JPH0738071U - Long object hanging tool - Google Patents

Long object hanging tool

Info

Publication number
JPH0738071U
JPH0738071U JP2806791U JP2806791U JPH0738071U JP H0738071 U JPH0738071 U JP H0738071U JP 2806791 U JP2806791 U JP 2806791U JP 2806791 U JP2806791 U JP 2806791U JP H0738071 U JPH0738071 U JP H0738071U
Authority
JP
Japan
Prior art keywords
long
long object
hoist
skid
twist lock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2806791U
Other languages
Japanese (ja)
Inventor
富士夫 相原
平康 甲斐
譲 神山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Mitsubishi Heavy Industries Ltd
Original Assignee
JFE Steel Corp
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Steel Corp, Mitsubishi Heavy Industries Ltd filed Critical JFE Steel Corp
Priority to JP2806791U priority Critical patent/JPH0738071U/en
Publication of JPH0738071U publication Critical patent/JPH0738071U/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)
  • Leg Units, Guards, And Driving Tracks Of Cranes (AREA)
  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

(57)【要約】 【目的】 本考案は、段積用スキッドビームの地上から
の吊上げ、及び下段鋼材上への並べ置き操作を自動化す
ることが可能な長尺物吊具を提供するものである。 【構成】 長尺物抱え機構2を備えた吊具の吊ビーム1
下面にI型走行軌条13を介し又は介さないで2個の連
動フックを有するホイスト3を設け、上記ホイスト3に
ツイストロック付き吊ビーム4を装備し、上記ツイスト
ロック付き吊ビーム4によりツイストロック受金24を
有するスキッドビーム5を着脱搬送操作するようにした
長尺物吊具。
(57) [Abstract] [Purpose] The present invention provides a long object hanging tool capable of automatically lifting the skid beams for stacking from the ground and arranging them side by side on a lower steel material. is there. [Structure] A hanging beam 1 of a hanging tool including a long object holding mechanism 2.
A hoist 3 having two interlocking hooks is provided on the lower surface with or without the I-type running rail 13, and the hoist 3 is equipped with a suspension beam 4 with a twist lock, and the suspension beam 4 with a twist lock is used to receive the twist lock. A long object hanging tool adapted to carry out the attachment / detachment operation of the skid beam 5 having the gold 24.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

本考案は長尺物吊具、特に長尺物段積用のスキッドビームを搬送操作する機能 を備えた長尺物吊具に関するものである。 The present invention relates to a long object hanging device, and more particularly to a long object hanging device having a function of transporting a skid beam for stacking long objects.

【0002】[0002]

【従来の技術】[Prior art]

鋼材等の長尺材を段付みしストックする場合、段付みする上下の長尺材の間に 枕木(スキッドビーム)をはさんで積重ねている。このスキッドビームの挿入は 、下廻りの地上作業者の人手により行なっている。 When long materials such as steel materials are stepped and stocked, sleepers (skid beams) are stacked between the upper and lower stepped long materials. This skid beam is inserted manually by the ground workers below.

【0003】[0003]

【考案が解決しようとする課題】[Problems to be solved by the device]

前述の従来技術には次のような問題点がある。 大径の鋼管など大型長尺材の段付みに用いるスキッドビームは、重量も大きく なり、人手だけでは取扱いが困難となる。従って、クレーンほかの機械力を併用 するが、時間が掛かり、非能率である。 The above-mentioned conventional technique has the following problems. The skid beam used for stepping large-sized long pipes such as large-diameter steel pipes becomes heavy and difficult to handle with only human hands. Therefore, although mechanical power of a crane or the like is used together, it takes time and is inefficient.

【0004】 また長尺材の運搬の方は自動化された吊具による遠隔制御で吊上げ、積降しさ れるが、吊具の下での地上作業であるから危険が大きい。 本考案は、上記した段積用スキッドビームの地上からの吊上げ、及び下段鋼材 上への並べ置き操作をすることが可能な長尺物吊具を提供することを目的とする ものである。[0004] In addition, when transporting a long material, it is hoisted and unloaded by remote control by an automated lifting tool, but it is dangerous because it is a ground work under the lifting tool. An object of the present invention is to provide a long object hanging tool capable of lifting the above-mentioned stack skid beam from the ground and arranging it side by side on a lower steel material.

【0005】[0005]

【課題を解決するための手段】[Means for Solving the Problems]

長尺物抱え機構を備えた吊具の下面に、走行軌条を介してホイストを設け、上 記ホイストにより、スキッドビームを着脱搬送操作する。 A hoist is provided on the lower surface of the suspension equipped with a long object holding mechanism via a traveling rail, and the skid beam is attached and detached by the hoist.

【0006】[0006]

【作用】[Action]

長尺物の段積みストック場所には、あらかじめ地上に最下段の長尺材を受ける スキッドビームが固定配置されている。走行クレーンの横行トロリーに吊下げた 長尺物吊具は、クレーン運転室からの遠隔制御で、ヤード内の製品溜り場から所 定数の長尺材を抱え上げ、段積みストック場所へ移動し、地上のスキッドビーム 上に遠隔制御で積付ける。長尺物吊具からホイストを降下し、段積みストック場 沿いに段積みされたスキッドビーム上に位置合せ結合させて吊上げ、ホイストの 移動又はクレーンの横行トロリーの移動で、上記スキッドビームを地上の積付け られた長尺物上の一定の間隔位置に着床させ、遠隔解放させる。再びクレーンを ヤード内製品溜り場へ戻し、同様の順序で長尺材を段積みストック場へ運搬し、 第2段、第3段の段積みを行なう。 At the stock location for stacking long objects, a skid beam for receiving the longest material at the bottom is fixedly placed on the ground in advance. The long object hanging equipment hung on the traverse trolley of the traveling crane is controlled remotely from the crane operator's cab, holds a certain amount of long material from the product storage area in the yard, moves it to the stacking stock location, and Remotely stow on the skid beam of. The hoist is lowered from the long object hanging equipment, aligned and coupled on the skid beam stacked along the stacking stock field, and hoisted.By moving the hoist or the traverse trolley of the crane, the skid beam is grounded. It is landed at fixed intervals on the loaded long objects and released remotely. The crane is returned to the product storage area in the yard again, and the long materials are transported to the stacking stock area in the same order, and the second and third stacking operations are performed.

【0007】[0007]

【実施例】【Example】

以下、本考案の好ましい実施例について説明する。 図1は本考案にかかる長尺物吊具の実施例の正面、図2、図3は平面と側面を 示す。図において、吊具は、図示しないクレーンのトロリーに巻上索10及びシ ーブ11を介し吊下げた吊ビーム1の両端に夫々一対の旋回フォーク12を持つ 長尺物抱え機構2,2を備えた既存の自動化された部分と、吊ビーム1下面に固 着したI型軌条13,13を走行するように設けた2ケの連動フックを有する型 のホイスト3と、ホイスト3に吊支え装着したツイストロック付き吊ビーム4, 4とからなるものを示している。既存の吊ビーム1及び抱え機構2部分は、他の 構成のものが組合せ使用されて良い。2ケの連動フック型ホイスト3,3は、軌 条13を介さず吊ビーム1下面1乃至2ケ固定して設けられても良く、又軌条1 3を設ける場合にも、軌条13の配列は、直線だけの場合、十字形に交叉させて 中央に旋回切換え軌条を設ける場合など任意の配置とされて良いものである。 Hereinafter, a preferred embodiment of the present invention will be described. FIG. 1 is a front view of an embodiment of a long object hanging device according to the present invention, and FIGS. 2 and 3 are plan and side views. In the figure, the hoisting tool includes long object holding mechanisms 2 and 2 each having a pair of turning forks 12 at both ends of a hoisting beam 1 suspended from a hoisting rope 10 and a sheave 11 on a trolley of a crane (not shown). An existing automated part equipped with it, a hoist 3 of a type having two interlocking hooks provided so as to travel on the I-shaped rails 13, 13 fixed to the lower surface of the suspension beam 1, and a hoist 3 is mounted with a suspension support. A suspension beam with twist locks 4 and 4 is shown. The existing suspension beam 1 and the holding mechanism 2 part may be used in combination with other configurations. The two interlocking hook type hoists 3 and 3 may be fixedly provided to the lower surface 1 to 2 of the hanging beam 1 without the rail 13, and when the rails 13 are provided, the arrangement of the rails 13 is not necessary. In the case of only a straight line, an arbitrary arrangement may be adopted such as a case where a crossover is crossed and a turning switching rail is provided in the center.

【0008】 図1乃至図3に戻って、抱え機構2,2は、図1、図2に示すフォーク12の 向きで各抱え機構2が長尺材を跨ぐように降下され、床に置かれた長尺材の下側 空隙高さ位置をセンサが検出して、フォーク12を図3で示すように旋回し、抱 え機構2,2の上昇で長尺物を持上げる。14はフォーク12に抱えた長尺鋼管 、14aは最も大径の長尺鋼管の場合である。長尺材14を降すときは抱え手段 2の降下着床をセンサが検出し、軟着床させ、フォーク12が長尺材14から下 へ離れたことが検出されてフォーク12が図2の位置へ戻され、抱え機構2を上 昇させて長尺材14の積置きを終える。軌条13は、図では吊ビーム1の両端側 で軸線方向に延び、吊ビーム1中央部で幅方向へ彎曲し突出す配置に、対称な2 条の軌条13,13を設け、各軌条13上に夫々1台ずつホイスト3及びツイス トロック付き吊ビーム4を設けた。Returning to FIG. 1 to FIG. 3, the holding mechanisms 2 and 2 are lowered so that each holding mechanism 2 straddles the long member in the direction of the fork 12 shown in FIGS. 1 and 2 and placed on the floor. The sensor detects the position of the lower side void height of the long material, the fork 12 is turned as shown in FIG. 3, and the holding mechanisms 2 and 2 are lifted to lift the long material. Reference numeral 14 is a long steel pipe held in the fork 12, and 14a is a long steel pipe having the largest diameter. When the long member 14 is lowered, the sensor detects the landing of the holding means 2 to softly land it, and it is detected that the fork 12 has been separated from the long member 14 and the fork 12 of FIG. It is returned to the position, the holding mechanism 2 is raised, and the stacking of the long members 14 is completed. The rails 13 extend in the axial direction at both ends of the suspension beam 1 in the figure, and are provided with two symmetrical rails 13 and 13 in a configuration in which the suspension beam 1 bends and projects in the width direction at the center of the suspension beam 1. A hoist 3 and a suspension beam 4 with a twist lock were provided for each of them.

【0009】 図4はツイストロック付き吊ビーム4の実施例を示す。ツイストロック付き吊 ビーム4は、十字形に結合した上下2本のIビーム15,16を本体部材とし、 下部ビーム16両端にツイストロック17,17を備え、操作シリンダ18の伸 縮で2ケのツイストロック17,17を90°旋回させる。下部ビーム16下面 には、コーン形の突出ガイド19を設け、上部ビーム15上に設けたブラケット 20を介し、ホイスト3の2ケのフックシーブ21に吊支えている。図5には、 上記ツイストロック付き吊ビーム4により、着脱搬送できるようにしたスキッド ビーム5を示し、中空の角形鋼材22上面に上記コーン形ガイド19と整合する ガイド孔23及びツイストロック受金(受け孔)24を設けている。スキッドビ ーム5を木製するときにはメタル製のガイド孔23及びツイストロック受金24 を埋設して取付ければ良い。FIG. 4 shows an embodiment of the suspension beam 4 with a twist lock. The suspension beam 4 with a twist lock has upper and lower two I-beams 15 and 16 connected in a cross shape as a main body member, is equipped with twist locks 17 and 17 at both ends of the lower beam 16, and the operation cylinder 18 can be extended and retracted to form two beams. Turn the twist locks 17, 17 by 90 °. A cone-shaped protruding guide 19 is provided on the lower surface of the lower beam 16, and is suspended and supported by two hook sheaves 21 of the hoist 3 via a bracket 20 provided on the upper beam 15. FIG. 5 shows a skid beam 5 which can be detached and conveyed by the suspension beam 4 with a twist lock, and a guide hole 23 and a twist lock bracket (which are aligned with the cone type guide 19 on the upper surface of a hollow square steel material 22). A receiving hole) 24 is provided. When the skid beam 5 is made of wood, a metal guide hole 23 and a twist lock bracket 24 may be embedded and attached.

【0010】 図6は、大径の鋼管長尺物14を一例として多段積みするストック場の構成例 である。25…は一定間隔で設けた荷崩れ防止用のスタンション、5はストック 場沿いにガイド26内に積重ねて置かれたスキッドビーム、5Bはスタンション 25に接してストック場を横切る方向へ地上に設けてあるスキッドビーム、5− 1,5−2はストック場に置かれた1段の長尺鋼管列の上、2段目の長尺鋼管列 の上に順に置場から運び上げて横置きしたスキッドビームである。FIG. 6 shows an example of the configuration of a stock field in which long steel pipes 14 having a large diameter are stacked in multiple stages as an example. Numerals 25 ... are stanchions for preventing load collapse provided at regular intervals, 5 are skid beams stacked in the guide 26 along the stock field, and 5B are provided on the ground in a direction crossing the stock field in contact with the stanchion 25. One skid beam, 5-1 and 5-2, are skid beams that are carried from the yard to the second row of long steel pipes in the stock field and then placed horizontally. Is.

【0011】 図7は、図6で示した長尺材ストック場を対象とし、図1乃至図3で示した長 尺物吊具により長尺物の段積み、スキッドビーム5の運搬配置を行なう要領を示 す。図において、長尺鋼管14、4個の1段目14−1は、前述した抱え機構2 の昇降と旋回フォーク12の操作で、ヤード内の製品溜りから図のストック場へ 運ばれスタンション25…内に降下して地上のスキッドビーム5B上に置かれる 。FIG. 7 is intended for the long material stock field shown in FIG. 6, and stacks long objects by the long object suspension tool shown in FIGS. 1 to 3 and carries the skid beam 5 for placement. Show the point. In the figure, the long steel pipes 14 and the first four stages 14-1 are carried from the product pool in the yard to the stock field in the figure by the lifting and lowering of the holding mechanism 2 and the operation of the turning fork 12 described above. It descends inside and is placed on the skid beam 5B on the ground.

【0012】 抱え機構2が、長尺鋼管14−1列を離した状態で、2台のホイスト3,3を 軌条13,13の突出部へ移動させ、この位置でツイストロック付き吊ビーム4 ,4を地上に積重ね置かれたスキッドビーム5の1つ5−1上に降下し、遠隔制 御下でツイストロック17を結合させ吊具全体をスタンション25より若干上の 高さへ上昇させ、同時に抱え機構2のフォーク12を抱え位置に旋回し、かつホ イスト3,3をそれぞれ吊ビーム1の両端寄り位置へ移動させる。ホイスト3の この移動で、スキッドビーム5−1は、吊ビーム1とクロスする方向へ90°向 きが換わり、トロリーの僅かな前進横行で前方のホイスト3をスタンション25 内側に位置合せし、ツイストロック付き吊ビーム4を降下させて、スキッドビー ム5−1を1段目長尺鋼管14−1上に置き、同様にトロリーを後進して後方の ホイスト3を後方スタンション25内側へ位置合わせし、長尺鋼管列14−1上 に他のスキッドビーム5−1を置く。The holding mechanism 2 moves the two hoists 3 and 3 to the protruding portions of the rails 13 and 13 in a state where the long steel pipes 14-1 row are separated, and at this position, the suspension beam 4 with a twist lock. 4 is dropped on one of the skid beams 5 stacked on the ground 5-1 and the twist lock 17 is connected under remote control to raise the entire lifting equipment to a height slightly above the stanchion 25, and at the same time. The forks 12 of the holding mechanism 2 are swung to the holding position, and the hoists 3 and 3 are moved to positions near both ends of the hanging beam 1, respectively. With this movement of the hoist 3, the skid beam 5-1 changes its direction by 90 ° in the direction crossing the suspension beam 1, and the forward hoist 3 is aligned with the inside of the stanchion 25 by a slight forward traverse of the trolley. The suspension beam with lock 4 is lowered, the skid beam 5-1 is placed on the first-stage long steel pipe 14-1, and similarly the trolley is moved backward to align the rear hoist 3 inside the rear stanchion 25. , Another skid beam 5-1 is placed on the long steel pipe array 14-1.

【0013】 ツイストロック付き吊ビーム4,4を上限まで上昇させフォーク12を開き位 置へ戻して、クレーンがヤード内の製品溜りへ移動し、第2段目の長尺鋼管14 −2列を抱えて上記鋼管段積ストック場へ運び、スタンション25内へ鋼管14 −2を降し、前記と同様に、2段目鋼管14−2列上に次のスキッドビーム5− 2を載せる作業を繰返えす。The suspension beams 4 and 4 with twist locks are lifted to the upper limit, the forks 12 are returned to the open position, the crane moves to the product pool in the yard, and the second long steel pipe 14 -2 row is moved. Carrying it to the above-mentioned steel pipe stack stock field, dropping the steel pipe 14 -2 into the stanchion 25, and repeating the work of placing the next skid beam 5-2 on the second stage steel pipe 14-2 row in the same manner as above. Return.

【0014】 上述した図6の長尺材段積みストック場の構成の違い、例えばスキッドビーム 5の地上置き場が長尺材の端部側であったり、向きが変ったりすると、それに合 わせて、吊具上の軌条13の配置、及び図7の操作要領も適当に変更することが 必要となる。 なお、スキッドビームを吊り上げる機構としては、ツイストロックに限らず掴 み式、吸着式等の他の機構でも可能である。[0014] Differences in the configuration of the long material stacking stock field in Fig. 6 described above, for example, if the above-ground storage site of the skid beam 5 is on the end side of the long material or if the orientation is changed, It is necessary to appropriately change the arrangement of the rails 13 on the hanger and the operating procedure of FIG. The mechanism for lifting the skid beam is not limited to the twist lock, and other mechanisms such as a grip type and a suction type can be used.

【0015】 例示した構成によれば自動化された長尺材吊具を使用し、長尺材運搬と連続し た工程の中で、段積みされた長尺材上へのスキッドビームの運搬配置操作を遠隔 制御下で安全に自動化作業で行なえるようになり、この種作業に存在した危険を 解消し能率を高めることができる。According to the illustrated configuration, an automated long material suspender is used, and the operation of transporting the skid beam onto the stacked long materials in the continuous process of transporting the long materials. Can be performed safely by automated work under remote control, eliminating the dangers present in this kind of work and increasing efficiency.

【0016】[0016]

【考案の効果】[Effect of device]

本考案による長尺物吊具は、長尺物抱え機構を備えた吊具の吊ビーム下面に走 行軌条を介してホイストを設け、上記ホイストにより、スキッドビームを着脱搬 送操作するよう構成したことにより、次の効果を有する。 吊具を使用する長尺材の運搬と連続した工程の中で、同じ吊具を用い、段積み された長尺材上へスキッドビームの運搬、配置操作を遠隔制御下で行なえるよう になり、従来の地上作業を省力化し、危険作業を解消し、長尺材の運搬、ストッ ク作業の能率を著しく高めることができる。 The long object hanging device according to the present invention is configured such that a hoist is provided on the lower surface of the hanging beam of the hanging device having the long object holding mechanism via a traveling rail, and the skid beam is detachably carried by the hoist. This has the following effects. In the continuous process of transporting long materials using suspension equipment, the same suspension equipment can be used to transport and arrange skid beams on stacked long materials under remote control. In addition, the labor of conventional ground work can be saved, dangerous work can be eliminated, and the efficiency of long material transportation and stock work can be significantly improved.

【図面の簡単な説明】[Brief description of drawings]

【図1】本考案長尺物吊具の実施例の正面図である。FIG. 1 is a front view of an embodiment of a long object hanging device according to the present invention.

【図2】図1の平面図である。FIG. 2 is a plan view of FIG.

【図3】図1の側面図である。FIG. 3 is a side view of FIG.

【図4】図1に示したツイストロック付き吊ビームの拡
大図である。
FIG. 4 is an enlarged view of the suspension beam with a twist lock shown in FIG.

【図5】図4に示したスキッドビームの斜視図である。5 is a perspective view of the skid beam shown in FIG. 4. FIG.

【図6】長尺材の段積みストックを示す斜視図である。FIG. 6 is a perspective view showing a stack stock of long materials.

【図7】図6に示した長尺材の段積みストックを行う要
領図である。
FIG. 7 is a diagram showing how to stack the long materials shown in FIG.

【符号の説明】[Explanation of symbols]

1 吊ビーム 2 長尺物抱え機構 3 ホイスト 4 ツイストロック付き吊ビーム 12 旋回フォーク 13 I型軌条 1 Suspended Beam 2 Long Object Holding Mechanism 3 Hoist 4 Suspended Beam with Twist Lock 12 Turning Fork 13 I-type Rail

───────────────────────────────────────────────────── フロントページの続き (51)Int.Cl.6 識別記号 庁内整理番号 FI 技術表示箇所 B66C 11/06 13/08 L (72)考案者 甲斐 平康 愛知県知多市川崎町1丁目1番地 川崎製 鉄株式会社知多製作所内 (72)考案者 神山 譲 愛知県知多市川崎町1丁目1番地 川崎製 鉄株式会社知多製作所内─────────────────────────────────────────────────── ─── Continuation of the front page (51) Int.Cl. 6 Identification number Internal reference number FI technical display location B66C 11/06 13/08 L (72) Creator Heiyasu Kai 1-chome, Kawasaki-cho, Chita-shi, Aichi Address Kawasaki Steel Co., Ltd. Chita Works (72) Inventor Yu Kamiyama 1-1, Kawasaki-cho, Chita City, Aichi Prefecture Kawasaki Steel Co., Ltd. Chita Works

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 長尺物抱え機構を備えた吊具の吊ビーム
下面に走行軌条を介してホイストを設け、上記ホイスト
により、スキッドビームを着脱搬送操作するよう構成し
たことを特徴とする長尺物吊具。
1. A long object characterized in that a hoist is provided on a lower surface of a hanging beam of a hanging tool provided with a long object holding mechanism via a traveling rail, and the skid beam is detachably conveyed by the hoist. Hanging equipment.
JP2806791U 1991-04-23 1991-04-23 Long object hanging tool Withdrawn JPH0738071U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2806791U JPH0738071U (en) 1991-04-23 1991-04-23 Long object hanging tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2806791U JPH0738071U (en) 1991-04-23 1991-04-23 Long object hanging tool

Publications (1)

Publication Number Publication Date
JPH0738071U true JPH0738071U (en) 1995-07-14

Family

ID=12238423

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2806791U Withdrawn JPH0738071U (en) 1991-04-23 1991-04-23 Long object hanging tool

Country Status (1)

Country Link
JP (1) JPH0738071U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012111609A (en) * 2010-11-25 2012-06-14 Kajima Corp Operation method of fixed cable crane
CN114249233A (en) * 2021-12-27 2022-03-29 广东南桂起重机械有限公司 Special oxidation crane with auxiliary hook
CN116715133A (en) * 2023-08-11 2023-09-08 天津三号线轨道交通运营有限公司 Steel rail hoisting lifting appliance with adjustable lifting point

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012111609A (en) * 2010-11-25 2012-06-14 Kajima Corp Operation method of fixed cable crane
CN114249233A (en) * 2021-12-27 2022-03-29 广东南桂起重机械有限公司 Special oxidation crane with auxiliary hook
CN114249233B (en) * 2021-12-27 2024-06-07 广东南桂起重机械有限公司 Special oxidation crane with auxiliary hook
CN116715133A (en) * 2023-08-11 2023-09-08 天津三号线轨道交通运营有限公司 Steel rail hoisting lifting appliance with adjustable lifting point
CN116715133B (en) * 2023-08-11 2023-11-24 天津三号线轨道交通运营有限公司 Steel rail hoisting lifting appliance with adjustable lifting point

Similar Documents

Publication Publication Date Title
US3827744A (en) Process and apparatus for handling bulk building materials at construction sites
US3680715A (en) Building materials transporting and handling apparatus
JPH0738071U (en) Long object hanging tool
CN208700406U (en) A kind of lifting pallet fork
CN202924636U (en) Multi-purpose crane
US3861546A (en) Apparatus for lifting wallboard into multi-story buildings
CN209760046U (en) Transport support and transport device
JPH06166438A (en) Controller for pallet in gantry crane
CN210286531U (en) Steel coil ferry railcar
CN210708399U (en) Independent combined type three-dimensional bracket for storing semi-finished steel bars
JP3180203B2 (en) Material lifting assembly equipment used for construction of high-rise structures
CN212387560U (en) Hoisting device for assembly type building
CN113319998A (en) Prefabricated superimposed sheet production system
CN113104720A (en) Automatic feeding device for wire steel bars
CN215905702U (en) Construction site turnover hoisting moving frame
CN218665264U (en) Transportation device is assisted in brickwork material hoist and mount
CN220363377U (en) Hanging material carrying device for construction
CN213950406U (en) Simple heavy object hoisting and moving device
AU2016277682A1 (en) Transport Device
CN214733943U (en) Snatch hoist and building hoisting accessory
CN214653052U (en) Mobilizable regularization lifting device
CN109536659A (en) A kind of discarded steel slag transfer pushes away the slag car
CN107720549A (en) A kind of rail shipment method and special hanger
JP2024044263A (en) How to move sling aids and long objects
JPH0738068U (en) Long steel hoist

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 19950713