JPH0752053B2 - Refrigeration equipment - Google Patents

Refrigeration equipment

Info

Publication number
JPH0752053B2
JPH0752053B2 JP62335911A JP33591187A JPH0752053B2 JP H0752053 B2 JPH0752053 B2 JP H0752053B2 JP 62335911 A JP62335911 A JP 62335911A JP 33591187 A JP33591187 A JP 33591187A JP H0752053 B2 JPH0752053 B2 JP H0752053B2
Authority
JP
Japan
Prior art keywords
refrigerant
defrost
hot gas
valve
opening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP62335911A
Other languages
Japanese (ja)
Other versions
JPH01179876A (en
Inventor
遊二 藤本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daikin Industries Ltd
Original Assignee
Daikin Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daikin Industries Ltd filed Critical Daikin Industries Ltd
Priority to JP62335911A priority Critical patent/JPH0752053B2/en
Publication of JPH01179876A publication Critical patent/JPH01179876A/en
Publication of JPH0752053B2 publication Critical patent/JPH0752053B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C05FERTILISERS; MANUFACTURE THEREOF
    • C05GMIXTURES OF FERTILISERS COVERED INDIVIDUALLY BY DIFFERENT SUBCLASSES OF CLASS C05; MIXTURES OF ONE OR MORE FERTILISERS WITH MATERIALS NOT HAVING A SPECIFIC FERTILISING ACTIVITY, e.g. PESTICIDES, SOIL-CONDITIONERS, WETTING AGENTS; FERTILISERS CHARACTERISED BY THEIR FORM
    • C05G5/00Fertilisers characterised by their form
    • C05G5/30Layered or coated, e.g. dust-preventing coatings
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2400/00General features or devices for refrigeration machines, plants or systems, combined heating and refrigeration systems or heat-pump systems, i.e. not limited to a particular subgroup of F25B
    • F25B2400/19Pumping down refrigerant from one part of the cycle to another part of the cycle, e.g. when the cycle is changed from cooling to heating, or before a defrost cycle is started

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Pest Control & Pesticides (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Defrosting Systems (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は冷凍装置、詳しくはデフロスト時冷媒を計量し
て、デフロスト回路に流し、一定の冷媒量でデフロスト
運転を行なうようにした冷凍装置に関する。
Description: TECHNICAL FIELD The present invention relates to a refrigerating device, and more particularly to a refrigerating device in which a refrigerant during defrosting is metered and flowed to a defrost circuit to perform a defrosting operation with a constant amount of refrigerant. .

(従来の技術) 従来、冷媒を計量してデフロスト回路に流し、一定の冷
媒量でデフロスト運転を可能にした冷凍装置は、特開昭
59−197764号公報に見られるように知られている。
(Prior Art) Conventionally, a refrigerating device which measures a refrigerant and flows it into a defrost circuit to enable defrost operation with a constant amount of refrigerant is disclosed in Japanese Patent Application Laid-Open No.
It is known as can be found in the publication 59-197764.

この冷凍装置は、第5図に示した通り、圧縮機(CP)か
ら吐出されるホットガスを凝縮器(CD)を側路して蒸発
器(E)にバイパスさせるホットガスバイパス路(H)
と蒸発器(E)へホットガスをバイパスするホットガス
量を制御して能力制御を行なうホットガス弁(HV)を備
えると共に、前記凝縮器(CD)の下流側に、1対の電磁
弁(SV1)(SV2)とこれら電磁弁(SV1)(SV2)間に介
装する計量器(T)とで構成する冷媒計量部(A)を設
け、デフロスト運転時この計量部(A)で計量する一定
の冷媒量を、前記ホットガスバイパス路(H)と蒸発器
(E)及び圧縮機(CP)とで形成するデフロスト回路に
流出させ、一定の冷媒量でデフロストを行なうようにし
たものである。
As shown in FIG. 5, this refrigeration system has a hot gas bypass passage (H) for bypassing hot gas discharged from a compressor (CP) to an evaporator (E) by-passing a condenser (CD).
And a hot gas valve (HV) for controlling the capacity by controlling the amount of hot gas bypassing the hot gas to the evaporator (E), and a pair of solenoid valves (on the downstream side of the condenser (CD) ( SV 1) (SV 2) these solenoid valves (SV 1) (SV 2) measuring instrument interposed (T) and the refrigerant metering unit constituting leaving the (a) provided between, during the defrosting operation the metering unit (a ), A constant amount of refrigerant to be measured is discharged to a defrost circuit formed by the hot gas bypass path (H), the evaporator (E), and the compressor (CP) so that defrosting is performed with a constant amount of refrigerant. It was done.

尚、第 図において(EX)は膨張弁、(D)は分流器で
ある。
In the figure, (EX) is an expansion valve and (D) is a flow divider.

(発明が解決しようとする問題点) しかして、以上の如く構成する冷凍装置において、前記
計量部(A)による冷媒の計量は、下流側の電磁弁(SV
1)を閉じた状態でポンプダウン運転を行ない、ポンプ
ダウン終了後、前記計量部(A)の上流側電磁弁(S
V2)を閉じることにより行なうものであり、この計量部
(A)で計量した冷媒を前記デフロスト回路に流出する
のは、前記したポンプダウン運転終了後、待機タイマー
により一定時間(約20秒)の後に上流側の前記電磁弁
(SV1)を開き、高低圧のバランスで行なっている。つ
まり、高圧の計量部(A)と低圧となっている蒸発器
(E)側のデフロスト回路との圧力差で計量部(A)の
冷媒を前記デフロスト回路に流出するようにしている。
(Problems to be Solved by the Invention) In the refrigeration apparatus configured as described above, the metering of the refrigerant by the metering section (A) is performed by the solenoid valve (SV) on the downstream side.
Pump down operation is performed with 1 ) closed, and after the pump down is completed, the upstream solenoid valve (S) of the measuring unit (A) is
This is done by closing V 2 ), and the refrigerant measured by the measuring unit (A) flows out to the defrost circuit for a certain time (about 20 seconds) by the standby timer after the pump down operation is completed. After that, the solenoid valve (SV 1 ) on the upstream side is opened, and high-low pressure balance is performed. That is, the pressure difference between the high pressure metering section (A) and the low pressure defrost circuit on the evaporator (E) side causes the refrigerant in the metering section (A) to flow out to the defrost circuit.

所が、以上のように高低圧バランスで流出させるから、
その流出に時間がかゝり、また、計量部(A)は室外に
配設されていることが多いため低外気時には特に時間が
かゝる問題が生ずるし、また、この冷媒流出の途中でデ
フロスト運転が開始されるため冷媒量不足となって所望
のデフロストが行なえず、それだけデフロスト時間が長
くなる問題がある。
However, because it discharges in a high-low pressure balance as described above,
It takes a long time for the gas to flow out, and since the metering section (A) is often installed outdoors, there is a problem that it takes a long time especially when the outside air is low. Since the defrost operation is started, there is a problem that the amount of refrigerant becomes insufficient and desired defrost cannot be performed, and the defrost time becomes longer accordingly.

また、低外気時デフロスト回路を循環するホットガス
は、前記計量部(A)にも流れるので、つまり、膨張弁
(EX)は通常感温膨張弁が用いられているため、デフロ
スト時には全開状態となっているし、また、前記電磁弁
(SV1)は開状態となっていることから、前記ホットガ
スが前記計量部(A)に流れ込み、低外気時には、この
計量部(A)で凝縮して溜り込むことになるのであっ
て、この現象によっても冷媒量が不足してデフロスト時
間が長くなる問題があった。
Further, since the hot gas circulating in the defrost circuit at the time of low outside air also flows to the metering section (A), that is, since the expansion valve (EX) is usually a temperature sensitive expansion valve, it is in a fully open state at the time of defrost. Since the solenoid valve (SV 1 ) is in the open state, the hot gas flows into the measuring unit (A) and condenses in the measuring unit (A) when the outside air is low. However, this phenomenon also causes a problem that the amount of refrigerant is insufficient and the defrost time becomes long.

本発明の目的は、計量部で計量した冷媒を圧縮機から吐
出するホットガスの吐出圧力で強制的に流出することに
より、前記冷媒のデフロスト回路への流出を短時間で行
なえると共に、前記計量部での溜り込みをなくし冷媒量
不足によりデフロスト時間が長くなる前記した従来の問
題を解決する点にある。
The object of the present invention is to forcibly flow out the refrigerant measured by the metering unit with the discharge pressure of the hot gas discharged from the compressor, so that the refrigerant can be discharged to the defrost circuit in a short time, and This is to solve the above-mentioned conventional problem that the defrost time becomes long due to the lack of the amount of the refrigerant by eliminating the accumulation in the section.

(問題点を解決するための手段) 本発明は、圧縮機(1)、凝縮器(2,3)、膨張機構
(5)及び蒸発器(4)を備えた冷凍装置において、前
記凝縮器(2,3)の下流側に、デフロストの開始指令に
より閉成して、前記凝縮器(2,3)を含む液溜め部に冷
媒を閉じ込める第1開閉機構(30)を設けると共に、該
第1開閉機構(30)の上流側に、前記液溜め部に閉じ込
めた冷媒のうち、デフロストに使用する冷媒の計量部
(33)を形成する第2開閉機構(32)を設ける一方、前
記計量部(33)における第2開閉機構(32)の下流側
に、前記圧縮機(1)の高圧ガス管(6a)から切換機構
(34)を介して分岐するホットガスの導入路(35)を接
続して、デフロスト時、前記導入路(35)を経由するデ
フロスト回路を形成したことを特徴とするものである。
(Means for Solving Problems) The present invention relates to a refrigeration apparatus including a compressor (1), a condenser (2, 3), an expansion mechanism (5) and an evaporator (4), wherein the condenser ( A first opening / closing mechanism (30) for closing the refrigerant in a liquid reservoir including the condenser (2, 3) is provided on the downstream side of 2, 3) by a defrost start command, and the first opening / closing mechanism (30) is provided. On the upstream side of the opening / closing mechanism (30), a second opening / closing mechanism (32) that forms a measuring section (33) of the refrigerant used for defrosting of the refrigerant trapped in the liquid reservoir is provided, while the measuring section ( A hot gas introduction path (35) branched from the high pressure gas pipe (6a) of the compressor (1) via the switching mechanism (34) is connected to the downstream side of the second opening / closing mechanism (32) in 33). At the time of defrosting, a defrost circuit passing through the introduction path (35) is formed.

(作用) デフロスト時、前記計量部(33)で計量して冷媒は、ポ
ンプダウン運転終了後直ちに圧縮機(1)から吐出され
るホットガスの吐出圧力により強制的に押出されてデフ
ロスト回路に流出するし、デフロスト運転中、ホットガ
スが前記計量部(33)に流れるので、この計量部(33)
に計量した冷媒の一部が溜り込むことがないのである。
(Operation) At the time of defrost, the refrigerant measured by the metering unit (33) is forcedly extruded by the discharge pressure of the hot gas discharged from the compressor (1) immediately after the end of the pump down operation and flows out to the defrost circuit. However, since hot gas flows to the measuring unit (33) during the defrosting operation, this measuring unit (33)
Therefore, a part of the measured refrigerant is not accumulated.

従って、冷媒量が不足することはなく、デフロスト運転
時、必要な冷媒量は確保できるのであり、冷媒量不足に
よりデフロスト運転が長くなることはないのである。
Therefore, the amount of the refrigerant does not become insufficient, and the necessary amount of the refrigerant can be secured during the defrost operation, and the defrost operation does not become long due to the insufficient amount of the refrigerant.

(実施例) 第1図に示したものはコンテナ用冷凍装置であって、圧
縮機(1)、空冷凝縮器(2)、水冷凝縮器(3)、蒸
発器(4)、感温部(5a)をもつ感温膨張弁(5)を備
え、これら各機器を冷媒配管(6)で連結し、前記凝縮
器(3)で庫内空気を冷却するようにしたものである。
(Example) What is shown in FIG. 1 is a container refrigerating apparatus, which includes a compressor (1), an air-cooled condenser (2), a water-cooled condenser (3), an evaporator (4), and a temperature sensing part ( A temperature-sensitive expansion valve (5) having 5a) is provided, these devices are connected by a refrigerant pipe (6), and the inside air of the refrigerator is cooled by the condenser (3).

尚、第1図において(7)はドライヤ、(8)はリキッ
ドインジケータ、(9)はアキュムレータ、(10)は前
記蒸発器(3)に付設するファン、(11)は前記空冷凝
縮器(2)に付設するファンである。
In FIG. 1, (7) is a dryer, (8) is a liquid indicator, (9) is an accumulator, (10) is a fan attached to the evaporator (3), and (11) is the air-cooled condenser (2). ) Is a fan attached to.

そして、以上の如く構成する冷凍装置において、高圧ガ
ス管(6a)に、前記圧縮機(1)から吐出されるホット
ガスを、前記各凝縮器(2)(3)、感温膨張弁(5)
を側路して前記蒸発器(4)にバイパスするホットガス
バイパス路(20を)接続し、その出口側を前記蒸発器
(4)の入口側に設ける分流器(12)に接続し、そして
このホットガスバイパス回路(20)の前記高圧ガス管
(6a)への接続部位に、比例制御弁から成るホットガス
弁(21)を介装すると共に、前記水冷凝縮器(3)の下
流側、第1図では、前記リキッドインジケータ(8)の
下流側で、前記膨張弁(5)の上流側に、冷凍又は冷蔵
運転の停止指令及びデフロスト運転の開始指令で閉じる
電磁弁から成る第1開閉機構(以下単に電磁弁という)
(30)を設け、かつ、この第1電磁弁(30)の上流側に
計量タンク(31)を設けて、前記電磁弁(30)の閉動作
により、ポンプダウン運転を可能とし、前記計量タンク
(31)及び前記凝縮器(2)(3)を含む液溜め部に冷
媒を閉じ込めるようにする一方、前記計量タンク(31)
の上流側、第1図では前記リキッドインジケータ(8)
と計量タンク(31)との間に、前記液溜め部に閉じ込め
た冷媒のうち、デフロストに使用する一定量の冷媒を計
量する計量部(33)を形成する電磁弁から成る第2開閉
機構(以下単に電磁弁という)(32)を設け、更に、前
記計量部(33)における前記計量タンク(31)と第2電
磁弁(32)との間に、前記ホットガスバイパス回路(2
0)の途中に、切換機構を構成する三方切換弁(34)を
介装して分岐し、前記高圧ガス管(6a)を流れるホット
ガスを前記バイパス路(20を介して導入する導入路(3
5)を接続したのである。
In the refrigeration apparatus configured as described above, the hot gas discharged from the compressor (1) is supplied to the high pressure gas pipe (6a) by the condensers (2) (3) and the temperature-sensitive expansion valve (5). )
Is connected to the evaporator (4) by bypassing the hot gas bypass passage (20), and its outlet side is connected to the flow divider (12) provided at the inlet side of the evaporator (4), and A hot gas valve (21) consisting of a proportional control valve is provided at a connection part of the hot gas bypass circuit (20) to the high pressure gas pipe (6a), and a downstream side of the water cooling condenser (3), In FIG. 1, a first opening / closing mechanism including a solenoid valve that is closed on the downstream side of the liquid indicator (8) and on the upstream side of the expansion valve (5) by a stop command of a refrigerating or refrigerating operation and a start command of a defrost operation. (Hereinafter simply called solenoid valve)
(30) is provided, and a measuring tank (31) is provided on the upstream side of the first electromagnetic valve (30), and the closing operation of the electromagnetic valve (30) enables a pump-down operation. Refrigerant is confined in a liquid storage part including (31) and the condensers (2) and (3), while the measuring tank (31)
Upstream of the liquid indicator (8) in FIG.
And a measuring tank (31), a second opening / closing mechanism including a solenoid valve forming a measuring section (33) for measuring a fixed amount of the refrigerant used for defrost among the refrigerant trapped in the liquid reservoir ( Hereinafter, simply referred to as an electromagnetic valve) (32) is provided, and the hot gas bypass circuit (2) is further provided between the measuring tank (31) and the second electromagnetic valve (32) in the measuring section (33).
In the middle of (0), a three-way switching valve (34) that constitutes a switching mechanism is interposed and branched to introduce hot gas flowing through the high-pressure gas pipe (6a) through the bypass passage (20) ( 3
5) was connected.

しかして、以上の構成において、デフロスト運転時間冷
媒を循環させるデフロスト回路は、前記ホットガス弁
(21)を、圧縮機(1)からのホットガスが全量ホット
ガスバイパス回路(20)に流れるように切換えると共
に、前記三方切換弁(34)を、ホットガスバイパス回路
(20)に流れるホットガスが全量前記導入路(35)に流
れるように切換えて形成するのであって、圧縮機
(1)、ホットガス弁(21)、ホットガスバイパス回路
(20)、三方切換弁(34)、導入路(35)、計量部(3
3)、感温膨張弁(5)、蒸発器(4)、アキュムレー
タ(9)により形成される。
In the above configuration, the defrost circuit that circulates the refrigerant for the defrost operation time passes through the hot gas valve (21) so that the entire amount of hot gas from the compressor (1) flows to the hot gas bypass circuit (20). In addition to switching, the three-way switching valve (34) is formed such that all of the hot gas flowing through the hot gas bypass circuit (20) flows through the introduction path (35). Gas valve (21), hot gas bypass circuit (20), three-way switching valve (34), introduction path (35), metering unit (3
3), the temperature-sensitive expansion valve (5), the evaporator (4), and the accumulator (9).

尚、第1図に示したものは、前記計量部(33)を形成す
る高圧液管(6b)には、前記計量部の下流側に三方切換
弁(34)によりドレンパンヒータ(36)を液管(6b)か
ら切離し可能に接続しており、このドレンパンヒータ
(36)も前記デフロスト回路の一部を形成している。
Incidentally, in the one shown in FIG. 1, in the high pressure liquid pipe (6b) forming the metering section (33), a drain pan heater (36) is connected to the downstream side of the metering section by a three-way switching valve (34). It is detachably connected to the pipe (6b), and this drain pan heater (36) also forms part of the defrost circuit.

前記三方切換弁(34)は、除湿運転(庫内空気を蒸発器
(4)で冷却除湿した後、ドレンパンヒータ(36)で再
熱する運転)及びデフロスト運転時は、冷媒がドレンパ
ンヒータ(36)へ流れるように切換えられ、通常の冷凍
又は冷蔵運転時はドレンパンヒータ(36)に冷媒が流れ
るように切換えられる。
During the dehumidifying operation (operation of cooling the chamber air with the evaporator (4) for dehumidifying and then reheating with the drain pan heater (36)) and the defrost operation, the three-way switching valve (34) causes the refrigerant to drain drain heater (36). ), And during normal freezing or refrigerating operation, the refrigerant is switched to flow to the drain pan heater (36).

又、前記ホットガス弁(21)は、電圧に比例して前記ホ
ットガスバイパス路(20)への弁開度を0〜100%に制
御可能とし、前記蒸発器(4)へのホットガスバイパス
量を制御することにより能力調整を行い、冷凍運転及び
冷蔵運転を可能にすると共に、デフロスト運転時にはホ
ットガスの全量がホットガスバイパス路(20)に流れる
ようにするのであって、コンピュータを内蔵するコント
ローラ(40)によりPID制御が行なわれるようになって
いる。
The hot gas valve (21) can control the valve opening to the hot gas bypass passage (20) to 0 to 100% in proportion to the voltage, and the hot gas bypass to the evaporator (4) can be controlled. The capacity is adjusted by controlling the amount to enable freezing operation and refrigerating operation, and at the time of defrosting operation, the entire amount of hot gas flows to the hot gas bypass passage (20), which has a built-in computer. PID control is performed by the controller (40).

また、(5b)は感温膨張弁(5)の均圧管で、この均圧
管(5b)は三方切換弁(41)を介して冷凍運転時は第1
連絡管(5c)により低圧ガス管(6d)に、冷蔵運転時は
第2連絡管(5d)によりホットガスバイパス管(20)に
切換接続されるようになっており、冷凍運転時は感温膨
張弁(5)による過熱度制御を行い、また、冷蔵運転時
は感温膨張弁(5)を閉じ気味とし、液冷媒流量を少な
くし、経済的な能力制御を行なえるようにしている。
Further, (5b) is a pressure equalizing pipe of the temperature-sensing expansion valve (5), and the pressure equalizing pipe (5b) is a first valve during the refrigerating operation via the three-way switching valve (41).
The low pressure gas pipe (6d) is switched by the connecting pipe (5c) and the hot gas bypass pipe (20) is connected by the second connecting pipe (5d) during the refrigerating operation. The expansion valve (5) is used to control the degree of superheat, and during the refrigerating operation, the temperature-sensitive expansion valve (5) is closed so that the liquid refrigerant flow rate can be reduced and economical capacity control can be performed.

また、前記計量部(33)は、計量タンク(31)を用いて
形成しているが、この計量タンク(31)は必らずしも必
要でないし、また、高圧液管(6b)に形成したが低圧液
管(6c)に形成してもよいのであって、計量タンク(3
1)を用いない場合は液管を利用し、一定量の冷媒が計
量できるようにすればよい。
Further, although the measuring section (33) is formed by using the measuring tank (31), the measuring tank (31) is not always necessary and is formed in the high pressure liquid pipe (6b). However, it may be formed in the low-pressure liquid pipe (6c), and the measurement tank (3
When 1) is not used, a liquid pipe may be used so that a certain amount of refrigerant can be measured.

尚第1図において(HPS)は高圧スイッチ、(HPCS)は
高圧制御スイッチ、(LPS)は低圧スイッチ、(OPS)は
油圧保護スイッチ、(WPS)は水圧スイッチである。
In FIG. 1, (HPS) is a high pressure switch, (HPCS) is a high pressure control switch, (LPS) is a low pressure switch, (OPS) is a hydraulic pressure protection switch, and (WPS) is a water pressure switch.

また、デフロスト運転の開始指令は、主としてエアープ
レッシャスイッチ(APS)とデフロストタイマーにより
行ない、デフロスト運転の終了は、主として低圧ガス管
(6d)の温度を検出するサーモスタット(TH)により行
ない、また、デフロスト運転の開始指令により行なうポ
ンプダウン運転の終了は、前記低圧スイッチ(LPS)を
用いて行なうのである。
The defrost operation start command is issued mainly by the air pressure switch (APS) and the defrost timer, and the defrost operation end is issued mainly by the thermostat (TH) that detects the temperature of the low pressure gas pipe (6d). The low pressure switch (LPS) is used to terminate the pump down operation performed by the operation start command.

しかして、以上の構成において冷凍又は冷蔵運転を行な
う場合、コントローラのセットポイントセレクターによ
り設定温度を設定して行なうのであって、設定温度が−
5℃より低い冷凍運転においては、蒸発器(4)の吸込
側に設けるリターンセンサー(RS)をもとに圧縮機
(1)の発停制御により設定温度に調整し、また、−5
℃以上の冷蔵運転においては、吹出側に設けるサプライ
センサー(SS)をもとに、前記ホットガス弁(21)を0
〜100%の開度に制御し、この開度に応じた流量でホッ
トガスを蒸発器(4)にバイパスすることにより設定温
度に調整するのである。
Therefore, when the refrigerating or refrigerating operation is performed in the above configuration, the set temperature is set by the set point selector of the controller, and the set temperature is −
In the freezing operation below 5 ° C, the temperature is adjusted to the set temperature by the start / stop control of the compressor (1) based on the return sensor (RS) provided on the suction side of the evaporator (4), and -5
In refrigerating operation above ℃, the hot gas valve (21) is set to 0 based on the supply sensor (SS) installed on the outlet side.
The opening is controlled to -100%, and the hot gas is bypassed to the evaporator (4) at a flow rate according to the opening to adjust the temperature to the set temperature.

そして、以上の如く冷凍又は冷蔵運転を行なっている。
前記蒸発器(4)がフロストして前記エアープレッシャ
スイッチ(APS)が作動するか、又はデフロストタイマ
ーが動作してデフロスト指令が出ると次の如くデフロス
ト運転が行なわれる。
Then, the freezing or refrigerating operation is performed as described above.
When the evaporator (4) is frosted and the air pressure switch (APS) is operated, or the defrost timer is operated and a defrost command is issued, the defrost operation is performed as follows.

このデフロスト運転を第2図に示したフローチャートに
従って説明する。
This defrost operation will be described with reference to the flowchart shown in FIG.

先ず、デフロスト運転の開始指令が出ると、前記第1電
磁弁(30)が閉じると共に、前記ホットガス弁(21)の
ホットガスバイパス(20)への回路がある場合には0%
に制御されてポンプダウン運転が始まる。
First, when a defrost operation start command is issued, the first solenoid valve (30) is closed, and 0% if there is a circuit to the hot gas bypass (20) of the hot gas valve (21).
The pump down operation starts under the control of.

このポンプダウン運転で液冷媒は凝縮器(2)(3)か
ら第1電磁弁(30)に至る部分に閉じ込められるのであ
って、液冷媒の閉じ込みの進行と共に低圧圧力が低下
し、この低圧圧力が前記低圧スイッチ(LPS)の設定値
より低くなると、前記低圧スイッチ(LPS)がオフ動作
し、ポンプダウン運転の終了が検出される。
In this pump-down operation, the liquid refrigerant is confined in the portion from the condensers (2) and (3) to the first solenoid valve (30), and the low pressure decreases as the liquid refrigerant confines. When the pressure becomes lower than the set value of the low pressure switch (LPS), the low pressure switch (LPS) is turned off, and the end of the pump down operation is detected.

このとき、前記低圧スイッチ(LPS)がオフ動作すると
圧縮機(1)は通常停止するが、次に説明する計量後の
第1電磁弁(30)の開動作により低圧が上昇すると再起
することになる。しかし、デフロスト運転を行なう場合
のポンプダウン運転終了時前記圧縮機(1)を停止させ
る必要はないし、むしろ停止させない方が好ましいか
ら、前記ポンプダウン運転の終了を検出する前記低圧ス
イッチ(LPS)のオフ動作時には前記圧縮機(1)の停
止は行なわないようにするのである。
At this time, when the low pressure switch (LPS) is turned off, the compressor (1) is normally stopped, but when the low pressure rises due to the opening operation of the first solenoid valve (30) after metering, which will be described next, the compressor (1) restarts. Become. However, it is not necessary to stop the compressor (1) at the end of the pump down operation in the case of performing the defrost operation, and it is preferable not to stop it. Therefore, the low pressure switch (LPS) for detecting the end of the pump down operation is operated. The compressor (1) is not stopped during the off operation.

そして、前記低圧スイッチ(LPS)によるポンプダウン
運転の終了が検出されると、前記ホットガス弁(21)が
ホットガスバイパス路(20)に対し100%開度に切換え
られると共に、前記三方切換弁(34)も、導入路(35)
側に切換えられ、かつ、前記蒸発器(4)に付設のファ
ン(10)が停止されると共にこれら動作と同時に前記第
2電磁弁(32)が閉じると共に、第1電磁弁(30)が開
くのである。
When the end of the pump down operation by the low pressure switch (LPS) is detected, the hot gas valve (21) is switched to 100% opening with respect to the hot gas bypass passage (20), and the three-way switching valve is also opened. (34) is also the introduction route (35)
To the side, and the fan (10) attached to the evaporator (4) is stopped, and simultaneously with these operations, the second solenoid valve (32) is closed and the first solenoid valve (30) is opened. Of.

しかして、前記第2電磁弁(32)の閉動作により、前記
第1電磁弁(30)の閉動作で閉じ込めた冷媒のうち、デ
フロスト運転に必要な冷媒量が前記計量部(33)におい
て計量されるのであり、斯く計量された冷媒は、前記第
1電磁弁(30)の開動作により蒸発器(4)側へ流出す
ると共に、前記ホットガス弁(21)及び三方切換弁(3
4)の切換動作により、前記圧縮機(1)から吐出され
るホットガスの吐出圧力により強制的に前記デフロスト
回路に押し出されるのである。
Then, due to the closing operation of the second electromagnetic valve (32), the amount of the refrigerant required for the defrost operation of the refrigerant trapped by the closing operation of the first electromagnetic valve (30) is measured in the measuring section (33). The refrigerant thus measured flows out to the evaporator (4) side by the opening operation of the first electromagnetic valve (30), and the hot gas valve (21) and the three-way switching valve (3
By the switching operation of 4), the discharge pressure of the hot gas discharged from the compressor (1) forces it to be pushed out to the defrost circuit.

斯くて、ポンプダウン運転からデフロスト運転に直ちに
移行できるし、計量された冷媒をデフロスト回路に短時
間で移送できるのであって、デフロスト運転の開始当初
より冷媒量が不足することなく効率よくデフロストが行
なえるのであり、しかも、デフロスト運転時、ホットガ
スは前記計量部(33)に流通させるから、従来例のよう
に前記計量部(33)にデフロスト回路を循環する冷媒の
一部が溜り込んで冷媒量不足を来たすこともないのであ
る。
Thus, the pump down operation can be immediately switched to the defrost operation, and the measured refrigerant can be transferred to the defrost circuit in a short time, and the defrost operation can be performed efficiently without the shortage of the refrigerant amount from the beginning of the defrost operation. In addition, since the hot gas is circulated to the metering unit (33) during the defrost operation, a part of the refrigerant circulating in the defrost circuit is accumulated in the metering unit (33) as in the conventional example. There is no shortage of quantity.

従って、以上のようにデフロスト運転の開始当初のみな
らず、デフロスト運転の途中で冷媒量が不足することは
ないので、それだけデフロスト時間を短かくできるし、
また、予め設定した一定量の冷媒でデフロスト運転を行
なえるから、このデフロスト運転の直前における運転状
態に関係なく常に最適なデフロストが可能となるのであ
る。
Therefore, as described above, not only at the beginning of the defrost operation, but because the refrigerant amount does not run short during the defrost operation, the defrost time can be shortened accordingly.
Further, since the defrosting operation can be performed with a preset fixed amount of refrigerant, the optimum defrosting can always be performed regardless of the operating state immediately before the defrosting operation.

そして、以上の如くデフロストの進行により低圧ガス管
(6d)の温度が上昇し、この温度を検出するサーモスタ
ット(TH)の設定温度を越えると、前記サーモスタット
(TH)の動作でデフロスト終了信号が出力し、デフロス
ト運転が終了する。
Then, the temperature of the low pressure gas pipe (6d) rises due to the progress of defrost as described above, and when the set temperature of the thermostat (TH) that detects this temperature is exceeded, the defrost end signal is output by the operation of the thermostat (TH). Then, the defrost operation ends.

このデフロスト運転の終了に伴ない前記第2電磁弁(3
2)が開き、三方切換弁(34)がホットガスバイパス路
(20)側に切換えられると共に、冷凍運転に戻るとき
は、ホットガス弁(21)がホットガスバイパス路(20)
側の開度0%に、また、冷蔵運転に戻るときは、コント
ローラからの開度制御に基づいた開度に制御されるので
ある。
With the completion of this defrost operation, the second solenoid valve (3
2) is opened, the three-way switching valve (34) is switched to the hot gas bypass passage (20) side, and when returning to the refrigeration operation, the hot gas valve (21) is changed to the hot gas bypass passage (20).
The opening degree on the side is 0%, and when returning to the refrigerating operation, the opening degree is controlled based on the opening degree control from the controller.

以上説明した実施例は、前記高圧液管(6b)における前
記計量部(33)の下流側にドレンパンヒータ(36)を介
装したが、第3図のように前記ドレンパンヒータ(36)
を、三方切換弁(37)を介して前記高圧液管(6b)にお
ける前記計量部(33)の下流側に接続し、前記ドレンパ
ンヒータ(36)の出口側を、前記ホットガスバイパス路
(20)又は前記分流器(12)に接続してもよい。
In the embodiment described above, the drain pan heater (36) is provided downstream of the measuring section (33) in the high pressure liquid pipe (6b), but as shown in FIG. 3, the drain pan heater (36) is provided.
Is connected to the downstream side of the measuring section (33) in the high pressure liquid pipe (6b) via a three-way switching valve (37), and the outlet side of the drain pan heater (36) is connected to the hot gas bypass passage (20). ) Or may be connected to the shunt (12).

この場合、前記膨張弁(5)をデフロスト回路から除外
できるし、前記ドレンパンヒータ(36)が前記蒸発器
(4)の風下側にある場合、冷凍又は冷蔵運転時、前記
ドレンパンヒータ(36)を迂回できるので再熱を防止で
きる。
In this case, the expansion valve (5) can be excluded from the defrost circuit, and when the drain pan heater (36) is on the lee side of the evaporator (4), the drain pan heater (36) can be operated during freezing or refrigerating operation. Since it can be bypassed, reheat can be prevented.

また、第4図のように、前記ドレンパンヒータ(36)の
接続路(36a)に電磁弁(38)を設けると共に、前記感
温膨張弁(5)の均圧ライン(5b)に、デフロスト運転
時第2連絡管(5d)を接続してデフロスト運転時前記膨
張弁(5)を閉動作させ、計量した冷媒の全量を前記ド
レンパンヒータ(36)を流すようにしてもよい。
Further, as shown in FIG. 4, a solenoid valve (38) is provided in the connection path (36a) of the drain pan heater (36), and a defrost operation is performed in the pressure equalizing line (5b) of the temperature-sensitive expansion valve (5). The second communication pipe (5d) may be connected to close the expansion valve (5) during the defrost operation, and the entire amount of the measured refrigerant may flow through the drain pan heater (36).

又、前記導入路(35)は三方電磁弁(34)を介してホッ
トガスバイパス路(20)の途中に接続したが、高圧ガス
管(6a)に接続してもよい。この場合前記ホットガス弁
(21)の上流側でも下流側でもよいし、また切換機構と
しては三方電磁弁を用いる他、二方電磁弁を導入路(3
5)の途中に設けてもよい。
Further, although the introduction passage (35) is connected to the middle of the hot gas bypass passage (20) via the three-way solenoid valve (34), it may be connected to the high pressure gas pipe (6a). In this case, it may be upstream or downstream of the hot gas valve (21), and a three-way solenoid valve may be used as a switching mechanism, and a two-way solenoid valve may be used as an introduction path (3
It may be provided in the middle of 5).

又、以上の構成において、凝縮器として空冷及び水冷凝
縮器(2)(3)を併用したが、単一の凝縮器(2)又
は(3)のみでもよいし、コンテナ冷凍装置に適用した
が、その他冷蔵庫にも適用できる。
Further, in the above configuration, the air-cooled and water-cooled condensers (2) and (3) are used together as a condenser, but only a single condenser (2) or (3) may be used, or it is applied to a container refrigerating apparatus. It can also be applied to other refrigerators.

(発明の効果) 以上の如く本発明は、一定量の冷媒を計量してデフロス
ト運転を行なうようにしたから、デフロスト運転は、そ
の運転の直前の運転状態に関係なく行なえるのであっ
て、デフロスト終了時冷媒の高圧圧力が異常に上昇した
り、圧縮機モータに過電流が流れたりして運転不能にな
ることなく定常運転に復帰できるのである。
(Effects of the Invention) As described above, in the present invention, the defrosting operation is performed by measuring the constant amount of the refrigerant. Therefore, the defrosting operation can be performed regardless of the operating state immediately before the operation. At the end, the high pressure of the refrigerant rises abnormally, or overcurrent flows to the compressor motor, so that normal operation can be restored without the operation becoming impossible.

しかも、前記計量部(33)で計量した冷媒は、圧縮機
(1)から吐出されるホットガスの吐出圧力で強制的に
デフロスト回路に移送できるから、移送は短時間で行な
え、デフロスト運転の開始当初から冷媒量の不足なくデ
フロストが行なえると共に、デフロスト運転時前記計量
部(33)に常時ホットガスを流すから、従来例のように
前記計量部(33)にデフロスト回路を循環する冷媒が溜
り込むことはなく、常に計量した一定量の冷媒でデフロ
ストを行なえるのである。従って、冷媒量不足によりデ
フロスト時間が長くなる問題はないのである。
Moreover, the refrigerant measured by the metering unit (33) can be forcibly transferred to the defrost circuit by the discharge pressure of the hot gas discharged from the compressor (1), so that the transfer can be performed in a short time and the defrost operation starts. From the beginning, defrosting can be performed without a shortage of the refrigerant amount, and hot gas is constantly supplied to the metering unit (33) during defrosting operation, so that the refrigerant circulating in the defrost circuit is accumulated in the metering unit (33) as in the conventional example. It is possible to carry out defrosting with a fixed amount of refrigerant that is always metered in without being charged. Therefore, there is no problem that the defrost time becomes long due to the shortage of the refrigerant amount.

その上、計量した冷媒の移送は、ホットガスにより強制
的に行い、計量部にホットガスを流してデフロストを行
なうようにしたから、前記した効果が得られながら、更
にポンプダウン運転の終了と同時にデフロスト運転が行
なえ、換言すると従来例のように、ポンプダウン運転の
終了後、計量した冷媒の移送を待って行う必要があいか
ら、デフロスト運転への移行も短時間に行なえるのであ
って、全体としてデフロスト時間をより短かくすること
ができるのである。
Moreover, the metered refrigerant is forcibly transferred by hot gas, and the hot gas is caused to flow into the metering section for defrosting. The defrost operation can be performed, in other words, as in the conventional example, after the pump down operation is completed, it is necessary to wait for the transfer of the measured refrigerant, so that the transition to the defrost operation can be performed in a short time. As a result, the defrost time can be shortened.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明冷凍装置の一実施例を示す冷媒配管系統
図、第2図はデフロスト運転のフローチャート図、第3
図及び第4図は別の実施例を示す冷媒配管系統図、第5
図は従来例を示す概略図である。 (1)……圧縮機 (2)(3)……凝縮器 (4)……蒸発器 (20)……ホットガスバイパス路 (21)……ホットガス弁 (30)……第1開閉機構(第1電磁弁) (32)……第2開閉機構(第2電磁弁) (33)……計量部 (34)……切換機構(三方切換弁) (35)……導入路
FIG. 1 is a refrigerant piping system diagram showing an embodiment of the refrigeration system of the present invention, FIG. 2 is a flow chart diagram of defrost operation, and FIG.
FIG. 4 and FIG. 4 are refrigerant pipe system diagrams showing another embodiment, and FIG.
The figure is a schematic view showing a conventional example. (1) ...... Compressor (2) (3) ...... Condenser (4) ...... Evaporator (20) ...... Hot gas bypass passage (21) ...... Hot gas valve (30) ...... First opening / closing mechanism (First solenoid valve) (32) …… Second opening / closing mechanism (second solenoid valve) (33) …… Measuring section (34) …… Switching mechanism (three-way switching valve) (35) …… Introduction path

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】圧縮機(1)、凝縮器(2,3)、膨張機構
(5)及び蒸発器(4)を備えた冷凍装置において、前
記凝縮器(2,3)の下流側に、デフロストの開始指令に
より閉成して、前記凝縮器(2,3)を含む液溜め部に冷
媒を閉じ込める第1開閉機構(30)を設けると共に、該
第1開閉機構(30)の上流側に、前記液溜め部に閉じ込
めた冷媒のうち、デフロストに使用する冷媒の計量部
(33)を形成する第2開閉機構(32)を設ける一方、前
記計量部(33)における第2開閉機構(32)の下流側
に、前記圧縮機(1)の高圧ガス管(6a)から切換機構
(34)を介して分岐するホットガスの導入路(35)を接
続して、デフロスト時、前記導入路(35)を経由するデ
フロスト回路を形成したことを特徴とする冷凍装置。
1. A refrigeration system comprising a compressor (1), a condenser (2,3), an expansion mechanism (5) and an evaporator (4), downstream of the condenser (2,3), A first opening / closing mechanism (30) for closing the refrigerant in the liquid reservoir including the condenser (2, 3) is provided at the upstream side of the first opening / closing mechanism (30) by closing the defrosting start command. The second opening / closing mechanism (32) of the metering section (33) is provided while the second opening / closing mechanism (32) is provided which forms a metering section (33) of the refrigerant used for defrosting among the refrigerant trapped in the liquid storage section. ) Is connected to a hot gas introduction path (35) branched from the high-pressure gas pipe (6a) of the compressor (1) through a switching mechanism (34), and the introduction path (35) is defrosted. A refrigeration system characterized in that a defrost circuit passing through 35) is formed.
JP62335911A 1987-12-29 1987-12-29 Refrigeration equipment Expired - Lifetime JPH0752053B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP62335911A JPH0752053B2 (en) 1987-12-29 1987-12-29 Refrigeration equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP62335911A JPH0752053B2 (en) 1987-12-29 1987-12-29 Refrigeration equipment

Publications (2)

Publication Number Publication Date
JPH01179876A JPH01179876A (en) 1989-07-17
JPH0752053B2 true JPH0752053B2 (en) 1995-06-05

Family

ID=18293745

Family Applications (1)

Application Number Title Priority Date Filing Date
JP62335911A Expired - Lifetime JPH0752053B2 (en) 1987-12-29 1987-12-29 Refrigeration equipment

Country Status (1)

Country Link
JP (1) JPH0752053B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100566001B1 (en) * 2004-06-18 2006-03-30 위니아만도 주식회사 Defrosting control method of heat pump type air-conditioner in outdoor low temperature condition
KR20050120394A (en) * 2004-06-18 2005-12-22 위니아만도 주식회사 Heat pump type air-conditioner with improved defrosting structure
CN209246477U (en) * 2016-05-27 2019-08-13 三菱电机株式会社 Cooling unit
JP2022103988A (en) * 2020-12-28 2022-07-08 アクア株式会社 refrigerator

Also Published As

Publication number Publication date
JPH01179876A (en) 1989-07-17

Similar Documents

Publication Publication Date Title
EP1484561A1 (en) Heat pump type water heater
EP0123554A2 (en) Refrigeration unit
JPH05106922A (en) Control system for refrigerating equipment
EP1455145A1 (en) Heat pump type hot water supply device
JPH0752053B2 (en) Refrigeration equipment
JP3158787B2 (en) Operation control device for refrigeration equipment
JPH0554026B2 (en)
JPH01296066A (en) Refrigerator
JP2001033119A (en) Multi-room type air conditioner
JPH0536705B2 (en)
JPH0539411Y2 (en)
JPH01174868A (en) Refrigerator
JPH0610570B2 (en) Refrigeration equipment
JP2841708B2 (en) Refrigeration equipment
JPH0571862B2 (en)
JP2924057B2 (en) Refrigeration equipment
JPH0263152B2 (en)
JPH0539412Y2 (en)
JPH06341741A (en) Defrosting controller for refrigerating device
JPH0338515B2 (en)
JPH0571855B2 (en)
JP2500531B2 (en) Refrigeration system operation controller
JPH04356675A (en) Refrigerating apparatus
JPS63183359A (en) Refrigerator
JPH0752052B2 (en) Refrigeration equipment