JPH08141723A - Die casting apparatus - Google Patents

Die casting apparatus

Info

Publication number
JPH08141723A
JPH08141723A JP28810094A JP28810094A JPH08141723A JP H08141723 A JPH08141723 A JP H08141723A JP 28810094 A JP28810094 A JP 28810094A JP 28810094 A JP28810094 A JP 28810094A JP H08141723 A JPH08141723 A JP H08141723A
Authority
JP
Japan
Prior art keywords
product
molten metal
time lag
casting
plunger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP28810094A
Other languages
Japanese (ja)
Inventor
Masayuki Suzuki
将之 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Aisan Industry Co Ltd
Original Assignee
Aisan Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aisan Industry Co Ltd filed Critical Aisan Industry Co Ltd
Priority to JP28810094A priority Critical patent/JPH08141723A/en
Publication of JPH08141723A publication Critical patent/JPH08141723A/en
Pending legal-status Critical Current

Links

Landscapes

  • Injection Moulding Of Plastics Or The Like (AREA)

Abstract

PURPOSE: To stably produce a product having less casting blow holes by providing a measuring means for the product temp. just after casting having the intimate relation with the solidification starting temp. of molten metal as to a molten metal partial pressurizing system die casting apparatus, using a pressurizing time lag control device and controlling the operation of a plunger in the following process based on this measured value. CONSTITUTION: The temp. of the product 59 taken out from the dies 18, 26 just after casting with a product taking out machine 54 is measured with an infrared ray radiation thermometer 55, and this measured value is inputted to the pressurizing time lag control device 56. Successively, the dies 18, 26 are clamped and the molten metal for the following process is filled up into a cavity 30, and when the filling completion signal is transmitted to the pressurizing time lag control device 56, the pressurizing time lag control device 56 advances the plunger 36 based on the optimum time lag obtd. from the temp. of the product 58 in the previous cycle. Feeding of the molten metal for head is executed and the pressurization is continued until the molten metal in the cavity 30 completes the solidification. Therefore, even if the solidification starting time is changed, the feeder head quantity is always kept to be suitable.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、金型のキャビティ内に
溶湯を充填した後、加圧プランジャーをキャビティ内に
突出させて溶湯を部分加圧するダイカスト装置に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a die-casting device for filling a molten metal into a cavity of a mold and then projecting a pressure plunger into the cavity to partially press the molten metal.

【0002】[0002]

【従来の技術】ダイカスト装置では、金型のキャビティ
内に充填した溶湯が冷却されて凝固するときに、その体
積が収縮することにより鋳巣が発生する。この鋳巣の発
生を防止するために、従来、キャビティ内に充填した溶
湯が凝固する前に、加圧プランジャーをキャビティ内に
突出させることにより溶湯を部分加圧するものがある
(例えば、特公昭60−2947号公報参照)。
2. Description of the Related Art In a die casting machine, when the molten metal filled in the cavity of a mold is cooled and solidified, the volume of the molten metal shrinks to form porosity. In order to prevent the formation of the porosity, conventionally, there is one that partially pressurizes the molten metal by projecting a pressure plunger into the cavity before the molten metal filled in the cavity is solidified (for example, Japanese Patent Publication No. 60-2947 gazette).

【0003】[0003]

【発明が解決しようとする課題】前記特公昭60−29
47号公報のダイカスト装置では、加圧プランジャーの
作動による部分加圧開始時間いわゆるタイムラグの設定
が、できる限り短くすることが望ましいと表現されてい
るにすぎず、そのタイムラグの設定が明確でないため、
加圧プランジャーにより実際に押し湯される実用押し湯
量Vが製品形状や金型構造の制約を受け、記述の容量を
確保できない場合が多い。特に、実用押し湯量Vを確保
できない時の製品密度は、加圧プランジャーの作動によ
る部分加圧開始時間いわゆるタイムラグの影響を大きく
受ける。
DISCLOSURE OF THE INVENTION Problems to be Solved by the Invention
In the die-casting device of Japanese Patent Publication No. 47, it is merely expressed that it is desirable to set the partial pressurization start time by the operation of the pressurizing plunger, so-called time lag, as short as possible, and the setting of the time lag is not clear. ,
In many cases, the practical amount of molten metal V to be actually melted by the pressure plunger is restricted by the product shape and the mold structure, and the described capacity cannot be secured. In particular, the product density when the practical amount V of the poured molten metal cannot be secured is greatly affected by the partial pressurization start time so-called time lag due to the operation of the pressurizing plunger.

【0004】詳しくは、短いタイムラグで部分加圧を行
えば、実用押し湯量Vが確保できず、当然、押し湯不足
になり鋳巣の少ない製品を得ることは困難になる。ここ
で、製品部のみ、もしくは製品の一部に限定して押し湯
効果を調査し、鋳造直後の製品温度(単に製品温度とも
いう)と押し湯量の関係をタイムラグをパラメータとし
て表したところ、図3に示される線図が得られた。図3
において、製品温度が変化すると、加圧プランジャーに
よる押し湯量も変化し、製品温度が高くなるにしたがっ
て装置の最大押し湯量Vmax に近づく、また、製品温度
を一定としタイムラグを短くしても同様となる。なお、
鋳造直後の製品温度と溶湯の凝固開始時間とは密接な関
係にある。
More specifically, if the partial pressurization is performed with a short time lag, the practical amount V of the molten metal cannot be secured, and naturally, the amount of molten metal is insufficient and it becomes difficult to obtain a product with few cavities. Here, we investigated the effect of the molten metal on the product part only or on a part of the product, and expressed the relationship between the product temperature immediately after casting (also simply called the product temperature) and the amount of the molten metal as a parameter with the time lag. The diagram shown in 3 was obtained. FIG.
In the above, when the product temperature changes, the amount of hot water supplied by the pressurizing plunger also changes, and as the product temperature rises, it approaches the maximum amount of hot water Vmax of the device. Also, even if the product temperature is kept constant and the time lag is shortened, the same is true. Become. In addition,
There is a close relationship between the product temperature immediately after casting and the solidification start time of the molten metal.

【0005】また、図4はタイムラグと製品密度との関
係を鋳造直後の製品温度をパラメータとして表したグラ
フである。図4において、各製品温度により製品密度が
最も高くなる点A,B,Cが存在し、それに応じた最適
なタイムラグSa ,Sb ,Sc がある。なお図4中、ρ
0 はアルミニウムダイカスト合金の真密度である。つま
り、溶湯の凝固開始時間に対しタイムラグが早すぎる場
合は、射出スリーブ側へも加圧された溶湯が供給され、
押し湯量不足が発生し製品密度は上がらず、また遅すぎ
る場合は、凝固が進み押し湯効果が得られない。一方、
溶湯の凝固開始時間は、サイクルタイム、金型の冷却水
量水圧、溶湯温度等の変化により変動することから、溶
湯の凝固開始時間に対応したタイムラグで加圧を行わな
いと鋳巣の少ない製品を安定して生産することができな
い。
FIG. 4 is a graph showing the relationship between the time lag and the product density, using the product temperature immediately after casting as a parameter. In FIG. 4, there are points A, B, and C at which the product density becomes highest depending on each product temperature, and there are optimum time lags Sa, Sb, and Sc corresponding to the points. In Fig. 4, ρ
0 is the true density of the aluminum die cast alloy. That is, when the time lag is too early for the solidification start time of the molten metal, the pressurized molten metal is supplied also to the injection sleeve side,
The product density does not increase due to insufficient amount of hot water, and when it is too slow, solidification proceeds and the effect of hot water is not obtained. on the other hand,
The solidification start time of the molten metal fluctuates due to changes in cycle time, mold cooling water pressure, molten metal temperature, etc.Therefore, if pressure is not applied at a time lag that corresponds to the solidification start time of the molten metal, products with less porosity will be produced. We cannot produce it stably.

【0006】本発明が解決しようとする技術的課題は、
溶湯を部分加圧する加圧プランジャーの動作タイミング
を適正にコントロールし、鋳巣の少ない高品質の製品を
安定して生産することのできるダイカスト装置を提供す
ることにある。
The technical problem to be solved by the present invention is as follows.
An object of the present invention is to provide a die-casting device that can appropriately control the operation timing of a pressure plunger that partially pressurizes the molten metal and can stably produce a high-quality product with few cavities.

【0007】[0007]

【課題を解決するための手段】前記課題を解決する請求
項1の発明は、金型のキャビティ内に溶湯を充填した
後、加圧プランジャーをキャビティ内に突出させて溶湯
を部分加圧するダイカスト装置において、溶湯の凝固開
始時間と密接に関係する鋳造直後の製品温度を測定する
温度測定手段と、前記温度測定手段の測定温度に基づい
て前記加圧プランジャーの次サイクルでの動作タイミン
グをコントロールする加圧タイムラグ制御手段と、を備
えたことを特徴とするダイカスト装置である。
In order to solve the above-mentioned problems, the invention of claim 1 is a die casting for filling a molten metal into a cavity of a mold and then projecting a pressure plunger into the cavity to partially pressurize the molten metal. In the apparatus, the temperature measuring means for measuring the product temperature immediately after casting, which is closely related to the solidification start time of the molten metal, and the operation timing in the next cycle of the pressure plunger based on the temperature measured by the temperature measuring means are controlled. And a pressurizing time lag control means for controlling the die casting device.

【0008】[0008]

【作用】請求項1の発明のダイカスト装置によると、溶
湯の凝固開始時間と密接に関係する鋳造直後の製品温度
を測定し、この測定温度に基づいて加圧プランジャーの
次サイクルでの動作タイミングをコントロールするの
で、例えばサイクルタイムや冷却水量、水圧あるいは溶
湯温度の変化により、金型に充填した溶湯の凝固開始時
間が変化しても、それに対し最適なタイムラグをもって
加圧プランジャーを作動させることができる。
According to the die casting apparatus of the present invention, the product temperature immediately after casting, which is closely related to the solidification start time of the molten metal, is measured, and the operation timing of the pressurizing plunger in the next cycle is based on this measured temperature. Therefore, even if the solidification start time of the molten metal filled in the mold changes due to changes in the cycle time, the amount of cooling water, the water pressure, or the temperature of the molten metal, the pressure plunger should be operated with an optimal time lag. You can

【0009】[0009]

【実施例】本発明の一実施例を図面にしたがって説明す
る。なお本実施例装置の基本的構成については、前記特
公昭60−2947号公報の装置と同様であるから一部
省略して述べることにする。ダイカスト装置の概要を型
閉じ状態で示した図2の縦断面図において、工場等の床
面等に固定した装置の固定台1には、射出シリンダ保持
台2,3を介して射出シリンダ4が設置されている。射
出シリンダ4内には射出ピストン5が摺動自在に設けら
れている。射出ピストン5は、射出シリンダ4の両端に
開口した第1,第2信号油圧パイプ6,7よりの油圧を
受けて射出シリンダ4内を図示左右方向に変位する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described with reference to the drawings. The basic structure of the apparatus of this embodiment is the same as the apparatus of Japanese Patent Publication No. 60-2947, and will be omitted here. In the vertical sectional view of FIG. 2 showing the outline of the die casting device in a mold closed state, the injection cylinder 4 is mounted on the fixing base 1 of the device fixed to the floor surface of a factory or the like via the injection cylinder holding bases 2 and 3. is set up. An injection piston 5 is slidably provided in the injection cylinder 4. The injection piston 5 receives the hydraulic pressure from the first and second signal hydraulic pipes 6 and 7 opened at both ends of the injection cylinder 4 and is displaced in the injection cylinder 4 in the left-right direction in the drawing.

【0010】信号油圧は、図示しない油圧ポンプより入
力パイプ8を介して導入され、電磁弁製の油圧切り換え
バルブ9によって第1,第2のいずれか一方の信号油圧
パイプ6,7に選択供給され、また射出ピストン5によ
って押し出された射出シリンダ4内の油は、信号圧力の
供給されなかった側の信号油圧パイプ7又は6及び油圧
切り換えバルブ9を介して出力パイプ10より図示しな
い油圧ポンプ側へ送り出される。また、第1信号油圧パ
イプ6の途中に配設された圧力スイッチ11は、その信
号油圧パイプ6内の油圧が所定圧以上となった時に、後
述する油圧切り換えバルブ42へ電気信号を印加する。
前記射出ピストン5の変位は射出棒12を介して射出プ
ランジャー13に伝えられ、射出プランジャー13は射
出スリーブ14内を図示左右方向に摺動する。金属溶湯
の給湯口15は、射出スリーブ14の上方側面のうち、
射出プランジャー13が最も後退した時(図2の状態)
に開口する位置に設けられている。
The signal hydraulic pressure is introduced from a hydraulic pump (not shown) via an input pipe 8 and is selectively supplied to either one of the first and second signal hydraulic pipes 6 and 7 by a hydraulic pressure switching valve 9 made of a solenoid valve. Further, the oil in the injection cylinder 4 pushed out by the injection piston 5 is transferred from the output pipe 10 to the hydraulic pump side (not shown) through the signal hydraulic pipe 7 or 6 and the hydraulic pressure switching valve 9 on the side where the signal pressure is not supplied. Sent out. Further, the pressure switch 11 arranged in the middle of the first signal hydraulic pipe 6 applies an electric signal to a hydraulic pressure switching valve 42 described later when the hydraulic pressure in the signal hydraulic pipe 6 becomes equal to or higher than a predetermined pressure.
The displacement of the injection piston 5 is transmitted to the injection plunger 13 via the injection rod 12, and the injection plunger 13 slides in the injection sleeve 14 in the left-right direction in the drawing. The molten metal inlet 15 is provided on the upper side surface of the injection sleeve 14,
When the injection plunger 13 is most retracted (state of FIG. 2)
It is provided at the position where it opens.

【0011】前記固定台1上に固定した固定型支持体1
6には、固定型18が固定してある。固定型18は、固
定ブロック19と固定中子20とがボルトによって連結
されてなる。また前記射出スリーブ14は固定型支持体
16および固定ブロック19を貫通して、固定ブロック
19の端面に開口している。前記固定型支持体16は、
図2では緊締棒22の左端部にしか示されていないが、
実際には緊締棒22の右端部にも設けられている。この
両固定型支持体16には上下各2本の緊締棒22が架設
されている。前記緊締棒22が貫通する可動型支持体2
3は、固定台1上を図示しないピストンの駆動力を受け
て図示左右方向に変位可能となっている。前記可動型支
持体23には、側面の締め付け板24と上下の締め付け
板25とを介して可動型26が固定してある。可動型2
6は、上記固定型18と同じく可動ブロック27と可動
中子28とがボルトによって連結されてなる。なお可動
型26と固定型18とを総称して金型という。
Fixed type support 1 fixed on the fixed base 1.
A fixed die 18 is fixed to the unit 6. The fixed mold 18 is formed by connecting a fixed block 19 and a fixed core 20 with bolts. The injection sleeve 14 penetrates the fixed-type support 16 and the fixed block 19 and opens at the end surface of the fixed block 19. The fixed support 16 is
In FIG. 2, only the left end of the tightening rod 22 is shown,
Actually, it is also provided at the right end of the tightening rod 22. Two upper and lower tightening rods 22 are installed on both the fixed-type supports 16. Movable support 2 through which the tightening rod 22 penetrates
3 is displaceable on the fixed base 1 in the left-right direction in the drawing by receiving a driving force of a piston (not shown). A movable die 26 is fixed to the movable die support 23 through a side fastening plate 24 and upper and lower fastening plates 25. Movable type 2
6, the movable block 27 and the movable core 28 are connected by bolts as in the fixed die 18. The movable mold 26 and the fixed mold 18 are collectively referred to as a mold.

【0012】そして、図示しないピストンの駆動力によ
り可動型支持体23を変位させることによって可動型2
6を固定型18に密接させ、この両型18,26により
製品鋳造用の型空間であるキャビティ30と、このキャ
ビティ30へ溶湯を射出する射出通路31と、この射出
通路31とは別の位置でキャビティ30に連通する加圧
通路17とが形成される。また、固定型18と可動型2
6との接合面の所定箇所には、射出通路31より射出さ
れた溶湯によって押し出されたキャビティ30内の空気
を逃がすエアベント(符号省略)が形成されている。ま
た、射出通路31のキャビティ30側の端部には通路径
を絞る湯口34が形成されており、射出通路31より供
給された溶湯が高速となってキャビティ30へ射出され
る。
Then, the movable die support 23 is displaced by the driving force of a piston (not shown) to move the movable die 2
6 is brought into close contact with the fixed mold 18, and a cavity 30 which is a mold space for product casting by the molds 18 and 26, an injection passage 31 for injecting molten metal into the cavity 30, and a position different from the injection passage 31. Thus, the pressure passage 17 communicating with the cavity 30 is formed. In addition, the fixed mold 18 and the movable mold 2
An air vent (reference numeral omitted) that releases the air in the cavity 30 pushed out by the molten metal injected from the injection passage 31 is formed at a predetermined position on the joint surface with 6. Further, a spout 34 for narrowing the passage diameter is formed at the end of the injection passage 31 on the cavity 30 side, and the molten metal supplied from the injection passage 31 is injected into the cavity 30 at a high speed.

【0013】前記キャビティ30の略中心に対応すべく
可動ブロック27、可動中子28に形成された円筒孔内
には、加圧プランジャー36が摺動可能に挿入されてお
り、加圧プランジャー36端面よりその前進方向の空間
にて加圧通路17が形成されている。この加圧プランジ
ャー36によって、加圧通路17部分の溶湯をキャビテ
ィ30内の加圧通路17対向部分(ここを湯溜まり部3
2と称す)へ押し出すようになっている。
A pressure plunger 36 is slidably inserted into a cylindrical hole formed in the movable block 27 and the movable core 28 so as to correspond to the approximate center of the cavity 30. A pressurizing passage 17 is formed in a space in the forward direction of the end surface 36. The pressurizing plunger 36 allows the molten metal in the pressurizing passage 17 portion to be opposed to the portion in the cavity 30 facing the pressurizing passage 17 (this is the sump 3
2)).

【0014】前記加圧プランジャー36の後端側に設け
られた加圧ピストン38は、加圧シリンダ39内を摺動
して加圧プランジャー36に前進、後退の変位を与え
る。加圧シリンダ39には、射出シリンダ4と同様に第
3,第4信号油圧パイプ40,41が開口しており、電
磁弁製の油圧切り換えバルブ42によって、油圧ポンプ
(図示せず)より入力された信号油圧を制御して加圧ピ
ストン38の前進、後退を行うようになっている。この
加圧シリンダ39は、前記締め付け板24に固定されて
おり可動型26と一体に移動する。
The pressure piston 38 provided on the rear end side of the pressure plunger 36 slides in the pressure cylinder 39 to give the pressure plunger 36 forward and backward displacements. Similarly to the injection cylinder 4, the pressurizing cylinder 39 has the third and fourth signal hydraulic pipes 40 and 41 opened, and is input from a hydraulic pump (not shown) by a hydraulic switching valve 42 made of a solenoid valve. The signal hydraulic pressure is controlled to move the pressurizing piston 38 forward and backward. The pressure cylinder 39 is fixed to the tightening plate 24 and moves integrally with the movable die 26.

【0015】また、前記可動ブロック27、可動中子2
8を貫通して先端がキャビティ30内に臨んでいるエジ
ェクタピン44は、可動型26を後退させて型開きした
後に、キャビティ30内で凝固しているダイカスト品を
可動型26より押し離すものであり、エジェクタプレー
ト45、押し出しロッド46、押し出しプレート47お
よび押し出し棒48を介して押し出しピストン49の変
位を受け、図示左右方向に変位する。なお押し出しロッ
ド46は、可動ブロック27に設けられた図示しない摺
動穴内を摺動することによって図示左右方向に移動す
る。
The movable block 27 and the movable core 2 are also provided.
The ejector pin 44, which penetrates 8 and has its tip facing the cavity 30, pushes away the die-cast product solidified in the cavity 30 from the movable die 26 after retracting the movable die 26 and opening the die. There, the ejecting piston 49 is displaced via the ejector plate 45, the extruding rod 46, the extruding plate 47, and the extruding rod 48, and is displaced in the lateral direction in the drawing. The push rod 46 slides in a slide hole (not shown) provided in the movable block 27 to move in the left-right direction in the figure.

【0016】前記押し出しピストン49を変位させる押
し出しシリンダ50は、射出シリンダ4や加圧シリンダ
39と同様に、第5,第6信号油圧パイプ51,52が
開口しており、油圧ポンプ(図示せず)より入力された
信号油圧を電磁弁製の油圧切り換えバルブ53によって
制御し、押し出しピストン49の前進、後退を行うよう
になっている。
Like the injection cylinder 4 and the pressurizing cylinder 39, the push-out cylinder 50 for displacing the push-out piston 49 has the fifth and sixth signal hydraulic pipes 51 and 52 opened, and a hydraulic pump (not shown). ), The signal hydraulic pressure input from the above is controlled by a hydraulic pressure switching valve 53 made of a solenoid valve, and the pushing piston 49 is moved forward and backward.

【0017】次に、要部についてダイカスト装置の要部
を型開き状態で示した図1の平断面図を参照して述べ
る。鋳造後に型開きした金型の中からダイカスト品(製
品ともいう)を取り出す製品取り出し機54の待機位置
すなわち後退位置において取り出した鋳造直後の製品5
9の加圧部分に対向する位置には、その製品の表面温度
を非接触で瞬時に測定することのできる赤外線放射温度
計55が配設されている。この赤外線放射温度計55に
よって測定された測定値の検出信号はマイクロコンピュ
ータを主体として構成された加圧タイムラグ制御装置5
6に入力される。なお赤外線放射温度計55が本発明で
いう温度検出手段に相当している。
Next, the main parts will be described with reference to the plan sectional view of FIG. 1 showing the main parts of the die casting apparatus in the mold open state. The product 5 immediately after casting taken out at the standby position, that is, the retracted position of the product take-out machine 54 for taking out a die cast product (also referred to as a product) from the mold opened after casting.
An infrared radiation thermometer 55, which is capable of instantaneously measuring the surface temperature of the product in a non-contact manner, is arranged at a position facing the pressurizing portion of 9. The detection signal of the measurement value measured by the infrared radiation thermometer 55 is a pressurizing time lag control device 5 mainly composed of a microcomputer.
6 is input. The infrared radiation thermometer 55 corresponds to the temperature detecting means in the present invention.

【0018】加圧タイムラグ制御装置56は、溶湯の充
填完了確認として射出プランジャー13の高速切り換え
リミットスイッチ57の電気信号を入力とし、加圧プラ
ンジャー36の前進・後退を切り換える油圧切り換えバ
ルブ42への電気信号を出力として、充填完了から加圧
プランジャー36が動きだすまでの時間(以下、タイム
ラグ)を前記赤外線放射温度計55の測定温度(鋳造直
後の製品温度)に基づいて自動的に最適値にコントロー
ルする。なお加圧タイムラグ制御装置56が本発明でい
う加圧タイムラグ制御手段に相当している。
The pressurization time lag control device 56 receives the electric signal of the high-speed changeover limit switch 57 of the injection plunger 13 as an input to confirm the completion of the filling of the molten metal, and sends it to the hydraulic pressure changeover valve 42 for switching the forward and backward movements of the pressurizing plunger 36. As an output, the time from the completion of filling until the pressurizing plunger 36 starts to move (hereinafter, time lag) is automatically set to an optimum value based on the temperature measured by the infrared radiation thermometer 55 (product temperature immediately after casting). Control to. The pressurization time lag control device 56 corresponds to the pressurization time lag control means in the present invention.

【0019】また前記射出プランジャー13の付近に
は、その前進完了の直前において作動する高速切り換え
リミットスイッチ57が配置されている。この高速切り
換えリミットスイッチ57は、その作動によって射出プ
ランジャー13の前進速度を高速に切り換えるととも
に、その切り換え信号を加圧タイムラグ制御装置56に
入力する。
Further, near the injection plunger 13, a high speed changeover limit switch 57 which is activated immediately before the completion of the forward movement is arranged. The high-speed changeover limit switch 57 switches the forward speed of the injection plunger 13 to a high speed by its operation, and inputs the switching signal to the pressurization time lag control device 56.

【0020】ここで、タイムラグと製品密度との関係を
製品温度をパラメータとして表した図4のグラフより、
溶湯の凝固開始時間の代用特性を示す鋳造直後の製品温
度Tと最適タイムラグSの関係を求め、その関係に近似
した下記関係式(1) 又は(2)を導く。 S=aT+b …(1) あるいは S=aT2 +bT+c …(2) なお図4のグラフは鋳造する製品毎に個々に求められる
ものであり、従って関係式中のa,b,cは図4から求
められる製品毎の定数である。
Here, from the graph of FIG. 4 showing the relationship between the time lag and the product density using the product temperature as a parameter,
The relationship between the product temperature T immediately after casting and the optimum time lag S, which shows the substitute characteristic of the solidification start time of the molten metal, is obtained, and the following relational expression (1) or (2) approximate to the relationship is derived. S = aT + b (1) or S = aT 2 + bT + c (2) Note that the graph of FIG. 4 is obtained individually for each product to be cast, and therefore a, b, and c in the relational expression from FIG. It is a constant for each product required.

【0021】引き続き、前記したダイカスト装置による
鋳造工程について述べる。まず可動型支持体23を前進
させることによって型閉じすなわち図2に示されるよう
に可動型26を固定型18に密接させる。次に、溶湯注
入器を用いて溶湯を給湯口15より射出スリーブ14内
に注湯する。その後、油圧切り換えバルブ9を切り換え
て、信号油圧を第1信号油圧パイプ6側に供給して射出
ピストン5と共に射出プランジャー13を前進させるこ
とにより、溶湯を金型のキャビティ30内へ充填する。
Next, the casting process by the die casting apparatus described above will be described. First, the movable die support 23 is moved forward to close the die, that is, the movable die 26 is brought into close contact with the fixed die 18 as shown in FIG. Next, the molten metal is poured into the injection sleeve 14 from the hot water supply port 15 using a molten metal injector. After that, the hydraulic pressure switching valve 9 is switched to supply the signal hydraulic pressure to the first signal hydraulic pressure pipe 6 side to advance the injection plunger 13 together with the injection piston 5, thereby filling the molten metal into the cavity 30 of the mold.

【0022】この時、射出プランジャー13は、高速切
り換えリミットスイッチ57の位置までは低速で前進
し、このスイッチが作動すると高速に切り換わる。な
お、高速切り換え時より充填完了までの時間は一般的に
は0.1〜0.5秒程度で製品により異なるが、ショッ
ト毎のばらつきは0.05秒以内のため、本実施例では
この高速切り換えタイミングを充填完了のタイミングと
して代用している。高速切り換えリミットスイッチ57
の信号が加圧タイムラグ制御装置56に入力されるのと
ほとんど同時に充填が完了する一方、加圧タイムラグ制
御装置56は前サイクルの製品温度から求められる加圧
プランジャー36の最適タイムラグに基づき加圧プラン
ジャー36の油圧切り換えバルブ42に前進の信号を出
力する。すると、加圧プランジャー36が前進し、製品
部に押し湯を行い凝固完了時まで加圧し続ける。この場
合の押し湯量は、製品温度(凝固開始時間)が変化して
も常に最適な加圧タイムラグによるため適正な押し湯量
が得られる。
At this time, the injection plunger 13 advances at a low speed to the position of the high speed changeover limit switch 57, and switches to a high speed when this switch is operated. The time from the high speed switching to the completion of filling is generally about 0.1 to 0.5 seconds and varies depending on the product, but since the variation between shots is within 0.05 seconds, this high speed is used in this embodiment. The switching timing is used as the filling completion timing. High speed changeover limit switch 57
While the filling is completed almost at the same time that the signal of is input to the pressurizing time lag controller 56, the pressurizing time lag controller 56 pressurizes based on the optimum time lag of the pressurizing plunger 36 obtained from the product temperature of the previous cycle. A forward signal is output to the hydraulic pressure switching valve 42 of the plunger 36. Then, the pressurizing plunger 36 moves forward, presses hot water to the product portion, and continues to pressurize until the completion of solidification. In this case, the amount of molten metal to be poured is always the optimum pressurizing time lag even if the product temperature (solidification start time) changes.

【0023】製品部の凝固が完了すると、予め決められ
た時間経過後に、油圧切り換えバルブ42によって信号
油圧の切り換えを行い、加圧プランジャー36を後退さ
せた後、可動型支持体23を図2で右方向に後退させる
ことによって型開きすなわち可動型26を固定型18よ
り引き離す。金型が開かれると、図1に示される製品取
り出し機54は金型間の所定の位置まで前進し、製品5
9のビスケット部をチャックする。それと同期して、油
圧切り換えバルブ53が作動することによって押し出し
ピストン49を図2で左方へ移動させ、この押し出しピ
ストン49の移動によってエジェクタピン44が製品5
9を押し出す。
When the solidification of the product portion is completed, the signal hydraulic pressure is switched by the hydraulic pressure switching valve 42 after a lapse of a predetermined time, and the pressurizing plunger 36 is retracted. The mold is opened, that is, the movable mold 26 is separated from the fixed mold 18 by retreating in the right direction with. When the mold is opened, the product ejector 54 shown in FIG. 1 advances to a predetermined position between the molds, and the product 5
Chuck the biscuit part of 9. In synchronization with this, the hydraulic pressure switching valve 53 operates to move the pushing piston 49 to the left in FIG. 2, and the movement of the pushing piston 49 causes the ejector pin 44 to move to the product 5
Push 9 out.

【0024】製品59が金型より押し出されると、製品
取り出し機54は図1に示されるように後退し金型間よ
り製品59を取り出す。この製品取り出し機54の後退
位置においては、図示されないが光電スイッチ等による
製品の有無を検出するとともに赤外線放射温度計55に
より製品温度を測定し、その値を加圧タイムラグ制御装
置56へ出力する。その後、製品取り出し機54は製品
59をシュートに置くか、あるいはプレス機等の仕上げ
装置に製品59をセットし、1サイクルを終了する。
When the product 59 is extruded from the mold, the product take-out machine 54 retreats as shown in FIG. 1 to take out the product 59 from between the molds. At the retracted position of the product take-out machine 54, although not shown, the presence or absence of a product is detected by a photoelectric switch or the like, the product temperature is measured by the infrared radiation thermometer 55, and the value is output to the pressurization time lag control device 56. After that, the product take-out machine 54 puts the product 59 on the chute or sets the product 59 in a finishing device such as a press, and completes one cycle.

【0025】なお本実施例装置では、最適加圧タイムラ
グを計算するのに1サイクル前の製品温度を測定するた
め、型段取り時や作業停止後の初回サイクルでは前もっ
て決めてあるタイムラグにより加圧を行うものとする。
また、金型冷却系統等の異常により製品温度が設定値を
越えた場合は、警報を出すか、あるいはダイカスト装置
を停止するようにしてある。また、溶湯の充填完了の確
認としては、実施例の高速リミットスイッチ57の切り
換えタイミングに代え、特公昭60−2947と同様に
射出プランジャー13の油圧立ち上がりの圧力の検出を
用いることもできる。
In the apparatus of this embodiment, the product temperature one cycle before is measured in order to calculate the optimum pressurization time lag, so that the pressurization is performed by a predetermined time lag at the time of mold setup or the first cycle after the work is stopped. Assumed to be performed.
Further, when the product temperature exceeds the set value due to an abnormality in the mold cooling system or the like, an alarm is issued or the die casting device is stopped. Further, in order to confirm the completion of the filling of the molten metal, instead of the switching timing of the high speed limit switch 57 of the embodiment, the detection of the pressure of the hydraulic pressure rise of the injection plunger 13 can be used as in JP-B-60-2947.

【0026】上記したダイカスト装置は、要すれば、製
品取り出し機54で金型内より取り出された鋳造直後の
製品59の温度を赤外線放射温度計55により測定し、
その値を次サイクルにおける加圧タイムラグ制御装置5
6の入力信号として、あらかじめ求めた式(1) あるいは
(2) を用い、充填完了からの最適加圧タイムラグを加圧
タイムラグ制御装置56内で計算し、次サイクルで充填
完了確認の高速リミットスイッチ57の信号が加圧タイ
ムラグ制御装置56に入力された時、最適なタイムラグ
を加圧プランジャー36の油圧切り換えバルブ42へ出
力するものである。
In the die casting apparatus described above, if necessary, the temperature of the product 59 immediately after casting taken out from the mold by the product take-out machine 54 is measured by the infrared radiation thermometer 55,
The value is used as the pressurization time lag control device 5 in the next cycle.
As the input signal of 6, the formula (1) obtained in advance or
Using (2), the optimum pressurization time lag from the completion of filling was calculated in the pressurization time lag control device 56, and the signal of the high-speed limit switch 57 for confirming the completion of filling was input to the pressurization time lag control device 56 in the next cycle. At this time, the optimum time lag is output to the hydraulic pressure switching valve 42 of the pressurizing plunger 36.

【0027】上記ダイカスト装置によると、溶湯の凝固
開始時間と密接に関係する鋳造直後の製品温度に基づい
て加圧プランジャー36の次サイクルでの動作タイミン
グをコントロールするので、例えばサイクルタイムや冷
却水量、水圧あるいは溶湯温度の変化により、金型に充
填された溶湯の凝固開始時間が変化しても、それに対し
最適なタイムラグをもって加圧プランジャー36を作動
させることができる。従って、製品密度のばらつきを小
さく抑えることが可能でその密度が真密度近くに向上す
ることにより、鋳巣の少ない高品質の製品59が得られ
る。
According to the die casting apparatus, the operation timing of the pressurizing plunger 36 in the next cycle is controlled based on the product temperature immediately after casting, which is closely related to the solidification start time of the molten metal. Even if the solidification start time of the molten metal filled in the mold changes due to changes in the water pressure or the temperature of the molten metal, the pressure plunger 36 can be operated with an optimal time lag. Therefore, variations in product density can be suppressed to a small value, and the density can be improved to near the true density, so that a high-quality product 59 with few cavities can be obtained.

【0028】本実施例装置で作られた製品と、本実施例
装置でタイムラグ制御装置56を使用しないで作られた
製品との密度分布を比較した図が図5・図6に示されて
いる。製品はいずれもアルミニウム合金をダイカスト材
料として用いた場合のものであり、それぞれ100個の
製品を日と時間を変えてサンプリングし、同一箇所の密
度を測定して各密度において各々いくつの製品が得られ
たかを度数で表示したものである。ここで、図5は本実
施例装置で作られた製品群の密度分布を示し、また、図
6はタイムラグ制御装置56を使用しないで作られた製
品群の密度分布を示している。図5・図6から明らかな
ように、本実施例装置で得られた製品群はタイムラグ制
御装置56を使用しないものに比べて、密度のばらつき
が小さく抑えられその密度が真密度ρ0 近くに向上され
ていることがわかる。
FIG. 5 and FIG. 6 are diagrams comparing the density distributions of the product manufactured by the device of this embodiment and the product manufactured by the device of this embodiment without using the time lag control device 56. . All of the products were made using aluminum alloy as a die-casting material. 100 products were sampled at different days and times, and the density at the same location was measured to obtain how many products at each density. It is a display of whether or not it was done. Here, FIG. 5 shows the density distribution of the product group made by the apparatus of this embodiment, and FIG. 6 shows the density distribution of the product group made without using the time lag control device 56. As is clear from FIGS. 5 and 6, the product group obtained by the device of the present embodiment has a smaller variation in density and has a density close to the true density ρ 0 as compared with the product not using the time lag control device 56. You can see that it has been improved.

【0029】[0029]

【発明の効果】請求項1の発明によれば、温度検出手段
により溶湯の凝固開始時間と密接に関係する鋳造直後の
製品温度を測定し、この測定した温度から加圧プランジ
ャーの次サイクルでの動作タイミングをコントロールす
るから、製品密度のばらつきを小さく抑えその密度を真
密度近くに向上することが可能で、鋳巣の少ない高品質
の製品を安定して生産することができる。
According to the invention of claim 1, the temperature of the product immediately after casting, which is closely related to the solidification start time of the molten metal, is measured by the temperature detecting means, and the measured temperature is used in the next cycle of the pressure plunger. Since the operation timing is controlled, it is possible to suppress variations in product density and improve the density close to the true density, and it is possible to stably produce high-quality products with few cavities.

【図面の簡単な説明】[Brief description of drawings]

【図1】ダイカスト装置の要部を型開き状態で示す平面
図である。
FIG. 1 is a plan view showing a main part of a die casting device in a mold open state.

【図2】ダイカスト装置の概要を型閉じ状態で示す縦断
面図である。
FIG. 2 is a vertical sectional view showing an outline of a die casting apparatus in a mold closed state.

【図3】製品温度と押し湯量との関係をタイムラグをパ
ラメータとして表した線図である。
FIG. 3 is a diagram showing a relationship between a product temperature and an amount of hot water as a parameter with a time lag as a parameter.

【図4】タイムラグと製品密度との関係を製品温度をパ
ラメータとして表したグラフである。
FIG. 4 is a graph showing the relationship between time lag and product density with product temperature as a parameter.

【図5】本実施例装置で作られた製品群の密度分布を示
す図である。
FIG. 5 is a diagram showing a density distribution of a product group manufactured by the apparatus of this embodiment.

【図6】タイムラグ制御装置を使用しないで作られた製
品群の密度分布を示す図である。
FIG. 6 is a diagram showing a density distribution of a product group made without using a time lag control device.

【符号の説明】[Explanation of symbols]

30 キャビティ 36 加圧プランジャー 55 赤外線放射温度計(温度測定手段) 56 加圧タイムラグ制御装置(加圧タイムラグ制御手
段) 59 製品
30 Cavity 36 Pressure Plunger 55 Infrared Radiation Thermometer (Temperature Measuring Means) 56 Pressurization Time Lag Control Device (Pressure Time Lag Control Means) 59 Products

───────────────────────────────────────────────────── フロントページの続き (51)Int.Cl.6 識別記号 庁内整理番号 FI 技術表示箇所 // B29C 45/76 7365−4F ─────────────────────────────────────────────────── ─── Continuation of front page (51) Int.Cl. 6 Identification number Office reference number FI technical display location // B29C 45/76 7365-4F

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 金型のキャビティ内に溶湯を充填した
後、加圧プランジャーをキャビティ内に突出させて溶湯
を部分加圧するダイカスト装置において、 溶湯の凝固開始時間と密接に関係する鋳造直後の製品温
度を測定する温度測定手段と、 前記温度測定手段の測定温度に基づいて前記加圧プラン
ジャーの次サイクルでの動作タイミングをコントロール
する加圧タイムラグ制御手段と、を備えたことを特徴と
するダイカスト装置。
1. A die casting apparatus for filling a molten metal into a cavity of a mold and then partially pressurizing the molten metal by projecting a pressure plunger into the cavity, which is immediately related to the solidification start time of the molten metal immediately after casting. A temperature measuring means for measuring a product temperature; and a pressure time lag control means for controlling the operation timing of the pressure plunger in the next cycle based on the temperature measured by the temperature measuring means. Die casting equipment.
JP28810094A 1994-11-22 1994-11-22 Die casting apparatus Pending JPH08141723A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP28810094A JPH08141723A (en) 1994-11-22 1994-11-22 Die casting apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP28810094A JPH08141723A (en) 1994-11-22 1994-11-22 Die casting apparatus

Publications (1)

Publication Number Publication Date
JPH08141723A true JPH08141723A (en) 1996-06-04

Family

ID=17725798

Family Applications (1)

Application Number Title Priority Date Filing Date
JP28810094A Pending JPH08141723A (en) 1994-11-22 1994-11-22 Die casting apparatus

Country Status (1)

Country Link
JP (1) JPH08141723A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0819487A1 (en) * 1996-07-17 1998-01-21 Alusuisse Bayrisches Druckguss-Werk GmbH & Co. KG Device and method to produce pressure die castings
JP2002210550A (en) * 2001-01-18 2002-07-30 Yanagawa Seiki Co Ltd Locally pressurized casting system
US7350557B2 (en) * 2002-07-25 2008-04-01 Baraldi Chemgroup Srl. Method to detect the distribution of service temperatures in a technological process

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0819487A1 (en) * 1996-07-17 1998-01-21 Alusuisse Bayrisches Druckguss-Werk GmbH & Co. KG Device and method to produce pressure die castings
JP2002210550A (en) * 2001-01-18 2002-07-30 Yanagawa Seiki Co Ltd Locally pressurized casting system
US7350557B2 (en) * 2002-07-25 2008-04-01 Baraldi Chemgroup Srl. Method to detect the distribution of service temperatures in a technological process

Similar Documents

Publication Publication Date Title
KR910009623B1 (en) Pressing mechanism for casting apparatus
CA1288928C (en) Die casting apparatus
CN109773152B (en) Multi-point feeding casting and forging integrated forming device and method
EP0040919B1 (en) Pressure casting process and machine for carrying out the process
KR102135823B1 (en) Device and method for forming metal
JPH02229660A (en) Method and device for pressure casting
US4844847A (en) Method and apparatus for controlling injection molding machines
JPH08141723A (en) Die casting apparatus
GB2056338A (en) Die-casting method and apparatus
JPH05285628A (en) Method and apparatus for squeeze casting molten metal
JPS59165634A (en) Injection molding method
JPS6031930A (en) Compression molding method of thermoplastic resin
JP2642993B2 (en) Plastic molding method
US4499941A (en) Modified pressure casting process and machine
JPH05123847A (en) Secondary pressurizing method in die casting machine
JPH04143058A (en) Injection forming apparatus
JPH0531564A (en) Method for controlling pressurized timing for squeeze pin in partial squeeze casting
JPS6394808A (en) Injection compression molding
JPS635861A (en) Method and apparatus for plunger pressuring casting
JPH04246523A (en) Injection compression molding method
JPS6233050A (en) Method for ejecting injection product at mold opening of injection molding machine
JPH1158397A (en) Mold clamping method for straight-hydraulic mold clamping system
JP3196148B2 (en) Casting equipment
JPH08505323A (en) Cold chamber die casting machine injection device
JPH0513750B2 (en)