JPH0940965A - Device for exchanging body frame of coke oven - Google Patents

Device for exchanging body frame of coke oven

Info

Publication number
JPH0940965A
JPH0940965A JP21252995A JP21252995A JPH0940965A JP H0940965 A JPH0940965 A JP H0940965A JP 21252995 A JP21252995 A JP 21252995A JP 21252995 A JP21252995 A JP 21252995A JP H0940965 A JPH0940965 A JP H0940965A
Authority
JP
Japan
Prior art keywords
frame
furnace
body frame
coke oven
furnace body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP21252995A
Other languages
Japanese (ja)
Inventor
Toshiro Ozawa
敏郎 尾沢
Kenji Hashimoto
賢治 橋本
Koji Shimooka
幸二 下岡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Nippon Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Corp filed Critical Nippon Steel Corp
Priority to JP21252995A priority Critical patent/JPH0940965A/en
Publication of JPH0940965A publication Critical patent/JPH0940965A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Coke Industry (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a device for exchanging the body frame of a coke oven safely and easily within a short time by providing a coke oven with a specified oven cover lifter, a specified body frame detachment frame and a support mount for inclining the frame. SOLUTION: This device for exchanging the body frame of a coke oven is provided with an oven cover lifter 13 provided with at least two engagement parts 12 engaged with the oven cover of a coke oven 11, a body frame detachment frame 15 attached to the lifter 13 in a detachable manner, integrally fitted to a body frame 14 and temporarily engaging with the frame 14 and a support mount 16 for inclining the frame 14.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、コークス炉の炉体
フレームの取替装置に係り、更に詳しくは、短時間で、
安全かつ容易に炉体フレームを取り替え可能なコークス
炉の炉体フレームの取替装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a furnace body frame replacement device for a coke oven, more specifically, in a short time,
The present invention relates to a furnace frame replacement device for a coke oven, which allows safe and easy furnace frame replacement.

【0002】[0002]

【従来の技術】コークス炉の炉体フレームは、長期間使
用していると、熱により歪みが発生し、この歪みを原因
として炉体フレームに傾斜や亀裂が生じている。これに
より、ナイフエッジによるシール不良が起き、炭化室の
乾溜ガスが洩れ出す虞れがあった。そこで、この対策と
して、例えば特公昭57−47707号公報「コークス
炉々蓋フレームの取替方法」に記載されたもののよう
に、炉蓋の煉瓦面に接離可能に防熱壁を設けて、この防
熱壁をコークス炉内に固定具で固定した後、炉体フレー
ムを取り替えて、コークス炉を空窯にすることなく、短
時間で修復するものが開発されている。
2. Description of the Related Art A coke oven furnace body frame is distorted by heat when used for a long period of time, and the distortion causes the furnace body frame to be inclined or cracked. As a result, a sealing failure due to the knife edge may occur, and the dry gas in the carbonization chamber may leak out. Therefore, as a countermeasure against this, for example, as described in Japanese Patent Publication No. 57-47707 "Coke oven lid frame replacement method", a heat insulating wall is provided so as to be able to come into contact with and separate from the brick surface of the oven lid. After fixing the heat shield wall in the coke oven with a fixture, the furnace frame is replaced to repair the coke oven in a short time without emptying the oven.

【0003】このような方法に限らず、炉体フレームを
取り替える際には、天井クレーンの玉掛けを行なった起
立状態の炉体フレームの表面から、締着用の多数本のボ
ルトを作業者が抜き取って、天井クレーンを移動させ
て、取り付け基台となるコークス炉の炉壁に固着された
プロテクタから炉体フレームを取り外し、それを天井ク
レーンにより吊り出したり、新しい炉体フレームを運び
込んで取り替えていた。
Not only by such a method, but when replacing the furnace body frame, an operator pulls out a large number of bolts for fastening from the surface of the furnace body frame in an upright state where the ceiling crane is slid. , The overhead crane was moved, the furnace frame was removed from the protector fixed to the furnace wall of the coke oven that was the mounting base, and it was hung by the overhead crane, or a new furnace frame was carried in and replaced.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、このよ
うに従来技術のコークス炉の炉体フレームの取り替えに
あたっては、天井クレーンにより吊り下げたまま、プロ
テクタから旧い炉体フレームを取り外したり、新しい炉
体フレームを取り付ける作業が、炉体フレームが大重量
物であったり、高温のコークス炉という悪環境下での作
業となるために、作業性が悪くて、作業中に作業者が怪
我や火傷をする虞れもあった。本発明はかかる事情に鑑
みてなされたもので、短時間で、安全かつ容易に炉体フ
レームを取り替え可能なコークス炉の炉体フレームの取
替装置を提供することを目的とする。
However, when replacing the furnace frame of the prior art coke oven as described above, the old furnace frame is removed from the protector or the new furnace frame is suspended from the overhead crane. Since the furnace frame is heavy and the work is done in a bad environment such as a high temperature coke oven, the workability is poor and the worker may get injured or burned during the work. There was also The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a furnace body frame replacement device for a coke oven, which enables safe and easy replacement of the furnace body frame in a short time.

【0005】[0005]

【課題を解決するための手段】前記目的に沿う請求項1
記載のコークス炉の炉体フレームの取替装置は、コーク
ス炉の炉蓋に係止される少なくとも二つの係止部が設け
られた炉蓋リフタと、該炉蓋リフタに着脱可能で、炉体
フレームに一体的に嵌合され、かつ前記炉体フレームを
仮り受け係止する炉体フレーム取り外し枠と、前記炉体
フレームを起倒させる預け台とを備えるようにした。
According to the present invention, there is provided a semiconductor device comprising:
An apparatus for replacing a furnace body frame of a coke oven according to the description, a furnace lid lifter provided with at least two engaging portions to be engaged with a furnace lid of a coke oven, and a furnace body detachable from the furnace lid lifter. A furnace body frame removing frame that is integrally fitted to the frame and temporarily receives and locks the furnace body frame, and a depository for tilting the furnace body frame are provided.

【0006】[0006]

【作用】請求項1記載のコークス炉の炉体フレームの取
替装置においては、コークス炉側へ前進する炉蓋リフタ
に仮り受け係止された炉体フレーム取り外し枠を、コー
クス炉の旧い炉体フレームに一体的に掛合し、次いで炉
蓋リフタを後進させて炉体フレームをコークス炉から取
り外し、その後、取り外された旧い炉体フレームを起立
状態で預け台に搭載してそれを預け台上で横倒しし、次
いでそれを天井クレーンにより運び出して、新しい炉体
フレームを預け台に搭載し、そこで起立させた後、先程
とは反対の操作により新しい炉体フレームをコークス炉
に取り付ける。
In the device for replacing a furnace frame of a coke oven according to claim 1, the furnace frame removing frame temporarily received and locked by the furnace lid lifter advancing to the coke oven side is the old furnace body of the coke oven. It is engaged integrally with the frame, then the furnace lid lifter is moved backward to remove the furnace frame from the coke oven, and then the removed old furnace frame is mounted on the depository in an upright state and placed on the depository. After laying it down sideways, it is carried out by an overhead crane, a new furnace body frame is mounted on the depository, and it is erected there. Then, the new furnace body frame is attached to the coke oven by the operation opposite to the above.

【0007】[0007]

【発明の効果】請求項1記載のコークス炉の炉体フレー
ムの取替装置は、このようにコークス炉に常設されてい
る炉蓋リフタを用いて、炉蓋リフタに仮り受け係止され
た炉体フレーム取り外し枠および預け台を介して、新旧
炉体フレームの取り替え作業を行なうようにしたので、
短時間で、安全かつ容易に炉体フレームの取り替えがで
きる。
The apparatus for replacing the furnace body frame of the coke oven according to the first aspect of the present invention uses the oven lid lifter permanently installed in the coke oven as described above to temporarily receive and lock the oven lid lifter. Since the old and new furnace body frames are replaced through the body frame removal frame and the depository,
The furnace frame can be replaced safely and easily in a short time.

【0008】[0008]

【発明の実施の形態】続いて、添付した図面を参照しつ
つ、本発明を具体化した実施の形態につき説明し、本発
明の理解に供する。ここに、図1は本発明の最良の実施
の形態に係るコークス炉の炉体フレームの取替装置の使
用状態の拡大斜視図、図2(a)は炉蓋リフタへの炉体
フレーム取り外し枠の仮り受け係止開始状態を示す斜視
図、図2(b)は炉蓋リフタと炉体フレーム取り外し枠
との仮り受け係止状態を示す側面図、図2(c)は炉蓋
リフタによる炉体フレーム取り外し枠と炉体フレームと
の嵌合開始状態を示す斜視図、図2(d)は炉体フレー
ムの取り外し状態を示す側面図、図3(a)は取り外さ
れた炉体フレームの走行状態を示す側面図、図3(b)
は炉体フレームを起立状態で搭載した預け台の斜視図、
図3(c)は預け台による炉体フレームの横倒し状態を
示す側面図、図3(d)は天井クレーンによる炉体フレ
ームの運び出し状態を示す斜視図である。
BEST MODE FOR CARRYING OUT THE INVENTION Next, referring to the attached drawings, an embodiment in which the present invention is embodied will be described to provide an understanding of the present invention. Here, FIG. 1 is an enlarged perspective view of a usage state of a furnace body frame replacement device for a coke oven according to the best mode of the present invention, and FIG. 2A is a furnace body frame removal frame for a furnace lid lifter. 2B is a side view showing a temporary receiving and locking state of the furnace lid lifter and the furnace frame removing frame, and FIG. 2C is a furnace using the furnace lid lifter. Fig. 2 (d) is a side view showing a detached state of the furnace body frame, Fig. 3 (a) is a running state of the detached furnace body frame. Side view showing the state, FIG. 3 (b)
Is a perspective view of a depository with the furnace frame mounted in an upright position,
3 (c) is a side view showing a state in which the furnace body frame is laid down by the depository, and FIG. 3 (d) is a perspective view showing a state in which the furnace body frame is carried out by the overhead crane.

【0009】図1に示すように、コークス炉の炉体フレ
ームの取替装置10は、コークス炉11の炉蓋に係止さ
れる上下2対の係止部12が設けられた炉蓋リフタ13
と、炉蓋リフタ13に設けられて、炉体フレーム14と
一体的に嵌合され、かつ炉体フレーム14を仮り受け係
止する炉体フレーム取り外し枠15と、取り外された炉
体フレーム14を起倒させる預け台16(図3(b)、
(c)参照)とを備えている。同図の炉蓋リフタ13
は、コークス炉11の消火車側において、コークス炉1
1に沿って預け台16へと延びる横行レール上を走行す
る移動台車に搭載されたものであり、横行レールと直交
する方向に延びた移動台車上のレールに沿って移動す
る。
As shown in FIG. 1, a furnace body frame replacement device 10 for a coke oven has a furnace lid lifter 13 provided with two pairs of upper and lower engaging portions 12 which are engaged with the furnace lid of the coke oven 11.
And a furnace body frame removing frame 15 that is provided on the furnace lid lifter 13 and that is integrally fitted with the furnace body frame 14 and that temporarily receives and locks the furnace body frame 14, and the removed furnace body frame 14. The depository 16 to be tilted (FIG. 3 (b),
(See (c)). Furnace lid lifter 13 in FIG.
Is the coke oven 1 on the fire engine side of the coke oven 11.
It is mounted on a traveling carriage that travels along a traverse rail extending to the depository 16 along 1 and moves along a rail on the traveling carriage that extends in a direction orthogonal to the traverse rail.

【0010】図示された炉体フレーム14は金属製の枠
体であり、多数本のボルトを介して、コークス炉11の
燃焼室11aのコークス押し出し口11bの周辺壁を保
護するプロテクタ17に着脱可能に締着されている。炉
体フレーム14の上下部の表面には、炉蓋を係止する係
止部17aが、それぞれ対向する左右において係止向き
を反対にして一対ずつ突設されている。炉体フレーム取
り外し枠15は、炉体フレーム14の開口部の両端部間
に配置される一対の支柱18を有している。両支柱18
の上下端部には、各支柱18の周側面に固着された側板
19の下部間に、炉蓋リフタ13の対配置された係止部
12に係止される係止ロッド20が横架され、また両側
板19の上部の先端間に連結板21が横架されている。
各連結板21の中央部には、ピン22を介して、炉体フ
レーム14の係止部17aに回動係止される係止レバー
23が軸着されており、上下側の係止レバー23の一端
部間には、細長い連動ロッド24が軸着されている。さ
らに、各支柱18の上端付近および下端部の中央部側間
には、それぞれ補強ロッド25が横架されている。
The furnace frame 14 shown in the figure is a metal frame, and is attachable to and detachable from a protector 17 for protecting the peripheral wall of the coke extrusion port 11b of the combustion chamber 11a of the coke oven 11 through a large number of bolts. Is fastened to. On the upper and lower surfaces of the furnace body frame 14, locking portions 17a for locking the furnace lid are provided so as to project in pairs on opposite left and right sides with opposite locking directions. The furnace body frame removal frame 15 has a pair of columns 18 arranged between both ends of the opening of the furnace body frame 14. Both struts 18
At the upper and lower ends, between the lower portions of the side plates 19 fixed to the peripheral side surfaces of the columns 18, the locking rods 20 that are locked to the locking portions 12 of the furnace lid lifter 13 that are arranged in pairs are laterally installed. Further, a connecting plate 21 is provided horizontally between the upper ends of the side plates 19.
A locking lever 23 pivotally locked to the locking portion 17a of the furnace body frame 14 is pivotally attached to the central portion of each connecting plate 21 via a pin 22. An elongated interlocking rod 24 is axially mounted between the one ends of the. Further, reinforcing rods 25 are horizontally installed near the upper ends of the columns 18 and between the central portions of the lower ends thereof.

【0011】図3(b)、(c)に示すように、預け台
16は、炉体フレーム14の横幅より長い間隔で配置さ
れた一対の縦ガイドレール26の下端部の裏面に、元部
が若干上方傾斜した横ガイドレール27が連結され、か
つ縦、横ガイドレール26、27に沿って、炉体フレー
ム14が着脱可能に装着される、4個の車輪28aを有
する枠体のフレーム起倒枠台車28を起倒可能に設けた
ものである。縦、横ガイドレール26、27は、各対向
側の面が開口されており、フレーム起倒枠台車28の上
下端部の両側枠の表面には、それぞれ係止金具29が突
出しており、左右の対向する係止金具29間に、横倒し
時に炉体フレーム14を下方から支持する下受バー30
が着脱可能に横架できるようになっている。フレーム起
倒枠台車28の上枠には、天井クレーン31のフック3
1aが係止される係止リング32が取り付けられてお
り、天井クレーン31のワイヤ33を徐々に緩めたり引
き戻したりすることにより、フレーム起倒枠台車28が
縦、横ガイドレール26、27に沿ってゆっくりと起倒
される。
As shown in FIGS. 3 (b) and 3 (c), the depository 16 has a base portion on the back surface of the lower end portions of a pair of vertical guide rails 26 arranged at intervals longer than the lateral width of the furnace frame 14. Of the frame body of the frame body having four wheels 28a to which the horizontal guide rails 27 inclined slightly upward are connected, and the furnace body frame 14 is detachably mounted along the vertical and horizontal guide rails 26 and 27. The tilting frame carriage 28 is provided so as to be able to be tilted. The vertical and horizontal guide rails 26 and 27 are open on the opposite side, and locking metal fittings 29 are projected on the surfaces of both side frames at the upper and lower ends of the frame tilting frame carriage 28. Between the opposite locking metal fittings 29 of the lower support bar 30 that supports the furnace body frame 14 from below at the time of lying down.
Can be removably mounted on the side. The hook 3 of the overhead crane 31 is attached to the upper frame of the frame raising / lowering frame carriage 28.
A locking ring 32 to which 1a is locked is attached, and by gradually loosening or pulling back the wire 33 of the overhead crane 31, the frame tilting frame carriage 28 is guided along the vertical and horizontal guide rails 26, 27. And slowly fall down.

【0012】続いて、本発明の最良の実施の形態に係る
コークス炉の炉体フレームの取替装置10の動作につい
て説明する。炉体フレーム14をコークス炉11のプロ
テクタ17から取り外す際には、図2(a)に示すよう
に、炉蓋リフタ13の上下に一対ずつ配置された係止部
12に、天井クレーンに吊り下げられた炉体フレーム取
り外し枠15の係止ロッド20を係止することにより、
炉体フレーム取り外し枠15を炉蓋リフタ13に仮り受
け係止する(図2(b)参照)。次いで、図2(c)に
示すように、炉体フレーム取り外し枠15が係止された
炉蓋リフタ13を、コークス炉11の床面に敷設された
レールに沿って対応する燃焼室11a側へ移動させるこ
とにより、炉体フレーム取り外し枠15を炉体フレーム
14のコークス押し出し口11b内へ押し込む。それか
ら、図2(d)に示すように、炉体フレーム取り外し枠
15の上下側の係止レバー23をピン22を中心に回動
させて、それぞれの係止レバー23の両端部を、左右側
において係止向きが上下反対になった炉体フレーム14
の各係止部17aに係止させ、その後、炉蓋リフタ13
を後退させることにより、予めプロテクタ17側との連
結用のボルトが外されていた炉体フレーム14を強引に
引き抜く。
Next, the operation of the furnace frame replacement device 10 of the coke oven according to the preferred embodiment of the present invention will be described. When removing the furnace body frame 14 from the protector 17 of the coke oven 11, as shown in FIG. 2 (a), it is hung on the overhead crane by the locking portions 12 arranged in pairs at the top and bottom of the furnace lid lifter 13. By locking the locking rod 20 of the removed furnace body frame removal frame 15,
The furnace frame removal frame 15 is temporarily received and locked to the furnace lid lifter 13 (see FIG. 2B). Next, as shown in FIG. 2C, the furnace lid lifter 13 to which the furnace body frame removal frame 15 is locked is moved to the corresponding combustion chamber 11a side along the rail laid on the floor surface of the coke oven 11. By moving the furnace body frame removal frame 15, the furnace body frame removal frame 15 is pushed into the coke pushing port 11b of the furnace body frame 14. Then, as shown in FIG. 2 (d), the upper and lower locking levers 23 of the furnace body frame removal frame 15 are rotated around the pins 22 so that both ends of each locking lever 23 are moved to the left and right sides. Frame 14 with the locking direction turned upside down in
Of the furnace lid lifter 13
By retreating, the furnace body frame 14 from which the bolt for connecting with the protector 17 side has been removed in advance is forcibly pulled out.

【0013】次に、図3(a)、(b)に示すように、
炉体フレーム14が取り付けられた炉蓋リフタ13をコ
ークス炉11に沿って横移動させることにより、炉蓋リ
フタ13を預け台16との正対位置まで移動させ、そこ
で炉蓋リフタ13を、その正対状態のまま預け台16側
へ移動させて、炉体フレーム14をフレーム起倒枠台車
28の枠内へ挿入し、上下側の係止金具29間に下受バ
ー30を横架することにより、炉体フレーム14をフレ
ーム起倒枠台車28に取り付ける。このとき、炉体フレ
ーム取り外し枠15は、その係止ロッド20側を炉蓋リ
フタ13側に向けて配置される。次いで、図3(c)に
示すように、天井クレーン31のワイヤ33を徐々に緩
めることにより、車輪28aを介して、縦ガイドレール
26に起立されていたフレーム起倒枠台車28が、自重
により横ガイドレール27に沿って少しずつ横倒しされ
ていく。完全な横倒し状態になった後、図3(d)に示
すように、吊下ワイヤにより玉掛けされた炉体フレーム
14を、その状態のまま天井クレーン31により図外の
炉体フレーム14の交換場まで搬送して、そこで新しい
炉体フレーム14に交換する。
Next, as shown in FIGS. 3 (a) and 3 (b),
By laterally moving the furnace lid lifter 13 to which the furnace body frame 14 is attached along the coke oven 11, the furnace lid lifter 13 is moved to a position directly facing the depository 16, and the furnace lid lifter 13 is moved there. To move the furnace body frame 14 into the frame of the frame raising and lowering frame carriage 28 while moving it to the side of the depository 16 while keeping it in the face-to-face state, and to horizontally lay the undercarriage bar 30 between the upper and lower engaging metal fittings 29. Thus, the furnace body frame 14 is attached to the frame raising and lowering frame carriage 28. At this time, the furnace frame removing frame 15 is arranged with the locking rod 20 side facing the furnace lid lifter 13 side. Next, as shown in FIG. 3C, by gradually loosening the wire 33 of the overhead crane 31, the frame erection frame carriage 28 that has been erected on the vertical guide rail 26 via the wheels 28a is moved by its own weight. The horizontal guide rail 27 is gradually laid down sideways. After being completely laid down, as shown in FIG. 3 (d), the furnace frame 14 slung by the hanging wire is used as it is in the state of exchanging the furnace frame 14 outside the drawing by the overhead crane 31. It is transported to and is replaced with a new furnace frame 14.

【0014】次に、新しい炉体フレーム14は、天井ク
レーン31により預け台16の横置きされたフレーム起
倒枠台車28内に載置され(図3(d)参照)、それか
らフック31aにフレーム起倒枠台車28の係止リング
32を係止して、天井クレーン31のワイヤ33をゆっ
くりと引き上げることにより、フレーム起倒枠台車28
を横ガイドレール27から縦ガイドレール26へ移動さ
せて、炉体フレーム14を起立させる(図3(c)、
(b)参照)。起立後、先程の炉蓋リフタ13に係止さ
れた炉体フレーム取り外し枠15に炉体フレーム14を
係止し、上下側の下受バー30を取り外して、炉蓋リフ
タ13を後退させてフレーム起倒枠台車28内から炉体
フレーム14を取り出し(図3(a)参照)、それから
炉蓋リフタ13を横移動させて、コークス炉11の対応
する燃焼室11aに正対させてから、炉体フレーム14
をコークス炉11側へ押し込んで、炉体フレーム14を
プロテクタ17にボルト締着する(図2(d)参照)。
Next, the new furnace body frame 14 is placed by the overhead crane 31 in the frame raising / lowering frame carriage 28 of the depository 16 (see FIG. 3 (d)), and then the hook 31a is framed. By locking the locking ring 32 of the tilting frame carriage 28 and slowly pulling up the wire 33 of the overhead crane 31, the frame tilting frame carriage 28
Is moved from the horizontal guide rail 27 to the vertical guide rail 26 to erect the furnace body frame 14 (FIG. 3 (c),
(B)). After standing up, the furnace body frame 14 is locked to the furnace body frame removal frame 15 that is locked to the furnace lid lifter 13 described above, the upper and lower lower support bars 30 are removed, and the furnace lid lifter 13 is retracted to move the frame. The furnace frame 14 is taken out from the inside of the tilting frame carriage 28 (see FIG. 3 (a)), and then the furnace lid lifter 13 is laterally moved to face the corresponding combustion chamber 11a of the coke furnace 11 before the furnace. Body frame 14
Is pushed into the coke oven 11 side, and the furnace frame 14 is bolted to the protector 17 (see FIG. 2 (d)).

【0015】続いて、係止レバー23を回動して、炉蓋
リフタ13側と炉体フレーム14とを切り離し(図2
(c)参照)、次にまた炉蓋リフタ13を後退させた後
(図2(b)参照)、炉蓋リフタ13の上下側の係止部
12から係止ロッド20を離脱させることにより、炉蓋
リフタ13から炉体フレーム取り外し枠15を取り外す
(図2(a)参照)。このように、コークス炉11に常
設されている炉蓋リフタ13を用いて、炉蓋リフタ13
に仮り受け係止された炉体フレーム取り外し枠15およ
び預け台16を介して、新旧炉体フレーム14の取り替
え作業を行なうようにしたので、短時間で、簡単に炉体
フレーム14の取り替えができる。しかも、コークス炉
11付近での作業者の手作業による工程は、炉体フレー
ム14とプロテクタ17との締着または緩め工程に限定
され、怪我をしたり火傷をしたりする頻度を小さくでき
る。
Then, the locking lever 23 is rotated to disconnect the furnace lid lifter 13 side from the furnace body frame 14 (see FIG. 2).
(See (c)), then, after retracting the furnace lid lifter 13 again (see FIG. 2 (b)), the locking rods 20 are released from the upper and lower locking portions 12 of the furnace lid lifter 13. The furnace frame removing frame 15 is removed from the furnace lid lifter 13 (see FIG. 2A). In this way, by using the oven lid lifter 13 that is permanently installed in the coke oven 11, the oven lid lifter 13
Since the old and new furnace body frames 14 are replaced via the furnace body frame removal frame 15 and the depository 16 which are temporarily received and locked to the furnace body frame 14, the furnace body frame 14 can be replaced easily in a short time. . Moreover, the process manually performed by the worker near the coke oven 11 is limited to the process of fastening or loosening the furnace frame 14 and the protector 17, and the frequency of injury or burns can be reduced.

【0016】以上、本発明の実施の形態を説明したが、
本発明はこれらに限定されるものではなく、要旨を逸脱
しない範囲での設計の変更があっても本発明に含まれ
る。例えば、実施の形態では、炉蓋リフタ13には、上
下一対ずつの係止部を設けたが、これに限定しなくて
も、例えば2つ、3つまたは5つ以上の係止部を設けた
ものでもよい。
The embodiments of the present invention have been described above.
The present invention is not limited to these, and even if the design is changed without departing from the scope of the invention, the present invention is included. For example, in the embodiment, the furnace lid lifter 13 is provided with a pair of upper and lower engaging portions, but without being limited to this, for example, two, three, or five or more engaging portions are provided. It may be a thing.

【0017】また、預け台の構造も、実施の形態のもの
のように、縦、横ガイドレールおよびフレーム起倒枠台
車を有するものに限定されなくても、炉体フレームを起
立状態から横倒し状態またはその反対に起倒可能なもの
であれば、どのような構造のものでもよい。
Further, the structure of the depository is not limited to the one having the vertical and horizontal guide rails and the frame raising and lowering frame carriage as in the embodiment, but the furnace body frame can be tilted from the standing state to the sideways state. On the contrary, any structure may be used as long as it can be raised and lowered.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の最良の実施の形態に係るコークス炉の
炉体フレームの取替装置の使用状態の拡大斜視図であ
る。
FIG. 1 is an enlarged perspective view of a state in which a furnace frame replacement device for a coke oven according to a preferred embodiment of the present invention is in use.

【図2】(a)炉蓋リフタへの炉体フレーム取り外し枠
の仮り受け係止開始状態を示す斜視図である。 (b)炉蓋リフタと炉体フレーム取り外し枠との仮り受
け係止状態を示す側面図である。 (c)炉蓋リフタによる炉体フレーム取り外し枠と炉体
フレームとの嵌合開始状態を示す斜視図である。 (d)炉体フレームの取り外し状態を示す側面図であ
る。
FIG. 2A is a perspective view showing a state in which a furnace frame removal frame is temporarily received and locked by a furnace lid lifter. (B) It is a side view which shows the temporary receiving engagement state of a furnace lid lifter and a furnace frame removal frame. (C) It is a perspective view showing a fitting start state of a furnace frame removal frame and a furnace frame by a furnace lid lifter. (D) It is a side view which shows the removal state of the furnace frame.

【図3】(a)取り外された炉体フレームの走行状態を
示す側面図である。 (b)炉体フレームを起立状態で搭載した預け台の斜視
図である。 (c)預け台による炉体フレームの横倒し状態を示す側
面図である。 (d)天井クレーンによる炉体フレームの運び出し状態
を示す斜視図である。
FIG. 3 (a) is a side view showing a traveling state of the removed furnace body frame. (B) It is a perspective view of the depository which mounted the furnace frame in the standing state. (C) It is a side view which shows the state in which the furnace frame was laid down by the depository. (D) It is a perspective view which shows the carrying-out state of the furnace frame by an overhead crane.

【符号の説明】[Explanation of symbols]

10 炉体フレームの取替装置 11 コークス炉 11a 燃焼室 11b コークス
押し出し口 12 係止部 13 炉蓋リフタ 14 炉体フレーム 15 炉体フレー
ム取り外し枠 16 預け台 17 プロテクタ 17a 係止部 18 支柱 19 側板 20 係止ロッド 21 連結板 22 ピン 23 係止レバー 24 連動ロッド 25 補強ロッド 26 縦ガイドレ
ール 27 横ガイドレール 28 フレーム起
倒枠台車 28a 車輪 29 係止金具 30 下受バー 31 天井クレー
ン 31a フック 32 係止リング 33 ワイヤ
10 Furnace Frame Replacement Device 11 Coke Oven 11a Combustion Chamber 11b Coke Extrusion Port 12 Locking Part 13 Furnace Lid Lifter 14 Furnace Body Frame 15 Furnace Frame Removing Frame 16 Depository Stand 17 Protector 17a Locking Part 18 Strut 19 Side Plate 20 Locking rod 21 Connecting plate 22 Pin 23 Locking lever 24 Interlocking rod 25 Reinforcing rod 26 Vertical guide rail 27 Horizontal guide rail 28 Frame raising / lowering frame trolley 28a Wheels 29 Locking bracket 30 Undercarriage bar 31 Overhead crane 31a Hook 32 Locking Ring 33 wire

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 コークス炉の炉蓋に係止される少なくと
も二つの係止部が設けられた炉蓋リフタと、該炉蓋リフ
タに着脱可能で、炉体フレームに一体的に嵌合され、か
つ前記炉体フレームを仮り受け係止する炉体フレーム取
り外し枠と、前記炉体フレームを起倒させる預け台とを
備えたことを特徴とするコークス炉の炉体フレームの取
替装置。
1. A furnace lid lifter provided with at least two locking portions to be locked to a furnace lid of a coke oven; a furnace lid lifter detachable from the furnace lid lifter; and integrally fitted to a furnace body frame, A furnace body frame replacement device for a coke oven, further comprising a furnace body frame removal frame for temporarily receiving and locking the furnace body frame, and a depository for raising and lowering the furnace body frame.
JP21252995A 1995-07-28 1995-07-28 Device for exchanging body frame of coke oven Withdrawn JPH0940965A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21252995A JPH0940965A (en) 1995-07-28 1995-07-28 Device for exchanging body frame of coke oven

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21252995A JPH0940965A (en) 1995-07-28 1995-07-28 Device for exchanging body frame of coke oven

Publications (1)

Publication Number Publication Date
JPH0940965A true JPH0940965A (en) 1997-02-10

Family

ID=16624189

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21252995A Withdrawn JPH0940965A (en) 1995-07-28 1995-07-28 Device for exchanging body frame of coke oven

Country Status (1)

Country Link
JP (1) JPH0940965A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002317181A (en) * 2001-04-18 2002-10-31 Mitsubishi Chemicals Corp Method for detaching oven frame of coke oven
CN107338060A (en) * 2017-06-16 2017-11-10 五冶集团上海有限公司 Carbonizing chamber of coke oven insulation barricade, firedoor frame change system and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002317181A (en) * 2001-04-18 2002-10-31 Mitsubishi Chemicals Corp Method for detaching oven frame of coke oven
CN107338060A (en) * 2017-06-16 2017-11-10 五冶集团上海有限公司 Carbonizing chamber of coke oven insulation barricade, firedoor frame change system and method
CN107338060B (en) * 2017-06-16 2023-06-09 五冶集团上海有限公司 Coke oven carbonization chamber heat preservation retaining wall, and system and method for replacing furnace door frame

Similar Documents

Publication Publication Date Title
TW512171B (en) Method of repairing a coke oven buckstay and a moving device for use in such method
JPH05201487A (en) Device and method to attach/detach bottom lid of coke drum
US20060151764A1 (en) Pin changing device and method
CN105733613A (en) Coke oven door installing device and method
JPH0940965A (en) Device for exchanging body frame of coke oven
JP3559244B2 (en) Rod demolition machine
JP2019073654A (en) Cleaning apparatus for riser pipe
JP4821050B2 (en) Coke oven removal method
JP4049310B2 (en) Hot repair method for coke oven carbonization chamber wall
JP6706516B2 (en) Furnace lid mounting method and temporary trolley
JP2003336072A (en) Dry distillation equipment
JP3232947U (en) Lance pipe carry-in assistance device
CN220664727U (en) Quartz sleeve replacement tool of electric dust collector
JP2020029319A (en) Lifting fixture and hoist lifting method using same
JP3371772B2 (en) Lance exchange mechanism, lance hose attachment / detachment mechanism, lance fixing mechanism, and lance automatic exchange device
JP4073151B2 (en) Replacement method of feed water heater in condenser
JP3674331B2 (en) Heating furnace door replacement method and apparatus
JP6678484B2 (en) Furnace frame mounting method and jig used for the method
JP2564232B2 (en) Insulation box used for hot repair work of coke oven and its installation method
JPH07123539A (en) Mounting/demounting mechanism for high capacity inverter
KR101929685B1 (en) Heatsink installation and demolition jig set for repairing a coke
SU1404525A1 (en) Device for mounting blast furnace components
JPS6127965Y2 (en)
JPH0953077A (en) Heat insulating box for hot repair of coke oven and method of installing it
JPH04194506A (en) Radiant tube exchange device

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20021001