JPH0762658A - Guide pipe used for the installation of permanent substructural column and method of installing permanent substructural column using the guide pipe - Google Patents

Guide pipe used for the installation of permanent substructural column and method of installing permanent substructural column using the guide pipe

Info

Publication number
JPH0762658A
JPH0762658A JP35500392A JP35500392A JPH0762658A JP H0762658 A JPH0762658 A JP H0762658A JP 35500392 A JP35500392 A JP 35500392A JP 35500392 A JP35500392 A JP 35500392A JP H0762658 A JPH0762658 A JP H0762658A
Authority
JP
Japan
Prior art keywords
guide pipe
column
true
pillar
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP35500392A
Other languages
Japanese (ja)
Inventor
Yoji Moroi
陽児 諸井
Yoichi Seki
洋一 関
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP35500392A priority Critical patent/JPH0762658A/en
Publication of JPH0762658A publication Critical patent/JPH0762658A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PURPOSE:To support an upper structural body during underground work based on a reverse pile driving method and install a permanent substructural column under steel structure connected to the upper structural body. CONSTITUTION:A rack device 10 comprises a positioning rack 11 installed to the upper part of a foundation pile hole 3 and a guide pipe 20 supported on the rack 11 and suspended and set into the pile hole 3. The guide pipe 20 is supported on the positioning rack 11 at the tip while the lower end of a permanent substructural column 4 to be inserted inside is clamped at an accurate height so that it may be set into the upper part of the pile 11. A spacer 50 mounted to the side of the permanent substructural column or the inside of the guide pipe 20 allows both to slide with each other and to be guided so that the permanent substructural column 4 may be installed with accuracy.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、建物の地下柱の位置に
上部構造体を支持するための鉄骨造等の構真柱を設置す
るための架台装置に係り、とくに、地表面から掘削した
杭孔内にコンクリートを打設してそれに接続する鉄骨造
等の構真柱を設置するときの、架台装置の改良に関する
ものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a gantry device for installing a structural column such as a steel frame for supporting an upper structure at the position of an underground column of a building, and particularly, excavating from the ground surface. The present invention relates to an improvement of a gantry device when placing concrete in a pile hole and installing a structural column such as a steel frame structure connected to the concrete.

【0002】[0002]

【従来の技術】建築物を鉄骨造、鉄骨鉄筋コンクリート
造等で形成し、地下室の下方で基礎杭で支持するとき
に、地下室の柱部分に鉄骨の柱の施工を先行させ、この
柱を構真柱として構築する工法が知られている。その概
要は、図11に示すように、鉄骨造等の建築物を地下室
の下方で基礎杭1で支持するときに、まず、地盤2の上
面からスタンドパイプ3aで保護しながら杭孔3を掘削
し、トレミー管を使用する水中コンクリート工法等によ
って、地下室の下方に場所打ち杭1を構築する。この杭
1の上部を根固めコンクリートとするように構真柱4を
吊り下ろし、杭1に接続して立設する。構真柱4は鋼製
構造であり、通常は鉄骨造とするが。鋼管柱、鋼管コン
クリート柱等の形態で使用される。杭孔3の孔口には簡
単な架台5を使用し、これに揚重機6から吊おろした構
真柱4を預け、中心部の受け台7で側面から支持しなが
ら、構真柱自体の懸垂の鉛直度の保持を頼りにして、架
台5上で正確な芯出しを行い、構真柱4の下端部41を
杭1の頂部内に根入れして正確な高さに設置する。構真
柱4の芯出しは測量器8を使用して建築物の通り芯に合
致させる。以後、杭孔3内を砕石、掘削土砂等によって
埋め戻し、地表面に一階の床と梁を含む基盤を構成する
ことは周知のとおりであり、その支持のもとで地下室部
分を掘削しながら、柱、梁の構造体をいわゆる逆打ち工
法で上方から順に構築することができると共に、その
間、仮設構造体として設置した構真柱4によって建築物
の上部構造体の荷重を支持し、地上の構築を地下と平行
して上階に進めることができる。
2. Description of the Related Art When a building is made of steel frame, steel frame reinforced concrete, etc., and is supported by foundation piles below the basement, the column of the basement is preceded by the construction of a steel frame column, and this column is constructed. The construction method of building as a pillar is known. As shown in FIG. 11, when a building such as a steel frame is supported by a foundation pile 1 below the basement, first, a pile hole 3 is excavated from the upper surface of the ground 2 while protecting it with a stand pipe 3a. Then, the cast-in-place pile 1 is constructed below the basement by an underwater concrete method using a tremie pipe. The structure columns 4 are hung so that the upper part of the pile 1 is solidified and made into concrete, and connected to the pile 1 to stand upright. The structure column 4 has a steel structure and is usually made of steel. Used in the form of steel pipe columns, steel pipe concrete columns, etc. A simple pedestal 5 is used at the hole opening of the pile hole 3, and the true column 4 hung from the lifting machine 6 is deposited in the hole, and the pedestal 7 in the center supports the true column 4 from the side. Accurate centering is performed on the pedestal 5 by relying on the maintenance of the verticality of the suspension, and the lower end 41 of the true column 4 is rooted in the top of the pile 1 and installed at the correct height. The centering of the true column 4 is performed by using the surveying instrument 8 to match the center of the building. After that, it is well known that the pile hole 3 is backfilled with crushed stone, excavated earth and sand, etc. to form a basement including a floor and beams on the ground floor, and the basement is excavated under the support of it. However, the structure of pillars and beams can be constructed in order from the upper side by the so-called upside-down construction method, and during that time, the load of the upper structure of the building is supported by the structure columns 4 installed as the temporary structure, The construction of can be advanced to the upper floor in parallel with the basement.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、構真柱
は、懸垂時の鉛直性の原理によるものでありながら、実
際には、簡易な架台を使用すると変位や撓みが避けられ
ず、とくに、揚重機6からの支持のもとで芯出しの移動
を行うことが困難であるばかりでなく、調整に時間を要
し、また、鉄骨鉄筋コンクリート造とする柱では、コン
クリートの打設によって下部に衝撃を受けることからそ
の精度には限界があり、芯出しの結果では大きな誤差を
生じていることが多いばかりでなく、別個に挿入して設
置される基礎杭の補強鉄筋との衝接や引っかかり等によ
ってずれる欠点がある。さらに、構真柱と補強鉄筋とを
一体に組付けて挿入すると、構真柱の精度が補強鉄筋の
位置に左右され、また、自体の重心が変化して、懸垂の
鉛直度を損なってしまうものであった。
However, although the true column is based on the principle of verticality when suspended, in reality, when a simple pedestal is used, displacement and bending are unavoidable. Not only is it difficult to perform centering movement under the support of the heavy equipment 6, it also takes time to adjust, and in the case of columns made of steel-framed reinforced concrete, impact is applied to the lower part by placing concrete. There is a limit to its accuracy because it is received, and not only a large error often occurs in the result of centering, but also due to collision or catching with the reinforcing steel bars of the foundation pile that is separately inserted and installed. There is a drawback of slipping. Furthermore, if the structure columns and the reinforcing bars are assembled and inserted together, the accuracy of the structure columns will depend on the position of the reinforcing bars, and the center of gravity of itself will change, impairing the verticality of the suspension. It was a thing.

【0004】いずれにしても、構真柱は地上構造体に接
続するものであり、精度の確保が重要であって、地下柱
の完成までは仮設構造体として機能しているから、構真
柱の構築用の架台装置は、経済上の条件として簡易なも
のであることが望ましく、しかもなお、構造上の位置と
工程上の円滑さのために、構真柱工法の基幹をなし、合
理的で、かつ、施工性や安全性に富む構築方法を提供す
ることができるものでなければならない。
In any case, since the true structure pillar is connected to the above-ground structure, it is important to ensure accuracy, and it functions as a temporary structure until the underground pillar is completed. It is desirable that the pedestal device for construction is simple as an economic condition, and yet, because of its structural position and process smoothness, it is the basis of the structural pillar construction method and is rational. In addition, it must be able to provide a construction method that is rich in workability and safety.

【0005】[0005]

【課題を解決するための手段】本発明は、上記のような
状況に鑑み、その解決を課題として、構真柱の架台装置
の構造を改善するように創案したものであって、建築物
の地下柱の位置に上部構造体を支持するための鉄骨造等
の構真柱を設置するための架台装置において、該架台装
置は、基礎杭孔の上部に水平移動自在に設置される位置
出し架台と、該位置出し架台の中心部を通して上部を支
持されて杭孔内に懸垂建入れされる長尺のガイドパイプ
とからなり、ガイドパイプは、頂部において位置出し架
台の上で水平移動自在に支持されると共に、内部に嵌挿
される構真柱の下端部の周囲に、根固めコンクリートを
打設して根入れする部分を残す長さに構成して正確な高
さに把持され、構真柱の側面またはガイドパイプの内面
に取付けたスペイサーによって両者が相互に摺動、案内
されることによって構真柱がガイドパイプ内に正確に設
置されることを特徴とするものである。
SUMMARY OF THE INVENTION In view of the above situation, the present invention has been made to solve the problem and was devised so as to improve the structure of a gantry device of a true post. In a gantry device for installing a structural column such as a steel frame for supporting an upper structure at the position of an underground pillar, the gantry device is a positioning gantry installed horizontally above the foundation pile hole. And a long guide pipe that is supported by the upper portion through the center of the positioning base and suspended and installed in the pile hole. The guide pipe is supported at the top so as to be horizontally movable on the positioning base. In addition, around the lower end of the true column to be inserted inside, the concrete column is cast to a length that leaves a portion where the concrete is placed and left to be inserted. Spey attached to the side of the It is characterized in that both slide relative to each other, 構真 pillar by being guided is correctly installed in the guide pipe by chromatography.

【0006】従って、本発明によれば、構真柱の設置の
ための架台装置を、従来のように直接構真柱を支持する
位置決め架台で構成して揚重機や測量器を使用して時間
と労力を費やす工程によることなく、構真柱と同様の長
尺のガイドパイプを支持する位置決め架台を設置し、ガ
イドパイプ内に構真柱を挿入することによって、構真柱
とガイドパイプ内の相互間に設けたスペイサーに摺動さ
せ、所定の位置に確保するように容易に設置することが
できる。また、ガイドパイプは、構真柱の形状や種類に
限定されず、従って、スペイサーの形状も規制されない
ばかりでなく、操作が簡単であるから、先行するコンク
リート作業後の経過時間による硬化状況に影響されるこ
ともなく、鉄骨構造体の柱に先付けれたガセットプレー
トをそのままスペイサーとすることもできて、構真柱の
設置方法そのものを改善することができる。
Therefore, according to the present invention, the gantry device for installing the true column is constituted by the positioning pedestal for directly supporting the true column as in the prior art, and the time is required by using the lifting machine and the surveying instrument. By installing a positioning stand that supports a long guide pipe similar to that of a true column, and inserting the true column into the guide pipe, It can be easily installed by sliding it on a spacer provided between the two so as to secure it at a predetermined position. In addition, the guide pipe is not limited to the shape and type of the true column, and therefore the shape of the spacer is not restricted, and the operation is simple, which affects the hardening status due to the elapsed time after the preceding concrete work. It is also possible to use the gusset plate that is attached to the pillar of the steel frame structure as it is as a spacer, and to improve the installation method of the true pillar.

【0007】[0007]

【実施例】本発明を、本発明の構真柱用の架台装置を採
用した好適な実施例を示す図面に基づいて詳細に説明す
る。図1は構真柱の設置位置における本発明のガイドパ
イプを採用した架台装置の垂直断面図であり、図2は平
面図である。図11の参照番号は、対応する部材につい
て共通にしてある。本発明に従って、構真柱を設置する
には、まず、地盤2内に杭のための杭孔3を公知の方法
で地上から掘削し、深い掘削に際しては通常、泥水循環
工法が採用され、杭孔3内に泥水が満たされる。構真柱
4は、円形はもちろん、十字形やH形にしても、建築物
の通り芯に合わせた柱の直角座標軸x、yに合わせて設
置されるが、本発明では水平断面が円形で鋼管コンクリ
ート造の構真柱4として採用されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described in detail with reference to the drawings showing a preferred embodiment in which a gantry device for a true post is adopted. FIG. 1 is a vertical cross-sectional view of a gantry device adopting the guide pipe of the present invention at the installation position of a true column, and FIG. 2 is a plan view. Reference numerals in FIG. 11 are common to corresponding members. According to the present invention, in order to install a true pillar, first, a pile hole 3 for a pile in the ground 2 is excavated from the ground by a known method, and in the case of deep excavation, a mud circulation method is usually adopted. The holes 3 are filled with muddy water. The true column 4 is not only circular but also cross-shaped or H-shaped, and is installed according to the rectangular coordinate axes x and y of the column aligned with the core of the building, but in the present invention, the horizontal section is circular. It is adopted as a structural pillar 4 made of steel pipe concrete.

【0008】図1、図2において、10は本発明に係る
構真柱の構築用架台装置(以下架台装置という)であっ
て、該架台装置10は位置出し架台11とガイドパイプ
20とからなり、ガイドパイプ20はパイプ本体、垂直
固定アーム21、柱頭レベル設定ポスト22等からなっ
ている。位置出し架台11は、環状円形の鉄板12上に
多数のボールベアリング13を介して水平全方向に移動
自在に支持され、鉄板12の外周部に設けた求心方向の
水平方向調整ボルト14を螺進螺退させてx、y方向の
芯合わせの位置決めができるようになっている。
1 and 2, reference numeral 10 denotes a gantry device for constructing a true column according to the present invention (hereinafter referred to as gantry device). The gantry device 10 comprises a positioning pedestal 11 and a guide pipe 20. The guide pipe 20 includes a pipe body, a vertical fixed arm 21, a stigma level setting post 22, and the like. The positioning base 11 is movably supported on an annular circular iron plate 12 through a number of ball bearings 13 in all horizontal directions, and a centering direction horizontal adjustment bolt 14 provided on the outer peripheral portion of the iron plate 12 is screwed. It can be screwed back and positioned for centering in the x and y directions.

【0009】ガイドパイプ20は、位置出し架台11の
中心孔15に、例えば、ジンバル機構30を介して支持
されている。ジンバル機構30はジャイロスコープ等に
応用されている公知のものであって、図3に示すよう
に、外リング31の外側とその内側の内リング32との
間に夫々直交二方向の軸33、34が設けられ、外側の
軸33が位置出し架台11の中心孔15に軸支され、内
側の軸34がガイドパイプ20に嵌合された内リング3
2に軸支され、位置出し架台11のあらゆる方向の傾斜
に対してガイドパイプ20が常に下げ振りの原理で鉛直
に垂下するように作動するものである。
The guide pipe 20 is supported in the center hole 15 of the positioning base 11 via, for example, a gimbal mechanism 30. The gimbal mechanism 30 is a known one applied to a gyroscope or the like, and as shown in FIG. 3, an axis 33 in two orthogonal directions is provided between the outer ring 31 and an inner ring 32 inside the outer ring 31, respectively. 34, the outer shaft 33 is axially supported by the center hole 15 of the positioning base 11, and the inner shaft 34 is fitted to the guide pipe 20.
It is pivotally supported by 2 and operates so that the guide pipe 20 always hangs down vertically on the principle of downward swinging with respect to the inclination of the positioning base 11 in all directions.

【0010】ガイドパイプ20の垂直固定アーム21
は、ガイドパイプ20の上端に水平十字方向に固定され
たアーム部材であって、アーム先端の位置は、位置出し
架台11の上面に形成した固定装置25に係着して固定
されるようになっている。固定装置25は、図4に示す
ように、アーム先端に固着された対向2片のブラケット
26に螺入された対向2個の固定ボルト27によって、
位置出し架台11上面に立設されたアングル柱28の1
辺のフランジを挟着して固定し、位置出し架台11に対
して垂直固定アーム21の先端を固定できるようになっ
ている。また、柱頭レベル設定ポスト22はレベル調整
ボルト23を調整して上面高さを調節できるようになっ
ている。
A vertical fixed arm 21 of the guide pipe 20.
Is an arm member fixed to the upper end of the guide pipe 20 in the horizontal cross direction, and the position of the arm tip is fixed by being fixed to a fixing device 25 formed on the upper surface of the positioning base 11. ing. As shown in FIG. 4, the fixing device 25 is provided with two facing fixing bolts 27 screwed into two facing two-piece brackets 26 fixed to the arm tip.
One of the angle columns 28 erected on the upper surface of the positioning base 11
The side flanges are sandwiched and fixed so that the tip of the vertical fixed arm 21 can be fixed to the positioning base 11. Further, the stigma level setting post 22 can adjust the upper surface height by adjusting the level adjusting bolt 23.

【0011】[0011]

【作 用】次に上記の架台装置10を用いて、鋼管コン
クリートで形成した構真柱4の構築方法の一例を図5な
いし図7を参照して説明する。図5では、まず場所打ち
鉄筋コンクリート基礎杭1の施工のための基礎杭孔3を
公知の泥水循環工法等によって掘削し、孔底に鉄筋篭1
bを吊込み、トレミー管等を使用して基礎杭1のコンク
リート1aを打設する。この後、構真柱用の架台装置1
0を杭1の上方地面に設置し、柱頭レベル設定ポスト2
2の上面高さをレベル調整ボルト23の調整によって構
築する構真柱4の所定柱頭部高さに設定し、柱頭レベル
設定ポスト22の上面に設けた2点の位置決め指標24
(図2)をレーザー測定機等の測量器によって測定しな
がら位置出し架台11の外周の水平方向調整ボルト14
を螺進螺退させて位置出し架台11を水平方向に移動さ
せ、ガイドパイプ20の芯を正確に所定位置に一致させ
る。ガイドパイプ20の鉛直度はガイドパイプ20を支
持しているジンバル機構30によって自動的に鉛直方向
に決定されるから、垂直固定アーム21の先端部が位置
出し架台11の上面に接触しない範囲に維持して、固定
装置25によって固定すれば、ガイドパイプ20は正確
に所定位置に鉛直に固定される。
[Operation] Next, an example of a method of constructing the true-column 4 made of steel pipe concrete using the above-mentioned gantry device 10 will be described with reference to FIGS. In FIG. 5, first, a foundation pile hole 3 for constructing a cast-in-place reinforced concrete foundation pile 1 is excavated by a known mud circulation method or the like, and the bottom of the hole is a reinforced cage 1
Suspend b and place concrete 1a of foundation pile 1 using a tremie pipe or the like. After this, the gantry device 1 for the true column
0 on the ground above the pile 1 and the stigma level setting post 2
The height of the upper surface of 2 is set to a predetermined height of the pillar head of the true pillar 4 constructed by adjusting the level adjusting bolts 23, and two positioning indexes 24 provided on the upper surface of the stigma level setting post 22.
While measuring (Fig. 2) with a surveying instrument such as a laser measuring machine, a horizontal adjustment bolt 14 on the outer circumference of the positioning base 11 is positioned.
Is screwed forward and backward to move the positioning base 11 horizontally, so that the core of the guide pipe 20 is accurately aligned with a predetermined position. Since the verticality of the guide pipe 20 is automatically determined in the vertical direction by the gimbal mechanism 30 supporting the guide pipe 20, the vertical end of the vertical fixed arm 21 is positioned within a range where it does not come in contact with the upper surface of the pedestal 11. Then, if the guide pipe 20 is fixed by the fixing device 25, the guide pipe 20 is accurately fixed vertically at a predetermined position.

【0012】次に図6では、構真柱4の外殻をなす鋼管
40に底板40aを付けて揚重機6で吊り、スペイサー
50を取付けた鋼管40をガイドパイプ20内に摺動さ
せて挿入すれば、ガイドパイプ20と鋼管40の軸心を
一致させることができる。ついで、コンクリートポンプ
等で鋼管40内にコンクリート43を投入し、鋼管40
の降下に伴う浮力の増加に対して、逐次充填するコンク
リート43によって重量を増加させる状態でガイドパイ
プ20内を降下させる。鋼管40の下端部41が基礎杭
コンクリート1aに達した後、構築した構真柱4の上端
部42に接合する梁の下部まで充填したコンクリート4
3の重量で鋼管40の下端を未硬化の基礎杭コンクリー
ト1a中に沈下させ、鋼管40の上端部42が架台装置
10の柱頭レベル設定ポスト22の上面と一致したとこ
ろで降下を停止し、上端部42を柱頭レベル設定ポスト
22に預ける。この工程では、長尺でかつ重量の大きい
鋼管コンクリート造の柱が現場において構築されて構真
柱4を形成し、構真柱4の輸送手段が全面的に改善され
る。
Next, referring to FIG. 6, a bottom plate 40a is attached to the steel pipe 40 forming the outer shell of the true-column 4 and is hung by the lifting machine 6, and the steel pipe 40 with the spacer 50 is slidably inserted into the guide pipe 20. By doing so, the axial centers of the guide pipe 20 and the steel pipe 40 can be matched. Then, concrete 43 is put into the steel pipe 40 by a concrete pump or the like,
With respect to the increase in buoyancy associated with the descent of the guide pipe 20, the concrete 43 to be sequentially filled is lowered in the guide pipe 20 in a state of increasing the weight. After the lower end 41 of the steel pipe 40 reaches the foundation pile concrete 1a, the concrete 4 filled up to the lower part of the beam joined to the upper end 42 of the constructed concrete column 4
The lower end of the steel pipe 40 was sunk into the uncured foundation pile concrete 1a with a weight of 3, and the descent was stopped when the upper end 42 of the steel pipe 40 coincided with the upper face of the stigma level setting post 22 of the gantry device 10, and the upper end portion was stopped. 42 is deposited in the stigma level setting post 22. In this step, a long and heavy column made of steel pipe concrete is constructed on site to form the true column 4, and the transportation means of the true column 4 is completely improved.

【0013】次に図7では、基礎杭コンクリート1a及
び鋼管40の充填コンクリート43の安定化後、揚重機
6、架台装置10、ガイドパイプ20等を撤去し、構真
柱4の鋼管40の上端部を杭孔3の孔口に仮固定し、次
に、基礎杭孔3の掘削時に排出した掘削土を使用して作
成したソイルモルタルを鋼管40の外周杭孔内に充填し
て基礎杭孔3内の泥水と置換する。その後、構真柱4の
建入れ修正を行い、構真柱4の上部に梁を接合する。そ
の後の工程は公知のとおりであり、梁を切梁とする支保
のもとで、地下の掘削と構築が逆打ち工法等によって進
められ、一方、構真柱4の支持のもとで上部構造体の構
築が平行して進められる。
Next, in FIG. 7, after the foundation pile concrete 1a and the filled concrete 43 of the steel pipe 40 are stabilized, the lifting machine 6, the gantry device 10, the guide pipe 20 and the like are removed, and the upper end of the steel pipe 40 of the true column 4 is removed. Part is temporarily fixed to the hole opening of the pile hole 3, and then the soil mortar created by using the excavated soil discharged at the time of excavating the foundation pile hole 3 is filled in the outer peripheral pile hole of the steel pipe 40 to form the foundation pile hole. Replace with muddy water in 3. After that, the construction pillars 4 are repaired and the beams are joined to the upper portions of the structure pillars 4. Subsequent steps are known, and underground excavation and construction are carried out by the reverse construction method, etc. under the support of beams as cutting beams, while the superstructure is supported under the support of structure columns 4. Body construction proceeds in parallel.

【0014】本発明の実施例では、上記以外の構成が可
能であり、図8と図9には、図2、図1に対応して、架
台装置10の他の実施例を示す。この例では、位置出し
架台11が枠組構成であり、上面には柱芯に対応して、
主桁16と副桁17を架設し、それらの上面でガイドパ
イプ20の上部に設けたブラケット35を支持し、この
支持手段では全体として図11に示した従来技術を踏襲
しながら、前記ジンバル機構30に対応させた他の支持
方法を示している。すなわち、ガイドパイプ20の側面
に固定したブラケット35を図示しないジャッキ等によ
って昇降自在に支持し、ガイドパイプ20の鉛直度を決
定する。ついで、構真柱4の頂部にはブラケット45を
固着し、ガイドパイプ20の上方から懸垂して挿入し、
前記のブラケット35の上面でブラケット45を支持す
ることによって、構真柱4がガイドパイプ20内に設置
される。
In the embodiment of the present invention, configurations other than the above are possible, and FIGS. 8 and 9 show another embodiment of the gantry device 10 corresponding to FIGS. In this example, the positioning platform 11 has a frame structure, and the upper surface corresponds to the column core,
The main girder 16 and the sub-girder 17 are erected, and the brackets 35 provided on the upper portions of the guide pipes 20 are supported by the upper surfaces of the main girder 16 and the sub-girder 17, and the supporting means generally follows the conventional technique shown in FIG. 30 shows another supporting method corresponding to 30. That is, the bracket 35 fixed to the side surface of the guide pipe 20 is supported by a jack or the like (not shown) so as to be movable up and down, and the verticality of the guide pipe 20 is determined. Then, a bracket 45 is fixed to the top of the structure post 4, and is suspended from above the guide pipe 20 and inserted.
The true column 4 is installed in the guide pipe 20 by supporting the bracket 45 on the upper surface of the bracket 35.

【0015】図10には構真柱4を挿入した状態のガイ
ドパイプ20をスペイサー50の例として平面図で示し
てある。図(a)では円形断面の鋼管40と充填コンク
リート43とからなる構真柱4が示され、四方に配され
たガセットプレート44がスペイサー50を兼ねて鋼管
40の内面に摺接し、図(b)では構真柱が十字形断面
の鉄骨造であってガセットプレート44がスペイサー5
0を兼ねており、また、図(c)ではスペイサー50
が、鉄骨のフランジに取り付けた鋼棒で構成されてい
る。
FIG. 10 is a plan view showing the guide pipe 20 with the true column 4 inserted therein as an example of the spacer 50. In Fig. (A), a true column 4 composed of a steel pipe 40 having a circular cross section and a filled concrete 43 is shown, and gusset plates 44 arranged on all four sides are in contact with the inner surface of the steel pipe 40 also serving as spacers 50. ), The true pillar is a steel frame with a cruciform cross section, and the gusset plate 44 is a spacer 5.
It also doubles as 0, and in FIG.
Is made up of steel rods attached to steel flanges.

【0016】[0016]

【発明の効果】本発明の構真柱の設置用に使用するガイ
ドパイプは、建築物の地下柱の位置に上部構造体を支持
するための鉄骨造等の構真柱を設置するための架台装置
において、該架台装置は、基礎杭孔の上部に水平移動自
在に設置される位置出し架台と、該位置出し架台の中心
部を通して上部を支持されて杭孔内に懸垂建入れされる
長尺のガイドパイプとからなり、ガイドパイプは、頂部
において位置出し架台の上で水平移動自在に支持される
と共に、内部に嵌挿される構真柱の下端部の周囲に、根
固めコンクリートを打設して根入れする部分を残す長さ
に構成して正確な高さに把持され、構真柱の側面または
ガイドパイプの内面に取付けたスペイサーによって両者
が相互に摺動、案内されることによって構真柱がガイド
パイプ内に正確に設置されるものであり、併せて、この
装置のガイドパイプを使用する構真柱の構築方法を提供
することができるものであるから、地下構造体の完成ま
では仮設構造体として設置される構真柱を、各種の態様
で構成することができると共に、ガイドパイプの支持方
式に限定されることなく、上部構造体に接続するように
正確に設置することができる。従って、本発明は、構真
柱を含む地下柱の構築に際して、構真柱の設置方法をも
改善するものであり、正確にしかも容易に実施されるよ
うに構成した架台装置を提供することによって、構真柱
の設置に関する精度の保持が確実であり、しかも、ガイ
ドパイプを使用することによって構真柱の設置方法自体
の費用の削減に大いに貢献し、地下部分に構真柱を使用
するような大型建築物の構築工法に極めて有意義な画期
的効果を奏するものである。
INDUSTRIAL APPLICABILITY The guide pipe used for installing the structure columns of the present invention is a pedestal for installing the structure columns such as a steel frame for supporting the upper structure at the position of the underground column of the building. In the apparatus, the gantry device includes a positioning pedestal installed horizontally movably on an upper part of a foundation pile hole, and a long length hung and suspended in a pile hole by supporting the upper part through a central portion of the positioning gantry. The guide pipe is supported at the top so that it can be moved horizontally on the positioning stand, and at the same time, the rooting concrete is placed around the lower end of the structure column inserted inside. The length is set to leave the part to be rooted in and the grip is held at the correct height, and the space between the two is slid and guided by a spacer mounted on the side of the column or the inner surface of the guide pipe. Precisely the pillar is inside the guide pipe Since it is possible to provide a method of constructing a structure column using the guide pipe of this device, it is possible to provide a structure to be installed as a temporary structure until the underground structure is completed. The true pillar can be configured in various modes, and can be accurately installed so as to be connected to the upper structure without being limited to the guide pipe supporting method. Therefore, the present invention is to improve the method of installing a true pillar when constructing an underground pillar including a true pillar, and provides a gantry device configured to be accurately and easily implemented. The accuracy of the installation of the concrete columns is ensured, and the use of guide pipes greatly contributes to the reduction of the cost of the method of installing the concrete columns. It has an extremely significant epoch-making effect on the construction method of large large buildings.

【0017】[0017]

【図面の簡単な説明】[Brief description of drawings]

【図1】構真柱の設置位置における本発明のガイドパイ
プを採用した架台装置の垂直断面図である。
FIG. 1 is a vertical cross-sectional view of a gantry device adopting the guide pipe of the present invention at the installation position of a true column.

【図2】本発明の構真柱の架台装置の平面図である。FIG. 2 is a plan view of a gantry device having a true column according to the present invention.

【図3】位置出し架台によるガイドパイプの上部の支持
装置を説明する平面図である。
FIG. 3 is a plan view illustrating a support device for an upper portion of a guide pipe by a positioning platform.

【図4】位置出し架台によるガイドパイプの垂直固定ア
ームの先端の固定装置を説明する斜視図である。
FIG. 4 is a perspective view illustrating a fixing device of a tip end of a vertical fixing arm of a guide pipe by a positioning platform.

【図5】ガイドパイプの設置の段階を垂直断面で示す工
程図である。
FIG. 5 is a process diagram showing a stage of installing a guide pipe in a vertical section.

【図6】構真柱の挿入段階を垂直断面で示す工程図であ
る。
FIG. 6 is a process diagram showing a vertical cross section in the step of inserting the true column.

【図7】ガイドパイプの撤去を垂直断面で示す工程図で
ある。
FIG. 7 is a process diagram showing removal of the guide pipe in a vertical section.

【図8】架台装置10の他の実施例を示す図2に対応す
る平面図である。
8 is a plan view corresponding to FIG. 2, showing another embodiment of the gantry device 10. FIG.

【図9】図8の架台装置の図1に対応する垂直断面図で
ある。
9 is a vertical cross-sectional view of the gantry device of FIG. 8 corresponding to FIG.

【図10】構真柱を挿入した状態のガイドパイプを例と
して図(a)、図(b)、図(c)で示すスペイサーの
平面図である。
FIG. 10 is a plan view of the spacer shown in FIGS. (A), (b), and (c) using a guide pipe with a true column inserted as an example.

【図11】従来の構真柱工法を説明する垂直断面図であ
る。
FIG. 11 is a vertical sectional view for explaining a conventional structural pillar construction method.

【0018】[0018]

【符号の説明】[Explanation of symbols]

1 杭 1a 杭上部 2 地盤 3 杭孔 3a スタンドパイプ 4 構真柱 5 架台 6 揚重機 8 測量機 10 本発明の架台装置 11 位置出し架台 12 鉄板 13 ボールベアリング 14 水平方向調整ボルト 15 中心孔 16 主桁 17 副桁 18 水中ジャッキ 20 ガイドパイプ 21 垂直固定アーム 22 柱頭レベル設定ポスト 23 レベル調整ボルト 25 固定装置 26 ブラケット 27 固定ボルト 28 アングル柱 30 ジンバル機構 35 上部ブラケット 36 ジャーナルジャッキ 40 鋼管 41 下端部 42 上端部 43 コンクリート 44 ガセットプレート 45 ブラケット 50 スペイサー 1 Pile 1a Pile upper part 2 Ground 3 Pile hole 3a Stand pipe 4 Structural true column 5 Mounting stand 6 Lifting machine 8 Surveying machine 10 Mounting stand 12 of the present invention 11 Positioning stand 12 Iron plate 13 Ball bearing 14 Horizontal adjustment bolt 15 Center hole 16 Main Girder 17 Sub-girder 18 Underwater jack 20 Guide pipe 21 Vertical fixing arm 22 Vertical head level setting post 23 Level adjusting bolt 25 Fixing device 26 Bracket 27 Fixing bolt 28 Angle pillar 30 Gimbal mechanism 35 Upper bracket 36 Journal jack 40 Steel pipe 41 Lower end 42 Upper end Part 43 Concrete 44 Gusset plate 45 Bracket 50 Spacer

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 建築物の地下柱の位置に上部構造体を支
持するための鉄骨造等の構真柱を設置するための架台装
置において、該架台装置は、基礎杭孔の上部に水平移動
自在に設置される位置出し架台と、該位置出し架台の中
心部を通して上部を支持されて杭孔内に懸垂建入れされ
る長尺のガイドパイプとからなり、ガイドパイプは、頂
部において位置出し架台の上で水平移動自在に支持され
ると共に、内部に嵌挿される構真柱の下端部の周囲に、
根固めコンクリートを打設して根入れする部分を残す長
さに構成して正確な高さに把持され、構真柱の側面また
はガイドパイプの内面に取付けたスペイサーによって両
者が相互に摺動、案内されることによって構真柱がガイ
ドパイプ内に正確に設置されることを特徴とする構真柱
の設置用に使用するガイドパイプ。
1. A gantry device for installing a structural column, such as a steel frame structure, for supporting an upper structure at the position of an underground column of a building, wherein the gantry device moves horizontally to the upper part of a foundation pile hole. It consists of a positioning platform that is freely installed, and a long guide pipe that is supported by the upper part through the center of the positioning platform and suspended in the pile hole. The guide pipe is located at the top of the positioning platform. It is supported so that it can move horizontally on the top, and around the lower end of the true column that is fitted inside.
It is constructed by setting the length to leave the portion where the rooting concrete is placed by placing the concrete, and it is held at the correct height, and the two slide on each other by the spacer mounted on the side of the true column or the inner surface of the guide pipe. A guide pipe used for installation of a true pillar, characterized in that the true pillar is accurately installed in the guide pipe by being guided.
【請求項2】 ガイドパイプは水平断面が角形であり、
構真柱のガセットの先端が対角部に摺接してスペイサー
を兼ねていることを特徴とする請求項1記載の構真柱の
設置用に使用するガイドパイプ。
2. The guide pipe has a rectangular horizontal cross section,
The guide pipe used for installation of the true post as claimed in claim 1, wherein the tip of the gusset of the true post is in sliding contact with a diagonal portion and also serves as a spacer.
【請求項3】 建築物の地下柱の位置に上部構造体を支
持するための鉄骨造等の構真柱を設置する方法におい
て、基礎杭孔の上部に架台装置を設置し、該架台装置は
水平移動自在に構成した位置出し架台と、該位置出し架
台の中心部に插通して頭部部材によって支持される長尺
のガイドパイプとからなり、ガイドパイプを杭孔内に懸
垂建入して頂部において位置出し架台の上で支持すると
共に、ガイドパイプの内部に構真柱を挿入し、構真柱の
側面またはガイドパイプの内面に取付けたスペイサーに
よって両者を相互に摺動、案内させ、構真柱の下端部を
基礎杭孔内のコンクリートに根入したのち正確な高さに
把持し、しかるのちにガイドパイプを撤去することによ
って構真柱を正確に設置することを特徴とするガイドパ
イプを使用する構真柱の設置方法。
3. A method of installing a structural pillar, such as a steel frame structure, for supporting an upper structure at the position of an underground pillar of a building, wherein a gantry device is installed above the foundation pile hole, and the gantry device is It consists of a positioning platform that is configured to be horizontally movable, and a long guide pipe that is pierced through the center of the positioning platform and supported by a head member. The guide pipe is suspended and installed in a pile hole. While supporting it on the positioning platform at the top, inserting the true column into the guide pipe, and sliding and guiding both by the spacers attached to the side face of the true column or the inner surface of the guide pipe. Guide pipe characterized by accurately installing the true column by gripping the lower end of the true column into the concrete in the foundation pile hole, grasping it at the correct height, and then removing the guide pipe Use true pillar Installation method.
JP35500392A 1992-12-17 1992-12-17 Guide pipe used for the installation of permanent substructural column and method of installing permanent substructural column using the guide pipe Pending JPH0762658A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP35500392A JPH0762658A (en) 1992-12-17 1992-12-17 Guide pipe used for the installation of permanent substructural column and method of installing permanent substructural column using the guide pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP35500392A JPH0762658A (en) 1992-12-17 1992-12-17 Guide pipe used for the installation of permanent substructural column and method of installing permanent substructural column using the guide pipe

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP6792491A Division JPH0696849B2 (en) 1991-03-06 1991-03-06 Frame device for construction of true pillar

Publications (1)

Publication Number Publication Date
JPH0762658A true JPH0762658A (en) 1995-03-07

Family

ID=18441319

Family Applications (1)

Application Number Title Priority Date Filing Date
JP35500392A Pending JPH0762658A (en) 1992-12-17 1992-12-17 Guide pipe used for the installation of permanent substructural column and method of installing permanent substructural column using the guide pipe

Country Status (1)

Country Link
JP (1) JPH0762658A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020090839A (en) * 2018-12-05 2020-06-11 株式会社フジタ Inverted post positioning jig

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5939010A (en) * 1982-08-27 1984-03-03 Hitachi Ltd Lead wire of stationary electric induction apparatus
JPH04281916A (en) * 1991-03-06 1992-10-07 Shimizu Corp Base device for construction of main post

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5939010A (en) * 1982-08-27 1984-03-03 Hitachi Ltd Lead wire of stationary electric induction apparatus
JPH04281916A (en) * 1991-03-06 1992-10-07 Shimizu Corp Base device for construction of main post

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020090839A (en) * 2018-12-05 2020-06-11 株式会社フジタ Inverted post positioning jig

Similar Documents

Publication Publication Date Title
JP6830748B2 (en) Open caisson construction structure and its construction method
CN112900450A (en) Rotary drilling and full-rotation combined back-inserting method positioning method for steel pipe structure pile by reverse construction method
CN111945714B (en) Steel sleeve guiding method combined with steel upright column inserting construction method
JP7011254B2 (en) Structure Shinbashira building method and structure Shinbashira building device
CN113356185B (en) Assembled underground station steel pipe column and accurate installation method thereof
JPH0762658A (en) Guide pipe used for the installation of permanent substructural column and method of installing permanent substructural column using the guide pipe
JP2556215B2 (en) Construction method
JP3616895B2 (en) Construction pillar erection device
CN109235453B (en) Deep foundation pit PRC pipe pile assembled supporting method
JPH055391A (en) Structural stud erection holder
JPH04281916A (en) Base device for construction of main post
JP2799778B2 (en) Construction method of steel tube concrete pillar
JP3030377B2 (en) Construction and repair equipment for trussed pillars
JP2004100281A (en) Positioning method for permanent substructural column without using casing
CN216920733U (en) Integrative mounting structure of foundation pile and steel stand
JP2556216B2 (en) Construction pillar installation jig
JP7364105B2 (en) Position adjustment device and method for adjusting the position of the structure pillar
JP3062976B2 (en) Supporting steel frame mounting base
JP3030374B2 (en) Construction method and equipment for trussed pillar
JPH0531631B2 (en)
CN113529727B (en) Steel pipe column accurate positioning method applied to hole-pile method construction
CN218291919U (en) Novel cover digs reverse construction method steel-pipe column center secondary and rectifies and fix device
JPH0754488A (en) Erecting method for permanent sub-structural column, and stand therefor
CN117266241A (en) Construction method of reverse construction method lattice column
JPS58218515A (en) Method and apparatus for erecting structural center pillar at reverse-casting time