JPH0931968A - Method and device for soil improvement - Google Patents

Method and device for soil improvement

Info

Publication number
JPH0931968A
JPH0931968A JP18309195A JP18309195A JPH0931968A JP H0931968 A JPH0931968 A JP H0931968A JP 18309195 A JP18309195 A JP 18309195A JP 18309195 A JP18309195 A JP 18309195A JP H0931968 A JPH0931968 A JP H0931968A
Authority
JP
Japan
Prior art keywords
ground
screw
shaft
soil
screw rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP18309195A
Other languages
Japanese (ja)
Other versions
JP3505279B2 (en
Inventor
Takuro Odawara
卓郎 小田原
Kazuyoshi Kamimura
一義 上村
Hisayuki Matsumoto
久幸 松本
Shinichi Nishimura
晋一 西村
Yoshihiko Tatsuta
芳彦 立田
Katsuhide Sugiyama
勝英 杉山
Minoru Yamamoto
実 山本
Atsuo Fukuda
厚生 福田
Shuji Kami
上  周史
Setsu Horikiri
節 堀切
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Tenox Corp
Shimizu Corp
Fudo Tetra Corp
Original Assignee
Shimizu Construction Co Ltd
Tenox Corp
Shimizu Corp
Fudo Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Tenox Corp, Shimizu Corp, Fudo Construction Co Ltd filed Critical Shimizu Construction Co Ltd
Priority to JP18309195A priority Critical patent/JP3505279B2/en
Publication of JPH0931968A publication Critical patent/JPH0931968A/en
Application granted granted Critical
Publication of JP3505279B2 publication Critical patent/JP3505279B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

PROBLEM TO BE SOLVED: To easily carry out a removing work for soil corresponding to the geological condition, by providing shaft parts with screws and shaft parts without screws having appropriate lengths respectively in advance in accordance with the geological condition of the improving ground and constituting the screw rod to obtain a specified volume of removing soil. SOLUTION: A screw rod 12 is constituted to make long the shaft 19 part with screws in a geological condition to supply much solidifying agent and to make long the shaft 20 without screws in a geological condition to supply only a little solidifying agent. The screw rod 12 is rotated at a constant speed while supplying a certain quantity of solidifying material corresponding to the geological condition of the improving ground by a solidificer-feeding mechanism 23 and rotating the screw rod at a constant speed. In this way, the supply volume of the solidifying material and the removed volume of excess soil in the ground meet the geological condition. And hence, increase or decrease of earth pressure can be regulated by the removal of soil corresponding to the geological condition and the ground can be improved in low cost.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、軟弱な地盤を改良
して地盤中にブロック状、壁状、格子状、杭状、層状等
の固化体や改良地盤を造成するに際して用いて好適な地
盤改良工法および地盤改良装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a ground suitable for use in improving soft ground to form a block, wall, grid, pile, layer, etc. solidified body or improved ground. The present invention relates to an improved construction method and a ground improvement device.

【0002】[0002]

【従来の技術】周知のように、石灰、セメント等の固化
材をスラリー状に調製し、これらのスラリーを地盤内の
土と攪拌・混合することにより、固化材スラリーの水和
反応,この水和反応による水和生成物と粘土鉱物とのイ
オン交換作用,あるいはポゾラン反応等を主体とする化
学的固結反応を利用して土を化学的に固化させて、地盤
内に改良杭を造成することによって地盤を改良したり固
化体を造成したりする地盤改良工法がある。
2. Description of the Related Art As is well known, solidifying materials such as lime and cement are prepared in the form of slurry, and the slurry is stirred and mixed with the soil in the ground to hydrate the solidifying material slurry. Ion exchange between hydration products of clay reaction and clay minerals, or chemical consolidation reaction mainly consisting of pozzolanic reaction etc. is used to chemically solidify the soil and create improved piles in the ground. Therefore, there is a ground improvement method for improving the ground or forming a solidified body.

【0003】従来、この地盤改良工法では、図4に示す
ような、杭打ち機をベースとした地盤改良装置1が用い
られている。地盤改良装置1は、本体2に設けられた支
持柱3に、ロッド4がその軸周りに回転自在に支持さ
れ、このロッド4の下端部に、地盤G内の土の攪拌を行
う攪拌翼5と、地盤G内の土を掻き進むためのアースオ
ーガ6と、図示しない固化材供給手段から固化材スラリ
ーを地盤G中に供給するための吐出口7とが設けられた
概略構成となっている。
Conventionally, in this ground improvement method, a ground improvement device 1 based on a pile driver as shown in FIG. 4 has been used. In the ground improvement device 1, a rod 4 is rotatably supported by a support column 3 provided on a main body 2 around its axis, and a stirring blade 5 for stirring soil in the ground G is provided at a lower end portion of the rod 4. And an earth auger 6 for scraping the soil in the ground G, and a discharge port 7 for supplying the solidifying material slurry into the ground G from a solidifying material supply means (not shown). .

【0004】そして、このような地盤改良装置1を用い
て地盤Gを改良するには、まず、地盤Gにロッド4を回
転させながら貫入し、アースオーガ6で地盤G内を所定
の深さまで掻き進む。この際、固化材供給手段によっ
て、固化材スラリーをロッド4の下端部の吐出口7から
噴出させる。そして、ロッド4を引き上げながら、噴出
させた固化材スラリーと地盤Gの土とをアースオーガ6
および攪拌翼5で攪拌することによって、地盤G内に円
柱状に土を固化させた改良杭を造成することによって、
地盤Gを改良していた。
In order to improve the ground G by using the ground improving apparatus 1 as described above, first, the rod 4 is inserted into the ground G while rotating, and the ground auger 6 scratches the ground G to a predetermined depth. move on. At this time, the solidifying material slurry is ejected from the discharge port 7 at the lower end of the rod 4 by the solidifying material supply means. While pulling up the rod 4, the solidified material slurry ejected and the soil of the ground G are ground auger 6
And by stirring with the stirring blade 5 to form an improved pile in which the soil is solidified into a cylindrical shape in the ground G,
Ground G was being improved.

【0005】しかしながら、このような地盤改良装置1
では、改良杭を造成するために投入する固化材スラリー
の量が、地盤Gの土砂の間隙以上となると、地盤Gの体
積の膨張,土圧の上昇を招き、地盤Gが側方変位して周
囲の既設の地中構造物に影響を及ぼしたり、地表面の盛
り上がり等を招くという問題が生じることがある。
However, such a ground improvement device 1
Then, if the amount of the solidifying material slurry that is input to create the improved piles exceeds the gap between the soil of the ground G, the volume of the ground G expands and the earth pressure rises, and the ground G is displaced laterally. This may cause problems such as affecting existing existing underground structures and causing swelling of the ground surface.

【0006】このような問題が発生する可能性のある現
場においては、図5に示すような地盤改良装置1’が用
いられている。地盤改良装置1’は、スクリューロッド
8の外周面の全長にわたって、螺旋状のスクリュー翼9
が形成された構成とされている。地盤改良装置1’で
は、スクリューロッド8と一体に回転するスクリュー翼
9によって、余剰の土砂を地上に排土し、これによって
固化材スラリーの供給による地盤G中の土圧の上昇を防
止する構成となっている。
At a site where such a problem may occur, a ground improvement apparatus 1'as shown in FIG. 5 is used. The ground improvement device 1 ′ has a spiral screw blade 9 over the entire length of the outer peripheral surface of the screw rod 8.
Is formed. In the ground improvement device 1 ′, the screw blades 9 that rotate integrally with the screw rod 8 discharge the surplus earth and sand to the ground, thereby preventing an increase in earth pressure in the ground G due to the supply of the solidifying material slurry. Has become.

【0007】[0007]

【発明が解決しようとする課題】しかしながら、上述し
たような従来の地盤改良工法および地盤改良装置には、
以下のような問題が存在する。まず、地盤改良装置1’
においては、攪拌翼5とスクリュー翼9とが一体に回転
する。このため、要求される地盤Gの改良品質が得られ
るように、攪拌翼5の引揚げ速度と回転速度とを一定に
設定すると、これと等速度で引揚げ回転するスクリュー
翼9では地質条件が変化した場合に固化材スラリーの供
給量に見合った量の土砂を排土することができず、過剰
排土による土圧の低下や排土不足による土圧の上昇を発
生させてしまうこともある。また、地質条件が変化した
場合に、逆に、必要な排土量が得られるようにスクリュ
ー翼9すなわちスクリューロッド8の回転速度を設定す
れば、今度は望ましい攪拌が行われないために、地盤G
の改良品質に悪影響がでることになる。
However, in the conventional ground improvement method and ground improvement device as described above,
The following problems exist. First, ground improvement device 1 '
In, the stirring blade 5 and the screw blade 9 rotate integrally. Therefore, if the lifting speed and the rotation speed of the stirring blade 5 are set to be constant so that the required improved quality of the ground G can be obtained, the screw blade 9 that is lifted and rotated at the same speed as the stirring blade 5 has a geological condition. When it changes, it is not possible to discharge the amount of earth and sand corresponding to the supply amount of the solidifying material slurry, which may cause a decrease in earth pressure due to excessive earth discharge or an increase in earth pressure due to insufficient earth discharge. . On the contrary, if the rotation speed of the screw blades 9, that is, the screw rod 8 is set so that the required amount of soil removal can be obtained when the geological conditions change, the desired agitation will not be performed this time. G
Will have an adverse effect on the improved quality of.

【0008】あるいは、地盤Gの改良品質に見合った回
転速度でスクリューロッド8を作動させた状態で必要な
排土量を確保できるよう、翼径やピッチ等の異なる種々
のスクリュー翼9をあらかじめ用意することも考えられ
るが、多種多様のスクリュー翼9を多数製作するには多
大な費用がかかり、現実的ではない。
Alternatively, various screw blades 9 having different blade diameters and pitches are prepared in advance so that the required amount of soil can be secured while the screw rod 8 is operated at a rotation speed corresponding to the improved quality of the ground G. Although it is possible to do so, it is not practical to manufacture a large number of various types of screw blades 9 at a high cost.

【0009】加えて、改良すべき地盤Gの地質条件、す
なわち土質,地中の間隙比,地下水量等は均一であると
は限らず、深さによって異なっている場合が多い。 し
たがって、地質条件に応じて固化材スラリーの供給量を
深さによって変えるとしても、上記したように、これに
対応させてスクリュー翼9の回転速度等を制御して排土
量を変化させることは、改良品質を考慮して攪拌翼の回
転速度が優先して設定されるために不可能であるのが実
情である。
In addition, the geological conditions of the ground G to be improved, that is, the soil quality, the void ratio in the ground, the amount of groundwater, etc. are not always uniform, but often differ depending on the depth. Therefore, even if the supply amount of the solidifying material slurry is changed depending on the depth depending on the geological conditions, as described above, it is not possible to change the amount of soil discharged by controlling the rotation speed of the screw blades 9 or the like correspondingly. In fact, it is impossible because the rotation speed of the stirring blade is preferentially set in consideration of the improved quality.

【0010】このようにして、地盤Gの改良品質と、土
圧上昇あるいは過剰排土による土圧下降の防止という、
双方の目的を満足するのは、施工管理上重要でありなが
らきわめて困難なものとなっている。本発明は、以上の
ような点を考慮してなされたもので、地質に見合った排
土を行って土圧の上昇や下降を抑さえ、低コストで地盤
を改良することのできる地盤改良工法および地盤改良装
置を提供することを目的とする。
In this way, the improved quality of the ground G and the prevention of the earth pressure decrease due to the earth pressure increase or the excessive earth discharge,
It is extremely difficult to satisfy both purposes, though important for construction management. The present invention has been made in consideration of the above points, and a soil improvement method capable of performing soil removal commensurate with the geology and suppressing an increase or decrease in soil pressure and improving the ground at low cost. It is also an object of the present invention to provide a ground improvement device.

【0011】[0011]

【課題を解決するための手段】請求項1に係る発明は、
螺旋状のスクリュー翼を備えたスクリューロッドと、掘
削攪拌翼と、固化材供給手段とを備えた地盤改良装置を
用い、前記掘削攪拌翼で地盤を定められた深度まで掘進
した後、前記固化材供給手段で地盤中に固化材を供給す
るとともに、前記掘削攪拌翼で前記固化材と前記地盤中
の土砂とを攪拌混合しつつ、前記スクリューロッドで固
化材供給量に応じて地盤中の余剰の土砂を地上に排土す
ることによって地盤を改良するときに、予め、改良すべ
き前記地盤の地質条件に応じて単位時間当たりの所定の
排土量を設定し、スクリュー翼を備えたスクリュー付き
シャフト区間と、スクリュー翼を備えないスクリュー無
しシャフト区間とを適宜長に設けることによって、前記
所定の排土量となるように前記スクリューロッドを構成
しておき、前記地盤の地質条件に応じて、前記固化材供
給手段での前記固化材の単位時間当り供給量を制御する
ことを特徴としている。このように、地盤改良装置を用
いて地盤を改良するときに、予め、改良すべき前記地盤
の深さ毎の地質条件に応じて、スクリュー付きシャフト
区間とスクリュー無しシャフト区間とを適宜長に設ける
ことによって所定の排土量となるようにスクリューロッ
ドを構成しておき、固化材供給手段での固化材の単位時
間当り供給量を制御する構成とした。そして、供給すべ
き固化材の量が多い地質条件の場合にはスクリュー付き
シャフトの区間を長くし、供給すべき固化材の量が少な
い地質条件の場合にはスクリュー無しシャフトの区間を
長くするよう、スクリューロッドを構成する。そして、
前記地盤条件に対応させた量の固化材を固化材供給手段
で供給しつつ、スクリューロッドを一定速度で引揚げつ
つ定速度回転させると、固化材の供給量と排土量とを地
質条件に対応させたものとすることが可能となる。
The invention according to claim 1 is
A screw rod having a spiral screw blade, an excavation stirring blade, and a ground improvement device having a solidifying material supply means are used to excavate the ground with the drilling stirring blade to a predetermined depth, and then the solidified material. While supplying the solidifying material into the ground by the supplying means, while stirring and mixing the solidifying material and the earth and sand in the ground by the excavation stirring blade, the excess of the solid material in the ground depending on the solidified material supply amount by the screw rod. When the soil is improved by discharging earth and sand to the ground, a predetermined amount of discharged soil per unit time is set in advance according to the geological conditions of the ground to be improved, and a shaft with a screw equipped with a screw blade. The screw rod is configured so that the predetermined amount of soil is discharged by providing a section and a shaft section without a screw having no screw blade in an appropriate length. Depending on the geological conditions, it is characterized by controlling the unit time per supply amount of the solidifying material in the solidifying material supply means. In this way, when the ground is improved by using the ground improvement device, a shaft section with a screw and a shaft section without a screw are provided in an appropriate length in advance according to the geological condition for each depth of the ground to be improved. In this way, the screw rod is configured so that the amount of discharged soil is predetermined, and the amount of the solidified material supplied by the solidified material supply unit per unit time is controlled. Then, in the case of geological conditions in which the amount of solidified material to be supplied is large, the section of the shaft with a screw should be lengthened, and in the case of geological conditions in which the quantity of solidified material to be supplied is small, the section of the shaft without a screw should be long. , Constitute a screw rod. And
While supplying the solidifying material in an amount corresponding to the ground conditions by the solidifying material supply means, when the screw rod is rotated at a constant speed while being lifted at a constant speed, the solidified material supply amount and the soil discharge amount are set to the geological conditions. It becomes possible to correspond.

【0012】請求項2に係る発明は、請求項1記載の地
盤改良工法であって、予め、前記スクリュー付きシャフ
トのスクリュー翼の外径が異なるものを複数種用意して
おき、前記改良すべき地盤の地質条件に応じて、前記ス
クリューロッドに設ける前記スクリュー付きシャフトの
前記スクリュー翼の外径を変えることを特徴としてい
る。これにより、例えば上方部分に外径の大きなスクリ
ュー翼を備えたスクリュー付きシャフトを位置させたよ
うな場合においては、上方部分のほうが下方部分よりも
多くの排土量を確保することが可能となり、下方からの
排土による上方部分の土圧上昇を防止することができ
る。
The invention according to claim 2 is the ground improvement method according to claim 1, wherein a plurality of types having different outer diameters of screw blades of the shaft with a screw are prepared in advance, and the improvement should be made. The outer diameter of the screw blade of the screw shaft provided on the screw rod is changed according to the geological condition of the ground. As a result, for example, in the case where a shaft with a screw having a large outer diameter screw blade is located in the upper portion, it is possible to secure a larger amount of soil discharged in the upper portion than in the lower portion, It is possible to prevent the soil pressure from rising in the upper part due to soil discharge from below.

【0013】請求項3に係る発明は、請求項1または2
記載の地盤改良工法であって、前記地盤改良装置の前記
掘削攪拌翼が、改良すべき地盤の定められた深さにまで
到達したときに、該地盤の地表よりも上方位置まで前記
スクリュー付きシャフトが位置するよう、前記スクリュ
ーロッドを構成することを特徴としている。これによ
り、最深の深度部付近の施工時に、地表近傍において、
確実に排土することが可能となり、下方からの排土によ
る地表部付近の土圧上昇を防止することができ、従って
深部における土圧の上昇をも防止することになる。
The invention according to claim 3 is the invention according to claim 1 or 2.
The ground improvement method according to claim 1, wherein when the excavation and stirring blade of the ground improvement device reaches a predetermined depth of the ground to be improved, the screw shaft is provided to a position above the ground surface of the ground. Is characterized in that the screw rod is configured so that As a result, at the time of construction near the deepest depth, near the ground surface,
It is possible to surely remove the soil, and it is possible to prevent the soil pressure near the ground surface from increasing due to soil discharging from below, and thus prevent the soil pressure from increasing in the deep area.

【0014】請求項4に係る発明は、軸線回りに回転駆
動自在でかつ上下動自在に設けられたスクリューロッド
と、該スクリューロッドの先端部に設けられて地盤を攪
拌しつつ掘削する掘削攪拌翼と、該掘削攪拌翼の近傍に
備えられて地盤中に固化材を供給する固化材供給機構
と、該固化材供給機構での固化材の供給量を制御する制
御部とを備えてなり、前記スクリューロッドが、管体の
外周面に螺旋状のスクリュー翼を備えたスクリュー付き
シャフトと、前記スクリュー付きシャフトの管体と同径
を有した管体からなるスクリュー無しシャフトとを着脱
自在に接続してなる構成とされていることを特徴として
いる。これにより、地盤の地質条件に応じて、地盤を所
定の品質に改良することができる。また、改良すべき地
盤の地質条件、言い換えれば固化材の供給量に応じてス
クリュー付きシャフト区間とスクリュー無し区間とを適
宜長に設ける際に、適宜長のスクリュー無しシャフトを
着脱自在に組み合わせることによって、所定の排土量と
なるようにスクリューロッドを構成することができ、地
質条件に応じて所定の排土量の調節や設定をおこなうこ
とができる。しかも、改良すべき地盤の地質条件に応じ
てスクリュー無しシャフトのみの組み合わせや組み込み
長さを変化させるだけでも、地質条件の異なる他の現場
にこの地盤改良装置を最適の構成として用いることがで
きる。
According to a fourth aspect of the present invention, there is provided a screw rod rotatably driven about an axis and vertically movable, and an excavation stirring blade provided at the tip of the screw rod for excavating the ground while stirring. And a solidifying material supply mechanism which is provided near the excavating and stirring blade and supplies the solidifying material into the ground, and a control unit which controls a supply amount of the solidifying material in the solidifying material supply mechanism, The screw rod detachably connects a screw shaft having a spiral screw blade on the outer peripheral surface of the pipe body and a screwless shaft made of a pipe body having the same diameter as the pipe body of the screw shaft. It is characterized by being configured as follows. Thereby, the ground can be improved to a predetermined quality according to the geological conditions of the ground. Further, when the geological condition of the ground to be improved, in other words, the shaft section with a screw and the section without a screw according to the supply amount of the solidifying material are provided with an appropriate length, a screwless shaft of an appropriate length is detachably combined. The screw rod can be configured so as to have a predetermined amount of discharged soil, and the predetermined amount of discharged soil can be adjusted or set according to geological conditions. Moreover, the ground improvement apparatus can be used as an optimum configuration for other sites where the geological conditions are different, simply by changing only the combination of the shafts without screws and changing the built-in length according to the geological conditions of the ground to be improved.

【0015】[0015]

【発明の実施の形態】以下、本発明を、図1および図2
にそれぞれ示す第一および第二の実施の形態を参照して
説明する。
BEST MODE FOR CARRYING OUT THE INVENTION The present invention will be described below with reference to FIGS.
Will be described with reference to the first and second embodiments respectively shown in FIG.

【0016】[第一の実施の形態]まず、第一の実施の
形態においては、スクリューロッドに備えるスクリュー
付きシャフトのスクリュー翼径を一定とする場合の例を
用いて説明する。図1は、本発明に係る地盤改良装置の
一例を示すものである。
[First Embodiment] First, the first embodiment will be described using an example in which the screw blade diameter of a shaft with a screw provided in a screw rod is constant. FIG. 1 shows an example of a ground improvement device according to the present invention.

【0017】図1に示すように、地盤改良装置10は、
移動用の無限軌道キャタピラー等を備えた図示しない本
体に、地盤Gを削孔,攪拌するための削孔・攪拌機構1
1が、図示しない昇降機構によって昇降自在に備えられ
た構成となっている。削孔・攪拌機構11は、二本のス
クリューロッド12,12と、各スクリューロッド12
の下端部に設けられた攪拌翼(掘削攪拌翼)13,14
とを備えた概略構成とされている。
As shown in FIG. 1, the ground improvement device 10 includes
A boring / stirring mechanism 1 for boring and agitating the ground G in a main body (not shown) equipped with an endless track caterpillar for movement 1
1 is configured to be lifted and lowered by an elevator mechanism (not shown). The drilling / stirring mechanism 11 includes two screw rods 12 and 12, and each screw rod 12
Stirring blades (excavation stirring blades) 13 and 14 provided at the lower end of the
It has a schematic configuration including and.

【0018】スクリューロッド12,12は、それぞ
れ、その上端部が、駆動モータ(駆動源)16に減速機
(図示なし)を介して接続されて支持されており、この
駆動モータ16の駆動により、各スクリューロッド12
が軸線回りに回転駆動されるようになっている。また、
スクリューロッド12,12の下端部には干渉バンド1
8が設けられており、これらの離間間隔を保つようにな
っている。
The upper ends of the screw rods 12 and 12 are connected to and supported by a driving motor (driving source) 16 via a speed reducer (not shown). By driving the driving motor 16, Each screw rod 12
Is driven to rotate around the axis. Also,
An interference band 1 is provided at the lower end of the screw rods 12, 12.
8 are provided so as to maintain the distance between them.

【0019】各スクリューロッド12は、干渉バンド1
8よりも上側の部分が、管体19aの外周面に、攪拌し
た土砂を排出するため一定の外径を有して螺旋状に連続
するスクリュー翼19bが形成されてなるスクリュー付
きシャフト19と、管体19aと同一外径寸法を有した
管体20aからなるスクリュー無しシャフト20とが連
結されて、地盤条件に応じて所定の排土量となるように
設定された適宜長のスクリュー無し区間が設けられてい
る構成とされている。そして、この適宜長のスクリュー
無しシャフト区間を設ける際には、事前に所定の引揚げ
速度と回転速度における排土量試験を行うなどすればよ
い。これらスクリュー付きシャフト19と、スクリュー
無しシャフト20とは、図示しない適宜のジョイント機
構によって、着脱自在に連結されている。
Each screw rod 12 has an interference band 1
The upper part of 8 is a shaft 19 with a screw, in which a screw blade 19b is formed on the outer peripheral surface of the tubular body 19a, the screw blade 19b having a constant outer diameter and a spiral outer surface for discharging the stirred earth and sand, The screwless shaft 20 composed of the tubular body 20a having the same outer diameter as the tubular body 19a is connected to form a screwless section of an appropriate length set so that a predetermined amount of soil is discharged according to the ground condition. It is configured to be provided. Then, when the shaft section without a screw having an appropriate length is provided, a soil removal amount test at a predetermined lifting speed and rotation speed may be performed in advance. The shaft 19 with a screw and the shaft 20 without a screw are detachably connected by an appropriate joint mechanism (not shown).

【0020】また、攪拌翼13,14は、平面視、互い
に直交するように設けられている。下端側の攪拌翼13
の先端には、効率よく地盤Gを掻き回すためのビット1
3a,13a,…が設けられている。
The stirring blades 13 and 14 are provided so as to be orthogonal to each other in plan view. Lower end stirring blade 13
Bit 1 for efficiently agitating the ground G at the tip of the
3a, 13a, ... Are provided.

【0021】そして、攪拌翼13,14の翼元には、そ
れぞれ、固化材、例えばセメントスラリー等を吐出する
ための固化材吐出口22が設けられている。各固化材吐
出口22には、スクリューロッド12内を通る図示しな
いスラリーホースまたはスラリーパイプの一端が接続さ
れている。そして、このスラリーホース(図示なし)の
他端は、セメントスラリーを所定の配合で混練して製造
するとともに、予め入力されたデータに基づき所定量の
セメントスラリーを供給する制御部を備えたスラリー製
造装置(図示なし)に接続されている。これら固化材吐
出口22,スラリーホース(図示なし),スラリー製造
装置(図示なし)から固化材供給機構(固化材供給手
段)23が構成されている。
The blades of the stirring blades 13 and 14 are respectively provided with a solidifying material discharge port 22 for discharging a solidifying material such as cement slurry. One end of a slurry hose or slurry pipe (not shown) that passes through the screw rod 12 is connected to each solidified material discharge port 22. The other end of this slurry hose (not shown) is manufactured by kneading and manufacturing cement slurry with a predetermined composition, and is also provided with a controller for supplying a predetermined amount of cement slurry based on previously input data. It is connected to a device (not shown). A solidification material supply mechanism (solidification material supply means) 23 is constituted by the solidification material discharge port 22, the slurry hose (not shown), and the slurry manufacturing device (not shown).

【0022】この固化材供給機構23では、必要に応じ
て、スラリー製造装置(図示なし)で製造したセメント
スラリーを送り出し、これをスラリーホース(図示な
し)を通して固化材吐出口22から噴出させる構成とな
っている。
In the solidifying material supply mechanism 23, cement slurry produced by a slurry producing device (not shown) is sent out as needed, and is ejected from the solidifying material outlet 22 through a slurry hose (not shown). Has become.

【0023】次に、上記のような構成の地盤改良装置1
0を用いて行う場合の地盤改良工法の実施の形態につい
て説明する。これには、予め、改良すべき地盤Gの地質
条件、すなわち土質,地中間隙比,地下水量等の諸デー
タに基づき、固化材供給機構23の制御部(図示なし)
に、セメントスラリーの供給量データを入力しておく。
また、このセメントスラリーの供給量データに基づき、
攪拌翼13,14が所定の最深の深さに到達した状態
で、地盤Gの地表G1までスクリュー付きシャフト19
のスクリュー翼19bが位置するよう、スクリュー付き
シャフト19,19,…と、スクリュー無しシャフト2
0,20,…とを組み合わせてスクリューロッド12,
12を組み立てておく。
Next, the ground improvement device 1 having the above-mentioned structure.
An embodiment of the ground improvement method when 0 is used will be described. For this purpose, the control unit (not shown) of the solidifying material supply mechanism 23 is preliminarily based on the geological conditions of the ground G to be improved, that is, various data such as soil quality, underground void ratio, and groundwater volume.
Input the cement slurry supply amount data.
Also, based on this cement slurry supply amount data,
With the stirring blades 13 and 14 reaching the predetermined deepest depth, the shaft 19 with screw up to the ground surface G1 of the ground G
, So that the screw blades 19b of the
0, 20, ... in combination with the screw rod 12,
12 is assembled.

【0024】そして、実際に地盤改良作業を行うには、
まず、地盤Gの所定の箇所に、スクリューロッド12,
12を位置決めする。次に、駆動モータ16でスクリュ
ーロッド12,12を図中符号(イ)に示す方向に回転
駆動させることによって、攪拌翼13,14を回転させ
つつ、自重によって、削孔・攪拌機構11を地盤Gに貫
入させ掘進していく。
Then, in order to actually perform the ground improvement work,
First, at a predetermined location of the ground G, the screw rod 12,
Position 12 Next, by rotating the screw rods 12 and 12 in the direction indicated by reference numeral (a) in the drawing by the drive motor 16, the stirring blades 13 and 14 are rotated and the drilling / agitation mechanism 11 is grounded by its own weight. Go into G and continue to dig.

【0025】このようにして、攪拌翼13,14で地盤
Gを所定の深さまで削進した時点で、削孔・攪拌機構1
1の下降を停止させる。
In this way, when the ground G is cut to a predetermined depth by the stirring blades 13 and 14, the drilling / stirring mechanism 1
Stop the descent of 1.

【0026】続いて、スラリー製造装置側(図示なし)
に貯蔵されているセメントスラリーを各スクリューロッ
ド12の下方側の攪拌翼13、13の翼元に設けられた
固化材吐出口22から地盤G中に吐出させつつ、削孔・
攪拌機構11をさらに下降させ、攪拌翼13,14によ
る削孔を続行する。このとき、固化材吐出口22から吐
出されたセメントスラリーは、攪拌翼13,14によっ
て地盤G中の土砂に攪拌・混合される。
Next, the slurry manufacturing apparatus side (not shown)
While discharging the cement slurry stored in the ground into the ground G from the solidifying material discharge port 22 provided at the blade base of the stirring blades 13, 13 below the screw rods 12,
The stirring mechanism 11 is further lowered and the drilling by the stirring blades 13 and 14 is continued. At this time, the cement slurry discharged from the solidifying material discharge port 22 is stirred and mixed with the soil in the ground G by the stirring blades 13 and 14.

【0027】この後、上方側に位置する攪拌翼14,1
4が、所定の深さあるいは固化材を導入済みの深さにま
で達したら、削孔・攪拌機構11の下降を停止させる。
続いて、必要に応じてスクリューロッド12,12を回
転させたままの状態でセメントスラリーを下方側の攪拌
翼13,13の翼元に設けられた固化材吐出口22,2
2から地盤G中に一定時間噴出させて先端処理を行う。
After this, the stirring blades 14, 1 located on the upper side
When 4 reaches a predetermined depth or a depth at which the solidifying material has been introduced, the descent of the drilling / agitation mechanism 11 is stopped.
Subsequently, if necessary, the cement slurry is kept in a state where the screw rods 12 and 12 are rotated, and the cement slurry is discharged from the solidifying material discharge ports 22 and 2 provided at the blade bases of the lower stirring blades 13 and 13.
The tip treatment is carried out by ejecting from 2 into the ground G for a certain period of time.

【0028】上記先端処理の完了後、セメントスラリー
の吐出口を攪拌翼14,14の翼元に設けられた固化材
吐出口22,22に切り替える。そして、削孔・攪拌機
構11を引き上げつつ、攪拌翼13,14によって、攪
拌翼14,14の翼元に設けられた固化材吐出口22,
22から吐出するセメントスラリーを地盤G中の土砂と
攪拌混合しつつ削孔・攪拌機構11を引き揚げる。この
とき、固化材吐出口22,22からのセメントスラリー
の吐出量は、制御部に予め入力された前記供給量データ
に基づいて地盤の地質条件に応じて制御されるようにな
っている。
After the completion of the above-mentioned tip treatment, the discharge port of the cement slurry is switched to the solidified material discharge ports 22 and 22 provided at the bases of the stirring blades 14 and 14. Then, while raising the boring / stirring mechanism 11, by the stirring blades 13 and 14, the solidifying material discharge port 22 provided at the base of the stirring blades 14 and 14,
The cement slurry discharged from 22 is stirred and mixed with the soil in the ground G, and the drilling / agitation mechanism 11 is pulled up. At this time, the discharge amount of the cement slurry from the solidifying material discharge ports 22 and 22 is controlled according to the geological condition of the ground based on the supply amount data previously input to the control unit.

【0029】一方、スクリューロッド12,12におい
ては、攪拌翼21,21が所定の深さに到達した後にお
ける各スクリュー翼19bの回転とスクリューロッド1
2、12の引き揚げにより、各スクリュー付きシャフト
19の部分の土砂が上方に移動されることになる。ま
た、各スクリュー無しシャフト20の部分の土砂は、そ
の下方から移動されてくるスクリュー付きシャフト19
の部分の土砂によって上方に押し上げられるようにな
り、その土圧はほぼ一定に保たれることにより土圧の変
動による地盤の盛り上がりや側方変位などを防止するこ
とになる。そして、このようにしてスクリューロッド1
2,12の回転と引き揚げとにより上方に移動された土
砂は、地表G1よりも上方まで位置するスクリュー付き
シャフト19のスクリュー翼19bによって、特に最深
部付近の施工時において確実に地表に排土されるように
なっている。
On the other hand, in the screw rods 12 and 12, the rotation of each screw blade 19b and the screw rod 1 after the stirring blades 21 and 21 reach a predetermined depth.
Due to the lifting of Nos. 2 and 12, the earth and sand in the portion of the shaft with screw 19 is moved upward. In addition, the earth and sand of each shaft 20 without a screw has a shaft 19 with a screw that is moved from below.
It will be pushed up by the earth and sand in the area, and the earth pressure will be kept almost constant to prevent the ground from rising and lateral displacement due to the fluctuation of earth pressure. And in this way the screw rod 1
The earth and sand that have been moved upward by the rotation and pulling of Nos. 2 and 12 are reliably discharged to the surface of the earth by the screw blades 19b of the shaft 19 with a screw located above the surface of the earth G1, especially during construction near the deepest part. It has become so.

【0030】上記のようにして、地盤G中に吐出されて
土砂と攪拌混合されたセメントスラリーの水和反応,こ
の水和反応による水和生成物と粘土鉱物とのイオン交換
作用,あるいはポゾラン反応等を主体とする化学的固結
反応によって、土が化学的に固化し、これによって地盤
G中に円柱状の改良杭が造成される。このとき、前記の
ように構成された上記スクリューロッド12,12での
所定量の排土と地質条件に応じた固化材の供給とによっ
て、セメントスラリーの供給による地盤Gの体積膨張,
土圧の上昇を抑さえるとともに、過剰排土による土圧の
低下をも防止するようになっている。
As described above, the hydration reaction of the cement slurry discharged into the ground G and stirred and mixed with the earth and sand, the ion exchange action between the hydration product of this hydration reaction and the clay mineral, or the pozzolanic reaction The soil is chemically solidified by the chemical consolidation reaction mainly composed of, etc., whereby a columnar improved pile is formed in the ground G. At this time, the volume expansion of the ground G by the supply of the cement slurry by the discharge of a predetermined amount by the screw rods 12, 12 configured as described above and the supply of the solidifying material according to the geological condition,
It suppresses the rise of soil pressure and also prevents the decrease of soil pressure due to excessive soil removal.

【0031】この後、上記の工程を繰り返して、他の所
定の位置に所定本数の改良杭を順次造成していくことに
より、地盤Gの改良が完了する。
After that, the above steps are repeated to sequentially form a predetermined number of improved piles at other predetermined positions to complete the improvement of the ground G.

【0032】上述した地盤改良工法では、固化材供給機
構23でのセメントスラリーの供給量を、地盤Gの地質
条件に応じて制御するとともに、改良すべき地盤Gの地
質条件に応じて、所定の排土量となるようにスクリュー
付きシャフト19とスクリュー無しシャフト20とが適
宜長ごとに位置するように各々の長さを設定して設けら
れて、スクリューロッド12,12を構成するようにし
ている。このようにして、地盤Gの地質条件に対応させ
て、所定の排土量となるように設定したスクリューロッ
ドを採用して施工することによって、地盤を全体的に高
品質に改良することが可能となる。また、セメントスラ
リーの供給量が多い地質条件においても、セメントスラ
リーの供給量が少ない地質条件においても、スクリュー
無しシャフト20の区間の長さの変更または調節をする
ことのみによって排土量を所定の排土量になるようにす
ることができる。このようにして、土圧の上昇や過剰排
土による土圧の降下を防止して周囲の既設地中構造物や
近隣地盤に悪影響が及んだりする原因を排除するので、
地表が盛り上がったり沈下したり、あるいは近隣構造物
に土圧を負荷したりするのを防ぐことが可能となる。
In the ground improvement method described above, the amount of cement slurry supplied by the solidifying material supply mechanism 23 is controlled in accordance with the geological conditions of the ground G, and a predetermined amount is also specified in accordance with the geological conditions of the ground G to be improved. The screw rods 12 and 12 are configured by setting the lengths of the shafts with screws 19 and the shafts without screws 20 at appropriate lengths so that the amount of soil can be removed. . In this way, by adapting to the geological conditions of the ground G and adopting the screw rod set so that a predetermined amount of soil is discharged, it is possible to improve the ground as a whole with high quality. Becomes In addition, even under geological conditions in which the supply amount of cement slurry is large and in geological conditions in which the supply amount of cement slurry is small, the amount of soil to be discharged can be determined only by changing or adjusting the length of the section of the shaft 20 without screw. The amount of soil removed can be adjusted. In this way, the rise of soil pressure and the fall of soil pressure due to excessive soil removal are prevented, and the cause of adversely affecting surrounding existing underground structures and neighboring ground is eliminated.
It is possible to prevent the surface of the earth from rising, sinking, or applying earth pressure to neighboring structures.

【0033】また、最深の深度時において、スクリュー
ロッド12,12を、地盤Gの地表G1よりも上方位置
までスクリュー付きシャフト20が位置するような構成
とした。これにより、土圧が最も大きい最深の深度部の
セメントスラリー供給時に、地表G1付近において確実
に排土を行うことが可能となり、従来の地盤改良装置
1’のようにスクリュー翼8が地表G1付近にまで形成
されていない場合に生じていた、地表G1付近における
土圧の上昇を抑さえるとともに深部土圧をも低減するこ
とができる。したがって、このような構成により、特に
地表G1近傍に埋設されていることの多い各種配管や構
築物等に対して土圧の上昇による悪影響を及ぼすのを防
ぐことができる。
Further, at the deepest depth, the screw rods 12 and 12 are arranged so that the shaft 20 with a screw is positioned above the ground surface G1 of the ground G. As a result, it becomes possible to reliably discharge the soil near the ground surface G1 when the cement slurry is supplied to the deepest portion where the earth pressure is the largest, and the screw blades 8 are located near the ground surface G1 as in the conventional ground improvement device 1 '. It is possible to suppress an increase in earth pressure near the ground surface G1 that occurs when the ground pressure is not formed up to 1 and to reduce the deep earth pressure. Therefore, with such a configuration, it is possible to prevent adverse effects due to an increase in earth pressure on various pipes and structures often buried in the vicinity of the ground surface G1.

【0034】また、上述した地盤改良装置10では、ス
クリューロッド12,12が、スクリュー付きシャフト
19とスクリュー無しシャフト20を着脱自在に接続し
てなる構成とされている。このような構成により、地盤
Gの地質条件に応じて所定の排土量となるように、スク
リュー付きシャフト19に対してスクリュー無しシャフ
ト20を適宜長に構成して組み合わせることによって、
上記地盤改良工法を実現し得ることができる。しかも、
スクリュー付きシャフト19とスクリュー無しシャフト
20の組み合わせを、改良すべき地盤Gの地質条件に応
じて容易に組み替えることができるので、地質条件の異
なる他の現場にも、この地盤改良装置10に組み込むス
クリュー無しシャフトの長さを変化させるのみで用いる
ことができる。このようにして、この地盤改良装置10
が高い汎用性を有したものとなり、結果的に、各現場に
おける地盤改良コストを低減することが可能となる。
Further, in the ground improvement device 10 described above, the screw rods 12 and 12 are constructed so that the shaft 19 with a screw and the shaft 20 without a screw are detachably connected. With such a configuration, by combining the screwless shaft 20 with the screwless shaft 20 in an appropriate length so that a predetermined amount of soil is discharged according to the geological conditions of the ground G,
The ground improvement method can be realized. Moreover,
Since the combination of the shaft 19 with a screw and the shaft 20 without a screw can be easily rearranged according to the geological conditions of the ground G to be improved, the screw to be incorporated in the ground improvement device 10 at other sites where the geological conditions are different. None Can be used only by changing the length of the shaft. In this way, this ground improvement device 10
Has high versatility, and as a result, it becomes possible to reduce the ground improvement cost at each site.

【0035】なお、上記した第一の実施の形態では、ス
クリュー付きシャフト19とスクリュー無しシャフト2
0との間にジョイント機構(図示なし)を設けてスクリ
ューロッド12を行使しているが、ジョイント機構はこ
の位置に限定するものではなく、必要に応じて任意の位
置に設けてよい。
In the above first embodiment, the shaft 19 with screw and the shaft 2 without screw are used.
The screw rod 12 is exercised by providing a joint mechanism (not shown) with 0, but the joint mechanism is not limited to this position and may be provided at any position as necessary.

【0036】[第二の実施の形態]次に、本発明にかか
る地盤改良装置および地盤改良工法の第二の実施の形態
を示す。 ここで、以下に説明する第二の実施の形態の
地盤改良装置と、前記第一の実施の形態の地盤改良装置
10との相違点は、スクリューロッド12,12を構成
するスクリュー付きシャフト19のスクリュー翼19b
の径を変化させているという点のみである。したがっ
て、以下の説明において、前記第一の実施の形態の地盤
改良装置10と共通する構成については、同一符号を付
し、その説明を省略する。
[Second Embodiment] Next, a second embodiment of the ground improvement apparatus and ground improvement method according to the present invention will be described. Here, the difference between the ground improvement device of the second embodiment described below and the ground improvement device 10 of the first embodiment is that the shaft with screw 19 forming the screw rods 12, 12 Screw wing 19b
The only difference is that the diameter of is changed. Therefore, in the following description, the same components as those of the ground improvement device 10 of the first embodiment are designated by the same reference numerals, and the description thereof will be omitted.

【0037】図2に示すように、地盤改良装置30は、
前記第一の実施の形態と同様に、昇降自在に設けられた
削孔・攪拌機構11が、二本のスクリューロッド1
2’,12’と、攪拌翼13,14と、固化材供給機構
23とを備えた概略構成とされている。
As shown in FIG. 2, the ground improvement device 30 has
Similar to the first embodiment, the drilling / stirring mechanism 11 provided so as to be able to move up and down has two screw rods 1.
2'and 12 ', stirring blades 13 and 14, and a solidifying material supply mechanism 23 are provided.

【0038】各スクリューロッド12は、スクリュー付
きシャフト19と、スクリュー無しシャフト20とが、
図示しないジョイント部材によって着脱自在に連結され
ることによって構成されている。このスクリュー付きシ
ャフト19には、外周面に形成されたスクリュー翼19
の翼径が異なる、例えば3種類のものが用意されてい
る。
Each screw rod 12 has a shaft 19 with a screw and a shaft 20 without a screw.
It is configured by being detachably connected by a joint member (not shown). The screw shaft 19 has screw blades 19 formed on the outer peripheral surface.
Different blade diameters, for example, three types are prepared.

【0039】次に、このような構成の地盤改良装置30
を用いた場合の地盤改良工法の実施の形態について説明
する。これには、予め、改良すべき地盤Gの地質条件に
対応して、固化材供給機構23の制御部(図示なし)
に、セメントスラリーの供給量データを入力しておく。
そして、このセメントスラリーの供給量データに対応さ
せた排土量となるように、スクリュー付きシャフト19
に対するスクリュー無しシャフト20の長さを設定し
て、スクリューロッド12,12を構成する。例えば、
セメントスラリーの供給量と、バランスのとれる排土量
となるように、スクリュー翼19bの翼径の異なるスク
リュー付きシャフト19A,19B,19Cと、スクリ
ュー無しシャフト20,20,…とを配置して構成す
る。
Next, the ground improvement device 30 having such a configuration.
An embodiment of the ground improvement method using the above will be described. For this purpose, a control unit (not shown) of the solidifying material supply mechanism 23 is prepared in advance corresponding to the geological condition of the ground G to be improved.
Input the cement slurry supply amount data.
Then, the shaft 19 with a screw is installed so that the amount of soil discharged corresponds to the supplied amount data of the cement slurry.
The length of the screwless shaft 20 relative to the screw rods 12 and 12 is set. For example,
The shafts with screws 19A, 19B, 19C having different blade diameters of the screw blades 19b and the shafts without screws 20, 20, ... Are arranged so that the amount of cement slurry supplied and the amount of discharged soil can be balanced. To do.

【0040】この後、前記第一の実施の形態と全く同様
にして、攪拌翼13,14の下降による所定深さまでの
掘削、固化材供給機構23による先端処理等を行った
後、地中に供給したセメントスラリーを攪拌翼13,1
4で混合攪拌しつつ、スクリューロッド12’,12’
の回転引き揚げによる排土を行うことによって、地盤G
を改良していく。
Thereafter, in exactly the same manner as in the first embodiment, the stirring blades 13 and 14 are lowered to excavate to a predetermined depth, the solidifying material supply mechanism 23 performs tip treatment, and the like. Stirring blades 13 and 1 for the supplied cement slurry
Screw rods 12 ', 12' while mixing and stirring in 4
The ground G
To improve.

【0041】このとき、スクリューロッド12’,1
2’で排土を行うに際しては、スクリュー付きシャフト
19A,19B,19Cの各スクリュー翼19bの翼径
の大きさに対応して、翼径が大きいほど、より多くの土
砂が排土されるようになっている。
At this time, the screw rods 12 ', 1
When the soil is discharged at 2 ', the larger the blade diameter, the more soil is discharged according to the blade diameter of each screw blade 19b of the shaft 19A, 19B, 19C with screw. It has become.

【0042】上述した地盤改良工法では、上記第一の実
施の形態と全く同様の効果を奏することができる。加え
て、改良すべき地盤Gの現場毎の地質の相異に対応し
て、スクリュー翼19bの翼径の異なる複数種のスクリ
ュー付きシャフト19A,19B,19Cに対して、ス
クリュー無しシャフト20の長さを設定して組み合わせ
ることによって、スクリューロッド12’,12’を構
成するようになっている。これにより、改良すべき地盤
Gの地質条件が大きく相異する現場の場合にも、その相
異に応じて、排土量を変更させることができ、この場合
においても、土圧の上昇を招くことなく、全体を高品質
に地盤改良することができる。
The ground improvement method described above can achieve the same effects as those of the first embodiment. In addition, the length of the screwless shaft 20 is different from that of the shafts 19A, 19B, 19C with a plurality of types of screws having different blade diameters of the screw blades 19b, corresponding to the difference in the geology of each site of the ground G to be improved. The screw rods 12 'and 12' are configured by setting and combining the heights. As a result, even in the case of a site where the geological conditions of the ground G to be improved differ greatly, the amount of discharged soil can be changed according to the difference, and in this case also, the earth pressure rises. It is possible to improve the ground with high quality without the need.

【0043】なお、上記第一および第二の実施の形態に
おいて、スクリュー付きシャフト19については、図3
に示すように、スクリュー翼19bを部分的または断片
的に設けたものとしてよい。
In the first and second embodiments, the screw shaft 19 is shown in FIG.
The screw blades 19b may be partially or partially provided as shown in FIG.

【0044】[0044]

【発明の効果】以上説明したように、請求項1に係る地
盤改良工法によれば、地盤改良装置を用いて地盤を改良
するときに、予め、改良すべき前記地盤の地質条件に応
じて、スクリュー付きシャフト区間とスクリュー無しシ
ャフト区間とを適宜長に設けることによって、所定の排
土量となるようにスクリューロッドを構成しておき、固
化材供給手段での固化材の単位時間当り供給量を、地盤
の地質条件に応じて制御する構成とした。このようにし
て固化材の供給量を制御することによって、現場毎の地
質条件に応じて地盤を高品質に改良することが可能とな
る。そして、固化材の供給量に応じてスクリュー付きシ
ャフト区間とスクリュー無しシャフト区間とを適宜長に
位置させることによって、固化材の供給量に応じて所定
量の排土を行うことができる。したがって、土圧の上昇
や下降を防ぐことができ、周囲の既設地中構造物等に悪
影響が及んだり、地表が盛り上がったり沈下したりする
のを防ぐことが可能となる。従って、既設構造物等と密
接する至近部においても、地盤改良区域と既設構造物や
隣接地等との間に保護用の緩衝孔や溝を設けるなどの隣
接保護工を省略することも可能となる。また、隣接保護
工を省略できる結果として、既設構造物や隣接地に密接
して地盤改良を施工することをも可能とすることができ
る。
As described above, according to the ground improvement method of the first aspect, when the ground is improved by using the ground improving device, the ground improvement condition is previously set according to the geological condition of the ground to be improved. By providing the shaft section with a screw and the shaft section without a screw with appropriate lengths, the screw rod is configured so as to achieve a predetermined amount of soil removal, and the solidified material supply amount per unit time by the solidified material supply means is set. , The structure is controlled according to the geological conditions of the ground. By controlling the supply amount of the solidifying material in this way, it becomes possible to improve the ground to a high quality according to the geological conditions at each site. Then, by arranging the shaft section with a screw and the shaft section without a screw to have appropriate lengths in accordance with the supply amount of the solidifying material, a predetermined amount of soil can be discharged according to the supply amount of the solidifying material. Therefore, it is possible to prevent the earth pressure from rising and falling, and prevent the surrounding existing underground structures from being adversely affected, and preventing the ground surface from rising or sinking. Therefore, it is possible to omit the adjacent protective works such as providing buffer holes or grooves for protection between the ground improvement area and the existing structure or the adjacent land even in the close proximity to the existing structure. Become. In addition, as a result that the adjacent protection work can be omitted, it is possible to perform the ground improvement in close contact with the existing structure or the adjacent land.

【0045】請求項2に係る地盤改良工法によれば、ス
クリュー付きシャフトのスクリュー翼の外径の異なるも
のを複数種用意しておき、改良すべき地盤の地質条件に
応じて、スクリューロッドに設けるスクリュー付きシャ
フトのスクリュー翼の外径を変える構成とした。これに
より、固化材の供給量の特に多い部分、例えば軟弱地盤
部等においては、スクリューロッドの最上部に外径の大
きなスクリュー翼を備えたスクリュー付きシャフトを配
置することによって、地上部付近においてより多くの排
土量を確保することができるので、最深部の施工時にお
いて、よりスムーズな排土が可能となる故、請求項1に
かかる効果をより一層顕著なものとすることができる。
According to the ground improvement method of the second aspect, a plurality of types of shafts with a screw having different outer diameters of screw blades are prepared and provided on the screw rod according to the geological conditions of the ground to be improved. It was configured to change the outer diameter of the screw blade of the shaft with a screw. As a result, in a portion where the supply amount of the solidifying material is particularly large, such as a soft ground portion, by disposing a shaft with a screw having a large outer diameter screw blade at the uppermost portion of the screw rod, it is possible to further improve the vicinity of the ground portion. Since a large amount of soil can be secured, smoother soil can be discharged during construction of the deepest part, so that the effect according to claim 1 can be further enhanced.

【0046】請求項3に係る地盤改良工法によれば、地
盤改良装置の掘削攪拌翼が地盤中定められた深さにまで
到達したときに、地表よりも上方位置までスクリュー付
きシャフトが位置するようスクリューロッドを設けてお
く構成とした。これにより、最深部の施工時において地
表近傍の排土を確実に行うことができ、地表近傍や深部
の土圧が上昇して地盤の側方変位や地表面の盛り上がり
が発生するのを防ぐことができる。
According to the ground improvement method of the third aspect, when the excavation and stirring blade of the ground improvement device reaches the depth determined in the ground, the shaft with a screw is positioned above the ground surface. A screw rod is provided in advance. As a result, it is possible to reliably discharge the soil near the surface of the earth when constructing the deepest part, and to prevent lateral displacement of the ground and rise of the ground surface due to rising earth pressure near the surface and in the deep part. You can

【0047】請求項4に係る地盤改良装置によれば、ス
クリューロッドと、掘削攪拌翼と、固化材供給機構と、
固化材の供給量を制御する制御部とを備え、スクリュー
ロッドを、スクリュー付きシャフトとスクリュー無しシ
ャフトとを着脱自在に接続してなる構成とした。このよ
うな構成により、現場の地盤の地質条件に応じてスクリ
ュー付きシャフトに対してスクリュー無しシャフトの長
さを自在に変更させて組み合わせることにより、請求項
1にかかる地盤改良工法を現場毎の地質条件に応じて実
現することができる。しかも、スクリュー付きシャフト
に対して組み合わせるスクリュー無しシャフトの長さ
を、改良すべき地盤の地質に応じて適宜長に容易に組み
替えることができるので、他の現場にもこの地盤改良装
置を適合させて用いることができ、この地盤改良装置が
高い汎用性を有したものとなる。この結果、スクリュー
ロッドの製作費のコストダウンに加えて、各現場におけ
る地盤改良コストをさらに低減することが可能となる。
According to the ground improvement device of the fourth aspect, the screw rod, the excavating stirring blade, the solidifying material supply mechanism,
The screw rod has a configuration in which a shaft with a screw and a shaft without a screw are detachably connected to each other. With such a configuration, the length of the shaft without screw can be freely changed and combined with the shaft with screw according to the geological conditions of the ground at the site, and the ground improvement method according to claim 1 It can be realized according to the conditions. Moreover, the length of the screwless shaft to be combined with the screwed shaft can be easily changed to an appropriate length according to the geology of the ground to be improved, so this ground improvement device can be adapted to other sites as well. It can be used, and the ground improvement device has high versatility. As a result, in addition to the cost reduction of the screw rod manufacturing cost, the ground improvement cost at each site can be further reduced.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係る地盤改良工法および地盤改良装置
の一例を示す立断面図である。
FIG. 1 is a vertical sectional view showing an example of a ground improvement method and a ground improvement apparatus according to the present invention.

【図2】本発明に係る地盤改良工法および地盤改良装置
の他の一例を示す立断面図である。
FIG. 2 is a vertical cross-sectional view showing another example of the ground improvement method and the ground improvement device according to the present invention.

【図3】本発明に係る地盤改良装置に備えるスクリュー
付きロッドの他の各例を示す正面図および平断面図であ
る。
3A and 3B are a front view and a plan sectional view showing other examples of a rod with a screw included in the ground improvement device according to the present invention.

【図4】従来の地盤改良工法および地盤改良装置の一例
を示す側断面図である。
FIG. 4 is a side sectional view showing an example of a conventional ground improvement method and ground improvement device.

【図5】従来の地盤改良工法および地盤改良装置の他の
一例を示す立断面図である。
FIG. 5 is a vertical cross-sectional view showing another example of a conventional ground improvement method and ground improvement device.

【符号の説明】[Explanation of symbols]

10,30 地盤改良装置 12,12’ スクリューロッド 13,14 攪拌翼(掘削攪拌翼) 19 スクリュー付きシャフト 19b スクリュー翼 20 スクリュー無しシャフト 22 固化材吐出口 23 固化材供給機構(固化材供給手段) 10,30 Ground improvement device 12,12 'Screw rod 13,14 Stirring blade (excavation stirring blade) 19 Shaft with screw 19b Screw blade 20 Shaft without screw 22 Solidified material discharge port 23 Solidified material supply mechanism (solidified material supply means)

───────────────────────────────────────────────────── フロントページの続き (72)発明者 上村 一義 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 (72)発明者 松本 久幸 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 (72)発明者 西村 晋一 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 (72)発明者 立田 芳彦 東京都台東区台東一丁目2番1号 不動建 設株式会社内 (72)発明者 杉山 勝英 東京都台東区台東一丁目2番1号 不動建 設株式会社内 (72)発明者 山本 実 東京都台東区台東一丁目2番1号 不動建 設株式会社内 (72)発明者 福田 厚生 東京都港区赤坂六丁目13番7号 株式会社 テノックス内 (72)発明者 上 周史 東京都港区赤坂六丁目13番7号 株式会社 テノックス内 (72)発明者 堀切 節 東京都港区赤坂六丁目13番7号 株式会社 テノックス内 ─────────────────────────────────────────────────── ─── Continued Front Page (72) Inventor Kazuyoshi Uemura 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Construction Co., Ltd. (72) Inventor Hisayuki Matsumoto 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Construction (72) Inventor Shinichi Nishimura 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Construction Co., Ltd. (72) Inventor Yoshihiko Tachida 1-2-1 Taito, Taito-ku, Tokyo Within Fudo Construction Co., Ltd. (72) Inventor Katsuhide Sugiyama, 1-2-1, Taito, Taito-ku, Tokyo Within Fudo Construction Co., Ltd. (72) Inventor Minoru Yamamoto 1-2-1, Taito, Taito-ku, Tokyo Within Fudo Construction Co., Ltd. (72 ) Inventor Fukuda Kosei 6-13-7 Akasaka, Minato-ku, Tokyo, inside Tenox Co., Ltd. (72) Inventor Kamifumi Kagami 6-13-7 Akasaka, Minato-ku, Tokyo Inside Tenox, Inc. ( 72) Inventor Shun Horikiri Tennox Co., Ltd. 6-13-7 Akasaka, Minato-ku, Tokyo

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 螺旋状のスクリュー翼を備えたスクリュ
ーロッドと、掘削攪拌翼と、固化材供給手段とを備えた
地盤改良装置を用い、前記掘削攪拌翼で地盤を定められ
た深度まで掘進した後、前記固化材供給手段で地盤中に
固化材を供給するとともに、前記掘削攪拌翼で前記固化
材と前記地盤中の土砂とを攪拌混合しつつ、前記スクリ
ューロッドで固化材供給量に応じて地盤中の余剰の土砂
を地上に排土することによって地盤を改良するときに、 予め、改良すべき前記地盤の地質条件に応じて単位時間
当たりの所定の排土量を設定し、スクリュー翼を備えた
スクリュー付きシャフト区間と、スクリュー翼を備えな
いスクリュー無しシャフト区間とを適宜長に設けること
によって、前記所定の排土量となるように前記スクリュ
ーロッドを構成しておき、 前記地盤の地質条件に応じて、前記固化材供給手段での
前記固化材の単位時間当り供給量を制御することを特徴
とする地盤改良工法。
1. A ground improvement device equipped with a screw rod having a spiral screw blade, an excavation stirring blade, and a solidifying material supply means is used to excavate the ground to a predetermined depth with the excavation stirring blade. Then, while supplying the solidified material into the ground by the solidified material supply means, while stirring and mixing the solidified material and the earth and sand in the ground by the excavation stirring blade, depending on the amount of solidified material supplied by the screw rod. When improving the ground by discharging surplus soil in the ground to the ground, set a predetermined amount of discharged soil per unit time in advance according to the geological conditions of the ground to be improved, and set the screw blades The screw rod is configured so that the predetermined amount of soil is discharged by appropriately providing a shaft section with a screw provided and a shaft section without a screw without a screw blade. Place, depending on the geological conditions of the soil, soil improvement method, which comprises controlling the unit time per supply amount of the solidifying material in the solidifying material supply means.
【請求項2】 請求項1記載の地盤改良工法であって、
予め、前記スクリュー付きシャフトのスクリュー翼の外
径が異なるものを複数種用意しておき、 前記改良すべき地盤の地質条件に応じて、前記スクリュ
ーロッドに設ける前記スクリュー付きシャフトの前記ス
クリュー翼の外径を変えることを特徴とする地盤改良工
法。
2. The ground improvement method according to claim 1, wherein
In advance, a plurality of types having different outer diameters of screw blades of the shaft with a screw are prepared, and depending on the geological conditions of the ground to be improved, the outside of the screw blade of the shaft with a screw provided on the screw rod. A ground improvement method characterized by changing the diameter.
【請求項3】 請求項1または2記載の地盤改良工法で
あって、前記地盤改良装置の前記掘削攪拌翼が、改良す
べき地盤の定められた深さにまで到達したときに、該地
盤の地表よりも上方位置まで前記スクリュー付きシャフ
トが位置するよう、前記スクリューロッドを構成するこ
とを特徴とする地盤改良工法。
3. The ground improvement method according to claim 1 or 2, wherein when the excavation and stirring blade of the ground improvement device reaches a predetermined depth of the ground to be improved, The ground improvement method, wherein the screw rod is configured such that the shaft with screw is located above the surface of the earth.
【請求項4】 軸線回りに回転駆動自在でかつ上下動自
在に設けられたスクリューロッドと、該スクリューロッ
ドの先端部に設けられて地盤を攪拌しつつ掘削する掘削
攪拌翼と、該掘削攪拌翼の近傍に備えられて地盤中に固
化材を供給する固化材供給機構と、該固化材供給機構で
の固化材の供給量を制御する制御部とを備えてなり、 前記スクリューロッドが、管体の外周面に螺旋状のスク
リュー翼を備えたスクリュー付きシャフトと、前記スク
リュー付きシャフトの管体と同径を有した管体からなる
スクリュー無しシャフトとを着脱自在に接続してなる構
成とされていることを特徴とする地盤改良装置。
4. A screw rod rotatably driven around an axis and vertically movable, an excavation stirring blade provided at a tip end portion of the screw rod for excavating the ground while stirring, and the excavation stirring blade. A solidification material supply mechanism that is provided in the vicinity of to supply the solidification material into the ground, and a control unit that controls the supply amount of the solidification material in the solidification material supply mechanism, wherein the screw rod is a tubular body. A shaft with a screw having a spiral screw blade on the outer peripheral surface of the shaft, and a screwless shaft made of a pipe having the same diameter as the pipe of the shaft with a screw are detachably connected. Ground improvement device characterized by being
JP18309195A 1995-07-19 1995-07-19 Ground improvement method and ground improvement equipment Expired - Lifetime JP3505279B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18309195A JP3505279B2 (en) 1995-07-19 1995-07-19 Ground improvement method and ground improvement equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18309195A JP3505279B2 (en) 1995-07-19 1995-07-19 Ground improvement method and ground improvement equipment

Publications (2)

Publication Number Publication Date
JPH0931968A true JPH0931968A (en) 1997-02-04
JP3505279B2 JP3505279B2 (en) 2004-03-08

Family

ID=16129608

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18309195A Expired - Lifetime JP3505279B2 (en) 1995-07-19 1995-07-19 Ground improvement method and ground improvement equipment

Country Status (1)

Country Link
JP (1) JP3505279B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6198094B1 (en) * 2017-04-12 2017-09-20 五洋建設株式会社 Setting method of internal pressure relief blade
JP6274347B1 (en) * 2017-07-03 2018-02-07 五洋建設株式会社 Deep layer processing equipment using internal pressure relief blades

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021021234A (en) * 2019-07-26 2021-02-18 鹿島建設株式会社 Screw, ground excavator, and soil cement continuous wall construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6198094B1 (en) * 2017-04-12 2017-09-20 五洋建設株式会社 Setting method of internal pressure relief blade
JP2018178518A (en) * 2017-04-12 2018-11-15 五洋建設株式会社 Inner pressure relaxation blade setting method
JP6274347B1 (en) * 2017-07-03 2018-02-07 五洋建設株式会社 Deep layer processing equipment using internal pressure relief blades
JP2018178689A (en) * 2017-07-03 2018-11-15 五洋建設株式会社 Deep mixing device using inner pressure relaxation blade

Also Published As

Publication number Publication date
JP3505279B2 (en) 2004-03-08

Similar Documents

Publication Publication Date Title
US3604214A (en) Means and method of making columnar structures in situ
KR900006385B1 (en) Method and device for the in-situ formation of columns of stabilized and compacted soil
US3645101A (en) Method and apparatus for constructing impervious underground walls
US2782605A (en) Process and apparatus for grouting porous formations
KR930012067B1 (en) Process for compaction reinforcement grouting or for decompaction drainage and for construction of linear works and plane works in the soils
US3807184A (en) Method and means for producing pile or like structural columns in situ
US6485234B2 (en) Apparatus and method for making cylindrical columns
CN1206417C (en) Forming method for water-proof pile fender and screw drill therefor
JP3505279B2 (en) Ground improvement method and ground improvement equipment
JP3527574B2 (en) Ground improvement method and ground improvement equipment
JP5545622B2 (en) Ground improvement method and ground improvement structure
JP4923011B2 (en) Construction method of columnar ground improvement body
JP3370454B2 (en) Improved ground and ground improvement method
KR100476894B1 (en) The method of simultaneous mixing construction using a steel pipe and its device
JP3370456B2 (en) Ground improvement equipment
JP5202743B2 (en) Columnar ground improvement body construction device
DE69002615T2 (en) METHOD FOR BUILDING CONCRETE CONSTRUCTIONS IN LOOSE MATERIAL FROM THE TERRAIN OF THE TERRAIN AND DEVICE FOR CARRYING OUT THIS METHOD.
JP2576046B2 (en) Method of forming cured soil
JP4206011B2 (en) Ground excavation method
JP3971322B2 (en) Wet column manufacturing equipment for foundation ground
JP3247516B2 (en) Injection pipe for ground improvement
FI96793B (en) Method and tool for soil consolidation
JP3116148B2 (en) Ground improvement device and ground improvement method
JP2929981B2 (en) Excavation and stirrer for ground
JPS6111315Y2 (en)

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20031125

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20031215

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091219

Year of fee payment: 6

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091219

Year of fee payment: 6

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121219

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121219

Year of fee payment: 9

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121219

Year of fee payment: 9

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121219

Year of fee payment: 9

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121219

Year of fee payment: 9

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131219

Year of fee payment: 10

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term