JPH0771118A - Carrying/out method for structural body - Google Patents

Carrying/out method for structural body

Info

Publication number
JPH0771118A
JPH0771118A JP22018693A JP22018693A JPH0771118A JP H0771118 A JPH0771118 A JP H0771118A JP 22018693 A JP22018693 A JP 22018693A JP 22018693 A JP22018693 A JP 22018693A JP H0771118 A JPH0771118 A JP H0771118A
Authority
JP
Japan
Prior art keywords
frame
winch
rope
floor
worker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP22018693A
Other languages
Japanese (ja)
Inventor
Tadao Kanayama
忠雄 金山
Takahiro Akimoto
隆広 秋本
Koji Yamashita
浩二 山下
Satoshi Yamamoto
諭 山本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Systems Engineering and Service Co Ltd
Hitachi Building Systems Engineering Co Ltd
Original Assignee
Hitachi Building Systems Engineering and Service Co Ltd
Hitachi Building Systems Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Systems Engineering and Service Co Ltd, Hitachi Building Systems Engineering Co Ltd filed Critical Hitachi Building Systems Engineering and Service Co Ltd
Priority to JP22018693A priority Critical patent/JPH0771118A/en
Publication of JPH0771118A publication Critical patent/JPH0771118A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PURPOSE:To move a structural body with protruded and recessed parts at areas facing to each other between floors in short time without using any large- scaled device. CONSTITUTION:A frame 9 in which protruded and recessed parts are formed at areas facing to each other is arranged so that the recessed part is positioned at the lower side, a rope 12A of a winch 12 arranged on a floor 7 of the same story is connected to the lower left end 9C of the frame 9, and also a rope 14A of a winch 14 provided at the upper part of a lifting path is connected to the left end 9C of it. Also a rope 13A of a winch 13 provided on the balance weight 4 side from the winch 14 is connected to the right end 9D of the frame 9. When the right end 9D of the frame 9 arrives at the platform inlet 32 on the first story, first while a worker C winds up the rope 14A of the winch 14 and, a worker A feeds out the rope 12A of the winch 12. In addition, a worker B adjusts the amount of feeding of the rope 13A of the winch 13 to lower the right end 9D of the frame 9 on the lower side of the lifting path while the frame 9 is turned clockwise as shown by the arrow 33.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は構造物の搬出入方法に係
わり、特に、エスカレータのフレーム等のように凸部と
凹部とが相対向する側に形成された構造物の搬出入方法
に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of loading and unloading a structure, and more particularly to a method of loading and unloading a structure such as a frame of an escalator in which a convex portion and a concave portion are formed on opposite sides.

【0002】[0002]

【従来の技術】従来の相対向する側に凸部と凹部を有す
る構造物、例えばエスカレータのフレームを2階床より
も上階床の据付箇所への搬入、あるいは2階床よりも上
階床で撤去された既設フレームの搬出等を行なう場合
は、既設フレームを分割し、建物に既に備えられている
階段を利用したり、既設フレームを撤去するときに形成
した開口部を利用して行なわれていた。
2. Description of the Related Art A conventional structure having a convex portion and a concave portion on opposite sides, for example, a frame of an escalator is carried into an installation place on an upper floor above the second floor, or an upper floor above the second floor. When carrying out the existing frame that has been removed in step 2, the existing frame is divided and the stairs already provided in the building are used, or the opening formed when removing the existing frame is used. Was there.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、上述し
た従来の構造物の搬出入方法のように階段を利用して搬
出入する場合は、階段に合わせてフレームを多数個に分
割しなければならず、特に新設フレームの搬入の場合に
は、各フレームを後で一体に結合できるような構成とし
ておかなければならない。また開口部を利用する場合
は、大掛かりな揚重装置を設置する必要があると共に、
フレームを吊るロープが複数の階床にわたっているので
吊りロープの掛け方が面倒であり、かつ、種々の制限を
受け易く面倒な作業となっていた。
However, when carrying in and out using stairs as in the above-described conventional method for carrying in and out a structure, the frame must be divided into a plurality of frames according to the stairs. In particular, in the case of loading a new frame, each frame must be constructed so that they can be joined together later. Also, when using the opening, it is necessary to install a large-scale lifting device,
Since the rope that suspends the frame extends over a plurality of floors, how to hang the suspension rope is troublesome, and various restrictions are imposed, which is a troublesome work.

【0004】本発明の目的は、大掛かりな装置を用いる
ことなく短時間に、相対向する部分に凸部と凹部を有す
る構造物を階床間で移動することができる構造物の搬出
入方法を提供することにある。
An object of the present invention is to provide a structure loading / unloading method capable of moving a structure having a convex portion and a concave portion at opposing portions between floors in a short time without using a large-scale device. To provide.

【0005】[0005]

【課題を解決するための手段】本発明は上記目的を達成
するために、相対向する部分に凸部と凹部を形成した構
造物を、水平床とこれに連なっている鉛直空間との間で
搬出入いる構造物の搬出入方法において、上記凹部を下
にして上記構造物を上記水平床に配置し、上記鉛直空間
内の上方に間隔を置いて設けた少なくとも2個の揚重手
段から垂下される連結手段を上記フレームの両端にそれ
ぞれ連結すると共に、上記水平床に設けた他の揚重手段
からの連結手段を上記フレームの反鉛直空間側端に連結
し、上記水平床と上記鉛直空間との間で上記構造物を移
動する場合、上記各揚重手段の連結手段を調整しながら
上記構造物の上記凹部側を旋回の中心側にして旋回させ
ながら移動するようにしたことを特徴とする。
In order to achieve the above object, the present invention provides a structure in which a convex portion and a concave portion are formed at opposing portions between a horizontal floor and a vertical space continuous with the horizontal floor. In a method of carrying in and out a structure which is carried in and out, the structure is arranged on the horizontal floor with the recess facing downward, and the structure is hung from at least two lifting means provided above the vertical space at intervals. The connecting means is connected to both ends of the frame, and the connecting means from another lifting means provided on the horizontal floor is connected to the end of the frame on the side opposite to the vertical space, and the horizontal floor and the vertical space are connected. When moving the structure between and, while adjusting the connecting means of each of the lifting means, the concave side of the structure is made to move while rotating with the concave side being the center side of turning. To do.

【0006】[0006]

【作用】本発明による構造物の搬出入方法は、上述の如
く水平床および鉛直空間の相互間で構造物を搬出入する
際、構造物の凹部側が旋回の中心側となるように旋回さ
せているため、凹部から凸部側の最外方の点の軌跡まで
の距離を最少とすることができ、水平床と鉛直空間との
境界部の開口寸法に対してより大きな寸法の構造物を搬
出入することが可能となり、従って構造物の分割数を少
なくし、しかも構造物の旋回と支持を3つの揚重手段に
よって行なえるので、大掛かりな装置を必要とせずに短
時間で効率良く行なうことができる。
According to the method of carrying in and out the structure according to the present invention, when the structure is carried in and out between the horizontal floor and the vertical space as described above, the structure is swung so that the concave side of the structure becomes the center side of the turning. Therefore, it is possible to minimize the distance from the concave to the locus of the outermost point on the convex side, and carry out a structure with a size larger than the opening size of the boundary between the horizontal floor and the vertical space. Therefore, the number of divisions of the structure can be reduced, and the structure can be swung and supported by the three lifting means. Therefore, a large-scale device is not required and the structure can be efficiently performed in a short time. You can

【0007】[0007]

【実施例】以下、本発明の実施例を図面によって説明す
る。
Embodiments of the present invention will be described below with reference to the drawings.

【0008】図2は本発明の一実施例による構造物の搬
出入方法を採用したエスカレータのフレームの搬入作業
を示すフローチャートである。
FIG. 2 is a flow chart showing the work of loading and unloading the frame of the escalator adopting the method of loading and unloading a structure according to an embodiment of the present invention.

【0009】図2に示すようにエスカレータのフレーム
の搬入作業は、先ず、ステップS1の準備作業から始
め、ステップS2の荷引き作業、ステップS3の昇降路
引込み作業、ステップS4の振止め雇取付作業、ステッ
プS5の揚重手段、ステップS6の振止め雇撤去作業、
ステップS7の乗り場引出し作業を経て、ステップS8
の荷降作業で終わる。
As shown in FIG. 2, the work of loading the frame of the escalator starts with the preparatory work of step S1, the work of loading in step S2, the work of pulling up the hoistway in step S3, and the work of attaching a swing stop in step S4. , Lifting means in step S5, work for removing swing ties in step S6,
After the landing work in step S7, step S8
It ends with the unloading work.

【0010】エスカレータのフレームの搬入作業にエレ
ベータを用いるが、このエレベータは図3に示すように
一般的な構成のものである。つまり、建物に設置されて
いるエレベータの昇降路1内には、建物の最上部の機械
室に設置した巻上機3に巻回した主ロープ5の両端に結
合した乗かご2とつり合いおもり4が配置され、この昇
降路1の内壁の昇降方向には乗かご2を案内する一対の
ガイドレール26,27が図11に示すように固設され
ている。また昇降路1のピットには乗かご2とつり合い
おもり4の下部位置に対応してそれぞれバッファ6が設
置されている。次に、エスカレータのフレーム9を1階
の床7から3階の床8まで搬入する場合、先ず、ステッ
プS1として運搬のための準備作業を行なう。
An elevator is used for the work of loading the frame of the escalator, and this elevator has a general structure as shown in FIG. That is, in the hoistway 1 of the elevator installed in the building, the car 2 and the balance weight 4 connected to both ends of the main rope 5 wound around the hoisting machine 3 installed in the machine room at the top of the building. 11, a pair of guide rails 26 and 27 for guiding the car 2 are fixedly installed in the ascending and descending direction of the inner wall of the hoistway 1 as shown in FIG. In addition, buffers 6 are installed in the pits of the hoistway 1 at positions corresponding to lower positions of the car 2 and the counterweight 4. Next, when carrying in the frame 9 of the escalator from the floor 7 on the first floor to the floor 8 on the third floor, first, as a step S1, a preparatory work for transportation is performed.

【0011】つまり、図3に示すように乗かご2を昇降
路1の最上部に移動させ停止させた後、昇降路1内の最
上階またはその1階下の位置に支持床25を設置し、こ
の支持床25の下部の中央部にウインチ13を設置する
と共に、所定の間隔をおいてつり合いおもり4側にウイ
ンチ14を設置する。また1階において、床7にウイン
チ12を設置すると共に、搬入口となる1階の乗り場出
入口32の上部に滑車16を設置する。さらに3階にお
いては、床8上にウインチ15を設置し、搬出口となる
3階の天井部分に滑車17を設置する。
That is, as shown in FIG. 3, after moving the car 2 to the uppermost part of the hoistway 1 and stopping it, the support floor 25 is installed at the uppermost floor in the hoistway 1 or at a position one floor below it. The winch 13 is installed at the center of the lower part of the support floor 25, and the winch 14 is installed on the side of the counterweight 4 at a predetermined interval. Further, on the first floor, a winch 12 is installed on the floor 7, and a pulley 16 is installed above the landing entrance / exit 32 on the first floor, which serves as a carry-in entrance. Further, on the third floor, a winch 15 is installed on the floor 8, and a pulley 17 is installed on the ceiling portion of the third floor that serves as a carry-out exit.

【0012】次のステップS2は、フレーム9を1階の
乗り場出入口32まで運搬するための荷引き作業であ
る。
The next step S2 is a unloading operation for transporting the frame 9 to the platform entrance / exit 32 on the first floor.

【0013】図3に示すように1階の床7に第一台車1
0および第二台車11を準備し、これらの上にフレーム
9を搭載するが、フレーム9の凹部9Aが下になり凸部
9Bが上に向けられた状態にする。次いで、フレーム9
の左端9Cの上部にウインチ12のロープ12Aを掛
け、またフレーム9の左端9Cの上下部にウインチ14
のロープ14Aを掛け、さらにフレーム9の右端9Dの
上部にウインチ13のロープ13Aを玉掛けする。その
後、作業者A,Bは1階の図示の位置に立ち、作業者A
がウインチ13を操作して滑車16を介してフレーム9
の右端9Dの上部に連結したロープ13Aを巻き上げる
と同時に、作業者Bがウインチ12を操作してロープ1
3Aの巻き上げ量と同じ量だけロープ12Aを送り出
し、昇降路1の方向へフレーム9を水平移動させる。
As shown in FIG. 3, the first truck 1 is placed on the floor 7 on the first floor.
0 and the second trolley 11 are prepared, and the frame 9 is mounted on them, but the concave portion 9A of the frame 9 is on the lower side and the convex portion 9B is on the upper side. Then frame 9
The rope 12A of the winch 12 is hung on the upper end of the left end 9C of the frame, and the winch 14 is attached to the upper and lower parts of the left end 9C of the frame 9.
The rope 13A of the winch 13 is hooked on the right end 9D of the frame 9. After that, the workers A and B stand at the positions shown on the first floor, and the workers A and B
Operates the winch 13 and pulls the frame 9 through the pulley 16.
At the same time that the rope 13A connected to the upper part of the right end 9D of the rope is wound up, the worker B operates the winch 12 to operate the rope 1
The rope 12A is fed by the same amount as the winding amount of 3A, and the frame 9 is horizontally moved in the direction of the hoistway 1.

【0014】次はステップS3であり、フレーム9を昇
降路1に引き込むための昇降路搬入作業を行なう。
Next, in step S3, a hoistway loading operation for pulling the frame 9 into the hoistway 1 is performed.

【0015】作業者A,B,Cは1階の図1に示した位
置にそれぞれ待機し、フレーム9の右端9Dが1階の乗
り場出入口32に到達したら、先ず作業者Cがウインチ
14のロープ14Aを巻き上げながら、これに合わせて
作業者Aがウインチ12のロープ12Aを送り出し、さ
らに作業者Bはウインチ13のロープ13Aを送り出す
量を調整することにより、フレーム9を矢印33のよう
に右回り旋回させながらフレーム9の右端9Dを昇降路
下部側に落して行く。このとき、フレーム9の凹部9A
が旋回の内側になるように移動するため、フレーム9の
下部側が1階の乗り場出入口32の角部に接触して損傷
するのを容易に防止することができる。これによってフ
レーム9は昇降路1内で図4に示す状態、すなわち左端
9Cが上方になって右端9Dが下方になり、ウインチ1
4のロープ14Aによって吊下げられた状態となる。
The workers A, B and C stand by at the positions shown in FIG. 1 on the first floor, and when the right end 9D of the frame 9 reaches the landing entrance / exit 32 on the first floor, the worker C first ropes the winch 14. While winding up 14A, the worker A sends out the rope 12A of the winch 12 in accordance with this, and the worker B adjusts the amount of sending out the rope 13A of the winch 13 to rotate the frame 9 clockwise as indicated by the arrow 33. While turning, the right end 9D of the frame 9 is dropped to the lower side of the hoistway. At this time, the recess 9A of the frame 9
Moves so as to be inside the turning, so that it is possible to easily prevent the lower side of the frame 9 from coming into contact with and damaging the corner of the hall entrance / exit 32 on the first floor. As a result, the frame 9 in the hoistway 1 is in the state shown in FIG. 4, that is, the left end 9C is upward and the right end 9D is downward, and the winch 1
It will be in the state hung by the rope 14A of No. 4.

【0016】ステップS4は、フレーム9の揚重の際に
生じる振れを防止するための振れ止め雇取付作業であ
る。
Step S4 is a steady rest mounting work for preventing the shake generated when the frame 9 is lifted.

【0017】図4に示した作業者Aは、図示しない昇降
手段、例えば階段を利用して地下1階に降り、一方、作
業者B,Cは1階の図4に示す位置に待機し、作業者B
がウインチ13のロープ13Aを送り出し、作業者Cが
14のロープ14Aを送り出し、図5に示すようにフレ
ーム9を昇降路1の最下部に降ろし、その後、作業者A
がウインチ12のロープ12Aを外す。その後、図5の
要部拡大平面図である図11に示すようにフレーム9に
振れ止め雇23を取り付ける。この振れ止め雇23は、
その両側にそれぞれブラケット20,21が固定されて
おり、それぞれのブラケット20,21にはガイドレー
ル26,27を挟むように備えられたローラ20A,2
0Bと、ローラ21A,21Bがそれぞれ設けられてい
る。これら二対のローラ20A,20B,21A,21
Bによってフレーム9の下部はガイドレール26,27
によって振れが防止されると共に、ガイドレール26,
27に沿って案内されることになる。
The worker A shown in FIG. 4 descends to the first basement floor by using an elevating means (not shown) such as stairs, while the workers B and C stand by at the position shown in FIG. 4 on the first floor. Worker B
Sends the rope 13A of the winch 13 and the worker C sends the rope 14A of 14 to lower the frame 9 to the bottom of the hoistway 1 as shown in FIG.
Removes the rope 12A of the winch 12. After that, a steady rest 23 is attached to the frame 9 as shown in FIG. 11 which is an enlarged plan view of the main part of FIG. This steady rest 23
Brackets 20 and 21 are fixed to both sides thereof, and rollers 20A and 2 provided so as to sandwich the guide rails 26 and 27 on the brackets 20 and 21, respectively.
0B and rollers 21A and 21B are provided, respectively. These two pairs of rollers 20A, 20B, 21A, 21
The lower part of the frame 9 is guided by the guide rails 26, 27 by B.
The runout is prevented by the guide rail 26,
You will be guided along line 27.

【0018】次のステップS5は揚重作業である。The next step S5 is a lifting operation.

【0019】作業者A,B,Cは、図5の位置から図示
しない昇降手段、例えば階段を利用して3階に移動し、
3階の乗り場出入口28と、昇降路1内のつり合いおも
り4側の梁29との間に足場板30,31を橋絡し、ガ
イドレール26側に足場板30が位置するように、また
所定距離を隔ててガイドレール27側に足場板31が位
置するようにする。その後、作業者Aは足場板30上に
立ち、作業者Bは足場板31上に立ち、また作業者Cは
3階の図6に示す位置に立つ。次に、作業者Cがウイン
チ14のロープ14Aを巻き上げながらフレーム9を引
揚げるが、フレーム9の下部はロープ20A,20B,
21A,21Bによってガイドレール26,27に沿っ
て移動するため、振れて昇降路壁やガイドレール26,
27にフレーム9が当たって損傷することが防止され
る。このようにしてフレーム9を図6に示す状態、すな
わちフレーム9の左端9Cであった上部が3階の乗り場
出入口28の上端付近に到達した位置まで揚重する。
The workers A, B, and C move from the position of FIG. 5 to the third floor by using an elevating means (not shown) such as stairs,
The scaffold plates 30 and 31 are bridged between the platform entrance / exit 28 on the third floor and the beam 29 on the counterweight 4 side in the hoistway 1 so that the scaffold plate 30 is located on the guide rail 26 side. The scaffolding plate 31 is positioned on the guide rail 27 side at a distance. Then, the worker A stands on the scaffolding plate 30, the worker B stands on the scaffolding plate 31, and the worker C stands on the third floor at the position shown in FIG. Next, the worker C pulls up the frame 9 while hoisting the rope 14A of the winch 14, but the lower part of the frame 9 has ropes 20A, 20B,
Since it moves along the guide rails 26 and 27 by 21A and 21B, it shakes and the hoistway wall and the guide rail 26,
The frame 9 is prevented from hitting 27 and being damaged. In this way, the frame 9 is lifted to the position shown in FIG. 6, that is, to the position where the upper portion, which is the left end 9C of the frame 9, reaches the vicinity of the upper end of the landing entrance 28 on the third floor.

【0020】次はステップS6の振れ止め雇撤去作業を
行なう。
Next, the steady rest employment removal work in step S6 is performed.

【0021】図6に示すように足場板30および足場板
31上に立った作業者Aと作業者Bは振れ止め雇23を
取り外し、作業者Aは3階の床8に設置したウインチ1
5のロープ15Aを滑車17を介してフレーム9の左端
9Cであった上部に玉掛けする。
As shown in FIG. 6, the workers A and B standing on the scaffolding plate 30 and the scaffolding plate 31 remove the steady rests 23, and the worker A winches 1 installed on the floor 8 on the third floor.
The rope 15A of No. 5 is slid via the pulley 17 on the upper portion which is the left end 9C of the frame 9.

【0022】次に、フレーム9を昇降路1から3階の乗
場に引き出すための乗場搬出作業としてステップS7を
行なう。
Next, step S7 is carried out as a hall carry-out work for pulling out the frame 9 from the hoistway 1 to the hall on the third floor.

【0023】作業者A,B,Cは3階の図7に示すそれ
ぞれの位置に立ち、作業者Bはウインチ13のロープ1
3Aを、また作業者Aはウインチ15のロープ15Aを
同時に巻き上げながら、作業者Cがウインチ14のロー
プ14Aを送り出すと、フレーム9を矢印の方向に旋回
させることができる。すなわちフレーム9の凹部9Aが
旋回の内側となるように移動させ、昇降路1内から3階
の床8に向かって引き出すことができる。この場合もフ
レーム9の凹部9Aが下部となっているため、乗り場出
入口28の角にフレーム9を当てて損傷することなく、
容易にフレーム9を旋回することができる。
The workers A, B, and C stand at the respective positions shown in FIG. 7 on the third floor, and the worker B is the rope 1 of the winch 13.
When the worker C feeds out the rope 14A of the winch 14 while simultaneously winding the rope 3A of the winch 15 by the worker A, the frame 9 can be swung in the direction of the arrow. That is, the recess 9A of the frame 9 can be moved so as to be inside the turn, and the frame 9 can be pulled out from inside the hoistway 1 toward the floor 8 on the third floor. In this case as well, since the recess 9A of the frame 9 is at the bottom, without damaging the frame 9 against the corner of the landing entrance 28,
The frame 9 can be easily turned.

【0024】次はステップS8の荷降作業である。Next is the unloading work in step S8.

【0025】図8に示すように、床8上に第三台車18
を配置すると共に、その輪止めをして移動しないように
する。作業者Bはウインチ13のロープ13Aを、また
作業者Aはウインチ15のロープ15Aを同時に送り出
して、フレーム9を下降させながら、その左端9Cを第
三台車18に載せた後、作業者Cがウインチ14のロー
プ14Aを取り外す。次いで、図9に示すように作業者
Aがウインチ15のロープ15Aを滑車17から外すと
共に、作業者Bが第三台車18の輪止めを除去し、その
後、作業者Aがウインチ15のロープ15Aを巻き上げ
て第三台車18に搭載されたフレーム9をウインチ15
の方向に引き寄せながら、作業者Bもしくは作業者Cが
ウインチ13のロープ13Aを送り出し、フレーム9を
水平移動させる。これによってフレーム9が昇降路1か
ら完全に引き出されたなら、作業者Aがウインチ15の
巻き上げを止め、作業者Cが図10に示す所定の位置に
第四台車19を配置した後、作業者Bもしくは作業者C
がウインチ13のロープ13Aを送り出して第四台車1
9上にフレーム9の右端9Dを載せる。このようにし
て、フレーム9を1階から昇降路1内を経由して3階ま
で運搬することができる。
As shown in FIG. 8, the third carriage 18 is placed on the floor 8.
Place it and lock it to prevent it from moving. The worker B feeds the rope 13A of the winch 13 and the rope 15A of the winch 15 at the same time, lowers the frame 9 and puts the left end 9C on the third carriage 18, and then the worker C Remove the rope 14A of the winch 14. Next, as shown in FIG. 9, the worker A removes the rope 15A of the winch 15 from the pulley 17, the worker B removes the wheel stopper of the third carriage 18, and then the worker A removes the rope 15A of the winch 15. Winding up the frame 9 mounted on the third carriage 18 to winch 15
The worker B or the worker C sends out the rope 13A of the winch 13 and horizontally moves the frame 9 while pulling in the direction of. When the frame 9 is completely pulled out from the hoistway 1 by this, the worker A stops the winding of the winch 15 and the worker C arranges the fourth carriage 19 at a predetermined position shown in FIG. B or worker C
Sends out the rope 13A of the winch 13 and the fourth trolley 1
The right end 9D of the frame 9 is placed on 9. In this way, the frame 9 can be transported from the first floor to the third floor via the hoistway 1.

【0026】尚、上述の実施例は1階から3階までの搬
入について説明したが、既設フレームを1階まで搬出す
る場合には上述の手順を逆に行なえば良い。また構造物
としてエスカレータのフレームについて例示したが、他
の構造物であっても同様に適用することができる。さら
に上述の実施例においては、昇降路1を介して異なる階
床へ構造物を移動させたが、昇降路以外の異なる水平床
間を連通させた垂直空間を利用することができる。さら
に構造物の旋回と揚重のためにウインチとロープを用い
たが、その他の揚重手段と連結手段を用いても良い。
In addition, although the above-mentioned embodiment explained the carry-in from the first floor to the third floor, when carrying out the existing frame to the first floor, the above-mentioned procedure may be reversed. Further, the frame of the escalator has been exemplified as the structure, but the same can be applied to other structures. Further, in the above-described embodiment, the structure is moved to different floors via the hoistway 1, but a vertical space in which different horizontal floors other than the hoistway are communicated can be used. Further, although the winch and the rope are used for turning and lifting the structure, other lifting means and connecting means may be used.

【0027】[0027]

【発明の効果】以上説明したように本発明は、水平床と
垂直空間の相互間で構造物を搬出入する際、構造物の凹
部側が旋回の中心側となるようにしたため、水平空間と
鉛直空間との間に形成された乗り場出入口等の開口寸法
の大きさに対してより大きな寸法の構造物を搬出入する
事が可能となるので、建造物の分割数を少なくし、しか
も構造物を搬出入するのに最少3本のロープ等の連結手
段を持つ揚重手段で良いので、大掛かりな装置を必要と
せずに短時間で構造物の搬出入が行なえる。
As described above, according to the present invention, when the structure is carried in and out between the horizontal floor and the vertical space, the concave portion side of the structure is the center side of the turning, so that the horizontal space and the vertical space are vertical. Since it is possible to carry in and out a structure with a larger size than the size of the opening such as the entrance and exit formed between the space and the space, the number of divisions of the building can be reduced and the structure can be Since a hoisting means having a connecting means such as a minimum of three ropes is sufficient for carrying in and out, the structure can be carried in and out in a short time without requiring a large-scale device.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例による構造物の搬入出方法を
エスカレータのフレームの搬入作業に適用した昇降路引
込み作業初期を示す昇降路近傍の断面図である。
FIG. 1 is a cross-sectional view of the vicinity of a hoistway showing an early stage of hoistway retracting work in which a method of carrying in and out a structure according to an embodiment of the present invention is applied to a work of carrying in a frame of an escalator.

【図2】エスカレータのフレームの搬入時における作業
手順を示すフローチャートである。
FIG. 2 is a flowchart showing a work procedure when the frame of the escalator is carried in.

【図3】エスカレータのフレームの搬入時における荷引
き作業を示す昇降路近傍の断面図である。
FIG. 3 is a cross-sectional view in the vicinity of a hoistway showing a work of loading and unloading when the frame of the escalator is carried in.

【図4】エスカレータのフレームの搬入時における昇降
路引込み作業終期を示す昇降路近傍の断面図である。
FIG. 4 is a cross-sectional view of the vicinity of the hoistway showing the end of the hoistway retracting work when the frame of the escalator is carried in.

【図5】エスカレータのフレームの搬入時における振止
め雇取付作業を示す昇降路近傍の断面図である。
FIG. 5 is a cross-sectional view of the vicinity of a hoistway showing a work for attaching a swing stop when the escalator frame is carried in.

【図6】エスカレータのフレームの搬入時における揚重
作業を示す昇降路近傍の断面図である。
FIG. 6 is a cross-sectional view in the vicinity of a hoistway showing a lifting operation at the time of carrying in the frame of the escalator.

【図7】エスカレータのフレームの搬入時における乗り
場引出し作業初期を示す昇降路近傍の断面図である。
FIG. 7 is a cross-sectional view of the vicinity of a hoistway showing an initial stage of landing work when the escalator frame is loaded.

【図8】エスカレータのフレームの搬入時における乗り
場引出し作業終期を示す昇降路近傍の断面図である。
FIG. 8 is a cross-sectional view in the vicinity of the hoistway showing the final stage of the landing work when the escalator frame is carried in.

【図9】エスカレータのフレームの搬入時における荷降
作業初期を示す昇降路近傍の断面図である。
FIG. 9 is a cross-sectional view near the hoistway showing an initial stage of unloading work when the frame of the escalator is carried in.

【図10】エスカレータのフレームの搬入時における荷
降作業終期を示す昇降路近傍の断面図である。
FIG. 10 is a cross-sectional view in the vicinity of the hoistway showing the end of the unloading work when the frame of the escalator is carried in.

【図11】図5の要部拡大平面図である。11 is an enlarged plan view of an essential part of FIG.

【符号の説明】[Explanation of symbols]

1 昇降路 2 乗かご 4 つり合いおもり 5 主ロープ 9 フレーム 12,13,14,15 ウインチ 12A,13A,14A,15A ロープ 16,17 滑車 20A,20B,21A,21B ローラ 23 振止め雇 26,27 ガイドレール 1 hoistway 2 car 4 balance weight 5 main rope 9 frame 12, 13, 14, 15 winch 12A, 13A, 14A, 15A rope 16, 17 pulley 20A, 20B, 21A, 21B roller 23 swing stop 26, 27 guide rail

───────────────────────────────────────────────────── フロントページの続き (72)発明者 山本 諭 東京都千代田区神田錦町1丁目6番地 株 式会社日立ビルシステムサービス内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Satoshi Yamamoto 1-6-6 Kandanishikicho, Chiyoda-ku, Tokyo Inside Hitachi Building System Service Co., Ltd.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 相対向する部分に凸部と凹部を形成した
構造物を、水平床とこれに連なっている鉛直空間との間
で搬出入する構造物の搬出入方法において、上記凹部を
下にして上記構造物を上記水平床に配置し、上記鉛直空
間内の上方に間隔を置いて設けた少なくとも2個の揚重
手段から垂下される連結手段を上記フレームの両端にそ
れぞれ連結すると共に、上記水平床に設けた他の揚重手
段からの連結手段を上記フレームの反鉛直空間側端に連
結し、上記水平床と上記鉛直空間との間で上記構造物を
移動する場合、上記各揚重手段の連結手段を調整しなが
ら上記構造物の上記凹部側を旋回の中心側にして旋回さ
せながら移動するようにしたことを特徴とする構造物の
搬出入方法。
1. A method of loading and unloading a structure in which a convex portion and a concave portion are formed in opposing portions between a horizontal floor and a vertical space connected to the horizontal floor, wherein the concave portion is lowered. And the structure is arranged on the horizontal floor, and connecting means hanging from at least two lifting means provided at intervals above the vertical space are respectively connected to both ends of the frame, When connecting the connecting means from other lifting means provided on the horizontal floor to the end of the frame on the side of the anti-vertical space and moving the structure between the horizontal floor and the vertical space, A method for carrying in and out a structure, wherein the structure is configured to move while rotating while adjusting the connecting means of the weight means with the concave side of the structure being the center side of turning.
JP22018693A 1993-09-03 1993-09-03 Carrying/out method for structural body Pending JPH0771118A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22018693A JPH0771118A (en) 1993-09-03 1993-09-03 Carrying/out method for structural body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22018693A JPH0771118A (en) 1993-09-03 1993-09-03 Carrying/out method for structural body

Publications (1)

Publication Number Publication Date
JPH0771118A true JPH0771118A (en) 1995-03-14

Family

ID=16747234

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22018693A Pending JPH0771118A (en) 1993-09-03 1993-09-03 Carrying/out method for structural body

Country Status (1)

Country Link
JP (1) JPH0771118A (en)

Similar Documents

Publication Publication Date Title
AU2016202963A1 (en) An arrangement and a method for parallel transport and installation of elevator components
JPH03264482A (en) Method for installing elevator
JP3844944B2 (en) Demolition method of construction elevator
JPH0771118A (en) Carrying/out method for structural body
EP4267507A1 (en) Construction arrangement of an elevator and method
JPH09272671A (en) Elevator installation device and installation engineering method
JPH0797181A (en) Method for carrying in/out structure
JP3920527B2 (en) Elevator for construction
JP2930911B2 (en) Elevator installation method
CN112867688B (en) Method for installing guide rail of elevator in well and installation device of guide rail of elevator
JPH05262475A (en) Installation method of elevator
US20240017964A1 (en) Construction elevator arrangement and a method for producing the same
JP2859811B2 (en) Equipment transportation method and elevator with transportation basket
JP2549726Y2 (en) Construction lift
JP3253441B2 (en) Elevator installation method
JPH05201648A (en) Installation of elevator
JP2812591B2 (en) How to modify the elevator
WO2023160817A1 (en) An elevator construction arrangement and a method
JPH0776487A (en) Method for carrying in and out structure
JP2023087822A (en) Elevator device, and control method and trouble cancellation method of the same
JPH0747453B2 (en) Elevator installation method
WO2023160819A1 (en) An elevator construction arrangement and a method
WO2023160818A1 (en) An elevator construction arrangement and a method
JP2812589B2 (en) How to modify the elevator
JP2003073052A (en) Rope installing method of elevator and rope guide device