CN101824910B - Quick template supporting construction method of elevator shaft - Google Patents

Quick template supporting construction method of elevator shaft Download PDF

Info

Publication number
CN101824910B
CN101824910B CN200910113526XA CN200910113526A CN101824910B CN 101824910 B CN101824910 B CN 101824910B CN 200910113526X A CN200910113526X A CN 200910113526XA CN 200910113526 A CN200910113526 A CN 200910113526A CN 101824910 B CN101824910 B CN 101824910B
Authority
CN
China
Prior art keywords
elevator shaft
wall
stretcher
template
elevator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200910113526XA
Other languages
Chinese (zh)
Other versions
CN101824910A (en
Inventor
李桂江
张学利
冯忠民
刘国民
雍丽
王俊
李志刚
李吉寿
房公贤
吴继鸿
占财兴
贾森
牛寿鸿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Construction Engineering Group Co Ltd
China Construction Xinjiang Construction Engineering Group Second Construction Engineering Co Ltd
China Construction Xinjiang Construction Engineering Group Fifth Construction Engineering Co Ltd
Original Assignee
Xinjiang Construction Engineering Group Co Ltd
China Construction Xinjiang Construction Engineering Group Second Construction Engineering Co Ltd
China Construction Xinjiang Construction Engineering Group Fifth Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Construction Engineering Group Co Ltd, China Construction Xinjiang Construction Engineering Group Second Construction Engineering Co Ltd, China Construction Xinjiang Construction Engineering Group Fifth Construction Engineering Co Ltd filed Critical Xinjiang Construction Engineering Group Co Ltd
Priority to CN200910113526XA priority Critical patent/CN101824910B/en
Publication of CN101824910A publication Critical patent/CN101824910A/en
Application granted granted Critical
Publication of CN101824910B publication Critical patent/CN101824910B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a quick template supporting construction method of an elevator shaft. Firstly, a supporting frame which comprises a bottom stretcher, middle vertical posts and a top workbench is constructed in the bottom of the elevator shaft; the top workbench is matched with the elevator shaft in size; the lower end of the bottom stretcher is butted on an elevator door; the upper end is built on an elevator shaft wall which is opposite to the elevator door; the upper ends of the middle vertical posts are articulated together with the bottom surface of the top workbench; the lower end of one group of the middle vertical posts is articulated together with the upper stretcher body of the bottom stretcher; the lower end of the other group of the middle vertical posts is clamped on the bottom stretcher; then, an inner and an outer wall templates and an outer scaffold are constructed on the top workbench for casting the elevator shaft wall; after one layer of elevator shaft is cast, the inner wall template is moved inwards to leave a wall surface; the outer wall template is removed; the supporting frame is integrally lifted upwardly by one layer by vertical lifting equipment; then, the inner wall template is moved outwardly to be near the wall surface; the outer wall template is repeatedly constructed; and the casting of a previous elevator shaft wall is finished.

Description

The quick template supporting construction method of elevator shaft
Technical field
The invention belongs to technical field of building construction, relate to the quick template supporting construction method of a kind of job practices of elevator shaft, particularly elevator shaft.
Background technology
In the high-building construction process; The construction of lift well method that is adopted at present is more complicated all; Need use a large amount of templates to the concreting of the body of wall of elevator shaft, post, beam and support, building needs to descend the taking-up of all dismantling of the used template of one deck, supporting frame behind the one deck that finishes, during one deck elevator shaft on build; Build a framework separately again, mounting template, this process needs constantly to carry out repeatedly in the work progress of whole highrise building.This is narrow and small at the such construction space of elevator shaft, the degree of depth is high, fixed point is few, sweep in the big particular surroundings of frame formwork difficulty and construct, and not only existing job practices is very loaded down with trivial details, and wastes time and energy; Cause construction cost high; Labor strength is big, and inconvenient operation is dangerous during work.
Summary of the invention
The object of the present invention is to provide a kind of quick template supporting construction method of elevator shaft; Need not to install and remove repeatedly support scaffolding and template and can carry out the quick template supporting construction of elevator shaft from down to up; Can improve the speed of application of elevator shaft effectively, reduce labor strength, improve building operations efficient; Reduce construction cost, guarantee handling safety.
The objective of the invention is to realize like this: a kind of quick template supporting construction method of elevator shaft; This device comprises a bracing frame, and this bracing frame is made up of the bottom stretcher that is in tilted layout, middle part column and top workbench, and the size of top workbench and the size of elevator shaft are complementary; The lower end of bottom stretcher is against the elevator door place; The upper end of bottom stretcher rides on the elevator shaft wall relative with elevator door, and the middle part column is divided into two groups, and its upper end is all hinged with workbench bottom surface, said top; The lower end of one group of middle part column and the top support body of bottom stretcher are hinged; The lower end of another group middle part column is stuck on the bottom support body of bottom stretcher, and the inner, external wall template that is used for building the elevator shaft wall is being set on the working platform of top, carries out the pouring construction of elevator shaft wall; After having built one deck elevator shaft; Interior wall form moved inward leave metope; Remove outer wall template; Through vertical-lift equipment with said bracing frame in company with the interior wall form whole rising one deck that makes progress, and then interior wall form outwards moved near to the metope place, accomplish building of last layer elevator shaft wall thereby repeat to make up outer wall template; The upper end of stretcher is equipped with roller in the bottom; The center of workbench is provided with an opening that has cover plate at the top; In opening, place a ladder; The lower end of ladder rides over the elevator door place of next floor, and after floor construction was so instantly accomplished, the constructor can climb on the working platform of top through ladder.
When the inventive method is used; Earlier first floor elevator shaft wall is poured into a mould, build support frame in elevator shaft then is against the stretcher lower end, bottom of bracing frame on the doorframe both sides or ground at elevator door place; Carry out the cast of last layer elevator shaft wall according to said method, and the like.Accomplish the cast of whole highrise building elevator shaft through the vertical-lift equipment bracing frame that constantly raises.Compare with existing job practices of building elevator shaft; The inventive method not only operating procedure is simple; The device therefor volume is little, and is in light weight, and the integrated degree of equipment is high; Thereby simplified the loaded down with trivial details operation of building, removing bracing frame and metope template of carrying out repeatedly in the elevator shaft casting and constructing process greatly, only need repeat to make up the wall face support shuttering and get final product.Make full use of the effect of vertical-lift equipment, bracing frame is successively promoted, carry out the quick template supporting construction through vertical-lift equipment; Need not to install and remove repeatedly support scaffolding and metope template and can carry out the quick template supporting construction of elevator shaft from down to up; Can improve the speed of application of elevator shaft effectively, reduce labor strength, improve building operations efficient; Reduce construction cost, guarantee handling safety.
Description of drawings
To combine accompanying drawing that the present invention is described further below.
Fig. 1 is the perspective view of the used bracing or strutting arrangement of the present invention;
Fig. 2 is the construction sketch map of the inventive method.
The specific embodiment
A kind of quick template supporting construction method of elevator shaft like Fig. 1, shown in Figure 2, is at first constructed a bracing frame in the bottom of elevator shaft 5, this bracing frame is made up of the bottom stretcher 4 that is in tilted layout, middle part column 2 and top workbench 1.
The constructor enters on the top working platform 1 from the elevator door of next floor for ease; The center of workbench 1 can be provided with an opening 10 that has cover plate at the top; In opening 10, place a ladder 11, the lower end of ladder 11 rides over the elevator door place of next floor, after floor construction is so instantly accomplished; The constructor can climb on the top working platform 1 through ladder 11, thereby the convenient construction personnel are into and out of work.
The size of the size of top workbench 1 and elevator shaft 5 is complementary, and the lower end of bottom stretcher 4 is against the elevator door place.Like Fig. 1, shown in Figure 2; In order to improve the stability of strutting system of bottom stretcher 4; The lower, transverse of stretcher 4 is being fixedly connected a pin 12 in the bottom; When the lower end of bottom stretcher 4 was against the elevator door place, two of pin 12 corrected retaining on the doorframe wall of elevator door both sides, thereby can improve the job stability of bottom stretcher 4 greatly.
Certainly, the length of pin 12 is greater than the width of elevator door 7 but should be less than the distance between elevator shaft 5 side walls.
The upper end of bottom stretcher 4 rides on the elevator shaft wall relative with elevator door; Middle part column 2 is divided into two groups; Its upper end is all hinged with workbench 1 bottom surface, said top; The lower end of one group of middle part column 2 and the top support body of bottom stretcher 4 are hinged, and the lower end of another group middle part column 2 is stuck on the bottom support body of bottom stretcher 4 through buckle 6.
When through vertical-lift equipment this bracing frame being promoted, under action of gravity, the bottom support body and the buckle 6 of bottom stretcher 4 disengage, and along with the rising of bracing frame, the lower end of bottom stretcher 4 is left ground, elevator doorway and is suspended in the elevator shaft 5.
Above bracing frame goes upward to during the construction of lift well position of a floor; The constructor can be drawn to the lower end of bottom stretcher 4 with elevator well head ground through reinforcing bar and contact; Make the upper end of bottom stretcher 4 ride on the elevator shaft wall relative, can carry out next step working procedure with elevator door.
In order to rub bad elevator shaft wall in the upper end that prevents bracing frame its bottom stretcher 4 in up process, can be in the bottom upper end of stretcher 4 install roller 3, thereby can either protect the elevator shaft wall, be convenient to bracing frame again and move up.
Improvement as the used support frame structure of the present invention; Can also between bottom stretcher 4 and bottom have one group of middle part column 2 of buckle 6, an extension spring be installed; Under the effect of extension spring, bottom stretcher 4 can remain heeling condition, like this after bracing frame is upwards drawn high one deck by perpendicular lifting apparatus; The lower end of bottom stretcher 4 can ride on the ground at elevator shaft door place automatically, thereby saves the process through reinforcing bar tractive bottom stretcher 4 by the constructor.
After used bracing frame is constructed with the present invention, on top working platform 1, make up inner, external wall template 8,9 and the external scaffolding that is used for building the elevator shaft wall by the constructor, carry out the pouring construction of elevator shaft wall; After having built one deck elevator shaft 5; Interior wall form 8 moved inward leave metope; Remove outer wall template 9;, and then interior wall form 8 outwards moved near to the metope place the said bracing frame whole rising one deck that makes progress through vertical-lift equipment, accomplish building of last layer elevator shaft walls thereby repeat to make up outer wall template 9.
When job practices of the present invention is used; Earlier first floor elevator shaft 5 walls are poured into a mould, build support frame in elevator shaft 5 then is against bottom stretcher 4 lower ends of bracing frame on the doorframe both sides or ground at elevator door 7 places; The constructor stands on the top working platform 1; Build inner, external wall template 8,9, carry out the cast of last layer elevator shaft 5 walls according to said method, and the like.Accomplish the cast of whole highrise building elevator shaft through the vertical-lift equipment bracing frame that constantly raises.
The present invention has saved the demolition, installation bracing frame that carries out repeatedly in the conventional construction method and numerous and diverse step of inner, external wall template, thereby has improved the pouring construction speed of elevator shaft greatly.

Claims (1)

1. the quick template supporting construction method of an elevator shaft; It is characterized in that: this device comprises a bracing frame; This bracing frame is made up of the bottom stretcher (4) that is in tilted layout, middle part column (2) and top workbench (1); The size of the size of top workbench (1) and elevator shaft (5) is complementary, and the lower end of bottom stretcher (4) is against elevator door (7) and locates, and the upper end of bottom stretcher (4) rides on the elevator shaft wall relative with elevator door (7); Middle part column (2) is divided into two groups; Its upper end is all hinged with said top workbench (1) bottom surface, and the lower end of one group of middle part column (2) and the top support body of bottom stretcher (4) are hinged, and the lower end of another group middle part column (2) is stuck on the bottom support body of bottom stretcher (4); The inner, external wall template (8,9) that is used for building the elevator shaft wall is being set on top working platform (1), is carrying out the pouring construction of elevator shaft wall; After having built one deck elevator shaft (5); Interior wall form (8) moved inward leave metope; Remove outer wall template (9); Through vertical-lift equipment with said bracing frame in company with interior wall form (8) the whole rising one deck that makes progress, and then interior wall form (8) outwards moved near to the metope place, repeat to make up outer wall template (9) thus accomplish building of last layer elevator shaft wall; The upper end of the stretcher in the bottom (4) is equipped with roller (3); The center of the workbench at the top (1) is provided with an opening (10) that has cover plate; In opening (10), place a ladder (11); The lower end of ladder (11) rides over the elevator door place of next floor; So instantly, after floor construction was accomplished, the constructor can climb on the top working platform (1) through ladder (11).
CN200910113526XA 2009-11-17 2009-11-17 Quick template supporting construction method of elevator shaft Expired - Fee Related CN101824910B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910113526XA CN101824910B (en) 2009-11-17 2009-11-17 Quick template supporting construction method of elevator shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910113526XA CN101824910B (en) 2009-11-17 2009-11-17 Quick template supporting construction method of elevator shaft

Publications (2)

Publication Number Publication Date
CN101824910A CN101824910A (en) 2010-09-08
CN101824910B true CN101824910B (en) 2012-02-01

Family

ID=42689055

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910113526XA Expired - Fee Related CN101824910B (en) 2009-11-17 2009-11-17 Quick template supporting construction method of elevator shaft

Country Status (1)

Country Link
CN (1) CN101824910B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102777030A (en) * 2012-08-06 2012-11-14 中国建筑第六工程局有限公司 Method for building up formwork construction platform of lift shaft
JP6084936B2 (en) * 2014-02-25 2017-02-22 株式会社日立ビルシステム Elevator installation apparatus and method of assembling the installation apparatus
CN107842034B (en) * 2017-12-04 2024-01-05 三洋电梯(珠海)有限公司 Quick safety construction system and quick construction method for elevator shaft foundation
CN108824764A (en) * 2018-07-26 2018-11-16 凯斯博电梯有限公司 A kind of villa elevator support frame
CN109441090B (en) * 2018-12-28 2023-09-22 重庆建工住宅建设有限公司 Integral lifting elevator shaft construction platform
CN109853928A (en) * 2019-01-30 2019-06-07 山西三建集团有限公司 Set up the interior posture workbench and its erection method of elevator shear wall formwork for placing
CN109763627A (en) * 2019-03-13 2019-05-17 中国五冶集团有限公司 A kind of construction of elevator shaft in high-rise building structure and construction method
CN109972813A (en) * 2019-04-29 2019-07-05 北京天恒建设集团有限公司 Integrated form integral construction plateform system in a kind of elevator
CN111877744B (en) * 2020-06-08 2022-09-09 河南工业职业技术学院 Rapid formwork supporting construction device and method for elevator shaft
CN114197848B (en) * 2021-11-25 2023-04-07 中建八局第二建设有限公司 Novel elevator well promotion formula bracing operation steel platform

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5065843A (en) * 1990-05-16 1991-11-19 Otis Elevator Company Method for installing elevator system components
CN201065645Y (en) * 2007-07-19 2008-05-28 河北建设集团有限公司 High rising building elevator shaft formwork device
CN201158932Y (en) * 2008-02-01 2008-12-03 北京市第五建筑工程有限公司 Self-chucking platform especially for high-rise building elevator shaft formwork supports
CN101413341A (en) * 2008-11-19 2009-04-22 沈阳北方建设股份有限公司 Elevator well internal formwork construction method and elevator well internal formwork construction support

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5065843A (en) * 1990-05-16 1991-11-19 Otis Elevator Company Method for installing elevator system components
CN201065645Y (en) * 2007-07-19 2008-05-28 河北建设集团有限公司 High rising building elevator shaft formwork device
CN201158932Y (en) * 2008-02-01 2008-12-03 北京市第五建筑工程有限公司 Self-chucking platform especially for high-rise building elevator shaft formwork supports
CN101413341A (en) * 2008-11-19 2009-04-22 沈阳北方建设股份有限公司 Elevator well internal formwork construction method and elevator well internal formwork construction support

Also Published As

Publication number Publication date
CN101824910A (en) 2010-09-08

Similar Documents

Publication Publication Date Title
CN101824910B (en) Quick template supporting construction method of elevator shaft
CN108518053A (en) A kind of umbrella shape moves hydraulic up-down floor scaffold and its construction method
CN105839543B (en) Bridge High-pier rises outrigger over-form construction technique certainly
CN209482679U (en) Tub brace type integral steel platform suitable for sloping core construction
CN109356167B (en) Deep foundation pit support dismantling system and construction method
CN112727074B (en) Building machine and building construction method
CN211142839U (en) Self-propelled anti-collision wall construction formwork trolley
CN102777030A (en) Method for building up formwork construction platform of lift shaft
CN102704674A (en) Hydraulic self-elevating template for vertical shaft and construction method thereof
CN106284956A (en) The scaffold of a kind of automatic lifting and construction method thereof
CN105839542B (en) Bridge High-pier rises outrigger turning-over certainly
CN206233546U (en) A kind of elevator hoistways workbench
KR101519197B1 (en) Net device for preventing falling-down through elevator hole
JP3074765U (en) Pillar building construction system equipment
CN202577952U (en) Hydraulic automatic lifting template of vertical shaft
CN201546438U (en) Fast formwork-erecting construction device of elevator well
CN104131635A (en) Method and platform for constructing peripheral shear wall of prefabricated staircase
CN103243908A (en) Slab formwork system and house building construction method
CN104612060B (en) Construction working stand under prefabricated side bar lateral roof
CN212270670U (en) Movable hanging basket for bridge construction
JP2737868B2 (en) Mobile concrete casting method and scaffolding device
CN208763382U (en) A kind of removable hydraulic up-down floor scaffold of umbrella shape
CN112360136A (en) Formwork support frame body of concrete pouring wall body of elevator shaft and erection method thereof
CN207003989U (en) External hanging type scaffold is climbed in one kind
CN203238942U (en) Floor slab framework system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120201

Termination date: 20131117