain path for water and air inside is ensured, and water and air can be discharged more efficiently.

【0085】また、真空ポンプを間欠的に作動させる場
合において、負圧の状態から常圧の状態へと変わるとき
に、空気を送り込むようにすることもできる。この場合
には、地盤に作用する衝撃力もより大きくなり、地盤、
特に鉛直ト゛レーン材周りの地盤を構成する粒子間隙はよ
り大きく広がり、水と空気はより通り易くなり、より効
果的な排水がなされるようになる。尚、地盤中の水及び
空気の排出経路を確保するため、鉛直ト゛レーン材を振動
させるという方法を採ることもできる。
In the case where the vacuum pump is operated intermittently, air may be supplied when changing from a negative pressure state to a normal pressure state. In this case, the impact force acting on the ground becomes larger, and the ground,
In particular, the gaps between the particles constituting the ground around the vertical train material are larger, the water and the air are easier to pass through, and the drainage is more effective. Incidentally, a method of vibrating the vertical train material may be adopted in order to secure a discharge path for water and air in the ground.

【0086】請求項9〜15記載の軟弱地盤の改良工法
にあっては、a)〜f)の工程を有することから、圧密
沈下が大きな場合でも、土砂層による圧密載荷重と負圧
力とによって地盤及び土砂層の圧密脱水が効果的に進行
し、効率的な軟弱地盤の硬化地盤への改良がなされる。
In the method for improving soft ground according to the ninth to fifteenth aspects, since the method includes the steps a) to f), even if the consolidation settlement is large, the consolidation load by the earth and sand layer and the negative pressure can be applied. The consolidation and dewatering of the ground and the earth and sand layer effectively proceed, and an efficient soft ground is improved to a hardened ground.

【0087】また、上記工法においてd)e)f)の工
程を繰り返すことで、より効果的でかつ確実な地盤の改
良がなされるようになる。
Further, by repeating the steps d), e) and f) in the above construction method, more effective and reliable ground improvement can be achieved.

【0088】また、土砂層が浚渫泥によるものの場合に
は、上記圧密載荷重と負圧力とによる圧密脱水で、地盤
改良と同時に浚渫泥の処理も行うことができる。
When the soil layer is made of dredged mud, the consolidation dewatering by the above-mentioned consolidation load and negative pressure can simultaneously treat the ground improvement and the dredged mud treatment.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 地盤中に鉛直ト゛レーン材を打設した状態を示
す断面図。
FIG. 1 is a cross-sectional view showing a state where a vertical train material is cast in the ground.

【図2】 鉛直ト゛レーン材上端部と接触するように平行
状に通水材を配置した状態を示す断面図。
FIG. 2 is a cross-sectional view showing a state where a water-permeable material is arranged in parallel so as to be in contact with an upper end portion of a vertical train material.

【図3】 通水材を示す要部拡大断面図。FIG. 3 is an enlarged sectional view of a main part showing a water-permeable material.

【図4】 地盤上を前記鉛直ト゛レーン材上端部及び通水
材とともに気密シートで覆った状態を示す断面図。
FIG. 4 is a cross-sectional view showing a state in which the ground is covered with an airtight sheet together with an upper end portion of the vertical train material and a water-permeable material.

【図5】 水と空気が吸い出された後の鉛直ト゛レーン材
周りの地盤を示す模式図。
FIG. 5 is a schematic view showing the ground around a vertical train material after water and air are sucked out.

【図6】 負圧状態から常圧の状態へ戻すことにより、
鉛直ト゛レーン材周りの地盤を構成する粒子間隙を広げた
状態を示す模式図。
FIG. 6 By returning from a negative pressure state to a normal pressure state,
The schematic diagram which shows the state which expanded the particle | grain gap which comprises the ground around a vertical train material.

【図7】 本発明の改良工法により圧密沈下した地盤の
凹部を示す断面図。
FIG. 7 is a cross-sectional view showing a concave portion of the ground which has been compacted and settled by the improved method of the present invention.

【図8】 圧密沈下した地盤の気密シート上に土砂を撒
き出した状態を示す断面図。
FIG. 8 is a cross-sectional view showing a state in which earth and sand are scattered on an airtight sheet of the consolidated ground.

【図9】 土砂層中に鉛直ト゛レーン材を打設すると共に
土砂層上面を気密シートで覆った状態を示す断面図。
FIG. 9 is a cross-sectional view showing a state in which a vertical train material is cast in the earth and sand layer and the upper surface of the earth and sand layer is covered with an airtight sheet.

【図10】 圧密沈下した地盤の凹部を示す断面図。FIG. 10 is a cross-sectional view showing a concavity in the concavity of the ground.

【図11】 圧密沈下した凹部内にさらに土砂を撒き出
した状態を示す断面図。
FIG. 11 is a cross-sectional view showing a state in which earth and sand are further scattered into the concavity-concaved depression.

【図12】 圧密沈下した凹部内に第1の排水材、真空
タンクを設置する共に、第1の水平ト゛レーン材を敷設し
た状態を示す平面図。
FIG. 12 is a plan view showing a state where a first drainage material and a vacuum tank are installed in a concavity-concaved recess, and a first horizontal train material is laid.

【図13】 同じく断面図。FIG. 13 is a sectional view of the same.

【図14】 固化後の土砂層の上面に第2の排水材を設
置する共に、第2の水平ト゛レーン材を敷設した状態を示
す平面図。
FIG. 14 is a plan view showing a state in which a second drainage material is installed on the upper surface of the soil layer after solidification and a second horizontal train material is laid.

【図15】 固化した土砂を盛土材として、軟弱地盤上
に堤防を造成した状態を示す断面図。
FIG. 15 is a cross-sectional view showing a state in which a bank has been formed on soft ground using solidified earth and sand as an embankment material.

【図16】 従来の軟弱軟弱地盤の改良施工装置を示す
断面図。
FIG. 16 is a cross-sectional view showing a conventional apparatus for improving soft and soft ground.

【符号の説明】[Explanation of symbols]

11、24・・・鉛直ト゛レーン材 13・・・通水材 16、40・・・真空ポンプ 17・・・真空タンク 18、25、36、43・・・気密シート 21・・・砂層 22、26、35、42・・・土砂 30・・・凹部 32・・・真空タンク(水中ポンプ内蔵) 33a、33b・・・排水材 34a、34b・・・水平ト゛レーン材 11, 24: Vertical train material 13: Water-permeable material 16, 40: Vacuum pump 17: Vacuum tank 18, 25, 36, 43: Airtight sheet 21: Sand layer 22, 26 , 35, 42 ... soil 30 ... recess 32 ... vacuum tank (built-in submersible pump) 33a, 33b ... drainage material 34a, 34b ... horizontal train material

Claims (14)

【特許請求の範囲】[Claims] 【請求項1】 以下のa)〜h)の工程を有することを
特徴とする軟弱地盤の改良工法。 a) 鉛直ト゛レーン材を上端部を残して地盤中に所定の
間隔をおいて打設することにより、地盤中に鉛直排水壁
を造成する工程、 b) 前記鉛直ト゛レーン材上端部と接触するように水平
状に真空ポンプに連結した通水材を配置する工程、 c) 前記鉛直ト゛レーン材上端部及び通水材を砂層で覆
う工程、 d) 前記地盤上を前記鉛直ト゛レーン材上端部、通水材
及び砂層とともに気密シートで覆う工程、 e) 前記真空ポンプを作動させて地盤上面に負圧の状
態を造り出す工程、 f) 前記地盤の圧密沈下後の凹部内に土砂を撒き出す
工程、 g) 前記土砂層に前記気密シートを貫通して前記砂層
に至る深さまで鉛直ト゛レーン材を打設する工程、 h) 前記真空ポンプを作動させて前記地盤上面に負圧
の状態を造り出し、前記土砂層中に打設した鉛直ト゛レー
ン材を介して土砂層中の水及び空気を排出させる工程。
1. A method for improving soft ground, comprising the following steps a) to h). a) forming a vertical drainage wall in the ground by placing a vertical train material in the ground at a predetermined interval while leaving the upper end thereof; b) contacting the vertical train material with the upper end of the vertical train material. Arranging the water-permeable material connected to the vacuum pump horizontally; c) covering the upper end of the vertical train material and the water-permeable material with a sand layer; d) upper end of the vertical train material on the ground, the water-permeable material. E) a step of operating the vacuum pump to create a negative pressure state on the ground surface, f) a step of dispersing earth and sand in a concave portion of the ground after consolidation settlement, and g) the above. A step of driving a vertical train material through the airtight sheet to a depth reaching the sand layer in the soil layer, h) operating the vacuum pump to create a negative pressure state on the ground surface, and Casting Step of discharging the water and air of sediment layer was via a vertical Doreen material.
【請求項2】 前記e)、f)、g)の工程を繰り返す
ことを特徴とする請求項1記載の軟弱地盤の改良工法。
2. The method for improving soft ground according to claim 1, wherein the steps e), f) and g) are repeated.
【請求項3】 前記気密シート上に投入する土砂が浚渫
泥であることを特徴とする請求項1または2記載の軟弱
地盤の改良工法。
3. The method for improving soft ground according to claim 1, wherein the earth and sand put on the airtight sheet is dredge mud.
【請求項4】 前記各工程に使用される鉛直ト゛レーン
材、通水材及び気密シートのいずれか又は全てが、生分
解性成形材料よりなることを特徴とする請求項1〜3記
載の軟弱地盤の改良工法。
4. The soft ground according to claim 1, wherein at least one of the vertical train material, the water-permeable material, and the airtight sheet used in each of the steps is made of a biodegradable molding material. Improved construction method.
【請求項5】 生分解性成形材料が天然高分子を主体と
することを特徴とする請求項4記載の軟弱地盤の改良工
法。
5. The method for improving soft ground according to claim 4, wherein the biodegradable molding material is mainly composed of a natural polymer.
【請求項6】 真空ポンプを間欠的に作動させること
で、地盤上面に常圧及び負圧の状態を交互に造り出す工
程をさらに含むことを特徴とする請求項1〜5のいずれ
かに記載の軟弱地盤の改良工法。
6. The method according to claim 1, further comprising the step of intermittently operating a vacuum pump to alternately create a normal pressure state and a negative pressure state on the ground surface. Improvement method for soft ground.
【請求項7】 地盤上面が負圧の状態から常圧の状態へ
と移行するときに、地盤上面に空気を送り込むことを特
徴とする請求項1〜6のいずれかに記載の軟弱地盤の改
良工法。
7. The soft ground improvement according to claim 1, wherein air is blown into the ground upper surface when the ground upper surface shifts from a negative pressure state to a normal pressure state. Construction method.
【請求項8】 前記鉛直ト゛レーン材を振動させるように
したことを特徴とする請求項1〜7のいずれかに記載の
軟弱地盤の改良工法。
8. The method for improving soft ground according to claim 1, wherein the vertical train is vibrated.
【請求項9】 以下のa)〜f)の工程を有することを
特徴とする軟弱地盤の改良工法。 a) 圧密沈下後の地盤の凹部底面に、真空ポンプと連
結し、排水ポンプを備えている真空タンクと、同真空タ
ンクと接続した第1の排水材とを設置すると共に、この
第1の排水材と接するように、所定の間隔をおいて第1
の水平ト゛レーン材を敷設する工程、 b) 前記地盤の凹部内に土砂を撒き出す工程、 c) 前記真空ポンプを作動させて、真空タンク、第1
の排水材、第1の水平ト゛レーン材を介して土砂層に含ま
れる水分及び空気を除去し、土砂層を固化させる工程、 d) 前記固化した土砂上面に、第2の排水材を設置
し、この第2の排水材に接するように、所定の間隔をお
いて第2の水平ト゛レーン材を敷設すると共に、前記第2
の排水材と前記第1の排水材とを可撓管を介して接続す
る工程、 e) 前記凹部内に再度土砂を撒き出す工程、 f) 前記真空ポンプを作動させて、真空タンク、第
1、第2の排水材、第1、第2の水平ト゛レーン材、可撓
管を介して土砂層に含まれる水分及び空気を除去し、土
砂層を固化させる工程。
9. A method for improving soft ground, comprising the following steps a) to f). a) A vacuum tank connected to a vacuum pump and provided with a drainage pump and a first drainage material connected to the vacuum tank are installed on the bottom of the concave portion of the ground after consolidation settlement, and the first drainage is connected to the vacuum pump. At a predetermined interval, the first
Laying the horizontal train material of the above, b) dispersing the earth and sand in the concave portion of the ground, c) operating the vacuum pump to form the vacuum tank,
Removing the water and air contained in the sediment layer through the first drainage material and the first horizontal train material to solidify the sediment layer; d) installing a second drainage material on the solidified soil and sand upper surface; A second horizontal train member is laid at a predetermined interval so as to be in contact with the second drainage member, and
Connecting the drainage material and the first drainage material through a flexible pipe, e) re-spreading the earth and sand into the concave portion, f) operating the vacuum pump to form a vacuum tank, Removing the moisture and air contained in the sediment layer through the second drainage material, the first and second horizontal train materials, and the flexible pipe, and solidifying the sediment layer.
【請求項10】 前記a)の工程における地盤を圧密沈
下させて地盤に凹部を造成する工法が、以下のア)〜
オ)の工程からなることを特徴とする請求項9記載の軟
弱地盤の改良工法。 ア) 鉛直ト゛レーン材を上端部を残して地盤中に所定の
間隔をおいて打設することにより、地盤中に鉛直排水壁
を造成する工程、 イ) 前記鉛直ト゛レーン材上端部と接触するように水平
状に真空ポンプに連結した通水材を配置する工程、 ウ) 前記鉛直ト゛レーン材上端部及び通水材を砂層で覆
う工程、 エ) 前記地盤上を前記鉛直ト゛レーン材上端部、通水材
及び砂層とともに気密シートで覆う工程、 オ) 前記真空ポンプを作動させて地盤上面に負圧の状
態を造り出す工程。
10. A method of forming a concave portion in the ground by consolidating the ground in the step of a) to form a recess in the ground is as follows:
10. The method for improving soft ground according to claim 9, comprising the step of e). A) a step of forming a vertical drainage wall in the ground by placing a vertical train material in the ground at a predetermined interval while leaving the upper end thereof, a) making contact with the upper end of the vertical train material. Arranging the water-permeable material connected to the vacuum pump horizontally; c) covering the upper end of the vertical train material and the water-permeable material with a sand layer; d) upper end of the vertical train material on the ground, the water-permeable material. And a step of covering with an airtight sheet together with the sand layer. E) a step of operating the vacuum pump to create a negative pressure state on the ground surface.
【請求項11】 前記d)、e)、f)の工程を繰り返
すことを特徴とする請求項9または10記載の軟弱地盤
の改良工法。
11. The method for improving soft ground according to claim 9, wherein the steps d), e) and f) are repeated.
【請求項12】 前記圧密沈下後の凹部内に撒き出す土
砂が浚渫泥であることを特徴とする請求項9〜11記載
の軟弱地盤の改良工法。
12. The method for improving soft ground according to claim 9, wherein the earth and sand scattered in the recess after the consolidation settlement is dredge mud.
【請求項13】 前記各工程に使用される第1、第2の
水平ト゛レーン材、第1、第2の排水材及び可撓管のいず
れか又は全てが、生分解性成形材料よりなることを特徴
とする請求項9〜12記載の軟弱地盤の改良工法。
13. The method according to claim 1, wherein any or all of the first and second horizontal train members, the first and second drainage members, and the flexible pipe used in each of the steps are made of a biodegradable molding material. The method for improving soft ground according to any one of claims 9 to 12, wherein:
【請求項14】 生分解性成形材料が天然高分子を主体
とすることを特徴とする請求項13記載の軟弱地盤の改
良工法。
14. The method for improving soft ground according to claim 13, wherein the biodegradable molding material is mainly composed of a natural polymer.
JP23583098A 1997-08-22 1998-08-21 Improvement method for soft ground Expired - Lifetime JP4058550B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23583098A JP4058550B2 (en) 1997-08-22 1998-08-21 Improvement method for soft ground

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP22623597 1997-08-22
JP9-226235 1997-08-22
JP23583098A JP4058550B2 (en) 1997-08-22 1998-08-21 Improvement method for soft ground

Publications (2)

Publication Number Publication Date
JPH11131465A true JPH11131465A (en) 1999-05-18
JP4058550B2 JP4058550B2 (en) 2008-03-12

Family

ID=26527072

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23583098A Expired - Lifetime JP4058550B2 (en) 1997-08-22 1998-08-21 Improvement method for soft ground

Country Status (1)

Country Link
JP (1) JP4058550B2 (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6655873B2 (en) 2000-10-04 2003-12-02 Boskalis Westminster, Inc. Method and apparatus for consolidating earth strata
KR100463314B1 (en) * 2002-07-12 2004-12-29 김윤상 Soil Improvement Method of Soft Clay Using Water as Surcharge Load in Large Land
KR100870465B1 (en) * 2007-02-12 2008-11-25 장지건 Preloading method by controlling of buoyancy
JP2011132660A (en) * 2009-12-22 2011-07-07 Railway Technical Research Institute Banking with airtight structure
CN105239555A (en) * 2015-09-28 2016-01-13 华中科技大学 Method for treating soft soil foundation through combination of bagged grouting gravel pile and vacuum preloading
WO2019187169A1 (en) * 2018-03-27 2019-10-03 正佳 近藤 Vacuum consolidation dredging method, tower air-tight loading caisson, and dedicated work ship
CN111455974A (en) * 2020-03-04 2020-07-28 温州大学 Vacuum preloading flocculation drainage method for transverse drainage plate combined geotextile
CN114000495A (en) * 2021-11-22 2022-02-01 中交第一航务工程局有限公司 Underwater vacuum preloading process
CN114457784A (en) * 2022-03-18 2022-05-10 汕尾市广投建设工程有限公司 Prepressing structure of coastal sludge geological soft soil foundation and construction process thereof
CN114922131A (en) * 2022-05-19 2022-08-19 天津大学 Settlement installation method for large-size steel cylinder dyke dam retaining wall structure in ocean water body

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6655873B2 (en) 2000-10-04 2003-12-02 Boskalis Westminster, Inc. Method and apparatus for consolidating earth strata
US6991406B2 (en) 2000-10-04 2006-01-31 Dirk Albertus Bodegom Method and apparatus for consolidating earth strata
KR100463314B1 (en) * 2002-07-12 2004-12-29 김윤상 Soil Improvement Method of Soft Clay Using Water as Surcharge Load in Large Land
KR100870465B1 (en) * 2007-02-12 2008-11-25 장지건 Preloading method by controlling of buoyancy
JP2011132660A (en) * 2009-12-22 2011-07-07 Railway Technical Research Institute Banking with airtight structure
CN105239555A (en) * 2015-09-28 2016-01-13 华中科技大学 Method for treating soft soil foundation through combination of bagged grouting gravel pile and vacuum preloading
WO2019187169A1 (en) * 2018-03-27 2019-10-03 正佳 近藤 Vacuum consolidation dredging method, tower air-tight loading caisson, and dedicated work ship
WO2019187174A1 (en) * 2018-03-27 2019-10-03 正佳 近藤 Vacuum consolidation dredging method, tower air-tight loading caisson, and dedicated work ship
CN111455974A (en) * 2020-03-04 2020-07-28 温州大学 Vacuum preloading flocculation drainage method for transverse drainage plate combined geotextile
CN114000495A (en) * 2021-11-22 2022-02-01 中交第一航务工程局有限公司 Underwater vacuum preloading process
CN114457784A (en) * 2022-03-18 2022-05-10 汕尾市广投建设工程有限公司 Prepressing structure of coastal sludge geological soft soil foundation and construction process thereof
CN114922131A (en) * 2022-05-19 2022-08-19 天津大学 Settlement installation method for large-size steel cylinder dyke dam retaining wall structure in ocean water body

Also Published As

Publication number Publication date
JP4058550B2 (en) 2008-03-12

Similar Documents

Publication Publication Date Title
US10144892B2 (en) System and method for dewatering coal combustion residuals
JP3270968B2 (en) Improved construction method for soft ground and its improved construction equipment
NL192531C (en) Device for sealing against leakage water from a waste dump.
JPH11131465A (en) Improvement method for poor subsoil
JP4051666B2 (en) Consolidation improvement method for water bottom soft ground.
JP5390308B2 (en) How to improve soft ground
JP2001311136A (en) Ground improvement structure and construction method
CN207469222U (en) The pre-buried vacuum drainage system in reclamation by pumping filling area
JP3138909B2 (en) Improved construction method for soft ground and its improved construction equipment
JP2000144706A (en) Soft ground stabilization
JP4029335B2 (en) Consolidation accelerated landfill method
JP4055184B2 (en) Volume reduction method for water-bottom soft ground
JP2001279657A (en) Ground improvement structure and construction method
JP3007908B2 (en) Dewatering bag for bag dewatering of high moisture content clay
US10458087B2 (en) System and method for dewatering sediment ponds
JP2004293289A (en) Excavated muddy water treatment method and system
JPH10183683A (en) Method and device for volume reduction of construction sludge
JP7517054B2 (en) Anchor members and ground improvement methods
JP2016007562A (en) Waste volume reduction treatment method in landfill waste disposal site
JP4210965B2 (en) Filling stabilization method by decompression
JPH04326999A (en) Dehydration of mud
JPH0226699A (en) Method and apparatus for dehydrating soil with high water content
EP0960660A1 (en) Process for filling a disposal site for silt supplied with a high water content and device for applying drainage wicks
JP2000045257A (en) Processing engineering method for weak soil and drain material used for it
JP3720914B2 (en) Muddy water treatment method and treatment apparatus

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050817

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070518

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070528

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070726

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070925

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20071022

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20071203

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101228

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101228

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101228

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111228

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121228

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131228

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131228

Year of fee payment: 6

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313113

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131228

Year of fee payment: 6

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131228

Year of fee payment: 6

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

R371 Transfer withdrawn

Free format text: JAPANESE INTERMEDIATE CODE: R371

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131228

Year of fee payment: 6

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313113

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131228

Year of fee payment: 6

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

EXPY Cancellation because of completion of term