JPH08149136A - Network system - Google Patents

Network system

Info

Publication number
JPH08149136A
JPH08149136A JP28498194A JP28498194A JPH08149136A JP H08149136 A JPH08149136 A JP H08149136A JP 28498194 A JP28498194 A JP 28498194A JP 28498194 A JP28498194 A JP 28498194A JP H08149136 A JPH08149136 A JP H08149136A
Authority
JP
Japan
Prior art keywords
cross
user terminal
subscriber
control message
path
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP28498194A
Other languages
Japanese (ja)
Inventor
Junko Iwasaki
順子 岩崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Corp
Original Assignee
NEC Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEC Corp filed Critical NEC Corp
Priority to JP28498194A priority Critical patent/JPH08149136A/en
Publication of JPH08149136A publication Critical patent/JPH08149136A/en
Pending legal-status Critical Current

Links

Landscapes

  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

PURPOSE: To provide a network system in which a path is set quickly even when a path setting request comes from plural user terminal equipments through concentration. CONSTITUTION: Each subscriber terminal equipment 11 manages distributingly information relating to the operating state of each equipment in the network and having been controlled totally by a centralized control equipment in a conventional system and each subscriber system equipment (accommodation discrimination section 21) decides a path reaching to a connection destination terminal equipment. Then a control message representing a content of the decided path is transferred to a cross connector whose next use is decided and the cross connector executes the setting and the connection of a termination point corresponding to the content of the control message and the control message is transferred sequentially to each cross connector to set a path from the user terminal equipment making a path setting request to a user terminal equipment being a transmission destination through the system configuration as above.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、ネットワークシステム
に係わり、ユーザ端末間の通信を行う際に、パスの設定
が必要とされるネットワークシステムに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a network system, and more particularly to a network system in which a path needs to be set for communication between user terminals.

【0002】[0002]

【従来の技術】ネットワークシステムでは、通常、ユー
ザ端末間の通信を開始する前に、送信元となるユーザ端
末と送信先となるユーザ端末の間に、通信経路(パス)
の設定が行われ、たとえば、非同期転送モード(AT
M)網では、以下のような手順でパス設定が行われてい
る。
2. Description of the Related Art In a network system, a communication path (path) is usually provided between a source user terminal and a destination user terminal before starting communication between the user terminals.
Is set, for example, the asynchronous transfer mode (AT
In the M) network, the path is set in the following procedure.

【0003】図7を用いて、従来のATMネットワーク
システムにおけるパス設定手順の概要を説明する。な
お、実際のATMネットワークシステムでは、集中管理
装置14の管理下に、さらに多くの加入者系装置11お
よびクロスコネクト装置12が存在しており、また、各
加入者系装置11には、複数のユーザ端末10が接続さ
れているのであるが、図6では、説明の便宜上、2つの
特定のユーザ端末10A、10B 間にパスを設定した際
に、機能することになる装置だけを示してある。
An outline of a path setting procedure in a conventional ATM network system will be described with reference to FIG. In an actual ATM network system, more subscriber-related devices 11 and cross-connect devices 12 exist under the control of the centralized management device 14, and each subscriber-related device 11 has a plurality of subscriber-related devices 11. Although the user terminal 10 is connected, in FIG. 6, for convenience of explanation, only a device that will function when a path is set between two specific user terminals 10 A and 10 B is shown. is there.

【0004】この図において、たとえば、ユーザ端末1
A が、加入者系装置11A に対して、ユーザ端末10
B への通信を要求した場合、まず、加入者系装置11A
から、制御網16を介し集中管理装置14に対して、要
求元と接続先、帯域といったパス設定に必要となる情報
が与えられることになる。
In this figure, for example, the user terminal 1
0 A sends to the subscriber unit 11 A the user terminal 10
When requesting communication to B , first, the subscriber device 11 A
Therefore, the information necessary for path setting such as the request source, the connection destination, and the band is given to the centralized management device 14 via the control network 16.

【0005】そして、そのような情報を受けた集中管理
装置14は、ネットワーク内の伝送路および装置の構成
情報、各装置に設定されている終端点の識別子や、設定
されているパスに関する情報(VPI値、割当容量な
ど)が記憶された、内部のデータベースを参照して、必
要とされている帯域が確保できる、加入者系装置11A
から加入者系装置11B に至る経路を決定(機能させる
クロクコネクト装置の選択および各加入者系装置11と
クロスコネクト装置12に使用させる終端点の決定)
し、その決定内容に応じた制御情報を、制御網16を介
し、使用する各装置に通知する。この通知を受けた各装
置は、受信側、送信側終端点の設定、および、2つの終
端点の接続を行う。
Upon receiving such information, the central control device 14 receives the configuration information of the transmission lines and devices in the network, the identifier of the termination point set in each device, and the information about the set path ( A subscriber device 11 A that can secure a required bandwidth by referring to an internal database in which VPI values, allocated capacity, etc.) are stored.
The route from the subscriber device 11 B to the subscriber device 11 B (selection of a functional clock connect device and determination of termination points used by each subscriber device 11 and cross connect device 12)
Then, the control information according to the determined contents is notified to each device to be used via the control network 16. Receiving this notification, each device sets the receiving end point and the transmitting end point, and connects the two end points.

【0006】[0006]

【発明が解決しようとする課題】このように、従来のネ
ットワークシステムでは、集中管理装置が、ネットワー
クの使用状況を一括して管理しており、各使用者系装置
からのパス設定要求が、集中管理装置によって処理され
ている。パス設定処理において実際に行われる処理は複
雑なものであるため、各パス設定処理には、ある程度の
時間が必要とされる。このため、従来のネットワークシ
ステムでは、多数のパス設定要求が短時間内になされた
場合、要求に対するレスポンスが大きく遅れてしまうと
いった現象が生じていた。
As described above, in the conventional network system, the centralized management device collectively manages the usage status of the network, and the path setting requests from each user system device are centralized. It is being processed by the management device. Since the process actually performed in the path setting process is complicated, each path setting process requires a certain amount of time. Therefore, in the conventional network system, when a large number of path setting requests are made within a short time, the response to the requests is significantly delayed.

【0007】また、従来のネットワークシステムでは、
集中管理装置とクロスコネクト装置間で、制御網を介し
た情報伝送が行われているが、このための転送時間が無
視できないといった問題もあった。
Further, in the conventional network system,
Information is transmitted between the centralized management device and the cross-connect device via the control network, but there is also a problem that the transfer time for this purpose cannot be ignored.

【0008】このような問題を解決するための技術とし
ては、たとえば、特開平3−207140号公報に記載
されているように、実際には要求されていないパスを予
め設定しておくといった技術が知られている。しかし、
ユーザが必要とするパスを常に用意しておくことは、特
に、ネットワークシステムが大きくなった場合に困難で
あり、やはり、既設定のパスが存在しない、多数のパス
設定要求が短時間内になされた場合、要求に対するレス
ポンスが大きく遅れてしまうといった現象が生ずる。
As a technique for solving such a problem, for example, as described in Japanese Patent Laid-Open No. 3-207140, there is a technique of presetting a path that is not actually required. Are known. But,
It is difficult to always prepare the paths required by the user, especially when the network system becomes large. Again, there are no existing paths, and many path setting requests are made within a short time. In this case, the response to the request will be greatly delayed.

【0009】そこで、本発明の目的は、ネットワークに
接続された複数のユーザ端末からのパス設定要求が集中
的に発生しても、迅速にパスの設定が行われるネットワ
ークシステムを提供することにある。
Therefore, an object of the present invention is to provide a network system in which a path can be set quickly even if path setting requests from a plurality of user terminals connected to the network are concentrated. .

【0010】[0010]

【課題を解決するための手段】請求項1記載の発明は、
ユーザ端末が接続される複数の加入者系装置と、加入者
系装置と加入者系装置または他のクロスコネクト装置と
に情報伝送経路を設定するための複数のクロスコネクト
装置が、情報伝送路によって接続されたネットワークを
有するネットワークシステムを、(イ)自装置が使用す
ることがあるクロスコネクト装置の使用状況に関する情
報を記憶する使用状況記憶手段と、(ロ)自装置に接続
されたユーザ端末から、新規な情報伝送経路設定要求を
受けた場合に、使用状況記憶手段に記憶されている情報
を参照して、情報伝送に使用可能なクロスコネクト装置
を選択することによって、送信先ユーザ端末に至る情報
伝送経路を決定する経路決定手段と、(ハ)この経路決
定手段によって、次に使用されることになったクロスコ
ネクト装置に対して用いる終端点の設定と、ユーザ端末
と情報伝送を行っている終端点との接続を行う第1終端
点設定接続手段と、(ニ)経路決定手段によって決定さ
れた情報伝送経路と、終端点接続設定手段によって設定
された終端点の識別情報とを含む制御用メッセージを作
成する作成手段と、(ホ)作成した制御用メッセージ
を、次に使用することになるクロスコネクト装置に対し
て送信する送信手段と、(ヘ)受信した制御用メッセー
ジに応じて、送信元ユーザ端末側終端点の設定と、送信
先ユーザ端末と情報伝送を行うための終端点との接続を
行う第2終端点設定接続手段を具備した加入者系装置
と、(1)受信した制御用メッセージに応じて、送信元
ユーザ端末側終端点と送信先ユーザ端末側終端点の設定
およびそれら2つの終端点間の接続を行う終端点設定接
続手段と、(2)この終端点設定接続手段が設定した送
信先ユーザ端末側終端点の識別情報を基に、受信した制
御用メッセージを修正する修正手段と、(3)修正した
制御用メッセージを、次に使用することになるクロスコ
ネクト装置あるいは加入者系装置に対して転送する転送
手段とを具備したクロスコネクト装置を組み合わせるこ
とによって形成する。
According to the first aspect of the present invention,
A plurality of subscriber-related devices to which user terminals are connected, and a plurality of cross-connect devices for setting information transmission paths between the subscriber-related devices and the subscriber-related devices or other cross-connect devices From (a) a usage status storage unit that stores information about the usage status of the cross-connect device that the self-device may use, and (b) a user terminal that is connected to the self-device. When a new information transmission path setting request is received, the destination user terminal is reached by referring to the information stored in the usage status storage means and selecting a cross-connect device that can be used for information transmission. Route determining means for determining the information transmission route, and (c) for the cross-connect device to be used next by this route determining means. Setting of a termination point to be used, a first termination point setting connection means for connecting a user terminal to a termination point performing information transmission, (d) an information transmission route determined by the route determination means, and a termination point connection Creation means for creating a control message including the identification information of the termination point set by the setting means, and (e) Transmission for sending the created control message to the cross-connect device to be used next. And (2) a second terminal point setting connection for setting a terminal point on the transmission source user terminal side and connecting a terminal point for transmitting information to the transmission destination user terminal according to the received control message. And (1) setting a transmission source user terminal side termination point and a transmission destination user terminal side termination point, and connecting between these two termination points, according to the received control message. Termination point setting connection means, (2) correction means for correcting the received control message based on the identification information of the destination user terminal side termination point set by this termination point setting connection means, and (3) correction The control message is formed by combining a cross-connect device equipped with a transfer means for transferring the control message to the next cross-connect device or subscriber device.

【0011】すなわち、請求項1記載の発明では、従
来、集中管理装置によって一括して管理されていたネッ
トワーク内の各装置の使用状況に関する情報を、ネット
ワーク内に設けられる各加入者系装置に分散して管理さ
せ、各加入者系装置に、送信先端末に至る経路の決定を
行わせる。そして、決定した経路の内容を示した制御用
メッセージを、次に使用することが決定されたクロスコ
ネクト装置に転送し、そのクロスコネクト装置に制御用
メッセージの内容に応じた終端点の設定、接続を実行さ
せるとともに、次のクロスコネクト装置あるいは加入者
系装置に制御用メッセージを転送させることによって、
情報伝送経路の設定要求を出したユーザ端末から、送信
先となるユーザ端末への情報伝送経路を確保する。各加
入者系装置は、自装置に接続されたユーザ端末からの設
定要求だけに応答すればよく、また、使用状況に関する
情報も、自装置が関係する装置に関するものだけを保持
していれば良くなっているので、これにより、従来のネ
ットワークシステムでは生じたレスポンスの遅れを防止
できることになる。
That is, according to the first aspect of the present invention, the information about the usage status of each device in the network, which is conventionally collectively managed by the centralized management device, is distributed to each subscriber device provided in the network. Then, each subscriber device is made to decide the route to the destination terminal. Then, the control message indicating the content of the determined route is transferred to the cross-connect device that is determined to be used next, and the termination point is set and connected to the cross-connect device according to the content of the control message. And the control message is transferred to the next cross-connect device or subscriber device,
An information transmission path is secured from the user terminal that has issued the information transmission path setting request to the destination user terminal. Each subscriber device needs to respond only to the setting request from the user terminal connected to the device itself, and also needs to hold only the information on the usage status regarding the device to which the device itself is related. As a result, it is possible to prevent the delay in response that occurs in the conventional network system.

【0012】なお、制御用メッセージの伝送は、加入者
系装置とクロスコネクト装置間、および、クロスコネク
ト装置間の情報伝送路上に予め設定された特定のチャネ
ル、または、情報伝送路とは別に設けられた特定の制御
用メッセージ伝送路を介して行われることが望ましい。
The transmission of the control message is provided between the subscriber system device and the cross-connect device, or on a specific channel preset on the information transmission line between the cross-connect devices or separately from the information transmission line. It is desirable that this is performed via the specified specific control message transmission path.

【0013】[0013]

【実施例】以下、実施例につき本発明を詳細に説明す
る。
EXAMPLES The present invention will be described in detail below with reference to examples.

【0014】図1ないし図3を用いて、実施例のネット
ワークシステムの構成を説明する。なお、図3は、実施
例のネットワークシステムの概略構成を示した図であ
り、図1および図2は、図3に示した実施例のネットワ
ークシステム内に設けられている加入者系装置およびク
ロスコネクト装置の構成を示した図である。
The configuration of the network system of the embodiment will be described with reference to FIGS. 1 to 3. 3 is a diagram showing a schematic configuration of the network system of the embodiment, and FIGS. 1 and 2 are a subscriber system device and a cross device provided in the network system of the embodiment shown in FIG. It is the figure which showed the structure of the connection apparatus.

【0015】図3に示してあるように、実施例のネット
ワークシステムは、ユーザ端末10と加入者系装置11
とクロスコネクト装置12と管理装置13によって形成
され、加入者系装置11とクロスコネクト装置12間あ
るいは2つのクロスコネクト装置12間には、伝送路1
5が設けられ、管理装置13と各ノード装置(加入者系
装置11とクロスコネクト装置12)との間には、制御
網16が設けられている。
As shown in FIG. 3, the network system of the embodiment has a user terminal 10 and a subscriber device 11.
And the cross-connect device 12 and the management device 13, and the transmission line 1 is provided between the subscriber device 11 and the cross-connect device 12 or between the two cross-connect devices 12.
5 is provided, and a control network 16 is provided between the management device 13 and each node device (subscriber system device 11 and cross-connect device 12).

【0016】このように、実施例のネットワークシステ
ムにおける各装置の接続形態は、従来のネットワークシ
ステム(図7)と類似したものとなっているが、実施例
のネットワークシステムにおけるパス設定は、管理装置
13が行うのではなく、ユーザ端末10からのパス設定
要求を受けた加入者系装置11によって行われ、実施例
の管理装置13は、システムを形成した際、あるいは、
ノード装置(加入者系装置、クロスコネクト装置)およ
び伝送路を追加した際などに、各ノード装置に特定の識
別情報の付与と、各ノード装置間の各伝送路15上に、
パス設定用制御チャネル18を設定と、各ノード装置に
おける障害発生の有無などの管理とを、主に行うように
なっている。なお、パス設定用制御チャネル18の詳細
については後述する。
As described above, the connection form of each device in the network system of the embodiment is similar to that of the conventional network system (FIG. 7), but the path setting in the network system of the embodiment is performed by the management device. 13 is not performed by the subscriber device 11 that has received the path setting request from the user terminal 10. The management device 13 according to the embodiment, when the system is formed, or
When a node device (subscriber system device, cross-connect device) and a transmission line are added, specific identification information is given to each node device, and on each transmission line 15 between each node device,
The setting of the control channel 18 for path setting and the management of the presence / absence of a failure in each node device are mainly performed. The details of the path setting control channel 18 will be described later.

【0017】図1に示してあるように、加入者系装置1
1は、収容判定部21と終端点管理部22と接続設定部
23と送受信部24を主な構成要素として有しており、
送受信部24を介して、伝送路15と接続されている。
まず、この図を用いて、加入者系装置内に設けられてい
る各構成部の機能の概要を説明する。
As shown in FIG. 1, the subscriber unit 1
1 has an accommodation determination unit 21, a termination point management unit 22, a connection setting unit 23, and a transmission / reception unit 24 as main components,
It is connected to the transmission line 15 via the transmission / reception unit 24.
First, the outline of the function of each component provided in the subscriber system device will be described with reference to this drawing.

【0018】収容判定部21には、加入者系装置11に
関連する範囲のネットワークに関する、ノード装置(加
入者系装置、クロスコネクト装置)の接続関係に関する
情報と、各ノード装置による各伝送路の使用状況などが
記憶されたデータベースが備えられており、収容判定部
21は、パス設定用制御チャネル18を介して通知され
る、パス設定要求を基に、要求されたパスを設定可能か
どうか判定し、設定可能である場合には、その経路情報
を出力する。
The accommodating determination unit 21 includes information regarding connection relationships between node devices (subscriber devices, cross-connect devices) related to networks in the range related to the subscriber device 11, and the transmission paths of the node devices. The storage determination unit 21 is provided with a database in which usage conditions are stored, and the accommodation determination unit 21 determines whether or not the requested path can be set based on the path setting request notified via the path setting control channel 18. If it can be set, the route information is output.

【0019】終端点管理部22は、現在、使用されてい
る終端点の管理と、情報伝送の際に機能させる終端点の
生成および消滅を受け持ち、終端点管理部22によって
設定された、送信側および受信側終端点は、接続設定部
23によって接続されることになる。また、接続設定部
23には、収容判定部22からの経路情報と終端点管理
部22からの終端点IDを基に、所定のフォーマットに
従ったパス設定メッセージを作成する機能も備えられて
いる。
The termination point management unit 22 is in charge of management of the termination points currently used and generation and disappearance of the termination points that function at the time of information transmission, and is set by the termination point management unit 22. And the receiving end point is connected by the connection setting unit 23. The connection setting unit 23 also has a function of creating a path setting message in a predetermined format based on the route information from the accommodation determining unit 22 and the end point ID from the end point managing unit 22. .

【0020】そして、図2に示してあるように、実施例
のネットワークシステム内に設けられるクロスコネクト
装置12は、終端点管理部22と接続設定部23と送受
信部24を主な構成要素として有しており、送受信部2
4を介して、伝送路15と接続されている。各構成部の
機能は、加入者系装置11内に設けられているものと同
様のものであるので、個別の構成に関する説明は省略す
ることにする。
As shown in FIG. 2, the cross-connect device 12 provided in the network system of the embodiment has a terminal point management unit 22, a connection setting unit 23, and a transmission / reception unit 24 as main constituent elements. The transmitter / receiver 2
4 is connected to the transmission line 15. The function of each component is the same as that provided in the subscriber device 11, and therefore description of individual components will be omitted.

【0021】以下、図4ないし図6を用いて、実施例の
ネットワークシステムの総合的な動作を説明する。な
お、図4は、ユーザ端末からのパス設定要求を受信した
加入者系装置の動作を示した流れ図であり、図5は、加
入者系装置あるいはクロスコネクト装置から、パス設定
用メッセージを受信したクロスコネクト装置の動作の流
れを示した流れ図である。そして、図6は、接続先ユー
ザ端末が接続されている加入者系装置が、パス設定用メ
ッセージを受信した際の動作の流れを示した流れ図であ
る。
The overall operation of the network system of the embodiment will be described below with reference to FIGS. 4 to 6. 4. FIG. 4 is a flow chart showing the operation of the subscriber device that has received the path setting request from the user terminal, and FIG. 5 has received the path setting message from the subscriber device or cross-connect device. It is a flow chart showing the flow of operation of the cross-connect device. FIG. 6 is a flow chart showing the flow of operations when the subscriber device to which the connection destination user terminal is connected receives the path setting message.

【0022】図4に示してあるように、ユーザ端末から
パスの設定要求を受けた加入者系装置内では、送受信部
から収容判定部に対する要求内容通知(ステップS10
1)が行われ、その通知を受けた収容判定部は、内部の
データベースを参照して、要求されたパスが設定可能で
あるか否かの判定(ステップS103)を行う。そし
て、収容可能であった場合(ステップS103;Y)に
は、決定した経路情報を接続設定部に通知するととも
に、終端点管理部に送信先側終端点を生成させる(ステ
ップS104)。
As shown in FIG. 4, in the subscriber system apparatus that has received the path setting request from the user terminal, the transmission / reception section notifies the accommodation determination section of the request content (step S10).
1) is performed, and the accommodation determination unit that has received the notification refers to the internal database and determines whether or not the requested path can be set (step S103). Then, when it can be accommodated (step S103; Y), the determined route information is notified to the connection setting unit, and the termination point management unit is caused to generate the destination side termination point (step S104).

【0023】終端点管理部は、終端点の生成後、その完
了通知および設定した終端点IDを接続設定部に通知
し、その通知を受けた接続設定部は、送信元側終端点と
送信先側終端点の接続を実行(ステップS105)する
とともに、収容判定部からの経路情報と、終端点管理部
からの終端点IDを基に、決定された経路情報によって
使用が決定されている各ノード装置に、その旨を通知す
るためのパス設定メッセージを作成し、作成したパス設
定メッセージをパス設定用制御チャネル18を用いて、
次ノード装置に送出(ステップS107)する。
After the termination point is generated, the termination point management section notifies the connection setting section of the completion notice and the set termination point ID, and the connection setting section which has received the notice notifies the source side termination point and the transmission destination. Each node whose connection is determined by the determined route information based on the route information from the accommodation determination unit and the termination point ID from the termination point management unit while executing the connection of the side termination point (step S105). A path setting message for notifying the device is created, and the created path setting message is used by using the path setting control channel 18.
It is sent to the next node device (step S107).

【0024】その後、加入者系装置は、パスの設定が完
了したことを示す情報が、パス設定用制御チャネルを介
して入力されるまで待機(ステップS108)すること
になる。
After that, the subscriber system device stands by until the information indicating that the path setting is completed is input through the path setting control channel (step S108).

【0025】さて、このような手順によって作成された
パス設定用メッセージを受信したクロスコネクト装置内
では、図5に示してあるように、まず、受信したパス設
定メッセージ内の終端点IDに対する終端点の生成(ス
テップS201)が行われ、次に、パス設定メッセージ
内に含まれる経路情報で指定される次ノード装置への終
端点の生成と内部の接続(ステップS202)が行われ
る。そして、加入者系装置内で行われる処理と同様の手
順によって、生成した終端点IDを含むパス設定メッセ
ージが作成(ステップS203)され、そのパス設定メ
ッセージがパス設定用制御チャネルを介して、次ノード
装置に出力(ステップS204)される。
Now, in the cross-connect device that has received the path setting message created by such a procedure, as shown in FIG. 5, first, the end point for the end point ID in the received path setting message is Is generated (step S201), and then a termination point to the next node device specified by the route information included in the path setting message is generated and internal connection is performed (step S202). Then, a path setting message including the generated termination point ID is created by a procedure similar to the processing performed in the subscriber device (step S203), and the path setting message is transmitted via the path setting control channel to the next step. It is output to the node device (step S204).

【0026】経路上の各クロスコネクト装置で作成、出
力されたパス設定メッセージが、接続先ユーザ端末に対
応する加入者系装置において受信されたときには、図6
に示してあるように、その加入者系装置は、受信したパ
ス設定メッセージ内の終端点IDに対する終端点の生成
(ステップS301)を行い、次に、接続先ユーザ端末
に対して設定されているで終端点との接続(ステップS
302)を行う。そして、要求元加入者系装置に対し
て、パス設定終了通知を送出(ステップS303)す
る。
When the path setting message created and output by each cross-connect device on the route is received by the subscriber device corresponding to the connected user terminal, FIG.
As shown in FIG. 5, the subscriber device generates a termination point for the termination point ID in the received path setting message (step S301), and is then set for the connection destination user terminal. To connect to the end point (step S
302) is performed. Then, the path setting end notification is sent to the requesting subscriber system device (step S303).

【0027】図4に戻って、この後の動作を説明する。Returning to FIG. 4, the operation thereafter will be described.

【0028】既に説明したように、パス設定メッセージ
を出力後、要求元ユーザ端末に接続された加入者系装置
は、パス設定終了通知を待機している状態(ステップS
103)になっている訳だが、パス設定終了通知を受信
することによって、パス設定が完了したことを認識し、
要求元ユーザ端末と接続先ユーザ端末にパス設定が完了
したことを通知(ステップS108)し、設定したパス
に応じて内部のデータベースの内容を更新(ステップS
109)して、パス設定処理を終了する。
As described above, after outputting the path setting message, the subscriber unit connected to the requesting user terminal is waiting for the path setting end notification (step S
However, by receiving the path setting end notification, it is recognized that the path setting is completed,
The request source user terminal and the connection destination user terminal are notified that the path setting is completed (step S108), and the contents of the internal database are updated according to the set path (step S108).
Then, the path setting process is terminated.

【0029】なお、収容判定部が収容可能ではないと判
定した場合(ステップS103;N)には、ステップS
108において、その旨が、要求元ユーザ端末に通知さ
れることになる。
When the accommodation determining unit determines that the accommodation is not possible (step S103; N), step S
At 108, the fact is notified to the requesting user terminal.

【0030】このように、実施例のネットワークシステ
ムでは、従来、集中管理装置によって一括して管理され
ていたネットワーク内の各装置の使用状況に関する情報
を、ネットワーク内に設けられる各加入者系装置が分散
して管理する構成となっており、パス設定要求がなされ
た場合には、各加入者系装置が、接続先端末に至る経路
の決定を行う。そして、決定した経路の内容を示したパ
ス設定メッセージを、次に使用することが決定されたク
ロスコネクト装置に転送し、そのクロスコネクト装置に
制御用メッセージの内容に応じた終端点の設定、接続を
実行させるとともに、次のクロスコネクト装置あるいは
加入者系装置に制御用メッセージを転送させることによ
って、パス設定要求を出したユーザ端末から、接続先と
なるユーザ端末への情報伝送経路が確保される。
As described above, in the network system of the embodiment, each subscriber device provided in the network provides information on the usage status of each device in the network, which is conventionally collectively managed by the centralized management device. The configuration is such that they are managed in a distributed manner, and when a path setting request is made, each subscriber device determines the route to the connection destination terminal. Then, the path setting message indicating the contents of the decided route is transferred to the cross-connect device decided to be used next, and the termination point is set and connected to the cross-connect device according to the contents of the control message. And the control message is transferred to the next cross-connect device or subscriber device, the information transmission path from the user terminal that issued the path setting request to the user terminal that is the connection destination is secured. .

【0031】従って、実施例のネットワークシステムで
は、ネットワークに対するパス設定要求が分散して処理
されることになり、結果として、これにより、従来のネ
ットワークシステムでは生じたレスポンスの遅れを防止
できることになる。
Therefore, in the network system of the embodiment, the path setting requests for the network are processed in a distributed manner, and as a result, it is possible to prevent the delay in response that occurs in the conventional network system.

【0032】なお、実施例のネットワークシステムで
は、パス設定メッセージを伝送するための、パス設定用
制御チャネルを伝送路内に設けてあるが、パス設定メッ
セージを伝送するために特別な信号線網を設けても良
い。
In the network system of the embodiment, the path setting control channel for transmitting the path setting message is provided in the transmission line, but a special signal line network for transmitting the path setting message is provided. It may be provided.

【0033】[0033]

【発明の効果】以上、説明したように本発明のように、
ネットワーク内の各装置の使用状況に関する情報を、ネ
ットワーク内に設けられる各加入者系装置に分散して管
理させ、各加入者系装置が接続先端末に至る経路の決定
を行うようにシステムを構成すれば、ネットワークに対
するパス設定要求が分散して処理されることになり、結
果として、従来のネットワークシステムでは生じたレス
ポンスの遅れを防止できることになる。
As described above, according to the present invention,
The system is configured so that information on the usage status of each device in the network is distributed and managed by each subscriber device provided in the network, and each subscriber device determines the route to the connection destination terminal. Then, the path setting requests to the network are distributed and processed, and as a result, it is possible to prevent the delay in response that occurs in the conventional network system.

【0034】また、従来のネットワークシステムのよう
に、ネットワークを管理する装置を、多数のパス設定要
求が同時期に生じた場合に、対応できるように構成する
必要がなく、また、各加入者系装置内に記憶させておか
なければならない情報は、その加入者系装置が関係する
ノード装置に関するものだけで良いので、加入者系装置
自体の構成も、それほど、複雑にはならない。このた
め、システム自体を簡単に構成できることになり、特
に、大規模なネットワークシステムの構築に適したもの
となっている。
Further, unlike the conventional network system, it is not necessary to configure the device for managing the network so as to cope with a large number of path setting requests at the same time. Since the information that needs to be stored in the device only relates to the node device to which the subscriber device is related, the configuration of the subscriber device itself does not become so complicated. Therefore, the system itself can be easily configured, and is particularly suitable for constructing a large-scale network system.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例によるネットワークシステム
に設けられる加入者系装置の概略構成図である。
FIG. 1 is a schematic configuration diagram of a subscriber device provided in a network system according to an embodiment of the present invention.

【図2】実施例のネットワークシステムに設けられるク
ロスコネクト装置の概略構成図である。
FIG. 2 is a schematic configuration diagram of a cross-connect device provided in the network system of the embodiment.

【図3】実施例のネットワークシステムの概略構成図で
ある。
FIG. 3 is a schematic configuration diagram of a network system according to an embodiment.

【図4】パス設定を要求するユーザ端末に接続された加
入者系装置の、パス設定要求を受信した際の動作の流れ
を示した流れ図である。
FIG. 4 is a flow chart showing a flow of operations of a subscriber device connected to a user terminal requesting a path setting when the path setting request is received.

【図5】加入者系装置によって決定された経路上にある
クロスコネクト装置が、パス設定メッセージを受信した
際に行う動作の流れを示した流れ図である。
FIG. 5 is a flow chart showing a flow of operations performed when a cross-connect device on a route determined by a subscriber device receives a path setting message.

【図6】加入者系装置によって決定された経路上にある
接続先加入者系装置が、パス設定メッセージを受信した
際に行う動作の流れを示した流れ図である。
FIG. 6 is a flow chart showing a flow of an operation performed by a connection destination subscriber unit on a route determined by the subscriber unit when receiving a path setting message.

【図7】従来のネットワークシステムにおけるパス設定
処理を説明するために用いた、ネットワークシステムの
概略構成図である。
FIG. 7 is a schematic configuration diagram of a network system used for explaining a path setting process in a conventional network system.

【符号の説明】[Explanation of symbols]

11 加入者系装置 12 クロスコネクト装置 13 管理装置 14 集中管理装置 15 伝送路 16 制御網 18 パス設定用制御チャネル 21 収容判定部 22 終端点管理部 23 接続設定部 31 パス設定用制御チャネル終端点 11 subscriber system device 12 cross-connect device 13 management device 14 centralized management device 15 transmission line 16 control network 18 path setting control channel 21 accommodation determination unit 22 termination point management unit 23 connection setting unit 31 path setting control channel termination point

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 ユーザ端末が接続される複数の加入者系
装置と、加入者系装置と加入者系装置または他のクロス
コネクト装置とに情報伝送経路を設定するための複数の
クロスコネクト装置が、情報伝送路によって接続された
ネットワークを有するネットワークシステムであって、 前記各加入者系装置が、それぞれ、 自装置が使用することがあるクロスコネクト装置の使用
状況に関する情報を記憶する使用状況記憶手段と、 自装置に接続されたユーザ端末から、新規な情報伝送経
路設定要求を受けた場合に、前記使用状況記憶手段に記
憶されている情報を参照して、情報伝送に使用可能なク
ロスコネクト装置を選択することによって、送信先ユー
ザ端末に至る情報伝送経路を決定する経路決定手段と、 この経路決定手段によって、次に使用されることになっ
たクロスコネクト装置に対して用いる終端点の設定と、
前記ユーザ端末と情報伝送を行っている終端点との接続
を行う第1終端点設定接続手段と、 前記経路決定手段によって決定された情報伝送経路と、
前記終端点接続設定手段によって設定された終端点の識
別情報とを含む制御用メッセージを作成する作成手段
と、 作成した制御用メッセージを、次に使用することになる
クロスコネクト装置に対して送信する送信手段と、 受信した制御用メッセージに応じて、送信元ユーザ端末
側終端点の設定と、送信先ユーザ端末と情報伝送を行う
ための終端点との接続を行う第2終端点設定接続手段と
を具備しており、 前記クロスコネクト装置が、それぞれ、 受信した制御用メッセージに応じて、送信元ユーザ端末
側終端点と送信先ユーザ端末側終端点の設定およびそれ
ら2つの終端点間の接続を行う終端点設定接続手段と、 この終端点設定接続手段が設定した送信先ユーザ端末側
終端点の識別情報を基に、受信した制御用メッセージを
修正する修正手段と、 修正した制御用メッセージを、次に使用することになる
クロスコネクト装置あるいは加入者系装置に対して転送
する転送手段とを具備していることを特徴とするネット
ワークシステム。
1. A plurality of subscriber-system devices to which a user terminal is connected, and a plurality of cross-connect devices for setting information transmission paths to the subscriber-system devices and the subscriber-system devices or other cross-connect devices. A network system having a network connected by an information transmission path, wherein each of the subscriber devices stores information on the usage of the cross-connect device that may be used by the own device. And a cross-connect device that can be used for information transmission by referring to the information stored in the usage status storage means when a new information transmission path setting request is received from a user terminal connected to the device. By selecting, the route determining means for determining the information transmission route to the destination user terminal, and the route determining means to be used next. Setting a termination point used to cross-connect device became Rukoto,
A first terminal point setting connection means for connecting the user terminal to a terminal point performing information transmission, and an information transmission path determined by the path determination means,
Creation means for creating a control message including the identification information of the end point set by the end point connection setting means, and the created control message is transmitted to the cross-connect device to be used next. Transmitting means, and second terminating point setting / connecting means for setting a terminating point on the source user terminal side according to the received control message and for connecting the terminating point for transmitting information to the destination user terminal. The cross-connect device respectively sets a source user terminal-side termination point and a destination user terminal-side termination point and connects the two termination points according to the received control message. Modification to modify the received control message based on the termination point setting connection means to be performed and the identification information of the destination user terminal side termination point set by this termination point setting connection means Network system characterized in that it comprises a transfer means for transferring the stage, a control message to modify, then to cross-connect device or subscriber unit that will be used.
【請求項2】 前記送信手段および転送手段による制御
用メッセージの伝送が、加入者系装置とクロスコネクト
装置間、および、クロスコネクト装置間の情報伝送路上
に予め設定された特定のチャネルを用いて行われること
を特徴とする請求項1記載のネットワークシステム。
2. The transmission of the control message by the transmitting means and the transferring means uses a specific channel preset between the subscriber system device and the cross-connect device and between the cross-connect devices. The network system according to claim 1, which is performed.
【請求項3】 前記送信手段および転送手段による制御
用メッセージの伝送が、加入者系装置とクロスコネクト
装置間、および、クロスコネクト装置間に、前記情報伝
送路とは別に設けられた特定の制御用メッセージ伝送路
を介して行われることを特徴とする請求項1記載のネッ
トワークシステム。
3. Transmission of the control message by said transmitting means and transfer means is a specific control provided separately from said information transmission path between a subscriber system device and a cross-connect device and between cross-connect devices. The network system according to claim 1, wherein the network system is performed via a message transmission line for use.
JP28498194A 1994-11-18 1994-11-18 Network system Pending JPH08149136A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP28498194A JPH08149136A (en) 1994-11-18 1994-11-18 Network system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP28498194A JPH08149136A (en) 1994-11-18 1994-11-18 Network system

Publications (1)

Publication Number Publication Date
JPH08149136A true JPH08149136A (en) 1996-06-07

Family

ID=17685592

Family Applications (1)

Application Number Title Priority Date Filing Date
JP28498194A Pending JPH08149136A (en) 1994-11-18 1994-11-18 Network system

Country Status (1)

Country Link
JP (1) JPH08149136A (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05183579A (en) * 1991-11-08 1993-07-23 Mitsubishi Electric Corp Communication path selection device, communication path selection method and data exchange

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05183579A (en) * 1991-11-08 1993-07-23 Mitsubishi Electric Corp Communication path selection device, communication path selection method and data exchange

Similar Documents

Publication Publication Date Title
JP3394394B2 (en) Network connection quality control method
JPH07154407A (en) Local network
EP0487811A1 (en) Digital telecommunication system with intelligent user terminals
US6229820B1 (en) Network system and switching unit
US7353292B2 (en) Device and method for changing connection types between a fixed or variable state with an external switching unit
JPH08149136A (en) Network system
US6826190B1 (en) Method for controlling a network node and a telecommunications network together and a network node
US6519256B1 (en) Technique for constructing and controlling a private line using a switched virtual circuit in an ATM network
US6314174B1 (en) Apparatus for and method of controlling calls, and storage medium storing call control program
JP3155164B2 (en) Multi-class data communication method, data exchange and data terminal
JP2928882B1 (en) Local area network bandwidth control
KR19990022851A (en) Communication device and communication method
JPS5989065A (en) Facsimile communication system
JP2000049803A (en) Connection type communication system, terminal or node therein
JPH1075297A (en) Remote supervisory system
JPH07307794A (en) Method and device for testing interface identifier
EP0765101A2 (en) Switching apparatus, multicast- and multiconnection call control method
JPH04255136A (en) Packet exchange
JPH08163271A (en) Band managing method for communication system
JPH0442656A (en) Isdn call control system
JP3226868B2 (en) ISDN terminal adapter
JP3142047B2 (en) How to set up a call for a relocation subscriber
JP2000049888A (en) Communication protocol controller and communication equipment between different kinds of networks
JPH06216899A (en) Terminal adaptor
JP2002237887A (en) Call processing method and call processing system