JP3062976B2 - Supporting steel frame mounting base - Google Patents

Supporting steel frame mounting base

Info

Publication number
JP3062976B2
JP3062976B2 JP4173525A JP17352592A JP3062976B2 JP 3062976 B2 JP3062976 B2 JP 3062976B2 JP 4173525 A JP4173525 A JP 4173525A JP 17352592 A JP17352592 A JP 17352592A JP 3062976 B2 JP3062976 B2 JP 3062976B2
Authority
JP
Japan
Prior art keywords
steel frame
hole
frame insertion
center
supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP4173525A
Other languages
Japanese (ja)
Other versions
JPH0617540A (en
Inventor
幸一 山田
友邦 芝崎
みち夫 住友
眞 亀井
輝明 平尾
俊昭 世木田
俊郎 井上
武範 平野
忠夫 小池
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP4173525A priority Critical patent/JP3062976B2/en
Publication of JPH0617540A publication Critical patent/JPH0617540A/en
Application granted granted Critical
Publication of JP3062976B2 publication Critical patent/JP3062976B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、下部がコンクリート中
に埋め込まれ、かつ上部が構造物の支持柱として用いら
れる支持鉄骨を建て込むための支持鉄骨建込み用架台に
関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a supporting steel frame mounting base for mounting a supporting steel frame whose lower part is embedded in concrete and whose upper part is used as a supporting column of a structure.

【0002】[0002]

【従来の技術】一般に、逆巻工法を採用して地下構造物
を構築する際には、初期段階において、所定面積に掘削
された掘削穴の底床版中に複数本の支持鉄骨が建込まれ
る。前記支持鉄骨としては、13m〜18m程の長さの
H型鋼が使用されており、下部がコンクリート中に埋め
込まれ、上部が地下構造物の上床版を支持するか又は作
業用の架設桟橋杭として機能するように建込まれる。前
記支持鉄骨を底床版中に建込む場合には、予め、支持鉄
骨の建込み位置の所定深さに基礎坑(リバース坑)が打
ち込まれて柱穴(地表面から基礎杭の頭部までの深さが
12m〜17m程度)が形成されている。そして、柱穴
から基礎坑の頭部までコンクリートが打設された後、支
持鉄骨を、柱穴上部から高い垂直精度で挿入していくこ
とにより、底面地盤に支持鉄骨が建込まれるようになっ
ている。ここで、建込まれる支持鉄骨の垂直精度は、1
/500以下(鉛直方向500mmの範囲において水平
方向1mm以下)の精度が要求されている。
2. Description of the Related Art Generally, when constructing an underground structure using a reverse winding method, a plurality of supporting steel frames are erected in a bottom deck of an excavated hole excavated to a predetermined area in an initial stage. It is. As the supporting steel frame, an H-shaped steel having a length of about 13 m to 18 m is used, the lower part is embedded in concrete, and the upper part supports the upper floor slab of the underground structure or as a work pier pile for work. Built to work. When the supporting steel frame is to be built in the bottom slab, a foundation pit (reverse pit) is previously driven to a predetermined depth at a position where the supporting steel frame is erected, and a column hole (from the ground surface to the head of the foundation pile) is formed. (A depth of about 12 m to 17 m). After concrete is poured from the pillar hole to the head of the foundation pit, the supporting steel frame is inserted into the bottom of the ground with high vertical accuracy by inserting the supporting steel frame from the top of the pillar hole. ing. Here, the vertical accuracy of the supporting steel frame to be built is 1
Accuracy of / 500 or less (1 mm or less in the horizontal direction within a range of 500 mm in the vertical direction) is required.

【0003】[0003]

【発明が解決しようとする課題】ところで、前記のよう
に支持鉄骨を建て込む場合には、以下のような問題が生
じていた。
However, when the supporting steel frame is erected as described above, the following problems have occurred.

【0004】すなわち、支持鉄骨を柱穴内部に建て込む
際には、予め、支持鉄骨を臨む少なくとも2方向位置に
トランシットを設置し、複数の作業員がトランシットに
より支持鉄骨の垂直性を確認したうえで、他の作業員が
クレーン等を使用して支持鉄骨を柱穴内部に挿入してい
る。このため、従来技術においては、上述した垂直精度
に支持鉄骨を建込むために、熟練した多くの作業員によ
り多くの施工時間をかけて作業が行われているのが現状
であった。
[0004] That is, when the supporting steel frame is to be built into the inside of the column hole, a transit is previously installed at least in two positions facing the supporting steel frame, and a plurality of workers confirm the verticality of the supporting steel frame by the transit. Then, another worker inserts the supporting steel frame into the inside of the column hole using a crane or the like. For this reason, in the prior art, in order to build the supporting steel frame with the above-described vertical accuracy, the work has been performed by many skilled workers taking a lot of construction time.

【0005】また、上述した従来の技術では、建て込ま
れるべき支持鉄骨の軸芯を柱穴の軸芯に一致させる作業
(通り芯合わせ作業)、さらには建込まれた支持鉄骨の
高さ調整をも容易に行うことができない。
Further, in the above-mentioned conventional technique, the operation of matching the axis of the supporting steel frame to be built with the axis of the column hole (centering operation), and adjusting the height of the supporting steel frame built in Cannot be performed easily.

【0006】本発明は、前述の課題に鑑みてなされたも
ので、コンクリート中への支持鉄骨の建込み精度が大幅
に向上し、かつ作業能率を向上させることが可能な支持
鉄骨て建込み用架台を提供することを目的とするもので
ある。
SUMMARY OF THE INVENTION The present invention has been made in view of the above-mentioned problems, and has been made in consideration of the problems described above, and is intended to significantly improve the accuracy of installing a supporting steel frame in concrete and to improve work efficiency. It is intended to provide a gantry.

【0007】[0007]

【課題を解決するための手段】本発明の支持鉄骨建込み
用架台は、柱穴上部の地盤上に設置される架台本体と、
該架台本体の中央部から吊り支持されて柱穴内部に鉛直
に配設される鉄骨挿入部と、該鉄骨挿入部の上部および
下部にそれぞれ設けられ前記鉄骨挿入部に挿入された支
持鉄骨の外面に当接して該支持鉄骨を鉛直姿勢に保持し
つつ柱穴内への挿入を案内する支持ローラーとを備えた
ものである。そして、架台本体の上面には作業床が設け
られ、かつ作業床の中央部には基準枠体に囲まれて支持
鉄骨を挿入する鉄骨挿入孔が貫設されている。また、鉄
骨挿入部は、鉄骨挿入孔の中心と鉄骨挿入路の通り芯と
が一致せしめられて配設されている。架台本体には、架
台本体を水平方向に移動させて柱穴の軸芯と鉄骨挿入孔
の中心とを一致せしめる通り芯合わせ調整機構と、架台
本体のコーナー部を鉛直方向に移動させて基準枠体の水
平レベル出しを行う水平度調整機構と、基準枠体の水平
度を測定する水平レベル測定装置とが配設されている。
一方、鉄骨挿入部の長手方向には、鉄骨挿入部の垂直度
を測定する垂直レベル測定装置が配設されている。
According to the present invention, there is provided a support base for supporting a steel frame, comprising: a base body installed on the ground above a pillar hole;
It is suspended from the center of the gantry body and supported vertically
A steel frame insertion portion, and an upper portion of the steel frame insertion portion and
The supports respectively provided at the lower portions and inserted into the steel frame insertion portions
The supporting steel frame is held in a vertical position by abutting against the outer surface of the holding steel frame.
And a support roller that guides insertion into the pillar hole
Things. A work floor is provided on the upper surface of the gantry body, and a steel frame insertion hole for inserting a support steel frame surrounded by a reference frame is provided in the center of the work floor. In addition, the steel frame insertion portion is disposed such that the center of the steel frame insertion hole and the core of the steel frame insertion path coincide with each other. The gantry body has a center alignment mechanism that moves the gantry body in the horizontal direction to align the axis of the column hole with the center of the steel frame insertion hole, and a reference frame that moves the corner of the gantry body in the vertical direction. A leveling mechanism for leveling the body and a level measuring device for measuring the level of the reference frame are provided.
On the other hand, a vertical level measuring device for measuring the verticality of the steel frame insertion portion is provided in the longitudinal direction of the steel frame insertion portion.

【0008】[0008]

【作用】本発明の支持鉄骨建込み用架台によれば、通り
芯合わせ調整機構により、柱穴の軸芯に架台本体の鉄骨
挿入孔の中心を確実に一致させ、水平レベル測定装置の
傾斜データを元にして水平度調整機構を上下動させるこ
とにより基準枠体の水平レベル出しが容易に行われ、さ
らには、垂直レベル測定装置により垂直レベルを確認し
ながら鉄骨挿入部を架台本体に一体に連結することによ
り、鉄骨挿入部の通り芯が柱穴の軸芯と一致した状態で
極めて高い垂直精度に保持される。そして、そのように
垂直精度が設定された鉄骨挿入部を柱穴内に配設し、そ
の上下に設けた支持ローラーによって支持鉄骨を鉛直姿
勢に保持しつつ案内して支持鉄骨を挿入することによ
り、支持鉄骨の建込み精度が大幅に向上し、支持鉄骨の
建込みの工期を短縮することができる。さらには、従来
技術で必要とされていたトランシットが不要となり、作
業人員が減少されて工費を減少させることができる。
According to the supporting steel frame mounting stand of the present invention, the center of the steel frame insertion hole of the gantry main body is surely aligned with the axis of the column hole by the centering adjustment mechanism, and the inclination data of the horizontal level measuring device is obtained. By moving the horizontal adjustment mechanism up and down on the basis of, the horizontal level of the reference frame is easily obtained, and furthermore, the steel frame insertion part is integrated with the gantry body while checking the vertical level with the vertical level measuring device. By the connection, the core of the steel frame insertion portion is held with extremely high vertical accuracy while being aligned with the axis of the column hole. And like that
Arrange the steel insertion part with vertical accuracy set in the column hole, and
Supporting steel frame vertically by supporting rollers provided above and below
By inserting the supporting steel frame while guiding
As a result, the mounting accuracy of the support steel frame is greatly improved, and the construction period of the support steel frame can be shortened. Further, the transit required in the prior art becomes unnecessary, and the number of workers can be reduced, so that the construction cost can be reduced.

【0009】[0009]

【実施例】以下本発明の一実施例を、図1から図9を参
照して説明する。なお、支持鉄骨1が建込まれる柱穴2
は、地盤G中にのスタンドパイプ3(内径が2000m
m)が上縁部3aを地表面4から突出させた状態で埋設
されることにより形成されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described below with reference to FIGS. In addition, the column hole 2 where the supporting steel frame 1 is built
Is a standpipe 3 in the ground G (with an inner diameter of 2000m
m) is formed by being buried with the upper edge 3a protruding from the ground surface 4.

【0010】図中符号5は、柱穴2の上部に設置された
本実施例の支持鉄骨建込み用架台(以下、架台と略称す
る。)である。
Reference numeral 5 in the figure denotes a supporting steel frame mounting base (hereinafter abbreviated as a mounting base) of the present embodiment installed above the column hole 2.

【0011】この架台5は、地表面4上に設置された架
台本体6と、架台本体6の中央部下面側から鉛直下方に
延在する鉄骨挿入部7と、架台本体6の下部に設けられ
たジャーナルジャッキ(水平度調整機構)8及び通り芯
合わせ調整機構9と、傾斜装置(水平レベル測定装置)
10、浮き式傾斜計(垂直レベル測定装置)23、さら
には鉄骨挿入部7内に挿入された支持鉄骨1の高さ調整
を行うヤットコ25とが具備されてなるものである。
The gantry 5 is provided below the gantry body 6, a gantry body 6 installed on the ground surface 4, a steel frame insertion portion 7 extending vertically downward from the lower surface of the center of the gantry body 6. Journal jack (levelness adjustment mechanism) 8 and core alignment adjustment mechanism 9, and tilting device (horizontal level measurement device)
10, a floating inclinometer (vertical level measuring device) 23, and a yatco 25 for adjusting the height of the support steel frame 1 inserted into the steel frame insertion section 7.

【0012】架台本体6は、複数本のH形鋼材6a、6
b、6c…が相互に連結されて形成された函状の基台1
1と、基台11の上面中央部に設けられた四角枠状の基
準枠体12と、基準枠体12の内側(鉄骨挿入孔13)
以外の基台11上面にパンチングメタルを取り付けて形
成された作業床14とで構成されている。また、架台本
体6の一側部には、所定高さ(1600mm程)に設定
された作業床14上まで作業員が容易に移動できるよう
に階段15が着脱自在に設けられている。また、作業床
14の周囲には、手摺り16が着脱自在に配設されてい
る。そして、架台本体6の基準枠体12には、鉄骨挿入
部7が一体的に設けられている。
The gantry body 6 includes a plurality of H-shaped steel members 6a and 6a.
b, 6c... are connected to each other to form a box-shaped base 1.
1, a square frame-shaped reference frame 12 provided at the center of the upper surface of the base 11, and an inner side of the reference frame 12 (steel frame insertion hole 13).
And a work floor 14 formed by attaching punched metal to the upper surface of the base 11 other than the above. In addition, a stair 15 is detachably provided on one side of the gantry body 6 so that the worker can easily move to a work floor 14 set at a predetermined height (about 1600 mm). A handrail 16 is provided around the work floor 14 so as to be detachable. The reference frame 12 of the gantry body 6 is integrally provided with the steel frame insertion portion 7.

【0013】鉄骨挿入部7は、長手方向に所定間隔をあ
けて平行に配設された4本のH型鋼材17a、17b、
17c、17d(鋼材長さが7700mm)間に、複数
の斜材18…及び水平材19…が剛接合されてトラス構
造に形成されたものである。そして、各H型鋼材17a
…の長手方向を鉛直方向に向け、上端部が基準枠体12
の4隅位置でボルト締めされることにより、架台本体6
から吊り下げられた状態で連結される。この場合、基準
枠体12に固定された鉄骨挿入部7は、通り芯7Pが鉄
骨挿入孔13の中心と一致する。
[0013] The steel frame insertion part 7 is provided with four H-shaped steel members 17a, 17b, which are arranged in parallel at a predetermined interval in the longitudinal direction.
A plurality of diagonal members 18 and horizontal members 19 are rigidly joined between 17c and 17d (steel length is 7700 mm) to form a truss structure. And each H-shaped steel material 17a
Are oriented in the vertical direction, and the upper end is the reference frame 12.
Bolts at the four corner positions of the
It is connected in a state of being suspended from. In this case, in the steel frame insertion portion 7 fixed to the reference frame 12, the passing core 7 </ b> P coincides with the center of the steel frame insertion hole 13.

【0014】また、鉄骨挿入部7内部の鉄骨挿入路7b
上部及び下部には、H型鋼材17a…に連結された支持
ローラー20、20が対向配置されている。これら対向
する支持ローラー20、29間の距離Lは、挿入される
支持鉄骨1のフランジ1aの幅と略同一に設定されてい
る。そして、鉄骨挿入孔13から挿入された支持鉄骨1
は、係合して回転する上部の支持ローラー20、20に
支持されながら鉄骨挿入部7の下方7b側に移動してい
き、さらに下部の支持ローラー20、20と係合して支
持されることにより、鉄骨挿入部7の通り芯7Pに、支
持鉄骨1の長手方向の軸芯1Pが一致するようになって
いる。
Further, a steel frame insertion path 7b inside the steel frame insertion portion 7 is provided.
Support rollers 20, 20 connected to the H-shaped steel members 17a,... The distance L between the opposed support rollers 20, 29 is set to be substantially the same as the width of the flange 1a of the support steel frame 1 to be inserted. The support steel frame 1 inserted from the steel frame insertion hole 13
Moves to the lower side 7b side of the steel frame insertion portion 7 while being supported by the upper supporting rollers 20 and 20 which rotate by being engaged, and is further engaged with and supported by the lower supporting rollers 20 and 20. Accordingly, the axis 1P in the longitudinal direction of the supporting steel frame 1 coincides with the core 7P of the steel frame insertion portion 7.

【0015】また、ジャーナルジャッキ8…は、架台本
体6の底面側の4箇所のコーナー部に固定されており、
これらジャーナルジャッキ8…のいずれが適宜上下動す
ることにより、架台本体6の上部側の水平度が調整され
るようになっている。
The journal jacks 8 are fixed to four corners on the bottom side of the gantry body 6,
Any of these journal jacks 8 moves up and down as appropriate to adjust the level of the upper portion of the gantry body 6.

【0016】また、通り芯合わせ調整機構9は、架台本
体6の底部側に、平面視において直交するX方向及びY
方向の2方向に一対づつ配設されており、X方向及びY
方向に直線移動する移動棒21と、自身の回転動を移動
軸21に直線運動として伝達するハンドル部22とで構
成されている。そして、柱穴2を形成しているスタンド
パイプ3の上縁部3aに、ハンドル部22…の回転動に
より所定量に伸びた移動棒21…の先端が係合すること
により、柱穴2の軸芯2Pに鉄骨挿入部7の通り芯7P
(または鉄骨挿入孔13の中心)が合わせられるように
なっている。
The centering adjustment mechanism 9 is provided on the bottom side of the gantry body 6 in the X direction and the Y direction orthogonal to each other in plan view.
Are provided in pairs in two directions, the X direction and the Y direction.
A moving rod 21 linearly moves in the direction, and a handle portion 22 that transmits its own rotational movement to the moving shaft 21 as linear movement. Then, the tip of the moving rods 21 extending to a predetermined amount by the rotation of the handle portions 22 engages with the upper edge 3a of the stand pipe 3 forming the column hole 2, thereby forming the column hole 2. The core 7P of the steel core insertion part 7 on the shaft core 2P
(Or the center of the steel frame insertion hole 13).

【0017】また、基準枠体12上には傾斜装置10が
設置されている。この傾斜装置10は、基準枠体12の
X方向の水平度を測定する傾斜計10aと、基準枠体1
2のY方向の水平度を測定する傾斜計10bと、傾斜計
10a、10bから得られた基準枠体12の傾斜データ
を表示する指示計10cとを備えたものである。そし
て、指示計10cから得られた傾斜データを元にして、
前記ジャーナルジャッキ8…のいずれかを上下移動させ
て、基準枠体12(さらには鉄骨挿入部7)の水平度が
矯正されるようになっている。
On the reference frame 12, an inclining device 10 is provided. The tilt device 10 includes an inclinometer 10a for measuring the horizontality of the reference frame 12 in the X direction, and a reference frame 1
2 is provided with an inclinometer 10b for measuring the horizontality in the Y direction and an indicator 10c for displaying the inclination data of the reference frame 12 obtained from the inclinometers 10a and 10b. Then, based on the inclination data obtained from the indicator 10c,
By moving any one of the journal jacks 8 up and down, the horizontality of the reference frame 12 (and the steel frame insertion portion 7) is corrected.

【0018】さらに、鉄骨挿入部7には、所定のH型鋼
材17aの長手方向に沿って浮き式傾斜計23が配設さ
れている。この浮き式傾斜計23は、基準枠体12(ま
たは架台本体6)に対して鉄骨挿入部7の垂直度の精度
が高められるように設けられているもので、SGP管等
からなる円筒管(長さが約8000mm)23aの下端
部にキャップ23bが固接され、キャップ23bの内部
中央に円筒管23aの長さと略同一に設定されたつり糸
23cの一端が固接されているとともに、つり糸23c
の他端に円筒管23aの内径より縮径された筒状の発泡
スチロールで形成された浮き23dが固接され、さらに
円筒管23a内部に水23eが充填されてなるものであ
る。そして、円筒管23aの上端周縁には、90度間隔
に基準切り込み23fが設けられている。上記構造の浮
き式傾斜計23により、鉄骨挿入部7の垂直精度が保持
されていない場合(ただし、基準枠体12は水平度が保
持されているものとする。)には、円筒管23a内部の
浮き23dが傾斜方向の上方側に寄ってしまう。この場
合には、円筒管23a内部の浮き23dが中央に位置す
るように、基準枠体12と連結している鉄骨挿入部7の
上部のボルト締め部分の微調整を行う。
Further, a floating inclinometer 23 is disposed in the steel frame insertion portion 7 along the longitudinal direction of a predetermined H-shaped steel material 17a. The floating inclinometer 23 is provided so as to increase the accuracy of the perpendicularity of the steel frame insertion portion 7 with respect to the reference frame 12 (or the gantry body 6), and is a cylindrical tube (SGP tube or the like). A cap 23b is fixedly attached to a lower end of the length 23a (about 8000 mm), and one end of a suspending thread 23c having a length substantially equal to the length of the cylindrical tube 23a is fixedly attached to the center of the inside of the cap 23b. Thread 23c
At the other end, a float 23d formed of a cylindrical styrene foam having a diameter smaller than the inner diameter of the cylindrical tube 23a is fixedly attached, and the inside of the cylindrical tube 23a is filled with water 23e. In addition, reference cuts 23f are provided at 90-degree intervals around the upper end of the cylindrical tube 23a. When the vertical accuracy of the steel frame insertion portion 7 is not maintained by the floating inclinometer 23 having the above structure (however, it is assumed that the reference frame 12 has horizontality), the inside of the cylindrical tube 23a is maintained. 23d is shifted toward the upper side in the inclination direction. In this case, fine adjustment of the bolted portion on the upper part of the steel frame insertion portion 7 connected to the reference frame 12 is performed so that the float 23d inside the cylindrical tube 23a is located at the center.

【0019】さらに、ヤットコ25は、架台本体6上に
配設されたジャーナルジャッキ26に支持されながら鉄
骨挿入孔13の上部に配設されており、ジャーナルジャ
ッキ26の上下動とともに上下方向に移動する。そし
て、柱穴2内部に挿入された支持鉄骨1の頭部を押圧す
ることにより、支持鉄骨1を所定高さに設定するように
なっている。
Further, the yatco 25 is disposed above the steel frame insertion hole 13 while being supported by a journal jack 26 disposed on the gantry body 6, and moves in the vertical direction with the vertical movement of the journal jack 26. . Then, by pressing the head of the support steel frame 1 inserted into the column hole 2, the support steel frame 1 is set at a predetermined height.

【0020】次に、本実施例の架台10を柱穴2上に設
置する手順と、架台10を用いた支持鉄骨1の建込み方
法を説明する。
Next, a procedure for installing the gantry 10 of the present embodiment on the column hole 2 and a method for installing the supporting steel frame 1 using the gantry 10 will be described.

【0021】まず、地盤G中に、スタンドパイプ3を上
縁部3aを地表面4から突出させた状態で埋設して柱穴
2を形成する。そして、柱穴2内部の所定深さに基礎杭
(図示せず)を埋設するとともに、基礎杭の頭部にコン
クリートを打設しておく。
First, a column hole 2 is formed by burying a stand pipe 3 in the ground G with its upper edge 3a protruding from the ground surface 4. Then, a foundation pile (not shown) is buried at a predetermined depth inside the column hole 2, and concrete is poured into the head of the foundation pile.

【0022】次に、柱穴2上部に架台本体6を設置す
る。なお、架台本体の底部のコーナー部には、予めジャ
ーナルジャッキ8…が取り付けられているものとする。
Next, the gantry body 6 is installed above the pillar hole 2. It is assumed that journal jacks 8 are attached in advance to the bottom corners of the gantry body.

【0023】架台本体6の設置後、X方向及びY方向の
2方向に配設されているハンドル部22…を回転させ
て、移動棒21…をスタンドパイプ3の上縁部3aに適
宜係合させ、柱穴2の軸芯2Pと鉄骨挿入孔13の中心
を一致させる。
After the gantry body 6 has been installed, the handle portions 22 arranged in two directions, X and Y, are rotated so that the moving rods 21 engage with the upper edge 3a of the stand pipe 3 as appropriate. Then, the axis 2P of the column hole 2 and the center of the steel frame insertion hole 13 are made to coincide.

【0024】また、傾斜装置10の指示計10cから得
られた傾斜データを元にして、ジャーナルジャッキ8…
のいずれかを上下動させ、基準枠体12の水平度を矯正
する。そして、架台本体6に、階段15と手摺り16を
連結する。
On the basis of the tilt data obtained from the indicator 10c of the tilting device 10, the journal jacks 8 ...
Is moved up and down to correct the horizontality of the reference frame 12. Then, the stairs 15 and the handrails 16 are connected to the gantry body 6.

【0025】次に、クレーン等により架台本体6の上方
に吊り上げられてきた鉄骨挿入部7を、鉄骨挿入孔13
から柱穴2内部へ挿入していく。そして、柱穴2内部に
延在させた鉄骨挿入部7の上端部を、基準枠体12の4
隅位置にて、仮ボルト締めを行う。
Next, the steel frame insertion portion 7 lifted above the gantry body 6 by a crane or the like is inserted into the steel frame insertion hole 13.
From the inside of the column hole 2. Then, the upper end of the steel frame insertion portion 7 extended inside the column hole 2 is
At the corner position, perform temporary bolt tightening.

【0026】ここで、鉄骨挿入部7のH型鋼材17aに
沿って浮き式傾斜計23が配設されているので、鉄骨挿
入部7の垂直精度が保持されていない場合には、円筒管
23a内部の浮き23dが中央に位置するまで、基準枠
体12と、鉄骨挿入部7の上部とのボルト締め部分の微
調整を行う。そして、鉄骨挿入部7の垂直精度が矯正さ
れると、柱穴2の軸芯2Pと鉄骨挿入部7の通り芯7P
(または鉄骨挿入孔13の中心)とが一致した状態で鉄
骨挿入部7が架台本体6に一体化する。
Here, since the floatable inclinometer 23 is provided along the H-shaped steel member 17a of the steel frame insertion portion 7, if the vertical accuracy of the steel frame insertion portion 7 is not maintained, the cylindrical tube 23a Fine adjustment of the bolted portion between the reference frame 12 and the upper part of the steel frame insertion portion 7 is performed until the internal float 23d is located at the center. Then, when the vertical accuracy of the steel frame insertion portion 7 is corrected, the shaft core 2P of the pillar hole 2 and the core 7P of the steel frame insertion portion 7 are corrected.
(Or the center of the steel frame insertion hole 13) and the steel frame insertion portion 7 is integrated with the gantry body 6.

【0027】そして、クレーン等で吊り上げられて移動
してきた支持鉄骨1を、鉄骨挿入孔13から鉄骨挿入部
7内に挿入していく。徐々に下方側7aに下降していく
支持鉄骨1は、上部及び下部の支持ローラー20、20
と係合してそれら支持ローラー20、20により鉛直姿
勢を保持されつつ案内されて、鉄骨挿入部7の通り芯7
Pに沿って移動していく。そして、基礎杭頭部に極めて
高い垂直精度とされて建込まれる。
Then, the supporting steel frame 1 lifted and moved by a crane or the like is inserted into the steel frame insertion portion 7 from the steel frame insertion hole 13. The supporting steel frame 1, which gradually descends to the lower side 7a, includes upper and lower supporting rollers 20, 20.
With the support rollers 20 and 20
Guided while maintaining the force, the core 7
Move along P. And it is built with extremely high vertical accuracy on the foundation pile head.

【0028】さらに、ジャーナルジャッキ26の上下動
によってヤットコ25が支持鉄骨1の頭部を押圧するこ
とにより、支持鉄骨1は所定の高さに設定される。
Furthermore, the supporting steel frame 1 is set at a predetermined height by the vertical movement of the journal jack 26 causing the yatco 25 to press the head of the supporting steel frame 1.

【0029】従って、本実施例の柱穴2上に設置された
架台10は、通り芯合わせ調整機構9のハンドル部22
を回動させて所定量に伸長させた移動棒21をスタンド
イパイプ3の上縁部3aに係合することにより、柱穴2
の軸芯2Pに架台本体6の中央部(鉄骨挿入孔13の中
心)を確実に一致させ、傾斜装置10の傾斜データを元
にしてジャーナルジャッキ8…のいずれかを上下動させ
ることにより基準枠体12の水平レベル出しが容易に行
われ、さらには、浮き式傾斜計23内部の浮き23d位
置を確認しながら鉄骨挿入部7を架台本体6に一体に連
結することにより、鉄骨挿入部7の通り芯7Pが柱穴2
の軸芯2Pと一致して極めて高い垂直精度に保持される
ので、支持鉄骨1の建込み精度が大幅に向上し、さらに
は支持鉄骨1の建込みの工期を短縮することができる
Accordingly, the gantry 10 installed on the column hole 2 of the present embodiment is provided with the handle portion 22 of the centering adjustment mechanism 9.
Is rotated to engage the moving rod 21 extended to a predetermined amount with the upper edge 3 a of the stand-by pipe 3, whereby the column hole 2 is formed.
The center portion of the gantry body 6 (the center of the steel frame insertion hole 13) is surely aligned with the axis 2P of the gantry body 6, and one of the journal jacks 8 is moved up and down based on the inclination data of the inclining device 10, whereby the reference frame The horizontal leveling of the body 12 is easily performed, and furthermore, the steel frame insertion part 7 is integrally connected to the gantry body 6 while confirming the position of the floating 23d inside the floating inclinometer 23, so that the steel frame inserting part 7 Pole 7P is pillar hole 2
And is held with extremely high vertical accuracy in conformity with the axis 2P of the supporting steel frame 1P, so that the mounting accuracy of the supporting steel frame 1 is greatly improved, and the construction period of the supporting steel frame 1 can be shortened.

【0030】また、従来技術で必要とされていたトラン
シットが不要となり、作業人員が減少されて工費を減少
させることができる。
Further, the transit required in the prior art is not required, and the number of workers can be reduced, so that the construction cost can be reduced.

【0031】[0031]

【発明の効果】以上説明したように、本発明の支持鉄骨
建込み用架台は、通り芯合わせ調整機構により柱穴の軸
芯に架台本体の鉄骨挿入孔の中心を確実に一致させ、水
平レベル測定装置の傾斜データを元にして水平度調整機
構を上下動させることにより基準枠体の水平レベル出し
が容易に行われ、さらには、垂直レベル測定装置を確認
しながら鉄骨挿入部を柱穴内に鉛直に配設するものであ
るから、鉄骨挿入部の通り芯が柱穴の軸芯と一致した状
態で極めて高い垂直精度に保持され、しかも、鉄骨挿入
部の上下に設けた支持ローラーにより支持鉄骨を鉛直姿
勢に保持しつつ案内して柱穴内に挿入する構成であるか
ら、支持鉄骨の建込み精度が大幅に向上し、かつ支持鉄
骨の建込みの工期を短縮することができ、さらには、従
来技術で必要とされていたトランシットが不要となり、
作業人員が減少されて工費を減少させることができる。
As described above, according to the supporting steel frame mounting stand of the present invention, the center of the steel frame insertion hole of the base body is securely aligned with the axis of the column hole by the centering adjustment mechanism, and the horizontal level By moving the horizontal adjustment mechanism up and down based on the inclination data of the measuring device, the horizontal level of the reference frame can be easily set.Furthermore , while checking the vertical level measuring device, insert the steel frame insertion part into the column hole. It is installed vertically
Since that, the base line of the steel insertion portion is held to a very high vertical accuracy in a state consistent with the axis of the pillar holes but, steel inserts
The supporting steel frame is vertically set by the supporting rollers provided above and below the section
Is it a configuration that inserts into the pillar hole while guiding it while holding it
Al, Jian inclusive accuracy of the supporting steel frame is greatly improved, and it is possible to shorten the construction inclusive construction period of the supporting steel frame, further, transit becomes unnecessary which is required in the prior art,
The number of workers can be reduced and the cost can be reduced.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施例を示す正面図である。FIG. 1 is a front view showing an embodiment of the present invention.

【図2】前記側面図である。FIG. 2 is the side view.

【図3】図1におけるIIIーIII矢視図である。FIG. 3 is a view taken in the direction of arrows III-III in FIG.

【図4】図2におけるIVーIV矢視図である。FIG. 4 is a view taken in the direction of arrows IV-IV in FIG. 2;

【図5】本発明の鉄骨挿入部を示す正面図である。FIG. 5 is a front view showing a steel frame insertion portion of the present invention.

【図6】前記鉄骨挿入部の側面図である。FIG. 6 is a side view of the steel frame insertion portion.

【図7】図5のVIIーVII矢視図である。FIG. 7 is a view taken in the direction of arrows VII-VII in FIG. 5;

【図8】図6のVIIIーVIII矢視図である。FIG. 8 is a view taken in the direction of arrows VIII-VIII in FIG. 6;

【図9】図6のIXーIX矢視図であるFIG. 9 is a view taken in the direction of arrows IX-IX in FIG. 6;

【符号の説明】[Explanation of symbols]

1 支持鉄骨 2 柱穴 2P 柱穴の軸芯 3 スタンドパイプ 3a スタンドパイプの上縁部 5 架台 6 架台本体 7 鉄骨挿入部 7b 鉄骨挿入路 7P 鉄骨挿入路の通り芯 8 ジャーナルジャッキ(水平度調整機構) 9 通り芯合わせ調整機構 10 傾斜装置(水平レベル測定装置) 11 基台 12 基準枠体 13 鉄骨挿入孔 14 作業床 20 支持ローラー 23 浮き式傾斜計(垂直レベル測定装置) 25 ヤットコ 26 ジャーナルジャッキ G 地盤 DESCRIPTION OF SYMBOLS 1 Supporting steel frame 2 Pillar hole 2P Shaft core of pillar hole 3 Stand pipe 3a Upper edge of stand pipe 5 Stand 6 Stand body 7 Steel frame insertion part 7b Steel frame insertion path 7P Core of steel frame insertion path 8 Journal jack (leveling adjustment mechanism) 9) alignment adjustment mechanism 10 tilting device (horizontal level measuring device) 11 base 12 reference frame 13 steel frame insertion hole 14 work floor 20 supporting roller 23 floating inclinometer (vertical level measuring device) 25 yatco 26 journal jack G ground

───────────────────────────────────────────────────── フロントページの続き (72)発明者 住友 みち夫 東京都港区芝浦一丁目2番3号 清水建 設株式会社内 (72)発明者 亀井 眞 東京都港区芝浦一丁目2番3号 清水建 設株式会社内 (72)発明者 平尾 輝明 東京都港区芝浦一丁目2番3号 清水建 設株式会社内 (72)発明者 世木田 俊昭 東京都千代田区神田駿河台二丁目3番地 11号 株式会社鴻池組 東京本店内 (72)発明者 井上 俊郎 東京都千代田区神田駿河台二丁目3番地 11号 株式会社鴻池組 東京本店内 (72)発明者 平野 武範 東京都千代田区神田駿河台二丁目3番地 11号 株式会社鴻池組 東京本店内 (72)発明者 小池 忠夫 東京都千代田区神田駿河台二丁目3番地 11号 株式会社鴻池組 東京本店内 (56)参考文献 特開 平5−5313(JP,A) 実開 平4−46143(JP,U) (58)調査した分野(Int.Cl.7,DB名) E02D 13/04 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Michio Sumitomo 1-3-2 Shibaura, Minato-ku, Tokyo Within Shimizu Corporation (72) Inventor Makoto Kamei 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Corporation (72) Inventor Teruaki Hirao 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Corporation (72) Inventor Toshiaki Setakida 2-3-3 Kanda Surugadai, Chiyoda-ku, Tokyo Inside the Konoike Gumi Tokyo Main Store (72) Inventor Toshiro Inoue 2-3-11 Kanda Surugadai, Chiyoda-ku, Tokyo Inside the Konoike Gumi Tokyo Main Store (72) Inventor Takenori Hirano 2-3-1, Kanda Surugadai, Chiyoda-ku, Tokyo 11 Inside Konoike-gumi Tokyo Main Store (72) Inventor Tadao Koike 2-3 Koda Surugadai, Chiyoda-ku, Tokyo 11 Konoikegumi Tokyo Main Store (56) Reference Patent flat 5-5313 (JP, A) JitsuHiraku flat 4-46143 (JP, U) (58 ) investigated the field (Int.Cl. 7, DB name) E02D 13/04

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 下部がコンクリート中に埋め込まれ、上
部が建築物の柱として用いられる支持鉄骨を、地盤を掘
削して形成した柱穴内部に建込む支持鉄骨建込み用架台
であって、 前記柱穴上部の地盤上に設置される架台本体と、該架台
本体の中央部から吊り支持されて柱穴内部に鉛直に配設
される鉄骨挿入部と、該鉄骨挿入部の上部および下部に
それぞれ設けられ前記鉄骨挿入部に挿入された支持鉄骨
の外面に当接して該支持鉄骨を鉛直姿勢に保持しつつ柱
穴内への挿入を案内する支持ローラーとを備え、 しかも、前記架台本体の上面に作業床が設けられ、かつ
該作業床の中央部に基準枠体に囲まれて支持鉄骨を挿入
する鉄骨挿入孔が貫設され、前記鉄骨挿入部は、前記鉄
骨挿入孔の中心と前記鉄骨挿入路の通り芯とが一致せし
められて配設されており、 前記架台本体には、架台本体を水平方向に移動させて柱
穴の軸芯と前記鉄骨挿入孔の中心とを一致せしめる通り
芯合わせ調整機構と、架台本体のコーナー部を鉛直方向
に移動させて前記基準枠体の水平レベル出しを行う水平
度調整機構と、前記基準枠体の水平度を測定する水平レ
ベル測定装置とが配設されているとともに、 前記鉄骨挿入部の長手方向には、該鉄骨挿入部の垂直度
を測定する垂直レベル測定装置が配設されていることを
特徴とする支持鉄骨建込み用架台。
1. A supporting steel frame mounting base, wherein a lower part is embedded in concrete and an upper part is used to build a supporting steel frame used as a pillar of a building in a column hole formed by excavating the ground, a gantry main body installed in post holes top of the ground, the cross-platform
It is suspended and supported from the center of the main body, and vertically installed inside the pillar hole
And the upper and lower portions of the inserted steel frame
Support steel frames respectively provided and inserted into the steel frame insertion portion
Column while holding the supporting steel frame in a vertical position by contacting the outer surface of the column.
A support roller for guiding insertion into the hole, a work floor is provided on the upper surface of the gantry body, and a steel frame insertion hole for inserting a support steel frame surrounded by a reference frame at the center of the work floor. The steel frame insertion portion is disposed such that the center of the steel frame insertion hole and the core of the steel frame insertion path are aligned with each other, and the gantry body moves the gantry body in the horizontal direction. And a centering adjustment mechanism for aligning the axis of the column hole with the center of the steel frame insertion hole, and a levelness adjustment for moving the corner portion of the gantry body in a vertical direction to obtain a horizontal level of the reference frame. A mechanism and a horizontal level measuring device for measuring the horizontality of the reference frame are provided, and a vertical level measuring device for measuring the verticality of the steel frame inserting portion in the longitudinal direction of the steel frame inserting portion. Is characterized by being arranged Supporting steel frame construction included for the stand that.
JP4173525A 1992-06-30 1992-06-30 Supporting steel frame mounting base Expired - Lifetime JP3062976B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4173525A JP3062976B2 (en) 1992-06-30 1992-06-30 Supporting steel frame mounting base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4173525A JP3062976B2 (en) 1992-06-30 1992-06-30 Supporting steel frame mounting base

Publications (2)

Publication Number Publication Date
JPH0617540A JPH0617540A (en) 1994-01-25
JP3062976B2 true JP3062976B2 (en) 2000-07-12

Family

ID=15962143

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4173525A Expired - Lifetime JP3062976B2 (en) 1992-06-30 1992-06-30 Supporting steel frame mounting base

Country Status (1)

Country Link
JP (1) JP3062976B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0796893B2 (en) * 1987-03-12 1995-10-18 日本トムソン株式会社 Cross roller type roller bearing for infinite linear motion
CN109208533B (en) * 2018-09-26 2023-04-25 中交第二航务工程局有限公司 Wharf integrated construction system and wharf integrated construction method based on pile top pushing platform
CN116356820A (en) * 2023-03-03 2023-06-30 中铁四局集团建筑工程有限公司 Quick positioning device for steel pipe pile and construction method

Also Published As

Publication number Publication date
JPH0617540A (en) 1994-01-25

Similar Documents

Publication Publication Date Title
US7530176B2 (en) Method and apparatus for monitoring element alignment
JP3631552B2 (en) Upper centering device for guide pipe for construction of true pillar
JP3062976B2 (en) Supporting steel frame mounting base
JP2005090116A (en) Method for erecting steel frame column and positioning frame body used for it
JPH09203041A (en) Structural center column erection method and guide pipe used therefor
CN216920302U (en) Pre-buried steel column transfers system of hanging down
JP2556215B2 (en) Construction method
CN214116620U (en) Adjustable support for accurate positioning of permanent double-steel-pipe column
JP2019131990A (en) Permanent sub-structural column erection method and permanent sub-structural column erection apparatus
JP2002097643A (en) Form rise control method in slip form construction method
JP3616895B2 (en) Construction pillar erection device
JP3750042B2 (en) Construction pillar erection device
JP2556216B2 (en) Construction pillar installation jig
JPH055391A (en) Structural stud erection holder
JP3030374B2 (en) Construction method and equipment for trussed pillar
JPH073825A (en) Correction device for erecting position of under structural center column, and inclination measuring device
JPH04281916A (en) Base device for construction of main post
CN113832966B (en) Accurate positioning device for large-diameter ultra-long steel casing and accurate installation method thereof
JPH0531631B2 (en)
CN213952224U (en) Guide frame for embedding ultra-long steel protection cylinder
CN110872843B (en) Construction method for controlling verticality of foundation pit section steel lattice column
CN215669529U (en) Open cut foundation pit continuous beam capable of being rapidly installed with steel support
JPH0782892A (en) Build-in method of temporary steel column for reverse placing construction method
JP6913269B2 (en) Oblique pile driving stand and diagonal pile driving method
CN214530695U (en) Steel structure column of foundation pit support structure upright column pile and positioning frame of steel reinforcement cage

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20000314