JPH08134885A - Soil improvement and method thereof - Google Patents

Soil improvement and method thereof

Info

Publication number
JPH08134885A
JPH08134885A JP6274103A JP27410394A JPH08134885A JP H08134885 A JPH08134885 A JP H08134885A JP 6274103 A JP6274103 A JP 6274103A JP 27410394 A JP27410394 A JP 27410394A JP H08134885 A JPH08134885 A JP H08134885A
Authority
JP
Japan
Prior art keywords
ground
improved
solidifying material
drilling blade
earth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP6274103A
Other languages
Japanese (ja)
Other versions
JP3370454B2 (en
Inventor
Masaharu Nakamura
正治 中村
Juichi Ise
寿一 伊勢
Junji Tanaka
純二 田中
Sumio Ito
澄雄 伊藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ASAHI KISO KK
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
ASAHI KISO KK
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ASAHI KISO KK, Shimizu Construction Co Ltd, Shimizu Corp filed Critical ASAHI KISO KK
Priority to JP27410394A priority Critical patent/JP3370454B2/en
Publication of JPH08134885A publication Critical patent/JPH08134885A/en
Application granted granted Critical
Publication of JP3370454B2 publication Critical patent/JP3370454B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

PURPOSE: To improve the ground at a low cost and a short period. CONSTITUTION: A ground to be improved is constituted of a plurality of improving piles A forming alternately horizontal zones 41 and vertical zones 40 at the upper and lower parts. When the implement piles A are prepared, a cutting rod of a soil improving machine 10 is rotated to penetrate into the ground G and a solidifying slurry agent is charged from respective first and second earth augers 16, 17 into the ground to mix it with soil. In the second earth auger 17, the solidifying slurry agent is supplied only at a specified depth.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、地盤内の土砂を攪拌し
つつ固化材を混合して土砂を固化させることによって、
軟弱地盤を改良するのに好適な改良地盤および地盤改良
工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention is to solidify earth and sand by mixing the solidifying material while stirring the earth and sand in the ground.
The present invention relates to an improved ground suitable for improving soft ground and a ground improvement method.

【0002】[0002]

【従来の技術】周知のように、石灰、セメント等の固化
材をスラリー状に調製し、これらのスラリーを地盤内の
土と攪拌・混合することにより、固化材スラリーの水和
反応,この水和反応による水和生成物と粘土鉱物とのイ
オン交換作用,あるいはポゾラン反応等を主体とする化
学的固結反応を利用して土を化学的に固化させて、地盤
内に改良杭を造成し地盤改良を行う深層混合処理工法が
ある。
2. Description of the Related Art As is well known, solidifying materials such as lime and cement are prepared in the form of slurry, and the slurry is stirred and mixed with the soil in the ground to hydrate the solidifying material slurry. Ion exchange between hydration products of clay reaction and clay minerals, or chemical solidification reaction mainly consisting of pozzolanic reaction is used to chemically solidify the soil and create improved piles in the ground. There is a deep layer mixing treatment method for ground improvement.

【0003】従来、この深層混合処理工法では、図10
に示すような、杭打ち機をベースとした地盤改良装置1
が用いられている。地盤改良装置1は、本体2に設けら
れた支持柱3に、削孔ロッド4がその軸周りに回転自在
に支持され、この削孔ロッド4の下端部4aに、地盤G
内の土の攪拌を行う攪拌翼5と、地盤G内の土を掻き進
むためのアースオーガ6と、図示しない固化材供給手段
から固化材スラリーを地盤G中に供給するための吐出口
7とが設けられた概略構成となっている。
Conventionally, in this deep layer mixing processing method, as shown in FIG.
Ground improvement device 1 based on a pile driver as shown in
Is used. In the ground improvement device 1, a boring rod 4 is rotatably supported by a supporting column 3 provided on a main body 2 around its axis, and a ground G is attached to a lower end portion 4a of the boring rod 4.
A stirring blade 5 for stirring the soil in the ground, an earth auger 6 for scraping the soil in the ground G, and a discharge port 7 for supplying the solidifying material slurry into the ground G from a solidifying material supply means (not shown). Is provided.

【0004】そして、このような地盤改良装置1を用い
て地盤を改良するには、まず、地盤Gに削孔ロッド4を
回転させながら貫入し、アースオーガ6で地盤G内を所
定の深さまで掻き進む。次に、固化材供給手段によっ
て、固化材スラリーを削孔ロッド4の下端部4aの吐出
口7から噴出させる。そして、削孔ロッド4を引き上げ
ながら、噴出させた固化材スラリーと地盤Gの土とをア
ースオーガ6および攪拌翼5で攪拌することによって、
土を固化させて地盤G内に円柱状の改良杭を造成する。
In order to improve the ground by using the ground improving apparatus 1 as described above, first, the drilling rod 4 is inserted into the ground G while rotating, and the ground auger 6 is used to reach a predetermined depth in the ground G. Scratch forward. Next, the solidified material slurry is ejected from the discharge port 7 of the lower end portion 4 a of the drilling rod 4 by the solidified material supply means. Then, while pulling up the boring rod 4, by stirring the ejected solidifying material slurry and the soil of the ground G with the earth auger 6 and the stirring blade 5,
The soil is solidified to form a columnar improved pile in the ground G.

【0005】そして、地盤上に構築する構造物あるいは
地盤の利用目的にあわせて、このような改良杭を、単
独、あるいはブロック状,格子状,連壁状等に造成して
改良地盤を構築していた。
Then, according to the purpose of use of the structure or the ground constructed on the ground, such improved piles are constructed individually or in the form of blocks, grids, continuous walls, etc. to construct the improved ground. Was there.

【0006】[0006]

【発明が解決しようとする課題】しかしながら、上述し
たような従来の改良地盤および地盤改良工法には、以下
のような問題が存在する。すなわち、地盤G内を掻き進
むアースオーガ6が、削孔ロッド4の下端部4aにのみ
設けられているので、地盤G内に造成される改良杭は、
その外形形状が、アースオーガ6の回転径に等しい直径
を有した円筒状とならざるを得なかった。したがって、
広範囲にわたって地盤の改良を望む場合には、改良杭を
多数造成するか、あるいは適当な間隔で改良杭を造成
し、これらの改良杭の杭頭間の表層部のみを別途地盤改
良する等しなければならず、工期の長期化や施工コスト
の増大を招くといった問題があった。本発明は、以上の
ような点を考慮してなされたもので、低コストかつ短工
期で地盤を改良することのできる改良地盤および地盤改
良工法を提供することを目的とする。
However, the above-described conventional improved ground and ground improvement method have the following problems. That is, since the earth auger 6 that scrapes in the ground G is provided only on the lower end portion 4a of the drilling rod 4, the improved pile formed in the ground G is
The outer shape had to be a cylindrical shape having a diameter equal to the rotating diameter of the earth auger 6. Therefore,
If improvement of the ground is desired over a wide area, many improved piles must be created, or improved piles must be created at appropriate intervals and only the surface layer between the pile heads of these improved piles must be improved separately. However, there is a problem that the construction period is prolonged and the construction cost is increased. The present invention has been made in consideration of the above points, and an object thereof is to provide an improved ground and a ground improvement method capable of improving the ground at a low cost and in a short construction period.

【0007】[0007]

【課題を解決するための手段】請求項1に係る発明は、
地盤の土砂に固化材を混合することによって地盤中に構
築された一以上の改良杭から構成された改良地盤であっ
て、前記改良杭が、水平面内に位置する一定厚さの水平
部と、該水平部の下面から鉛直下方に向けて一定寸法延
在する鉛直部とが上下に交互に形成された構成とされて
いることを特徴としている。
The invention according to claim 1 is
It is an improved ground composed of one or more improved piles built in the ground by mixing solidifying material into the soil of the ground, wherein the improved piles are horizontal portions of a certain thickness located in the horizontal plane, It is characterized in that vertical portions, which vertically extend downward from the lower surface of the horizontal portion by a predetermined dimension, are alternately formed vertically.

【0008】請求項2に係る発明は、下端部に第一の削
孔翼を備え、その上方に前記第一の削孔翼よりも回転半
径の大きな第二の削孔翼を備えた構成の削孔ロッドを回
転させつつ地盤に貫入させていき、第一の削孔翼と第二
の削孔翼のそれぞれから前記地盤内に固化材を供給する
とともに、前記削孔翼で前記固化材と前記地盤内の土砂
とを混合することにより地盤を固化させて改良するとき
に、前記第二の削孔翼からの固化材の供給を定められた
深さにおいてのみ行うことを特徴としている。
According to a second aspect of the present invention, the lower end portion is provided with a first drilling blade, and the second drilling blade having a larger radius of rotation than the first drilling blade is provided above the first drilling blade. While rotating the drilling rod to penetrate into the ground, while supplying a solidifying material into the ground from each of the first drilling blade and the second drilling blade, with the solidifying material in the drilling blade When the soil is solidified and improved by mixing with the soil in the ground, the solidified material is supplied from the second boring blade only at a predetermined depth.

【0009】請求項3に係る発明は、下端部に第一の削
孔翼を備え、その上方に前記第一の削孔翼よりも回転半
径の大きな第二の削孔翼を備えた構成の削孔ロッドを回
転させつつ地盤に貫入させていき、第一の削孔翼と第二
の削孔翼のそれぞれから前記地盤内に固化材を供給する
とともに、前記削孔翼で前記固化材と前記地盤内の土砂
とを混合することにより地盤を固化させて改良するとき
に、前記第二の削孔翼から供給する固化材の配合比を、
定められた深さ毎に変えることを特徴としている。
According to a third aspect of the present invention, there is provided a structure in which a lower end portion is provided with a first drilling blade and a second drilling blade having a larger radius of rotation than the first drilling blade is provided above the first drilling blade. While rotating the drilling rod to penetrate into the ground, while supplying a solidifying material into the ground from each of the first drilling blade and the second drilling blade, with the solidifying material in the drilling blade When solidifying and improving the ground by mixing with the earth and sand in the ground, the mixing ratio of the solidifying material supplied from the second boring blade,
The feature is that it is changed for each specified depth.

【0010】[0010]

【作用】請求項1記載の発明では、改良地盤を、水平面
内に位置する一定厚さの水平部と、鉛直下方に向けて一
定寸法延在する鉛直部とを上下に交互に形成してなる改
良杭から構成するようにした。これにより、複数の改良
杭を、前記水平部どうしが隣接するように配置すれば、
改良地盤が、上下方向に連続する鉛直部から形成される
柱と、隣接することによって一方向に連続する水平部か
ら形成される梁とからなる、いわばラーメン構造とな
り、強固な構造となる。また、複数の改良杭を、平面視
したときに、水平部どうしが密に重なるように配置すれ
ば、前記水平部どうしが水平面内で連続して、スラブが
形成されることになる。
According to the first aspect of the invention, the improved ground is formed by alternately arranging a horizontal portion having a constant thickness located in a horizontal plane and a vertical portion vertically extending downward by a certain dimension. It is composed of improved piles. Thereby, if a plurality of improved piles are arranged so that the horizontal portions are adjacent to each other,
The improved ground has a rigid structure, which is a so-called rigid frame structure, which is composed of columns formed by vertical portions continuous in the vertical direction and beams formed by horizontal portions that are adjacent to each other and continuous in one direction. Further, when the plurality of improved piles are arranged so that the horizontal portions are densely overlapped with each other when seen in a plan view, the horizontal portions are continuously arranged in a horizontal plane to form a slab.

【0011】請求項2記載の発明では、削孔ロッドを回
転させつつ地盤に貫入させていき、第一の削孔翼と第二
の削孔翼のそれぞれから前記地盤内に固化材を供給し、
これを地盤内の土砂に混合させることにより地盤を固化
させて改良するときに、第二の削孔翼からの固化材の供
給を、定められた深さにおいてのみ行う構成とした。こ
れにより、第一の削孔翼から固化材を供給した部分にお
いては、その回転半径の範囲の土砂が上下方向に連続す
る杭状に固化される。また、第二の削孔翼から固化材を
供給した部分においては、その回転半径の範囲の土砂が
一定厚さに亘って固化される。したがって、地盤中に
は、第一の削孔翼で固化された小径の鉛直部と、第二の
削孔翼で固化された一定厚さの大径の水平部とから構成
される改良杭が造成されることになる。また、大径の水
平部以外の部分については、第二の削孔翼からの固化材
の供給は、ゼロから貧配合の任意とすることも可能であ
る。
According to the second aspect of the present invention, the hole drilling rod is rotated to penetrate into the ground, and the solidifying material is supplied into the ground from each of the first hole drilling blade and the second hole drilling blade. ,
When the ground is solidified by mixing it with the soil in the ground to improve the ground, the solidifying material is supplied from the second drilling blade only at a predetermined depth. As a result, in the portion supplied with the solidifying material from the first boring blade, the earth and sand in the range of the radius of gyration are solidified into a pile shape continuous in the vertical direction. Further, in the portion where the solidifying material is supplied from the second boring blade, the earth and sand in the range of the radius of gyration are solidified over a certain thickness. Therefore, in the ground, an improved pile composed of a small-diameter vertical portion solidified by the first drilling blade and a large-diameter horizontal portion of a constant thickness solidified by the second drilling blade. Will be created. In addition, for the portion other than the large-diameter horizontal portion, the supply of the solidifying material from the second drilling blade can be arbitrarily set from zero to poor mixing.

【0012】請求項3記載の発明では、削孔ロッドを回
転させつつ地盤に貫入させていき、第一の削孔翼と第二
の削孔翼のそれぞれから前記地盤内に固化材を供給し、
これを地盤内の土砂に混合させることにより地盤を固化
させて改良するときに、第二の削孔翼から供給する固化
材の配合比を定められた深さ毎に変えるようにした。こ
れにより、第一の削孔翼から固化材を供給した部分にお
いては、その回転半径の範囲の土砂が上下方向に連続す
る杭状に固化される。また、第二の削孔翼から固化材を
供給した部分においては、その回転半径の範囲の土砂
が、供給した固化材の配合比に応じた硬さ(強度)で固
化される。したがって、地盤中に、第一の削孔翼からの
固化材で固化された小径の鉛直部と、第二の削孔翼から
の固化材で固化されて一定厚さ毎に硬さの異なる大径の
水平部とから構成される改良杭を造成することができ
る。
According to the third aspect of the present invention, the drilling rod is rotated to penetrate into the ground, and the solidifying material is supplied into the ground from each of the first drilling blade and the second drilling blade. ,
When the soil is solidified and improved by mixing it with the soil in the ground, the mixing ratio of the solidifying material supplied from the second drilling blade is changed at each predetermined depth. As a result, in the portion supplied with the solidifying material from the first boring blade, the earth and sand in the range of the radius of gyration are solidified into a pile shape continuous in the vertical direction. Further, in the portion to which the solidifying material is supplied from the second boring blade, the earth and sand in the range of the radius of gyration are solidified with the hardness (strength) according to the compounding ratio of the supplied solidifying material. Therefore, in the ground, a small-diameter vertical portion solidified by the solidifying material from the first drilling blade and a large diameter solidified by the solidifying material from the second drilling blade and having different hardnesses at fixed thicknesses. It is possible to construct an improved pile composed of a horizontal portion having a diameter.

【0013】[0013]

【実施例】以下、本発明にかかる改良地盤および地盤改
良工法を図1ないし図9に示す第一ないし第四実施例を
参照して説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An improved ground and a ground improvement method according to the present invention will be described below with reference to first to fourth embodiments shown in FIGS.

【0014】[第一実施例]図1および図2は、本発明
にかかる地盤改良工法に用いる地盤改良装置の一例を示
すものである。図1に示すように、地盤改良装置10
は、移動用の無端キャタピラー11aを備えた本体11
と、本体11の前方に垂設された支持柱12と、この支
持柱12にその軸周りに回転自在に支持された削孔ロッ
ド13,13(一方のみを図示)と、本体11に設けら
れて、地盤Gに固化材を供給する固化材供給ポンプ(固
化材供給手段:図示せず)とを備えた概略構成となって
いる。
[First Embodiment] FIGS. 1 and 2 show an example of a ground improvement apparatus used in the ground improvement method according to the present invention. As shown in FIG. 1, the ground improvement device 10
Is a main body 11 having an endless caterpillar 11a for movement.
A support pillar 12 vertically provided in front of the main body 11; drilling rods 13 and 13 (only one of which is shown) rotatably supported by the support pillar 12 about its axis; And a solidifying material supply pump (solidifying material supply means: not shown) for supplying the solidifying material to the ground G.

【0015】図2に示すように、各削孔ロッド13は、
内軸13aと外筒13bとからなる二重構造とされてい
る。各内軸13aの上端は、それぞれ、これらをその軸
回りに回転駆動させるための駆動モータ14の回転軸に
接続されて支持されている。そして、この駆動モータ1
4は、支持柱12(図1参照)に上下動自在に設けられ
ており、これによって、削孔ロッド13,13は、駆動
モータ14と一体に、支持柱12(図1参照)に沿って
上下動自在な構成となっている。
As shown in FIG. 2, each drilled rod 13 is
It has a double structure composed of an inner shaft 13a and an outer cylinder 13b. The upper end of each inner shaft 13a is connected to and supported by the rotary shaft of a drive motor 14 for rotationally driving the inner shaft 13a around the inner shaft 13a. And this drive motor 1
4 is provided on the support column 12 (see FIG. 1) so as to be vertically movable, whereby the drilling rods 13 and 13 are integrated with the drive motor 14 along the support column 12 (see FIG. 1). It has a vertically movable structure.

【0016】一方、外筒13b,13bは、支持柱12
(図1参照)に沿って上下動自在に設けられた振れ止め
15a,15bによって、その軸回りに回転自在に支持
されている。また、外筒13b,13bの内側には、内
軸13a,13aに設けた係合凹部(図示せず)に出没
自在に係合する凸部(図示せず)が設けられている。こ
れら係合凹部と凸部とを必要に応じて係合させることに
よって、駆動モータ14の回転駆動力が内軸13a,1
3aを介して伝達されて、外筒13b,13bが回転駆
動されるようになっている。
On the other hand, the outer cylinders 13b and 13b are the support columns 12
It is rotatably supported about its axis by the steady rests 15a and 15b provided so as to be vertically movable along (see FIG. 1). Further, inside the outer cylinders 13b, 13b, there is provided a convex portion (not shown) that engages with an engaging concave portion (not shown) provided in the inner shafts 13a, 13a so as to be retractable. By engaging these engaging recesses and protrusions with each other as necessary, the rotational driving force of the drive motor 14 is increased by the inner shafts 13a, 1a.
The outer cylinders 13b and 13b are rotationally driven by being transmitted via 3a.

【0017】内軸13a,13aの下端には、地盤G内
の土を掻き回すための第一アースオーガ16,16(第
一の削孔翼)が設けられている。また、外筒13b,1
3bの下端には、第一アースオーガ16,16よりも回
転半径が大きな、第二アースオーガ17,17(第二の
削孔翼)が設けられている。これらの第一アースオーガ
16,16、第二アースオーガ17,17の先端には、
それぞれ、効率よく地盤Gを掻き回すためのビット1
8,18,…が設けられている。
At the lower ends of the inner shafts 13a, 13a, first earth augers 16, 16 (first boring blades) for agitating the soil in the ground G are provided. Also, the outer cylinders 13b, 1
At the lower end of 3b, second earth augers 17, 17 (second drilling blades) having a larger radius of rotation than the first earth augers 16, 16 are provided. At the tips of these first earth augers 16 and 16 and second earth augers 17 and 17,
Bit 1 for efficiently stirring the ground G
, 18, ... Are provided.

【0018】図1に示したように、本体11の後方に
は、引抜きウインチ20と引込みウインチ21が設けら
れている。引抜きウインチ20には、二本のワイヤー2
2,23の一端がそれぞれ固定されている。そして、一
方のワイヤー22の他端は、支持柱12の上端部に設け
られた支持部材24に回転自在に軸支されたシーブ2
5,26、および駆動モータ14の上面に回転自在に軸
支されたシーブ27を介して、支持部材24の下面に固
定されている。これにより、ワイヤー22を引抜きウイ
ンチ20で巻き取ると、駆動モータ14すなわち内筒1
3aが支持柱12に沿って上昇するようになっている。
他方のワイヤー23の他端は、支持部材24に回転自在
に軸支されたシーブ25,28、および振れ止め15a
の上面に回転自在に軸支されたシーブ29を介して、支
持部材24の下面に固定されている。これにより、ワイ
ヤー23を引抜きウインチ20で巻き取ると、振れ止め
15a,すなわち外筒13bが支持柱12に沿って上昇
するようになっている。
As shown in FIG. 1, a pull-out winch 20 and a pull-in winch 21 are provided behind the main body 11. The pull-out winch 20 has two wires 2
One end of each of 2, 23 is fixed. The other end of one wire 22 is a sheave 2 rotatably supported by a support member 24 provided at the upper end of the support column 12.
5, 26, and a sheave 27 that is rotatably supported on the upper surface of the drive motor 14, and is fixed to the lower surface of the support member 24. As a result, when the wire 22 is taken up by the pull-out winch 20, the drive motor 14, that is, the inner cylinder 1
3a rises along the support column 12.
The other end of the other wire 23 is provided with sheaves 25 and 28 rotatably supported by a support member 24, and a steady rest 15a.
It is fixed to the lower surface of the support member 24 via a sheave 29 rotatably supported on the upper surface of the support member 24. As a result, when the wire 23 is taken up by the pull-out winch 20, the steady rest 15 a, that is, the outer cylinder 13 b is raised along the support column 12.

【0019】また、引込みウインチ21には、ワイヤー
30の一端が固定されており、このワイヤー30の他端
は、本体11に回転自在に軸支されたシーブ31を介し
て、振れ止め15aに固定されている。これにより、ワ
イヤー30を引込みウインチ21で巻き取ると、振れ止
め15a,すなわち外筒13bが支持柱12に沿って下
降するようになっている。
Further, one end of a wire 30 is fixed to the retracting winch 21, and the other end of the wire 30 is fixed to the steady rest 15a via a sheave 31 rotatably supported by the main body 11. Has been done. As a result, when the wire 30 is pulled in and wound up by the winch 21, the steady rest 15a, that is, the outer cylinder 13b descends along the support column 12.

【0020】図1および図2に示したように、内軸13
a,13aの上端部にはスイーベル継ぎ手(図示せず)
が設けられている。このスイーベル継ぎ手は、本体11
(図1参照)に設けられた第一固化材供給ポンプにスラ
リーホース(図示せず)を通して接続されている。第一
アースオーガ16,16の翼元には、吐出口16a,1
6aが設けられている。そして、第一固化材供給ポンプ
(図示なし)によってスラリーホース,スイーベル継ぎ
手を通じて供給される固化材スラリーが、この吐出口1
6a,16aから噴出される構成となっている。
As shown in FIGS. 1 and 2, the inner shaft 13
A swivel joint (not shown) at the upper end of a and 13a
Is provided. This swivel joint is the main body 11
A slurry hose (not shown) is connected to a first solidifying material supply pump provided in (see FIG. 1). At the base of the first earth auger 16, 16, there are discharge ports 16a, 1
6a is provided. Then, the solidified material slurry supplied through the slurry hose and the swivel joint by the first solidified material supply pump (not shown) is the discharge port 1
It is configured to be ejected from 6a and 16a.

【0021】振れ止め15aの上部には、内軸13a,
13aを囲繞するようにスイーベル継ぎ手32,32が
設けられている。このスイーベル継ぎ手32,32には
スラリーホース33,33(図2参照)の一端が接続さ
れており、このスラリーホース33,33の他端は、固
化材を送給するために本体11(図1参照)に設けられ
た図示しない第二固化材供給ポンプに接続されている。
第二アースオーガ17,17の翼元には吐出口17a,
17aが設けられている。そして、第二固化材供給ポン
プによってスラリーホース33,33、スイーベル継ぎ
手32,32を通じて供給される固化材スラリーが、こ
の吐出口17a,17aから噴出される構成となってい
る。
At the upper part of the steady rest 15a, the inner shaft 13a,
Swivel joints 32, 32 are provided so as to surround 13a. One end of a slurry hose 33, 33 (see FIG. 2) is connected to the swivel joint 32, 32, and the other end of the slurry hose 33, 33 is connected to the main body 11 (FIG. 1) for feeding the solidifying material. (Refer to FIG. 2), which is connected to a second solidifying material supply pump (not shown).
The outlet of the second earth auger 17, 17 has a discharge port 17a,
17a is provided. Then, the solidified material slurry supplied through the slurry hoses 33, 33 and the swivel joints 32, 32 by the second solidified material supply pump is ejected from the discharge ports 17a, 17a.

【0022】次に、上記構成の地盤改良装置10を用い
た地盤改良工法について詳細に説明する。まず、地盤G
の所定の箇所に、第一アースオーガ16,16を位置決
めする。次に、駆動モータ14で内軸13a,13aを
回転駆動させることによって、第一アースオーガ16,
16を回転させつつ地盤Gに貫入させていき、地盤Gを
所定深さまで削孔する。
Next, the ground improvement method using the ground improvement device 10 having the above-mentioned structure will be described in detail. First, the ground G
The first earth augers 16 and 16 are positioned at predetermined positions. Next, by rotating the inner shafts 13a, 13a by the drive motor 14, the first earth auger 16,
While rotating 16 to penetrate into the ground G, the ground G is drilled to a predetermined depth.

【0023】第一アースオーガ16,16により所定の
深さまで削孔を終えた後、引込みウインチ21でワイヤ
ー30を巻き取り、振れ止め15aを下降させる。する
と、内軸13a,13aに設けた係合凹部と外筒13
b,13bに設けた凸部とが係合して、外筒13b,1
3bに駆動モータ14の駆動力が伝達される。そして、
さらにワイヤー30を巻き取って外筒13b,13bを
下降させていくことにより、第二アースオーガ17,1
7を回転させつつ地盤Gに貫入させていき、第二アース
オーガ17,17による地盤Gの削孔を開始する。
After the first earth augers 16 and 16 have finished drilling to a predetermined depth, the pull-in winch 21 winds the wire 30 and lowers the steady rest 15a. Then, the engaging recesses provided in the inner shafts 13a, 13a and the outer cylinder 13
b, 13b engages with the convex portions provided on the outer cylinders 13b, 1b.
The driving force of the drive motor 14 is transmitted to 3b. And
By further winding the wire 30 and lowering the outer cylinders 13b, 13b, the second earth augers 17, 1
While rotating 7 to penetrate into the ground G, the drilling of the ground G by the second earth augers 17, 17 is started.

【0024】このようにして、第一アースオーガ16,
16および第二アースオーガ17,17によって、地盤
Gをそれぞれ所定の深さまで削孔した後に、第一アース
オーガ16,16の先端において改良杭の先端処理を行
う。
In this way, the first earth auger 16,
After drilling the ground G to a predetermined depth by the 16 and the second earth augers 17, 17, the tip of the improved pile is processed at the tips of the first earth augers 16, 16.

【0025】次に、第一アースオーガ16,16の吐出
口16a,16aから、第一固化材供給ポンプにより固
化材スラリーを噴出させる。これとともに、第二アース
オーガ17,17の吐出口17a,17aから、第二固
化材供給ポンプ(図示なし)により固化材スラリーを噴
出させる。
Next, the solidifying material slurry is jetted from the discharge ports 16a, 16a of the first earth augers 16, 16 by the first solidifying material supply pump. At the same time, the solidifying material slurry is jetted from the discharge ports 17a, 17a of the second earth augers 17, 17 by a second solidifying material supply pump (not shown).

【0026】そして、固化材スラリーを噴出させつつ第
一アースオーガ16,16、第二アースオーガ17,1
7を回転させながら、引抜きウインチ20でワイヤー2
2,23を巻き取り、内軸13a,13aおよび外筒1
3b,13bを引き上げていく。ただし、このとき、図
3に示すように、第二固化材供給ポンプ(図示なし)で
は、第二アースオーガ17,17が、地盤G中、符号
(イ)に示す範囲に位置しているときのみ、固化材スラ
リーを噴出させるようにする。また、第二固化材供給ポ
ンプから供給する固化材スラリーは、第一固化材供給ポ
ンプから供給する固化材スラリーに比較して、その濃度
あるいは単位時間当りの吐出量を多くすることにより配
合比を高くする。
Then, the first earth augers 16, 16 and the second earth augers 17, 1 are ejected while ejecting the solidifying material slurry.
While rotating 7, rotate the wire 2 with the pull-out winch 20.
2 and 23 are wound, and the inner shafts 13a and 13a and the outer cylinder 1
Pull up 3b and 13b. However, at this time, as shown in FIG. 3, in the second solidifying material supply pump (not shown), when the second earth augers 17, 17 are located in the range indicated by reference numeral (a) in the ground G. Only so that the solidifying material slurry is ejected. Further, the solidifying material slurry supplied from the second solidifying material supply pump has a concentration or a blending ratio by increasing the discharge amount per unit time as compared with the solidifying material slurry supplied from the first solidifying material supply pump. Make it higher

【0027】すると、第一アースオーガ16,16の吐
出口16a,16a、第二アースオーガ17,17の吐
出口17a,17aから、それぞれ吐出された固化材ス
ラリーは、第一アースオーガ16,16、第二アースオ
ーガ17,17によって、土と攪拌・混合される。そし
て、土に混合された固化材スラリーの水和反応,この水
和反応による水和生成物と粘土鉱物とのイオン交換作
用,あるいはポゾラン反応等を主体とする化学的固結反
応によって、土が化学的に固化し、改良杭Aが造成され
る。
Then, the solidifying material slurry discharged from the discharge ports 16a, 16a of the first earth augers 16, 16 and the discharge ports 17a, 17a of the second ground augers 17, 17 respectively is the first ground augers 16, 16. , The second earth auger 17, 17 mixes and mixes with the soil. Then, the hydration reaction of the solidifying material slurry mixed with the soil, the ion exchange action between the hydration product of the hydration reaction and the clay mineral, or the chemical consolidation reaction mainly composed of the pozzolanic reaction causes the soil to be removed. It is chemically solidified and the improved pile A is created.

【0028】このようにして造成された改良杭Aは、第
一アースオーガ16から噴出された固化材スラリーによ
って形成された円筒状の鉛直部40と、第二アースオー
ガ17から噴出された固化材スラリーによって形成され
た一定厚さの円板状の水平部41とが、上下方向に交互
に連続して位置する複層構造をなしている。なお、前記
したように、第二固化材供給ポンプから供給する固化材
スラリーの配合比を、第一固化材供給ポンプからのもの
よりも高くしたので、水平部41は、単位体積あたりの
固化材スラリーの混合量が鉛直部40よりも多くなって
いる。
The improved pile A thus constructed has a cylindrical vertical portion 40 formed by the solidifying material slurry ejected from the first earth auger 16 and the solidifying material ejected from the second earth auger 17. A disk-shaped horizontal portion 41 having a constant thickness formed of the slurry forms a multilayer structure in which the horizontal portions 41 are alternately and vertically arranged. As described above, since the mixing ratio of the solidifying material slurry supplied from the second solidifying material supply pump is set higher than that from the first solidifying material supply pump, the horizontal portion 41 has the solidifying material per unit volume. The mixed amount of the slurry is larger than that in the vertical portion 40.

【0029】そして、第二アースオーガ17,17によ
る削孔が最低限重なり合うようにして第一アースオーガ
16,16の位置決めを行い、上記の工程を繰り返して
いく。すると、図4および図5に示すように、改良杭
A,A,…の各水平部41どうしが、互いに接した形態
の改良地盤B1が形成される。このようにして形成され
た改良地盤B1は、各改良杭Aの鉛直部40,40,…
によって上下方向に連続する柱が形成され、互いに隣接
する水平部41,41,…によって梁が形成された形態
となり、これによって、改良地盤B1は、いわばラーメ
ン構造をなした形態となる。
Then, the first earth augers 16 and 16 are positioned so that the holes formed by the second earth augers 17 and 17 overlap at least, and the above steps are repeated. Then, as shown in FIGS. 4 and 5, the improved ground B 1 in which the horizontal portions 41 of the improved piles A, A, ... Are in contact with each other is formed. The improved ground B 1 thus formed has the vertical portions 40, 40, ...
Form columns in which the columns are continuous in the vertical direction, and beams form adjacent horizontal portions 41, 41, ..., As a result, the improved ground B 1 has a so-called ramen structure.

【0030】上述した改良地盤B1では、この改良地盤
1が、水平面内に位置する一定厚さの水平部41と、
鉛直下方に向けて一定寸法延在する鉛直部40とを上下
に交互に形成してなる改良杭Aから形成され、これら複
数の改良杭Aの水平部41どうしが隣接するように配置
された構成とされている。これにより、改良地盤B
1を、ラーメン構造とすることができ、高い強度を有し
たものとすることができる。したがって、従来の改良杭
を多数造成することによって構築していた改良地盤に比
較して、少ない本数の改良杭Aから同等の性能を有した
改良地盤B1を形成することが可能となり、改良地盤B1
を経済的なものとして、短工期かつ低コストで構築する
ことが可能となる。
[0030] In improved ground B 1 described above, the ground improved B 1 is a horizontal section 41 of constant thickness which is located in a horizontal plane,
A configuration in which vertical piles 40 extending vertically downward are formed alternately and vertically to form improved piles A, and horizontal portions 41 of the plurality of improved piles A are arranged adjacent to each other. It is said that. As a result, the improved ground B
1 can have a ramen structure and can have high strength. Therefore, it becomes possible to form the improved ground B 1 having the same performance from a smaller number of the improved piles A, as compared with the improved ground constructed by creating a large number of conventional improved piles. B 1
It will be possible to construct as economical with a short construction period and low cost.

【0031】また、上述した地盤改良工法では、地盤改
良装置10の削孔ロッド13を回転させつつ地盤Gに貫
入させていき、第一アースオーガ16,第二アースオー
ガ17のそれぞれから地盤G内に固化材スラリーを供給
するときに、第二アースオーガ17からの固化材スラリ
ーの供給を、定められた深さ(図3および図4において
符号(イ)に示した範囲)においてのみ行う構成とし
た。これにより、地盤G中には、鉛直部40と水平部4
1とが上下方向に交互に形成された構成からなる改良杭
Aを造成することができる。このようにして、第二アー
スオーガ17に何ら拡径機構等を備えることなく、地盤
G中任意の位置に、鉛直部40よりも大径の水平部41
を形成することができるので、地盤改良装置10の設備
コストを上昇させることなく、改良杭Aを低コストで形
成することが可能となる。したがって、上記効果を一層
効果的なものとすることができる。
Further, in the above-mentioned ground improvement method, the drilling rod 13 of the ground improvement device 10 is rotated to penetrate into the ground G, and the first ground auger 16 and the second ground auger 17 are respectively fed into the ground G. When supplying the solidifying material slurry to the second earth auger 17, the solidifying material slurry is supplied from the second earth auger 17 only at a predetermined depth (the range indicated by reference numeral (a) in FIGS. 3 and 4). did. As a result, in the ground G, the vertical portion 40 and the horizontal portion 4
It is possible to create the improved pile A having a configuration in which 1 and 1 are alternately formed in the vertical direction. In this way, the second earth auger 17 is not provided with any diameter expanding mechanism or the like, and the horizontal portion 41 having a diameter larger than that of the vertical portion 40 is provided at an arbitrary position in the ground G.
Therefore, the improved pile A can be formed at low cost without increasing the equipment cost of the ground improvement device 10. Therefore, the above effect can be made more effective.

【0032】[第二実施例]次に、本発明にかかる地盤
改良工法の第二実施例について説明する。なお、第二実
施例では、地盤改良装置10を用いて改良杭Aを地盤G
中に造成する構成については、前記第一実施例と全く同
様であるので、異なる点についてのみ説明する。図3に
示したように、まず、地盤改良装置10で、改良杭Aを
地盤G中に造成する。
[Second Embodiment] Next, a second embodiment of the ground improvement method according to the present invention will be described. In the second embodiment, the ground improvement device 10 is used to fix the improved pile A to the ground G.
Since the structure formed inside is completely the same as that of the first embodiment, only different points will be described. As shown in FIG. 3, first, with the ground improvement device 10, the improved pile A is formed in the ground G.

【0033】次いで、造成した改良杭Aに隣接する位置
に、第二アースオーガ17,17による削孔が、先に造
成した改良杭Aの水平部41と互いに重なり合うように
第一アースオーガ16,16の位置決めを行い、新たに
改良杭Aを造成する。この後、上記の工程を繰り返して
いく。すると、図6に示すように、改良杭A,A,…の
各水平部41どうしが、密に重なり合った形態の改良地
盤B2が形成される。
Next, at a position adjacent to the formed improved pile A, the first earth auger 16, so that the holes formed by the second earth augers 17, 17 overlap with the horizontal portion 41 of the improved pile A previously formed. Positioning 16 is performed and a new improved pile A is created. After that, the above steps are repeated. Then, as shown in FIG. 6, the improved ground B 2 in which the horizontal portions 41 of the improved piles A, A, ... Are closely overlapped with each other is formed.

【0034】このようにして形成された改良地盤B
2は、各改良杭Aの鉛直部40,40,…によって上下
方向に連続する柱が形成され、互いに密に重なり合った
水平部41,41,…によってスラブが形成された形態
となっている。
Improved ground B formed in this way
2 is a form in which vertical columns 40, 40, ... Of the improved piles A form columns that are continuous in the vertical direction, and horizontal sections 41, 41, ... That closely overlap each other form a slab.

【0035】上述した改良地盤B2および地盤改良方法
では、上記第一実施例と同様の効果を奏することができ
る。これに加えて、上述した改良地盤B2では、この改
良地盤B2を形成する複数の改良杭Aの水平部41どう
しが密に重なり合うように配置された構成とされてい
る。これにより、改良地盤B2の、互いに密に重なり合
った水平部41,41,…からスラブを形成することが
できる。このスラブによってその上下の地盤Gが隔てら
れるので、地盤Gが例えばN値15未満の砂地盤等であ
る場合にも、地震発生時の地盤Gの液状化を防止するこ
とが可能となる。
The improved ground B 2 and the ground improvement method described above can achieve the same effects as those of the first embodiment. In addition to this, in the above-mentioned improved ground B 2 , the horizontal portions 41 of the plurality of improved piles A forming the improved ground B 2 are arranged so as to closely overlap each other. As a result, a slab can be formed from the horizontal portions 41, 41, ... Of the improved ground B 2 that are closely overlapped with each other. Since the slab separates the ground G above and below the slab, it is possible to prevent liquefaction of the ground G when an earthquake occurs, even when the ground G is, for example, a sand ground having an N value of less than 15.

【0036】[第三実施例]次に、本発明にかかる地盤
改良工法の第三実施例について説明する。なお、この第
三実施例では、地盤改良装置10を用いる点について
は、前記第一実施例と全く同様であり、以下、異なる点
についてのみ説明する。図1および図2に示した地盤改
良装置10は、第二アースオーガ17,17の吐出口1
7a,17aから噴出する固化材スラリーの配合比、す
なわちその濃度,あるいは単位時間当りの吐出量が調整
できるようになっている。
[Third Embodiment] Next, a third embodiment of the ground improvement method according to the present invention will be described. In this third embodiment, the point of using the ground improvement device 10 is exactly the same as that of the first embodiment, and only the different points will be described below. The ground improvement device 10 shown in FIGS. 1 and 2 has a discharge port 1 of the second earth augers 17, 17.
The mixing ratio of the solidifying material slurry ejected from 7a and 17a, that is, its concentration or the discharge amount per unit time can be adjusted.

【0037】そして、このような地盤改良装置10を用
いて、以下のようにして地盤G中に改良杭A’を造成す
る。まず、上記第一実施例と同様に、第一アースオーガ
16,16および第二アースオーガ17,17によっ
て、地盤Gを所定の深さまで削孔した後に、第一アース
オーガ16,16の先端において改良杭の先端処理を行
う。
Then, using the ground improvement device 10 as described above, the improved pile A'is formed in the ground G as follows. First, as in the first embodiment, the ground G is drilled to a predetermined depth by the first earth augers 16 and 16 and the second earth augers 17 and 17, and then at the tip of the first earth augers 16 and 16. The tip of the improved pile is processed.

【0038】次に、第一アースオーガ16,16の吐出
口16a,16a、および第二アースオーガ17,17
の吐出口17a,17aから、それぞれ、固化材スラリ
ーを噴出させつつ、第一アースオーガ16,16、第二
アースオーガ17,17を回転させながら引き上げてい
く。このとき、図3に示したように、第二アースオーガ
17,17が、符号(イ)に示す範囲に位置していると
きには、第二固化材供給ポンプ(図示なし)では、第一
アースオーガ16,16から噴出する固化材スラリーよ
りも高い配合比となるように、固化材スラリーを供給す
るようにする。また、第二アースオーガ17,17が、
符号(ロ)に示す範囲に位置しているときには、第一ア
ースオーガ16,16から噴出する固化材スラリーより
も低い配合比(ゼロでもよい)となるように、固化材ス
ラリーを供給するようにする。
Next, the discharge ports 16a, 16a of the first earth augers 16, 16 and the second earth augers 17, 17 are provided.
While ejecting the solidified material slurry from the discharge ports 17a, 17a of the above, the first earth augers 16, 16 and the second earth augers 17, 17 are pulled up while being rotated. At this time, as shown in FIG. 3, when the second earth augers 17 and 17 are located in the range indicated by reference numeral (a), the second solidification material supply pump (not shown) does not have the first earth auger. The solidifying material slurry is supplied so that the mixing ratio is higher than that of the solidifying material slurry ejected from the nozzles 16, 16. In addition, the second earth auger 17, 17,
When the solidified material slurry is located within the range indicated by the reference numeral (b), the solidified material slurry is supplied so that the compounding ratio is lower than that of the solidified material slurry ejected from the first earth augers 16 and 16 (may be zero). To do.

【0039】このようにして土に混合された固化材スラ
リーによって、土が化学的に固化し、改良杭A’が造成
される。
By the solidifying material slurry thus mixed with the soil, the soil is chemically solidified and the improved pile A'is formed.

【0040】造成された改良杭A’は、第一アースオー
ガ16から噴出された固化材スラリーによって形成され
た円柱状の鉛直部40と、第二アースオーガ17から噴
出された固化材スラリーによって形成された一定厚さの
円板状の水平部41とが、上下方向に交互に連続して位
置する複層構造をなしている。さらに、鉛直部40の周
囲には、水平部41と同径の筒状部42が形成されてい
る。なお、水平部41は、第二固化材供給ポンプから供
給する固化材スラリーの配合比を、第一固化材供給ポン
プからのものよりも高くしたので、単位体積あたりの固
化材スラリーの混合量が鉛直部40よりも多くなってい
る。また、筒状部42は、第二固化材供給ポンプから供
給する固化材スラリーの配合比を、第一固化材供給ポン
プからのものよりも低くしたので、単位体積あたりの固
化材スラリーの混合量が鉛直部40よりも少なくなって
いる。
The improved pile A'formed is formed by the cylindrical vertical portion 40 formed by the solidifying material slurry ejected from the first earth auger 16 and the solidifying material slurry ejected from the second earth auger 17. The disk-shaped horizontal portions 41 having a constant thickness are formed in a multilayer structure in which they are alternately and continuously positioned in the vertical direction. Further, a cylindrical portion 42 having the same diameter as the horizontal portion 41 is formed around the vertical portion 40. In addition, since the horizontal portion 41 sets the mixing ratio of the solidifying material slurry supplied from the second solidifying material supply pump higher than that of the first solidifying material supply pump, the mixing amount of the solidifying material slurry per unit volume is It is larger than the vertical portion 40. Further, since the tubular portion 42 has made the mixing ratio of the solidifying material slurry supplied from the second solidifying material supply pump lower than that of the first solidifying material supply pump, the mixing amount of the solidifying material slurry per unit volume is increased. Is less than the vertical portion 40.

【0041】この後、上記と同様にして、図7および図
8に示すように、改良杭A’,A’,…の各水平部41
どうしが、互いに接するように、順次改良杭A’を造成
していくことにより、改良地盤B3が形成される。この
ようにして形成された改良地盤B3は、各改良杭A’の
鉛直部40,40,…によって上下方向に連続する柱が
形成され、互いに隣接する水平部41,41,…によっ
て梁が形成された形態となり、これによって、改良地盤
3は、いわばラーメン構造をなした形態となる。そし
てさらに、鉛直部40の周囲には筒状部42が形成され
ており、互いに隣接する筒状部42によって、いわば連
壁が形成された形態となっている。
Thereafter, in the same manner as described above, as shown in FIGS. 7 and 8, each horizontal portion 41 of the improved piles A ', A', ...
The improved ground B 3 is formed by sequentially constructing the improved piles A ′ so that they are in contact with each other. In the improved ground B 3 formed in this manner, vertical columns 40, 40, ... Of the respective improved piles A ′ form columns that are continuous in the vertical direction, and horizontal sections 41, 41 ,. As a result, the improved ground B 3 has a so-called ramen structure. Further, a tubular portion 42 is formed around the vertical portion 40, and the adjacent tubular portions 42 form a so-called continuous wall.

【0042】上述した改良地盤B3は、円柱状の鉛直部
40と、一定厚さの円板状の水平部41とが、鉛直部4
0の周囲に形成された筒状部42とからなる複数の改良
杭A’から構成され、これら複数の改良杭A’の水平部
41どうしが隣接するように配置された構成とされてい
る。これにより、改良地盤B3が、各改良杭A’の鉛直
部40からなる柱と、互いに隣接する水平部41,4
1,…からなる梁とを備えたラーメン構造をなし、さら
に、互いに隣接する筒状部42,42,…によって連壁
が形成された形態となっている。したがって、従来の、
改良杭を連壁状に造成することによって構築していた改
良地盤に比較して、少ない本数の改良杭A’から改良地
盤B3を形成することが可能となり、改良地盤B3を経済
的なものとして、短工期かつ低コストで構築することが
可能となる。
In the above-mentioned improved ground B3, the vertical portion 40 having a cylindrical shape and the horizontal portion 41 having a disk shape having a constant thickness have the vertical portion 4
It is configured by a plurality of improved piles A ′ composed of a tubular portion 42 formed around 0, and the horizontal portions 41 of the plurality of improved piles A ′ are arranged so as to be adjacent to each other. As a result, the improved ground B 3 has pillars composed of the vertical portions 40 of the respective improved piles A ′ and horizontal portions 41, 4 adjacent to each other.
A ramen structure including a beam composed of 1, ... Is further formed, and a connecting wall is formed by the tubular portions 42, 42, ... Adjacent to each other. Therefore, the conventional
It is possible to form the improved ground B 3 from a smaller number of the improved piles A ′, as compared with the improved ground constructed by forming the improved piles in the form of a continuous wall, and the improved ground B 3 is economical. As a matter of course, it is possible to construct it in a short construction period and at low cost.

【0043】しかも、改良杭A’を、地盤改良装置10
によって造成するときに、第二アースオーガ17から供
給する固化材スラリーの配合比を、定められた深さ毎
(図3および図7において符号(イ)に示した範囲と符
号(ロ)に示した範囲)に変化させる構成とした。これ
により、上下に連続する同径の水平部41と筒状部42
とでその強度を変化させることができる。したがって、
固化材スラリーを効率的な配合比で地盤G中に混合させ
ることにより、その使用量を削減することができる。
Moreover, the improved pile A'is provided to the ground improvement device 10
At the time of creation, the mixing ratio of the solidifying material slurry supplied from the second earth auger 17 is shown for each defined depth (in the range indicated by reference numeral (a) and the reference numeral (b) in FIGS. 3 and 7). The range is changed to a different range). As a result, the horizontal portion 41 and the tubular portion 42 which are vertically continuous and have the same diameter are provided.
You can change its intensity with and. Therefore,
By mixing the solidifying material slurry in the ground G in an efficient mixing ratio, the amount of use can be reduced.

【0044】[第四実施例]次に、本発明にかかる地盤
改良工法の第四実施例について説明する。なお、本第四
実施例では、地盤改良装置10を用いて改良杭A’を地
盤G中に造成する構成については、前記第三実施例と全
く同様であるので、異なる点についてのみ説明する。ま
ず、図3に示したように、地盤改良装置10で、改良杭
A’を地盤G中に造成する。
[Fourth Embodiment] Next, a fourth embodiment of the ground improvement method according to the present invention will be described. In the fourth embodiment, the structure for forming the improved pile A ′ in the ground G using the ground improvement device 10 is exactly the same as that in the third embodiment, and only different points will be described. First, as shown in FIG. 3, an improved pile A ′ is formed in the ground G by the ground improvement device 10.

【0045】そして、造成した改良杭A’に隣接する位
置に、第二アースオーガ17,17による削孔が、先に
造成した改良杭A’の水平部41と互いに重なり合うよ
うにして第一アースオーガ16,16の位置決めを行
い、新たに改良杭A’を造成する。
Then, at a position adjacent to the formed improved pile A ', the first earth is formed such that the holes formed by the second earth augers 17 and 17 overlap with the horizontal portion 41 of the improved pile A'formed previously. The augers 16 and 16 are positioned and a new improved pile A'is created.

【0046】この後、上記の工程を繰り返していく。す
ると、図9に示すように、改良杭A’,A’,…の各水
平部41どうしが、密に重なり合った形態の改良地盤B
4が形成される。
After that, the above steps are repeated. Then, as shown in FIG. 9, the improved ground B in which the horizontal portions 41 of the improved piles A ′, A ′, ...
4 is formed.

【0047】このようにして形成された改良地盤B
4は、各改良杭A’の鉛直部40,40,…によって上
下方向に連続する柱が形成され、互いに密に重なり合っ
た水平部41,41,…によってスラブが形成されると
ともに、互いに密に重なり合った筒状部42,42,…
によって上下の水平部41,41間についても完全に地
盤改良された形態となっている。
Improved ground B formed in this way
4 , vertical columns 40, 40, ... Of each of the improved piles A'form columns that are continuous in the vertical direction, and horizontal sections 41, 41 ,. Overlapping tubular parts 42, 42, ...
Thus, the ground between the upper and lower horizontal portions 41, 41 is also completely improved.

【0048】上述した改良地盤B4および地盤改良方法
では、上記第三実施例と同様の効果を奏することができ
る。これに加えて、上述した改良地盤B4では、この改
良地盤B4を形成する複数の改良杭A’の水平部41ど
うしが密に重なり合うように配置された構成とされてい
る。これにより、改良地盤B4を、鉛直部40と、互い
に密に重なり合った水平部41および水平部42とから
なる、ブロック状の構成とすることができる。これによ
り、地盤Gを完全に地盤改良することができる。
The improved ground B4 and the ground improvement method described above can achieve the same effects as those of the third embodiment. In addition to this, the above-described improved ground B 4 is configured such that the horizontal portions 41 of the plurality of improved piles A ′ forming the improved ground B 4 are densely overlapped with each other. As a result, the improved ground B 4 can have a block-like configuration including the vertical portion 40 and the horizontal portion 41 and the horizontal portion 42 that are closely overlapped with each other. Thereby, the ground G can be completely improved.

【0049】なお、第一ないし第四実施例において、改
良地盤B1,B2,B3,B4を構築するのであれば、第二
アースオーガ17に拡径機能を有した地盤改良装置を用
いてもよい。この場合においても、上記した改良地盤B
1,B2,B3,B4による効果は奏することが可能であ
る。
If the improved grounds B 1 , B 2 , B 3 and B 4 are constructed in the first to fourth embodiments, a ground improvement device having a diameter expanding function for the second earth auger 17 is used. You may use. Even in this case, the improved ground B described above
The effects of 1 , B 2 , B 3 , and B 4 can be obtained.

【0050】[0050]

【発明の効果】以上説明したように、請求項1に係る改
良地盤によれば、改良地盤を、水平面内に位置する一定
厚さの水平部と、鉛直下方に向けて一定寸法延在する鉛
直部とを上下に交互に形成してなる改良杭から構成する
ようにした。このとき、複数の改良杭を、前記水平部ど
うしが隣接するように配置すれば、改良地盤が、上下方
向に連続する鉛直部すなわち柱と、柱どうしを接続する
水平部すなわち梁とからなる、いわばラーメン構造とな
り、強固な構造となる。これにより、従来に比較して、
少ない本数の改良杭で同等の性能を有した改良地盤を形
成することが可能となり、改良地盤を経済的なものとし
て、これを短工期かつ低コストで構築することが可能と
なる。また、複数の改良杭を、前記水平部どうしが平面
視したときに、前記水平部どうしが密に重なるように配
置すれば、前記水平部どうしが水平方向に連続して、ス
ラブが形成されることになる。このスラブによって、上
下の地盤が隔てられ、地盤が例えばN値15未満の砂地
盤である場合等に、地震発生時の地盤の液状化を防止す
ることが可能となる。
As described above, according to the improved ground according to the first aspect, the improved ground has a horizontal portion having a constant thickness located in a horizontal plane and a vertical portion extending vertically downward by a certain dimension. It is configured to be an improved pile in which the parts and the parts are alternately formed vertically. At this time, if a plurality of improved piles are arranged such that the horizontal parts are adjacent to each other, the improved ground is composed of vertical parts that are continuous in the vertical direction, that is, pillars, and horizontal parts that connect the pillars, that is, beams, It is a ramen structure, so to speak, and a strong structure. With this, compared to the conventional
It becomes possible to form the improved ground having the same performance with a small number of improved piles, and it becomes possible to construct the improved ground economically and to construct it in a short construction period and at low cost. Further, when a plurality of improved piles are arranged so that the horizontal portions are closely overlapped with each other when the horizontal portions are viewed in a plan view, the horizontal portions are continuously arranged in the horizontal direction to form a slab. It will be. By this slab, the upper and lower grounds are separated from each other, and when the ground is, for example, a sandy ground having an N value of less than 15, it is possible to prevent liquefaction of the ground when an earthquake occurs.

【0051】請求項2に係る地盤改良工法によれば、削
孔ロッドを回転させつつ地盤に貫入させていき、第一の
削孔翼と第二の削孔翼のそれぞれから固化材を供給する
ときに、第二の削孔翼からの固化材の供給を、定められ
た深さにおいてのみ行う構成とした。これにより、地盤
中に、第一の削孔翼からの固化材で固化された小径の鉛
直部と、第二の削孔翼からの固化材で固化された一定厚
さの大径の水平部とが形成されることになり、請求項1
に記載した改良杭を造成することができる。このとき、
第二の削孔翼に何らの拡径機構を備えることなく地盤中
の任意の位置に前記水平部を形成することができるの
で、低コストで前記改良杭を造成することが可能とな
る。
According to the ground improvement method of the second aspect, the hole drilling rod is rotated to penetrate into the ground, and the solidified material is supplied from each of the first hole drilling blade and the second hole drilling blade. At this time, the solidified material is supplied from the second drilling blade only at a predetermined depth. As a result, in the ground, a small-diameter vertical portion solidified by the solidifying material from the first drilling blade and a large-diameter horizontal portion of a fixed thickness solidified by the solidifying material from the second drilling blade. And are to be formed and claim 1
The improved pile described in can be created. At this time,
Since the horizontal portion can be formed at an arbitrary position in the ground without providing any diameter expansion mechanism on the second drilled blade, it is possible to construct the improved pile at low cost.

【0052】請求項3に係る地盤改良工法によれば、削
孔ロッドを回転させつつ地盤に貫入させていき、第一の
削孔翼と第二の削孔翼のそれぞれから固化材を供給する
ときに、第二の削孔翼から供給する固化材の配合比を、
定められた深さ毎に変えるようにした。これにより、地
盤中に、第一の削孔翼からの固化材で固化された小径の
鉛直部と、第二の削孔翼からの固化材で固化されて一定
厚さ毎に硬さの異なる大径の水平部とを有した改良杭を
造成することができる。このようにして、固化材を効率
的な配合比で地盤中に混合させることにより、その使用
量を削減することができる。そして、このような改良杭
を、前記水平部どうしが接するように造成すれば、地盤
中に連壁を有した改良地盤を構築することができる。ま
た、このような改良杭を、前記水平部どうしが密に重な
るように造成すれば、地盤中にブロック状の改良地盤を
造成することができる。
According to the ground improvement method of the third aspect of the present invention, the drilling rod is rotated to penetrate into the ground, and the solidifying material is supplied from each of the first drilling blade and the second drilling blade. Sometimes, the mixing ratio of the solidifying material supplied from the second drilling blade is
I changed it for each specified depth. As a result, in the ground, a small-diameter vertical portion solidified by the solidifying material from the first drilling blade and solidified by the solidifying material from the second drilling blade have different hardnesses at fixed thicknesses. It is possible to create an improved pile having a large-diameter horizontal portion. In this way, by mixing the solidifying material in the ground in an efficient mixing ratio, it is possible to reduce the usage amount. And if such an improved pile is constructed so that the horizontal portions contact each other, the improved ground having a continuous wall in the ground can be constructed. Further, if such improved piles are formed so that the horizontal portions are closely overlapped with each other, a block-shaped improved ground can be formed in the ground.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係る地盤改良工法に用いる地盤改良装
置を示す側面図である。
FIG. 1 is a side view showing a ground improvement device used in a ground improvement method according to the present invention.

【図2】前記地盤改良装置の要部を示す正面図である。FIG. 2 is a front view showing a main part of the ground improvement device.

【図3】本発明に係る改良地盤の一部を示す立断面図で
ある。
FIG. 3 is a vertical cross-sectional view showing a part of the improved ground according to the present invention.

【図4】前記改良地盤の一例を示す斜視断面図である。FIG. 4 is a perspective sectional view showing an example of the improved ground.

【図5】図4に示した改良地盤の立断面図である。FIG. 5 is a vertical sectional view of the improved ground shown in FIG.

【図6】前記改良地盤の他の一例を示す斜視断面図であ
る。
FIG. 6 is a perspective sectional view showing another example of the improved ground.

【図7】前記改良地盤のさらに一例を示す斜視断面図で
ある。
FIG. 7 is a perspective sectional view showing a further example of the improved ground.

【図8】図7に示した改良地盤の立断面図である。FIG. 8 is a vertical sectional view of the improved ground shown in FIG.

【図9】前記改良地盤の一例を示す斜視断面図である。FIG. 9 is a perspective sectional view showing an example of the improved ground.

【図10】従来の地盤改良工法に用いる地盤改良装置を
示す側面図である。
FIG. 10 is a side view showing a ground improvement device used in a conventional ground improvement method.

【符号の説明】[Explanation of symbols]

13 削孔ロッド 16 第一アースオーガ(第一の削孔翼) 17 第二アースオーガ(第二の削孔翼) 40 鉛直部 41 水平部 A,A’ 改良杭 B1,B2,B3,B4 改良地盤 G 地盤13 drilled rod 16 first earth auger (first drilling blades) 17 second ground auger (second drilling blade) 40 vertical part 41 the horizontal section A, A 'improved pile B 1, B 2, B 3 , B 4 Improved ground G ground

───────────────────────────────────────────────────── フロントページの続き (72)発明者 田中 純二 福岡県福岡市東区香椎台一丁目13ー23 (72)発明者 伊藤 澄雄 福岡県春日市松ヶ丘4ー76 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Junji Tanaka 1-13-23, Kashiidai, Higashi-ku, Fukuoka-shi, Fukuoka (72) Inventor Sumio Ito 4-76 Matsugaoka, Kasuga-shi, Fukuoka

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 地盤の土砂に固化材を混合することによ
って地盤中に構築された一以上の改良杭から構成された
改良地盤であって、前記改良杭が、水平面内に位置する
一定厚さの水平部と、該水平部の下面から鉛直下方に向
けて一定寸法延在する鉛直部とが上下に交互に形成され
た構成とされていることを特徴とする改良地盤。
1. An improved ground comprising one or more improved piles constructed in the ground by mixing a solidifying material with the soil of the ground, wherein the improved piles have a constant thickness located in a horizontal plane. The improved ground, wherein the horizontal portions and the vertical portions vertically extending downward from the lower surface of the horizontal portions are alternately formed vertically.
【請求項2】 下端部に第一の削孔翼を備え、その上方
に前記第一の削孔翼よりも回転半径の大きな第二の削孔
翼を備えた構成の削孔ロッドを回転させつつ地盤に貫入
させていき、第一の削孔翼と第二の削孔翼のそれぞれか
ら前記地盤内に固化材を供給するとともに、前記削孔翼
で前記固化材と前記地盤内の土砂とを混合することによ
り地盤を固化させて改良するときに、前記第二の削孔翼
からの固化材の供給を、定められた深さにおいてのみ行
うことを特徴とする地盤改良工法。
2. A drilling rod having a structure in which a first drilling blade is provided at a lower end portion, and a second drilling blade having a larger radius of rotation than the first drilling blade is provided above the first drilling blade. While penetrating into the ground while supplying the solidifying material into the ground from each of the first drilling blade and the second drilling blade, the solidifying material and the earth and sand in the ground with the drilling blade A method for improving the ground, characterized in that, when the ground is solidified and mixed by mixing, the solidifying material is supplied from the second drilling blade only at a predetermined depth.
【請求項3】 下端部に第一の削孔翼を備え、その上方
に前記第一の削孔翼よりも回転半径の大きな第二の削孔
翼を備えた構成の削孔ロッドを回転させつつ地盤に貫入
させていき、第一の削孔翼と第二の削孔翼のそれぞれか
ら前記地盤内に固化材を供給するとともに、前記削孔翼
で前記固化材と前記地盤内の土砂とを混合することによ
り地盤を固化させて改良するときに、前記第二の削孔翼
から供給する固化材の配合比を、定められた深さ毎に変
えることを特徴とする地盤改良工法。
3. A drilling rod having a structure in which a first drilling blade is provided at a lower end portion, and a second drilling blade having a larger radius of rotation than the first drilling blade is provided above the first drilling blade. While penetrating into the ground while supplying the solidifying material into the ground from each of the first drilling blade and the second drilling blade, the solidifying material and the earth and sand in the ground with the drilling blade A ground improvement method, wherein the mixing ratio of the solidifying material supplied from the second boring blade is changed for each predetermined depth when the ground is solidified and improved by mixing.
JP27410394A 1994-11-08 1994-11-08 Improved ground and ground improvement method Expired - Fee Related JP3370454B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP27410394A JP3370454B2 (en) 1994-11-08 1994-11-08 Improved ground and ground improvement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP27410394A JP3370454B2 (en) 1994-11-08 1994-11-08 Improved ground and ground improvement method

Publications (2)

Publication Number Publication Date
JPH08134885A true JPH08134885A (en) 1996-05-28
JP3370454B2 JP3370454B2 (en) 2003-01-27

Family

ID=17537050

Family Applications (1)

Application Number Title Priority Date Filing Date
JP27410394A Expired - Fee Related JP3370454B2 (en) 1994-11-08 1994-11-08 Improved ground and ground improvement method

Country Status (1)

Country Link
JP (1) JP3370454B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008144495A (en) * 2006-12-12 2008-06-26 Chem Grouting Co Ltd Liquefaction preventing construction method
JP2021046705A (en) * 2019-09-18 2021-03-25 株式会社竹中土木 Ground improvement structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5326005A (en) * 1976-08-20 1978-03-10 Tokyo Kiyuukou Dentetsu Kk Improvement of track board
JPS59118926A (en) * 1982-12-22 1984-07-09 Ohbayashigumi Ltd Improving work of ground under water pressure and iron-bar setter to be used therein
JPH01190818A (en) * 1988-01-25 1989-07-31 Shinsei Kiso Kogyo Kk Columnar improved body for ground and construction method and construction device thereof
JPH02311614A (en) * 1989-05-24 1990-12-27 Fudo Constr Co Ltd Sand ground improving pile
JPH06158639A (en) * 1992-11-19 1994-06-07 Asahi Kiso Kk Method and device for improving ground
JPH06158642A (en) * 1993-06-28 1994-06-07 Fudo Constr Co Ltd Method for improving soft ground

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5326005A (en) * 1976-08-20 1978-03-10 Tokyo Kiyuukou Dentetsu Kk Improvement of track board
JPS59118926A (en) * 1982-12-22 1984-07-09 Ohbayashigumi Ltd Improving work of ground under water pressure and iron-bar setter to be used therein
JPH01190818A (en) * 1988-01-25 1989-07-31 Shinsei Kiso Kogyo Kk Columnar improved body for ground and construction method and construction device thereof
JPH02311614A (en) * 1989-05-24 1990-12-27 Fudo Constr Co Ltd Sand ground improving pile
JPH06158639A (en) * 1992-11-19 1994-06-07 Asahi Kiso Kk Method and device for improving ground
JPH06158642A (en) * 1993-06-28 1994-06-07 Fudo Constr Co Ltd Method for improving soft ground

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008144495A (en) * 2006-12-12 2008-06-26 Chem Grouting Co Ltd Liquefaction preventing construction method
JP2021046705A (en) * 2019-09-18 2021-03-25 株式会社竹中土木 Ground improvement structure

Also Published As

Publication number Publication date
JP3370454B2 (en) 2003-01-27

Similar Documents

Publication Publication Date Title
KR900006385B1 (en) Method and device for the in-situ formation of columns of stabilized and compacted soil
US4063424A (en) Device for constructing a foundation in soft soil formations
US5295769A (en) Stirring apparatus for improving ground
JP4042010B2 (en) Ground improvement body construction method and continuous wall construction method
JP3370454B2 (en) Improved ground and ground improvement method
JP2000073354A5 (en)
JP3830460B2 (en) Boring device and underground drilling method
EP2703596A1 (en) Drilling device and method for producing a borehole
US20120114427A1 (en) Soil Mixing System
JP3116148B2 (en) Ground improvement device and ground improvement method
JP3370456B2 (en) Ground improvement equipment
JP3527574B2 (en) Ground improvement method and ground improvement equipment
JP2819025B2 (en) Soft ground improvement method
JPH07189241A (en) Ground improving machine and method of ground improving construction
JPH0931968A (en) Method and device for soil improvement
JP3370455B2 (en) Ground improvement equipment
DE69002615T2 (en) METHOD FOR BUILDING CONCRETE CONSTRUCTIONS IN LOOSE MATERIAL FROM THE TERRAIN OF THE TERRAIN AND DEVICE FOR CARRYING OUT THIS METHOD.
JP2003020637A (en) Agitating pile construction method and agitating pile construction equipment
JP6724200B1 (en) Excavator
JP2587777Y2 (en) Drilling rod for soil cement composite pile construction
JPH018587Y2 (en)
JP3560381B2 (en) Agitation rod for ground improvement
DE69702042T2 (en) Method of making foundation piles using a worm drill
JP2000104245A (en) Execution method of diaphragm wall and device thereof
JPS5837222A (en) Constructing method for wall body in ground and excavator thereof

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20021008

LAPS Cancellation because of no payment of annual fees