JPH0921238A - Entrance structure in building construction site - Google Patents

Entrance structure in building construction site

Info

Publication number
JPH0921238A
JPH0921238A JP19246195A JP19246195A JPH0921238A JP H0921238 A JPH0921238 A JP H0921238A JP 19246195 A JP19246195 A JP 19246195A JP 19246195 A JP19246195 A JP 19246195A JP H0921238 A JPH0921238 A JP H0921238A
Authority
JP
Japan
Prior art keywords
piles
temporary
entrance
fixed
shutter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP19246195A
Other languages
Japanese (ja)
Inventor
Shuji Takase
州治 高瀬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP19246195A priority Critical patent/JPH0921238A/en
Publication of JPH0921238A publication Critical patent/JPH0921238A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PROBLEM TO BE SOLVED: To increase workability by connecting the column lower end part of a temporary shutter to the upper end part of columns used for earth retaining, and providing the connecting means for a drive-in structural stand on the column and earth retaining sides of the temporary shutter. SOLUTION: When a temporary shutter 1 is installed at an entrance E, a column 2 is arranged on a pair of foundation piles 11. Next, the piles 11 are connected to the column 2 through a connecting plate 14 at a joint part 4. Also, when a drive-in structural stand 18 is constructed, the upper end of a stay 25 is fixed to the underside of a bracket 15 located at the lower end of the column 2, and the lower end of the stay 25 is fixed to the side of the piles 11. Then a joist beam 21 is placed, through a sleeper, on the temporary columns driven properly inside an excavated part A beam, the base end part of the beams 21 on both sides is fixed to the bracket 15, and those beams 21 other than them are fixed to a partition cap beam installed between the base end parts of the column 2. In addition the drive-in plate 24 and awning decks 22 and 22a are installed on the beam 21. Thus the shutter and drive-in plates can be installed easily and rigidly.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、建築現場における出入
口に設置した仮設シャッター及び山留め工法に使用中の
杭体に、大型車輌、土木作業機材及び資材等の搬入出の
ための乗入れ構台を連結可能にした建築現場における出
入口構造に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention connects a temporary shutter installed at a doorway at a construction site and a pile body being used for a mountain retaining method with a loading gantry for carrying in and out a large vehicle, civil engineering equipment, materials and the like. It relates to the entrance / exit structure at the construction site that was made possible.

【0002】[0002]

【従来の技術】従来、建築現場の境界部に仮設する仮囲
いにおける出入口には、現場内への部外者の侵入等を防
止するために仮設シャッターを設置しているが、該仮設
シャッターは大型車輌、土木作業機材及び資材等の搬入
出のために幅広で背高であるために非常に重く、而も一
対の支柱上端部間にシャッター本体を架設しているた
め、重心が上方にあってバランスが悪く、よって仮設シ
ャッターを支えるためのボリュームの大きい基礎の構築
作業が必要に成り、且つ仮設シャッターの倒壊等の事故
が発生しない様に綿密な構造計算も必要になって甚だ面
倒であった。
2. Description of the Related Art Conventionally, a temporary shutter is installed at the entrance of a temporary enclosure that is temporarily installed at the boundary of a construction site to prevent outsiders from entering the site. It is very heavy because it is wide and tall for loading and unloading large vehicles, civil engineering equipment and materials, and because the shutter body is installed between the upper ends of a pair of pillars, the center of gravity is above. Is unbalanced and therefore requires construction of a large-volume foundation to support the temporary shutter, and detailed structural calculations are required to prevent accidents such as the temporary shutter being collapsed, which is very troublesome. It was

【0003】又、建築現場においては、建物基礎、地下
構築物を構築するために1階床部よりやや広く敷地を掘
削する総根切りを行っており、かかる掘削時における掘
削壁面の崩壊を防止するための山留め工法は、掘削前に
掘削予定部の周囲部に多数の杭体を所定間隔毎に打ち込
み、その内側をクラムシェル、パワーシャベル等により
全面的に掘削する様にして行っている。
Further, at the construction site, in order to construct a building foundation and an underground structure, total root cutting is performed to excavate the site slightly wider than the first floor, and the collapse of the excavated wall surface during such excavation is prevented. Prior to excavation, the pile retaining method is performed by driving a large number of piles around the planned excavation area at a predetermined interval and entirely excavating the inside by a clamshell, a power shovel, or the like.

【0004】しかし、最近の建物は敷地ぎりぎりに建て
ることが多いため、掘削部も当然敷地ぎりぎりになり、
その結果仮設シャッターのための大ボリュームの基礎を
構築するスペースが無く、対応に苦慮していた。
However, since recent buildings are often built on the edge of the site, the excavation section is naturally on the edge of the site.
As a result, there was no space to build a large-volume foundation for the temporary shutters, and it was difficult to deal with them.

【0005】他方、掘削部内に構築する大型車輌、土木
作業機材及び資材等の搬入出のための乗入れ構台にあっ
ては、出入口の延長上に構築するものであり、掘削部に
打ち込んだ多数の支柱の上端間に大引梁を載架固設する
と共に、該大引梁上に根太梁を大引梁に対し直角にして
載架固設し、該根太梁上に覆工板を敷き詰める様にして
構築しているが、単独構築した乗入れ構台を山留め側に
連結する作業が別途必要で甚だ面倒な欠点を有してい
た。
On the other hand, a large-scale vehicle built in the excavation section, a loading gantry for carrying in and out of civil engineering work equipment, materials, etc. are constructed on the extension of the entrance and exit, and many A girder beam is mounted and fixed between the upper ends of the columns, and a joist beam is mounted and fixed on the girder beam at right angles to the girder beam, and a lining plate is spread over the joist beam. However, it has a serious trouble because it requires a separate work to connect the independently constructed boarding gantry to the mountain retaining side.

【0006】[0006]

【発明が解決しようとする課題】本発明は、山留めに使
用中の杭体に仮設シャッターを取り付けると共に、該仮
設シャッターの支柱及び山留め側に、予め乗入れ構台と
の連結手段を設けておくことによって、建物が敷地境界
線ぎりぎりの状況下でも仮設シャッターを設置可能と
し、且つ乗入れ構台の山留め側への連結を容易化した建
築現場における出入口構造を提供せんとするものであ
る。
SUMMARY OF THE INVENTION According to the present invention, a temporary shutter is attached to a pile body that is being used for a mountain retaining member, and connecting means for connecting to a boarding gantry is provided in advance on the pillar and the mountain retaining side of the temporary shutter. In addition, even if the building is close to the boundary of the site, temporary shutters can be installed, and the entrance / exit structure at the construction site that facilitates the connection of the boarding gantry to the mountain retaining side is not provided.

【0007】[0007]

【課題を解決するための手段】本発明は、上記従来技術
に基づく、建築現場の仮囲いにおける出入口に設置する
仮設シャッターは、綿密な構造計算に基づく大ボリュー
ム基礎の構築作業が必要になるが、建物が敷地ぎりぎり
では仮設シャッターを設置することが非常に困難な課題
に鑑み、地下構築物のための掘削部における山留め用の
多数の杭体の内、仮設シャッターにおける一対の支柱と
の対応位置で隣接する一対の杭体上端部へのジョイント
部を、仮設シャッターにおける一対の支柱下端部に夫々
設け、ジョイント部をボルト及びナットによる連結手段
により杭体に連結一体化することによって、地中深く打
ち込まれた杭体が仮設シャッターの基礎杭体になって、
敷地境界線と掘削部間に余地が無くとも仮設シャッター
を設置可能にしている。
According to the present invention, a temporary shutter to be installed at a doorway in a temporary enclosure of a construction site based on the above-mentioned conventional technique requires construction work of a large volume foundation based on careful structural calculation. , In view of the problem that it is very difficult to install a temporary shutter when the building is barely on the premises, among the many piles for retaining the earth in the excavation section for the underground structure, at the position corresponding to the pair of columns of the temporary shutter. Joints to the upper ends of a pair of adjoining piles are respectively provided at the lower ends of a pair of columns in the temporary shutter, and the joints are integrally connected to the piles by connecting means by bolts and nuts to drive deep into the ground. The piles that have become the foundation piles of the temporary shutter,
A temporary shutter can be installed even if there is no room between the site boundary line and the excavation section.

【0008】又、掘削部内に構築する大型車輌、土木作
業機材及び資材等の搬入出のための乗入れ構台にあって
は、山留め側との連結作業が困難な課題に鑑み、建築現
場の出入口に設置する仮設シャッターの支柱の下端掘削
側に設けたブラケット、及び支柱との対応位置の隣接す
る一対の杭体間の他の杭体上に載架した敷桁梁によっ
て、乗入れ構台の根太梁の基端部を下方支持し、ボルト
及びナットにより連結一体化することによって、乗入れ
構台を出入口にスムーズ且つ簡単に連結可能にして、上
記課題を解消せんとしたものである。
In addition, in the loading / unloading gantry for loading and unloading large-sized vehicles, civil engineering work equipment, materials, etc. constructed in the excavation part, in view of the problem that it is difficult to connect with the mountain retaining side, The bracket provided on the lower end excavation side of the pillar of the temporary shutter to be installed, and the beam girder beam mounted on the other pile body between the pair of adjacent pile bodies at the position corresponding to the strut, By supporting the base end portion downward and integrally connecting it with bolts and nuts, the loading gantry can be smoothly and easily connected to the entrance and exit, and the above problems are not solved.

【0009】[0009]

【実施例】以下本発明の一実施例を図面に基づいて説明
すると、1は建築現場の出入口Eに設置する仮設シャッ
ターであり、該仮設シャッター1両側部の支柱2、2aの
下端部には、掘削部Aの山留めに使用中の杭体3、3a…
へのジョイント部4、4aを夫々固設している。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings, in which 1 is a temporary shutter installed at an entrance E of a construction site, and the lower ends of columns 2 and 2a on both sides of the temporary shutter 1 are , Piles 3,3a in use for retaining the excavation A ...
The joint parts 4 and 4a are fixedly installed.

【0010】又、杭体3、3a…の夫々はフランジ5、5a
及びウェブ6からなるI型鋼又はH型鋼で、フランジ
5、5aを杭体3、3a…の配設方向に平行にして、而も最
終的な掘削部A底部より更に深く打ち込むと共に、上端
部を地盤面と略同一と成している。
Further, each of the piles 3, 3a ... Has a flange 5, 5a.
With the I-shaped steel or the H-shaped steel composed of the web 6, the flanges 5 and 5a are made parallel to the arrangement direction of the pile bodies 3 and 3a, and further driven deeper than the bottom of the final excavated portion A, and the upper end is It is almost the same as the ground surface.

【0011】又、杭体3、3a…のうち、出入口Eとの対
応位置の数本を取付杭体7、7a…とし、各取付杭体7、
7a…の上端部の掘削部A側には直角状且つ所定深さの切
欠8を形成している。
Further, among the piles 3, 3a ..., some of the positions corresponding to the entrance / exit E are set as the piles 7, 7a.
A notch 8 having a right angle and a predetermined depth is formed on the excavated portion A side of the upper end of 7a.

【0012】又、取付杭体7、7a…のうち仮設シャッタ
ー1の各支柱2、2aとの対応位置の2箇所における隣接
する一対の取付杭体を基礎杭体11、11a とし、それら以
外の取付杭体を受け杭体12、12a …とし、各受け杭体1
2、12a …における切欠8の座部8a上に水平な載置板9
を固設すると共に、該載置板9の両端下部には側縁部を
各取付杭体7、7a…のウェブ6側面に固設した補強リブ
10、10a を固設している。
Further, a pair of adjoining mounting piles at two positions corresponding to the columns 2 and 2a of the temporary shutter 1 among the mounting piles 7 and 7a are referred to as foundation piles 11 and 11a, and other than those. Receiving piles are designated as piles 12, 12a ...
2, 12a ... A horizontal mounting plate 9 on the seat portion 8a of the cutout 8
Reinforcing ribs that are fixed to the mounting plate 9 and side edges are fixed to the side surfaces of the webs 6 of the mounting piles 7, 7a ...
10 and 10a are fixed.

【0013】又、ジョイント部4、4aの夫々は、基板13
の下面両端側に一対の連結板14、14a を垂下固設して成
り、連結板14、14a の横幅はウェブ6より狭く、連結板
14、14a の間隔は取付杭体7、7a…のピッチと同幅と成
している。
Further, each of the joint portions 4 and 4a has a substrate 13
A pair of connecting plates 14 and 14a are hung and fixed on both ends of the lower surface of the connecting plate. The horizontal width of the connecting plates 14 and 14a is narrower than that of the web 6,
The distance between 14, 14a is the same as the pitch of the mounting piles 7, 7a ....

【0014】そして、基礎杭体11、11a の切欠8の座部
8a上方に各ジョイント部4、4aの基板13を配置すると共
に、基礎杭体11、11a の夫々のウェブ6にジョイント部
4、4aの連結板14、14a をボルト及びナットにより固定
して、基礎杭体11、11a に対し支柱2、2aを連結してい
る。
The seat portion of the notch 8 of the foundation pile 11, 11a
The base plate 13 of each joint portion 4 and 4a is arranged above 8a, and the connecting plates 14 and 14a of the joint portions 4 and 4a are fixed to the webs 6 of the foundation piles 11 and 11a by bolts and nuts. The columns 2 and 2a are connected to the piles 11 and 11a.

【0015】又、支柱2、2aの下端側にはブラケット1
5、15a を掘削部A側へ水平突設し、該ブラケット15、1
5a は固定板16、16a 表面に対し垂直に突設し、該固定
板16、16a を支柱2、2aにボルト及びナットにより固定
して、ブラケット15、15a を各支柱2、2aに固定してい
る。
Also, a bracket 1 is provided on the lower end side of the columns 2 and 2a.
5 and 15a are horizontally projected to the excavation section A side, and the brackets 15 and 1 are
5a is projected perpendicularly to the surface of the fixing plates 16 and 16a, and the fixing plates 16 and 16a are fixed to the columns 2 and 2a with bolts and nuts, and the brackets 15 and 15a are fixed to the columns 2 and 2a. There is.

【0016】又、受け杭体12、12a …上に載架固設した
敷桁梁17は、各受け杭体12、12a …における切欠8下方
部の載置板9上に配設してボルト及びナットにより固定
し、該敷桁梁17の上面はブラケット15、15a の上面と同
レベルと成している。
Further, the girder beam 17 mounted and fixed on the receiving piles 12, 12a ... Is arranged on the placing plate 9 below the notch 8 in each receiving pile 12, 12a. And fixed by nuts, the upper surface of the beam girder 17 is at the same level as the upper surfaces of the brackets 15 and 15a.

【0017】18は出入口Eに連設する様にして掘削部A
内に構築した乗入れ構台であり、該乗入れ構台18は横方
向及び縦方向に所定間隔毎に打込み立設した仮支柱19、
19a…と、該仮支柱19、19a …の横列上に載架固設した
大引梁20、20a …と、該大引梁20、20a …に対し直角且
つ大引梁20、20a …上に所定間隔毎に並列固設した根太
梁21、21a …と、該根太梁21、21a …上に敷き詰めた覆
工板22、22a …により構成している。
18 is an excavation part A so as to be connected to the entrance E.
It is a loading gantry built inside, and the loading gantry 18 is a temporary support column 19 which is vertically installed by driving at predetermined intervals in the horizontal and vertical directions.
19a ..., the large hauling beams 20, 20a, which are fixedly mounted on the rows of the temporary columns 19, 19a ..., and at right angles to the large hauling beams 20, 20a. , Which are fixed in parallel at predetermined intervals, and lining plates 22, 22a, which are spread over the joist beams 21, 21a.

【0018】又、根太梁21、21a …のうち両側方のもの
は、その基端部を支柱2、2aのブラケット15、15a で、
それら以外のものは、その基端部を敷桁梁17で夫々下方
支持すると共に、ボルト及びナットによりブラケット1
5、15a 及び敷桁梁17に固定している。
Of the joist beams 21, 21a ... On both sides, the base ends of the joist beams 21, 21a are brackets 15 and 15a of the columns 2 and 2a.
Other than these, the base ends of the brackets are supported downward by beam girders 17, respectively, and the bracket 1 is fixed by bolts and nuts.
It is fixed to 5, 15a and girder beam 17.

【0019】23は根太梁21、21a …の基端上部に載架固
設した溝形鋼であり、該溝形鋼23の高さは覆工板20、20
a …の板厚と同一とし、地面上に載置した、上面が傾斜
面である乗入板24の肉厚側を溝形鋼23に嵌め込んでい
る。
Reference numeral 23 is a grooved steel which is mounted and fixed on the upper end of the base end of the joist beams 21, 21a, and the height of the grooved steel 23 is the height of the lining plates 20, 20.
The plate thickness is the same as that of a ..., and the thick side of the entry plate 24, which is placed on the ground and whose upper surface is an inclined surface, is fitted into the channel steel 23.

【0020】次に、建築現場における出入口の構築方法
及び作用について説明すると、先ず、出入口Eへの仮設
シャッター1の設置方法は、クレーン等により仮設シャ
ッター1を吊り下げて、基礎杭体11、11a 上に各支柱
2、2aを配置し、基礎杭体11、11a の夫々のウェブ6側
面に各ジョイント部4、4aにおける一対の連結板14、14
a を当接すると共に、ボルト及びナットにより連結板1
4、14a を基礎杭体11、11a に固定して、各支柱2、2a
を基礎杭体11、11a に連結し、仮設シャッター1を出入
口Eに設置する。
Next, the construction method and operation of the entrance / exit at the construction site will be described. First, the installation method of the temporary shutter 1 at the entrance / exit E is as follows: the temporary shutter 1 is hung by a crane or the like, and the foundation piles 11 and 11a. The columns 2 and 2a are arranged on the upper side, and the pair of connecting plates 14 and 14 in the joints 4 and 4a are provided on the side surfaces of the webs 6 of the foundation piles 11 and 11a, respectively.
a) and connect plate 1 with bolts and nuts.
4 and 14a are fixed to the foundation piles 11 and 11a, and the columns 2 and 2a
Is connected to the foundation piles 11 and 11a, and the temporary shutter 1 is installed at the entrance E.

【0021】次に、乗入れ構台18の構築方法は、連結さ
れた仮設シャッター1の支柱2、2aの夫々の下端側のブ
ラケット15、15a の下部に方杖25、25a の上端を、一対
の基礎杭体11、11a の夫々内側の杭体における掘削部A
側の側面に方杖25、25a の下端を夫々固設し、次に敷桁
梁17を各受け杭体12、12a …における切欠8下方の載置
板9上に載置し受け杭体12、12a …間に載架して、ボル
ト及びナットにより載置板9に固設する。
Next, the method for constructing the boarding gantry 18 is as follows. Excavation part A in the pile body inside each of the pile bodies 11 and 11a
The lower ends of the canes 25 and 25a are fixed to the side surfaces on the side, and then the beam girder 17 is placed on the mounting plate 9 below the notch 8 in each receiving pile 12, 12a. , 12a, and fixed to the mounting plate 9 with bolts and nuts.

【0022】次に、仮支柱19、19a …を適宜掘削部A内
に打ち込むと共に、かかる仮支柱19、19a …の横列上に
大引梁20、20a …を載架固設し、該大引梁20、20a …上
に根太梁21、21a …を所定間隔毎に並列載架し、大引梁
20、20a …のうち両側方のものの基端部をブラケット1
5、15a 上に配置すると共に、それら以外のものの基端
部を敷桁梁17上に配置してボルト及びナットによりに固
定する。
Next, the temporary columns 19, 19a ... Are appropriately driven into the excavation section A, and the girder beams 20, 20a are mounted and fixed on the row of the temporary columns 19, 19a. The joist beams 21, 21a ... are placed in parallel at predetermined intervals on the beams 20, 20a.
Bracket 1 for the base end of both sides of 20, 20a.
5 and 15a are arranged, and the base ends of those other than those are arranged on the beam girder 17 and fixed by bolts and nuts.

【0023】そして、根太梁21、21a …の基端側上部に
溝形鋼23を載架固設すると共に、乗入板24の肉厚側を溝
形鋼23に嵌め込み、最後に根太梁21、21a …上に覆工板
22、22a …を敷き詰めて乗入れ構台18を構築する。
Then, the channel steel 23 is mounted and fixed on the base end side upper portions of the joist beams 21, 21a ... And the thick side of the board 24 is fitted into the channel steel 23, and finally the joist beam 21 is inserted. , 21a… Lining board on top
22, 22a ... are spread and a boarding gantry 18 is constructed.

【0024】尚、仮支柱19、19a …は山留め工法に使用
する支保工である切梁(図示せず)を固定支持するため
の支柱(図示せず)を利用する様にしても良い。
The temporary columns 19, 19a ... May use columns (not shown) for fixedly supporting a beam (not shown) that is a support work used in the mountain retaining method.

【0025】[0025]

【発明の効果】要するに本発明は、建築現場における掘
削部A内に立設した多数の仮支柱19、19a …の横列上に
大引梁20、20a …を載架固設すると共に、該大引梁20、
20a …上に並列載架した根太梁21、21a …上に覆工板2
2、22a …を敷き詰めた乗入れ構台18と出入口Eを連結
することによって、出入口Eの延長上の掘削部A内に乗
入れ構台18を構築することが出来るため、車輌の出入り
をスムーズに行うことが出来る。
In summary, according to the present invention, the large girders 20, 20a ... Are mounted and fixed on the row of a large number of temporary columns 19, 19a ... Standing in the excavation section A at the construction site. Draw beam 20,
20a ... joist beams 21 and 21a mounted in parallel on top of the lining 2
By connecting the entrance gantry 18 covered with 2, 22a ... and the entrance E, the entrance gantry 18 can be constructed in the excavation part A on the extension of the entrance E, so that the vehicle can smoothly enter and exit. I can.

【0026】又、山留めに使用中の杭体3、3a…で出入
口Eとの対応位置の複数本の取付杭体7、7a…のうち、
両側2箇所における一対のものを基礎杭体11、11a と
し、仮設シャッター1は両側部の支柱2、2aの下端部に
夫々固設したジョイント部4、4aにおける一対の連結板
14、14a を基礎杭体11、11a に連結して出入口Eに設置
したので、杭体3、3a…に仮設シャッター1を取付ける
ことが出来るため、掘削部Aが敷地ぎりぎりであっても
仮設シャッター1を簡単に設置出来、而も地中深く打ち
込まれた杭体3、3a…の一部を支柱2、2aの基礎杭体1
1、11a にすることが出来るため、仮設シャッター1専
用の基礎を別途構築する作業を行わずに仮設シャッター
1を堅牢に設置することが出来る。
Further, among the plurality of mounting piles 7, 7a ... At the position corresponding to the entrance / exit E of the piles 3, 3a ...
A pair of base plates 11 and 11a is provided at two locations on both sides, and the temporary shutter 1 is a pair of connecting plates at joints 4 and 4a fixed to the lower ends of columns 2 and 2a on both sides.
Since 14 and 14a are connected to the foundation piles 11 and 11a and installed at the entrance / exit E, the temporary shutter 1 can be attached to the piles 3 and 3a. 1 can be easily installed, and part of the piles 3, 3a ... Driven deep into the ground is part of the foundation piles 2 and 2a.
Since it can be set to 1 and 11a, the temporary shutter 1 can be firmly installed without performing the work of separately constructing the foundation for the temporary shutter 1.

【0027】又、支柱2、2aの下端側にはブラケット1
5、15a を掘削部A側へ水平突設し、取付杭体7、7a…
のうち基礎杭体11、11a 以外の受け杭体12、12a …上に
敷桁梁17を載架固設し、ブラケット15、15a 及び敷桁梁
17により乗入れ構台18における根太梁21、21a …の基端
部を下方支持する様にしたので、出入口E側の乗入れ構
台18との連結手段が仮設シャッター1の支柱2、2a及び
取付杭体7、7a…に予め設けられているため、乗入れ構
台18の出入口E側への連結作業の容易化を図ることが出
来、且つ構築された乗入れ構台18を確実に出入口E側の
延長上に配置することが出来る。
The bracket 1 is attached to the lower ends of the columns 2 and 2a.
5 and 15a are horizontally projected to the excavation part A side, and the mounting piles 7, 7a ...
Of the piles 11, 12a other than the foundation piles 11, 11a, the girder beams 17 are mounted and fixed on the brackets 15, 15a and the girder beams.
Since the base end portions of the joist beams 21, 21a in the loading gantry 18 are supported downward by 17, the connecting means with the loading gantry 18 on the entrance / exit E side is the columns 2, 2a of the temporary shutter 1 and the mounting piles 7. , 7a ... are preliminarily provided, the connection work of the entrance gantry 18 to the entrance / exit E side can be facilitated, and the built entrance gantry 18 is surely arranged on the extension of the entrance / exit E side. You can

【0028】又、取付杭体7、7a…の上端部の掘削部A
側に切欠8を設けると共に、該切欠8の下縁部上に仮設
シャッター1おける支柱2、2a下端部のジョイント部
4、4a及び敷桁梁17を配置する様にしたので、構築され
た乗入れ構台18上面を地盤面と略同レベルにすることが
出来、即ち乗入れ構台18上面と地盤面間の段差を少なく
することが出来るため、当該部位を通過する際の車輌の
振動をが少なく、荷台上の積荷の荷崩れ、土砂の溢れ落
ちを防止出来、スムーズな出入りを可能にすることが出
来る等その実用的効果甚だ大なるものである。
Further, the excavated portion A at the upper end of the mounting piles 7, 7a ...
Since the notch 8 is provided on the side, the columns 2, 4a of the temporary shutter 1 and the joints 4, 4a at the lower end of the temporary shutter 1 and the beam girder 17 are arranged on the lower edge of the notch 8, so that the built-in boarding Since the upper surface of the gantry 18 can be made substantially at the same level as the ground surface, that is, the step between the upper surface of the loading gantry 18 and the ground surface can be reduced, the vibration of the vehicle when passing through the relevant portion is reduced and the loading platform The practical effect of the above-mentioned load is great because it can prevent the collapse of the above cargo and the overflow of earth and sand, and enable smooth entry and exit.

【図面の簡単な説明】[Brief description of drawings]

【図1】仮設シャッター及び乗入れ構台を設置した出入
口の一部断面側面図である。
FIG. 1 is a partial cross-sectional side view of an entrance / exit in which a temporary shutter and a boarding gantry are installed.

【図2】図1のXーX断面図である。FIG. 2 is a sectional view taken along line XX of FIG.

【図3】図1のYーY断面図である。FIG. 3 is a sectional view taken along line YY of FIG. 1;

【図4】図2のZーZ断面図である。FIG. 4 is a sectional view taken along the line ZZ of FIG. 2;

【図5】仮設シャッター及び乗入れ構台の連結構造を示
す要部拡大断面図である。
FIG. 5 is an enlarged cross-sectional view of a main part showing a connection structure of a temporary shutter and a boarding gantry.

【図6】乗入れ構台の連結構造を示す要部拡大断面図で
ある。
FIG. 6 is an enlarged cross-sectional view of an essential part showing a connecting structure of a loading gantry.

【図7】仮設シャッター及び乗入れ構台の連結構造を掘
削部側から見た要部拡大図である。
FIG. 7 is an enlarged view of an essential part of the connection structure of the temporary shutter and the boarding gantry viewed from the excavation side.

【図8】図7の平面図である。FIG. 8 is a plan view of FIG. 7;

【符号の説明】[Explanation of symbols]

1 仮設シャッター 2、2a 支柱 3、3a… 杭体 4、4a ジョイント部 7、7a… 取付杭体 8 切欠 11、11a 基礎杭体 12、12a … 受け杭体 14、14a 連結板 15、15a ブラケット 17 敷桁梁 18 乗入れ構台 19、19a … 仮支柱 20、20a … 大引梁 21、21a … 根太梁 22、22a … 覆工板 A 掘削部 E 出入口 1 Temporary shutter 2, 2a Support 3,3a ... Piles 4,4a Joint 7,7a ... Mounting pile 8 Notches 11, 11a Foundation pile 12, 12a… Receiving pile 14, 14a Connecting plate 15, 15a Bracket 17 Girder beam 18 Loading gantry 19, 19a… Temporary columns 20, 20a… Draft beam 21, 21a… Joist beam 22, 22a… Covering plate A Excavation section E Entrance

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 建築現場における掘削部内に立設した多
数の仮支柱の横列上に大引梁を載架固設すると共に、該
大引梁上に並列載架した根太梁上に覆工板を敷き詰めた
乗入れ構台と出入口を連結してなる出入口構造におい
て、山留めに使用中の杭体で出入口との対応位置の複数
本の取付杭体のうち、両側2箇所における一対のものを
基礎杭体とし、仮設シャッターは両側部の支柱の下端部
に夫々固設したジョイント部における一対の連結板を基
礎杭体に連結して出入口に設置し、又支柱の下端側には
ブラケットを掘削部側へ水平突設し、取付杭体のうち基
礎杭体以外の受け杭体上に敷桁梁を載架固設し、ブラケ
ット及び敷桁梁により乗入れ構台における根太梁の基端
部を下方支持する様にしたことを特徴とする建築現場に
おける出入口構造。
1. A girder beam is mounted and fixed on a row of a large number of temporary columns that are erected in an excavation section at a construction site, and a lining plate is mounted on a joist beam that is mounted in parallel on the girder beam. In a doorway structure consisting of a loading gantry and a doorway connected to each other, among a plurality of mounting piles at positions corresponding to the doorway of a pile body being used for mountain retaining, a pair of foundation piles at two locations on both sides The temporary shutter is installed at the entrance and exit by connecting a pair of connecting plates at the joints fixed to the lower ends of the columns on both sides to the foundation pile body, and a bracket is attached to the excavation part side at the lower end of the column. Horizontally projecting, mounting girder beams on receiving piles other than foundation piles among the mounting piles, and mounting and fixing the girder beams, and supporting the bottom end of the joist beam in the boarding gantry downward by the brackets and girder beams. The entrance / exit structure at the construction site characterized by
【請求項2】 取付杭体の上端部の掘削部側に切欠を設
けると共に、該切欠の座部上に仮設シャッターおける支
柱下端部のジョイント部及び敷桁梁を配置する様にした
ことを特徴とする請求項1の建築現場における出入口構
造。
2. A notch is provided on the excavation side of the upper end of the mounting pile, and a joint part and a beam girder of the lower end of the pillar of the temporary shutter are arranged on the seat part of the notch. The entrance / exit structure for a construction site according to claim 1.
JP19246195A 1995-07-04 1995-07-04 Entrance structure in building construction site Pending JPH0921238A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19246195A JPH0921238A (en) 1995-07-04 1995-07-04 Entrance structure in building construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19246195A JPH0921238A (en) 1995-07-04 1995-07-04 Entrance structure in building construction site

Publications (1)

Publication Number Publication Date
JPH0921238A true JPH0921238A (en) 1997-01-21

Family

ID=16291689

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19246195A Pending JPH0921238A (en) 1995-07-04 1995-07-04 Entrance structure in building construction site

Country Status (1)

Country Link
JP (1) JPH0921238A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104234447A (en) * 2014-09-24 2014-12-24 北京建工土木工程有限公司 Tool-type suspension staircase for deep foundation pit
JP2019044361A (en) * 2017-08-30 2019-03-22 株式会社竹中工務店 Installation method of temporary support column

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104234447A (en) * 2014-09-24 2014-12-24 北京建工土木工程有限公司 Tool-type suspension staircase for deep foundation pit
CN104234447B (en) * 2014-09-24 2016-02-24 北京建工土木工程有限公司 Deep foundation ditch tool-type hangs stair
JP2019044361A (en) * 2017-08-30 2019-03-22 株式会社竹中工務店 Installation method of temporary support column

Similar Documents

Publication Publication Date Title
US5528877A (en) Concrete building frame construction method
JPH102018A (en) Building unit, unit building, and its constructing method
KR100642326B1 (en) A temporary apparatus for constructing girder by top-down style construction method
JP4362824B2 (en) Reverse strike method
JPH0921238A (en) Entrance structure in building construction site
JP2876182B2 (en) Joint foundation for temporary shutter
GB2273310A (en) Improvements relating to buildings
JP3016215B2 (en) Underground multi-story parking lot and its construction method
JPH11140892A (en) Method for excavating ground and method for constructing underground structure using the same
JP2007039995A (en) Seismically retrofitting frame for existing building
JP3234442B2 (en) Building and scrap type building method
JP2894217B2 (en) Building structural frame
JP2585174B2 (en) How to fix scaffolding for temporary tents
KR102523155B1 (en) Connecting structure of middle girder and construction method thereof
JP2613417B2 (en) Construction method of underground structure
JP4733496B2 (en) Seismic retrofit structure
JP2900840B2 (en) How to build underground structures
JP2959436B2 (en) How to build underground structures
JPH1193273A (en) Unit building
JPH08291529A (en) Underground floor construction method
JPH0742179A (en) Modified inversion placing construction method
JP2917328B2 (en) How to build a new building that can operate existing structures
JP2649682B2 (en) Underground structure
JP2540369B2 (en) How to build a building with a basement
JP2000257169A (en) Unit building structure on sloping ground