JPH0819657B2 - Flexible Mound Foundation Structure Construction Method - Google Patents

Flexible Mound Foundation Structure Construction Method

Info

Publication number
JPH0819657B2
JPH0819657B2 JP1298542A JP29854289A JPH0819657B2 JP H0819657 B2 JPH0819657 B2 JP H0819657B2 JP 1298542 A JP1298542 A JP 1298542A JP 29854289 A JP29854289 A JP 29854289A JP H0819657 B2 JPH0819657 B2 JP H0819657B2
Authority
JP
Japan
Prior art keywords
bag body
seabed
mound
base
flexible
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1298542A
Other languages
Japanese (ja)
Other versions
JPH03158515A (en
Inventor
哲郎 堀
修一郎 源波
保夫 梶岡
正博 田中
巧 大山
正 小野
博喜 大内田
久雄 阿部
哲志 清川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP1298542A priority Critical patent/JPH0819657B2/en
Publication of JPH03158515A publication Critical patent/JPH03158515A/en
Publication of JPH0819657B2 publication Critical patent/JPH0819657B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Description

【発明の詳細な説明】 「産業上の利用分野」 この発明は、沿岸近くでの波の伝播や海底等の砂の移
動を制御する水没型の潜堤の基礎構造に係わり、特に、
可撓性素材からなる袋体を用いたフレキシブルマウンド
(柔構造潜堤)の基礎構造の施工方法に関する。
TECHNICAL FIELD The present invention relates to the substructure of a submerged submerged dike that controls the propagation of waves near the coast and the movement of sand such as the sea floor.
The present invention relates to a method of constructing a foundation structure of a flexible mound (flexible submerged dike) using a bag made of a flexible material.

「従来の技術」 従来、沿岸近くの波や砂を制御する潜堤としては、ケ
ーソンを用いて構築する方式や消波ブロックを海中に積
み上げる方式のもの等が一般的である。
“Prior art” Conventionally, as a submerged dike for controlling waves and sand near the coast, a method of using caisson or a method of stacking wave-dissipating blocks in the sea is generally used.

ところで、上記の潜堤では、ケーソンや多量の消波ブ
ロックを現場へ輸送しなければならず、構築現場の海底
の地ならしやマウンドなどの基礎施工が必要であり、工
期が長期化しコスト高になるといった問題点がある。ま
た、設置後、構造物を移動、撤去する必要が生じた場
合、作業に非常に多くの期間とコストとを要する。
By the way, in the above-mentioned submerged dike, caisson and a large amount of wave-dissipating blocks must be transported to the site, and foundation work such as seabed leveling and mound at the construction site is required, resulting in a long construction period and high costs There is a problem such as. In addition, if it is necessary to move or remove the structure after installation, the work requires a very long period and cost.

さらに言えば、ケーソンや消波ブロックで構築され
る、いわゆる剛構造の潜堤は、この天端上で波を砕波さ
せると共にこの砕波による乱れを幅広い天端上で継続さ
せることで、波のエネルギー損失を図って消波させるも
のである。従って、このような潜堤によって十分な消波
効果を得るためには、潜堤の天端を水面近くまで高くす
ると共に、潜堤が非常に大規模なものになると共に、船
舶等の航行の妨げになる、という問題点がある。
Furthermore, the so-called rigid structure submerged dike constructed by caisson and wave-dissipating block breaks the wave on this crown and continues the disturbance by this breaking wave on a wide crown, thus the energy of the wave It is intended to make a loss and to make the wave disappear. Therefore, in order to obtain a sufficient wave-dissipating effect with such a submerged dike, the top of the submerged dike is raised close to the water surface, the submerged dike becomes very large, and the navigation of vessels etc. There is a problem that it becomes an obstacle.

そこで、本出願人は前記問題点を解決しうる有効な手
段として、フレキシブルマウンド(柔構造潜堤)を提案
した(特願昭62−239872号等)。
Therefore, the present applicant has proposed a flexible mound (flexible structure submerged dike) as an effective means for solving the above-mentioned problems (Japanese Patent Application No. 62-239872, etc.).

ここで、このフレキシブルマウンドの基礎構造を第21
図を参照して説明する。
Here, the basic structure of this flexible mound is
It will be described with reference to the drawings.

フレキシブルマウンド30は、海底地盤G上に設置され
たシート状の可撓性素材からなり、海水等の流体を注入
されることによって膨らむ袋体31と、この袋体31の底縁
部に沿って配設され、内部に土砂等の充填材が充填され
たアンカーチューブ32とを備えると共に、このアンカー
チューブ32を該フレキシブルマウンドの基礎構造として
前記海底地盤G中に埋設するようにしたものである。
The flexible mound 30 is made of a sheet-shaped flexible material installed on the seabed G and has a bag body 31 that swells when a fluid such as seawater is injected, and a bottom edge portion of the bag body 31. An anchor tube 32, which is disposed inside and filled with a filler such as earth and sand, is provided, and the anchor tube 32 is embedded in the seabed G as a basic structure of the flexible mound.

アンカーチューブ32は、前記袋体31と同様の可撓性素
材から形成されており、内部に海底地盤Gの土砂と同一
の砂H′(充填材)が充填された状態で、袋体31の底縁
部外方の海底地盤G中に埋設されることによって、フレ
キシブルマウンド30の基礎構造となる。このアンカーチ
ューブ32には、その内部に前記砂H′を注入、充填する
ための注入弁33および余分な海水等の流体を排出する排
出弁(図示略)がそれぞれ設けられている。
The anchor tube 32 is made of the same flexible material as that of the bag body 31 and is filled with the same sand H ′ (filler) as the soil of the seabed G in the bag body 31. By being embedded in the seabed ground G outside the bottom edge, the foundation structure of the flexible mound 30 is obtained. The anchor tube 32 is provided therein with an injection valve 33 for injecting and filling the sand H'and a discharge valve (not shown) for discharging excess fluid such as seawater.

つぎに、前記フレキシブルマウンドの基礎構造の施工
方法について第22図および第23図を参照して説明する。
Next, a method of constructing the basic structure of the flexible mound will be described with reference to FIGS. 22 and 23.

まず始めに、陸上で製作されて作業船によって予定海
域に運ばれたフレキシブルマウンド30を海底に沈めて、
海底地盤G上に接地させる。
First of all, sink the flexible mound 30 that was manufactured on land and carried by the work boat to the planned sea area to the bottom of the sea,
Ground on the seabed G.

つぎに、第22図に示すように、フレキシブルマウンド
30の袋体31に海水Bおよび砂Hを充填弁34から所定量に
達するまで注入する。また、余分な海水Bは排出弁35か
ら排出する。
Next, as shown in Fig. 22, the flexible mound
Seawater B and sand H are poured into the bag body 31 of 30 from the filling valve 34 until a predetermined amount is reached. The excess seawater B is discharged from the discharge valve 35.

そして、アンカーチューブ32周囲の海底地盤Gを第23
図に示すように掘削しつつこの掘削土砂H′を注入弁33
からアンカーチューブ32内に注入する。さらに、内部に
土砂H′が充填されたアンカーチューブ32を海底地盤G
中に埋設することによって、フレキシブルマウンド30を
海底地盤G上へ定着させる。
Then, the seabed ground G around the anchor tube 32 is
While excavating as shown in the figure, this excavated sediment H'is injected into the valve 33
To the anchor tube 32. Further, the anchor tube 32 filled with earth and sand H'is attached to the seabed G.
The flexible mound 30 is fixed on the seabed G by being embedded in the inside.

「発明が解決しようとする課題」 しかし、従来のフレキシブルマウンドの基礎構造の施
工方法においては、アンカーチューブ周囲の海底地盤を
掘削しつつ、この掘削土砂をこのアンカーチューブ内に
注入し、このアンカーチューブを該海底地盤中に埋設す
るものなので、フレキシブルマウンドの設置場所となる
海底地盤の土質は砂質性のものに限られるという問題が
あった。
[Problems to be solved by the invention] However, in the conventional method of constructing the foundation structure of the flexible mound, while excavating the seabed ground around the anchor tube, the excavated sand is injected into the anchor tube, and the anchor tube Since it is buried in the seabed, the soil of the seabed where the flexible mound is installed is limited to sandy soil.

この発明は前記事情に鑑みてなされたもので、海底地
盤の土質に左右されることを少なくして、フレキシブル
マウンドを海底地盤上に定着させることが可能なフレキ
ブルマウンドの基礎構造の施工法を提供しようとするも
のである。
The present invention has been made in view of the above circumstances, and a method of constructing a flexible mound foundation structure capable of fixing a flexible mound on the seabed ground while reducing the influence of the soil quality of the seabed ground. It is the one we are trying to provide.

「課題を解決するための手段」 可撓性素材からなり、内部に流体を注入することによ
って膨らむ袋体と、該袋体の底部に配設され、かつ前記
袋体を海底地盤上に定着させるための基礎とを備えてな
るフレキシブルマウンドの基礎構造の施工方法におい
て、 請求項(1)記載の発明では、海底地盤に鋼矢板から
なる囲いを設けたのち、該囲いの内側に充填材を充填
し、固化させることによって基礎本体を形成した。
"Means for Solving the Problem" A bag body made of a flexible material, which is inflated by injecting a fluid into the inside, and a bag body disposed on the bottom portion of the bag body and fixed on the seabed ground. In the method of constructing a flexible mound foundation structure comprising a foundation for manufacturing, in the invention according to claim (1), an enclosure made of steel sheet pile is provided on the seabed ground, and a filling material is filled inside the enclosure. Then, the base body was formed by solidifying.

請求項(2)記載の発明では、海底地盤上に石材を堆
積させて錐体状の捨石マウンドを設けたのち、該基礎本
体の上にベースを積層した。
In the invention described in claim (2), after the stone material is deposited on the seabed to provide the cone-shaped rubble mound, the base is laminated on the base body.

請求項(3)記載の発明においては、ベースの側面に
鋼製スカートを設けたのち、該鋼製スカートの先端を海
底地盤上に打ち込み、つづいて前記ベースと海底地盤と
の間の空隙にモルタルグラウトを充填した。
In the invention according to claim (3), after a steel skirt is provided on the side surface of the base, the tip of the steel skirt is driven into the seabed ground, and subsequently, the mortar is provided in the gap between the base and the seabed ground. Filled with grout.

請求項(4)記載の発明においては、H鋼からなる基
礎杭を海底地盤に打ち込んだのち、該杭間にH鋼からな
る梁を架け渡して架構を設置し、つづいて該架構の上に
ベースを配設した。
In the invention according to claim (4), after the foundation pile made of H steel is driven into the seabed ground, a beam made of H steel is bridged between the piles to install a frame, and then on the frame. The base is arranged.

請求項(5)記載の発明においては、杭打ち込み用孔
を有するブロックを海底地盤に接地させたのち、該杭打
ち込み孔に杭を貫通させ、つづいて該杭を打ち込み固定
した。
In the invention according to claim (5), after the block having the pile driving hole is grounded to the seabed ground, the pile is penetrated through the pile driving hole, and then the pile is fixed.

「実施例」 以下、本発明の一実施例について図面を参照して説明
する。
Hereinafter, an embodiment of the present invention will be described with reference to the drawings.

第1図ないし第4図は請求項(1)記載の発明の実施
例を示すもので、本発明を凹凸のある海底地盤上に適用
した場合の実施例である。
FIGS. 1 to 4 show an embodiment of the invention described in claim (1), which is an embodiment when the present invention is applied to a seabed with unevenness.

まず第1図に示すように多数の鋼矢板を海底地盤Gに
打ち立てて方形状の囲い2を形成する。つぎに、第2図
に示すようにこの囲い2の内側にプレパクトコンクリー
トあるいは水中コンクリートからなる充填材を海底地盤
G表面の凹凸を覆うようにし、かつ囲いの高さと略同一
になるようにして注入・充填する。そして、前記充填材
を固化させることによって、袋体Fを設置するための基
礎本体3を作る。そして、この基礎本体3の上面に複数
のボルト等の部材からなる連結用部材4、4、…を該上
面の縁に沿って、かつ該縁の近傍にアンカーリングによ
って設けて袋体Fを取り付けられるようにする。このよ
うにして、海底地盤G上にプレパクトコンクリートある
いは水中コンクリートからなる基礎1を設置することに
よって、第4図に示すようにその基礎1の重さによって
フレキシブルマウンドを海底地盤G上に定着させること
ができる。
First, as shown in FIG. 1, a large number of steel sheet piles are set up on the seabed ground G to form a rectangular enclosure 2. Next, as shown in FIG. 2, a filling material made of prepact concrete or underwater concrete is applied to the inside of the enclosure 2 so as to cover the irregularities on the surface of the seabed G and to be approximately the same height as the enclosure. Inject and fill. Then, the base body 3 for installing the bag body F is made by solidifying the filling material. Then, the bag body F is attached to the upper surface of the base body 3 by providing connecting members 4, 4, ... Composed of a plurality of members such as bolts along the edge of the upper surface by an anchor ring in the vicinity of the edge. To be able to In this way, by installing the foundation 1 made of prepact concrete or underwater concrete on the seabed G, the flexible mound is fixed on the seabed G by the weight of the foundation 1 as shown in FIG. be able to.

なお、本発明においては、フレキシブルマウンドの海
底地盤上への定着が海底地盤表面の凹凸状態や土質状態
に左右されることが少なく、フレキシブルマウンドの設
置予定海域の水深に合わせて基礎の高さを調節すること
が可能なものなので、もっとも消波効果の高い場所にフ
レキシブルマウンドを配置することができる。
In the present invention, the fixing of the flexible mound on the seabed is less affected by the unevenness and soil condition of the surface of the seabed, and the height of the foundation is adjusted according to the water depth of the planned sea area of the flexible mound. Since it is adjustable, the flexible mound can be placed in the place where the wave-dissipating effect is the highest.

第5図ないし第8図は、請求項(2)記載の発明の実
施例を示すもので、本発明を凹凸のある海底地盤上に適
用した場合の実施例である。
5 to 8 show an embodiment of the invention described in claim (2), which is an embodiment in the case where the present invention is applied to a seabed with unevenness.

まずはじめに、第5図に示すように海底地盤G上に石
材を積み重ねて四角錐状の台(捨石マウンド6)を作
る。また、陸上において、この捨石マウンド6の上面に
積層するためのPCベース7を作り、このPCベース7の上
面に袋体Fを取り付ける。ここで、このPCベース7はプ
レキャストコンクリートによって方形板状に成型された
もので、PCベース7の上面は袋体Fを取り付けるための
複数の連結用部材8、8、…が該上面の縁に沿って、か
つ該縁の近傍に設けられており、これらの連結部材8、
8、…によってPCベース7の上面に袋体Fを取り付け
る。さらに、この袋体Fを取り付けたPCベース7を設置
予定海域まで運搬したのち、第7図および第8図に示す
ようにPCベース7を作業船E、Eの係留策D、Dに係留
し、つづいて該係留策D、Dをゆっくり伸ばすことで袋
体Fを海底地盤G上に設けられた捨石マウンド6の上に
積層して基礎5が完成する。
First, as shown in FIG. 5, stone materials are piled on the seabed G to make a quadrangular pyramid-shaped platform (rubbish mound 6). Further, on land, a PC base 7 for stacking is formed on the upper surface of the rubble mound 6, and the bag body F is attached to the upper surface of the PC base 7. Here, the PC base 7 is molded into a rectangular plate shape by precast concrete, and the upper surface of the PC base 7 has a plurality of connecting members 8, 8, ... For attaching the bag F to the edge of the upper surface. Are provided along and near the edge, and these connecting members 8,
The bag F is attached to the upper surface of the PC base 7 by 8, ... Further, after carrying the PC base 7 with the bag body F attached thereto to the planned sea area, the PC base 7 is moored to the mooring measures D, D of the work vessels E, E as shown in FIGS. 7 and 8. Then, by slowly extending the mooring measures D, D, the bag body F is laminated on the rubble mound 6 provided on the seabed G to complete the foundation 5.

このようにして海底地盤上に捨石マウンドとPCベース
とからなる基礎を設置することによって、この基礎の重
さによってフレキシブルマウンドを海底地盤上に定着さ
せることができる。
In this way, by installing the foundation consisting of the rubble mound and the PC base on the seabed, the flexible mound can be fixed on the seabed by the weight of the foundation.

なお、本発明においては、フレキシブルマウンドの海
底地盤上への定着が海底地盤表面の凹凸状態や土質状態
に左右されることが少なく、フレキシブルマウンドの設
置予定海域の水深に合わせて基礎の高さを調節すること
が可能なものなので、もっとも消波効果の高い場所にフ
レキシブルマウンドを配置することができる。
In the present invention, the fixing of the flexible mound on the seabed is less affected by the unevenness and soil condition of the surface of the seabed, and the height of the foundation is adjusted according to the water depth of the planned sea area of the flexible mound. Since it is adjustable, the flexible mound can be placed in the place where the wave-dissipating effect is the highest.

第9図および第11図は、請求項(3)記載の発明の実
施例を示すもので、本発明を凹凸のある海底地盤上に適
用した場合の例である。
FIG. 9 and FIG. 11 show an embodiment of the invention described in claim (3), which is an example of the case where the present invention is applied to the seabed ground having irregularities.

まずはじめに、第9図に示すように陸上にてプレキャ
ストコンクリートによって方形状のPCベース10を成型
し、このPCベース10の上面に袋体Fを取り付けるための
複数の連結用部材11、11、…を該上面の縁に沿って、か
つ該縁の近傍に設ける。つぎに、これらの連結用部材1
1、11、…に袋体Fを取り付ける。また、PCベース10の
側面に鋼製スカート12を取り付ける。つぎに、この袋体
Fと鋼製スカート12とを取り付けたPCベース10をフレキ
シブルマウンドの設置予定海域の海底に沈め、第10図に
示すようにこの鋼製スカート12の先端を海底地盤Gに打
ち込み固定する。さらにPCベース10と海底地盤Gとの間
の空隙Sにモルタルグラウト13を充填してこの空隙Sを
埋めることによって基礎9が完成する。
First, as shown in FIG. 9, a rectangular PC base 10 is molded on land by precast concrete, and a plurality of connecting members 11, 11 for attaching the bag F to the upper surface of the PC base 10 are connected. Along the edge of the top surface and near the edge. Next, these connecting members 1
Attach the bag F to 1, 11, .... Further, a steel skirt 12 is attached to the side surface of the PC base 10. Next, the PC base 10 to which the bag body F and the steel skirt 12 are attached is sunk on the seabed in the area where the flexible mound is to be installed, and the tip of the steel skirt 12 is placed on the seabed G as shown in FIG. Fix by driving. Further, the space 9 between the PC base 10 and the seabed G is filled with the mortar grout 13 and the space S is filled to complete the foundation 9.

このようにして海底地盤上にモルタルグラウトとPCベ
ースとからなる基礎を設置することによって、その基礎
の重さによってフレキシブルマウンドを海底地盤上に定
着させることができる。
By thus installing the foundation consisting of the mortar grout and the PC base on the seabed, the flexible mound can be fixed on the seabed by the weight of the foundation.

なお、本発明においては、フレキシブルマウンドの海
底地盤上への定着が海底地盤表面の凹凸状態や土質状態
に左右されることが少なく、フレキシブルマウンドの設
置予定海域の水深に合わせて基礎の高さを調節すること
が可能なものなので、もっとも消波効果の高い場所にフ
レキシブルマウンドを配置することができる。
In the present invention, the fixing of the flexible mound on the seabed is less affected by the unevenness and soil condition of the surface of the seabed, and the height of the foundation is adjusted according to the water depth of the planned sea area of the flexible mound. Since it is adjustable, the flexible mound can be placed in the place where the wave-dissipating effect is the highest.

第12図ないし第15図は、請求項(4)記載の発明の実
施例で、凹凸のある海底地盤上に本発明を適用した場合
の実施例である。
12 to 15 show an embodiment of the invention described in claim (4), which is an embodiment in the case where the present invention is applied on a seabed with unevenness.

まずはじめに、第12図に示すようにH鋼からなる基礎
杭を海底地盤Gに打ち込み、これらの杭間にH鋼からな
る梁を架け渡して架構15を作る。また、陸上において第
13図に示すようにプレキャストコンクリートによって方
形状のPCベース16を成型し、このPCベース16の上面に袋
体Fを取り付けるための複数の連結用部材17、17、…を
該上面の縁に沿って、かつ該縁の近傍に設ける。つぎ
に、これらの連結用部材17、17、…に袋体Fを取り付け
る。そして、この袋体Fを取り付けたPCベース16を設置
予定海域まで運搬したのち、第14図および第15図に示す
ようにPCベース16を作業船E、Eの係留策D、Dに係留
し、つづいて該係留策D、Dをゆっくり伸ばすことでPC
ベース16を海底地盤G上に設けられた架構15の上に積層
して基礎14が完成する。
First, as shown in FIG. 12, a foundation pile made of H steel is driven into the seabed G, and a beam made of H steel is bridged between these piles to form a frame 15. In addition, on land
As shown in FIG. 13, a rectangular PC base 16 is molded with precast concrete, and a plurality of connecting members 17, 17, for attaching the bag F to the upper surface of the PC base 16 are provided along the edge of the upper surface. And in the vicinity of the edge. Next, the bag body F is attached to these connecting members 17, 17, .... After carrying the PC base 16 with the bag body F attached to the planned sea area, the PC base 16 is moored to the mooring measures D and D of the work vessels E and E as shown in FIGS. 14 and 15. , Then slowly extend the mooring measures D, D to PC
The base 14 is completed by stacking the base 16 on the frame 15 provided on the seabed G.

このようにして海底地盤上に架構を設け、その上にPC
ベースを設置することによって基礎を形成するので、そ
の基礎の重さによってフレキシブルマウンドを海底地盤
上に定着させることができる。
In this way, a frame is set up on the seabed and a PC is placed on it.
Since the foundation is formed by installing the base, the flexible mound can be fixed on the seabed by the weight of the foundation.

なお、本発明においては、フレキシブルマウンドの海
底地盤上への定着が海底地盤表面の凹凸状態や土質状態
に左右されることが少なく、フレキシブルマウンドの設
置予定海域の水深に合わせて基礎の高さを調節すること
が可能なものなので、もっとも消波効果の高い場所にフ
レキシブルマウンドを配置することができる。
In the present invention, the fixing of the flexible mound on the seabed is less affected by the unevenness and soil condition of the surface of the seabed, and the height of the foundation is adjusted according to the water depth of the planned sea area of the flexible mound. Since it is adjustable, the flexible mound can be placed in the place where the wave-dissipating effect is the highest.

第16図ないし第18図は、請求項(5)記載の発明の実
施例で、平坦な海底地盤上に適用した場合の実施例であ
る。
16 to 18 show an embodiment of the invention described in claim (5), which is an embodiment applied to a flat seabed.

まずはじめに、第16図に示すように基礎を設置する海
底地盤C表面を平坦にして、その平坦化された地盤上に
2本のPCブロック19、19を所定の間隔を置いて、かつ平
行になるようにして海底地盤G上に置く。ここで、この
PCブロック19、19は、第17図に示すようにプレキャスト
コンクリートにより方形状に成型加工されたもので、そ
の上面から下面に開口した複数の杭打ち用孔20、20、…
が設けられ、またこのPCブロック19、19の上面には、そ
の長手方向に沿った一方の縁近傍に袋体Fを取り付ける
ための複数の連結用部材21、21、…が設けられている。
つぎに第18図に示すように杭打ち用孔20、20、…に杭2
2、22、…を貫通させて、これらの杭22、22、…を打ち
込み固定することによって基礎18が完成する。
First of all, as shown in Fig. 16, the surface of the seabed C on which the foundation is installed is flattened, and two PC blocks 19, 19 are placed on the flattened ground at predetermined intervals and in parallel. And place it on the seabed G. Where this
As shown in FIG. 17, the PC blocks 19 and 19 are formed into a rectangular shape by precast concrete, and have a plurality of pile driving holes 20, 20 opened from the upper surface to the lower surface, ...
Further, a plurality of connecting members 21, 21, ... For attaching the bag body F are provided on the upper surface of the PC blocks 19, 19 in the vicinity of one edge along the longitudinal direction thereof.
Next, as shown in Fig. 18, the piles 2 are placed in the pile driving holes 20, 20 ,.
The foundation 18 is completed by penetrating 2, 22, ... And driving and fixing these piles 22, 22 ,.

この基礎18に袋体Fを取り付けるには、第18図に示す
ように袋体Fを2台の作業船E、Eによって設置予定海
域まで曳航し、係留索F、Fをゆっくり伸ばすことで袋
体Fを海底地盤G上に設けられたPCブロック19、19の上
に着底させる。そして、袋体FをPCブロック19、19の連
結用部材21、21、…に連結して、袋体FをPCブロック1
9、19の上面に固定することによって第19図に示すよう
にフレキシブルマウンドが完成する。
To attach the bag body F to the foundation 18, as shown in FIG. 18, the bag body F is towed by the two work boats E, E to the planned sea area, and the mooring lines F, F are slowly extended. The body F is set on the PC blocks 19, 19 provided on the seabed G. Then, the bag body F is connected to the connecting members 21, 21, ... Of the PC blocks 19, 19 to connect the bag body F to the PC block 1
The flexible mound is completed as shown in FIG. 19 by fixing it to the upper surfaces of 9 and 19.

このようにして海底地盤にブロックを接地させ、これ
に杭を打ち込み固定するものなので、ブロックによっ
て、フレキシブルマウンドを海底地盤上に定着させるこ
とができる。
In this way, the block is grounded on the seabed, and the piles are driven into the block to fix the block, so that the flexible mound can be fixed on the seabed by the block.

また、第20図に示すように、海底地盤G上に前記PCブ
ロック19、19の上面のみが露出されるようにして前記PC
ブロック19、19を海底地盤G中に埋設したのち、杭22、
22、…を打ち込み固定することによって基礎18を設ける
ことによって、袋体Fの下部における洗掘の発生を防ぐ
ことができる。
Further, as shown in FIG. 20, the PC blocks 19 and 19 are exposed on the seabed G so that only the upper surfaces of the PC blocks 19 and 19 are exposed.
After burying blocks 19 and 19 in the seabed G, piles 22 and
By providing the base 18 by driving and fixing 22, ..., it is possible to prevent scouring from occurring in the lower portion of the bag body F.

なお、プレキャストコンクリートからなるPCブロック
のかわりに、鋼製ケーソンからなるブロックを用いても
良い。
A block made of steel caisson may be used instead of the PC block made of precast concrete.

また、ブロックの平面形状は前記実施例に限定され
ず、例えば、ドーナッツ状に成型されたプレキャストコ
ンクリートあるいは鋼製ケーソンからなるブロックを用
いてもよい。ドーナッツ状のブロックを用いることによ
って、袋体下部における洗掘の発生を防ぐことも可能と
なる。さらに、2本のブロックの間に架設を設けること
も可能である。
Further, the planar shape of the block is not limited to the above-mentioned embodiment, and for example, a block made of doughnut-shaped precast concrete or steel caisson may be used. By using a donut-shaped block, it is possible to prevent scour at the bottom of the bag. Further, it is possible to provide a bridge between the two blocks.

「発明の効果」 以上説明したように、可撓性素材からなり、内部に流
体を注入することによって膨らむ袋体と、該袋体の底部
に配設され、かつ前記袋体を海底地盤上に定着させるた
めの基礎とを備えてなるフレキシブルマウンドの基礎構
造の施工方法において、 請求項(1)記載の発明では、海底地盤に鋼矢板から
なる囲いを設けたのち、該囲いの内側に充填材を充填
し、固化させることによって基礎本体を形成したことに
より、 請求項(2)記載の発明では、海底地盤上に石材を堆
積させて錐体状の捨石マウンドを設けたのち、該捨石マ
ウンドの上にベースを積層したことにより、 請求項(3)記載の発明においては、ベースの側面に
鋼製スカートを設けたのち、該鋼製スカートの先端を海
底地盤上に打ち込み、つづいて前記ベースと海底地盤と
の間の空隙にモルタルグラウトを充填したことにより、 請求項(4)記載の発明においては、H鋼からなる基
礎杭を海底地盤に打ち込んだのち、該杭間にH鋼からな
る梁を架け渡して架構を設置し、つづいて該架構の上に
ベースを配設したことにより、 請求項(5)記載の発明においては、杭打ち込み用孔
を有するブロックを海底地盤に接地させたのち、該杭打
ち込み孔に杭を貫通させ、つづいて該杭を打ち込み固定
したことにより、 フレキシブルマウンドの設置場所となる海底地盤の土
質状態に左右されることなく、フレキシブルマウンドの
定着が可能となり、フレキシブルマウンドが持つ消波作
用を効果的に利用することができるものとなる効果を奏
する。
"Effects of the Invention" As described above, a bag body made of a flexible material, which swells when a fluid is injected into the bag body, and the bag body disposed on the bottom of the bag body and placed on the seabed ground. In the method of constructing a flexible mound foundation structure including a foundation for fixing, in the invention according to claim (1), an enclosure made of steel sheet pile is provided on the seabed ground, and then a filler is provided inside the enclosure. In the invention according to claim (2), since the foundation body is formed by filling and solidifying the stone, the stone material is deposited on the seabed to provide a cone-shaped rubble mound, and then the rubble mound By stacking the base on the base, in the invention according to claim (3), after the steel skirt is provided on the side surface of the base, the tip of the steel skirt is driven into the seabed ground, and then the base is formed. Ocean By filling the space between the bottom ground with mortar grout, in the invention according to claim (4), after the foundation pile made of H steel is driven into the seabed ground, the beam made of H steel is placed between the piles. The frame is installed over the bridge, and then the base is disposed on the frame. Therefore, in the invention according to claim (5), after the block having the pile driving hole is grounded to the seabed ground. By penetrating the pile into the pile driving hole and then driving and fixing the pile, the flexible mound can be fixed without being affected by the soil condition of the seabed where the flexible mound is installed. The wave-dissipating effect of the mound can be effectively used.

【図面の簡単な説明】[Brief description of drawings]

第1図ないし第4図は請求項(1)記載の発明の実施例
を説明するための側面断面図、第5図ないし第8図は請
求項(2)記載の発明の実施例を説明するための側面断
面図、第9図ないし第11図は請求項(3)記載の発明の
実施例を説明するための側面断面図、第12図ないし第15
図は請求項(4)記載の発明の実施例を説明するための
側面断面図、第16図ないし第19図は請求項(5)記載の
発明の実施例を説明するための図で、第16図および第18
図は側面断面図、第17図は平面図、第20図は請求項
(2)記載の発明の変形例を説明するための側面断面
図、第21図は従来のフレキシブルマウンドの基礎構造を
示す側面断面図、第22図および第23図は従来のフレキシ
ブルマウンドの基礎構造の施工方法を説明するための図
である。 G……海底地盤、 S……空隙、 1、5、9、14、18……基礎、 2……囲い、 3……基礎本体、 4、8、11、17、21……連結用部材、 6……捨石マウンド、 7、10、16……プレキャストコンクリート製ベース、 12……鋼製スカート、 13……モルタルグラウト、 15……架構、 19……プレキャストコンクリート製ブロック、 20……杭打用孔、 22……杭。
1 to 4 are side sectional views for explaining an embodiment of the invention described in claim (1), and FIGS. 5 to 8 explain an embodiment of the invention described in claim (2). FIGS. 9 to 11 are side sectional views for explaining the embodiment of the invention described in claim (3), and FIGS. 12 to 15 are sectional side views.
FIG. 16 is a side sectional view for explaining the embodiment of the invention described in claim (4), and FIGS. 16 to 19 are views for explaining the embodiment of the invention described in claim (5). 16 and 18
FIG. 17 is a side sectional view, FIG. 17 is a plan view, FIG. 20 is a side sectional view for explaining a modification of the invention described in claim (2), and FIG. 21 shows a basic structure of a conventional flexible mound. Side sectional views, FIG. 22 and FIG. 23 are views for explaining a method for constructing a conventional flexible mound foundation structure. G: submarine ground, S: void, 1, 5, 9, 14, 18 ... foundation, 2 ... enclosure, 3 ... foundation body, 4, 8, 11, 17, 21 ... connecting member, 6 …… Scrap stone mound, 7, 10, 16 …… Precast concrete base, 12 …… Steel skirt, 13 …… Mortar grout, 15 …… Frame, 19 …… Precast concrete block, 20 …… Pile driving Hole, 22 ... Pile.

フロントページの続き (72)発明者 田中 正博 東京都中央区京橋2丁目16番1号 清水建 設株式会社内 (72)発明者 大山 巧 東京都中央区京橋2丁目16番1号 清水建 設株式会社内 (72)発明者 小野 正 東京都中央区京橋2丁目16番1号 清水建 設株式会社内 (72)発明者 大内田 博喜 東京都中央区京橋2丁目16番1号 清水建 設株式会社内 (72)発明者 阿部 久雄 東京都中央区京橋2丁目16番1号 清水建 設株式会社内 (72)発明者 清川 哲志 東京都中央区京橋2丁目16番1号 清水建 設株式会社内 (56)参考文献 特開 昭58−69909(JP,A) 特公 平7−30535(JP,B2)Front page continued (72) Inventor Masahiro Tanaka 2-16-1 Kyobashi, Chuo-ku, Tokyo Shimizu Construction Co., Ltd. (72) Inventor Takumi Oyama 2-16-1 Kyobashi, Chuo-ku, Tokyo Shimizu Construction Stock In-company (72) Inventor Tadashi Ono 2-16-1 Kyobashi, Chuo-ku, Tokyo Shimizu Construction Co., Ltd. (72) Inventor Hiroki Ouchida 2-16-1 Kyobashi, Chuo-ku, Tokyo Shimizu Construction Co., Ltd. (72) Inventor Hisao Abe 2-16-1, Kyobashi, Chuo-ku, Tokyo Shimizu Construction Co., Ltd. (72) Inventor Satoshi Kiyokawa 2-16-1, Kyobashi, Chuo-ku, Tokyo Shimizu Construction ( 56) References JP-A-58-69909 (JP, A) JP-B 7-30535 (JP, B2)

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】可撓性素材からなり、内部に流体を注入す
ることによって膨らむ袋体と、該袋体の底部に配設さ
れ、かつ前記袋体を海底地盤上に定着させるための基礎
とを備えてなるフレキシブルマウンドの基礎構造の施工
方法において、海底地盤に鋼矢板からなる囲いを設けた
のち、該囲いの内側に充填材を充填し、固化させること
によって基礎本体を形成したことを特徴とするフレキシ
ブルマウンドの基礎構造の施工方法。
1. A bag body which is made of a flexible material and expands by injecting a fluid into the inside, and a base which is disposed at the bottom of the bag body and which fixes the bag body on the seabed ground. In the method for constructing a flexible mound foundation structure, the foundation body is formed by providing an enclosure made of steel sheet pile on the seabed ground, then filling a filler inside the enclosure and solidifying the enclosure. Flexible mound foundation structure construction method.
【請求項2】可撓性素材からなり、内部に流体を注入す
ることによって膨らむ袋体と、該袋体の底部に配設さ
れ、かつ前記袋体を海底地盤上に定着させるための基礎
とを備えてなるフレキシブルマウンドの基礎構造の施工
方法において、海底地盤上に石材を堆積させて錐体状の
捨石マウンドを設けたのち、該捨石マウンドの上にベー
スを積層したことを特徴とするフレキシブルマウンドの
基礎構造の施工方法。
2. A bag body which is made of a flexible material and expands by injecting a fluid into the inside, and a base which is disposed at the bottom of the bag body and which fixes the bag body on the seabed ground. In the method for constructing a foundation structure of a flexible mound, which is characterized in that a stone is deposited on the seabed to provide a cone-shaped rubble mound, and then a base is laminated on the rubble mound. Construction method of foundation structure of mound.
【請求項3】可撓性素材からなり、内部に流体を注入す
ることによって膨らむ袋体と、該袋体の底部に配設さ
れ、かつ前記袋体を海底地盤上に定着させるための基礎
とを備えてなるフレキシブルマウンドの基礎構造の施工
方法において、ベースの側面に鋼製スカートを設けたの
ち、該鋼製スカートの先端を海底地盤に打ち込み、つづ
いて前記ベースと海底地盤との間の空隙にモルタルグラ
ウトを充填したことを特徴とするフレキシブルマウンド
の基礎構造の施工方法。
3. A bag body which is made of a flexible material and expands by injecting a fluid into the inside, and a base which is arranged at the bottom of the bag body and which fixes the bag body on the seabed ground. In a method of constructing a flexible mound foundation structure comprising: a steel skirt provided on a side surface of the base, the tip of the steel skirt is driven into the seabed ground, and then a gap between the base and the seabed ground is provided. A method for constructing a foundation structure of a flexible mound, characterized by being filled with mortar grout.
【請求項4】可撓性素材からなり、内部に流体を注入す
ることによって膨らむ袋体と、該袋体の底部に配設さ
れ、かつ前記袋体を海底地盤上に定着させるための基礎
とを備えてなるフレキシブルマウンドの基礎構造の施工
方法において、H鋼からなる基礎杭を海底地盤に打ち込
んだのち、該杭間にH鋼からなる梁を架け渡して架構を
設置し、つづいて該架構の上にベースを配設したことを
特徴とするフレキシブルマウンドの基礎構造の施工方
法。
4. A bag body which is made of a flexible material and swells by injecting a fluid into the inside, and a base which is disposed at the bottom of the bag body and which fixes the bag body on the seabed ground. In the method of constructing a foundation structure of a flexible mound, the foundation pile made of H steel is driven into the seabed, and then a beam made of H steel is laid between the piles to install a frame, and then the frame is installed. A method for constructing a flexible mound foundation structure, characterized in that a base is disposed on the base.
【請求項5】可撓性素材からなり、内部に流体を注入す
ることによって膨らむ袋体と、該袋体の底部に配設さ
れ、かつ前記袋体を海底地盤上に定着させるための基礎
とを備えてなるフレキシブルマウンドの基礎構造の施工
方法において、杭打ち込み用孔を有するブロックを海底
地盤に接地させたのち、該杭ち込み孔に杭を貫通させ、
つづいて該杭を打ち込み固定したことを特徴とするフレ
キシブルマウンドの基礎構造の施工方法。
5. A bag body which is made of a flexible material and expands by injecting a fluid into the inside, and a base which is arranged at the bottom of the bag body and which fixes the bag body on the seabed ground. In the method of constructing a foundation structure of a flexible mound comprising, after grounding a block having a hole for driving a pile to the seabed ground, penetrating the pile into the pile driving hole,
Next, a method for constructing a foundation structure of a flexible mound, characterized in that the pile is driven in and fixed.
JP1298542A 1989-11-16 1989-11-16 Flexible Mound Foundation Structure Construction Method Expired - Lifetime JPH0819657B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1298542A JPH0819657B2 (en) 1989-11-16 1989-11-16 Flexible Mound Foundation Structure Construction Method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1298542A JPH0819657B2 (en) 1989-11-16 1989-11-16 Flexible Mound Foundation Structure Construction Method

Publications (2)

Publication Number Publication Date
JPH03158515A JPH03158515A (en) 1991-07-08
JPH0819657B2 true JPH0819657B2 (en) 1996-02-28

Family

ID=17861077

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1298542A Expired - Lifetime JPH0819657B2 (en) 1989-11-16 1989-11-16 Flexible Mound Foundation Structure Construction Method

Country Status (1)

Country Link
JP (1) JPH0819657B2 (en)

Also Published As

Publication number Publication date
JPH03158515A (en) 1991-07-08

Similar Documents

Publication Publication Date Title
EP0075487A2 (en) Marine structure
KR102097580B1 (en) A Method for the Construction of Offshore Structures Using General Concrete
CA1331102C (en) Strengthened protective structure
JPH06146305A (en) Underwater foundation and installation method thereof
JPS58143023A (en) Caisson for pile supporting type breakwater
JP3075179B2 (en) Bridge pier foundation structure and its construction method
JPH0819657B2 (en) Flexible Mound Foundation Structure Construction Method
JP2537415B2 (en) Flexible mound basic structure
JP3320580B2 (en) Foundation construction method for offshore structures
JP2630994B2 (en) Construction method of quay using caisson
JP7495904B2 (en) Improvement structure and method of existing wharf
JPH0742180A (en) Anchor
KR101961655B1 (en) Quay wall and construction method using driven pile and box type pre-cast concrete structure
JP2597878B2 (en) Weir structure
JP3132846B2 (en) Construction method of pile type offshore structure
JP2764447B2 (en) Ground structure such as pier support
JP2655322B2 (en) Construction method of revetment structure
JPS62237983A (en) Wall body for preventing leakage of waste
JPH04297619A (en) Construction of underwater foundation
JP2556380B2 (en) Construction method of revetment structure
JPH0663211B2 (en) Flexible mound
JPH06257163A (en) Droughty pontoon for constructing shallow foundation
JPS58160420A (en) Levee body using king post
JPS6195125A (en) Fixation of concrete caisson
JPH0211688B2 (en)

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100228

Year of fee payment: 14

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100228

Year of fee payment: 14