JPH09170339A - Base isolation method for existing building - Google Patents

Base isolation method for existing building

Info

Publication number
JPH09170339A
JPH09170339A JP33366895A JP33366895A JPH09170339A JP H09170339 A JPH09170339 A JP H09170339A JP 33366895 A JP33366895 A JP 33366895A JP 33366895 A JP33366895 A JP 33366895A JP H09170339 A JPH09170339 A JP H09170339A
Authority
JP
Japan
Prior art keywords
pile head
seismic isolation
existing building
ring beam
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP33366895A
Other languages
Japanese (ja)
Inventor
Yoshikazu Miki
美一 三木
Hirotoshi Ikeda
宏俊 池田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP33366895A priority Critical patent/JPH09170339A/en
Publication of JPH09170339A publication Critical patent/JPH09170339A/en
Pending legal-status Critical Current

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Vibration Prevention Devices (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

PROBLEM TO BE SOLVED: To reduce a construction period of time and curtail a construction cost for base isolation. SOLUTION: The directly under ground of the lower part 10a of a skeleton in the existing building is excavated to form an underground space, and a pile head 14a of a bearing pile 14 buried in the ground is only exposed. Then, a bearing slab 30 is monolithically formed on the circumference of the lower part of the pile head 14a. Then, a ring beam 40 having an outside diameter larger than the pile head 14a is monolithically formed. Successively, a base isolation device 38 is installed between the bearing slab 30 and ring beam 40. Then, the pile head 14a positioned downward of the position wherein the ring beam is monolithically formed is divided up and down, vertical load of the existing building borne on the bearing pile 14 is transferred to the bearing pile through the ring beam 40 and base isolation device 38.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】この発明は、既に構築されて
いる既存建物の基礎部に新たに免震装置を設置する既存
建物の免震化工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a seismic isolation construction method for an existing building in which a seismic isolation device is newly installed on the foundation of the existing building.

【0002】[0002]

【従来の技術】近年、地震発生時の地震力が直接建物に
伝わらない構造とし、建物の揺れを極力減少して建物破
壊を防止する免震化工法が種々開発されている。ところ
で、新築建物に免震化工法を採用する場合には、免震化
工法を容易に行うことができる。しかし、既に構築され
ている既存建物の土中に埋設されている基礎部に新たに
免震装置を設置する場合には、常に既存建物の垂直荷重
を確実に受けながら基礎部に対して免震装置を設置しな
ければならず、施工時の安全性、既存建物の確実な免震
性能の確保等の面で問題がある。 そこで、上記課題を
解決する技術として、例えば特開平2−20767号公
報に記載された既存建物の免震化工法が知られている。
2. Description of the Related Art In recent years, various seismic isolation construction methods have been developed which have a structure in which the seismic force at the time of earthquake occurrence is not directly transmitted to the building and reduce the shaking of the building as much as possible to prevent the destruction of the building. By the way, when the seismic isolation method is adopted for a new building, the seismic isolation method can be easily performed. However, when installing a new seismic isolation device on the foundation part buried in the soil of an already constructed existing building, the seismic isolation of the foundation part should always be performed while reliably receiving the vertical load of the existing building. Equipment has to be installed, and there are problems in terms of safety during construction and secure seismic isolation performance of existing buildings. Therefore, as a technique for solving the above problem, for example, a seismic isolation method for existing buildings is known, which is described in Japanese Patent Laid-Open No. 2-20767.

【0003】この免震化工法は、既存建物の地下を根
切りして支持杭を支持層地盤まで露出させる段階と、
露出した支持杭の外周に必要本数の仮受けサポートを建
て、各仮受けサポートにジャッキを設置し、このジャッ
キを既存建物の地下構造躯体との間に働かせて支持杭の
負担軸力を仮受けサポートへ盛り替える段階と、軸力
を盛り替えた後に支持杭を解体し、代わって同位置に本
設の鉄骨柱を建てる段階と、本設鉄骨柱と既存建物の
地下構造躯体との間に免震装置を設置し、その後、仮受
けサポートの軸力を本設の鉄骨柱へ盛り替え、仮受けサ
ポート等を撤去する段階とを備えた工法である。
This seismic isolation method involves the steps of cutting the basement of an existing building to expose the support piles to the support layer ground,
A required number of temporary support supports are built around the exposed support piles, jacks are installed on each temporary support, and the jacks work with the underground structure body of the existing building to temporarily receive the axial load of the support piles. Between the stage of remounting to the support, the stage of reassembling the axial force, dismantling the support piles, and instead building a main steel column at the same position, and between the main steel column and the underground structure frame of the existing building. It is a construction method that includes the steps of installing a seismic isolation device, then replacing the axial force of the temporary support with the steel column of the main structure and removing the temporary support.

【0004】この免震化工法によると、既存建物の地下
を根切りして地下空間を形成した後に、既存建物を仮受
サポート及びジャッキにより支持した状態とし、解体し
た支持杭の位置に本設の鉄骨柱と、免震装置を設置して
これらにより既存建物を支持するので、施工の安全性を
確保することができるとともに、確実に既存建物の免震
性能を確保することができる。
According to this seismic isolation method, after undergrounding an existing building to form an underground space, the existing building is supported by a temporary support and a jack, and is installed at the position of the dismantled support pile. Since the steel columns and the seismic isolation device are installed and the existing building is supported by these, the construction safety can be secured and the seismic isolation performance of the existing building can be surely secured.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、上記特
開平2−20767号公報に記載した技術は、前記、
の段階において仮受サポート、ジャッキ、鉄骨柱を地
上から地下空間に搬入する作業が行われ、前記の段階
において、使用済の仮受サポート及びジャッキを地下空
間から地上に搬出する作業が行われるので、多量の施工
資材の搬入搬出に多くの時間が費やされる。
However, the technique described in the above-mentioned Japanese Patent Laid-Open No. 2-20767 has the following problems.
At this stage, the work of loading the temporary support, jacks, and steel columns from the ground to the underground space is carried out, and at the above stage, the work of the used temporary support and jacks is carried out from the underground space to the ground. A lot of time is spent in loading and unloading a large amount of construction materials.

【0006】また、前記の段階において、地盤深くに
埋設されている支持杭が支持層地盤まで露出するように
大空間の地下空間を形成しなければならず、この大空間
の地下空間の形成に多くの掘削期間を必要とする。した
がって、上記従来技術は、施工期間の短縮化、施工費用
の低減を図ることが難しい。
Further, in the above-mentioned stage, a large underground space must be formed so that the support piles buried deep in the ground are exposed to the ground of the support layer. It requires a lot of excavation period. Therefore, it is difficult for the above-mentioned conventional technique to reduce the construction period and the construction cost.

【0007】さらには、上記従来技術は、前記の段階
において地下空間の掘削のために発生した多量の土砂を
地上に搬出しなければならず、また、前記の段階にお
いて、多数の支持杭が解体されることにより、多量の産
業廃棄物が発生してしまうおそれがある。この発明は、
上記事情に鑑みてなされたものであり、既存建物の垂直
荷重を確実に受け持ち、安全性を高めながら免震装置を
設置することは勿論のこと、施工期間の短縮化、施工費
用の低減を図り、さらには、地上に搬出される土砂及び
産業廃棄物を少量とすることが可能な既存建物の免震化
工法を提供することを目的とする。
Further, in the above-mentioned conventional technique, a large amount of earth and sand generated for excavation of the underground space in the above-mentioned step must be carried to the ground, and in the above-mentioned step, a large number of support piles are dismantled. As a result, a large amount of industrial waste may be generated. The present invention
It was made in view of the above circumstances, and it is necessary not only to install the seismic isolation device while surely bearing the vertical load of the existing building and improving safety, but also to shorten the construction period and reduce the construction cost. Furthermore, it is an object of the present invention to provide a seismic isolation method for an existing building that can reduce the amount of earth and sand and industrial waste that are carried to the ground.

【0008】[0008]

【課題を解決するための手段】本発明の請求項1記載の
既存建物の免震化工法は、既存建物の躯体下部に沿って
当該躯体下部の直下の地盤を根切りすることにより地下
空間を形成し、この地下空間に前記躯体下部から土中に
埋設されている支持杭の杭頭部のみを露出させる工程
と、前記地下空間に露出した前記杭頭部を貫通する耐圧
版を形成する工程と、前記杭頭部の上部外周に、前記杭
頭部より大きな外径のリング形状を有し、且つ上面を前
記躯体下部に固着したリングビームを一体に形成する工
程と、前記耐圧版の上面と前記リングビームの下面との
間に、免震装置を設置する工程と、前記リングビームが
一体に形成されている位置より下方位置の前記杭頭部を
軸心と直交する方向に切断して前記杭頭部を上下に分断
し、前記支持杭が負担していた前記既存建物の垂直荷重
を、前記リングビーム及び前記免震装置を介して前記支
持杭に導入する工程と、前記地下空間を埋め戻す工程と
を備えた工法である。
The seismic isolation method for an existing building according to claim 1 of the present invention forms an underground space by cutting the ground directly below the lower part of the skeleton of the existing building along the lower part of the skeleton. Forming, exposing only the pile heads of the support piles buried in the soil from the lower part of the frame in this underground space, and forming a pressure plate that penetrates the pile heads exposed in the underground space And a step of integrally forming a ring beam having an outer diameter larger than that of the pile head on the upper periphery of the pile head and having an upper surface fixed to the lower part of the frame, and an upper surface of the pressure plate. Between the bottom surface of the ring beam and a step of installing a seismic isolation device, and cutting the pile head below the position where the ring beam is integrally formed in a direction orthogonal to the axis. Divide the pile head into upper and lower parts, and The vertical load of the existing building has been, a step of introducing to the support piles through the ring beam and the seismic isolation device, a method comprising the step of backfilling said underground space.

【0009】また、請求項2記載の発明は、請求項1記
載の既存建物の免震化工法において、前記リングビーム
と一体に形成される前記杭頭部の上部外周を、前記躯体
下部から前記耐圧版側の下方に向かうに従い外径を縮径
した形状とし、この縮径した位置を、前記杭頭部を上下
に分断する切断位置とした工法である。
According to a second aspect of the present invention, in the seismic isolation method for an existing building according to the first aspect, the upper outer periphery of the pile head integrally formed with the ring beam is arranged from the lower portion of the frame to the upper outer periphery. In this method, the outer diameter is reduced toward the lower side of the pressure plate, and the reduced position is used as a cutting position for vertically dividing the pile head.

【0010】[0010]

【発明の実施の形態】以下、本発明の既存建物の免震化
工法の一実施形態について、図面に基づいて説明する。
図1は、免震化工法を行う既存建物10を示すものであ
り、この既存建物10は、躯体下部10aから支持層地
盤12まで達している複数本の支持杭14に、既存建物
10の垂直荷重が軸力として導入されることにより支持
されている。なお、支持杭14は、鉄筋コンクリート製
の円柱体である。
BEST MODE FOR CARRYING OUT THE INVENTION An embodiment of the seismic isolation method for existing buildings of the present invention will be described below with reference to the drawings.
FIG. 1 shows an existing building 10 for which the seismic isolation method is used. The existing building 10 is a vertical structure of the existing building 10 on a plurality of support piles 14 extending from a lower frame body 10a to a support layer ground 12. The load is supported by being introduced as an axial force. The support pile 14 is a columnar body made of reinforced concrete.

【0011】そして、本実施形態の免震化工法は、先
ず、図2に示すように、この既存建物10の周囲の土中
に止水を兼ねた山止め壁16を埋設する。そして、この
山止め壁16の埋設が完了した後、既存建物10と山止
め壁16との間の土を掘削して空間18を形成する。次
いで、空間18の底部から既存建物10に向かう水平方
向に土を掘削し、既存建物10の躯体下部10aの直下
を根切りしていく。これにより、躯体下部10aの下面
を天井として水平方向に延在させ、各支持杭14の杭頭
部14aを露出させた地下空間20を形成する。
In the seismic isolation method of this embodiment, first, as shown in FIG. 2, a mountain retaining wall 16 that also serves as a water stop is buried in the soil around the existing building 10. Then, after the embedding of the mountain retaining wall 16 is completed, the space between the existing building 10 and the mountain retaining wall 16 is excavated to form the space 18. Next, the soil is excavated in the horizontal direction from the bottom of the space 18 to the existing building 10, and the root of the existing building 10 is cut off immediately below the lower frame 10a. Thereby, the lower surface of the lower frame body 10a is extended in the horizontal direction as a ceiling to form the underground space 20 in which the pile heads 14a of the support piles 14 are exposed.

【0012】次いで、図3に示すように、地下空間20
に露出した杭頭部14aの下部外周に対して目荒らし作
業を行い、粗面のコンクリート外周面14bを形成す
る。そして、この粗面のコンクリート外周面14bに対
するケミカルアンカー施工、すなわち、杭頭部14aの
軸と直交する水平方向に複数の穴を開け、これらの穴に
樹脂や硬化促進剤などとともに複数本の横鉄筋22を挿
入して固定する。
Next, as shown in FIG. 3, the underground space 20
A roughening concrete outer peripheral surface 14b is formed by performing a roughening work on the outer periphery of the lower portion of the pile head 14a exposed to the outside. Then, chemical anchoring is applied to the rough concrete outer peripheral surface 14b, that is, a plurality of holes are formed in the horizontal direction orthogonal to the axis of the pile head 14a, and a plurality of horizontal holes are formed in the holes together with the resin and the curing accelerator. The rebar 22 is inserted and fixed.

【0013】次いで、図4に示すように、杭頭部14a
に固定した横鉄筋22に耐圧版用の鉄筋24、26を配
筋する。また、最上部の鉄筋24、26に、杭頭部14
aの外周を覆うように免震装置ベース用鉄筋27を接続
する。そして、杭頭部14aの粗面のコンクリート外周
面14bを囲む配筋が完了した時点でコンクリートを打
設する。これにより、図5に示すように、地下空間20
の地下地盤20a上に、杭頭部14aの下部に一体化さ
れた鉄筋コンクリート製の耐圧版30が形成される。
Next, as shown in FIG. 4, the pile head 14a
The reinforcing bars 24 and 26 for pressure plates are arranged on the horizontal reinforcing bars 22 fixed to the. Moreover, the pile head 14 is attached to the uppermost reinforcing bars 24 and 26.
The seismic isolation device base reinforcing bar 27 is connected so as to cover the outer periphery of a. Then, the concrete is placed when the bar arrangement surrounding the rough concrete outer peripheral surface 14b of the pile head 14a is completed. As a result, as shown in FIG.
A pressure plate 30 made of reinforced concrete integrated with the lower part of the pile head 14a is formed on the underground ground 20a.

【0014】次いで、図6に示すように、躯体下部12
aの下面の杭頭部14aの先端が接続している位置の全
周にケミカルアンカー施工、すなわち、躯体下部12a
の下部に鉛直方向の複数の穴を開け、これらの穴に樹脂
や硬化促進剤などとともに複数本の縦鉄筋28を挿入し
て固定する。また、耐圧版30の上面から躯体下部10
aの下面まで延在している杭頭部14aの先端部外周を
破砕し、躯体下部10から下方に向かうに従い杭頭部1
4aの外径を縮径した第1テーパ部31aと、耐圧版3
0側から上方に向かうに従い杭頭部14aの外径を縮径
した第2テーパ部31bとを形成する。ここで、これら
第1及び第2テーパ部31a、31bによって形成した
部分を縮径部33と称する。
Next, as shown in FIG.
Chemical anchoring is applied to the entire circumference of the position where the tip of the pile head 14a on the lower surface of a is connected, that is, the lower frame body 12a.
A plurality of vertical holes are formed in the lower part of the, and a plurality of vertical reinforcing bars 28 are inserted and fixed in these holes together with a resin and a curing accelerator. In addition, from the upper surface of the pressure plate 30 to the lower body 10
The tip of the pile head 14a extending to the lower surface of a is crushed, and the pile head 1 is moved downward from the lower part 10 of the skeleton.
A first taper portion 31a having a reduced outer diameter of 4a, and a pressure plate 3
A second taper portion 31b is formed by reducing the outer diameter of the pile head portion 14a as it goes upward from the 0 side. Here, the portion formed by the first and second tapered portions 31a and 31b is referred to as a reduced diameter portion 33.

【0015】次いで、耐圧版30が完全に固着した後、
耐圧版30の上面から突出している免震装置ベース用鉄
筋27の周囲を型枠(図示せず)で覆い、この型枠内部
にコンクリートを打設する。これにより、図7に示すよ
うに、耐圧版30の上面にリング形状の免震装置用ベー
ス34が一体に形成される。次いで、図8に示すよう
に、杭頭部14aに形成した第1テーパ部31aの全周
を覆うようにリングビーム用鉄筋かご36を配設する。
なお、このリングビーム用鉄筋かご36は、下方位置に
形成されているリング状の免震装置用ベース34の外径
寸法より僅かに縮径された外径寸法となるように形成さ
れている。
Then, after the pressure plate 30 is completely fixed,
The periphery of the base isolation bar 27 for the base isolation device protruding from the upper surface of the pressure plate 30 is covered with a form (not shown), and concrete is placed inside the form. As a result, as shown in FIG. 7, a ring-shaped base isolation device base 34 is integrally formed on the upper surface of the pressure plate 30. Next, as shown in FIG. 8, the ring beam reinforcing bar cage 36 is arranged so as to cover the entire circumference of the first tapered portion 31a formed on the pile head portion 14a.
The ring beam reinforcing bar cage 36 is formed to have an outer diameter dimension slightly smaller than the outer diameter dimension of the ring-shaped base isolation device 34 formed at the lower position.

【0016】次いで、免震装置用ベース34が完全に固
着した後、図9に示すように、免震装置用ベース34の
上面に4台の免震装置38を配置する。この際、図10
に示すように、免震装置用ベース34の上面にグラウト
材40を設け、このグラウト材40が固化する前に、免
震装置用ベース34に固定ボルト39aを埋設した免震
装置38を水平度を高めて配置する。なお、免震装置3
8は、例えば複数枚の鋼板及びゴムシートを交互に貼り
合わせて柱状に形成したアイソレータが採用されてい
る。
Next, after the seismic isolation device base 34 is completely fixed, as shown in FIG. 9, four seismic isolation devices 38 are arranged on the upper surface of the seismic isolation device base 34. At this time, FIG.
As shown in FIG. 3, a grout material 40 is provided on the upper surface of the base 34 for seismic isolation device, and before the grout material 40 is solidified, the seismic isolation device 38 in which the fixing bolt 39a is embedded in the base 34 for seismic isolation device is installed. Place it up. In addition, seismic isolation device 3
The isolator 8 employs, for example, a plurality of steel plates and rubber sheets alternately laminated to form a columnar shape.

【0017】ここで、4台の免震装置38は、図11に
示すように、杭頭部14aの軸心P 1 を中心とし、免震
装置用ベース34の内外半径の略中間位置を半径rとし
た所定の円周上を四等分した位置に配置されている。次
いで、躯体下部12aの下面から下方に突出している縦
鉄筋28及びリングビーム用鉄筋かご36の外周及び底
部を型枠(図示せず)で覆い、この型枠内部にコンクリ
ートを打設する。なお、免震装置38の上面は、底部に
配設される型枠の一部として使用するとともに、装置上
盤38aから上方に突出している固定ボルト39bを型
枠内部に延在させる。
Here, the four seismic isolation devices 38 are shown in FIG.
As shown, the axis P of the pile head 14a 1Seismic isolation
A radius r is set at a substantially intermediate position between the inner and outer radii of the device base 34.
It is arranged at a position divided into four equal parts on a predetermined circumference. Next
And vertically protruding downward from the lower surface of the lower body 12a.
Outer periphery and bottom of the rebar 28 and the ring beam rebar cage 36
Cover the part with a formwork (not shown) and attach the concrete inside the formwork.
Place the card. In addition, the top surface of the seismic isolation device 38
Used as a part of the formwork to be placed and on the device
The fixing bolt 39b protruding upward from the board 38a
Extend inside the frame.

【0018】そして、この型枠内部にコンクリートを打
設することにより、図12に示すように、杭頭部14a
の第1テーパ部31aに一体化された鉄筋コンクリート
製のリングビーム40が形成される。ここで、図10に
示すように、躯体下部10aの下面及びリングビーム4
0の上端面が密着性を高めて接合するように、リングビ
ーム40の上端面にグラウト材42を注入する。
Then, by placing concrete inside the formwork, as shown in FIG. 12, the pile head 14a.
The reinforced concrete ring beam 40 integrated with the first tapered portion 31a is formed. Here, as shown in FIG. 10, the lower surface of the lower frame 10a and the ring beam 4
The grout material 42 is injected into the upper end surface of the ring beam 40 so that the upper end surface of the ring beam 40 is bonded to the upper surface of the ring beam 40 with improved adhesion.

【0019】次いで、図10に示すように、例えばワイ
ヤソー等の切断装置を使用して縮径部33を径方向に切
断し、第1及び第2テーパ部31a、31bを分断す
る。この縮径部33の切断により、既存建物10の垂直
荷重がリングビーム40、免震装置38及び耐圧版30
を介して支持杭14に導入される。また、他の支持杭1
4に対しても、上述した手順で免震装置38を設置とと
もに、杭頭部14aに形成した縮径部33を切断し、既
存建物10の垂直荷重を支持杭14に導入していく。こ
れにより、地震発生時の地震力が支持杭14に伝達して
も免震装置38が地震力を吸収し、既存建物10の揺れ
を極力減少して建物破壊が防止される。
Then, as shown in FIG. 10, the diameter-reduced portion 33 is radially cut by using a cutting device such as a wire saw to divide the first and second tapered portions 31a and 31b. By cutting the reduced diameter portion 33, the vertical load of the existing building 10 is applied to the ring beam 40, the seismic isolation device 38, and the pressure plate 30.
It is introduced into the support pile 14 via. Also, other support piles 1
Also for 4, the seismic isolation device 38 is installed by the above-described procedure, the reduced diameter portion 33 formed on the pile head 14a is cut, and the vertical load of the existing building 10 is introduced to the support pile 14. As a result, even if the seismic force at the time of occurrence of an earthquake is transmitted to the support pile 14, the seismic isolation device 38 absorbs the seismic force and the shaking of the existing building 10 is reduced as much as possible to prevent the building from being destroyed.

【0020】上記方法の既存建物の免震化工法による
と、従来技術(特開平2−20767号公報)と比較し
て、以下に示す作用効果を得ることができる。すなわ
ち、本実施形態の免震化工法では、ジャッキ、仮受サポ
ート、鉄骨柱等の施工資材を一切必要としないので、従
来技術で行われていた地上及び地下空間の間の施工資材
の搬入搬出の作業を省略することができる。また、支持
杭14の杭頭部14aのみが露出するように小空間の地
下空間20を形成するので、地下空間20の形成のため
に掘削に要する期間が短期間で済む。
According to the seismic isolation construction method for an existing building of the above method, the following operational effects can be obtained as compared with the prior art (JP-A-2-20767). That is, since the seismic isolation method of the present embodiment does not require any construction material such as jacks, temporary support, and steel columns, it can be carried in and out of the construction material between the above-ground and underground space, which was performed by the conventional technology. Can be omitted. Further, since the small space underground space 20 is formed so that only the pile heads 14a of the support piles 14 are exposed, the period required for excavation for forming the underground space 20 is short.

【0021】また、地下空間20に露出した杭頭部14
a下部に一体形成された耐圧版30と、杭頭部14aの
先端外周に一体形成されたリングビーム40との間に4
台の免震装置38を設置し、杭頭部14aの縮径部33
を径方向に切断することにより、既存建物10の垂直荷
重がリングビーム40、4台の免震装置38及び耐圧版
30を介して支持杭14に導入されて既存建物10の免
震構造の施工が完了するので、安全性を高めて既存建物
10を支持することができるとともに、支持杭14の解
体作業や、ジャッキ、仮設サポート部材の撤去作業を不
要とするので、従来技術と比較して施工が完了する時間
を大幅に短縮することができる。したがって、本実施形
態の既存建物の免震化工法は、施工期間の短縮化、施工
費用の低減を充分に図ることができる。
The pile head 14 exposed in the underground space 20
a between the pressure plate 30 integrally formed in the lower portion and the ring beam 40 integrally formed on the outer periphery of the tip of the pile head 14a.
The base isolation device 38 is installed, and the reduced diameter portion 33 of the pile head 14a is installed.
The radial load of the existing building 10 is introduced into the support pile 14 through the ring beam 40, the four seismic isolation devices 38, and the pressure plate 30 by cutting in the radial direction to construct the seismic isolated structure of the existing building 10. Since the construction is completed, it is possible to increase the safety and support the existing building 10, and it is not necessary to dismantle the support piles 14, and to remove the jack and the temporary support member. The time to complete can be greatly reduced. Therefore, the seismic isolation method for the existing building of the present embodiment can sufficiently shorten the construction period and the construction cost.

【0022】一方、地下空間20は、支持杭14の杭頭
部14aのみを露出させるために小空間の地下空間とし
て形成するだけなので、地下空間20の掘削のために地
上に搬出する土砂を少量とすることができ、地上の土砂
の仮置場を小面積とすることができる。また、支持杭1
4は縮径部33のみを切断するだけなので、産業廃棄物
が少量しか発生しない。
On the other hand, since the underground space 20 is only formed as a small underground space to expose only the pile heads 14a of the support piles 14, a small amount of earth and sand to be carried out to the ground for excavating the underground space 20 is used. The temporary storage area for earth and sand can be made small. Also, support pile 1
Since 4 only cuts the reduced diameter portion 33, only a small amount of industrial waste is generated.

【0023】また、リングビーム40は、杭頭部14a
の躯体下部10から下方に向かうに従い外径が縮径され
た第1テーパ部31aの外周にテーパのクサビ効果を利
用して確実に一体化されているので、既存建物10の垂
直荷重を、リングビーム40、免震装置38、耐圧版3
0を介して確実に支持杭14に導入することができる。
The ring beam 40 has a pile head 14a.
Since the outer diameter of the first tapered portion 31a whose diameter is reduced from the lower part of the frame 10 is securely integrated by utilizing the wedge effect of the taper, the vertical load of the existing building 10 is Beam 40, seismic isolation device 38, pressure plate 3
It can be reliably introduced into the support pile 14 via 0.

【0024】さらにまた、第1テーパ部31aの縮径部
33を切断位置としているので、切断作業を短時間で完
了することができる。なお、本実施形態では、4台の免
震装置38を使用した例を示したが、本発明の要旨がこ
れに限るものではなく、既存建物10の垂直荷重を支持
杭14に確実に導入し、且つ地震発生時の地震力を確実
に吸収することが可能であれば、その台数を増減しても
よい。
Furthermore, since the reduced diameter portion 33 of the first taper portion 31a is set as the cutting position, the cutting work can be completed in a short time. In addition, although the example which used four seismic isolation devices 38 was shown in this embodiment, the gist of this invention is not limited to this, The vertical load of the existing building 10 is reliably introduce | transduced to the support pile 14. If the seismic force at the time of an earthquake can be reliably absorbed, the number may be increased or decreased.

【0025】また、リングビーム40内にリングビーム
鉄筋かご36を配筋した構造としたがこれに限るもので
はなく、他の配筋構造としても同様の作用効果を得るこ
とができる。また、本実施形態では、既存建物10の躯
体下部10aが平坦形状であることを前提として説明し
たが、例えば土中の一部に地階部分を設けて凹凸の底面
を有する躯体下部が形成されている場合には、その躯体
下部の凹凸の底面直下の地盤を根切りして地下空間を形
成する。
Further, the ring beam reinforcing bar cage 36 is arranged in the ring beam 40, but the structure is not limited to this, and similar effects can be obtained by using other bar arrangement structures. Further, although the present embodiment has been described on the premise that the lower frame body 10a of the existing building 10 has a flat shape, for example, a lower floor frame having an uneven bottom surface is formed by providing a basement part in a part of the soil. If so, the ground immediately below the bottom surface of the irregularities at the bottom of the frame is cut off to form an underground space.

【0026】[0026]

【発明の効果】以上説明したように、本発明の請求項1
記載の既存建物の免震化工法は、従来の免震化工法のよ
うにジャッキ、仮受サポート、鉄骨柱等の施工資材を一
切必要としないので資材の搬入搬出に要する期間を省く
ことができ、また、支持杭の杭頭部のみが露出するよう
に小空間とした地下空間を形成するので、地下空間の形
成のために掘削に要する期間が短期間で済む。また、杭
頭部の下部外周に一体化した耐圧版と、杭頭部の上部外
周に一体化したリングビームとの間に免震装置を設置
し、リングビームと一体化されている位置より下方位置
の杭頭部を軸心と直交する方向に切断することによって
既存建物の免震構造の施工が完了するので、従来の免震
化工法と比較して施工の完了時間を大幅に短縮すること
ができる。
As described above, according to the first aspect of the present invention,
Unlike the conventional seismic isolation method, the existing building's seismic isolation method does not require any construction materials such as jacks, temporary supports, steel columns, etc. Also, since the underground space is formed as a small space so that only the pile heads of the support piles are exposed, the period required for excavation for forming the underground space is short. In addition, a seismic isolation device was installed between the pressure plate integrated on the lower outer circumference of the pile head and the ring beam integrated on the upper outer circumference of the pile head, and the seismic isolation device was installed below the position integrated with the ring beam. Since the construction of the seismic isolation structure of the existing building will be completed by cutting the pile head at the position in the direction orthogonal to the axis, the completion time of the construction will be greatly shortened compared with the conventional seismic isolation method. You can

【0027】従って、本発明は、安全性を高めながら施
工期間の短縮、施工費用の低減を充分に図ることができ
る。また、本発明において形成する地下空間は、支持杭
の杭頭部のみが露出する程度の小空間の地下空間となる
ので、この地下空間の掘削のために地上に搬出する土砂
を少量とすることができ、地上における土砂の仮置場を
小面積とすることができる。また、支持杭はその一部が
軸と直交する方向に切断されるだけなので、産業廃棄物
を少なくすることができる。
Therefore, according to the present invention, it is possible to sufficiently shorten the construction period and the construction cost while improving the safety. Further, since the underground space formed in the present invention is a small space in which only the pile heads of the support piles are exposed, a small amount of earth and sand is carried to the ground for excavation of this underground space. Therefore, the temporary storage area for earth and sand can be made small. Further, since the support pile is only partially cut in the direction orthogonal to the axis, it is possible to reduce industrial waste.

【0028】一方、請求項2記載の既存建物の免震化工
法は、請求項1記載の効果を得ることができるととも
に、リングビームは、躯体下部から耐圧版側の下方に向
かうに従い外径が縮径されている杭頭部の上部外周にテ
ーパのクサビ効果で確実に一体化されているので、既存
建物の垂直荷重を、リングビーム、免震装置、耐圧版を
介して確実に支持杭に導入することができる。
On the other hand, the seismic isolation construction method for an existing building according to claim 2 can obtain the effect according to claim 1, and the ring beam has an outer diameter as it goes downward from the lower part of the frame to the pressure plate side. Since the taper wedge effect is integrated securely on the upper circumference of the reduced diameter pile head, the vertical load of the existing building is surely supported by the ring beam, seismic isolation device and pressure plate to the support pile. Can be introduced.

【0029】さらに、縮径されている杭頭部の上部外周
の外径の小さな位置を杭頭部を上下に分断する切断位置
としているので、切断作業を短時間で完了することがで
きる。
Further, since the position where the outer diameter of the upper outer periphery of the reduced diameter pile head is small is the cutting position for vertically dividing the pile head, the cutting work can be completed in a short time.

【図面の簡単な説明】[Brief description of the drawings]

【図1】複数本の支持杭により垂直荷重が支持された既
存建物を示す図である。
FIG. 1 is a diagram showing an existing building in which a vertical load is supported by a plurality of support piles.

【図2】各支持杭の杭頭部が露出するように既存建物の
躯体下部を根切りして地下空間を形成した状態を示す図
である。
FIG. 2 is a diagram showing a state in which an underground space is formed by cutting off a lower part of a skeleton of an existing building so that a pile head of each support pile is exposed.

【図3】地下空間に露出した杭頭部の下部外周の目荒ら
し作業を行った後、ケミカルアンカー施工を行った状態
を示す図である。
FIG. 3 is a diagram showing a state in which chemical anchoring is performed after the work of roughening the lower outer periphery of the pile head exposed in the underground space is performed.

【図4】杭頭部の下部の周囲に耐圧版を形成するための
鉄筋を配設している状態を示す図である。
FIG. 4 is a view showing a state in which reinforcing bars for forming pressure plates are arranged around the lower part of the pile head.

【図5】コンクリートの打設によって杭頭部の下部側と
一体化された耐圧版を地下地盤上に形成した状態を示す
図である。
FIG. 5 is a diagram showing a state in which a pressure plate integrated with the lower side of the pile head by pouring concrete is formed on the underground ground.

【図6】耐圧版から上方に延在している杭頭部の外周
を、縮径部が形成されるように破砕した状態を示す図で
ある。
FIG. 6 is a view showing a state in which the outer periphery of the pile head extending upward from the pressure plate is crushed so that a reduced diameter portion is formed.

【図7】耐圧版の上面に免震装置用ベースを形成した状
態を示す図である。
FIG. 7 is a diagram showing a state in which a base for a seismic isolation device is formed on the upper surface of a pressure plate.

【図8】杭頭部の上部外周にリングビーム用鉄筋かごを
配設した状態を示す図である。
FIG. 8 is a view showing a state where a ring beam reinforcing bar cage is arranged on the outer periphery of the upper part of the pile head.

【図9】免震装置用ベース上に免震装置を設置した状態
を示す図である。
FIG. 9 is a diagram showing a state in which the seismic isolation device is installed on the base for the seismic isolation device.

【図10】本発明の基礎部の構造及び上下に分断された
杭頭部を示す図である。
FIG. 10 is a view showing the structure of the foundation of the present invention and the pile head divided vertically.

【図11】図9におけるVI−VI線矢視断面であり、免震
装置用ベース上に設置された複数の免震装置を示す図で
ある。
FIG. 11 is a cross-sectional view taken along the line VI-VI of FIG. 9, showing a plurality of seismic isolation devices installed on the base for seismic isolation devices.

【図12】杭頭部の上部外周に一体に形成されたリング
ビームを示す図である。
FIG. 12 is a view showing a ring beam integrally formed on the outer periphery of the upper part of the pile head.

【符号の説明】[Explanation of symbols]

10 既存建物 10a 躯体下部 14 支持杭 14a 杭頭部 20 地下空間 30 耐圧版 31a 杭頭部の第1テーパ部 31b 杭頭部の第2テーパ部 33 縮径部(杭頭部の外径の小さな位置) 34 免震装置用ベース 38 免震装置 40 リングビーム 10 Existing Building 10a Lower Body 14 Support Piles 14a Pile Head 20 Underground Space 30 Pressure Plate 31a First Tapered Part of Pile Head 31b Second Tapered Part 33 of Pile Head 33 Reduced Diameter Part (small outer diameter of pile head Position) 34 Base for seismic isolation device 38 Seismic isolation device 40 Ring beam

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 既存建物の躯体下部に沿って当該躯体下
部の直下の地盤を根切りすることにより地下空間を形成
し、この地下空間に前記躯体下部から土中に埋設されて
いる支持杭の杭頭部のみを露出させる工程と、 前記地下空間に露出した前記杭頭部を貫通させた耐圧版
を形成する工程と、 前記杭頭部の上部外周に、前記杭頭部より大きな外径の
リング形状を有し、且つ上面を前記躯体下部に固着した
リングビームを一体に形成する工程と、 前記耐圧版の上面と前記リングビームの下面との間に、
免震装置を設置する工程と、 前記リングビームが一体に形成されている位置より下方
位置の前記杭頭部を軸心と直交する方向に切断して前記
杭頭部を上下に分断し、前記支持杭が負担していた前記
既存建物の垂直荷重を、前記リングビーム及び前記免震
装置を介して前記支持杭に導入する工程と、を備えたこ
とを特徴とする既存建物の免震化工法。
1. An underground space is formed by cutting the ground directly below the lower part of the structure along the lower part of the frame of an existing building to form a subterranean space in which the support piles buried in the soil from the lower part of the structure are formed. A step of exposing only the pile head, a step of forming a pressure-resistant plate that penetrates the pile head exposed in the underground space, and an outer circumference of an upper portion of the pile head having a larger outer diameter than the pile head. A step of integrally forming a ring beam having a ring shape and having an upper surface fixed to the lower part of the frame; and between an upper surface of the pressure plate and a lower surface of the ring beam,
Installing a seismic isolation device, cutting the pile head below the position where the ring beam is integrally formed in a direction orthogonal to the axis to divide the pile head up and down, A method of introducing a vertical load of the existing building, which was carried by the support pile, into the support pile through the ring beam and the seismic isolation device. .
【請求項2】 前記リングビームと一体に形成される前
記杭頭部の上部外周を、前記躯体下部から前記耐圧版側
の下方に向かうに従い外径を縮径した形状とし、この縮
径した位置を、前記杭頭部を上下に分断する切断位置と
したことを特徴とする請求項1記載の既存建物の免震化
工法。
2. An outer periphery of an upper portion of the pile head integrally formed with the ring beam is reduced in diameter as it goes downward from the lower portion of the body toward the pressure plate side, and the reduced position 2. The seismic isolation method for an existing building according to claim 1, wherein is set as a cutting position for vertically dividing the pile head.
JP33366895A 1995-12-21 1995-12-21 Base isolation method for existing building Pending JPH09170339A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP33366895A JPH09170339A (en) 1995-12-21 1995-12-21 Base isolation method for existing building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP33366895A JPH09170339A (en) 1995-12-21 1995-12-21 Base isolation method for existing building

Publications (1)

Publication Number Publication Date
JPH09170339A true JPH09170339A (en) 1997-06-30

Family

ID=18268640

Family Applications (1)

Application Number Title Priority Date Filing Date
JP33366895A Pending JPH09170339A (en) 1995-12-21 1995-12-21 Base isolation method for existing building

Country Status (1)

Country Link
JP (1) JPH09170339A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007198050A (en) * 2006-01-27 2007-08-09 Shimizu Corp Joining method of concrete member
JP2007270443A (en) * 2006-03-30 2007-10-18 Fudai Sangyo Kk Base isolation lower part structure construction method and base plate
JP2009001974A (en) * 2007-06-19 2009-01-08 Mase Kensetsu Kk Existing-column cutting and holding method, and load bearing member
JP2014214485A (en) * 2013-04-25 2014-11-17 株式会社大林組 Base isolating method of existing building
JP2015168992A (en) * 2014-03-07 2015-09-28 鹿島建設株式会社 Base-isolation structuring method of existing construction

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007198050A (en) * 2006-01-27 2007-08-09 Shimizu Corp Joining method of concrete member
JP4674721B2 (en) * 2006-01-27 2011-04-20 清水建設株式会社 Method for joining concrete members
JP2007270443A (en) * 2006-03-30 2007-10-18 Fudai Sangyo Kk Base isolation lower part structure construction method and base plate
JP2009001974A (en) * 2007-06-19 2009-01-08 Mase Kensetsu Kk Existing-column cutting and holding method, and load bearing member
JP2014214485A (en) * 2013-04-25 2014-11-17 株式会社大林組 Base isolating method of existing building
JP2015168992A (en) * 2014-03-07 2015-09-28 鹿島建設株式会社 Base-isolation structuring method of existing construction

Similar Documents

Publication Publication Date Title
JP2000054409A (en) Work execution method of top-down construction stanchion in underground excavated space peripheral part
JP2012112121A (en) Excavation method of ground under spread foundation and base-isolating method of existing building
JP3534928B2 (en) Construction method of seismic isolation pit for existing building
JP4624867B2 (en) Seismic isolation repair method for existing buildings
JP2001349065A (en) Underground base isolating construction method for existing building
JPH09170339A (en) Base isolation method for existing building
JP3692805B2 (en) Seismic isolation method for existing buildings
JP3134114B2 (en) Reinforcement method of pier base
JP3002126B2 (en) Temporary receiving method for structures
JPH09170338A (en) Base isolation method for existing building
JP2989539B2 (en) Existing building seismic isolation method
JP2002256571A (en) Reconstructing method for building, using method for existing pile and building
JPH11310928A (en) Vibration isolation reinforcing method for existing structure
JP2005002671A (en) Underpinning method and viaduct
JP7182485B2 (en) building construction method
JP7106305B2 (en) Structural columns and seismically isolated buildings
JP3536543B2 (en) Seismic isolation method for foundations of existing buildings
JPH09228398A (en) Construction method for pile support type multistoried building
JP3407168B2 (en) Foundation of new building using existing pile foundation
JP6534026B2 (en) Seismic isolation building and its construction method
JP3586835B2 (en) Installation method of seismic isolation device on existing building
JP2000328585A (en) Base isolating method
JP2000045542A (en) Foundation base isolation method for existing structure
JPH09170340A (en) Base isolation method of existing building and base isolation device therefor
JP3353166B2 (en) Method of rebuilding building structure and basic structure used for it