JPH0828043A - Mobile type concrete placement method and scaffolding device thereof - Google Patents

Mobile type concrete placement method and scaffolding device thereof

Info

Publication number
JPH0828043A
JPH0828043A JP6165080A JP16508094A JPH0828043A JP H0828043 A JPH0828043 A JP H0828043A JP 6165080 A JP6165080 A JP 6165080A JP 16508094 A JP16508094 A JP 16508094A JP H0828043 A JPH0828043 A JP H0828043A
Authority
JP
Japan
Prior art keywords
scaffold
concrete
scaffolding
lifting
elevating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP6165080A
Other languages
Japanese (ja)
Other versions
JP2737868B2 (en
Inventor
Nobuyuki Matsui
信行 松井
Tomoyuki Ogawa
知之 小河
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP6165080A priority Critical patent/JP2737868B2/en
Publication of JPH0828043A publication Critical patent/JPH0828043A/en
Application granted granted Critical
Publication of JP2737868B2 publication Critical patent/JP2737868B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/12Canopies
    • E04G2005/125Roof for scaffolds, e.g. extending to the adjacent building

Landscapes

  • Movable Scaffolding (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

PURPOSE:To shorten a construction period by installing a horizontal pipeline provided with a plurality of concrete discharge pipes on an upper deck of a two stage type scaf-folding which may rise freely, and what is more, installing a roof removably and controlling concrete placement and an equivalent type form. CONSTITUTION:Concrete is supplied to a horizontal pipeline 15, which is installed on a guide mast M in a liftable manner, from a concrete pump car by way of a hose 23. The concrete is adapted to be discharged from a nozzle of a discharge pipe 17 connected to a flow dividing valve 16, and compacted with a vibrator 22. A roof 9 is removably mounted on an upper stage scaffolding 1 so that work may be carried out even when it is rainy. Furthermore, when concrete placement work is advanced and a form is added, the adjustment of forms is carried out by a lower stage work deck 33 even when concrete is being placed. This construction makes it possible to execute concrete placement work safely and in a shorter construction period.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、移動してコンクリート
を打設する2段式昇降足場によるコンクリート打設方法
およびその足場装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a concrete pouring method and a scaffolding device therefor by a two-stage lifting scaffold for moving and pouring concrete.

【0002】[0002]

【従来の技術】例えば、地下タンクの側壁工事におい
て、側壁の両側に組立足場を全面に組立て、型枠の移
設、組立、建て調整、セパレータ取付け、脱型やセパレ
ータ孔塞ぎ等の作業を行ったり、あるいは1段の昇降足
場を設置して作業員が作業レベルまで昇降して上記の作
業を行っている。
2. Description of the Related Art For example, in side wall construction of an underground tank, assembling scaffolds on both sides of the side wall to perform work such as formwork transfer, assembly, building adjustment, separator installation, demolding, and separator hole closing. Alternatively, a single-stage lifting scaffold is installed and a worker is raised and lowered to a work level to perform the above work.

【0003】また上記の足場と側壁上から、または1段
の昇降足場に跳ねだし足場を設置して鉄筋の組立、建込
み作業を行い、前記組立足場と側壁の鉄筋に簡易足場を
設置して、その上に打設作業員およびポンプ車運転員を
配置し、地上コンクリートポンプによりコンクリート打
設を行っている。そして、30m程度コンクリート打設
すると打設位置を移動しながら鉄筋籠内の作業員がホー
スやバイブレータ等の移動作業を行う方法が一般に行わ
れている。
[0003] In addition, the above-mentioned scaffolding and side walls, or the one-step elevating scaffolding, is provided with a scooping scaffolding for assembling and erection work of a reinforcing bar, and a simple scaffolding is installed on the assembling scaffolding and side wall reinforcing bar , Placing workers and pump truck operators are placed on it, and concrete is placed by the above-ground concrete pump. Then, when placing concrete for about 30 m, a method is generally used in which a worker inside the rebar cage moves the hose or vibrator while moving the pouring position.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、組立足
場の組立、撤去作業は高所の危険作業であり、作業員の
作業位置までの移動や材料の運搬は時間が掛かり、事故
が発生しやすく、また、コンクリート打設時は鉄筋籠内
での狭い空間で、ホース係やバイブレータ係等の多数の
作業員が錯綜して作業を行っている。
However, assembling and removing work of the assembly scaffold is a dangerous work at a high place, and it takes time for the worker to move to the work position and the material is transported, and an accident is likely to occur. In addition, when pouring concrete, a large number of workers such as hose staff and vibrator staff work in a confined space inside the rebar cage.

【0005】さらに、鉄筋籠の剪断筋等が打設ホースの
移動の邪魔になるため、ホースの取り回しは厄介で危険
な作業となり易い。
Furthermore, since the shearing muscles of the reinforcing bar cage hinder the movement of the driving hose, handling the hose is difficult and dangerous.

【0006】そして、構築期間中の降雨により工程が左
右されるという問題もある。
There is also a problem that the process is affected by rainfall during the construction period.

【0007】また、1段の昇降足場を設置しても、同一
ブロックで同一レベルの作業しか出来ないので、上記の
問題をすべて解決する事はできない。
Further, even if one stage of scaffolding is installed, only the same level of work can be performed in the same block, so that all the above problems cannot be solved.

【0008】したがって、本発明は、上記の問題点に鑑
み、型枠作業からコンクリート打設まで効率よく、安全
に、降雨に左右されずに施工できる移動式コンクリート
打設方法およびその足場装置を提供することを目的とし
ている。
Therefore, in view of the above problems, the present invention provides a mobile concrete pouring method and its scaffolding device which can be efficiently and safely constructed from formwork to concrete pouring without being affected by rainfall. The purpose is to do.

【0009】[0009]

【課題を解決するための手段】本発明によれば、移動し
てコンクリートを打設する2段式昇降足場によるコンク
リート打設方法において、ガイドマストに沿って昇降す
る上部足場と下部足場とを昇降自在に設置し、上部足場
にはコンクリート打設水平管を設置し、その水平管に複
数の分流弁を設けてその分流弁に吐出管を介して吐出ノ
ズルを設置し、地上に設置したコンクリートポンプと前
記コンクリート打設水平管とを接続しコンクリートの供
給を受けて型枠内にコンクリート打設し、コンクリート
打設レベルの調整は上部足場を昇降して行い、コンクリ
ート打設中の型枠調整は前記下部足場を昇降して行い、
上部足場には着脱自在に屋根を設置してコンクリート打
設することを特徴とする移動式コンクリート打設方法を
提供している。
According to the present invention, in a concrete pouring method using a two-stage lifting scaffold for moving and pouring concrete, an upper scaffold and a lower scaffold that go up and down along a guide mast are moved up and down. Freely installed, concrete placing horizontal pipe installed on the upper scaffold, multiple shunt valves installed on the horizontal pipe, and discharge nozzle installed on the shunt valve via the discharge pipe, concrete pump installed on the ground And the concrete pouring horizontal pipe are connected and concrete is poured into the formwork by receiving the supply of concrete, and the concrete pouring level is adjusted by elevating and lowering the upper scaffold. Performing by raising and lowering the lower scaffold,
We provide a movable concrete pouring method, which is characterized by installing a removable roof on the upper scaffold and pouring concrete.

【0010】また、本発明によれば、ガイドマストとそ
のガイドマストに沿って昇降自在に上部足場と下部足場
とを設け、上部足場と下部足場との間に前記ガイドマス
トに沿って昇降する昇降装置を備え、その昇降装置は上
部足場と接続する第1の接続手段および下部足場と接続
する第2の接続手段とを有し、前記上部足場は第1の接
続手段と接続する部材と昇降ロック装置とを有し、下部
足場は第2の接続手段と接続する部材および昇降ロック
装置を有し、それらの昇降ロック装置は前記昇降装置の
駆動と同時にロックが解除され、停止と同時にロックが
オンされるよう構成され、上部足場には着脱自在に屋根
が設けられている。
Further, according to the present invention, a guide mast and an upper scaffold and a lower scaffold are provided so as to be vertically movable along the guide mast, and ascending and descending along the guide mast between the upper scaffold and the lower scaffold. A lifting device having a first connecting means for connecting to the upper scaffold and a second connecting means for connecting to the lower scaffold, the upper scaffold being a member connecting to the first connecting means and a lifting lock. A lower scaffold has a member connecting to the second connecting means and a lifting lock device, and these lifting lock devices are unlocked at the same time when the lifting device is driven, and the lock is turned on at the same time when the lifting device is stopped. The upper scaffold is provided with a detachable roof.

【0011】また、第1および第2の接続手段は、足場
側に複数のヨークを設け、昇降手段側に複数のブラケッ
トを設けてピンで接続している。
In the first and second connecting means, a plurality of yokes are provided on the scaffold side and a plurality of brackets are provided on the elevating means side, and they are connected by pins.

【0012】[0012]

【作用効果の説明】本発明は上記のように構成されお
り、ガイドマストに設けられた下部足場を昇降装置と第
2の接続手段で接続し、昇降して型枠天端位置に停止し
て昇降ロック装置でガイドマストにロックする。この時
上部足場は邪魔にならない位置にロックされている。次
いで、下部足場を昇降装置から外し、昇降装置を上昇さ
せて第1の接続手段で上部足場と接続して昇降しコンク
リート打設位置に移動する。
The present invention is constructed as described above, and the lower scaffold provided on the guide mast is connected to the elevating device and the second connecting means, and then elevates and stops at the mold top end position. Lock the guide mast with the lifting lock. At this time, the upper scaffold is locked out of the way. Next, the lower scaffold is removed from the lifting device, and the lifting device is lifted to connect with the upper scaffold by the first connecting means to lift and lower to move to the concrete pouring position.

【0013】上部足場には打設配管を設けて地上のコン
クリートポンプと接続し、バイブレータ昇降リールを設
けてコンクリート打設を開始する。
A placing pipe is provided on the upper scaffold to connect to a concrete pump on the ground, and a vibrator lifting reel is provided to start concrete placing.

【0014】コンクリート吐出ノズルから打設箇所まで
の落下高さを昇降装置で調整し、コンクリート打設す
る。
The height of the drop from the concrete discharge nozzle to the pouring place is adjusted by an elevating device, and concrete is poured.

【0015】この間、型枠調整が必要なときは、昇降装
置を上部足場から切離して下部足場と接続し下部足場を
昇降して型枠の調整を行う。
During this time, when the formwork needs to be adjusted, the elevating device is separated from the upper scaffold and connected to the lower scaffold, and the lower scaffold is lifted to adjust the formwork.

【0016】1ロットのコンクリート打設が終了したら
上部足場のバイブレータをリールに収容し、コンクリー
ト打設配管を撤収する。
After the completion of placing one lot of concrete, the vibrator of the upper scaffold is housed in the reel, and the concrete placing pipe is removed.

【0017】コンクリート養生時は上部足場はロックし
て昇降装置と切離し、屋根掛けしておく。
During concrete curing, the upper scaffold is locked, separated from the lifting device, and placed on the roof.

【0018】鉄筋、型枠組立て作業に邪魔になる場合
は、邪魔になる屋根は側壁外に移動しておく。
When the work of assembling the reinforcing bar and the formwork is disturbed, the disturbing roof is moved to the outside of the side wall.

【0019】したがって、効率よく上下の足場で同時に
作業ができ、作業が交錯すること無く安全であり、降雨
の影響も受けない。
Therefore, it is possible to work efficiently on the upper and lower scaffolds at the same time, the work is safe without intermingling, and is not affected by rainfall.

【0020】[0020]

【実施例】以下、図面を参照して、本発明の実施例を説
明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0021】図1は上部足場1を示す斜視図で、パイプ
で構成された上部足場フレーム2の上面は上部足場作業
デッキ3が張られる共に周囲には手摺10が設けられ、
そのデッキ3の中央部には上部足場を昇降する昇降装置
と接続される上部足場昇降フレーム4が設けられ、その
昇降フレーム4の上端には上部足場上段昇降ガイドロー
ラ5が設けられ、下端には上部足場下段昇降ガイドロー
ラ6と後述する昇降装置と接続される接続部材である複
数の昇降装置接続ヨーク8とが設けられている。
FIG. 1 is a perspective view showing an upper scaffold 1, in which an upper scaffolding work deck 3 is stretched on the upper surface of an upper scaffolding frame 2 made of a pipe, and handrails 10 are provided around the upper scaffolding work deck 3.
An upper scaffold lifting frame 4 connected to a lifting device that lifts and lowers an upper scaffold is provided at the center of the deck 3, an upper scaffold upper stage lifting guide roller 5 is provided at an upper end of the lifting frame 4, and a lower end is provided at a lower end thereof. An upper scaffolding lower stage elevating guide roller 6 and a plurality of elevating device connecting yokes 8 which are connecting members to be connected to an elevating device described later are provided.

【0022】また、昇降フレーム4には後述するガイド
マストと係合し上部足場をガイドマストにロックする上
部足場昇降ロック装置7が取付けられている。
An upper scaffold lifting lock device 7 is attached to the lifting frame 4 to engage with a guide mast, which will be described later, to lock the upper scaffold on the guide mast.

【0023】そして、前記作業デッキ3の上面にはホー
ス23を介して図示しないコンクリートポンプに連結さ
れるコンクリート打設水平管15が備えられ、その水平
管には複数のコンクリート分流弁16を介してコンクリ
ート打設吐出管17と吐出ノズル18とが設けられてい
る。
A concrete pouring horizontal pipe 15 connected to a concrete pump (not shown) via a hose 23 is provided on the upper surface of the work deck 3, and a plurality of concrete shunt valves 16 are provided in the horizontal pipe. A concrete pouring discharge pipe 17 and a discharge nozzle 18 are provided.

【0024】また、作業デッキ3には複数のバブレータ
昇降リール19を有するバイブレータリール移動台車2
0が移動レール21上を移動自在に設けられ、その昇降
リールにはバイブレータ22を懸吊するケーブルが巻回
されている。
Further, the work deck 3 has a vibrator reel moving carriage 2 having a plurality of babulator lifting reels 19.
0 is movably provided on the moving rail 21, and a cable for suspending the vibrator 22 is wound around the elevator reel.

【0025】なお、上部足場1には後述する屋根9が取
付けられている。
A roof 9 which will be described later is attached to the upper scaffold 1.

【0026】図2は前記上部足場昇降ロック装置7を示
す斜視図で、上部足場装置を支持するガイドマストMに
はラック25が固着され、昇降フレーム4に固設された
ロック装置7の本体50には軸受56が設けられ、その
軸受56には一端にブレーキドラム51を有し、他端に
ピニオンギヤ55を有するシャフト57が回転自在に設
けられ、本体50には複数のブレーキシュウ52とブレ
ーキシュウ52をブレーキドラムに圧着しブレーキを作
動させるソレノイド54とが設けられている。
FIG. 2 is a perspective view showing the upper scaffolding lifting / lowering lock device 7, in which a rack 25 is fixed to a guide mast M for supporting the upper scaffolding device, and a main body 50 of the locking device 7 fixed to the lifting frame 4 is fixed. A bearing 56 is provided on the bearing 56, and a shaft 57 having a brake drum 51 at one end and a pinion gear 55 at the other end is rotatably provided at the bearing 56. The main body 50 has a plurality of brake shoes 52 and brake shoes 52. There is provided a solenoid 54 that presses 52 onto the brake drum to operate the brake.

【0027】図3は下部足場31を示し、パイプで構成
された下部足場フレーム32の上面は下部足場作業デッ
キ33が張られる共に周囲には手摺39が設けられ、そ
のデッキ3の中央部には下部足場装置を昇降する前記の
昇降装置と接続される下部足場昇降フレーム34が設け
られ、その昇降フレーム34の上端には下部足場上段昇
降ガイドローラ35が設けられ、下端には下部足場下段
昇降ガイドローラ36と後述する昇降装置と接続される
接続部材である複数の昇降装置接続ヨーク38とが設け
られている。
FIG. 3 shows a lower scaffold 31, and a lower scaffolding frame 32 made of pipe is provided with a lower scaffolding work deck 33 on the upper surface thereof, and a handrail 39 is provided around the lower scaffolding work deck 33, and a central portion of the deck 3 is provided. A lower scaffold lifting frame 34, which is connected to the lifting device for lifting the lower scaffolding device, is provided, a lower scaffolding upper stage lifting guide roller 35 is provided at an upper end of the lifting frame 34, and a lower scaffolding lower stage lifting guide is provided at a lower end thereof. A roller 36 and a plurality of lifting device connecting yokes 38, which are connection members connected to the lifting device described later, are provided.

【0028】また、昇降フレーム34には後述するガイ
ドマストと係合し下部足場をガイドマストにロックする
上部足場と同様の(図2に示す)下部足場昇降ロック装
置37が取付けられている。
Further, a lower scaffold raising / lowering lock device 37 (shown in FIG. 2) similar to the upper scaffold which engages with a guide mast described later and locks the lower scaffold with the guide mast is attached to the elevating frame 34.

【0029】図4は昇降装置40を示し、昇降装置フレ
ーム41の上部にはガイドマストMと係合する昇降装置
上段ガイドローラ42と第1の接続手段である上部足場
連結ブラケット44とが設けられ、下部には昇降装置下
段ガイドローラ43と第2の接続手段である下部足場連
結ブラケット45とが設けられている。そして、フレー
ム41に固設された昇降駆動装置46は前記ガイドマス
トMに固着されたラック25と係合するピニオンギヤ5
0を有し、故障等の場合に自動停止する安全装置を備え
ている。
FIG. 4 shows an elevating device 40. An elevating device frame 41 is provided with an elevating device upper guide roller 42 which engages with the guide mast M and an upper scaffold connecting bracket 44 which is a first connecting means. A lower guide roller 43 of the lifting device and a lower scaffold connecting bracket 45 which is a second connecting means are provided in the lower part. The lift drive device 46 fixed to the frame 41 engages with the rack 25 fixed to the guide mast M.
It has 0 and is equipped with a safety device that automatically stops in the event of a failure or the like.

【0030】フレーム41の周囲には床49が張られ、
その床の周囲には手摺47が取付けられ、梯子48が備
えられている。
A floor 49 is stretched around the frame 41,
A handrail 47 is attached around the floor and a ladder 48 is provided.

【0031】図5は上部足場フレームの屋根を示す斜視
図で、足場フレーム2のデッキフレーム3aに屋根ポス
ト61を設け、その屋根ポスト61の上端にアウタフレ
ーム62を取付け、そのアウタフレーム62の内側をス
ライドするインナフレーム63を設け、そのインナフレ
ーム63の両端部にブラケット66が設けられ、そのブ
ラケット66に屋根フレーム65を介して屋根部材67
が取付けられている。
FIG. 5 is a perspective view showing the roof of the upper scaffolding frame. A roof post 61 is provided on the deck frame 3a of the scaffolding frame 2, an outer frame 62 is attached to the upper end of the roof post 61, and the inside of the outer frame 62 is attached. An inner frame 63 that slides is provided, brackets 66 are provided at both ends of the inner frame 63, and a roof member 67 is provided on the bracket 66 via a roof frame 65.
Is installed.

【0032】図6は、図5の屋根を格納した態様を示
し、ピン64で固定している。
FIG. 6 shows a state in which the roof of FIG. 5 is stored, and is fixed by a pin 64.

【0033】図7は屋根の別の実施例を示し、足場フレ
ーム2に設けたデッキフレーム3aの両端に前脚71と
後脚72とを設け、後脚72の上端に起伏ピン73を介
して屋根フレーム75を回動自在に取付け、屋根フレー
ム75に屋根部材76を取付け、フレームの一端に設け
たアーム77の端部の孔78と後脚72に取付けられた
ブラケット79とをピンで固定し、Aのように屋根が格
納状態で支持されるよう構成している。
FIG. 7 shows another embodiment of the roof. A front leg 71 and a rear leg 72 are provided at both ends of a deck frame 3a provided on the scaffolding frame 2, and a roof pin 73 is provided on the upper end of the rear leg 72 via a undulating pin 73. The frame 75 is rotatably attached, the roof member 76 is attached to the roof frame 75, and the hole 78 at the end of the arm 77 provided at one end of the frame and the bracket 79 attached to the rear leg 72 are fixed with pins. As in A, the roof is configured to be supported in a retracted state.

【0034】以下、上記の足場装置によるコンクリート
打設方法を説明する。
Hereinafter, a concrete pouring method using the above-mentioned scaffolding device will be described.

【0035】図8は地下タンク側壁構築施工の態様を示
す斜視図であり、タンク内側に複数のガイドマストMが
設けられ、そのガイドマストMには上方から上部足場作
業デッキ3および昇降フレーム4と昇降装置40および
下部足場作業デッキ33と昇降フレーム34とが設置さ
れている。そして、側壁型枠Wとこの図では側壁型枠を
兼ねる止水・土留壁Gとの間には鉄筋篭Gが設けられて
いる。
FIG. 8 is a perspective view showing a mode of construction of a side wall of an underground tank. A plurality of guide masts M are provided inside the tank, and the guide masts M include an upper scaffolding work deck 3 and an elevating frame 4 from above. A lifting device 40, a lower scaffolding work deck 33, and a lifting frame 34 are installed. Further, a rebar cage G is provided between the side wall form W and the water blocking / retaining wall G which also serves as the side wall form in this figure.

【0036】なお、符号9は上部足場デッキの屋根が掛
けられている状態を示し、符号Hは公知の跳ねだし足場
をそれぞれ示している。
Reference numeral 9 indicates a state in which the roof of the upper scaffolding deck is hung, and reference numeral H indicates a well-known springing out scaffold.

【0037】図9〜図12は上・下部足場の昇降方法を
示し、上部足場1をガイドマストMに昇降ロック装置7
で固定した状態で、昇降装置40の駆動装置46を駆動
して降下させて昇降装置の下部足場連結ブラケット46
と下部足場昇降フレーム34の連結ヨーク38とをピン
で連結し(図9)、昇降装置40と下部足場31間の図
示しないケーブルを接続する。次いで、昇降装置40の
昇降スイッチをオンすれば駆動装置46のモーターにブ
レーキがきいた状態で下部足場昇降ロック装置のブレー
キが解除され、駆動装置46のモーターが駆動されると
同時にブレーキが解除され昇降装置と共に下部足場が昇
降する(図10は上昇時を示す)。
9 to 12 show a method of raising and lowering the upper and lower scaffolds, and the upper and lower scaffolds 1 are mounted on the guide mast M by a lifting and lowering lock device 7.
The lower scaffold connecting bracket 46 of the lifting device is driven by lowering the driving device 46 of the lifting device 40 while being fixed.
And the connecting yoke 38 of the lower scaffold lifting frame 34 are connected by pins (FIG. 9), and a cable (not shown) between the lifting device 40 and the lower scaffold 31 is connected. Next, when the elevating switch of the elevating device 40 is turned on, the brake of the lower scaffolding elevating lock device is released while the motor of the drive device 46 is being braked, and the motor of the drive device 46 is driven and the brake is released at the same time. The lower scaffold ascends and descends with the device (FIG. 10 shows the ascent).

【0038】また、上部足場1を昇降する場合は、同様
に下部足場31を昇降ロック装置37でガイドマストM
に固定し、昇降装置40を上昇させて上部足場1に連結
し(図11)、昇降装置40を駆動し上部足場1を昇降
させる(図12は上昇時を示す)。
When the upper scaffold 1 is lifted or lowered, the lower scaffold 31 is similarly lifted by the lift lock device 37 to guide the mast M.
Then, the elevating device 40 is lifted and connected to the upper scaffold 1 (FIG. 11), and the elevating device 40 is driven to elevate the upper scaffold 1 (FIG. 12 shows the rising time).

【0039】また、図13〜図16は上記の上・下部足
場による側壁のコンクリート打設方法を示し、コンクリ
ート打設開始時は下部足場31は型枠天端レベルで停止
ロックする。次いで、上部足場のコンクリート打設水平
管15と側壁外地上の図示しないコンクリートポンプと
をコンクリート打設配管で連結し、吐出管17を型枠W
内の下端まで延長し、バイブレータ22も下端まで繰出
す。屋根9は打設面を覆う状態にセットし、コンクリー
ト打設開始する。
FIGS. 13 to 16 show a method of placing concrete on the side wall by the above-mentioned upper and lower scaffolds. At the start of concrete placing, the lower scaffold 31 is stopped and locked at the mold top level. Next, the concrete placing horizontal pipe 15 of the upper scaffold and a concrete pump (not shown) on the outside of the side wall are connected by a concrete placing pipe, and the discharge pipe 17 is connected to the form W.
It extends to the lower end inside, and the vibrator 22 is also extended to the lower end. The roof 9 is set to cover the pouring surface, and concrete pouring is started.

【0040】吐出ノズル18と打設箇所との高さH(図
14)が設定高さ以上にならないようコンクリートはレ
ア状に打設し、その後、上部足場1を昇降装置40で1
レア分ずつリフトし、バイブレータはリフト毎に高さを
調整する(図13、図14)。コンクリート打設中にお
ける型枠Wの調整は、上部足場1をロックし、昇降装置
40を下部足場31と連結して下部足場を昇降しつつ行
えばよい。
Concrete is cast in a rare shape so that the height H (FIG. 14) between the discharge nozzle 18 and the placement point does not exceed the set height, and then the upper scaffold 1 is lifted by the lifting device 40.
Rarely lifted, and the vibrator adjusts the height for each lift (FIGS. 13 and 14). The adjustment of the form W during concrete pouring may be performed while the upper scaffold 1 is locked and the elevating device 40 is connected to the lower scaffold 31 to elevate and lower the lower scaffold.

【0041】1ロット分のコンクリート打設終了時は、
下部足場31は型枠Wの天端レベルで停止ロック状態に
ある。上部足場1は1ロット分だけ打設開始時より高い
位置までリフトアップしている(図15、図16)。
At the end of placing one lot of concrete,
The lower scaffold 31 is stopped and locked at the top level of the form W. The upper scaffold 1 is lifted up by one lot to a position higher than that at the start of placing (FIGS. 15 and 16).

【0042】そして、コンクリート養生時は上部足場は
ロックして屋根を掛け、昇降装置40は分離しておく。
鉄筋、型枠組立てのために邪魔になる屋根は1時的に側
壁外に移動しておけばよい。
During concrete curing, the upper scaffold is locked and the roof is hung, and the lifting device 40 is separated.
The roof, which is an obstacle for assembling the reinforcing bars and the formwork, should be temporarily moved to the outside of the side wall.

【0043】したがって、安全に、効率よく側壁のコン
クリート打設ができ、天候に左右される事もない。
Therefore, the concrete can be placed on the side wall safely and efficiently without being affected by the weather.

【0044】[0044]

【発明の効果】本発明は、上記のように構成されている
ので、以下の優れた効果を奏する。 (1) 足場装置が2段あるので、2つのレベルで別の
作業が同時にでき、工期が短縮できる(例えば、型枠の
調整とセパレータの孔塞ぎ)。 (2) 上部足場に屋根が掛けられるので、天候に左右
されず稼働率が向上する。 (3) コンクリート打設時、複数の吐出管からコンク
リートを吐出し、同時に昇降させ、また、バイブレータ
も足場から吊下げ移動できるので、鉄筋籠内での錯綜作
業がなくなり、作業員の人員も減少できる。 (4) 打設時のコンクリートの自由落下高さを小と
し、かつ安定できるので品質が向上する。 (5) したがって、短い工期で、安全に低コストでコ
ンクリート打設作業ができる。
Since the present invention is constructed as described above, it has the following excellent effects. (1) Since there are two stages of scaffolding devices, different work can be performed at two levels at the same time, and the construction period can be shortened (for example, adjustment of formwork and blockage of separator holes). (2) Since the roof is hung on the upper scaffold, the operating rate is improved regardless of the weather. (3) When pouring concrete, concrete can be discharged from multiple discharge pipes, moved up and down at the same time, and the vibrator can be hung and moved from the scaffolding, eliminating the need for intricate work inside the rebar cage and reducing the number of workers. it can. (4) Since the height of free fall of concrete during pouring can be made small and stable, the quality is improved. (5) Therefore, concrete pouring work can be performed safely and at low cost in a short construction period.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の1実施例を示す上部足場の斜視図。FIG. 1 is a perspective view of an upper scaffold showing an embodiment of the present invention.

【図2】図1の上部足場の昇降ロック装置を示す斜視
図。
FIG. 2 is a perspective view showing a lift lock device for the upper scaffold of FIG.

【図3】下部足場を示す斜視図。FIG. 3 is a perspective view showing a lower scaffold.

【図4】昇降装置を示す斜視図。FIG. 4 is a perspective view showing a lifting device.

【図5】図1の上部足場の屋根を示す斜視図。5 is a perspective view showing the roof of the upper scaffold of FIG. 1. FIG.

【図6】図5の屋根の格納状態を示す図。FIG. 6 is a view showing a stored state of the roof of FIG.

【図7】屋根の別の実施例を示す斜視図FIG. 7 is a perspective view showing another embodiment of the roof.

【図8】本発明による地下タンク側壁構築施工例を示す
斜視図。
FIG. 8 is a perspective view showing an example of construction of an underground tank sidewall construction according to the present invention.

【図9】下部足場の昇降方法(1)を説明する図。FIG. 9 is a diagram for explaining a method (1) for raising and lowering a lower scaffold.

【図10】下部足場の昇降方法(2)を説明する図。FIG. 10 is a diagram for explaining a method (2) for raising and lowering a lower scaffold.

【図11】上部足場の昇降方法(1)を説明する図。FIG. 11 is a diagram for explaining a method (1) for raising and lowering the upper scaffold.

【図12】上部足場の昇降方法(2)を説明する図。FIG. 12 is a view for explaining a method (2) for raising and lowering the upper scaffold.

【図13】本発明によるコンクリート打設する打設方法
(1)を説明する正面図。
FIG. 13 is a front view for explaining a placing method (1) for placing concrete according to the present invention.

【図14】本発明によるコンクリート打設する打設方法
(1)を説明する側面図。
FIG. 14 is a side view illustrating a placing method (1) for placing concrete according to the present invention.

【図15】本発明によるコンクリート打設する打設方法
(2)を説明する正面図。
FIG. 15 is a front view for explaining a placing method (2) for placing concrete according to the present invention.

【図16】本発明によるコンクリート打設する打設方法
(2)を説明する側面図。
FIG. 16 is a side view illustrating a placing method (2) for placing concrete according to the present invention.

【符号の説明】[Explanation of symbols]

1…上部足場 2…上部足場フレーム 3…上部足場作業デッキ 4…上部足場昇降フレーム 5…上部足場上段昇降ガイドローラ 6…上部足場下段昇降ガイドローラ 7…上部足場昇降ロック装置 8…昇降装置連結ヨーク 9…屋根 10…手摺 15…コンクリート打設水平管 16コンクリート分流弁 17…コンクリート吐出管 18…吐出ノズル 19…バイブレータ昇降リール 22…バイブレータ 25…ラック 31…下部足場 32…下部足場フレーム 33…下部足場作業デッキ 34…下部足場昇降フレーム 37…下部足場昇降ロック装置 40…昇降装置 41…昇降装置フレーム 44…上部足場連結ブラケット 46…昇降駆動装置 50…本体 51…ブレーキドラム 52…ブレーキシュウ 54…ソレノイド 61…屋根ポスト 62…アウタフレーム 63…インナフレーム 67…屋根部材 71…前脚 72…後脚 73…起伏ピン 75…屋根フレーム 1 ... Upper scaffolding 2 ... Upper scaffolding frame 3 ... Upper scaffolding work deck 4 ... Upper scaffolding elevating frame 5 ... Upper scaffolding upper elevating guide roller 6 ... Upper scaffolding lower elevating guide roller 7 ... Upper scaffolding elevating lock device 8 ... Elevating device connecting yoke 9 ... Roof 10 ... Handrail 15 ... Horizontal concrete casting pipe 16 Concrete shunt valve 17 ... Concrete discharge pipe 18 ... Discharge nozzle 19 ... Vibrator lift reel 22 ... Vibrator 25 ... Rack 31 ... Lower scaffold 32 ... Lower scaffolding frame 33 ... Lower scaffolding Working deck 34 ... Lower scaffold lifting frame 37 ... Lower scaffold lifting lock device 40 ... Lifting device 41 ... Lifting device frame 44 ... Upper scaffold connecting bracket 46 ... Lifting drive device 50 ... Main body 51 ... Brake drum 52 ... Brake shoe 54 ... Solenoid 61 … Roof post 62… Outer Frame 63 ... Inner frame 67 ... Roof member 71 ... Front leg 72 ... Rear leg 73 ... Elevating pin 75 ... Roof frame

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 移動してコンクリートを打設する2段式
昇降足場によるコンクリート打設方法において、ガイド
マストに沿って昇降する上部足場と下部足場とを昇降自
在に設置し、上部足場にはコンクリート打設水平管を設
置し、その水平管に複数の分流弁を設けてその分流弁に
吐出管を介して吐出ノズルを設置し、地上に設置したコ
ンクリートポンプと前記コンクリート打設水平管とを接
続しコンクリートの供給を受けて型枠内にコンクリート
打設し、コンクリート打設レベルの調整は上部足場を昇
降して行い、コンクリート打設中の型枠調整は前記下部
足場を昇降して行い、上部足場には着脱自在に屋根を設
置してコンクリート打設することを特徴とする移動式コ
ンクリート打設方法。
1. A concrete pouring method using a two-stage lifting scaffold for moving and pouring concrete, in which an upper scaffold and a lower scaffold that can be moved up and down along a guide mast are installed so that the scaffold can move up and down. Install a horizontal casting pipe, install a plurality of diversion valves on the horizontal pipe, install a discharge nozzle through the diversion valve in the diversion valve, and connect the concrete pump installed on the ground and the concrete casting horizontal pipe. When concrete is poured into the formwork, the level of the concrete placement is adjusted by raising and lowering the upper scaffold, and the formwork during concrete placement is adjusted by moving the lower scaffold up and down. A movable concrete pouring method characterized by installing a removable roof on the scaffold and pouring concrete.
【請求項2】 ガイドマストとそのガイドマストに沿っ
て昇降自在に上部足場と下部足場とを設け、上部足場と
下部足場との間に前記ガイドマストに沿って昇降する昇
降装置を備え、その昇降装置は上部足場と接続する第1
の接続手段および下部足場と接続する第2の接続手段と
を有し、前記上部足場は第1の接続手段と接続する部材
と昇降ロック装置とを有し、下部足場は第2の接続手段
と接続する部材および昇降ロック装置を有し、それらの
昇降ロック装置は前記昇降装置の駆動と同時にロックが
解除され、停止と同時にロックがオンされるよう構成さ
れ、上部足場には着脱自在に屋根が設けられたことを特
徴とする移動式コンクリート打設足場装置。
2. A guide mast and an upper scaffold and a lower scaffold provided to be movable up and down along the guide mast, and an elevating device for elevating and lowering along the guide mast between the upper scaffold and the lower scaffold, and elevating the scaffold The device is the first to connect with the upper scaffold
Connecting means and a second connecting means for connecting to the lower scaffold, the upper scaffolding has a member for connecting to the first connecting means and a lifting lock device, and the lower scaffolding is for connecting the second connecting means. It has a connecting member and a lifting lock device, and these lifting lock devices are configured so that the lock is released when the lifting device is driven, and the lock is turned on when the lifting device is stopped. A mobile concrete pouring scaffolding device characterized by being provided.
【請求項3】 第1および第2の接続手段は、足場側に
複数のヨークを設け、昇降手段側に複数のブラケットを
設けてピンで接続した請求項2に記載の移動式コンクリ
ート打設足場装置。
3. The mobile concrete pouring scaffold according to claim 2, wherein the first and second connecting means are provided with a plurality of yokes on the scaffolding side and a plurality of brackets on the elevating means side and are connected by pins. apparatus.
JP6165080A 1994-07-18 1994-07-18 Mobile concrete casting method and scaffolding device Expired - Fee Related JP2737868B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6165080A JP2737868B2 (en) 1994-07-18 1994-07-18 Mobile concrete casting method and scaffolding device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6165080A JP2737868B2 (en) 1994-07-18 1994-07-18 Mobile concrete casting method and scaffolding device

Publications (2)

Publication Number Publication Date
JPH0828043A true JPH0828043A (en) 1996-01-30
JP2737868B2 JP2737868B2 (en) 1998-04-08

Family

ID=15805497

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6165080A Expired - Fee Related JP2737868B2 (en) 1994-07-18 1994-07-18 Mobile concrete casting method and scaffolding device

Country Status (1)

Country Link
JP (1) JP2737868B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2308934A1 (en) * 2007-05-29 2008-12-01 Navarra Intelligent Concrete System, S.L Automatic system for construction of buildings
JP2014231682A (en) * 2013-05-28 2014-12-11 株式会社大林組 Rainproof device elevation type concrete form, and slip form device
JP2019112218A (en) * 2017-12-22 2019-07-11 西尾レントオール株式会社 Mobile elevation type scaffold with lifting device for people and cargoes, construction method using the same, and installation method thereof
CN110469114A (en) * 2019-08-27 2019-11-19 广东山众建筑科技有限公司 Cementitious material exact distributing and closely knit Work robot
CN110759288A (en) * 2019-11-08 2020-02-07 九江职业技术学院 Building wall detects and repairs manned elevating gear
JP2020033791A (en) * 2018-08-31 2020-03-05 株式会社タカミヤ Mobile elevation type scaffold

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2308934A1 (en) * 2007-05-29 2008-12-01 Navarra Intelligent Concrete System, S.L Automatic system for construction of buildings
WO2008145790A1 (en) * 2007-05-29 2008-12-04 Navarra Intelligent Concrete System, S.L Automatic system for construction of buildings
JP2014231682A (en) * 2013-05-28 2014-12-11 株式会社大林組 Rainproof device elevation type concrete form, and slip form device
JP2019112218A (en) * 2017-12-22 2019-07-11 西尾レントオール株式会社 Mobile elevation type scaffold with lifting device for people and cargoes, construction method using the same, and installation method thereof
JP2020033791A (en) * 2018-08-31 2020-03-05 株式会社タカミヤ Mobile elevation type scaffold
CN110469114A (en) * 2019-08-27 2019-11-19 广东山众建筑科技有限公司 Cementitious material exact distributing and closely knit Work robot
CN110759288A (en) * 2019-11-08 2020-02-07 九江职业技术学院 Building wall detects and repairs manned elevating gear
CN110759288B (en) * 2019-11-08 2020-12-11 九江职业技术学院 Building wall detects and repairs manned elevating gear

Also Published As

Publication number Publication date
JP2737868B2 (en) 1998-04-08

Similar Documents

Publication Publication Date Title
US6557817B2 (en) Wall climbing form hoist
US4102463A (en) Transporter for slab casting tables
US10914083B2 (en) Wall-climbing concrete form lifting system
CN101824910B (en) Quick template supporting construction method of elevator shaft
KR102115380B1 (en) Hydraulic slipform safety locking device and virtical structure and slab construction method using the same
KR20100001123U (en) Self-standing auto climbing apparatus and system using the same
JPH04505040A (en) building construction system
KR100647977B1 (en) Lifting method of a formwork working platform equipped with removable cylinder and mobile hydraulic pump
JP2010222083A (en) Lift for self-climbing construction
US4530648A (en) Wall climbing form hoist
JP2737868B2 (en) Mobile concrete casting method and scaffolding device
KR100514133B1 (en) Carrier for curtain-wall panel establishing use and curtain-wall establishing method using the same
KR20090020246A (en) Self-standing auto climbing system, apparatus and method using the same
JPH10292618A (en) Working scaffolding for wall construction work
JP4316514B2 (en) Working device in mechanical parking device and its working method
KR102445485B1 (en) Vertical hole construction apparatus and vertical hole construction method using the construction apparatus
JP2620123B2 (en) Temporary lifting equipment for construction work
GB2217296A (en) Lift building construction
JP3032477B2 (en) Moving scaffold for floor slab assembly
JP2612974B2 (en) Mounting method of outer wall PC members
KR20050102793A (en) Construction-material lift being installed at the outside of the construction-structure
KR200267717Y1 (en) Lifter for construction of a pier
CN215716443U (en) Support system for silo top structure
JP3560000B2 (en) Vertical shaft moving center
KR200159796Y1 (en) Elevating device of form for underground building construction work in the underground

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees